Вы находитесь на странице: 1из 2

STRENGTH OF MATERIALS - MEE214 Class strength : 55 11

List of Projects : Hand truck Crane Hoist

Project Team :

Steel Bridge

Fitness equipment Playground equipment Tricycle Submit :

Concept sketches, Component details, references regarding the project till date - Friday 01/02/13 Specifications-Requirements, Component sketches, Material selection and properties justification references Monday 11/02/13

Project discussion 04/03/13

Free body diagram of components, loading conditions and design calculations references Monday -11/03/13 - review Final specifications Drawing with Bill of materials cost estimation Monday -18/03/13 Software model / real model. Final report submission Monday 22/04/13

Note :

Each submittals should be in A4 sheets. The front page should contain Project Title, Team Members, Submittal title and Date of submission and signed by each member of the team.

The contents should be neatly formatted and should include references at the end.

The last page of each submittal should have the following details. Team Member Contribution References

Each member should preserve a copy of the submittals. ********************

Вам также может понравиться