FOOTING DETAIL

Base plate and Anchor bolt as Tower Supplier detail

600

Base D
500

FFL Compacted back fill

Base plate and Anchor bolt as Tower Supplier detail

600

Base A

0.00
Compacted back fill

-200
Compacted back fill

200

NOTES 1.1. PRECOUSION FOR THE SOIL EROSION SHOULD BE GET CONSIDERING ALL AREA OF SITE. 1.3. The average excavation depth should not be lower than 2000mm in sloped area 1.3. Slope area should be covered with 6"x4"Rubble packing or Turfing to avoid soil Erosion .

X1

X1

e Rubbl
2250

Pitch

ing
Compacted back fill line of excavation Compacted back fill

2300

-2250

EGL

T12 @200 T1/T2

T10@150

line of excavation

T10@150 squre

150

X1

X1

HARD SOIL
T16 @200 B1
line of excavation

T16 @200 B2 1400

2100

Compacted back fill

Compacted back fill

2800
line of excavation

T10@150 squre

SECTION THROUGH LEG A AND D

T12 @200 T1/T2

T10@150

400 150 150

HARD SOIL
T16 @200 B1 T16 @200 B2 1400

450

150

400

450

2800

DIALOG AXIATA PLC


8027
475,UNION PLACE COLOMBO 02,SRILANKA.

SOORIYAARACHCHI ASSOCIATE
58C ,WEERAMAWATHA, KALALGODA, PANNIPITIYA.

TIE BEAM DETAIL


250
4T16 T10@200

COLUMN DETAIL
T16 T16

FL : 0.00

600
T20

LIONEL GUNAWICKREMA
B.Sc (Eng.), C(Eng.) MIE(SL) ,MSSE(SL), PG.Dip. in Str. Eng. Design

600

2T12

T20 T16 T20 T16 T20 T16 T20 T16

T20 T16

2T12 T10@300-midle 4T16

T10@300
FOUNDATION LAYOUT PLAN

T20

T10@150 T16
T20

X1-X1