Вы находитесь на странице: 1из 1

WEAVER ROAD

Existing Ordinary High Water


SHEPARD WAY NW ON-STREET
OVERFLOW Proposed Ordinary High Water
PARKING Existing 50-ft Buffer

Proposed 50-ft Buffer

Proposed Extent of Marsh

PRESERVE FOREST Salt Marsh Restoration


CANOPY
Intertidal Restoration

Intertidal

Impervious Surface

Understory Forest Restoration

Forested Riparian Restoration


EXISTING
ACCESS ROAD Riparian Restoration / View Corridor

Dune Grass / Backshore Restoration

Future Trail Connections


UNDERSTORY FOREST
RESTORATION

FUTURE CONNECTION TO
WATERFRONT TRAIL

PEDESTRIAN BRIDGE
Permitted with restoration project
Construction with park improvements
VEGETATIVE BUFFER
RIPARIAN
RESTORATION AREA

MEADOW

-
graphic file: I:Project\City of Bainbridge\Shoreline Restoration\Strawberry\grapic files\straw 01 11x17.ai

FUTURE EXTENSION OF NON-MOTORIZED


RIPARIAN RESTORATION AREA HAND POWERED
WATERFRONT TRAIL
BOAT LAUNCH

MARSH RESTORATION AREA


RESTORED SHORELINE

INTERTIDAL RESTORATION AREA


OVERWATER VIEWING STRUCTURE
Permitted with restoration project
Construction with park improvements
Demonstrate environmentally-sensitive design
REMOVE CREOSOTE Compatible with Restoration
PILINGS, RETAIN ALL Maintains popular existing viewpoint
CONCRETE PILING FOR Picnicking and wildlife viewing
WILDLIFE

Вам также может понравиться