Академический Документы
Профессиональный Документы
Культура Документы
Revision Status Notes Revised according to comment sheet No.EM-667 dated on 4th October 2007 from HC.
VFE
Drawn by Name / Date
Visa.
SAKDA.S
9 Oct. 2007
NAM THEUN 2
CONSTRUCTION PHASE
115kV/500kV TRANSMISSION LINES EM2 Package General Work Procedure Of Stringing Work
Mitsubishi Corporation
16- KONAN 23, CHOME , MINATOKU, TOKYO 1088228, J AP AN
CEDEX FRANCE
TEL : +334 79 60 60 60
FORMAT :
A4
SHEETS : 24
SCALE :
IH
NTCO X 266
503 202 B
COORDINATION DOCUMENTS
This document is NTPC property and cannot be used, reproduced, transmitted and /or disclosed without permission
30 16
12 16 18 20
20 12
10
11
12
13
14
T102N N2
T103N N3
T104N N4
Less than ACSR 200mm2 Less than ACSR 410mm2 Less than ACSR 810mm 3150kgf 5.5kg 1.01.5kg
15
General Work Procedure Stringing Work HYDRAULIC PUMP ENGINE DRIVEN TYPE
17
General Work Procedure Stringing Work fot 100t Hydraulic Compressor HEAD
18
General Work Procedure Stringing Work Hydrauliv Hose fot 100t Hydraulic Compressor
19
20