Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page1 of 10
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page2 of 10
INDEX
TITLE 1. LIST OF REFERENCE DOCUMENTS 2. PURPOSE OF THE SYSTEM 3. HYDRUALIC CALCULATION 4. SIZING CALCULATION and PRESSURE DROP Page 4 4 4 4-9
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page3 of 10
3. HYDRAULIC CALCULATION
Design data are as follows: Design Ambient Temperature Max . Ambient Temperature Min Ambient Temperature Design Gas Pressure ( max ) Gas Pressure ( nominal ) Normal Condition ( Pressure/Temperature ) Gas flow rate for each units
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
+15 0C +37 0C -30 0C 27 barg 22.5 barg 1.01 bar / 150C 45718 Nm3/hr ~ 46000 ~100000 Nm3/hr 250 Nm3/hr
Nm3/hr Gas flow rate for 2 unit Gas flow rate for NEW HVAC building
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page4 of 10
4. SIZING CALCULATION
4.1. Main Portion 4.1.1. Calculations Criteria : Criteria for line sizing are as follow: The limit of velocity is 20m/s Gas pressure at terminal point of turbine is 22.5 barg .
PV1 P2V2 1 = T1 T2
4.1.3. System Conditions P1= 14.7 psi = 1.01 bar T1 = 15+ 273= 2880K V1 = 100000 Nm3/hr for DN300 header
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
The worst condition in the natural gas system for DN350 Line will be : P2 = 22.5 bara (max. pressure) T2 = 37 +273 = 310 0 K max temperature 1.01*100000/288 = 22.5*Q/310 Q= 4832 m3/hr
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page5 of 10
o =
For Pipe DN350 : gas (37 oC)= 0.014 cp Re= vd/ = 14.9*15.25*339.76/0.014 Re=5.5*106
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page6 of 10
pipes and d= 336.54 mm for internal diameter of DN350 pipe, we can obtain the f
= 0.05
1 / f 1 / 2 = 1.8 log[( f = .013 ( ) 6.9 +( D )1.11 ] 3.7 Re D
L (Pipe length) = 1100 m No. Ball Valve = 1 No. Elbow = 46 No. Tee Red. = 1 Le (Total length) = 1100+ (1x0.3048x15) + (20x0.3048x46) + (1x0.3048x23) = 1392 m
hL = f
Second Node Pressure = First Node Pressure 22.5 0.88 = 21.65 barg
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
P total =
4.2.2. DN300 After feeding first unit the header will reduce to DN300 : 1.01x50000/288 = 21.65xQ/310 Q = 2510 m3/hr D= 304.4 mm Sch.30 (t=9.28 mm) : A= 0.072 m2 Q=V.A
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page7 of 10
For Pipe DN300 : gas (37 oC)= 0.014 cp Re= vd/ = 14.9*9.68*304/0.014 Re= 3.1x106 Considering moody diagram ,with Re Number & factor .
pipes and d= 304 mm for internal diameter of DN300 pipe, we can obtain the f
= 0.05
1 / f 1 / 2 = 1.8 log[(
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
f = 0.011
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page8 of 10
Second Node Pressure = First Node Pressure 21.65 0.01 = 21.64 barg
( Before Filtration Skid )
P total =
For VHVAC feeding line with Q= 250 Nm3/hr and 4 bara pressure a branch line with DN40 will be taken off from existing DN80 gas pipe: 1.01*250/288 = 4*Q/310 Q= 68 m3/hr D= 40 mm Sch.40 : A= 0.0013 m2 Q= VNEW HVAC .A VNEW HVAC = 14.52 m/s < 20
Assume Vmax in Existing DN80 = 18 m/s < 20 Q= V Existing HVAC x A DN80 Existing DN 80 gas line Q= 18 x 0.0048
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
, A= 0.0048 m2
Q= 0.0864 x 3600 = 312 m3/hr 1.01*Q1/288 = 4*312/310 Q1 = 1148 Nm3/hr The DN80 pipe line supplies fuel gas for existing HVAC room with max consumption 400 Nm3/hr then it is possible for take off a DN40 branch for New HVAC room from this line.
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page9 of 10
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN
Doc. No. : TSM/AL-99/BP-M-40-FG0-230 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:
Rev.: A
Page10 of 10