Вы находитесь на странице: 1из 4

FORWARDING PUMP HOUSE POWER CABLE SIZING CALCULATION

D C B A 0 Rev.

For Final Approval H.A. May.05 For Approval H.KH. 02.05 Description Design Date
MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

H.KH. H.KH. Check

May.05

E.A. May.05 02.05 E.A. 02.05 Date Appr. Date

IPDC
PROJECT: TITLE: Drawing No. Scale Design Drawn Check Approve
NTS

6x159 MW SHIRVAN GAS TURBINE POWER PLANT FORWARDING PUMP HOUSE POWER CABLE SIZING CALCULATION MP-SVG-18ED-08-EGO-003 Format Date Date Date Date
A4 File No.

Rev. No. SHEET 1 OF 4

IN-HOUSE REVISIONS E D C B A For Final Approval H.A. May.05 H.KH. May.05 E.A. May.05 0 For Approval H.KH. 02.2005 H.KH. 02.2005 E.A. 02.2005 Rev. Description Design Date Check Date Appr. Date

H.A. H.A. H.KH. E.A.

May.05 CONTRACT NO. May.05 SV-0602-HA/TL May.05 MF CODE May.05

DETAIL DESIGN SE CODE: 9007

DEQWE3R3R

MAPNA CO.

PRIVATE JOINT STOCK

IRAN POWER PLANT PROJECTS MANAGEMENT CO.

KHERAD WATER TREATMENT CO.

REVISION PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 0 X X X X X A B C D E F G REMARK PAGE 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80


PROJ.

REVISION 0 A B C D E F G REMARK

FORMAT: A4

SCALE: N.T.S. SHEET: 2 OF 4 MF CODE: REV. A

D C
MAPNA CO. (PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT CO.

DES.
DRAW.

H.A. H.A.
E.A.

DATE May.05 DATE May.05


TITEL

SHIRVAN 6x159 M.W. GAS TURBINE POWER PLANT FORWARDING PUMP HOUSE POWER CABLE SIZING CALCULATION
DWG.No. MP-SVG-18ED-08-EGO-003

SE CODE: 9007

B A KHERAD WATER TREATMENT CO. 0 Rev. For Final Approval FOR APPROVAL Description

CHK.

H.KH. DATE May.05


DATE May.05

H.KH. May.05 E.A.


H.KH. 02.2005 E.A. CHK. DATE

May.05 02.2005

APP. FILE NO:

APP. DATE

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMMPANY IPDC

REFERENCE:
1. FORWARDING PUMP HOUSE POWER & I&C CABLES ROUTING & GENERAL ARRANGEMENT & DETAILS OF INSTALLATION MP-SVG-18ED-01-FX3-001 2. FORWARDING PUMP HOUSE SINGLE LINE DIAGRAM 3. GAS OIL SYSTEM POWER CABLE SIZING DESIGN CRITERIA MP-SVG-18ED-02-EG0-002 MP-SVG-18ED-06-EG0-002

PROJ.

FOMAT: A4

SCALE: NTS MF CODE:

SHEET: 3 OF 4 REV. A

D C B
MAPNA CO. (PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT CO.

DES.
DRAW.

H.A. H.A.
E.A.

DATE May.05 DATE May.05


TITEL

PARAND 6x159 M.W.GAS TURBINE POWER PLANT FORWARDING PUMP HOUSE POWER CABLE SIZING CALCULATION
DWG.No. MP-SVG-18ED-08-EGO-003

SE CODE: 9007

CHK. For Final Approval FOR APPROVAL Description H.KH. May.05 E.A. H.KH. 02.2005 E.A. CHK. DATE May.05 APP. 02.2005

H.KH. DATE May.05


DATE May.05

A 0 KHERAD WATER TREATMENT CO. Rev.

FILE NO:

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMMPANY IPDC

APP. DATE

Rated Current(A)

Oper. Voltage(V)

I START / I NOMINAL

Power Factor (Running)

Power Factor (Starting)

Rated Power (Kw)

Efficiency(%)

Cable Size Calculation KS 2 ((KA) S) U running (%) U starting (%)


2 2

Item No.

Rev. No.

Tag No.

Description

Cable 2 Size(mm )

Type

Derated Derating Current Factor (A) 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 39.6 4.0 4.0 9.4

Remark

L(m) CSA1 (MM2)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

61EGC1010B 62EGC1010B 63EGC1010B 64EGC1010B 65EGC1010B 66EGC1010B 61EGC1030B 62EGC1030B 63EGC1030B 64EGC1030B 65EGC1030B 66EGC1030B 60EGC1010B 60EGC1030B 60EGC1050B

BARRIER.XLS

UNIT-1 FUEL OIL FORWARDING PUMP 1 UNIT-2 FUEL OIL FORWARDING PUMP 1 UNIT-3 FUEL OIL FORWARDING PUMP 1 UNIT-4 FUEL OIL FORWARDING PUMP 1 UNIT-5 FUEL OIL FORWARDING PUMP 1 UNIT-6 FUEL OIL FORWARDING PUMP 1 UNIT-1 FUEL OIL FORWARDING PUMP 2 UNIT-2 FUEL OIL FORWARDING PUMP 2 UNIT-3 FUEL OIL FORWARDING PUMP 2 UNIT-4 FUEL OIL FORWARDING PUMP 2 UNIT-5 FUEL OIL FORWARDING PUMP 2 UNIT-6 FUEL OIL FORWARDING PUMP 2 FUEL OIL FEED PUMP 1 FOR AUXILIARY BOILER FUEL OIL FEED PUMP 2 FOR AUXILIARY BOILER FORWARDING REPEATER PANEL

3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x2.5 3x2.5 3x2.5

XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC XLPE/PVC

18.5 18.5 18.5 18.5 18.5 18.5 18.5 18.5 18.5 18.5 18.5 18.5 1.5 1.5 1.5

400 400 400 400 400 400 400 400 400 400 400 400 400 400 230

0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.83 0.83 0.85

0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.7 0.7 -

90.5 90.5 90.5 90.5 90.5 90.5 90.5 90.5 90.5 90.5 90.5 90.5 79 79 100

32.46 32.46 32.46 32.46 32.46 32.46 32.46 32.46 32.46 32.46 32.46 32.46 3.31 3.31 7.67

7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 6.4 6.4 -

68 63 58 53 47 43 63 58 53 47 41 38 38 37 12

3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x10 3x2.5 3x2.5 3x2.5

2.1 1.9 1.8 1.6 1.4 1.3 1.9 1.8 1.6 1.4 1.2 1.2 0.4 0.4 0.6

7.6 7.0 6.5 5.9 5.2 4.8 7.0 6.5 5.9 5.2 4.6 4.2 2.3 2.3 -

1.31E-01 see Note (1)

NOTE: 1) The let through energy of protective miniature C.B. OR MCCB (without overload protection) of each cable should be limited to K 2S2 .

DEQWE3R3R
D C
MAPNA CO. (PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT CO.

PROJECT.

DES.
DRAW.

H.A. H.A. H.KH. E.A.

DATE May.05 DATE May.05 DATE May.05 DATE May.05 DWG.No.


TITEL

SHIRVAN 6x159 MW GAS TURBINE POWER PLANT FORWARDING PUMP HOUSE POWER CABLE SIZING CALCULATION
MP-SVG-18ED-08-EGO-003

FOMAT:A4 SE CODE: 9007

SCALE: NTS MF CODE:

SHEET: 4 OF 4 REV. A