Вы находитесь на странице: 1из 26
Po2.ore Washington Metropolitan Area Transit Authority Point of Sale Network and Extension Options Technical Proposal March 21, 2002 @cusic 7 TRANSPORTATION: Y SYSTEMS, IN INC. 5850 Koamy Mesa Road ‘Sen Dioge, GA aett Abcohment-C Table of Contents aaa INTRODUCTION... 44 SCOPE OF THE WORK. POS TERMINAL, General, Functional SPECIFICATIONS 22 POS TERMINAL SPECIMCATIONS 23 PERFORIANCE 24 POS TERMINAL Sta TRIP PERFORMANCE REGUREMENTS. 2 POS Temanal REQUiREMENTS ba Hor Cao List Donnoans AND Garo LOGinG. 24 POS NETWORK CONTROLLER, 28 POS NETWORK CONTROLLER EXTENSION OPTIONS. NETWORK CONTROLLER CAPACITY ANALYSIS ADDITIONAL REPORTING. DEBIT AND CREDIT TRANSACTION PROCESSING, TRANSIT APPLICATION MANAGEMENT [SYSTEM MONITORING. AUTOLOAD, ‘ThesHoL0-BAsED ALTOLoAD Feo PERIOD RECURRING LOAD AND PREPAD BENEFITS MANAGEMENT APPLICATION 3-10 PREPAID BENEFITS, ot ‘SYSTEM SUPPORT FOR THESE PROGRAMS. 342 Device PRocessina 342 Horus PRocessiNG Cranes 313 DATA ENHANCEMENT. 316 ‘ANOMALOUS LOAD DETECTION 315 Fie CusToweR SERVES, 316 WMATA MAINFRAME SOFTWARE CHANGES. a7 DEPOT MAINTENANCE AND APPLICATION SUPPORT a7 DEPOT MaNTENANCE, a7 [APPLICATION SUPPORT. a7 Table of Contents (Continued) LIST OF ILLUSTRATIONS Figure 1-1, POS Network Architecture 42 Figure 2-1. POS Terminal and PIN Pad. 22 Figure 3-1. MTA Configuration, a4 Figure 3-2. Autoload Processing - Threshold Load 28 Figuce 3-3. Autoload Processing -Dreciod Load 39 Figure 84. Autoload Processing - Fld Period Recuring Loads. 340 Figure 35. Doviee Processing of Card Transactions 32 Figure 38. Holle Processing Enhancements, 3.43 Figure 3:7. Data Enhancement 314 Figure 38 WMATA Autoload Processing Anomalous Load Detection and Corecton 345 Figure 39. WMATA Autoload Processing Station Manager Query Processing, 316 LIST OF TABLES Table 3-1. Detailed Configuration of the Server for MTA Bus Program. 32

Вам также может понравиться