PELABUHAN KUANTAN

MALAYSIA

WELCOME
TO
KUANTAN PORT AUTHORITY
COUNTRY PAPER MALAYSIA
KUANTAN PORT- TOWARDS 2020

ESTABLISHMENT

1974

CONSTRUCTION STARTED

1976

COMPLETION

1979

PARTIAL OPERATION

1980

FULL OPERATION

1984

PRIVATISATION

1 JAN 1998

to Kuantan Port Consortium(KPC)

STRATEGICALLY
.

LOCATED FACING THE


PACIFIC RIM

ENTRY/EXIT POINT TO
THAILAND, INDO-CHINA,
FAR EAST AND AMERICA

UTILISATION
LPKtn Administration

HECTARAGE
0.7

Operational Usage

120.0

Water Basin Area

160.0

Industrial Usage

315.0

Commercial Usage

3.3

Recreational & Housing

5.0

Road & Drainage Reserve

97.6

Green Area

46.0

TOTAL

650.0

BERTH

NO OF BERTH

BERTH
LENGTH(M)

DRAUGHT
(M)

DISPLACEMENT
TONNES

PALM OIL BERTH 1

150

8.0

8,000

PALM OIL BERTH 2

240

11.2

54,000

PALM OIL BERTH 3

240

11.2

53,000

MINERAL OIL BERTH

150

8.0

8,000

LIQUID CHEMICAL BERTH

720

11.2

53,000

CONTAINER BERTH

600

11.2

45,000

MULTIPURPOSE BERTH

725

11.2

45,000

SERVICE JETTY

140

4.0

6,000

BERTH 5

18

5.0

16,800

BERTH 6

120

7.0

17,800

BERTH 1A

70

8.0

8,000

MTBE BERTH

240

11.2

53,000

TOTAL

19

CAPACITY = 17.1 JUTA

3413

14000
12000
10000

11403

12079

10273

9402

10065

10673

9411

9699

8999

7532

5510

2000

5500

4000

6027

6000

9804

8000

0
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

2500

2000

1845

2405

2447

2315

2375

2324

2195

2382

2280

2067

1855

1516

1419

1000

1677

1500

500

0
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

160000
140000
120000

99709

142080

132250

127061

124834

119167

122745

108108

76339

62783

20000

56056

40000

50989

60000

91524

80000

127600

100000

0
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Proposed Port Layout

Phase

Hectare

Phase 1

59

Phase 2 (Base)

67

Phase 2 (Opt)

37

Future Development

82

TOTAL

245

Source: W&B-2010

Indicative roadmap
APPROVAL PLAN
201115 Jan
2011

23 Feb
2011

28 Mar
2011

IMPLEMENTATION PLAN
30 Apr
2011

Principle approval on :
a. Formation of Task force
comprising of
1. UKAS (PPP+ Corridor)
2. EPU
3. MOT/KPA
4. ECERDC
5. Others (if any)
b. Proposed Funding
c. Concessionaire/ GTO (Cabinet
Approval)

Presentation to JKAS

Presentatio
n to EC

30 Apr
2011

1 June
2011

2012

2013

2014

2015

2016

2017

Terminal operator
selection and approach
Selection of
concessionaire

Funding available

Preparati
o-n for
the
appointm
e-nt of
Detailed
Design
Consultan
t (Infra
ECERDC)

Detailed design and


pre-engineering study

Construction of port

Commenc
e
operations