18-Nov-04
SIMTRAFFIC LOS REPORT
Fifth Street Corridor. 2000.
I ie cag a paras einai
PM ‘# of Runs: 5
Intersection: 6: Fifth Street & E Street Type: Un-Signalized
Demand | Volume Served Delay/Veh (sec)
a ee ee ee ne coe
t a a
NB T 18 7 4 3 D 86
Rg 7 70 99 12 134 B 33
ee ~[—
sB T 3 6 720 3 c 727]
R 6 7 17 4 A es |
pana & 9 113 2 76 A 37
eB ¥ 739 730 99 4 29 A 03
ee
a oS
t Ser tea
We kd 581 393. 702 18 28 A 03,
7 ee
cael | et | as | er
roar [een] coer [oar [ep a af
Type: _ Signalized
Demand Volume Served Delay/Veh (sec)
gproach | Movement | Nome [hg Pk | Baba | hae | Babe
c oe
NB T 220 218 38 a 28.1 c 25
u a [ a ee
Samar 308 | oar “ae -
L 60 54 8 394 D | 66
SB |= | 2 [ 12 287 c 13
R 648 a 26 c 35
Spee | pak ut ares 208 c 5
Ce) Co ee
R 4 ot 35 5 96 a 29)
sat | at ore z
L 4a 41 3 5 229 c 38
we is ‘541 553, 102 15 106 B iW
i [ep
ee 2
Total 2182 276 | 100, = 764 3 ra