Вы находитесь на странице: 1из 11

Single Site Verification Report For

U4123_ Ide-Edo Comm Bank Nnewi, Ichi, Ojoto, Anambram State

ASHRNC1

26-02-2013

Single Site Verification

1. SITE INFORMATION:
Site Name Latitude/Longitude General location Date SSV was conducted Start Stop Time BTS Type Site Configuration U4213 6.053/6.869 Ide-Edo Comm Bank Nnewi, Ichi, Ojoto Anambram State. 15-02-2013 12:00 HRS- 6:30HRS BTS3900A WCDMA S2/2/2

2. TEAM INFO :
Title RNP&O Manager RNP&O Engineer RNP&O Engineer Name Onanuga Adetayo E-mail adetayonng@gmail.com Telephone 08032022924

3. RF INFO :
Site Name U4123 U4123 U4123 U4123 U4123 U4123 Cell ID 41238 41239 41230 41235 41236 41237 Cell Name 4123GA 4123GB 4123GC 4123GD 4123GE 4123GF Antenna Type Single-Band Single-Band Single-Band Single-Band Single-Band Single-Band Mech Tilt 0 0 0 0 0 0 Elect Tilt 3 3 3 3 3 3 Azimuth RF Height 22 22 22 22 22 22

90 220 330 90 220 330

4.
RNCID ASHRNC1 ASHRNC1 ASHRNC1 ASHRNC1 ASHRNC1 ASHRNC1

CELL INFO :
Site Name U4123 U4123 U4123 U4123 U4123 U4123 Cell ID 41238 41239 41230 41235 41236 41237 Cell Name 4123GA 4123GB 4123GC 4123GD 4123GE 4123GF PSC LAC UARFCN Uplink 9612 9612 9612 9637 9637 9637 UARFCN Downlink 10562 10562 10562 10587 10587 10587

462 463 464 462 463 464

50381 50381 50381 50381 50381 50381

Single Site Verification

5. VOICE CALL SET-UP :


Cell ID 41238 41238 41239 41239 41230 41230 41235 41235 41236 41236 41237 41237 Cell Name 4123GA 4123GA 4123GB 4123GB 4123GC 4123GC 4123GD 4123GD 4123GE 4123GE 4123GF 4123GF Voice Call CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP Call Type Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Successful Yes/NO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Comments Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok

6. VIDEO PHONE SET-UP :


Cell ID 41238 41238 41239 41239 41230 41230 41235 41235 41236 41236 41237 41237 Cell Name 4123GA 4123GA 4123GB 4123GB 4123GC 4123GC 4123GD 4123GD 4123GE 4123GE 4123GF 4123GF Video Phone CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP CS-VP Call Type Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Mobile Originating Mobile Terminating Successful Yes/NO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Comments Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok

7. HSDPA SET-UP :
Cell ID 41238 41239 41230 41235 Cell Name 4123GA 4123GB 4123GC 4123GD Test type HSDPA HSDPA HSDPA HSDPA FTP-Download/Upload FTP-Download FTP-Download FTP-Download FTP-Download Successful Yes/NO Yes Yes Yes Yes Comments Ok Ok Ok Ok

Single Site Verification


41236 41237 4123GE 4123GF HSDPA HSDPA FTP-Download FTP-Download Yes Yes Ok Ok

8. HAND-OVERS BETWEEN SECTORS :


Source Sector A B A C B C Target Sector B A C A C B Successful Yes/NO Yes Yes Yes Yes Yes Yes Swapped/rotated Sectors (Yes/NO) No No No No No No Comments Ok Ok Ok Ok Ok Ok

9. PSC PLOT:

Single Site Verification 10. RSCP GRAPH SHOWING:

11. Ec/Io GRAPH SHOWING:

Single Site Verification 12. HANDOVER:

13.

F1: HSDPA FTP DOWNLOAD GRAPH SHOWING:

Single Site Verification Maximum Throughput per cell Cell ID


41238 41239 41230

Cell Name
4123GA 4123GB 4123GC

DL Throughput, mbs
2.47 4.23 5.41

14. F1: HSDPA FTP DOWNLOAD HISTOGRAM SHOWING:

Single Site Verification

15. TRAFFIC STATISTICS FOR THE NEW SITE: 15.1. Performance of the site: KPIs in Excel sheet 15.2. Neighbour list: Neighbour list in Excel sheet sheet 16. SUMMARY:
Checklist Cells on-air Frequency as planned PSC as planned Neighbor Cells Call setups Handovers SQI satisfactory Dropped calls Coverage issues Interference issues Checked (Yes/NO) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Comments and corrective actions Ok Ok Ok Ok Ok Ok Ok None None None

17. The Panoramic Picture for Site : Sector1:

Single Site Verification

Sector2 :

Sector3:

Single Site Verification

18.

Single Site Verification Checklist:

Single Site Verification Checklist


No.
1
Idle Mode

Activity/Process
Frequency correctly defined Primary Scrambling Code correctly defined The LAC/RAC is correctly defined MO-SMS and MT-SMS CPICH_RSCP > -85 dBm near site

Checked
Yes Yes Yes Yes Yes

Remarks
Ok Ok Ok Ok Ok

2 3 4 5

Con

10

Single Site Verification

nection Mode

6 7 8 9 10 11 21 22

CPICH_EcIo > -8 dB near site Mobile terminating calls and mobile originating calls for voice service The video phone service quality is good PS attach is checked PS detach is checked PS PDP activation and deactivation is checked The HSDPA download Rate( Sector 1) The HSDPA download Rate( Sector 2) The HSDPA download Rate( Sector 3) Soft handover for CS service to and from the 3G cells checked OK Soft handover for PS service to and from the 3G cells checked OK Soft handover for HSDPA service to and from the 3G cells checked OK

Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok Ok

PS

23 24

Handover

25 26

11

Вам также может понравиться