Академический Документы
Профессиональный Документы
Культура Документы
1-0" (MIN) 3-0" (MAX) DECK SLAB SLIP FIT CONNECTION 1"
JOINT DECK SLAB
UTILITY POLE
6"
POLE
RISER
TO MANHOLE OR RISER ~
(TYPICAL)
PLASTIC
END BELL
B
6" DIA. FIBERGLASS CONDUIT FIBERGLASS CONDUIT 6" DIA.
6" DIA.
MANHOLE
FIBERGLASS CONDUIT
6" DIA.
A
12-0"
PIER NOTE:
(AS REQUIRED)
FIBERGLASS CONDUIT
12-0" (MAX)
NOTE:
(MAX)
ABUTMENT
SLEEVES GROUTED INTO OPENING IN ABUTMENT BEGIN JOB BY USING FULL 10 LENGTH AT ONE END AND WORKING TOWARDS THE OTHER END. INSTALL EXPANSION JOINT
LAST (SEE OTHER END)
CONDUIT PACKAGE MUST NOT BE SUSPENDED BELOW BRIDGE STRINGERS - IF BOLTS ARE TOO LONG THEY MUST BE CUT OFF AND ENDS GALVANIZED
NOTE:
AT PROPER ALIGNMENT
ABUTMENTS (SEE NOTES 6 & 10)
CONDUIT RUN TO MANHOLE IS NOT DONE AT SAME TIME AS BRIDGE WORK C FIBERGLASS CONDUIT IS TO EXTEND UP
TO THE FIRST MANHOLE ON EITHER SIDE OF THE BRIDGE
PROFILE
NOTE:
CONDUIT BEVELS NEED NOT BE SEMI-CIRCULAR, SUPPORT MEMBER
GENERAL NOTES
NOTE:
1.
BUT ALL DIMENSIONS MUST BE HELD. THE BEVELS MUST BE SUCH THAT THEY DO NOT ALLOW LATERAL MOVEMENT OF THE CONDUIT
WORK PRACTICE.
2-0"
24" FOR DETAIL "A" CAN BE MADE BY USING TWO 3"x4" CROSSARMS
(MAX)
2.
2X2 ARRANGEMENT
10" 1-10" DETAIL "B" CAN BE MADE BY USING A 1" 1"
3.
1"
2" SINGLE 3"X4" CROSSARM CONDUIT BEVELS CAN THEN BE CUT TO MAINTAIN DESIRED SEPARATIONS
MOVEMENTS OF 3"
A
ANCHOR BRACE (BY OTHERS)
6" DIA. FIBERGLASS CONDUIT
4.
6"
NOTE:
MANUFACTURED CONDUIT SUPPORT SYSTEMS MAY BE SUBSTITUTED FOR THE PRESSURE TREATED WOOD SYSTEM SHOWN. THESE ARE AVAILABLE FROM:
INTERMEDIATE EXPANSION
4"
5.
2"
6" 6" -
6"
1"
4"
4"
END BELL
(AT MANHOLE LOCATION) (SEE NOTE 13)
ARE MAINTAINED.
11"
11"
11"
800-533-2077
6.
DETAIL A
NOTE
7. - FAX 404-296-0952
THE END HOLE OF THE 2X2 ARRANGEMENT WILL BE THE CENTER HOLE IN THE 2X4 1" ARRANGEMENT HOWEVER ELIMINATE THIS HOLE FOR THE 2X3 ARRANGEMENT
METRA INDUSTRIAL CORP - METRA INDUSTRIAL CORP P O BOX 30845
BILL OF MATERIALS
ITEM COLUMBUS, OHIO 43230 800-872-3828 FAX 614-475-7759 1 NO 6" AIRTIGHT EXPANSION JOINTS
DESCRIPTION 2 conduits
8.
4 conduits
6 conduits
8 conduits
9.
AS REQUIRED
HOT - DIP GALVANIZED. 3" " 2 46" FOR 2X4 ARRANGEMENT 35" FOR 2X3 ARRANGEMENT
3"
DIA.
10.
STAINLESS STEEL OR
RAD (TYP)
12
16
215-724-0700
11.
AS REQUIRED
1"
4"
AS REQUIRED
DETAIL B
AS REQUIRED
12.
SLAB OR PRECAST BEAMS IS STRICTLY PROHIBITED BY 8 CONDUIT ARRANGEMENT (2X4) 24" FOR 2X2 ARRANGEMENT
SUPPORT MEMBER
DETAIL C
6 CONDUIT ARRANGEMENT (2X3)
13.
4 CONDUIT ARRANGEMENT (2X2) GALVANIZED " DIA. THREADED RODS, NUTS AND LOCK
15" MAX.
11"
11"
INFORMATION ONLY.
NOT TO BE INCLUDED
NUTS TIGHTEN NUTS FOR SNUG ASSEMBLY ONLY AND LOCK NUT TOP & BOTTOM USE 2 RODS FOR THE 2X2 AND 2X3 ARRANGEMENTS
IN CONTRACT PLANS.
SUPERCEDED BY:
PLATE 2.3-4
7-13-92
JD
JH
11"
3-3-87
REVISED NOTE 8
AMD
JH
8/86
REDRAWN
MS
DB
10/82
WW
KK
NO
DATE
REVISION
BY
CK
AUTH
BOTTOM
DISTRIBUTION STANDARD
5"
8" DIA. PIPE SLEEVE, 11" 11" GROUTED IN PLACE (TYP) 11" (NOTE 7)
STANDARD INSTALLATION OF
50^C
OPERATING
6"
HIGHWAY BRIDGES
100^C
EMERGENCY
DRAWN BY:
DATE
SCALE: NONE
STIFFNESS = 50 LBF/(IN2)
GFG
12/22/75
CHECKED BY:
DATE
J. L. KANE, JR.
SHT 1 OF 1
SECTION A - A
SECTION B - B
DRAWING NO.
J. M. HOLMES
APPROVED BY:
DATE
SIGNATURE
DATE
D-68289