Вы находитесь на странице: 1из 2

Attachment 28_(SECL-PIP032) Ultrasonic Examination Report

No.:
ULTRASONIC EXAMINATION Page_____of____
REPORT Job No:
Eni Iraq b.v. Date:
Project Name: Subcontractor Name:
Request No.: ISO DWG. No:
Procedure No Test Package No.:
Material: Thickness:
Acceptance Criteria:
Instrument Probe
Manufacturer: Angle 0° 45° 60° 70°
Model Name: Manufac
Type: Model
S/N Type
Calibration
Due Date: S/N
Calibration Block Freq.
Kind Type Material Thickness Size
Standard Couplant
Reference Oil □ Gel □ C.M.C. □ Glycerin □
Primary Reference Level (dB) Scanning Level (dB)

Screen Height Linearity Amplitude Control Linearity

Within ± ___% of FSH


Surface Condition As Ground □ As Weld □
As Casting □ As Machined □ Test Temperature

Notes / Sketches:

Attachment __________ Yes __________ No


SUBCONTRACTOR CONTRACTOR
EXAMINED APPROVED WITNESSED APPROVED
BY BY BY BY COMPANY

NAME

POSITION

SIGNATURE/ DATE
SECL-PIP032 REV.0 SAMSUNG ENGINEERING CO.LTD.
Attachment 28_(SECL-PIP032) Ultrasonic Examination Report
No.:
(continuation sheet) Page____of___
ULTRASONIC EXAMINATION Job No:
Eni Iraq b.v.
REPORT Date:
Project Name Subcontractor Name:
Request No.: ISO DWG. No:
Procedure No Test Package No.:
Material: Thickness:
Weld Dia Thickness Depth Location Level (Accept /
S/N ISO DWG No. Joint No Welder ID (Inch) (SCH) (mm) Length (0 to mm) (%) Reject)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
“DEFECT CODE”
N: NONE CR:CRACK UC:UNDER CUTTING EP:EXCESS PENETRATION R-UC:ROOT UNDER CUT
SD:SURFACE DEFECT IP:INCOMPLETE PENETRATION RC:ROOT CONCAVITY DB:DEBRIS
LF:LACK OF FUSION BT:BURN THROUGH
SUBCONTRACTOR CONTRACTOR
EXAMINED APPROVED WITNESSED APPROVED
BY BY BY BY COMPANY
NAME
POSITION
SIGNATURE/ DATE
SECL-PIP032 REV.0 SAMSUNG ENGINEERING CO., LTD