CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS

REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE CLIENT CONTRACT REFERENCE LOCATION AIT PMT REPRESENTATIVE/RESIDENT ENGINEER AIT SITE REPRESENTATIVE / CSR AIT HSE OFFICER AMSB SITE MANAGER AMSB CONSTRUCTION MANAGER AMSB SITE PROJECT ENGINEER AMSB FIELD ENGINEER AMSB SAFETY OFFICER 01. SAFETY / MANHOUR REPORT PREVIOUS TOTAL MANHOURS WORKED (AMSB/HSAP) (Start from FILL UP PRE-MOB DATE) TOTAL MANHOURS WORKED (AMSB/PVSB) (Start from FILL UP PRE-MOB DATE) TOTAL MANHOURS WORKED (AIT) NUMBER OF LOST WORKDAYS ( FOR LTI's ) NUMBER OF RESTRICTED WORK CASES ( RWC's ) NUMBER OF MEDICAL, TREATMENT CASES ( MTC's ) NUMBER FIRST AID TREATMENT CASES ( FTC's ) NUMBER OF FIRE INCIDENTS ( ON JOB SITE ) NUMBER OF PROPERTY DAMAGE ( ON JOB SITE ) NUMBER OF EQUIPMENT FAILURE INCIDENTS ( ON JOB SITE ) NUMBER OF NEAR MISSES ( ON JOB SITE ) NUMBER OF INCIDENT MEDICAL EVACUATION ( MEDIVAC ) 02. WEATHER REPORT DESCRIPTION WEATHER / SKY 03. SAFETY REPORT UCUA OBSERVATION PREVIOUS UNSAFE CONDITION UNSAFE ACT SAFE OBSERVATION 04. PROGRESS NARRATIVE FROM 0800 0830 0845 1000 1200 1300 1400 1645 TO 28" & 36" ONSHORE PIPELINE INSTALLATION 0830 0845 1100 1200 1300 1400 1645 1700 TOOL BOX MEETING PRE JOB BRIEFING REMOVE FOAM WORK AND BACKFILL ON TEMPORARY PIPE SUPPORT MOBILIZE 2-3 STONE PRIOR TO CONSTRUCT DETOUR ROAD BREAK FOR LUNCH CONTINUE MOBILIZE 2-3 STONE PRIOR TO CONSTRUCT DETOUR ROAD CONSTRUCT DETOUR ROAD PRIOR TO INSTALL 36 & 28 CONCRETE SLAB HOUSEKEEPING PRE-COMMISSIONING WORKS 0000 0045 0130 0200 0230 0300 0330 0345 0415 0430 0500 0530 0600 0755 0835 0830 0845 0925 0940 0955 0955 1015 1035 1045 1055 1110 1205 1530 1630 1645 1715 1745 1805 1820 1840 1900 1905 1945 2000 2030 0045 0130 0200 0230 0300 0330 0345 0415 0430 0500 0530 0600 0800 0810 0840 0845 0925 0940 0955 1015 1015 1035 1045 1055 1110 1205 1530 1630 1645 1715 1745 1805 1820 1840 1900 1905 1945 2000 2030 2400 START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (VOLUME OF WATER INSIDE PIPELINE WAS 1567.2M3) CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE: 1.2M3/MIN) CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE: 1.3M3/MIN) ABLE TO PUMP SMALL VOLUME OF WATER CONTINUE DUE TO LOW TIDE CONDITION (1.2M SEA LEVEL) INTO BREAK TANK) START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE: 1.2M3/MIN) CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (VOLUME OF WATER INSIDE PIPELINE WAS 1803.5M3) CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (FLOWRATE: 1.1M3/MIN) CONTINUE FILLING SEAWATER INSIDE BREAK TANK START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE (VOLUME OF WATER INSIDE PIPELINE WAS 1912.2M3) TOOL BOX MEETING PRE JOB BRIEFING PREPARATION FOR ALL EQUIPMENT RELATED AND PROCEED WITH PUMP SELF-PRIMING. INSPECTION OF 4" SUBMERSIBLE PUMP AND 50 Kva GENERATOR SET BY AIT AT LAYDOWN AREA. RECEIVED MATERIALS FROM KK PORT (HIGH PRESSURE FITTINGS & 4" FOOT VALVE START PUMPING TO FILL TREATED SEAWATER INSIDE 28" PIPELINE AT 0.2 BAR. DONE INSPECTION OF 4" SUBMERSIBLE PUMP AND 20 Kva GENERATOR BY AIT FOUND BUBLE GOING OUT FROM 2" VENT OUTLET AT TEMPORARY LAUNCHER. STOP PUMPING TREATED SEA WATER INSIDE FOR PRESSURE STABILIZE INSIDE PIPELINE (CURRENT PRESSURE 0.5BAR) CONTINUE PUMPING TREATED SEAWATER INSIDE 28" PIPELINE FOUND BUBBLE GOING OUT FROM 2" VENT OUTLET AT TEMPORARY LAUNCHER AT 0.5 BAR. AIT HSE MANAGER (MR IBNIL & MR ROGER) CAME TO PVSB LAUNCHER SITE AREA FOR INSPECTION (AIT REQUEST FOR DOE APPROVAL TO INJECT CHEMICAL INSIDE PIPELINE) INSTALL AND SETUP 4" SUBMERSIBLE PUMP AT JETTY SITE AREA STILL UNABLE TO CONTINUE PUMPING. TOTAL VOLUME PUMPED IS 11498.3M3 SERVICE AND DEPLOY NEW WIRE MESH AT 6" FOOT VALVE FOR SUCTION HOSE. PREPARATION WORK FOR INSTALLATION SUBMERSIBLE PUMP AT JETTY SITE AREA CONTINUE PUMPING AT 600 RPM (1.2M3/MIN) STOP PUMPING AND FILLING SEAWATER INSIDE BREAK TANK CONTINUE PUMPING AT 600 RPM (1.23M3/MIN) STOP PUMPING DUE TO LOW TIDE CONDITION (1.1M SEA LEVEL) CONTINUE PUMPING STOP PUMPING DUE TO LOW TIDE CONDITION (1.1M SEA LEVEL) CONTINUE PUMPING (0.66M3/MIN) STOP PUMPING DUE TO LOW TIDE CONDITION (1.0M SEA LEVEL) HANDOVER JOB AND PRE JOB BRIEFING TO NIGHT SHIFTS CREW CHANGE STANDBY DUE TO LOW TIDE (TOTAL VOLUME:1912.2M3, PRE-FLOOD PERCENTAGE: 46%) TOTAL (MIN) 210min 285min 40min 20min 15min ACTIVITIES DESCRIPTION DT (MINUTES) 92 62 36 TODAY 1 0 0 TOTAL ACCUMULATIVE 93 62 36 191 0900 FINE 1200 FINE 1500 FINE 41,594 6,876 3,881 0 0 0 0 0 0 0 0 0 0 TODAY 240 276 24 0 0 0 0 0 0 0 0 0 0 CUMULATIVE 41,834 7,152 3,905 52,891 0 0 0 0 0 0 0 0 0 0 : : : : : : : : : : : : : : ASO/SEM/1104/DPR/ONS-126 8-Aug-12 (WEDNESDAY) ALLIANCE INTERGRATED TEAM(AIT) CHO/2009/DFIN/743 SABAH OIL & GAS TERMINAL(SOGT),KIMANIS TENGKU SHAHRU HASLAN PARK SUNG HWAN HARAHAP ALLAN JOHN LIEW LIEW KIEW NAM MUHAMMAD WARID BIN ABDULLAH ARIFIN ABD RAUF / AHMAD ZARIDZ BIN AHMAD NIZAM MOHD ISAMUDDIN HARON RYAN O NEIL

Accumulative Total Manhours :

Page 1 of 4

CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE : : ASO/SEM/1104/DPR/ONS-126 8-Aug-12 (WEDNESDAY)

05.

MEANWHILE ACTIVITY FROM TO MEANWHILE DT (MINUTES)

TOTAL (MIN) 06. PROJECT MILES STONE PROGRESS ACHIEVEMENT ITEMS ACTIVITIES WT % PREVIOUS TODAY TO DATE PLANNED

COMPLETION DATE

ONSHORE CONSTRUCTION WORK


01 02 03 04 05 Mobilisation of Equipment, Machineries and Material Site Office Set-Up Construction of Rock Berm Reinstatement Work Demob of Equipment, Machineries and Material PL 36" 06 07 08 09 10 11 12 13 14 Piling of Cofferdam Welding Sturts and Whalers Piling Holdback Anchor Wall (Linear Winch and Barge) Install Linear Winch and Barge Holdback Padeye Excavation of Trench Linear Winch Set-up Onshore Pipeline Installation Extraction of Sheet Pile Backfill Open Trench PL 28" 15 16 17 18 19 20 21 22 23 Piling of Cofferdam Welding Sturts and Whalers Piling Holdback Anchor Wall (Linear Winch and Barge) Install Linear Winch and Barge Holdback Padeye Excavation of Trench Linear Winch Set-up Onshore Pipeline Installation Extraction of Sheet Pile Backfill Open Trench TOTAL 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 15.00% 1.68% 1.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 1-May-12 9-May-12 3-May-12 26-May-12 7-Jun-12 1-Jun-12 24-Jul-12 28-Jul-12 1-Aug-12 2.30% 2.30% 2.30% 2.30% 2.30% 2.30% 15.00% 1.68% 1.68% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 29-Apr-12 1-May-12 3-May-12 4-May-12 14-May-12 12-May-12 24-Jul-12 2-Aug-12 3-Aug-12 20.00% 10.00% 2.30% 1.70% 1.68% 100.00% 100.00% 100.00% 75.00% 32.62% 0.00% 0.00% 0.00% 5.00% 0.00% 100.00% 100.00% 100.00% 80.00% 32.62% 100.00% 100.00% 100.00% 100.00% 100.00% 28-Apr-12 13-Apr-12 28-Apr-12

100.00%

98.51%

0.09%

98.60%

NOTE 1: ONSHORE TEAM ACTIVIES IN ASSISTING 1MAS 300 BEACH PULL AND PL PRE-COMMISSIONING (OPTIONAL) ARE NOT CAPTURED IN THE MILESTONE AND PERCENTAGE PROGRESS ACHIEVEMENT

No. 1 2 3 4 5 6 7 8 9

ACTIVITIES Mobilization of all PVSB personnal, material & equipment Setup Equipment/HDPE Pre-comm 28" pipeline Pre-flooding for 28" Cleaning,Gauging for 28" Hydrotesting Pre-comm 36" pipeline Pre-flooding for 36" Cleaning,Gauging for 36" Hydrotesting Demobilization TOTAL

WT %

PREVIOUS

TODAY

TO DATE

PLANNED

COMPLETION DATE 3-Aug-12

10.00% 20.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 10.00% 100.00%

99.96% 100.00% 38.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 33.80%

0.00% 0.00% 8.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.80%

99.96% 100.00% 46.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 34.60%

100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 5.00% 0.00% 80.50%

07.

PLANNED ACTIVITIES FOR THE NEXT 24 HOURS ACTIVITIES ONSHORE PIPELINE INSTALLATION 1 2 3 4 1 2 CLOSED ORIGINAL ROAD AND OPEN DETOUR ROAD FOR TEMPORARY ACCESS WAY EXCAVATE GROUND PRIOR TO INSTALL 36 & 28 CONCRETE SLAB INSTALL FOAM WORK INSIDE OPEN CUT TRENCH CAST IN SITU CEMENT FOR CONSTRUCTION OF CONCRETE SLAB PRE-COMMISSIONING WORKS CONTINUE WITH PRE-FLOODING ACTIVITY RECTIFICATION WORK TO IMPROVE ON PUMPING FLOW RATE ( ADDITIONAL BREAK TANK TO BE MOBILIZED AND SET-UP AT MOLF JETTY AS ADDITIONAL BACK-UP FOR CONTINUOUS PUMPING)

08.

MATERIAL ON SITE MATERIAL ON SITE SHEET PILE (PCS) ARMOUR ROCK (TON) I-BEAM (PCS) CHEMICAL (3 IN 1 & DYE) 36" PIG 28" PIG DIESEL PREVIOUS 798 2142 52 76 4 5 13 TODAY 0 0 0 0 0 0 0 TO DATE 798 2142 52 76 4 5 13

Page 2 of 4

CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE 09. EQUIPMENT ON SITE EQUIPMENT ON SITE SHORE APPROACH EX 200 EXCAVATOR 25 TON MOBILE CRANE 20 FT OFFICE CONTAINER 10 FT STORE CONTAINER PORTABLE TOILET WITH SEPTIC TANK 20FT RESTING SHED 100KVA GENSET WATER TANK EX 400 EXCAVATOR C/W VIBRO HAMMER 600 AMPS WELDING MACHINE TOWER LIGHT EX 200 LONG ARM EXCAVATOR 120 TON MOBILE CRANE LINEAR WINCH SPREAD 26.5T LINEAR WINCH 30T CABLE DRUM PRE-COMMISSIONING SUCTION PUMP FLOODING PUMP 6" HDPE PIPE (700 METER) BREAK TANK FILTER UNIT CHEMICAL PUMP 6" FLOWMETER MANIFOLD 12" C/W 6" OUTLET 175 CFM AIR COMPRESSOR DIESEL STORAGE 36" TEMPORARY LAUNCHER 28" TEMPORARY LAUNCHER SITE OFFICE @ 20' CANOPY TEST CABIN TOWER LIGHT TOILET & SANITARY 20 KVA GENSET HIGH PRESSURE PUMP TOTAL 10 PROJECT DOWNTIME BREAK DOWN PROJECT DOWNTIME BREAK DOWN (ONSHORE PIPELINE INSTALLATION) 1.1 EQUIPMENT BREAKDOWN 1.2 PTW 1.3 WEATHER DOWNTIME 1.4 WELD REPAIR 1.5 NDT 1.6 OTHERS SUB TOTAL : CRITICAL TODAY (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CRITICAL TODATE (HRS) 7.00 3.00 28.40 0.00 0.00 21.18 59.58 NON-CRITICAL TODAY (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NON-CRITICAL TODAY (HRS) 0.00 0.00 0.00 0.00 0.00 NON-CRITICAL TODATE (HRS) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 NON-CRITICAL TODATE (HRS) 0.00 0.00 0.00 0.00 0.00 4 2 1 1 1 2 2 1 4 1 1 1 1 1 2 2 1 2 54 28/07/2012 17/07/2012 17/07/2012 17/07/2012 19/07/2012 27/07/2012 17/07/2012 17/07/2012 17/07/2012 27/07/2012 28/07/2012 27/07/2012 27/07/2012 27/07/2012 17/07/2012 17/07/2012 28/07/2012 1 1 3 1 1 1 2 1 1 4 3 1 1 1 1 1 07/04/2012 07/04/2012 08/04/2012 08/04/2012 08/04/2012 09/04/2012 09/04/2012 09/04/2012 11/04/2012 16/04/2012 27/04/2012 04/05/2012 09/05/2012 10/05/2012 11/05/2012 11/05/2012 13/07/2012 03/07/2012 03/07/2012 03/07/2012 07/08/2012 QUANTITY On Hire Off Hire : : ASO/SEM/1104/DPR/ONS-126 8-Aug-12 (WEDNESDAY)

PROJECT DOWNTIME BREAK DOWN (PRE-COMMISSIONING WORKS) 1.1 EQUIPMENT BREAKDOWN 1.2 PTW 1.3 WEATHER DOWNTIME 1.4 OTHERS SUB TOTAL :

CRITICAL TODAY (HRS) 0.00 0.00 0.00 4.75 4.75

CRITICAL TODATE (HRS) 0.00 0.00 6.50 14.00 20.50

Page 3 of 4

CONTRACT NO : 39275-U-SEMSB-SO-2368 SOGT PROJECT NO : S02368 OFFSHORE TRANSPORTATION, INSTALLATION AND PRE-COMMISSIONING FOR SOGT PROJECT DAILY PROGRESS REPORT Onshore & Shore Approach Pipeline Construction and Installation & Pre-Commissioning DOC No. DATE 11 PROJECT PERSONNEL PERSONNEL SHORE APPROACH SITE MANAGER SITE PROJECT ENGINEER FIELD ENGINEER SAFETY OFFICER CONSTRUCTION MANAGER FIELD ENGINEER SAFETY OFFICER QA/QC 3RD PARTY INSPECTOR RIGGER FOREMAN RIGGER WELDER FOREMAN FITTER PIPE WELDER STRUCTURAL WELDER EXCAVATOR OPERATOR VIBROHAMMER OPERATOR CRANE OPERATOR LINEAR WINCH OPERATOR NDT TECHNICIAN STOREKEEPER BACKHOE OPERATOR HELPER SURVEYOR MECHANIC ELECTRICIAN SITE CLERK SECURITY GUARD OTHERS COMPANY AMSB AMSB AMSB AMSB HSAP HSAP HSAP HSAP AMSB/BV HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP HSAP SUB TOTAL PERSONNEL PRE-COMMISSIONING PROJECT MANAGER PROJECT CO-ORDINATOR TECHNICAL ADVISOR ENGINEER SAFETY OFFICER SUPERVISOR MECHANIC SKILL OPERATOR OPERATOR HDPE PERSONNEL COMPANY PVSB PVSB PVSB PVSB PVSB PVSB PVSB PVSB PVSB PVSB SUB TOTAL CLIENT CSR AIT RESIDENT ENGINEER AIT SURVEYOR AIT INSPECTOR AIT PROJECT ENGINEER AIT CIVIL & STRUCTURE ENGINEER AIT HSO AIT CONSTRUCTION ENGINEER GRAND TOTAL REMARKS/ COMMENTS BY AIT: COMPANY AIT AIT AIT AIT AIT AIT AIT AIT SUB TOTAL MALAYSIAN 1 1 1 1 1 1 1 1 0 4 4 0 1 0 2 2 0 1 0 0 0 0 1 2 2 0 0 3 0 30 MALAYSIAN 0 1 1 2 1 3 2 4 9 0 23 MALAYSIAN 0 1 0 0 0 0 1 0 2 55 ASIAN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ASIAN 0 0 0 0 0 0 0 0 0 0 0 KOREAN 1 0 0 0 0 0 0 0 1 1 OTHERS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OTHERS 0 0 0 0 0 0 0 0 0 0 0 OTHER 0 0 0 0 0 0 0 0 0 0 TOTAL 1 1 1 1 1 1 1 1 0 4 4 0 1 0 2 2 0 1 0 0 0 0 1 2 2 0 0 3 0 30 TOTAL 0 1 1 2 1 3 2 4 9 0 23 TOTAL 1 1 0 0 0 0 1 0 3 56 : : ASO/SEM/1104/DPR/ONS-126 8-Aug-12 (WEDNESDAY)

PREPARED BY (AMSB):-

CHECKED BY (AMSB):-

CHECKED BY (AMSB):-

APPROVED BY (AIT):-

NAME :

AHMAD ZARIDZ BIN AHMAD NIZAM

NAME : MUHAMMAD WARID POSITION : PROJECT ENGINEER

NAME : JOHN LIEW POSITION : SITE MANAGER

NAME : PARK SUNG HWAN POSITION : AIT CSR

POSITION : FIELD ENGINEER

Page 4 of 4