DIGI Technology Operation Centre


2.1 INTRODUCTION

Figure 2.0 : DiGi Technology Operations Centre (TOC)

The new DiGi Technology Operations Centre (TOC) in Shah Alam is fully operational by 2011. The TOC is the first Data Centre to receive the Green Building Index Provisional Gold Certification (Design Assessment), making DiGis data center the first in Malaysia to be awarded the standard. GBI is Malaysias industry-recognised green rating tool for buildings to promote sustainability in the build environment. Data centers are traditionally large consumers of energy. DiGis TOC has been designed to reduce energy usage as much as possible and incorporates a spectrum of environmentally-friendly features.

Figure 2.1 : Certificate of GBI

2.2

GENERAL INFORMATION Project Name Client Location No. of Storeys Project Milestones date) Areas Site Areas : DIGI Technology Operation Centre, Malaysia : DIGI Telecommunications Sdn. Bhd. : Subang High Tech Park, Shah Alam, Selangor : 4 Storey (23.5m high) : Apr 2009 (Construction start) Apr 2010 (completion due : Total gross area (GFA): 12,982 sqm : Lot 42 (8517 sqm) & Lot 43 (8561 sqm)

2.3

DESIGN TOOLS The TOC is the first Data Centre to receive the Green Building Index Provisional Gold Certification (Design Assessment), making DiGis data center the first in Malaysia to be awarded the standard. GBI is Malaysias industryrecognised green rating tool for buildings to promote sustainability in the build environment. Data centers are traditionally large consumers of energy. DiGis TOC has been designed to reduce energy usage as much as possible and incorporates a spectrum of environmentally-friendly features.

2.4

DESIGN BRIEF The project is a Data Centre with ancillary facilities i.e. Administration Offices, Reception Lobby, Telco Tower and Service Management Centre (Command Centre) for Digi Telecommunications Sdn. Bhd. The Clients brief is to design a Data Centre based IT Data Centers Uptime Institute Tier III platform with possibility to scale-up to Tier IV security and with ecological features. The response to the Clients brief is a building designed with effective drainage and waterproofing, enclosed walls to reduce heat absorption into the data centre with tight security measures. The faades of the Data Centre are designed with vertical green walls that act as living walls and as means of filtering and improving a buildings indoor air quality. Green walls are a living, breathing, regenerating type of cladding that can be as simple as a living art installation or as complex as a biological air filter. Green walls, both indoors and out, decrease local CO2, increase local humidity, trap dust, reduce noise and create a habitat for urban wildlife. Exterior green wall installations reduce solar gain (the entrapment of heat by passive solar gain on the building surface) and, by extension, building energy costs; provide protection from the effects of UV radiation and acid rain; and help lessen the buildings contribution to the heat island effect (when forest is replaced with concrete and asphalt, causing urban centres to become warmer than nature areas).

2.5

DESIGN FEATURES 2.5.1 Vegetated Green Wall The ecological design approach for the building is expressed in a Vertical Plantscape System wrapping around the building envelope. Vegetation acts as an effective barrier against solar radiation and also acts to insulate the building which significantly reduces ongoing heating and cooling energy costs of the building. Plants act as bio-purifiers and through a number of biochemical processes can break down and remove airborne contaminants which offer immediate environmental advances in reducing existing greenhouse and other volatile organic compounds.

Figure 2.2: Vegetated Green Wall

2.5.2

Solar Sun-shading Office areas inhabited throughout the day receive shading devices which act to reduce direct heat gain and in turn reduce cooling loads. Enable passive transmission of lighter deeper into the floor plate while allowing the use of clear glass for better daylight penetration, which in turn reduces energy lighting loads.

2.5.3

Daylighting Main office and circulation spaces are Fully glazed using curtain wall systems to provide maximum daylight penetration and enable highly efficient lighting schemes within the spaces. Secondary rooms are also fitted with Natural Daylight and open-able windows for ventilation.

2.5.4

Bio-swale Natural filtration and drainage systems are used in a portion of the site to reduce the burden of surface run off to the public drainage system, This also acts to collect this run off for reuse in the central irrigation system.

2.5.5

Rainwater Harvesting Using Siphonic rainwater down pipes for high velocity surface run off, a collection tank is situated at ground level buried in the landscape for minimal impact. This tank is then the recycling point for water reuse. The collected rainwater is filtered and then pumped to irrigate the Plantscapes around the building and also caters for the water requirement for the Vegetated Green Wall.

2.5.6

Renewable Energy A dual system of photovoltaics is to be used. On the upper roof level an area of 163m2 will be installed generating 54.4KWh daily or 19,867 KWh Yearly which translates to 12,516 kg of C02 emission reduction per year. The second system with be an expose of green technology using semi-transparent photovoltaic modules in the guard house roof of the project & will output 1.5 kWh daily.

2.5.7

Air-conditioning A high efficient Air cooled chiller system (as close as to 0.6KW/tonne) with multiple zoning FCU and precision Air-Cond in Data Centre. Zoning of FCU creates savings in Energy requirement due to variations on zoning usage.

2.5.8

Pumps Variable speed Pumps for energy efficient usage due to variation in load, this estimates 30% energy savings for pump systems.

2.5.9

Lighting Light fittings to be highly efficient Florescent T5 using low loss electronic ballast, these offer higher luminance levels and using intelligent design through zoning can enable energy conservation through specific usage requirements. This system is bolstered through the use of occupancy sensors and control via the central Building Automation control scheme.

2.5.10 Lifts and Escalators Lifts to be AC VVVF control Gearless Motor dive with Synchronous Motor with Permanent Magnet. The lift is to be fitted with detection sensors, Sleep mode and energy saving light fittings.

2.5.11 Sanitary Fittings Dual Flushing WC's to be fitted allowing control of water volume based on different usage needs. All taps, facets and hoses to be fitted with Water efficient nozzles and are considered 'Green Label Certified'.

2.6

MATERIAL AND RESOURCES 2.6.1 2.6.2 2.6.3 External Timber Deck made from "CT- Wood" a composite of pure polymer resin and Bio-waste (rice husk). This material Reuses bio-waste which in turn reduces air pollution and can be re-grinded into powder to be recycled or reprocessed. Office areas to receive Nippon Odour- less premium all in 1 paint. This product has almost zero Volatile Organic Compounds which have been suggested to lead to sick building syndrome while ideal for those sensitive or allergic to pain odour. This leads to greater productivity and a healthier working environment. The Primary Roof water proofing system is using Hitchins "Trafficgard" A liquid applied membrane of heavy bodied acrylic polymer gel. This is an environmentally friendly coating system and is a Green Label certified product. Low RTTV from the roof as the space below the roof is mainly data centre and telco areas. Interior walls & Ceiling lining in Office areas to receive "Boral EnviroBoard" recycled, environmentally friendly Plasterboard. Composed of High Purity Synthetic Gypsum (HPSG) plaster core encase in Heavy Duty face a backing liner and is non-hazardous to work with. It also contains low OTTV value and comply with MS 1525. Office Areas to receive Carpets with 30% of more recycled products.