Вы находитесь на странице: 1из 3

INSPECTION & TEST PLAN FOR ELECTRICAL EQUIPMENT OF NATURAL GAS SYSTEM

D C B A 0 Rev.

For Approval Description

H.A. Oct.06 Design Date

H.KH.

Oct.06 H.R.D. Oct.06

Check

Date

Appr.

Date

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

IPDC
PROJECT: TITLE: 6x159 MW SHIRVAN GAS TURBINE POWER PLANT INSPECTION & TEST PLAN FOR ELECTRICAL EQUIPMENT OF NATURAL GAS SYSTEM

Drawing No. Scale Design Drawn Check Approve


NTS

MP-SVG-19EE-31-FG0-001
A4 File No.

Rev. No. SHEET 1 OF 3 DETAIL DESIGN SE CODE: 9007

IN-HOUSE REVISIONS E D C B A 0 Rev.

Format H.A. Date H.A. Date H.KH. Date H.R.D. Date

Oct.06 CONTRACT NO. Oct.06 SV-0602-HA/TL Oct.06 MF CODE Oct.06

DEQWE3R3R

MAPNA CO.

For Approval Description

H.A. Design

Oct.06

H.KH.

Oct.06

H.R.D.

Oct.06

PRIVATE JOINT STOCK

Date

Check

Date

Appr.

Date

IRAN POWER PLANT PROJECTS MANAGEMENT CO.

REVISION PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 0 X X X A B C D E REMARK PAGE 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80


PROJECT:

REVISION 0 A B C D E REMARK

FOMAT:A4

SCALE:

SHEET: 2 OF 3 REV. 0

KHERAD WATER

D C B A 0 Rev. FOR APPROVAL Description H.KH. CHK. Oct.06 DATE H.R.D. APP. Oct.06 DATE

DES.
DRAW.

H.A. H.A. H.KH. H.R.D.

DATE DATE DATE DATE

Oct.06 Oct.06 Oct.06 Oct.06

SHIRVAN 6x159 M.W GAS SE CODE: MF CODE: TURBINE POWER PLANT 9007 TITEL: INSPECTION & TEST PLAN FOR ELECTRICAL EQUIPMENT OF NATURAL GAS SYSTEM
MP-SVG-19EE-31-FG0-001

MAPNA CO. (PRIVATE JOINT STOCK) IRAN POWER PLANT PROJECTS MANAGEMENT CO.

CHK. APP. FILE NO:

MINISTRY OF ENERGY
IRAN POWER DEVELOPMENT COMPANY

IPDC

QUALITY CONTROL PLAN


PROJECT : EQUIPMENT ITEM NO : UNIT: EQUIPMENT NAME : EQUIPMENT SUPPLIER (VENDOR) : ID
1 2

6x159 MW SHIRVAN GAS TURBINE POWER PLANT NATURAL GAS SYSTEM CATHODIC PROTECTION MATERIAL KHERAD WATER TREATMENT CO. UNITS,COMPONENETS & PARTS TO BE INSPECTED
Type, material, Anode Cable same as ID 2 Type, material, Insulation, Core, Sheath, Voltage, Size Type, Size, voltage(Input & output), Paining, Wiring, Meters, Terminals, Gland, Thightness, Busbar, Earth Lug, Opening/Closeing of Breakers, Labels, Nameplate, Phase Identity, Megger Test Output Voltage, Voltage Adjustement, No-Load Test, Short Circuit Test Type, Cable Gland, Terminals, Shunt, Copper Link, Variable Resistor Material

INSPECTION AND TEST ITEMS


ANODES Inspection Cables Inspection

EXT.OF INSP.
RI RI

INVOLVED PARTES 1
WP WP

2
WP WP

3
RD RD

DWG/DOC.TO BE USED FOR INSPECTION


Vendor Document Vendor Document

REPORT PLACE TO BE OF INSP. SUBMIT'D


R R MS MS

Transformer/Rectifier PANEL Visual Inspection

TI

WP

WP

RD

Vendor Document

MS

4 5 6

RECTIFIER PANEL Functional Test Bond Box, Resistance Box Backfill

TI TI TI

WP WP WP

WP WP WP

RD RD RD

Vendor Document Vendor Document Vendor Document

R R R

MS MS MS

Involved Parties: 1=Sub-vendor 2=Vendor (Kherad) 3=Client

abbreviation: HP=Hold Point WP=Withness Point RI=Random Inspection RD=Review Documents TI=Total Inspection PLACE OF INSPECTION MS : Vendor shop SS : Subvendor's shop F : Field