600
Base D
500
600
Base A
0.00
Compacted back fill
-200
Compacted back fill
200
NOTES 1.1. PRECOUSION FOR THE SOIL EROSION SHOULD BE GET CONSIDERING ALL AREA OF SITE. 1.3. The average excavation depth should not be lower than 2000mm in sloped area 1.3. Slope area should be covered with 6"x4"Rubble packing or Turfing to avoid soil Erosion .
X1
X1
e Rubbl
2250
Pitch
ing
Compacted back fill line of excavation Compacted back fill
2300
-2250
EGL
T10@150
line of excavation
T10@150 squre
150
X1
X1
HARD SOIL
T16 @200 B1
line of excavation
2100
2800
line of excavation
T10@150 squre
T10@150
HARD SOIL
T16 @200 B1 T16 @200 B2 1400
450
150
400
450
2800
SOORIYAARACHCHI ASSOCIATE
58C ,WEERAMAWATHA, KALALGODA, PANNIPITIYA.
COLUMN DETAIL
T16 T16
FL : 0.00
600
T20
LIONEL GUNAWICKREMA
B.Sc (Eng.), C(Eng.) MIE(SL) ,MSSE(SL), PG.Dip. in Str. Eng. Design
600
2T12
T20 T16
T10@300
FOUNDATION LAYOUT PLAN
T20
T10@150 T16
T20
X1-X1