Вы находитесь на странице: 1из 24

LAST REVISION

Revision Status Notes Revised according to comment sheet No.EM-667 dated on 4th October 2007 from HC.

VFE
Drawn by Name / Date

Checked by Visa. Name / Date


Y.WATANABE 9 Oct. 2007

Agreed by Visa. Name / Date


Y.WATANABE 9 Oct. 2007

Visa.

SAKDA.S

9 Oct. 2007

Creation date of document : 5 October 2006

NAM THEUN 2 POWER COMPANY Ltd.

NAM THEUN 2
CONSTRUCTION PHASE

115kV/500kV TRANSMISSION LINES EM2 Package General Work Procedure Of Stringing Work

EDF HEAD-CONTRACTOR CENTRE DINGENIERIE HYDRAULIQUE

Mitsubishi Corporation
16- KONAN 23, CHOME , MINATOKU, TOKYO 1088228, J AP AN

SAVOIE TECHNOLAC 73373 LEBOURGET DU LAC

CEDEX FRANCE

TEL : +334 79 60 60 60

FORMAT :

A4

SHEETS : 24

SCALE :

NTPC document number : HC document number:


TRANSMITTER : MC & JPS

IH

NTCO X 266

503 202 B
COORDINATION DOCUMENTS

TYPE OF DOCUMENT : PROJECT MANAGEMENT AND

This document is NTPC property and cannot be used, reproduced, transmitted and /or disclosed without permission

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

30 16

12 16 18 20

20 12

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

10

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

11

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

12

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

13

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

14

General Work Procedure Stringing Work

Come-along (Wedge type)

EM2 Construction Contractor MC/J-Power Systems

Type No. Applicable Cond. Tension Weight Weight of wedge

T102N N2

T103N N3

T104N N4

Less than ACSR 200mm2 Less than ACSR 410mm2 Less than ACSR 810mm 3150kgf 5.5kg 1.01.5kg
15

5000kgf 8.0kg 2.02.5kg

7000kgf 10.0kg 3.03.5kg

General Work Procedure Stringing Work HYDRAULIC PUMP ENGINE DRIVEN TYPE

EM2 Construction Contractor MC/J-Power Systems

17

General Work Procedure Stringing Work fot 100t Hydraulic Compressor HEAD

EM2 Construction Contractor MC/J-Power Systems

18

General Work Procedure Stringing Work Hydrauliv Hose fot 100t Hydraulic Compressor

EM2 Construction Contractor MC/J-Power Systems

19

General Work Procedure Stringing Work

EM2 Construction Contractor MC/J-Power Systems

20

Вам также может понравиться