Вы находитесь на странице: 1из 174

SAFEGUARD PROPERTIES VENDOR WEB USERS MANUAL

Getting Started
Please read the following section prior to accessing the Vendor Web. It covers hardware and software requirements of your computer that must be verified prior to being able to access the Vendor Web site.

Internet Browser Settings


The Safeguard Vendor Web supports Microsofts Internet Explorer web browser. You may use any version of this browser equal to or greater than 5.5. Version 6.0 and above is preferred.

Determining Your Internet Explorer Version


The web browsers HELP menu will reveal the version of Internet Explorer that is currently loaded on your computer. Heres how it works: 1. Open Internet Explorer 2. Access the HELP menu 3. Choose the ABOUT INTERNET EXPLORER option A dialog box will appear

Version #

4. Note the version you are running 5. Click OK The About Internet Explorer dialog box closes and you return to the Internet Explorer program

Safeguard Vendor Web: Getting Started

Last Updated On 7-24-08

Internet Explorer Settings


Please ensure that your Java Script software is updated to the latest available version.

Pop Up Blockers
The Safeguard Vendor Web requires that pop-up screens be able to open. In order to ensure that the Safeguard Vendor Web functions properly, all pop-up blockers, be they Windows based or third party software, must be turned off or set to not block pop-up screens opened by the Safeguard Vendor Web. 1. If you have a pop-up blocker enabled you will see the following screen upon making your first attempt to log in to the Safeguard Vendor Web.

A message will appear showing that the pop-up has been blocked.

2. Click the pop-up message to bring up the pop-up options.

3. Choose Always Allow Pop-ups from This Site.

Safeguard Vendor Web: Getting Started

Last Updated On 7-24-08

4. Click the Yes button to allow the pop-ups from the Vendor Web site.

Safeguard Vendor Web: Getting Started

Last Updated On 7-24-08

Logging In
You may access the Vendor Web from www.safeguardproperties.com. Once you click the Contractors button the system will progress to the Vendor Web Login Page. This page allows you to access several items that can be viewed without logging into the Vendor Web site. The Login Page also offers authorized users the capability to log into the Vendor Web. Before exploring the log in process lets examine the components of the Login Page.

Login Page Components


The Login Page contains five components. This section of the manual will explain these components in the following order: Quick Links Supply Purchasing Corporate Message Special Messages Log In

Corporate Message Quick Links

Log In Area

Supply Purchasing
Safeguard Vendor Web: Logging In 1 Last Updated On 7-24-08

Quick Links
The Quick Links section displays in the top left corner of the Login Page. It contains three links which are explained below. You do not have to be logged into the Vendor Web for these links to be functional.

Vendor Application
The Vendor Application appears first in the Quick Links section of the Login Page. This link opens a new window that contains an employment application. Complete this application if you would like to be considered for a subcontracting position with Safeguard.

Vendor Memos
The second item, in the Quick Links section of the Login Page, is labeled Vendor Memos. This link leads to the Memos section of the Vendor Web Help Page. Contractor memos containing important field servicing industry policies are housed here. This page opens into a new window and contains other functionality that becomes available after you successfully log into the Vendor Web.

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

Frequently Asked Questions


The third Quick Links item, on the Login Page, is the Frequently Asked Questions link. A new window containing Vendor Webs Help Page also opens to reveal a list of common Vendor Web user questions. These questions appear in logical categories that help you locate your information quickly.

Supply Purchasing
An image appears beneath the Login Pages Quick Links section. Your home improvement store shopping can be accomplished by clicking our Buy All Your Supplies Online image. This action will open another window that takes you to our www.mfssupply.com address. Supplies, coupons and pricing are located on our electronically catalogued website.

Corporate Message
The right side of the Login page contains an important message from our founder, Robert Klein. This message is followed by verbiage that explains why you should consider becoming a part of the Safeguard Properties field services representative team.

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

Special Messages
At times a Special Message will appear below the Corporate Message. It will alert you about a system down period. This message appears on the Login Page in order to prevent an unnecessary login to a system that is experiencing a down time. This section will not appear if there is no message to display.

NOTE: Our website is unavailable every Saturday from 12:00 am until 5:00 pm Eastern time. During this time Safeguard backs up this sites critical information, so please plan accordingly.

Login Access
Safeguard Properties contractors (P&P, REO, Grass, and Claims), as well as certain Safeguard employees, are the only authorized users permitted to log into the Vendor Web. Once you are selected to be a Safeguard contractor you will be sent a login name in an e-mail message. Another message soon follows that contains your initial password. This password must be changed as soon as you successfully log into the site. The Log In section of the Login Page is utilized by authorized Vendor Web users who need to follow-up on orders, update work orders and read contractor memos.

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

Login Steps
Use these steps to log in to the Vendor Web. Once logged in you may access order information and update Safeguard regarding the work you performed on our clients properties. 1. Go to the Login Pages Log In section

2. Type the contractor code, Safeguard provided you, into the {Contractor Code} field 3. Press the [Tab] key You will progress to the {Password} field 4. Type your password If this is the first time you are logging into the website use the password that was e-mailed to you by Safeguard Properties. This password will initially allow you to log in but will immediately require you to change it. It is important that you change this password to something you will be able to remember. NOTE: Refer to the Password section of this manual to for instructions on using the proper password format.

5. Click the Sign In button Once the system processes a successful login you will progress to Vendor Webs Home Page. NOTE: You will be automatically logged out of the Safeguard Vendor Web site after 15 minutes of inactivity.

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

Successful Log In Attempts


Once you enter the correct contractor code and password, you will advance to the Vendor Web Home Page. This feature-rich page offers: Special Messages Alerts Memos New site feature explanations

Unsuccessful Log In Attempts


Your login attempt may fail for several reasons. A message will emit in the event that you cannot log into the Vendor Web system. The most common of these are listed below: Contractor code is invalid Password is invalid The system is currently unavailable

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

Caution: Your account will lock after three failed login attempts. Please contact the Safeguard Properties Help Desk in the event of a lockout.

Forgotten Contractor Code


If you have truly forgotten your Safeguard contractor code the system will automatically send it to you via e-mail. Follow the steps below to receive a Vendor Web password. NOTE: Your password and contractor code will never appear in the same message. They will always arrive in separate messages for security reasons. 1. Click the Forgot your Contractor Code link A Forgot Your Contractor Code window opens

2. Enter the e-mail address you last provided Safeguard 3. Click the Submit button The Your ID has been sent to you message appears 4. Click the Back to Login link The Login Page refreshes 5. Open the e-mail message that comes from Safeguard Properties The message shown here opens

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

6. Note the contractor code being referenced in this message and return to the Login Page 7. Login using this contractor code and your password 8. Click Sign In The Home Page appears

Forgotten Password
When you know your contractor code, not your password, the system will automatically send it to you via e-mail. Follow the steps below to invoke this feature: NOTE: Safeguard will never send your contractor code and password in the same message. They will always arrive separately due to security reasons. 1. Click the Forgot your Password link A Forgot Your Password? window opens 2. Click into the {Contractor Code} field and enter your code

3. Click the Submit button An Identity Confirmation window appears 4. Enter the correct answer to your question

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

5. Click the Submit button A Your password has been sent to you message appears 6. Click the Back to Login link The Vendor Web Login Page refreshes 7. Open the e-mail message that comes from Safeguard Properties The message listed below opens

8. Note the password being referenced in this message and return to the Login Page NOTE: Safeguard will provide a temporary password. It will allow you to log in but insist that you change to a more permanent password you will easily remember. The new password you create will be valid for 90 days. 9. Login using your contractor code along with this temporary password. 10. Click Sign In The Your password has expired window will open. 11. Enter information into all Your password has expired window fields and click the Submit button The Home Page comes into view and your password is now reset to the one you just created.

Safeguard Vendor Web: Logging In

Last Updated On 7-24-08

Returning To The Login Page


The Login Page remains open even after you successfully log into the site. If you access this page while you are logged in the You have been logged in message appears on this page.

Another way to return to this page is when the system automatically logs you off due to inactivity. If the system senses that no action has been taken on the website within a 15 minute timeframe it will log you off. You will need to log back into the site to access the Vendor Webs functionality. Please keep in mind that this important feature is in place to protect our clients property information.

Safeguard Vendor Web: Logging In

10

Last Updated On 7-24-08

Logging Out
A vendor may access the Log Out command from any page within the Vendor Web. The Log Out command can be found in the upper-right portion of any Vendor Web screen.

1. Click the Log Out link in the upper right corner of any screen.

NOTE: If you choose to log out while in the process of completing an order, your progress will be saved so you can log in later and continue from where you left off at the time of logging out.

2. Upon clicking the Log Out link, you will be returned to the Vendor Web Login screen.
Safeguard Vendor Web: Logging Out 1 Last Updated On 7-24-08

NOTE: Leaving your computer idle will cause you to be logged out automatically. The Vendor Web will log you out after 15 minutes of inactivity.

Safeguard Vendor Web: Logging Out

Last Updated On 7-24-08

Home Page
The Home Page displays after you successfully log into our Vendor Web. This page serves as a springboard for the site since it provides access to other robust features. Once you successfully log in, the Home Page will open into a new browser window. From this point forward you will no longer see your web browsers menu or toolbar. All page navigation will now take place within the website. The Navigation section of our manual will offer more detail regarding how to maneuver within Safeguards Vendor Web.

Window Components
This page contains several different components, some of which are carried on to all other website pages. Each component is marked on the screen shot and explained below.
Safeguard Logo Log off site Change account information

Tabs Site Assistance

Left Pane

Messages Policies Memos

Safeguard Vendor Web: Home Page

Last Updated On 7-24-08

This window is divided into four sections. Each section is described in the area below. Tabs Left pane Messages Memos

Tabs
Tabs appear at the top of the Home Page. They may be used to access various website functions. Currently only two tabs appear in this section of the window: Home and Orders. The active tab denotes which page you are currently viewing. You know it is active because the tab appears to be pushed forward and contains a white background. An inactive tab, conversely, looks as though it is in the background and has a grey canvas.

Leaving The Home Page


You may progress to other areas of the website by clicking a link or tab. This websites tabs are located at the top of the page. When you leave the Home Page Home tabs background becomes grey. This tab will also appear to be in a background position since it is no longer active.

Inactive Tab

Returning To The Home Page


Click the Home tab any time you wish to return to the Home Page. When you return the Home tab pushes forward and possess a white background. It becomes the active tab and presents all of the Home Pages functionality.

Active Tab

Safeguard Vendor Web: Home Page

Last Updated On 7-24-08

Left Pane
The left pane of this window contains four main sections. Three of the four sections contain links to other pages within this website while the last section leads to another site. Each of the following components of this window pane will be explained below: Alerts New Site Features Training Supply Purchasing

Alerts
The first section of the left-hand pane contains Alerts. This area of the page holds order count information that is subdivided into the categories listed in the table below. The Order tab may also be used to progress to this information.

Category

Function

Links To
Order List Informational only, not a link Order List

Open Orders Shows open maintenance, grass and claims orders. These items appear in the Open Order section of the Order List page. Past Due Includes both past due Open and Re-opened Orders orders. These orders are highlighted in red. Re-opened Shows maintenance, grass and claims orders Orders Safeguard cannot close due to a question or additional information needed. These items appear in the Re-opened Order section of the Order List page.

New Site Features


The New Site Features section also appears in the Left Pane of the Home Page. It is located underneath the Alerts. This area contains announcements about new website functionality or update script changes.

Safeguard Vendor Web: Home Page

Last Updated On 7-24-08

Training
The Training section appears below the New Site Features in the left pane of the Home Page. It holds training documentation, links to recorded classes, tips regarding website usage, training calendars, frequently asked questions, and much more. Once on the Training page you will find a link to this sites help documents.

Supply Purchasing
Much of the shopping you do today at home improvement stores can be accomplished by clicking on our Buy All Your Supplies Online image. This image is located below the Training section. It will open another window and lead you to the http://www.mfssupply.com site. Supplies, coupons and pricing are located on our electronically catalogued website. This convenient link is just another way in which Safeguard Properties strives to be a full service organization to you, our valued contractors.

Safeguard Vendor Web: Home Page

Last Updated On 7-24-08

Messages
The center portion of the Home Page is dedicated to messages. Three different types of items may appear in the messages section of the Home Page. They include: System Messages, Password Expiration Notifications, and Cover Letter Reminders. Each possibility is outlined below.

Sample Message

System Messages
A system message may appear in the middle portion of the Home Page. Typically this message will inform you of critical system issues. This area of the page will not appear when there are no active messages to display.

Password Expiration Notifications


When appropriate, a Your password will expire in ___ days. Please visit the My Account section to change it. will appear below the system message. This will occur when your password is set to expire in 7 days, or less.

Cover Letter Reminders


Procedural reminders, known as Cover Letter Reminders, will appear below the Password Expiration Notifications. This critical section of the screen will help to educate you regarding Safeguard, as well as industry, procedures that must be followed by our contractors.

Sample Policy

Memos
The center portion of the Home Page also contains a section for unread memos. These appear below the messages portion of the page. Any unread and unacknowledged Safeguard-issued memos display here. The most recently issued memos appear first. They contain a link that allows you to open and acknowledge receipt.

Sample Memo

Safeguard Vendor Web: Home Page

Last Updated On 7-24-08

Once a message is acknowledged and read it will move off the Home Page. You may review it in the Help page. These messages are also accessible on the Login Page. You may click on this pages Memos section to access past memos.

Safeguard Vendor Web: Home Page

Last Updated On 7-24-08

Recover User ID
A contractor ID is required to log into the Vendor Web site. If you have forgotten your Contractor code, it can be recovered using the Forgot Your Contractor Code link.

1. Click the Forgot your Contractor Code link on the Log In page.

2. The Contractor Code Recovery screen will appear.

3. Type your e-mail address in the space provided.

Safeguard Vendor Web: Recover User ID

Last Updated On 8-7-08

4. Click the submit button.

Check your e-mail for a message containing your contractor code.

Safeguard Vendor Web: Recover User ID

Last Updated On 8-7-08

Recover Password
Recovering your password is as simple as entering your contractor code.

From the Log In page, click the Forgot your Password link.

Enter your contractor code and click the Submit button.

Safeguard Vendor Web: Recover Password

Last Updated On 7-30-08

Password Maintenance
The Vendor Web system allows any vendor to modify their password or challenge question information at any time. These features can be accessed through the My Account link located in the upper right hand corner of any Vendor Web screen.

Changing Your Password

1. Click the My Account link in the upper right hand corner of the screen.

The My Account: Change Password page will display. Before proceeding you will need to have your current password. If you have lost you current password, you will need to have the password retrieved. Please refer to the Forgot Password section of this manual for instructions on retrieving a forgotten password.

Safeguard Vendor Web: Change Password

Last Updated On 7-30-08

2. Type your current password in the {Current Password} field. 3. Type your new password and then type it again to confirm. Please ensure the same word is typed into each field. a. If the words in the {New Password} and {Confirm Password} fields do not match you will receive an error message. 4. Click the Save button to confirm the password change.

Safeguard Vendor Web: Change Password

Last Updated On 7-30-08

Challenge Question
Changing Your Password Challenge Question

If you need to retrieve a lost or forgotten password, you will be asked a challenge question to prove your identity. This challenge question can also be changed from the My Account link. 1. In the Navigation Tree on the left, click Change Challenge Question 2. Type your current password in the {Current Password} field. 3. From the drop down box, choose the desired challenge question.

Safeguard Vendor Web: Challenge Question

Last Updated On 7-30-08

4. Type the answer to your chosen challenge question in the {Challenge Answer} field. 5. Click the Save button to confirm the Challenge Question and answer change.

Safeguard Vendor Web: Challenge Question

Last Updated On 7-30-08

Contractor Memos
Safeguard routinely sends out contractor communications in the form of memos. These can highlight changes to Safeguard, Client or Investor procedures in addition to general reminders regarding work performance. All memos that are sent to our contractors are archived and available for viewing from the Vendor Web.

You can access the archived memos from the Log In page.

Safeguard Vendor Web: Contractor Memos

Last Updated On 8-7-08

1. Click the link for Memos from the navigation tree on the left side of the page.

2. You will see the Memos page display with a navigation tree on the left side of the page. The memos are archived based on the year they were released.

Safeguard Vendor Web: Contractor Memos

Last Updated On 8-7-08

3. By clicking the link for the year you will see the months appear in which memos were released that year.

Memos will display that were released from the chosen month and year.

By clicking the [more] link the complete text to the memo will display.

Safeguard Vendor Web: Contractor Memos

Last Updated On 8-7-08

When you log into the Vendor Web the first page that appears is the Home Page. The Home Page will display the latest Contractor Memo that was released along with any other memos that have yet to be read.

By clicking the Read Memo link the text of the memo will appear.

Notice the link at the bottom titled Please check here to signify you have read this memo. By clicking this link you are advising Safeguard that you have read
Safeguard Vendor Web: Contractor Memos 4 Last Updated On 8-7-08

the memo and are aware of its contents. Until you acknowledge you have read the memo by clicking the link, it will continue to remain on your Home Page.

Safeguard Vendor Web: Contractor Memos

Last Updated On 8-7-08

General Navigation
Once a contractor begins his/her update,

The Navigation Tree


The Navigation Tree is located on the left side of the updating screen and serves as a visual representation of all sections of the order and their current status. As a contractor navigates through their update the navigation tree will change to reflect which section the contractor is currently viewing. It will also display various symbols which will inform the contractor of the status of sections which have already been completed.

The Navigation Tree will highlight the section the vendor is currently viewing and/or working on.

Safeguard Vendor Web: General Navigation

Last Updated On 7-30-08

Sections which have been completed and are without errors, will be marked with a green checkmark within the Navigation Tree.

Sections which have been completed, but have an error will be marked with a red X within the Navigation Tree. These errors can be corrected within the topic screen being displayed on the right. The screen will prompt the user as to the cause of the error.

Error Review
Errors can be corrected on the screen as they are discovered or they may be corrected at the end of the updating process during error review. The Errors and Warnings page appears prior to finalizing the update. This page will be separated into two sections, Errors and Warnings. Errors: Errors must be corrected prior to submitting the update to Safeguard Properties. The individual errors will be listed with links provided to return to the section of the update where they can be corrected. Once all errors have been corrected, the update can be finalized.

Safeguard Vendor Web: General Navigation

Last Updated On 7-30-08

When all errors on the update are cleared the Submit Update button will become available

Warnings: Warnings need not be corrected prior to finalizing the update, however the listed items may cause the order to be left open and will most likely require additional follow up or questions from Safeguard Properties.

Safeguard Vendor Web: General Navigation

Last Updated On 7-30-08

Orders Tab
Clicking on the orders tab from the Home Screen will take you to your Orders Page. The Orders Page displays all relevant information to your open, re-opened, cancelled, or completed orders.

Orders Tab
The Orders tab will be the area in which you will perform most of your work. It is where you will view and search for orders. The update will also be performed within this tab. This screen is made up of several components.

Navigation Bar Orders Lists Main Order List

Navigation Bar
The area under the Orders tab is known as the Order Navigation Bar. This bar populates as you begin to update or review orders during your current Vendor Web session. The Order Navigation Bar can also return you to the Orders List screen at any time revealing the orders last viewed. This function can be performed using the View Order List function that is located to the left of the navigation bars first order. Arrows, on either side of this bars order numbers, will allow you to scroll horizontally. The View Order List feature remains fixed on the left-hand side of the Order Navigation Bar.

Safeguard Vendor Web: Orders Tab

Last Updated On 8-8-08

Order Lists
The Orders tab contains your Orders Lists on the left side of the window. The lists are separated into categories and clicking on each category will change what is displayed in the main orders window.

Main Order List


The Main Orders List screen shows defaults to your current open orders. You can adjust this list by selecting one of the filters located in the Orders Lists on the left side of the screen. You can filter your Main Order List display by clicking on the following options:

Open Orders Re-opened Orders Cancelled Orders Order History

Safeguard Vendor Web: Orders Tab

Last Updated On 8-8-08

Each category contains the following departments. You can further filter your Main Order List display by selection one of the following:

All Maintenance Grass Claims

Each status (Open, Re-opened and History) will have a set of data columns. These columns will be a subset of this list of order or property attributes (the subsequent use cases define which attributes are displayed in each list): Field City Client Completed Date Department Description City in which the property associated to the order is located Alphanumeric client code listed in the Safeguard system Date you, the contractor, completed the work order. This date comes from the update information entered by a contractor. Department with which the order is associated i.e. Maintenance, Grass, Claims Date on which order is due Type of follow-up you are viewing i.e. Update, Billing, Cancelled, On Hold Amount paid to your for a given work order

Due Date Follow-Up Type Invoice Amount Invoice Num- The invoice number entered by the vendor when their update ber and invoice are submitted for a given work. Loan Type The loan type stored in the Safeguard system (FHA, VA, CV,
Safeguard Vendor Web: Orders Tab 3

Last Updated On 8-8-08

Order Date Order Description Order Notes

Order Number State The state in which the property associated to the order is located. Street Ad- The street number and name of the property to which the order dress is associated. Zip The zip code in which the property associated to the order is located. If a user chooses to view a list that contains no orders, in place of the table of orders will be text saying: No orders found.

FNM, FMC, CDG, UNK). The date on which the order was placed by Safeguard. The alphanumeric description of the services ordered by Safeguard. During the vendor scripting process, users will have the ability to enter customized notes for their internal reference. These notes will be stored and the first 25 characters will be displayed. The internal Safeguard order number.

The first field in each row of each table will be underlined indicating a link that will take the user to the Order Details screen. However, clicking on any part of the row in the table will take the user to the Order Details. Each order list table will allow the contractor to sort the list on any of the data columns. The contractor will click on the column heading once to sort the table ascending order by this column. The contractor can click on the column heading again to sort the table descending order by this column. Each table will have a button that will allow the contractor export the list to Microsoft Excel. All columns and all rows should be exported to the report in the current sorted or filtered format.

Safeguard Vendor Web: Orders Tab

Last Updated On 8-8-08

Order Details
Accessing the Property Information Screen
Orders Tab
Clicking the Orders Tab will display the current vendors list of orders. By default the list will display all open orders currently assigned to the logged-in vendor.

Filtering the Order List View


A vendor may filter the orders displayed in the Order List by selecting the desired order type from the navigation pane on the left. By choosing the appropriate viewing criteria, a vendor may display open orders, orders which have been re-opened for additional information, or they may review past orders which have been closed.

Selecting an Order to View


The Order List displays all orders matching the criteria chosen by the vendor from the navigation pane on the left. Clicking a particular property will display the Property Information screen.

Safeguard Vendor Web

Last Updated On 7-22-08

Order Details Screen


The Property Information Page displays a variety of information on a particular work order including the loan type, work order instructions, and other open orders for the property. In addition, the Order Details Page serves as the launch point for the scripting process which will allow the vendor to communicate the specifics of work completed at the property back to Safeguard Properties.

Tip: You can return to the Order List at any time by clicking on the Orders Tab at the top of your screen.

Safeguard Vendor Web

Last Updated On 7-22-08

Property Information
The Property Information section displays basic information on the property including the loan type, client, occupancy status, convey date (if applicable), and the property address. This section also includes a location photo of the property.

Tip: The Address field includes a Map link which will launch Google maps to assist the vendor in locating the property.

Order Information
The Order Information section displays the order number, order date, the work ordered, the due date and any additional comments and/or instructions provided by Safeguard for the order being viewed.

Work Order Text


The Work Order Text section displays the specific order instructions provided by Safeguard Properties for the selected work order number. A link is provided which allows the contractor to Print Work Order Text.

Safeguard Vendor Web

Last Updated On 7-22-08

Order Messages
The Order Messages Section displays any messages that have been sent to the contractor from an associate of Safeguard Properties. These messages may be inquiries for the status of a late order or may be asking for additional information or bids on the work order being displayed.

Create Status Report


This section allows the contractor to create a status update to be sent to Safeguard. Full instructions on creating a Status Report will be covered later in the manual.

Orders for Property


The Orders for Property section displays all other orders assigned to the logged-in contractor for the property being viewed.

Bids for Property


The Bids for Property section displays all bids previously placed by the logged-in contractor for the property being viewed. The list includes a description of the bid, the order number where the bid was placed, the date given, and the current status of the bid.

Damages for Property


The Damages for Property section displays all damages that have been previously reported by the logged-in contractor for the property being viewed. The list includes the

Safeguard Vendor Web

Last Updated On 7-22-08

damage type where the bid was placed, the amount of the bid, the date given, and the current status of the bid.

Safeguard Vendor Web

Last Updated On 7-22-08

Update buttons
The Perform Update button is used to begin the process of entering photos, bids, eyeball estimates, etc. through a series of scripted questions. This button will appear at the bottom of the order details screen if no update has been started on the work order displayed. The Restart Update button is used to continue the process of entering photos, bids, eyeball estimates, etc. through a series of scripted questions. This button will appear at the bottom of the order details screen only if an update was started previously. Upon clicking the Restart Update button, the vendor will be given the option of continuing the previous update or starting over.

Field Description Table


Name
Address Amount Client Completion Date Convey Date Create Status Report Damage Type Date Date Damage Reported Due Date Eyeball Estimate Loan Type Map Message Occupancy Status Order Comments
Safeguard Vendor Web

Function
The physical address for the selected property. Displays the amount of previous bids submitted for the property. Displays the mortgagee for the selected property. Displays the completed date of the referenced work order. Displays the date the property conveyed to HUD if applicable. Launches the Status Report Entry screen. This allows the contractor to communicate reasons for delays in completing work (weather, bad address, etc.) Displays the category of previously reported damage to the selected property (Roof, Freeze, Mortgagor Neglect, etc.) Shows the date a message was sent from Safeguard or the date a previous bid was submitted to Safeguard. Shows the date of the work order where previous damage was reported. Shows the date that the displayed work order must be completed by. Displays the amount given for previously reported damages. Displays loan type for the selected property. (CV, FHA, VA, FNM, etc.) Launches Google Maps application which will display the location of the selected property. Links to a text sent from Safeguard to the logged-in vendor. Displays the current occupancy status for the selected property. (Occupied, Vacant, Unknown, Partial) Displays any special instructions/comments on the selected property which were provided by Safeguard.

Last Updated On 7-22-08

Order Date Order Number Print Work Order Text Print Page Content Status Work Ordered

Displays the date the order was opened for the selected work order number. Displays the work order number for the selected orders. Launches the printing utility which can be used to print a paper copy of the work order instructions. Prints the entire Order Details Page. Displays the current status of a previously provided bid. (Approved, Denied, Pending, etc.) Provides a description of the specific work ordered for the selected work order. (Lock change, winterization, grass cut, etc.)

Safeguard Vendor Web

Last Updated On 7-22-08

Status Reports
From time to time, a situation may arise that makes it impossible to complete an order by the assigned due date. In these situations, a Status Report can be sent to Safeguard to keep everyone apprised of the situation and the time frame in which the order will be completed.

Creating a Status Report 1. Scroll to the {Create Status Report} section of the Order Details page.

Safeguard Vendor Web: Status Reports

Last Updated On 8-6-08

2. Choose the reason for the status report by clicking the drop down box and selecting the appropriate reason.

3. The {Status Report Text} field will appear. Type in additional details regarding the status report including when the work is expected to be completed. 4. Click the Create Status Report button to submit your status report to Safeguard.

NOTE: Status reports are not to be used to send bids, eyeball estimates, etc. Status reports are only to be used to send general information regarding the status of an open work order.

Safeguard Vendor Web: Status Reports

Last Updated On 8-6-08

Verifying Previous Bids & Damages


Bid Verification Process
The Vendor Web system requires that all previous bids be verified as valid or invalid on all subsequent visits to the property. This process will ensure that the clients always have the most up-to-date and correct information in regards to work that is needed at the property. Upon entering the Order Details screen, previous bids and damages which must be verified will appear at the bottom of the screen.

Safeguard Vendor Web: Verifying Previous Bids

Last Updated On 8-8-08

1. In order to validate the previous bids click on the section from the Navigation Tree in which the bid is located that you wish to validate. NOTE: Any category that is listed in the navigation tree has at least 1 bid that must be verified.

2. Every header that is listed will have bids that need to be verified. 3. Click the arrow at the left of the header to expand the field, this is where you will find the details of the bid.

4. You will be asked if the bid is still valid, if the bid is still valid choose yes from the dropdown box. 5. If the bid is valid you will have the option to attach a photo to support the bid is valid. NOTE: This is an optional photo.

Safeguard Vendor Web: Verifying Previous Bids

Last Updated On 8-8-08

6. You may also choose no, the bid is no longer valid. 7. If the bid is no longer valid, you will be prompted to select the reason why it is no longer valid.

8. The comments box is available to enter more specific information regarding the situation.

9. A photo can be attached to support the work is no longer needed

Safeguard Vendor Web: Verifying Previous Bids

Last Updated On 8-8-08

Uploading Images
Uploading Photos
Images are transmitted to Safeguard Properties through the use of the Image Uploader. Upon beginning an order, the Vendor Web will require that photos be uploaded. These photos can then be assigned to completed work and/or bids within the update.

1. Click on the Upload Images link.

NEW: Many categories within the Vendor Web now require a during photo in addition to the before and after photos required in the past.

Safeguard Vendor Web: Order Photos

Last Updated On 7-30-08

2. The Vendor Web Image Uploader window will appear.

3. Using the Navigation Tree on the left, click on the folder or drive containing the files to be uploaded to Safeguard. The files contained in the chosen folder will display on the right side of the Image Uploader window.

4. While pressing the [Ctrl] button, click the photos to be transmitted to Safeguard Properties. Each selected photo will highlight in blue to indicate it has been chosen.

Safeguard Vendor Web: Order Photos

Last Updated On 7-30-08

5. Photos which appear upside down or sideways can be rotated by clicking on the Rotate icon located at the bottom of each photo. This must be done prior to uploading the photos to Safeguard Properties.

Tip: You can rotate all photos at the same time by clicking the button and then using the Rotate icon on any of the selected photos. 6. If you wish to add every photo in the selected folder to the upload queue, click the Add All button.

7. You can remove a photo from the upload queue by clicking on the red X in the upper right hand corner of a photo.

8. Once you have the photos you wish to upload added to the queue, click on the Upload Image(s) button.

Safeguard Vendor Web: Order Photos

Last Updated On 7-30-08

9. Select OK from the pop-up box to confirm the quantity of photos to be uploaded.

10. The Upload Files window will appear and a green bar will track the progress of the upload until finished. The box will close upon completion of the upload.

11. Click the next button to proceed to update the order. (You do not have to wait for the images to finish uploading before you hit the Next button. The images will appear in the gallery once they have completed uploading.

Additional Photo Options


At the bottom of the Image upload screen there are 3 additional headers. The Used Images header allows you to look at the images that have already been used (assigned to labels) for the selected order.

The Incomplete Images and the Incomplete Images with Labels headers display images that did not upload correctly. These images will have to be unassigned from labels and possibly re-uploaded prior to submitting the order to Safeguard Properties.

Safeguard Vendor Web: Order Photos

Last Updated On 7-30-08

General Property Information


Entering General Property Information
The General Property Information screen will display. A vendor may script general information by answering the questions which appear on the screen and providing the appropriate information, number of units, descriptions, etc.

General Property Information

1. Click the General Property Information navigation bar to expand the questions selection.

2. Using the drop down box provided, enter if the property is now {Vacant Land}

Safeguard Vendor Web: General Property Information

Last Updated On 8-7-08

3. {Multi-Unit:} Select if the property is a multi-unit from the drop down box. a. If you answer Yes to {Is the property a multi-unit property?} Three additional questions will appear. Answer the questions appropriately. 4. {Is the property in an area of high vandalism?} Select the appropriate answer from the drop down box. a. If you answer Yes, you will need to supply a reason why the area is considered high vandalism. 5. {Gated community or Condo association:} Select the appropriate answer from the drop down box. a. If you answer Yes, you will need to supply the Name or Number of the community association. 6. {Is the property stand alone?} Select Yes if there is only a single structure on the property. Otherwise select No. 7. Select if the property has a garage from the drop down list. a. If you answer Yes, advise if the garage is attached or detached.

Safeguard Vendor Web: General Property Information

Last Updated On 8-7-08

8. Advise if the property was secure upon arrival and departure. a. If you answer No, you must advise on why the property was not secure. 9. Type the date the work was completed. 10. {Is the property for sale?} Select the appropriate answer from the drop down box. a. If you answer Yes to {Is the property for sale?} questions will appear asking for the brokers name and contact information and as well as if the listing is active. 11. Select if the property was found conveyed to HUD or sold. 12. Choose the appropriate Occupancy Status from the drop down list.

NOTE: Selecting certain answers on some questions (i.e. Selecting Yes to Property for Sale) may cause additional questions and/or sub-screens to be displayed. These questions are mandatory and must be answered to avoid receiving an error or warning.

Safeguard Vendor Web: General Property Information

Last Updated On 8-7-08

Entering Utility Information

1. Click the Utility Information navigation bar to expand the questions selection. 2. Using the drop down lists, choose the status of each utility upon arrival and departure. 3. Repeat the above steps for each utility.

Entering Non-Work Order Specific Information

1. {Is the Property a Mobile Home?} Select the appropriate answer from the drop down box.
Safeguard Vendor Web: General Property Information 4 Last Updated On 8-7-08

2. Advise if there are any citations or violations posted by choosing the correct answer from the drop down box. 3. {Are there damages to report on the property?} Select Yes if the property has damages present, otherwise select No. 4. Select if boarding or reglazing was completed or is being bid. 5. Advise if there is a pool or a hot tub at the property. 6. {Is there debris at the property?} Select the appropriate answer from the drop down box. 7. Choose the location where the lock box was installed from the drop down box. a. If you choose Yes to {Any other work completed} a list of work categories will display. Check the categories of the work you completed. NOTE: Answers given in the Non-Work Order Specific section will cause screens to be displayed later in the update which will ask for more specific information. (i.e. Answering yes to Is there debris present will trigger the Debris screen to display later in the update.
Safeguard Vendor Web: General Property Information 5 Last Updated On 8-7-08

8. Click and drag photos from the image gallery to the appropriate image labels.

Safeguard Vendor Web: General Property Information

Last Updated On 8-7-08

Property Vacancy
General Property Vacancy
Entering the occupancy status of a single unit property is handled on the General Property Information page. Please refer to the General Property Information section of this manual for further instruction on single property vacancy status.

Multi-Unit Property Vacancy


Entering the occupancy status of multi-unit properties is a two part process. 1. On the General Property Information screen, report that the property is a multiunit. 2. Type the number of units in the space provided. 3. Enter how the units are marked.

NOTE: It is extremely important that you enter the units as they are marked. For example, if the apartments are marked 815 and 816, do not refer to them as unit 1 and unit 2. Call them 815 and 816. If the units are unmarked, you may call them whatever you like, but remain consistent throughout the update.

Safeguard Vendor Web: Property Vacancy

Last Updated On 8-8-08

4. Once you finish the General Property Information screen, the Property Vacancy screen will display. This screen will allow you to report individual vacancy statuses for each unit.

5. Click the header to expand the section.

6. Enter the unit number in the space provided.

7. Select the occupancy status for the selected unit by choosing from the drop down list.

8. Repeat steps 5-7 for each additional unit.

Safeguard Vendor Web: Property Vacancy

Last Updated On 8-8-08

Lock Changes
Securing a property to client specifications is critical. It is imperative that the work order be reviewed and followed when securing a property, because securing specifications can vary by loan type, from one property to the next; as well as from one client to another. Some general securing requirements are listed below. All properties: Photo of working lockbox on each visit, accurate lockbox code Working keys in the lockbox including any padlock keys P&P properties: Follow work order specifications regarding locks to change Install cover plates / disable deadbolts per Contractor Memo 1116, unless stated otherwise on work order Gain access, rear door REO properties: Secure all doors including garage man door Broker Notification follow Contractor Memo #1214 Remove cover plate and install deadbolt Redemption secure secondary door only (no lockbox if personals are present) Initial services work order (front door)

Entering Securing Information


The securing screen will display. A vendor may script securing information by answering the questions which appear on the screen and providing the appropriate information, bids, locations, etc.

Safeguard Vendor Web: Securing

Last Updated On 8-1-08

Entering a Lock Change


1. {Was a Lock Change Completed?} Select the appropriate answer by clicking and choosing from the drop down list. 2. {Any lock change bids?} Using the drop down box, select if you are placing bids for lock changes or not. 3. Type any additional information in the comments box provided.

Safeguard Vendor Web: Securing

Last Updated On 8-1-08

4. Ensure you are in the Securing - Work Completed section of the Securing page. 5. Select the type of lock installed from the Add New Task drop down box.

6. A header will be created which will allow you to enter details for the selected lock change. 7. Select the location of the lock change from the drop down list provided.

8. Choose the lock key code from the {Lock Type} drop down list.

9. Type any additional information in the comments box provided.

Safeguard Vendor Web: Securing

Last Updated On 8-1-08

10. Add supporting photos for the reported lock changes by clicking and dragging the appropriate photo from the Image Gallery at the bottom of the page into the corresponding Image Needed box.

11. Repeat steps 5-10 for each additional lock change completed.

NOTE: You can select multiple photos for a single category by pressing and holding either CTRL of SHIFT button while making your selections.

Entering a Lock Change Bid


1. {Any Lock Change Bids?} Select Yes from the drop down list. 2. Select the appropriate lock type from the Add New Bid drop down box.

3. A header will be created which will allow you to enter details for the selected lock change bid.
Safeguard Vendor Web: Securing 4 Last Updated On 8-1-08

4. Select the location for the lock change bid from the drop down list provided.

5. Select the correct key code from the Lock Type drop down box.

6. Type the amount for the bid in the box provided.

7. Select if the bid is a bid to resecure or the first time we are securing the door. 8. Add supporting photos for the lock bid by clicking and dragging the appropriate photo from the Image Gallery at the bottom of the page into the corresponding Image Needed box. 9. Repeat steps 2-8 for each additional lock change completed.

NOTE: You can select multiple photos for a single bid by pressing and holding either CTRL or SHIFT button while making your selections.

Safeguard Vendor Web: Securing

Last Updated On 8-1-08

Safeguard Vendor Web: Securing

Last Updated On 8-1-08

Winterizations
Winterizations are performed in order to prepare a property for the colder months. This is accomplished by removing all water from the plumbing and adding an anti-freezing agent to all toilets, bath tubs, sink traps and dishwashers. Photo documentation must include: Before/during/after of winterization being performed including antifreeze being poured Winterization stickers on all items winterized Photo of the air compressor connected to the lines with the gauge visible (either holding or not holding pressure) Additional items when completing a winterization include: All properties: Water needs to be removed from the bowl and back of tank Completely fill out winterization stickers Subsequent visits to a property, verify integrity of the winterization Pressure test Missing or damaged plumbing or systems issue o Blow lines o Add antifreeze REO properties: Year round regardless of broker comments

Safeguard Vendor Web: Winterizations

Last Updated On 08-01-08

Reporting General Winterization Information


1. Under the Winterization header click the drop down box and choose the type of system that was winterized. 2. Once you have chosen the system type click the drop down box and choose whether or not the winterization was completed, if the winterization was not completed under this order please choose the appropriate response. NOTE: On the General Property Information Screen you have already advised on the status of the utilities upon arrival and departure. This information will be carried over into
Safeguard Vendor Web: Winterizations 2 Last Updated On 08-01-08

the winterization screen automatically.

3. By clicking the drop down box to advise whether you were able to get a meter reading, there was not a meter present, or for multiunit properties the meter was common. 4. If you were able to get the reading enter it in the space provided. 5. By clicking the drop down box advise whether you were able to get the serial number from the meter. 6. If you were able to get the serial number enter it in the space provided. 7. Repeat steps 5 & 6 for the additional utilities. 8. Type in any relevant comments in the Additional Comments box.

Reporting Winterization Completed Information


1. Ensure you are in the Work Completed section of the Winterization page. 2. Select the heating system type from the Add New Task drop down list.

Safeguard Vendor Web: Winterizations

Last Updated On 08-01-08

3. A header will appear which will allow you to enter the details of all work that was completed as part of the winterization by either choosing Completed or N/A. Note: All tasks you advise have been completed will require a photo to support even if it is a non-required photo.

4. If you choose N/A, a comments box will appear. Enter the reason for not completing the winterization step.

5. Click and drag photos from the Image Gallery to the appropriate image label.

Providing Winterization Bids


1. Ensure you are in the Winterization Bids section of the Winterization page.

Safeguard Vendor Web: Winterizations

Last Updated On 08-01-08

2. Select the appropriate bid from the Add New Bid drop down list.

3. Drag a photo to the Image label to support the bid for the winterization.

Safeguard Vendor Web: Winterizations

Last Updated On 08-01-08

Damages
It is extremely important to accurately report and define damages at a property. Proper photo documentation of all damages found at a property is required. If there are no damages, then property condition photos are required. Photo documentation of the property condition is necessary in case damages are reported at a later date. The following information should be considered when reporting damage at a property. Vandalism: Damages will be evident in the photos, many broken windows, graffiti, neighbor reports, etc. One (1) broken window is not considered vandalism. Fire: Fire damage to interior or exterior of the property is considered fire damage. An outside grill that is burnt is not considered fire damage. Roof: The $400 Roof Allowable should cover the cost to tarp all properties. Structural: Crumbling foundations, caved in and cracking walls. Holes in walls are not structural; they should be reported as Mortgagor Neglect. Caution: The only damage that can be repaired without bid approval is roof damage. When a Roof Allowable is available, tarping and/or Roof repairs should be completed within the allowable amount without bid approval. Your work order will advise of a Roof Allowable.

Entering Damages Information


The General Damages screen allows a vendor to report damages to the property. It allows a vendor to submit an eyeball estimate, submit photos of the damage, and submit a bid to repair if necessary.

Safeguard Vendor Web: Damages

Last Updated On 08-01-08

Damages Work Completed


1. Ensure you are in the Damages Work Completed section of the page. 2. Click the drop down box next to {Add new task}

Safeguard Vendor Web: Damages

Last Updated On 08-01-08

3. A header bar will be created which will allow you to enter details about the work completed.

Damages Estimates 1. Ensure you are in the Damages Estimates section of the page. 2. To add an estimate, first choose a location from the {Add new estimate} drop down box. All locations can be chosen one at a time.

Safeguard Vendor Web: Damages

Last Updated On 08-01-08

3. As you select locations a header bar will be created which will allow you to enter details about the damages. Once the details are entered you can click on the arrow to collapse the detail section. NOTE: If you are reporting a damage that requires a bid (mold, roof) you will be required to enter that bid when you report the damage.

4. Add any supporting photos for your estimate by clicking and dragging the photo(s) into the corresponding image label.

Safeguard Vendor Web: Damages

Last Updated On 08-01-08

Pool/Hot Tub Information


If a vendor selects that there is a pool and/or hot tub while entering general property information, the Pool Screen will be displayed later in the update. A swimming pool or hot tub can pose a serious threat if left unattended and unsecured. Because of this, Safeguard has specific guidelines for securing swimming pools. In ground pools are to be secured by building a frame of 2x6 purlins and 2x4 joists that extend a minimum of 6 inches beyond the pool's edges. The joists are to be a maximum of 48 inches apart. Fasten #10 wire mesh to the top of the frame with heavy duty 1/2 inch staples. Additional information for REO properties: Secure pool gate and discuss w/broker Client specific above ground CMC, SPS Above ground pool, remove decking if pool is in good condition Cleaning pool: drain/fill, use pool chemicals, shock treatment Hot Tubs: Padlock and find cover Additional information for P&P properties: Above ground pools with decking secure as you would an in-ground pool. All bids must be supported with sufficient photo documentation. Safeguard does understand that occasionally there are extreme or unusual situations where the bid may exceed the maximum cost set forth above, and in these cases, we will require detailed bids that list the time and materials to complete the work.

Safeguard Vendor Web: Pools and Hot tubs

Last Updated On 8-8-08

Reporting General Pool Information


1. Ensure you are in the Pool / Pond Information section of the Pool Information page. 2. Select if the pool is above ground, in-ground, or is a pond from the drop down list. 3. Select the shape of the pool or pond from the {Shape} drop down list.

4. Type the length and width of the pool in feet.

5. {Was the pool secure on arrival?} Choose if the pool was secure when you arrived at the property. a. If you answer Yes to the above question, you will need to inform Safeguard how the security of the pool was determined. 6. Advise if there was water in the pool upon arrival or not by selecting the appropriate answer from the drop down list.

Safeguard Vendor Web: Pools and Hot tubs

Last Updated On 8-8-08

7. Enter any additional comments in the {Pool Comments} field.

8. Add the required photos by dragging the appropriate image from the Image Gallery the Photo - Pool label.

1. Ensure you are in the Work Completed section of the Pool Information page.

2. Select an action from the {Add New Task} drop down box. You may select more than one task although you must select them one at a time.

3. Once you have selected the work completed headers will appear on the page which can be expanded to enter additional details of the work completed.

Safeguard Vendor Web: Pools and Hot tubs

Last Updated On 8-8-08

4. Click the arrow on the left side of the header, you will notice the field expand, advise how much water was left in the pool. You can add any additional comments in the comments section. 5. You will then be asked to insert the photos to support the work was completed. To complete this drag the photos from the bottom of the screen into the appropriate section located just above the list of photos.

Safeguard Vendor Web: Pools and Hot tubs

Last Updated On 8-8-08

Giving Pool/HOT TUB Bids


1. Ensure you are in the Bids section of the Pool Information page.

2. Select an action from the {Add New Task} drop down box. You may select more than one task although you must select them one at a time.

3. Once you have selected the work completed, headers will appear on the page which can be expanded to enter additional details of the work completed 4. Click the arrow on the left side of the header, you will notice the field expand. Enter the details and the amount of the bid.

Safeguard Vendor Web: Pools and Hot tubs

Last Updated On 8-8-08

5. You will then be asked to insert the photos to support the work was completed. To complete this drag the photos from the bottom of the screen into the appropriate section located just above the list of photos.

6. Click the Next button to continue with additional sections of the update.

Safeguard Vendor Web: Pools and Hot tubs

Last Updated On 8-8-08

Mobile Homes
The following information will aid in identifying mobile, manufactured, and prefab homes.

All manufactured homes are required to have a Department of Housing tag affixed to the rear section of the home. This requirement has been in effect since 1977. This small metal tag will include the point of origin and the home's serial number. If the home is more than one section (double-wide, triple-wide, etc.), each section will have a tag. The "peak" of the roof can also be a good indicator that these homes are manufactured homes. Most, although not all, roofs will also have a roof cap along the center of the roof. This roof cap is usually visible from the street. Occasionally older mobile homes will have flat roofs, but these are usually located in mobile home parks rather than on private property. When manufactured homes are located on private property site built/ ground-set, there will be a vapor barrier line around the home. This is a wood strip abutting the ground along the bottom of the home's siding. On all site built/ground-set homes, a ground access panel will be evident even from some distance away. Ground-set homes may be located on private property or in mobile home communities.

When performing any maintenance work order on a mobile or a manufactured home, and you are reporting it vacant, the VIN # must be obtained and provided on the update via the Vendor Web. This information is critically important for our clients and Safeguard has made a commitment to provide it on all vacant properties. The serial number or VIN could be inside the mobile home in a kitchen or utility cabinet, by the electrical circuit breaker box, under the tongue, on the tongue, underneath the mobile home, or on a plate near the front or back door. If the data plates that are supposed to be inside the unit have been removed, the serial number or VIN can be located on the tow bar/hitch or frame front cross member of each transportable section. Usually it is cold stamped directly onto the outside of a steel crossbeam that is part of the main undercarriage frame. If you are unable to locate a VIN for any reason, call SPI from site. Otherwise, orders that are updated without identification numbers and the attached report will remain open and incomplete. Tip: Mobile VIN numbers contain approximately 20 characters.

The Mobile Home screen will display. A vendor may script Mobile Home information by answering the questions which appear on the screen and providing the appropriate information: make, model, dimensions, VIN, etc.
Safeguard Vendor Web: Mobile Homes 1 Last Updated On 8-1-08

Entering Mobile Home Information

1. {Mobile Home Type:} Select the appropriate answer by clicking and choosing from the drop down list. 2. {Make:} Type the make of the mobile home in the space provided. 3. {Model:} Type the model of the mobile home in the space provided. 4. {Year:} Type the year the mobile home was manufactured in the space provided.

Safeguard Vendor Web: Mobile Homes

Last Updated On 8-1-08

5. Provide a description of the mobile home by filling in the {Size}, {Length} and {Width} fields. 6. Enter at least 1 VIN number in the space provided. Additional spaces are given if more than one number is present. NOTE: At least one VIN must be entered on the Mobile Home screen to avoid receiving an error. 7. Enter at least 1 HUD Tag number in the space provided. Additional spaces are given if more than one number is present. 8. Provide the physical details of the mobile home by choosing the appropriate answers from the {Skirted?}, {Tongues/Axle/Wheels Attached} and {Affixed to foundation} fields. 9. Add a photo of the mobile home by dragging the photo into the appropriate photo box.

Safeguard Vendor Web: Mobile Homes

Last Updated On 8-1-08

Debris
The General Debris screen can be used to either report debris that was removed or bid debris for later removal. When reporting debris, remember the following: Before, during and after photos are required. Take photos of debris AFTER removal to show debris has been cleared. Photos should be of same area and angle as BEFORE photos. Final photo should be of contractor's full truckload or full dumpster load. If bidding any type of debris, the bid must include quantity, price per unit, bid amount and description of the debris. For personal property: must also include approximate value, interior or exterior, a bid to remove and a bid to store. If you are only removing health hazards, if possible, show the health hazards in a pile, and then removed. An original location photo would be helpful.

Safeguard Vendor Web: Debris

Last Updated On 08-01-08

Debris: Work Completed


1. Ensure you are working in the Work Completed section of the Debris screen.

2. Select the category of debris that was removed by choosing from the drop down menu labeled {Add New Task}

3. As you select types of debris headers will appear which will allow you to enter details about the work completed. Anytime you report debris was removed from the property you must advise on a description, a quantity/measurement, and the contact information for the dump site (FHA Loans only)

Safeguard Vendor Web: Debris

Last Updated On 08-01-08

4. You will then be asked to insert the photos to support the work was completed. To complete this drag the photos from the bottom of the screen into the appropriate section located just above the list of photos.

Debris Bids
1. Ensure you are working in the Bids section of the Debris screen.

2. Select the category of debris that you are bidding to remove from the drop down menu labeled {Add New Bid} NOTE: You will need to open a separate header for each item you are bidding to remove

Safeguard Vendor Web: Debris

Last Updated On 08-01-08

3. As you select types of debris, headers will appear on the page which will allow you to enter additional details regarding your bid.

4. Drag the photos from the bottom of the page into the appropriate section located just above the list of photos.

Safeguard Vendor Web: Debris

Last Updated On 08-01-08

Trashout/Maid Service
When completing a Trashout/Maid Service remember the following: Call and email the broker when complete Document the entire room as well as individual fixtures on both Initial and Refresh The property must not smell. Air fresheners, photo required

Entering Trashout Information


Under the General Property Information Page you will be asked if you completed the Trashout/Maid Service.

If you answer yes when you click to advance to the next page the Trashout/Maid Service page will appear.

Safeguard Vendor Web: Trashout/Maid Service Reporting

Last Updated On 8-08-08

1. Type the completed date in the field provided or you may click the calendar icon and choose the date by clicking on it. 2. From the {Add New Task} drop down box select the appropriate Trashout service. 3. An expanded header will be created which will allow you to enter the details of the trashout.

4. Type the number of man hours used to complete the trashout, and the number of CYDs removed.

Safeguard Vendor Web: Trashout/Maid Service Reporting

Last Updated On 8-08-08

5. Click to place a checkmark next to all rooms serviced.

6. Add supporting photos by clicking the photo in the image gallery and dragging it to the appropriate image label.

Entering Maid Service Information


1. Type the completed date in the field provided or you may click the calendar icon and choose the date by clicking on it. 2. From the {Add New Task} drop down box select the appropriate Maid Service item.

3. An expanded header will be created which will allow you to enter the details of the Maid Service.

Safeguard Vendor Web: Trashout/Maid Service Reporting

Last Updated On 8-08-08

4. Type the number of manhours needed to complete the maid service in the space provided. 5. Click to place a checkmark next to all rooms serviced.

6. Click to place a checkmark next to all cleaning activities performed.

7. Add supporting photos by clicking the photo in the image gallery and dragging it to the appropriate image label.

Safeguard Vendor Web: Trashout/Maid Service Reporting

Last Updated On 8-08-08

Miscellaneous Bids
Bids that do not fall under any of the basic categories such as securing, winterizations, yard maintenance etc. will be submitted under the miscellaneous bids screen.

1. Ensure you are you are in the Miscellaneous Bids. 2. {Add new bid} Select the bid you with to submit by clicking and choosing from the drop down list.

3. A new Header will appear.

Safeguard Vendor Web: Miscellaneous

Last Updated On 8-8-08

4. Enter your description, comments, and your bid amount.

5. Click and drag your supporting image from the Image Gallery to the image label.

6. Click the arrow on the left side of the header to collapse the section. 7. On the right side of the header your bid amount will appear. You will also see the word Remove, if you place the bid by mistake you can remove the entire bid clicking the word Remove. If you need to amend the bid in any way you can click the arrow, expand the header again and make your changes.
Safeguard Vendor Web: Miscellaneous 2 Last Updated On 8-8-08

Yard Maintenance
Grass Cut Requirements Curb appeal is essential! Ensure that all clippings are removed from sidewalks, driveways, and lawns. Weeds are to be trimmed from fence lines, foundation of the home, driveways, and flower beds without damaging the existing plants or flowers. In addition, weeds found in driveway/sidewalk/walkway cracks must be sprayed with weed killer. Shrubs must be trimmed and all clippings removed. Edging must be done on all lawns maintained on each grass cut. This includes fence lines, foundations, driveways, walkways and sidewalks. Grass must be cut by the due date. In order to ensure this happens, all contractors must maintain a grass cut list regardless of open order status. Grass must be cut when crews are at the property. It is not acceptable to leave a property without performing the required grass cut. If there is a sprinkler system, please contact the Broker to determine if the system should be maintained and running. Submit any necessary bids to accomplish this task. Photo and Update Documentation Before, during and after photos of the front, rear and side of yards are required. Photos of the fence lines, driveway, and sidewalks are required. Before and after photos of the shrub trimming are required. Duplicate photo submission of grass cuts (including location and condition photos) will not be tolerated and should it occur, will result in immediate termination of work.

Safeguard Vendor Web: Yard Maintenance

Last Updated On 8-1-08

Reporting Completed Grass Cuts

1. The first question you will be asked is whether or not the grass cut was completed. Select Yes from the drop down box. 2. If you answer Yes that the grass cut was completed, choose what work was completed from the drop down box.

3. A header will be created which will allow you to enter details for the completed grass cut.

Safeguard Vendor Web: Yard Maintenance

Last Updated On 8-1-08

4. Enter the details of the grass cut that was completed.

5. Add supporting photos for the completed work by clicking and dragging the appropriate photo(s) from the Image Gallery at the bottom of the page into the corresponding Image Needed box. Placing Yard Maintenance Bids The yard Maintenance bid section will allow you to place bids for many different types of yard work including grass cuts, bush hogging, shrub trimming and snow removal. 1. Ensure you are in the Yard Maintenance Bids section of the screen. 2. Select the appropriate bid from the Add New Bid drop down box.

3. A header will be created which will allow you to enter details for the yard maintenance bid.

Safeguard Vendor Web: Yard Maintenance

Last Updated On 8-1-08

4. Enter the details of the grass cut that was completed.

5. Add supporting photos for the bid by clicking and dragging the appropriate photo(s) from the Image Gallery at the bottom of the page into the corresponding Image Needed box.

Safeguard Vendor Web: Yard Maintenance

Last Updated On 8-1-08

Work Per Bid


When bids from previously completed work orders are approved, a Work Per Bid order will be opened and assigned to the contractor who originally placed the bid. The work order will contain a description of which bids have been approved and the amount for which the work should be completed. Contractors will be required to complete the work and provide proper photo documentation. Work Per Bid orders may include work that was bid by others, if it is on your work order you are required to complete the work. All properties: When completing a GCL or Refresh, add to your GCL or Refresh list New before pictures are required of all work completed.

Reporting Work Per Bid Completed

Safeguard Vendor Web: Work Per Bids

Last Updated On 8-1-08

1. The work order text will list each bid which has been approved.

2. Ensure you are in the Work Completed section of the Work Per Bid screen.

3. There will be a header located on the page for each bid to be completed on the selected order. 4. Click the arrow on the left side of the header to expand the selection and enter details regarding the work completed per bid.

5. The system will display the amount of the original bid as well as the approved amount.

6. Choose Yes from the {Completed} drop down list.

7. {Disposal Method} Choose the appropriate means of disposal from the drop down box provided.

Safeguard Vendor Web: Work Per Bids

Last Updated On 8-1-08

8. Type the name of the dump site, junk yard, impound lot or storage company where the debris was dumped, in the {Name of Location} field. 9. Type the street address of the dump site, junk yard, impound lot or storage company in the {Address of Location} field.

10. Type the phone number of the location where the debris was dumped in the {Phone Number of Location} field. 11. {Was the debris towed?} Select the appropriate answer from the drop down list provided. 12. Type any additional comments in the {Comments} box provided.

13. Add supporting photos for the completed work by clicking and dragging the appropriate photo(s) from the Image Gallery at the bottom of the page into the corresponding Image Needed box.

14. Repeat steps 4-13 for all other work per bid items listed on the screen.

Safeguard Vendor Web: Work Per Bids

Last Updated On 8-1-08

NOTE: Dump receipt information will only be required when debris or health hazards were removed from the property in question. If other types of bid work are being completed (i.e. Patching a roof) dump receipt information will not be required.

Reporting Work Per Bid Not Completed


1. Ensure you are in the Work Completed section of the Work Per Bid screen. 2. There will be a header located on the page for each bid to be completed on the selected order.

3. Click the arrow on the left side of the header to expand the selection and enter details regarding the work completed per bid.

4. Choose No from the {Completed} drop down list.

5. Select the reason from the drop down box for why the work per bid was not completed.

Safeguard Vendor Web: Work Per Bids

Last Updated On 8-1-08

6. Type any additional comments on why the work was not completed in the box provided.

Safeguard Vendor Web: Work Per Bids

Last Updated On 8-1-08

Cash for Keys


A cash for keys order is when the client is willing to pay the occupant to vacate the property, to avoid an eviction. The client now owns this property. In order to perform a cash for keys order, it is necessary to visit the property in the evening when it is more likely that someone will be home. A dollar range that can be negotiated will be provided on the order. Please advise the occupant that the client now owns the property, and they are interested in making an offer to the occupant to vacate the property in exchange for a check. Please also explain to the occupants that as part of this agreement, they will be expected to clear out the property and clean it, so that it is in marketable condition. This means that all debris and personals must be removed, and the interior must be wiped down. Failure to do so will result in the occupant not receiving their check. Call the REO department immediately and advise on the success of your efforts. If the mortgagor counter offers, please let us know that amount. We need to stay informed for the entire process. You may need to make multiple trips to establish contact, so please let us know each time you go out and when you can make another trip. We will also provide a notice that must be left at the property if direct contact is not made. Place this in an envelope and tape it to the door. Cash for keys offers can be extended to tenants and mortgagors alike. Once the occupants agree to an amount, you must set a date and time to return with their check. Preferably the appointment will be set within two weeks of their agreeing to the deal. You may give them up to three weeks if necessary, but anything beyond three weeks requires the client's approval. You must notify us immediately if the occupants require more than three weeks to move. We will overnight a check to you once you advise on the date and time, and the amount needed. If you have a cash for keys order and the property is vacant, please call your regional coordinator immediately. Contractors will be paid for successful cash for keys orders only. If you believe that the property is already vacant, call in to your regional coordinator and advise. You will be instructed to proceed with the initial services. We will open an initial services order for you, and you will need to submit all information under that order. If you find that there are personals inside, proceed with only one lock change, winterize if in season, and submit a bid to remove and store the personals. Do not remove anything from the property at that time.

Entering Cash for Keys Information


The Cash for Keys screen will display. A vendor may script cash for keys information by answering the questions which appear on the screen and providing the appropriate information, contact name, property condition, etc.

Safeguard Vendor Web: Cash for Keys

Last Updated On 8-7-08

1. {Was Cash for Keys deal completed?} Select Yes from the drop down list. a. If you answer No, you will be required to advise why the deal was not completed. 2. Add any {Additional Comments} in the box provided.

3. Type the persons name whom the check was released to for the Cash for Keys transaction. 4. Choose Yes from the drop down box if a signature was obtained from the occupant. Otherwise select No.

Safeguard Vendor Web: Cash for Keys

Last Updated On 8-7-08

5. Choose Yes from the drop down box if the occupants removed all of their personals. Otherwise select No. 6. Choose Yes from the drop down box if the occupants cleaned the interior of the property. Otherwise select No. 7. Choose Yes from the drop down box if the occupants cut the grass. Otherwise select No.

8. Choose Yes from the drop down box if the occupants left the property in the desired condition. Otherwise select No. 9. Enter any comments or additional information in the {Additional Comments} field. 10. Add the required photos and documentation for the cash for keys transaction by dragging the photo/document into the appropriate photo/document box.

Safeguard Vendor Web: Cash for Keys

Last Updated On 8-7-08

NOTE: The vendor must supply Cash for Keys agreement that is signed by the occupant of the property. This can be uploaded as a document and placed in the Document box when selecting supporting photos.

Safeguard Vendor Web: Cash for Keys

Last Updated On 8-7-08

Utility Transfers
A contractor may be asked to turn utilities on and transfer them into the clients name. Utility orders are placed to transfer the utilities into the clients name in order to maintain the heat or operate the sump pump. On utility orders for transfers or to turn on, it is critical to assure that: Properties convey on time (There are some states that require utilities be transferred into Mortgagee's name). Properties do not freeze pending completion of winterization work. Sump pumps are operational. On your update, please provide the name and phone number of the utility company along with the account number that the property is registered to. After the utility company has informed you that utilities have been transferred into Mortgagee's name and are on, it is essential you verify this by going to the property and assuring this to be the case. Provide photos showing the lights on and running water.

Entering Utility Transfer Information


The Utility Transfer screen will display. The vendor will be able to report transferring the electricity, gas, water, oil, propane or other.

Safeguard Vendor Web: Utility Transfers

Last Updated On 08-01-08

Entering a Completed Utility Transfer


1. You will asked for the reason the utilities are being transferred. Choose between sump pump and maintain heat or both.

2. If you choose Maintain Heat you will be asked for a photo of the thermostat to support the heat is set at 55 degrees. NOTE: The photo is optional, however we strongly recommend the photo is submitted. 3. Under the Utility Transfer Work Completed header click the {Add new task} drop down arrow and choose Transfer utilities. 4. A header will appear which will allow you to enter details of the utility transfer.

5. Place a check mark in the box next to all utilities that were transferred.

Safeguard Vendor Web: Utility Transfers

Last Updated On 08-01-08

6. For each utility you choose, a menu bar will appear which can be expanded to enter details of the transfer. 7. Click the drop down arrow next to the utility you wish to enter details for. The window will expand to display the required questions.

8. Add supporting photos to illustrate the utilities status (i.e. a light on) by clicking and dragging the appropriate photo from the Image Gallery at the bottom of the page into the corresponding Image label.

Safeguard Vendor Web: Utility Transfers

Last Updated On 08-01-08

Entering a Utility Transfer Bid


If the utilities cannot be transferred for the allowable or the city must be contacted, a bid may be necessary. The following steps will walk you through the process of placing a bid to transfer utilities.

1. Ensure you are in the Bids section of the Utility Transfer page. 2. Select Transfer utilities from the drop down box provided.

3. The Transfer Utilities header will appear which will allow you to enter details of the bid.

4. Click the box next to each utility included in the bid to transfer.

5. A header will appear titled Gas Bid. Click the arrow to expand the field.

Safeguard Vendor Web: Utility Transfers

Last Updated On 08-01-08

6. Enter the details for the utility company.

Safeguard Vendor Web: Utility Transfers

Last Updated On 08-01-08

Give Access
When completing a Give Access order the following procedures need to be included. All Properties Make contact within 24 hours of the work order to schedule an appointment Remain at the property, never give out keys or lockbox codes. Document what was removed from the property Inventory bid remaining inventory Complete Inspection Sign In Sheet REO Properties Provide necessary bids, if personals remain (remains may be debris)

Entering Give Access Information


The Give Access screen will display. A vendor may script access information by answering the questions which appear on the screen and providing the appropriate information, names, comments, etc.

Safeguard Vendor Web: Give Access

Last Updated On 8-7-08

Reporting Access Was Given


1. {Was access given to the property?} Select Yes from the drop down list.

2. {Who was access given to?} Select who access was given to from the drop down list.

3. Type the name of the person who was given access in the box provided.

NOTE: If the vendor stayed at the property during the give access order, the system will prompt the user to enter how long the person remained at the property. If the vendor did not stay at the property this question will not appear.

4. Using the drop down box provided, select if you remained at the property or not. a. If applicable, type how long you remained at the property. 5. Enter additional comments, if needed, in the box provided.

Safeguard Vendor Web: Give Access

Last Updated On 8-7-08

6. Drag the appropriate photo from the image gallery to the corresponding image photo.

Reporting Access Was Not Given


1. {Was access given to the property?} Select the reason for access not being given from the drop down list provided. 2. {Who was access not needed for?} Select who access was not given to from the drop down list.

3. Type the name of the person who was not given access in the box provided. 4. Type the explanation as to why access was not needed. 5. Enter additional comments, if needed, in the box provided.

Safeguard Vendor Web: Give Access

Last Updated On 8-7-08

Providing a Bid to Give Access


1. {Was access given to the property?} Select the reason for access not being given from the drop down list provided. 2. {Who was access not needed for?} Select who access was not given to from the drop down list.

3. Type the name of the person who was not given access in the box provided. 4. Enter your bid amount (in whole dollars) in the {Bid Amount} box. 5. Enter additional comments for the bid, if needed, in the box provided.

Safeguard Vendor Web: Give Access

Last Updated On 8-7-08

Estimate Orders
Entering Estimate Information
If you can place a bid, you can give an estimate. Estimate orders vary depending on the type of bid being requested in the work order. Because of this there are many variations to the process of giving an estimate.

1. Ensure you are on the page corresponding to the type of estimate you intend to give. (i.e. if you are giving a securing bid, you must be on the securing screen, if you are giving a damage bid you must be on the damage screen, etc.)

2. From the {Add New Bid} drop down box, select the bid you wish to place.

3. An expanded section will appear that will allow you to enter details regarding the bid.

Safeguard Vendor Web: Estimates

Last Updated On 8-8-08

4. Add any supporting photos for your bid by clicking and dragging the photo(s) into the corresponding image label.

5. Repeat the steps for each additional bid being given.

NOTE: The listed tasks and/or actions will vary depending on the type of bid you have chosen to give.

Safeguard Vendor Web: Estimates

Last Updated On 8-8-08

Evictions

Reporting a Completed Eviction


1. {Was the eviction complete?} Select Yes from the drop down list.

2. Ensure you are in the Eviction - Work Completed section of the page. 3. Select Perform Eviction from the Add New task drop down list. 4. A Perform Eviction header will open which will allow you to enter details about the eviction.

Safeguard Vendor Web: Evictions

Last Updated On 8-8-08

5. Type the date of the eviction or you may choose it by clicking on the Calendar icon and selecting the correct date. 6. Type the number of people on the eviction crew and advise on how many hours the eviction took. 7. Using the boxes provided, supply the Sheriff information including name, phone number and department.

8. Choose if the sheriff signed the form by selecting yes or no from the drop down box.

9. Add any special instruction given by the sheriff in the box provided. 10. Supply supporting photos by clicking on the photo from the image gallery and dropping it in the appropriate image label.

Safeguard Vendor Web: Evictions

Last Updated On 8-8-08

Police or Fire Reports


Copies of police or fire reports are needed so the client can file insurance claims for certain damage types.

Entering Police or Fire Report Information

Obtained a Police or Fire Report


When a Police or Fire Report has been obtained, information will be entered via the Miscellaneous Work Completed section. 1. Under the {Update Property Info} section. Select the Miscellaneous link

Safeguard Vendor Web: Police and Fire Reports

Last Updated On 8-1-08

2. The Miscellaneous section appears. Notice the {Miscellaenous Work Completed} section.

3. {Add new task} Select the down arrow to choose File police report. 4. Select the {File police report} option. 5. Enter the {Report number}. 6. Type the number of pages contained in the report in the space provided. 7. Enter important details into the {Description} text box. 8. Add the required document (police report) by dragging the appropriate image from the Image Gallery to the label.

Bid to obtain a Police or Fire Report


To place a bid to obtain a Police or Fire Report, enter this information via the Miscellaneous Work Bids section. 1. Under the {Update Property Info} section. Select the Miscellaneous link

Safeguard Vendor Web: Police and Fire Reports

Last Updated On 8-1-08

2. The Miscellaneous section appears. Notice the {Miscellaenous Bids} section.

3. {Add new task} Select the down arrow to submit a bid to File police report. 4. Choose File police report from the list. 5. Select the {File police report} option. 6. Enter the {Description}. 7. Enter the important details into the {Comments} text box. 8. Enter in the {Bid Amount}.

Safeguard Vendor Web: Police and Fire Reports

Last Updated On 8-1-08

Contact Orders
From time to time it is necessary for Safeguard to make contact with an individual at a property. These contact orders can be opened for the purpose of either scheduling a later give access order, or to set up a cash for keys negotiation. The Contact order is opened so details regarding these future orders can be provided to Safeguard.

Entering Contact Orders Information


The Contact screen will display. A vendor may script contact information by answering the questions which appear on the screen and providing the appropriate information. A vendor will be given the option of entering contact information for two different types of contact orders, cash for keys negotiations or give access scheduling.

Cash for Keys Negotiation


1. {Type of contact completed} Choose Cash for Keys Negotiation from the drop down box.

Safeguard Vendor Web: Contact Orders

Last Updated On 8-1-08

2. {Who was access given to?} Choose Yes from the drop down box. 3. Type in the name of the person with whom the deal was negotiated. 4. Enter the negotiated amount for the cash for keys deal.

5. Enter the date of the appointment by either typing in the space provided or clicking on the calendar icon and choosing the appropriate date. 6. Type the time that was set for the appointment and choose AM or PM from the drop down box. 7. {Did you explain what is expected of the occupant?} Choose Yes from the drop down box. 8. {Did you obtain signature of the occupant?} Choose Yes from the drop down box. 9. Add the required photos and documentation for the contact order by dragging the photo/document into the appropriate photo/document box.

Safeguard Vendor Web: Contact Orders

Last Updated On 8-1-08

Give Access Scheduling


1. {Type of contact completed} Choose Give Access Scheduling from the drop down box. 2. {Was a give access appointment scheduled?} Choose Yes from the drop down box. 3. {Who was the appointment scheduled with?} Choose the appropriate answer from the drop down list.

4. Type the name of the person to who access will be given. 5. Enter the date of the appointment by either typing in the space provided or clicking on the calendar icon and choosing the appropriate date. 6. Type the time that was set for the appointment and choose AM or PM from the drop down box.

Safeguard Vendor Web: Contact Orders

Last Updated On 8-1-08

Boarding and Reglazing


Broken windows that allow access or elements into the property may need to be boarded or re-glazed. Boarding or re-glazing broken windows may be needed to further protect a property from unwanted entry. Potential damage due to the elements is also a concern. For P&P properties boarding and re-glazing must be completed per appropriate HUD/VA guidelines. If the entire property has been boarded or screened, before/after photos of the entire front, entire back and both sides are needed (a total of 8 photos). Please do not take a separate photo of each single window. In addition, each boarded window must have an interior photo taken showing the bolts secured to 2x4's across the frame. Removal of broken glass is part of the boarding/reglazing process. If individual windows have been boarded, before and after photos are needed (2 photos). In addition, each boarded window must have an interior photo taken showing the bolts secured to 2x4's across the frame. Re-glazing photos must show a hand or rag through the broken window. For P&P properties, After photos should show the new window glass with either a taped "X" on the glass, or the glass can be marked with soap or a grease pencil.

Safeguard Vendor Web: Boarding and Reglazing

Last Updated On 8-8-08

Boarding: Work Completed


1. Using the drop down box, select if you are submitting any boarding bids. 2. Add any additional comments in the box provided.

3. Ensure you are working in the Work Completed section of the Boarding & Reglazing screen. 4. Select the category of boarding that was completed by choosing from the drop down menu labeled {Add New Task}

5. A section will display where details of the boarding or reglazing can be entered.

6. Choose the location of the opening from the drop down box.

Safeguard Vendor Web: Boarding and Reglazing

Last Updated On 8-8-08

7. Choose the {Material} used to cover the opening from the drop down box provided.

8. Type the length and width of the boarded opening in inches.

9. Enter the {Number of Openings} boarded.

NOTE: It is important that the number you enter for the Number of Openings, only be for openings that are the same size. (i.e. If you have two 50x55 windows you can state there are 2 openings, however if the windows are different sizes, they must be entered as separate bids.) 10. Add supporting photos for the reported boarding by clicking and dragging the appropriate photo from the Image Gallery at the bottom of the page into the corresponding image label.

Reglazing: Work Completed

Safeguard Vendor Web: Boarding and Reglazing

Last Updated On 8-8-08

1. Ensure you are working in the Work Completed section of the Boarding & Reglazing screen.

2. Select the category of reglazing that was completed by choosing from the drop down menu labeled {Add New Task}

3. A section will display where details of the boarding or reglazing can be entered.

4. Choose the location of the opening from the drop down box.

5. Type the length and width of the reglazed opening in inches.

Safeguard Vendor Web: Boarding and Reglazing

Last Updated On 8-8-08

6. Enter the number of openings reglazed.

7. Type any comments in the Comments box.

8. Add supporting photos for the reported reglazing by clicking and dragging the appropriate photo from the Image Gallery at the bottom of the page into the corresponding image label.

Boarding and Reglazing Bids


1. Ensure you are working in the Bids section of the Boarding & Reglazing screen. 2. Select the category of boarding that you are bidding by choosing from the drop down menu labeled {Add New Task}

Safeguard Vendor Web: Boarding and Reglazing

Last Updated On 8-8-08

3. A section will display where details of the boarding or reglazing bid can be entered.

4. Choose the location of the opening you are bidding from the drop down box.

5. Choose the Material used to cover the opening from the drop down box provided.

6. Type the length and width in inches for the opening being bid.

7. Enter the number samesized openings being bid.

8. Type the amount of your bid in the {Bid Amount} field.


Safeguard Vendor Web: Boarding and Reglazing 6 Last Updated On 8-8-08

9. Type any additional comments in the Comments box.

10. Add supporting photos for the bid by clicking and dragging the appropriate photo from the Image Gallery at the bottom of the page into the corresponding image label.

NOTE: The Material question will not appear when you are bidding to reglaze a window. The system will assume the material is glass.

Safeguard Vendor Web: Boarding and Reglazing

Last Updated On 8-8-08

Hazard Claims
There are times when damages at a property are so vast that a Hazard Claim must be filed to address them. Claims contractors report the damages to Safeguard Properties and provide detailed, itemized estimates to address these damages. This section outlines the process of updating Hazard Claims orders.

Updating an Itemized Estimate


1. Ensure you are in the Estimate Information section of the Estimate page.

Safeguard Vendor Web: Hazard Claims

Last Updated On 8-8-08

2. Click on the Calendar Icon next to the {Estimate Date} field. The expanded calendar view will appear. Click on the appropriate date to fill in the {Estimate Date} field.

3. Ensure you are in the Estimate Bids section of the Estimate page. 4. Choose the correct item for the estimate by selecting a location from the {Add new estimate} drop down menu. Multiple locations/items may be chosen from this drop down menu.

5. For each item selected, a corresponding header will be created.

6. Click the arrow to the left of the new header to expand it and enter details.

Safeguard Vendor Web: Hazard Claims

Last Updated On 8-8-08

7. Choose the appropriate task by clicking the check box next to the desired location. More than one selection can be made by checking multiple boxes. a. If Other is selected, you will be required to provide a description. 8. Choose the appropriate action by clicking the check box next to the desired item. (Paint, Clean, Remove, etc.) More than one selection can be made by checking multiple boxes.

a. If Other is selected, you will be required to provide a description. 9. Type in a measurement by entering a whole number in the {Measurement} field. 10. Choose a measurement type (CYD, Linear Feet, Square, etc.) from the drop down list provided.

11. Enter the total amount for your bid in the {Bid Amount} field.

Safeguard Vendor Web: Hazard Claims

Last Updated On 8-8-08

12. Add any additional comments in the {Comments} box provided.

13. Add supporting photos for the estimate by dragging photos from the Image Gallery to the corresponding photo label.

14. Click the next button to continue the update. NOTE: It is extremely important for the contractor to continue to provide Safeguard Properties a paper itemized estimate. The paper estimate will contain all of the detail needed to process the Estimate (Dimensions, material costs, man hours, etc.) The Vendor Web is only used to provide the total cost of the work as well as some general information regarding the work needed.

Updating Hazard Claims Work Completed Per Bid

Safeguard Vendor Web: Hazard Claims

Last Updated On 8-8-08

1. Ensure you are in the Repair Information section of the Estimate page. 2. {Did you complete the repairs?} Answer Yes only if you completed all the repairs. Otherwise select No. 3. Add any additional comments explaining details of the work completed or why all work was not completed. 4. Click on the Calendar Icon next to the {Completed Date} field. The expanded calendar view will appear. Click on the appropriate date to fill in the {Completed Date} field.

5. Advise if any additional damages were discovered during repairs. If the answer is Yes you will be required to provide details/bids. 6. Add any additional comments explaining details of the work completed or why all work was not completed.

Safeguard Vendor Web: Hazard Claims

Last Updated On 8-8-08

7. Add supporting photos for the work completed by dragging photos from the Image Gallery to the corresponding photo label.

8. Click the next button to continue the update.

Safeguard Vendor Web: Hazard Claims

Last Updated On 8-8-08

Citations and Violations


Refer to Memo 1211, for additional information regarding Citations and Violations. This section of the update allows you to report the existence of any citations or violations posted on the property. When you report that the property contains citations or violations the system will prompt you to provide the details. Unless otherwise noted, the following questions are all optional since you may not be able to provide all the information. You must, however, validate any citations or violations that were previously reported. A table containing previously reported violations, from you or other contractors, will appear. Indicate whether the violation is still applicable, was resolved or if the condition worsened.

Reporting the Citation/Violations


1. On the General Property Info screen, answer Yes to {Any citation or violation notices posted?} a. Once you report there is a citation/violation present, the system will add the Citations and Violations section to your update.

Safeguard Vendor Web: Citations and Violations

Last Updated On 8/8/08

2. Ensure you are in the Citations and Violations - Work Completed section of the page. 3. From the {Add new task} drop down menu, choose Report Citation or Violation. This will create a new header.

4. Choose the type of posting (Citation or Violation) by placing a checkmark next to the correct item. 5. Specify if the posting is for yard maintenance, debris removal, securing, demolition, or other.

6. Select the date of the posting by clicking on the Calendar icon and then choosing the correct date from the Calendar.

Safeguard Vendor Web: Citations and Violations

Last Updated On 8/8/08

7. Select the date the violation was cured on (if applicable) by clicking on the Calendar icon and then choosing the correct date from the Calendar.

8. Select if you contacted the person or department who put the posting on the property in question.

9. From the drop down menu, choose if the citation or violation was posted by the State, the City, the District, or other. 10. Type the name of the department that placed the citation or violation on the property. 11. Type the contact information for the department who placed the citation or violation on the property.

12. Type a detailed description of the citation or violation in the box provided.
Safeguard Vendor Web: Citations and Violations 3 Last Updated On 8/8/08

13. Enter the date that, per the posting, the violation must be corrected. 14. Type the amount of the potential fine as listed on the violation or citation. 15. Type any additional comments in the box provided.

16. Using the drop down box, select if you corrected the violation or if you will be bidding to do so.

17. Add a photo of the posting by dragging a photo from the Image Gallery to the corresponding image label.

Safeguard Vendor Web: Citations and Violations

Last Updated On 8/8/08

Reporting Convey Information


For Convey orders, remember the following tips. ICC Form is required Provide all Convey bids on first visit Do not submit unnecessary bids Refer to Contractor Memo #1203 Convey Condition Review

Entering Convey Condition Information


The Convey Condition screen consists of a list of headers, each header is labeled with a category that denotes the different work that needs to be completed in order for a property to be in convey condition. If all necessary work has been completed and there are not any pending bids for that category the right side of the header will advise Yes this indicates that all the necessary work for that category has been completed for the property to be in convey condition. If the right side of the header indicates NO either all necessary work has not been completed or there are still pending bids under that category heading.

Safeguard Vendor Web: Convey

Last Updated On 8-7-08

1. If there is a bid listed under the header that indicates that bid is still pending.

2. Select if the property is in convey condition by choosing Yes or No from the drop down list.

3. Type any additional comments in the box provided.

4. Drag the ICC form and Convey Condition photos to the corresponding image labels.

NOTE: If you would like to amend or delete a bid you must do so on the screen where that bid resides. Please see the Bid Verification section of the manual for instructions on how to amend or un-validate a previous bid.

Safeguard Vendor Web: Convey

Last Updated On 8-7-08

Reporting Marketable Information


For information regarding Marketable information, refer to Contractor Memos #1161 and #1179.

Entering Marketable Condition Information


The Marketable Condition screen consists of a list of headers, each header is labeled with a category that denotes the different work that needs to be completed in order for a property to be in marketable condition. If all necessary work has been completed and there are not any pending bids for that category the right side of the header will advise Yes this indicates that all the necessary work for that category has been completed for the property to be in marketable condition. If the right side of the header indicates NO either all necessary work has not been completed or there are still pending bids under that category heading.

Entering Marketable Information

Safeguard Vendor Web: Marketable Info

Last Updated On 8-7-08

1. If there is a bid listed under the header that indicates that bid is still pending. 2. Choose Yes or No from the dropdown list to select if the property is in marketable condition. 3. Type any additional comments in the box provided.

4. Drag marketable condition photos from the image gallery to the corresponding image label.

NOTE: If you would like to amend or delete a bid please see the Bid Verification section of the manual.

Safeguard Vendor Web: Marketable Info

Last Updated On 8-7-08

Work Completed
The Work Completed screen will list all the work that was completed under a particular work order along with the prices for that work. The work completed screen also acts as the invoice for that order. The fields will automatically populate with the allowable price for the work or the approved price per bid. In addition to the prices populating the contractors discount amount will populate and the system will perform the calculation of deducting that discount.

If there are not any corrections that need to be made to the invoice simply reviewed it and move on to the next page. If any prices need to be changed (i.e. your regional coordinator approved the work to be completed at no discount) they can be changed by clicking in the field and manually typing over the existing price or discount. Keep in mind that if you alter the invoice in any way you will be required to give an explanation.

From the Work Completed screen you can add any additional work that might have been completed. Too add a category click your mouse in the box next to the appropriate category and a check mark will appear. If you add additional work completed that category will now appear on the navigation tree on the left side of the page.

Safeguard Vendor Web: Work Completed

Last Updated On 8-6-08

To add the information for the additional category click on that link from the Navigation Tree and you will be taken to that screen. At the top of the Work Completed screen is where you can enter your invoice number.

Safeguard Vendor Web: Work Completed

Last Updated On 8-6-08

Bid Summary
Reviewing Bids
The Bid Summary screen lists all the bids submitted on that work order for your review. Once the bids are reviewed if you determine that all the information is correct you can move on to the next screen.

If you determine that any of the bids are not correct and need to be amended you can return to the bid by clicking the link.

Once you click the link you will be taken back to the page where the bid was originally placed.

Safeguard Vendor Web: Bid Summary

Last Updated On 8-6-08

From the bid page you can now expand the header to reveal the details of the bid.

If you would like to remove the bid completely click the remove tab in the upper right hand corner.

Safeguard Vendor Web: Bid Summary

Last Updated On 8-6-08

If you wish to amend the bid you can change any information necessary.

You can return to the Bid Summary Page by clicking Bid Summary from the Navigation Tree.

Safeguard Vendor Web: Bid Summary

Last Updated On 8-6-08

Creating Letterhead Bids

1. Ensure you are in the Bid Summary section of the page. 2. Click to place a checkmark next to all bids you wish to include on the letterhead bid. 3. If you wish to include all bids in a particular category, you can click to place a checkmark next to the category. All bids under that heading will be included in the letterhead. 4. Click the Create Letterhead Bid link.

Safeguard Vendor Web: Bid Summary

Last Updated On 8-6-08

5. Click the Open button once the File Download box appears.

6. You may now edit the letterhead as needed in the Word file.

Safeguard Vendor Web: Bid Summary

Last Updated On 8-6-08

Remaining Images
Remaining Photos
During the process of updating your order, you will assign your uploaded photos to work completed, bids, damages, condition descriptions, etc. The Remaining Images page will display all photos which were not assigned to any category within the work order. You will be given the option to assign the photos or delete them prior to submitting your update.

Deleting Unnecessary Images


Photos that are not needed can be deleted from the Remaining Images screen prior to submitting the update to Safeguard Properties. 1. Highlight the images to be deleted by clicking the desired photos. Multiple photos can be selected by holding down the [Ctrl] key while clicking.

Safeguard Vendor Web: Remaining Images

Last Updated On 8-08-08

2. Click the Delete Selected Images link at the top of the page. 3. Click the OK button to verify you wish to delete the selected image(s).

Assigning Remaining Images


Particular sections within the work order will require that an image or images be supplied. The Remaining Images Screen will not only display images that have not been assigned to a category, but it will also display the labels for required images for which no image has been assigned. You can assign any remaining image to one of the required labels by following the steps below. Display all labels needing to be assigned a photo by expanding the Remaining Required Labels section of the page.

1. Click and drag the desired photo onto the corresponding empty image label. Drop the photo to save.

Safeguard Vendor Web: Remaining Images

Last Updated On 8-08-08

2. The selected photos will appear in the image label.

3. Repeat steps 2 and 3 for all remaining required labels.

NOTE: If more than one photo has been assigned to a label, you can view all of the photos by hovering your mouse over the label. The window will expand to show all photos assigned to that label.

Safeguard Vendor Web: Remaining Images

Last Updated On 8-08-08

Comments and Review


It may be necessary for a contractor to communicate information to Safeguard that is in addition to what has already been communicated within the various categories within the update. (i.e. communicate securing info on a utility transfer order.) The Comments/Review screen allows the vendor to add comments to either be communicated to Safeguard, or for personal reference and tracking.

Entering Order Comments


All comments entered into the first comments box will appear on the update that is transmitted to Safeguard Properties. 1. Ensure you are in the Comments section of the Comments/Review page. 2. Click in the {Add comments to appear on update} field. Type your comments in the space provided.

Safeguard Vendor Web: Comments and Review

Last Updated On 8-8-08

3. Click in the {Add comments for your personal reference} field. Type your comments in the space provided.

NOTE: Comments entered in the personal reference comments box will not appear on your update and will not be transmitted to Safeguard Properties.

Update and Invoice Review


The review features of the Safeguard Vendor Web will allow you to see a copy of both the update and the invoice that will be transmitted to Safeguard prior to finalizing your update.

1. Ensure you are in the Preview Update and Invoice section of the Comments/Review page. 2. Click the Preview Update button.

NOTE: If you find mistakes in your update during the review process, you can return to the page where the mistake was made and correct it prior to submitting your update to Safeguard Properties.

Safeguard Vendor Web: Comments and Review

Last Updated On 8-8-08

3. The update will appear on your screen.

4. Click the Print button to print the displayed copy of your update. 5. Click the Preview Invoice button. 6. The invoice will appear on your screen.

7. Click the Print button to print the displayed copy of your invoice.

Safeguard Vendor Web: Comments and Review

Last Updated On 8-8-08

Errors and Warnings


The Vendor Web is programmed to assist a contractor by pointing out errors contained in the update so they can be corrected prior to the update being submitted to Safeguard Properties. Correcting these errors at the time the update is being completed will decrease the amount of time an order may need to be left open and will also limit the need for further follow up on behalf of Safeguard Properties.

Correcting Errors as They Occur


An error can occur when vital information is omitted from a particular screen or section of the update. Errors may be corrected right away or may be saved until the end of the updating process, however all errors must be corrected prior to a vendor being able to submit the finalized update to Safeguard Properties.

1. When you attempt to move on from a page that contains an error, the system will display a message informing you that an error has occurred.

Safeguard Vendor Web: Errors and Warnings

Last Updated On 8-8-08

a. Clicking the Continue Update button will allow the vendor to proceed to the next section of the update without correcting the error. Keep in mind however that the error will need to be corrected prior to submitting the update to Safeguard. b. Clicking the Review Error button will allow the vendor to return to the incorrect section of the update to immediately correct the error. 2. All errors contained within the displayed page will be listed at the top of the page in a red Errors box.

3. Each error in the Errors box will have a corresponding error (outlined in red) on the current page.

NOTE: If you are having a hard time finding the source of a particular error, you can click on the link in the errors box and it will take you directly to the errors location on the displayed page.

4. The error may now be corrected by providing the correct answer, photo, dimensions, etc. The error will then no longer display in the Errors box.
Safeguard Vendor Web: Errors and Warnings 2

The error has been cleared.

Last Updated On 8-8-08

Correcting Warnings as They Occur


A warning will occur when a vendor provides a bid or general information that falls outside of the acceptable parameters set by Safeguard Properties. For example, your bid is higher than the allowable for that particular item. Unlike errors, warnings need not be corrected prior to submitting the update to Safeguard. Leaving a warning un-corrected however, can lead to the order being left open for follow up from a Safeguard representative. Therefore, it is highly recommended that vendors take heed of all warnings and adjust their bids accordingly.

1. All warnings contained within the displayed page will be listed at the top of the page in a yellow Warning box. 2. Each warning in the Warnings box will have a corresponding warning (outlined in blue) on the current page.

Safeguard Vendor Web: Errors and Warnings

Last Updated On 8-8-08

3. Open the question that created the warning and change the amount of your bid, dimension, etc. to an amount that falls within the parameters listed within the yellow warning box at the top of the screen. 4. Once the amount that caused the warning is corrected, the warning will no longer be displayed in the yellow Warnings box at the top of the page.

The warning has been cleared.

Correcting Errors and Warnings at the End of an Update


The Errors & Warnings page will display all of the errors and/or warnings that were not corrected throughout the course of normal updating. All errors displayed on this page must be corrected prior to being able to submit the update to Safeguard Properties. Warnings can be left alone; however doing so may cause the order to be left open for further follow up from a Safeguard representative.

Safeguard Vendor Web: Errors and Warnings

Last Updated On 8-8-08

1. All sections that contain an error will be denoted in the Navigation Tree with a red X. Sections where no errors are located will have a green checkmark next to them.

2. Each error needing to be corrected will be listed on the top of the Errors & Warnings page. There will be an active link which will return you directly to the error so it can be immediately corrected.

3. Each warning needing to be corrected will be listed on the bottom of the Errors & Warnings page. There will be an active link which will return you directly to the warning so it can be immediately corrected. 4. Click on the link of the desired error or warning. 5. You will be returned to the section of the update containing the error and/or warning. You can now correct the problem. 6. Once all errors have been removed, you may click the Submit Update button to finalize your update and transmit it to Safeguard Properties.

Safeguard Vendor Web: Errors and Warnings

Last Updated On 8-8-08

Buttons and Links


There are numerous buttons and helpful links within the many pages of the Safeguard Vendor Web. This section of the manual provides a description of some of the more useful buttons and links.

Buttons
The buttons listed in the table below will appear on web pages as well as within dialog boxes. The below table explain the use for each button.

Button

Button Name
Abandon Add Add All Calendar Cancel Cancel Close Continue Deselect All Help Preview Invoice Preview Invoice

Function
Returns user to the Order List Screen without saving progress. Add a single selected photo to the queue in the image uploader. Add all photos from the selected folder to the queue in the image uploader. Opens the calendar graphic allowing the user to choose a specific date. Cancels the request Click to cancel choice and back out of a pop-up screen. Closes the current update. Click to confirm a choice and continue past a pop-up screen. Un-highlight all photos located in a single folder in the image uploader. Opens the Help for the page being viewed Displays a copy of the update that will be transmitted to Safeguard. Displays a copy of the invoice that will be transmitted to Safeguard.

Safeguard Vendor Web: Buttons and Links

Last Updated On 8-06-08

Remove Remove All Save

Remove a single selected photo to the queue in the image uploader. Remove all photos from the queue in the image uploader. Saves progress of an update that is in process and returns user to the Order List Screen. Highlight all photos located in a single folder in the image uploader. They can then be rotated, added, etc. Allows access to the Home Page once a valid contractor code and password are entered Submits your request to the system Transmits update, invoice, and photos to Safeguard Properties. Click to transmit all selected photos to Safeguard Properties using the image uploader.

Select All

Sign In Submit Submit Update Upload Image(s)

Links
Link Link Name
My Account Log Out Order List Export To Excel Map

Function
Opens account menu which allows the user to change their password. Returns user to the Vendor Web Login Page. Displays a list of all open orders for the logged in user. Exports the contractors open order list to an Microsoft Excel file. Opens Google maps and displays the location of the property being viewed.

Safeguard Vendor Web: Buttons and Links

Last Updated On 8-06-08

Glossary of Terms
Abandon: Allowable: Bid: Cash for Keys: Citation: Convey Condition: Convey: Error: Eyeball Estimate: Grass Cut List: Grass Cut Season: Green Checkmark: Header: Image Gallery: Image Label: Initial Grass Cut: Joist: Closes the order being worked on without saving your progress. The preservation price ceiling for work completed per the investor guidelines or client parameter. A cost amount for work that cannot be completed for the allowable. The process by which a mortgagor is offered cash in return for vacating a property. The actual fine that is assessed for a property that does not adhere to city or local code. The condition of the property meets all investor guideline requirements for reimbursement. The process of transferring title to the government investor. (HUD) A mistake on an update that must be corrected prior to being able to transmit the results to Safeguard Properties. A guesstimated cost amount for damages being reported at a property. A list of properties where the grass must be cut on a regular interval. This list is maintained by the contractor. The standard time of year where the grass must be maintained at a property. Displayed next to a section in the Navigation Tree that was completed with no errors. A section break used within the Vendor Web program. The bottom portion of the updating screen where uploaded photos are displayed. A grey box within an update where photos can be dragged and dropped. The first grass cut of the year.

Any of the wood, steel, or concrete beams set parallel from wall to wall or across or abutting girders to support a floor or ceiling.

Safeguard Vendor Web: Glossary Of Terms

Last Updated On 8-8-08

Lock Class: Lock Type: Mortgagee: Mortgagor: Navigation Tree: Perimeter Grass Cut: Purlin: Red X: Reglazing: Resecure: Save: Status Report: Task: VIN: Violation: Warning:

Used to select knoblock, padlock, lock box, deadbolt, etc. The key code for a specific lock. i.e. 67767 The lender The borrower The left hand portion of the updating screen which tracks the contractors progress through an update. A type of grass cut where a 15,000 sq ft section of a larger lot is cut.

A horizontal beam that supports the rafters of a roof Displayed next to a section in the Navigation Tree that was completed with errors that must be corrected. Replacing the pane of glass in a window. Securing a door which was once secure, but has become unsecure. To quit the update but preserve all of the current information. A short update that gives the status on why an order has not yet been completed. Work that has been completed on a particular order Vehicle identification number of a mobile home or automobile. A warning from the city or locality that there is a deviation from city code that may result in a fine if not remedied. There is a deviation from the acceptable parameters for a given item. For example a bid has been placed over the allowable. Warnings need not be corrected to submit the update. The standard time of year where a winterization must be completed at a property.

Winterization Season:

Safeguard Vendor Web: Glossary Of Terms

Last Updated On 8-8-08

Вам также может понравиться