Report No. : ME-63E1-CL-01

SUBJECT

FINAL CLOSING INSPECTION REPORT

EQUIPMENT NO.

: 3-PR-01 (PIG RECEIVER)

The above equipment has been suplied, erected and internally fitted in accorda with the applicable drawings, specifications and manufacturer's standard and it

certified to be mechanically completion. Equipment has been inspected interna cleanliness and free from debris, sustains and foreign materials and hereby the equipment accepted to Final Closing.

Remarks :

PT. Wira Matra Guna PRINT NAME SIGNATURE DATE

PT. Krakatau Engineering

PT. Cabot

QI - D.04
Report No. : ME-63E1-CL-01

PIM - 2 04 - 4166
Date : June 14, 2005