Вы находитесь на странице: 1из 6

ENRIQUE ARCAYNA RANISES

P5, Malingin, Calibunan, Cabadbaran City


8605 Agusan del Norte, PHILIPPINES
+39196314011-PHILIPPINES
+971503239583-ABU DHABI
aricranises@yahoo.com

Position : Land Surveyor

Skills : Handling computerized surveying instrument works and functions


-Total Station (Sokia 630rk, Trimble 610, theodolites and Geodimeter 510)
-GPS (Ashtech Solution 2.40)
-Automatic Level
Computer Literacy
-Downloading, processing and plotting of data using total station software
-Processing and plotting of data using AutoCAD
-AutoCAD 2007
-Microsoft Words and Excel
Driving Proficient

Education : HOLY NAME UNIVERSITY


Tagbilaran City, Philippines
March 1992
Bachelor of Science in Civil Engineering

Experience : I. January 2009 to Present : LIG ENGINEERING AND CONSTRUCTION


CO. LTD., ABU DHABI
RT-2-C12, Al Reem Island, Abu Dhabi
RT-2-C12, Al Reem Island, Abu Dhabi
United Arab Emirates
United Arab Emirates • In-
Position : Land Surveyor
Duties and Responsibilities : All survey work pertaining to site construction
Technical Department
Plan such as
Name of Projects : LIG TOWER
charge
with the use of the major survey instrument utilized in the construction site.
• Download, edit and process of data using SOKIA software for as built drawing.
• Processing and plotting of data using AUTOCAD Establishment of horizontal and
vertical control points for fixed reference using total station and automatic
level.(SOKIA 610)
• Profile and cross sectioning of areas covered by site construction area to determine
portion to be cut for excavation of 3rd, 2nd and 1st basement.
• Lay-out and setting out of vertical and horizontal alignment of concrete column,
footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical
layout and electrical layout.
• As-built all structure facilities based on design plan such as: footing column, other
P.O Box
revised structure, water pipe line and other 286985-Riyadh
underground facilities.
11320 Saudi Arabia
Position : Land Surveyor
Technical Department
Name of Projects : AL MUTAWA TOWER
Riyadh, Saudi Arabia
II. August 2005 to Sept 30, 2008 : SAMAMA CONTRACTING CO.
: ARMED FORCES HOSPITAL
Buraida, Qassim, KSA
• Duties and Responsibilities : All survey work pertaining to site construction In-
Plan such as
ENRIQUE ARCAYNA RANISES

charge with the use of the major survey instrument utilized in the construction site.
• Establishment of horizontal and vertical control points for fixed reference using total
station and automatic level.(SOKIA 610, GEODIMETER 610 trimble and
GEODIMETER 510 total station.)
• Profile and cross sectioning of areas covered by site construction area to determine
portion to be cut for excavation of 2nd and 1st basement.
• Lay-out and setting out of vertical and horizontal alignment of concrete column,
footing, slabs, doors, elevators, windows, stairs, other concrete structure, mechanical
layout and electrical layout.
• As-built all structure facilities based on design plan such as: footing column, other
revised structure, water pipe line and other underground facilities.
• Setting out required vertical elevation for all architectural finishing.
• Download, edit and process of data using SOKIA software for as built drawing.
• Processing and plotting of data using AUTOCAD.

III.October 2003 to April 2005 : JUNG WON INDUSTRIAL COMPANY LTD.


14-32 Yoi Dong Dong, Yong Deong
Po Ku, Seoul 150-010
SOUTH KOREA
Position : Survey Site Engineer/LAND SURVEYOR
Technical Department

Duties and Responsibilities : Responsible for all survey work pertaining to site
development plan such as:

• In-charge with the use of the major survey instrument utilized in the field.
• Establishment of horizontal and vertical control points for fixed reference using GPS or
GEODIMETER 610 ( trimble) and GEODIMETER 510 total station.
• Conduct topographic survey.
• Profile and cross sectioning of areas covered by site construction area to determine
portion to be cut or fill for preparation of monthly progress accomplishment for
monthly progress billing.
• Lay-out and as-built all structure facilities based on designed plan such as: LPG gas
pipe line, portable water pipe line, drainage pipe line and other underground facilities.
• Lay-out and setting out of vertical and horizontal alignment of concrete bridge.
• Download, edit and process of data using GST software for geodimeter.
• Processing and plotting of data using AUTOCAD.

IV. August 1996 to July 2003 : International Golf Construction and


Mgmt., Inc.
Rm.202, Jasper Bldg.
#193 Wilson St., San Juan, MM

Position : Survey Site Engineer


Technical Operation Div.

Duties and Responsibilities : Responsible for all survey works pertaining to


residential and golf course planning and
construction stage such as:
• Establishment of horizontal and vertical control points for fixed reference using GPS
and TOTAL STATION (GEODIMETER 510).

2
ENRIQUE ARCAYNA RANISES

• Download, edit and process of data using ASHTECH (SOLUTION 2.40) for GPS and
GST software for GEODIMETER 510.
• Processing and plotting of data using AUTOCAD.
• Conduct topographic and hydrographic survey.
• Lot data computation and preparation.
• Relocation and subdivision of lot corners and boundaries and all other structural
facilities based on design plan.
• As-built actual location of vertical and horizontal structures, golf features, including
underground facilities to indicate in the plan (as-built plan).
• Profile and cross sectioning of roads and areas covered by golf course construction to
determine portion to be cut of fill.
• Update accomplishment reports, attend coordination meetings and briefs manpower
on a systematic procedure of a given work schedule.

V. March 1995 to June 1996 : A. M. Oreta and Co., Inc


Engineering, Builders, Contractors
5th Floor Ermita Building,
Arquiza corner Alhambra St. Ermita, Manila

Position : Survey/Engineering Assistant


( Supplied Personnel or the consultant )

Name of Project : Calamba – Calauag Road Rehabilitation


Project Package II-A
(San Pablo City _ Pagbilao Section)

Project Cost : 85.5 Million (OEDF/ Phil – Japan Highway


Loan Project )

Project Description:
• Scope of works covers the rehabilitation of 65.67 kms. Of existing damaged PCCP with
carriageway of 6.0 mtrs. and 2.5 mtrs. shoulder. The project includes removal of
deteriorated PCCP to be replaced with new PCCP on improved base subbase, and or
replaced base sub base materials. It also includes construction of the drainage system
and realignment of one section.

Duties and Responsibilities :

• In-charge in staked survey inventory, condition of Portland Cement Concrete


Pavement, location structures, slope protection and all other appurtenant structures.
• Assist in all survey projects lay out.
• Preparation of monthly progress accomplishments and monthly progress billing.
• In charge in checking data for monthly billing in connection with the contractors claim
for payments.
• Checking the cross section for as built drawing.
• Perform verification survey.
• Checking and settings of work request.

3
ENRIQUE ARCAYNA RANISES

VI. March 1994 to Jan 1995 : F.T. Sanchez/Socor Construction


Pier 4, Reclamation Area, Cebu City

Position : Survey/Engineering Assistant


( Supplied Personnel or the consultant )

Name of Project : Calamba – Calauag Road Rehabilitation Project


Package III ( Pagbilao – Atimonan Section)

Project Cost : 275 Million (OEDF/ Phil – Japan Highway


Loan Project )

Project Description
• Scope of works covers the construction/Rehabilitation of 26.41 kms. of existing
damaged PCCP with carriageway of 6.70 mtrs. and 2.50 mtrs. shoulder. PCC pavement
including preparation of sub grade, sub base, crushed aggregate, and bituminous
stabilized base course. Construction of side ditch rectangular section, CHB wall with
concrete canal bottom. Construction of subsurface drain, filter materials with
perforated pipe, 0.15 m diameter. Construction of stonemasonry catch wall and road
realignment at one section, concrete asphalt overlay of 26.41 kms., including prime,
bituminous tack coat and asphalt cement wearing and binder course.

Duties and Responsibilities :


• In-charge with the use and recording of the major survey instrument utilized in the
field.
• Providing data for monthly progress reports in connection with contractors claim for
payment.
• Assist in checking/plotting the cross section for as built drawings.
• Perform verification survey.
• Checking and settings out of work request.

VII. June 1993 to Nov. 1993 : Municipal Government Center


Cabadbaran, Agusan del Norte

Position : Enumerator

Job Description :

• Conduct urban map survey.


• Gathering data for proposed commercial site, based on survey.

PERSONAL DATA

DATE OF BIRTH : July 15, 1970


PLACE OF BIRTH : Cabadbaran, Agusan del Norte
HEIGHT : 5’ 8’
WEIGHT : 170 lbs
NATIONALITY : Filipino
RELIGION : Roman Catholic
CIVIL STATUS : Single
4
ENRIQUE ARCAYNA RANISES

EDUCATIONAL BACKGROUND

COLLEGE
School : HOLY NAME UNIVERSITY
Tagbilaran City
Bachelor of Science in Civil Engineering
Year Graduated : March 1992
Period : 1987-1992

SECONDARY LEVEL
School : NORTHERN MINDANAO SCHOOL OF
AND TRADES
Cabadbaran, Agusan del Norte
Period : 1983-1987
ELEMENTARY LEVEL
School : CALIBUNAN ELEMENTARY SCHOOL
Calibunan, Cabadbaran, Agusan del Norte
Period : 1977-1983

SEMINAR ATTENDED
First Aid and Rescue Training March 18 & 19,1998
Rosevelt Conference Room
Camp John Hay, Baguio City

CHARACTER REFERENCE

Engr. Tammy S. Fallar, JR. Engr. Joseph Gino Tabirara


Survey Manager Site Manager
#830 Tangier St. #830 Tangier St.
BF Homes International BF Homes International
Las Piñas City Las Piñas City
Tel. No. 8201657 Tel. No. 8201657

Certified True and Correct.

ENRIQUE ARCAYNA RANISES

5
ENRIQUE ARCAYNA RANISES

6

Вам также может понравиться