Академический Документы
Профессиональный Документы
Культура Документы
ATG COVERS
REFINERY TANK FARM RAW-MATERIAL TANKS - 07 INTERMEDIATE STORAGE TANKS - 25 BLEND-COMPONANT TANKS - 09 FINISHED PRODUCT TANKS - 55 MARINE TANK FARM RAW MATERIAL TANKS - 16 FINISHED PRODUCT TANKS - 27 ROAD / RAIL TANK FARM RAW MATERIAL TANKS - 04 FINISHED PRODUCT TANKS - 18 UNIT DAY TANKS AROMATIC TANKS - 04 SULPHUR TANKS - 04 UTILITY / CPP TANKS - 08
WHITE & BLACK OILS WITH DIFFERENT GAUGE HEAD. MEETING CUSTODY TRANSFER REQUIREMENTS PROVEN FOR INTERFACING WITH FOXBORO.
RADAR LEVEL GAUGE MULTI SPOT TEMPERATURE PROBE SINGLE SPOT TEMPERATURE PROBE BOTTOM WATER LEVEL PROBE VAPOUR/N2 PRESSURE TRANSMITTER HYDROSTATIC PRESSURE TRANSMITTER DATA ACQUISITION UNIT INDIPENDENT DISPLAY UNIT FIELD COMMUNICATION UNIT FIELD BUS MODEM OPI STATION
RTG2920
RTG2930
FOR FIXED ROOF INSTALLATION WITHOUT STILL PIPE FOR STICKY AND CONDENSING PRODUCT.
RTG2940
RTG2960
WORKING ON FREQUENCY MODULATED CONTINUOUS WAVE (FMCW) FREQUENCY: 9.7 TO 10.3 GHz RESIDE INSIDE TRANSMITTER HEAD SAME ELECTRONICS HEAD IRRESPECTIVE OF ANTENNA TYPE CARDS INSIDE
POWER SUPPLY CARD COMMUNICATION CARD SIGNAL PROCESSING CARD CURRENT LOOP CARD BARRIER UNIT
SYSTEM INTERFACING
ACCURACY
LEVEL :- +/- 1 mm BOTTOM WATER LEVEL :- +/- 3 % OF FULL
RANGE. TEMPERATURE :- +/- 0.1 deg C HYDROSTATIC PRESSURE:- +/- 0.1 % OF FULL SCALE STATIC PRESSURE:- +/- 0.1 % OF FULL SCALE
INTERNAL FLOATING ROOF WITH N2 BLANKET - FOR CUSTODY TRANSFER - 1C INTERNAL FLOATING ROOF WITH N2 BLANKET - NOT FOR CUSTODY TRANSFER - 1N CONE ROOF WITH N2 BLANKET - FOR CUSTODY TRANSFER - 2C CONE ROOF WITH N2 BLANKET - NOT FOR CUSTODY TRANSFER - 2N CONE ROOF-FOR CUSTODY TRANSFER - 3C CONE ROOF-FOR CUSTODY TRANSFER - 3N OPEN FLOATING ROOF -FOR CUSTODY TRANSFER-4C OPEN FLOATING ROOF -FOR CUSTODY TRANSFER-4N SPHERE - SC
SPHERE - SC