Вы находитесь на странице: 1из 3

3

CATCH BASIN RETROFIT WITH PERVIOUS CONCRETE

1 Manufacturer: Whitacre Greer

Permeable Boardwalk Paver

Shade Tree

2 Manufacturer: Uni-Group
6

Permeable Paver

3 Pervious Concrete

2 1

PAVERS TYPE B PAVERS TYPE A BOLLARDS

GREAT LAKES MALL FOOD COURT ENTRANCE 6


Bioswale Plant Examples

4 Bollards

Entry Promenade Plan

Great Lakes Mall Green Infrastructure Planning Study City of Mentor | Simon Property Group | Chagrin River Watershed Partners Funding Source: Ohio Lake Erie Commission | Lake Erie Protection Fund

Environmental Design Group


July 5, 2012
PMS 295 Blue PMS 357 Green Font Myriad Pro Semi-Bold

SHADE TREES PERMEABLE PAVERS BIOSWALE PLANTS (GRASSES & PERENNIALS) YARD DRAIN BIOSWALE SOIL SAWTOOTH OR FLUSH CURB INLET

EXISTING ASPHALT EXISTING SOILS

PERFORATED PIPE OPEN AGGREGATE (#57) TO CATCH BASIN

Porous Promenade Section

Great Lakes Mall Green Infrastructure Planning Study City of Mentor | Simon Property Group | Chagrin River Watershed Partners Funding Source: Ohio Lake Erie Commission | Lake Erie Protection Fund

Environmental Design Group


July 5, 2012
PMS 295 Blue PMS 357 Green Font Myriad Pro Semi-Bold

PERVIOUS CONCRETE STANDARD ASPHALT

, ES RI BY Y VA D H INE TUD T M D S WI TER GE A DE AIN 14 DR 10

6 LAYER OF PERVIOUS CONCRETE COLLAR EXISTING CATCH BASIN

DIRTY WATER FROM PARKING LOT

#57 CLEAN STONE BACKFILL

EXISTING ASPHALT EXISTING SOIL 6 PERF. PIPE #57 CLEAN STONE BACKFILL 6 PERF. PIPE CLEAN WATER LEAVING THE SYSTEM SANDY SOILS AXON
Not to Scale

FILTER FABRIC

SECTION

Not to Scale

Pervious Concrete Collar Retrofit

Great Lakes Mall Green Infrastructure Planning Study City of Mentor | Simon Property Group | Chagrin River Watershed Partners Funding Source: Ohio Lake Erie Commission | Lake Erie Protection Fund

Environmental Design Group


July 5, 2012
PMS 295 Blue PMS 357 Green Font Myriad Pro Semi-Bold

Вам также может понравиться