Вы находитесь на странице: 1из 10

SAMEDAN OIL CORP.

OCSG-21188 #1

2O" CASING JOB


MISS. CANYON 849

CALCULATIONS FOR CEMENTING CASING


WRITTEN BY TIM TISON
LEAD CEMENT SYSTEM
HOLE I.D.

28.000
Prev. Csng. ID

33.000
GPS Lead H2O

5.456
GPS concentration
0.150
0.150
0.130

BBLS
CSNG O.D.

LENGTH O.H.

Bbl/FT

3509.00

0.2914

22.000
CSNG O.D.

LENGTH

22.000
Slurry wt.

28.000
Prev. Csng. ID

33.000

BBLS

Bbls (csng annulus)

Bbl/FT

LENGTH

0.00

GPS Tail H2O

Slurry wt.

Type

Chemical per tank Lead H2O


11.55
BASED
11.55
ON 10
10.01
BBL
0.00
TANKS
0.00
0.00

Bbl/Ft

% O.H. Excess
Bbls (gauge hole annulus)

145.71

0.00

Ft3 w/excess

Ft3 Tail

0.00

Bbls
29.14

Ft3 Tail
163.63
Total Ft3 Tail

1.20

Sx Tail

2209.01
Total Gals
0.0
0.0
0.0
0.0
0.0
0.0

Total H2O Tail (Bbls)


Total Tanks H2O
238.35
23.83
Total Sx Cement Required For Job= 12968.93

150
2045.38

Bbls (csng annulus)

0.5877

Yield Ft3/sk

15.6

11128.1

393.4
0.2914

22.000

890.97
Sx Lead

Sx. Lead / Tank


76.98

500.00

CSNG O.D.

Ft3 w/excess

Ft3 Lead

158.68
15245.47

LENGTH O.H.

22.000

150
14354.50

Total Ft3 Lead

Total Tanks H2O


144.56

SHOE JOINT
Length
Bbl/Ft.
75.00
0.3886

GPS concentration
0.000
0.000
0.000
0.000
0.000
0.000

1022.61

Total Gals
1669.2
1669.2
1446.7
0.0
0.0
0.0

Csng I.D.
20.0000
5.438

Bbls (gauge hole annulus)

1.37

Type
D-139
F-104
D-177

CSNG O.D.

% O.H. Excess

0.5877

Yield Ft3/sk

TAIL CEMENT SYSTEM


HOLE I.D.

Bbl/Ft

270.00

15.6

Total H2O Lead (Bbls)


1445.59

2715.2

1840.85
Chemical per tank Tail H2O
0.00
BASED
0.00
ON 10
0.00
BBL
0.00
TANKS
0.00
0.00

Sx. Tail / Tank


77.23

Casing Displacement Volumes


Csng I.D.
20.0000

F.C. Depth
50.00

Pipe I.D.
4.5646

Pipe Length
7721.00

Pipe I.D.
5.7179

Pipe Length
3654.00

Pipe I.D.
5.5010

Pipe Length
0.00

19.428416
Bbl. Spacer Behind
0.0
1st Drill Pipe or 2nd Casing
Pipe Vol.
116.05104
2nd Drill Pipe Volume
Pipe Volume
0

Mud Vol.
156.27

Displ. Vol.
156.27

Total Displacement Volume


291.8

SAMEDAN OIL CORP.


OCSG-21188 #1

MUD WT.
12.0

2O" CASING JOB


MISS. CANYON 849

Lead Cmt. Wt.


15.6

PLUG BUMP PRESSURES


Tail Cmt. Wt. Expected Plug Bump
15.6
786

Max. Plug Bump


1911

OCSG-15563
GREEN CANYON 237 # 5

E.R.T. INC

13-5/8" CASING

CALCULATIONS FOR CEMENTING CASING


WRITTEN BY TIM TISON
LEAD CEMENT SYSTEM

BBLS

HOLE I.D.

CSNG O.D.

16.490

LENGTH O.H.

Bbl/FT

0.00

0.0838

13.625

Prev. Csng. ID

CSNG O.D.

14.875

LENGTH

13.625

GPS Lead H2O

Slurry wt.

4.432

0.00

Type

Prev. Csng. ID

14.875

BBLS

Bbl/FT

0.0838

LENGTH

13.625

0.00

SHOE JOINT
Length
Bbl/Ft.
86.00
0.1488

GPS Tail H2O

Slurry wt.

GPS concentration
0.050
0.300
0.020
0.060

Bbl/Ft

0.0346

Bbls (csng annulus)

Type
D-47
D-168
D-185A
D-177

Ft3 Lead

0.00

0.00
Sx Lead

0.0
Chemical per tank Lead H2O
0.00
BASED
0.00
ON 10
0.00
BBL
0.00
TANKS
0.00
0.00

% O.H. Excess
Bbls (gauge hole annulus)

219.34
Bbls (csng annulus)

0.00

Ft3 Tail

Ft3 Tail
71.83
Sx Tail

1303.39
Total Gals
60.9
365.4
24.4
73.1
0.0
0.0

Total H2O Tail (Bbls)


Total Tanks H2O
128.54
12.85
Total Sx Cement Required For Job= 1218.12

Ft3 w/excess

0.00

Total Ft3 Tail

1.07

0
1231.56

Bbls
12.79

Yield Ft3/sk

16.4

0.00

232.1

2617.00

CSNG O.D.

Ft3 w/excess

Sx. Lead / Tank


94.77

LENGTH O.H.

13.625

Csng I.D.
12.3750
4.432

0.00

0.00

Total Tanks H2O


0.00

CSNG O.D.

Bbls (gauge hole annulus)

Total Gals
0.0
0.0
0.0
0.0
0.0
0.0

TAIL CEMENT SYSTEM

16.490

% O.H. Excess

Total Ft3 Lead

1.07

Total H2O Lead (Bbls)


0.00

HOLE I.D.

Bbl/Ft

0.0346

Yield Ft3/sk

16.4

GPS concentration

0.0

1218.12
Chemical per tank Tail H2O
4.74
BASED
28.43
ON 10
1.90
BBL
5.69
TANKS
0.00
0.00

Sx. Tail / Tank


94.77

Casing Displacement Volumes


Csng I.D.
12.3750

F.C. Depth
8458.00

Pipe I.D.
3.9256

Pipe Length
2504.00

Pipe I.D.

Pipe Length
0.00

Pipe I.D.

Pipe Length

MUD WT.
10.2

Lead Cmt. Wt.


16.4

1258.246
Bbl. Spacer Behind
10.0
1st Drill Pipe or 2nd Casing
Pipe Vol.
0

Mud Vol.
27.48

Displ. Vol.
37.48

2nd Drill Pipe Volume


Pipe Volume
Total MUD Displacement Volume
0
1285.7
PLUG BUMP PRESSURES
Tail Cmt. Wt. Expected Plug Bump
Max. Plug Bump
16.4
815
815

SAMEDAN OIL CORP.


OCSG-21188 #1

2O" CASING JOB


MISS. CANYON 849

CALCULATIONS FOR CEMENTING CASING


WRITTEN BY TIM TISON
LEAD CEMENT SYSTEM
HOLE I.D.

8.625
Prev. Csng. ID

8.625
GPS Lead H2O

3.683
GPS concentration
0.050
0.040

BBLS
CSNG O.D.

LENGTH O.H.

Bbl/FT

0.00

0.0723

0.000
CSNG O.D.

LENGTH

0.000
Slurry wt.

2.727
Prev. Csng. ID

8.625

Type
D-47
D-185A

BBLS
LENGTH O.H.

0.00

CSNG O.D.

208.00

GPS Tail H2O

Slurry wt.

Type
D-500
D-186
D-185A
D-47

Sx Lead

87.0
Chemical per tank Lead H2O
5.70
BASED
4.56
ON 10
0.00
BBL
0.00
TANKS
0.00
0.00

Sx. Lead / Tank


114.04

12.6
Bbl/FT

Bbl/Ft

0.0604

% O.H. Excess
Bbls (gauge hole annulus)

0.00
Bbls (csng annulus)

12.56

Ft3 Tail

Ft3 Tail
0.00
Sx Tail

70.50
Total Gals
58.1
10.9
2.2
3.6
3.6
3.6

Total H2O Tail (Bbls)


Total Tanks H2O
6.37
0.64
Total Sx Cement Required For Job=
159.69

Ft3 w/excess

70.50

Total Ft3 Tail

0.97

0
0.00

Bbls
0.00

Yield Ft3/sk

17.2

84.40

Total Ft3 Lead

0.007223

LENGTH

3.500

Ft3 Lead

15.03

Total Gals
4.4
3.5
0.0
0.0
0.0
0.0

0.000

Ft3 w/excess

0.00

Bbls (csng annulus)

Total Tanks H2O


0.76

CSNG O.D.

84.40

SHOE JOINT
Length
Bbl/Ft.
0.00
0.3280

GPS concentration
0.800
0.150
0.030
0.050
0.050
0.050

0.00

0.97

Csng I.D.
18.3750
3.683

Bbls (gauge hole annulus)

0.0723

Yield Ft3/sk

TAIL CEMENT SYSTEM


HOLE I.D.

% O.H. Excess

Bbl/Ft

208.00

17.2

Total H2O Lead (Bbls)


7.63

15.0

72.68
Chemical per tank Tail H2O
91.23
BASED
17.11
ON 10
3.42
BBL
5.70
TANKS
5.70
5.70

Sx. Tail / Tank


114.04

Casing Displacement Volumes


Csng I.D.
18.3750

F.C. Depth
139.00

Pipe I.D.
4.7910

Pipe Length
3764.00

Pipe I.D.
5.8285

Pipe Length
2613.00

Pipe I.D.
5.5010

Pipe Length
2712.00

45.590767
Bbl. Spacer Behind
10.0

Mud Vol.
73.93

Displ. Vol.
83.93

1st Drill Pipe or 2nd Casing


Pipe Vol.
86.230402
2nd Drill Pipe Volume
Pipe Volume
79.722402

Total Displacement Volume


285.5

SAMEDAN OIL CORP.


OCSG-21188 #1

MUD WT.
12.0

2O" CASING JOB


MISS. CANYON 849

Lead Cmt. Wt.


17.2

PLUG BUMP PRESSURES


Tail Cmt. Wt.
Expected Plug Bump
17.2
112

Max. Plug Bump


112

SAMEDAN
11 3/4" LINER

OCS-G-21188

MISS. CANYON 849 #1

CALCULATIONS FOR CEMENTING CASING


WRITTEN BY TIM TISON

LINER SYSTEM

SLURRY VOLUME REQUIRED:

BBLS

288.3

% O.H. Excess

OPEN HOLE ANNULUS


HOLE I.D.

CSNG O.D.

20.000

LENGTH O.H.

Bbl/FT

1914.00

0.1399

16.000

Bbls (gauge hole annulus)

267.74

Ft3 w/excess

1503.31

LINER OVERLAP
Prev. Csng. ID

18.730

CSNG O.D.

LENGTH

16.000

0.00

Bbl/Ft

Bbls (csng annulus)

0.0921

0.00

Bbl/Ft

Bbls

0.3408

0.00

Ft3 Slurry

0.00

CASING FILL ABOVE TOP OF LINER


Prev. Csng. ID

LENGTH

18.730

0.00

Ft3 Slurry

0.00

SHOE JOINT
Csng I.D.
14.8750

Length
95.56

Bbl/Ft.
0.21494

Bbls
20.54

Ft3
115.33

CEMENT SLURRY INFORMATION


GPS Tail H2O

4.40
GPS concentration
0.050
0.010

Slurry wt.

16.4

Yield Ft3/sk

Type
D-47
D-177

Total H2O Tail (Bbls)


159.97

Total Tanks H2O


16.00

F.C. Depth
2690.00

Pipe I.D.
4.7150

Pipe Length
4558.00

Pipe I.D.
3.9580

Pipe Length
0.00

Sx Tail

1618.64
Total Gals
76.4
15.3
0.0
0.0
0.0

TOTAL SX REQUIRED FOR JOB:

Csng. I.D.
14.8500

Total Ft3

1.06

1527.01
Chemical per tank Tail H2O
4.77
BASED
0.95
ON 10
0.00
BBL
0.00
TANKS
0.00

Sx. Tail / Tank


95.45

1527.01

Casing Displacement Volumes


Bbl. Spacer Behind
0.0
2nd Csng Or Drill Pipe Volume
Pipe Volume
98.434
2nd Drill Pipe Volume
Pipe Volume
0

Mud Vol.
576.25

Displ. Vol.
576.25

Total Drill Pipe Volume


98.4
Total Displacement Volume
674.7

OCSG-21188
MISS. CANYON 849 #1

WRITTEN BY TIM TISON

LEAD CEMENT SYSTEM


HOLE I.D.

BBLS
CSNG O.D.

30.000

26.000

Prev. Csng. ID

CSNG O.D.

33.500

26.000

GPS Lead H2O

Slurry wt.

4.555

12.0

GPS concentration
0.300
0.060
0.100
0.100
0.100

26.000

Prev. Csng. ID

CSNG O.D.

33.500

26.000

GPS Lead H2O

Slurry wt.

4.555

14.5

GPS concentration
0.300
0.060
0.100
0.100
0.100

211.00
Yield Ft3/sk

26.000
CSNG O.D.

26.000

Bbl/FT

0.2176

0.00

Bbl/Ft

0.4335

Yield Ft3/sk

4.7264
Pipe I.D.
4.6162
MUD WT.
11.2

F.C. Depth
0.00
820.00

887.7
Chemical per tank Lead H2O
27.66
BASED
5.53
ON 10
9.22
BBL
9.22
TANKS
9.22

% O.H. Excess
Bbls (gauge hole annulus)

65.28

150
Ft3 w/excess

916.33

Bbls (csng annulus)

Ft3 Lead

0.00

0.00
Sx Lead

751.1
Chemical per tank Lead H2O
27.66
BASED
5.53
ON 10
9.22
BBL
9.22
TANKS
9.22

Sx. Lead / Tank


92.21

83.6
Bbl/FT

100.00

0.2176
Bbl/Ft

0.4335

% O.H. Excess
Bbls (gauge hole annulus)

21.76

Yield Ft3/sk

0.00

Ft3 w/excess
Ft3 Tail

0.00
Ft3 Tail
163.70

Total Ft3 Tail

1.09

150
305.44

Bbls (csng annulus)

Bbls
29.15

Sx Tail

469.14
Total Gals
129.1
25.8
129.1
8.6
0.0

Total H2O Tail (Bbls)


Total Tanks H2O
47.34
4.73
Total Sx Cement Required For Job= 2069.23

Csng. I.D.
24.5000

513.58
Sx Lead

916.33

LENGTH O.H.

0.00

Ft3 Lead

91.47

Total Gals
225.3
45.1
75.1
75.1
75.1

Slurry wt.

Type
D-500
D-185
D-186
D-47

Bbls (csng annulus)

Total Ft3 Lead

1.22

LENGTH

Ft3 w/excess

800.26

163.2

LENGTH

150

Sx. Lead / Tank


92.21

300.00

GPS Tail H2O

GPS concentration
0.300
0.060
0.300
0.020

57.01

1313.84

LENGTH O.H.

Csng I.D.
24.5000

16.4

Bbls (gauge hole annulus)

Total Gals
266.3
53.3
88.8
88.8
88.8

BBLS
CSNG O.D.

% O.H. Excess

Total Ft3 Lead

1.48

SHOE JOINT
Length
Bbl/Ft.
50.00
0.5831

4.620

Bbl/Ft

0.4335

Total Tanks H2O


8.15

TAIL CEMENT SYSTEM

33.500

LENGTH

Type
D-500
185
D-186
F-104
D-139

Total H2O Lead (Bbls)


81.46

Prev. Csng. ID

0.2176

BBLS

CSNG O.D.

30.000

30.000

Bbl/FT

262.00

Total Tanks H2O


9.63

2ND LEAD CEMENT SYSTEM


HOLE I.D.

234.0

LENGTH O.H.

Type
D-500
D-185
D-186
F-104
D-139

Total H2O Lead (Bbls)


96.28

HOLE I.D.

SAMEDAN OIL CORP.


26" FOAM CMT JOB

CALCULATIONS FOR CEMENTING CASING

430.41
Chemical per tank Tail H2O
27.27
BASED
5.45
ON 10
27.27
BBL
1.82
TANKS
0.00

Sx. Tail / Tank


90.91

Casing Displacement Volumes


Bbl. Spacer Behind
0.0
2nd Csng or 1st Drill Pipe volume

Mud Vol.
0.00

Displ. Vol.
0.00

17.79

17.79

3rd Csng or 2nd Drill Pipe volume


Pipe Length
Pipe Volume
Total Displacement Volume
3730.00
77.21
95.0
PLUG BUMP PRESSURES
Lead Cmt. Wt.
Tail Cmt. Wt.
Expected Plug Bump
Max. Plug Bump
12.0
16.4
33
90

Bbl / Ft
0.00722
BBl / Ft.
0.01701
BBl / Ft.
0.02160
BBl / Ft.
0.03176
Bbl / Ft.
0.02919
Bbl / Ft.
0.02240
BBl / Ft.
0.01497
BBl / Ft.
0.02024
BBl / Ft.

I.D.

3-1/2" 13.30 S-135


2.726245

I.D.

5" 19.5 S-135


4.184547

I.D.

5-1/2 " 21.9 #/ft


4.715450

I.D.

6-5/8" 27 #
5.717900

I.D.

6-5/8" 34 #
5.481676

I.D.

6-5/8" 50#
4.801980

I.D.

5-1/2" 38#
3.925610

I.D.

6-5/8" 56.9# V-135


4.564588

I.D.
0.000000

BBl / Ft.

I.D.
0.000000

BBl / Ft.

I.D.

BBl / Ft.

I.D.

0.000000
0.000000

Compatibility Report for Casing Job Calculations.xls


Run on 2/7/2013 15:40
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when opening this workbook in
an earlier version of Excel or if you save this workbook in an earlier file format.

Minor loss of fidelity


Some cells or styles in this workbook contain formatting that is not supported by
the selected file format. These formats will be converted to the closest format
available.

# of occurrences
10

Version
Excel 97-2003

Вам также может понравиться