M.G.P.S.

OPERATING INSTRUCTION
1. ENSURE SW DOSING V/V FROM MGPS UNIT TO EITHER LOW (047VPW) OR HIGH SEA CHEST (048VPW) IS OPENED. 2. ENSURE SW V/V DOSING INLET TO EITHER LOW (008VPH) OR HIGH SEA CHEST (009VPH) IS OPENED. 3. ENSURE THAT SEA WATER FLOW TO CELL IS MAINTAINED AT 13.5 m3/hr. 4. SWITCH ON UNIT AND ENSURE OPERATING CURRENT IS SET CORRECTLY AS PER TABLE BELOW. ADJUST THE AMPERAGE BY MEANS OF DIAL FOR AMPERE ADJUSTMENT. 5. WHEN CHANGING OVER SEA CHEST, OPEN DOSING V/V AND SEA CHEST INLET V/V FOR SEA CHEST TO BE USED. SHUT DOSING V/V AND SEA CHEST INLET V/V FOR SEA CHEST NOT IN USE. 6. Cu AND Fe ALLOY ANODES SHALL BE RENEWED WHEN ANODES CONSUMPTION ALARM LAMP LIGHTS UP. 7. ALWAYS CHECK THE SEA WATER FLOW TO THE UNIT. IF LOW FLOW IS INDICATED, THE SYSTEM HAS TO BE CHECKED AND RECTIFY THE FAULT IMMEDIATELY. 8. OPERATING CURRENT SETTING SHALL BE ADJUSTED ACCORDING TO THE TREATED SW FLOW AS FOLLOWING:
PARAMETER MANOEUVRING AND SEA GOING LOADPORT, ANCHOR, STS, SBM DISCHARG E PORT

SEA WATER FLOW 13.5 13.5 13.5 INTO CELL (m3/Hr) OPERATIN Cu 2.2 2.2 2.2 G CURRENT Fe 8 8 8 (AMP) ** FOR EAGLE SUBARU AND EAGLE OTOME ONLY NOTE: IF AMMETER SHOWS 0A, I.E. IN RIVER PASSAGE, SWICTCH OFF MGPS UNIT. PREVENTION OF MARINE GROWTH IN SEA CHEST AND SW PIPING SYSTEM IS ACHIEVED BY ANTI FOULING FILMS AS A PRODUCT FROM DOSAGE OF Cu IONS.

PREVENTION OF CORROSION ON SW PIPING AND COPPER ALLOY TUBES OF COOLERS AND CONDENSERS IS ACHIEVED BY ANTI CORROSION FILMS AS A PRODUCT OF Fe HYDROXIDE COMPOUNDS. FAILURE IN MAINTAINING CORRECT OPERATION CURRENT WILL RESULT IN PREMATURE FAILURE OF SW PIPES AND INEFFICIENT COOLING SYSTEM *TO BE POSTED ON MGPS PANEL

Вам также может понравиться