W A T E R R E M E D Y (PVT) LTD. LAHORE

REVERSE OSMOSIS PLANT MODEL RA-0606 3 -- D.I START-UP OPERATION Check the water level in product tank if there is sufficient water level then start the D.I operations according to the fallowing steps 1) Open valve # 8 and 11 to start the D.I process 2) On Auto booster pump Turn into the Auto mode from main control panel 3) Adjust the D.I Water Flow at (6m3/hr) through valve # 8 4) Checked the conductivity on line meter Sr.No 1 2 3 4 5 6 7 8 9 10 11 12 13 Operation Back Washing Settling Resin Step I Caustic Injection(50%),60-70kg Caustic Slow Rinse HCL Injection (30%)70-90 kg HCL Slow Rinse Rapid Rinse Drain Down Air Scouring.(Ro Plant Off) Settle Step II Water Filling Fast Rinse Services Valve. No 1,2 All Valve Close 3,4,5 3,4 4,6,7 4,6 1,4,8 --2,9 All Valve Close 2,8 8,10 8,11 Time 10 Min 02 Min 20 Min 25 Min 20 Min 25 Min 10 Min --10 Min 02 Min 02 Min 30 Min --------Pump ON OFF ON ON ON ON ON --OFF OFF OFF ON
pH --pH pH pH pH

pH of Wat

12.0-12

8.0-8.

1.0-1.

3.0-3.

5.0-6.

Вам также может понравиться