PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CEMENTERIO DE MARAYCUCHO DEL DISTRITO DE ACRAQUIA, PROVINCIA DE TAYACAJA - HUANCAVELICA
Cofinanciamiento
1. Costos Directos
- Mano de Obra Calificada
- Mano de Obra No Calificada
- Materiales
- Equipos y Maquinarias
- Kit de Herramientas
- Kit de seguridad
2. Costos Indirectos
- Direccin Tcnica y Coordinacin
- Otros
3. TOTAL
S/.
Transferencia al Organismo
Proponente
(b)
Organismo Proponente
( c)
S/.
109,342.22
73,549.39
32,672.83
54.67%
36.77%
16.34%
109,342.22
73,549.39
32,672.83
54.67%
36.77%
16.34%
Otros Cofinanciantes
(d)
S/.
(CT)
S/.
72,206.80
36.10%
72,206.80
36.10%
181,549.02
90.77%
12,039.81
6.02%
12,039.81
6.02%
40,455.28
20.23%
40,455.28
20.23%
12,039.81
73,549.39
73,128.11
6.02%
36.77%
36.56%
16,971.71
2,740.00
8.49%
1.37%
16,971.71
2,740.00
8.49%
1.37%
8.49%
1.37%
1.56%
9.23%
3,120.00
13,218.48
1.56%
6.61%
3,120.00
13,218.48
1.56%
6.61%
5,232.50
2.62%
5,232.50
2.62%
16,971.71
2,740.00
3,120.00
18,450.98
12,718.48
500.00
6.36%
0.25%
12,718.48
500.00
6.36%
0.25%
5,232.50
2.62%
5,232.50
2.62%
12,718.48
5,732.50
6.36%
2.87%
122,560.70
61.28%
122,560.70
61.28%
77,439.30
38.72%
77,439.30
38.72%
200,000.00
100.00%
0.00
Filtrar
ANEXO N 09
DESAGREGADO DE COSTOS INDIRECTOS SEGN FUENTES DEL PROYECTO DEFINITIVO
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CEMENTERIO DE MARAYCUCHO DEL DISTRITO DE ACRAQUIA, PROVINCIA DE TAYACAJA - HUANCAVELICA
NEvaluador
de proyectos
Costo Base
del Servicio
S/.
H
Concepto
Coordinador Tecnico
1Promotor
EvaluadorCapacitador
de Proyectos
2
C Np
1,000.00
3.0
0.18 p /
1.15
860.00
3.0
0.18 NC
1.10
C
Responsable Tcnico
Maestro de obra
Maestro de obra
Economica
por Formulacin
8Bonificacin
Bonificacin Econmica
por Formulacin
de Proyectos de
3.0
1,000.00
3.0
NC
1.15
NC
NC
Asistente tcnico
NC
Guardiana
NC
= H x (Nm + 0.5) * CP
CS-MO = H x Nm
Cp
NC: No corresponde
K : Factor de distancia para costos por traslado de profesional
Kd : Coeficiente de disponibilidad del proyecto
Cp : Factor de costo del proyecto
1.00
1.05
1.10
1.15
1.50
2.00
2.50
0.250
0.262
0.275
0.287
0.375
0.500
0.750
3,906.98
500.00
500.00
5,232.50
3,000.00
3,000.00
18,450.98
13,218.48
K
0.15
0.17
Coef. Disponib. Coordinador Tcnico
0.18
Responsable Tecnico Kd
0.20
0.25 Proy. Infraestructura
4,749.50
3,906.98
5,232.50
FACTOR K DE DISTANCIA
0.15
0.17
0.18
0.20
0.25
1,062.00
4,749.50
NC
NC
1,062.00
Cofinanciamiento
= H (1 + K) (Nm + 0.50) Cp
NC
NC
Proyectos
Totales
10
CS-EP =CS-PSC=
H (1 + K)
ejecutor
S/.
Aporte del
Programa
(OTROS-Pago
directo por el
Programa)
500.00
1,300.00
Desagregado segn
fuentes
Costo total
Aporte del
= del
Hservicio
x (1+K) Aporte del
organismo
S/.
Programa
NC S-CT
52
5Responsable
Compensacion Tcnico
economica por Accidentes de participantes
proyecto / N prom.
0.18
participantes
Promotor Capacitador
econmica
4Compensacin
Materiales de Capacitacin
Factor de distancia
K
Coordinador Tcnico
Materiales
para Capacitacin General
1.00
1.10
1.20
1.40
0.182
0.200
0.220
0.254
NP<50
50<NP<75
75<NP<100
100<NP
5,232.50
FORMATO N 01
DESAGREGADO DE KIT DE IMPLEMENTOS DE SEGURIDAD
Cantidad (Und)
Parcial (S/.)
CASCOS
1.00
52.00
5.00
260.00
1.00
52.00
7.00
364.00
1.00
52.00
5.00
260.00
MASCARILLAS
1.00
52.00
3.00
156.00
POLOS
1.00
52.00
7.00
364.00
PONCHOS
1.00
52.00
12.00
624.00
BOTAS
1.00
52.00
20.00
1,040.00
FLETE
1.00
52.00
1.00
52.00
3,120.00
Cantidad (Und)
Precio Unitario
(S/.)
Parcial (S/.)
4 de 4
DESAGREGADO DE HERRAMIENTAS
Insumo
Unidad
Cantidad
Precio
Parcial
S/.
S/.
Und.
Und.
Und.
Und.
Und.
26.00
10.00
10.00
10.00
26.00
20.00
15.00
30.00
125.00
20.00
520.00
150.00
300.00
1,250.00
520.00
2,740.00
S/.
2,740.00
5 de 29
Proyecto :
Subproyecto N: 001
REF:
PLANO N:
Alquiler de local para la obra
Partida N
01.01.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
mes
Alto
(m)
Metrado Parcial
4.00
4.00
Metrado
total (mes)
Partida N
01.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
4.00
Unidad:
Und
Alto
(m)
Metrado Parcial
1.00
1.00
Metrado
total (Und)
Partida N
01.02.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
1.00
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
723.23
723.23
1.00
629.72
629.72
1.00
452.49
452.49
1.00
2284.06
2,284.06
sardinel
Sardinel de cunetas
Jr. Yawar Jasha (oeste)
1.00
3.69
0.15
1.00
6.31
0.15
0.95
1.00
108.05
0.15
16.21
1.00
4.77
0.15
0.72
1.00
2.07
0.15
1.00
1.84
0.15
0.28
1.00
123.33
0.15
18.50
1.00
3.71
0.15
0.56
1.00
8.77
0.15
1.32
1.00
103.25
0.15
15.49
1.00
4.66
0.15
0.70
1.00
2.07
0.15
0.31
1.00
1.84
0.15
0.28
1.00
3.35
0.15
0.50
1.00
5.96
0.15
0.89
1.00
94.28
0.15
14.14
1.00
4.65
0.15
0.70
1.00
2.07
0.15
0.31
1.00
1.84
0.15
0.28
1.00
3.22
0.15
0.48
1.00
8.16
0.15
1.22
1.00
88.11
0.15
13.22
1.00
4.78
0.15
0.72
1.00
2.07
0.15
0.31
1.00
1.84
0.15
0.28
1.00
3.35
0.15
0.50
1.00
5.81
0.15
0.87
1.00
68.34
0.15
10.25
1.00
4.55
0.15
0.68
1.00
1.95
0.15
0.29
1.00
1.84
0.15
0.28
1.00
3.45
0.15
0.52
1.00
7.27
0.15
1.09
1.00
59.59
0.15
8.94
1.00
4.83
0.15
0.72
1.00
2.07
0.15
0.31
1.00
1.84
0.15
0.28
1.00
52.52
0.15
7.88
1.00
31.34
0.15
4.70
1.00
56.63
0.15
8.49
1.00
89.84
0.15
13.48
1.00
0.55
0.31
1.84
0.15
0.28
1.00
2.47
0.15
0.37
1.00
11.42
0.15
1.71
1.00
3.50
0.15
0.53
1.00
181.19
0.15
27.18
1.00
4.88
0.15
0.73
1.00
3.80
0.15
0.57
1.00
4.49
0.15
0.67
1.00
4.59
0.15
0.69
1.00
115.55
0.15
17.33
1.00
2.88
0.15
0.43
1.00
3.85
0.15
0.58
1.00
3.69
0.25
0.92
1.00
6.31
0.25
1.58
Cuneta
Jr. Yawar Jasha (oeste)
6 de 29
1.00
108.05
0.25
27.01
1.00
4.77
0.25
1.19
1.00
2.07
0.25
0.52
1.00
1.84
0.25
0.46
1.00
123.33
0.25
30.83
1.00
3.71
0.25
0.93
1.00
8.77
0.25
2.19
1.00
103.25
0.25
25.81
1.00
4.66
0.25
1.17
1.00
2.07
0.25
0.52
1.00
1.84
0.25
0.46
1.00
3.35
0.25
0.84
1.00
5.96
0.25
1.49
1.00
94.28
0.25
23.57
1.00
4.65
0.25
1.16
1.00
2.07
0.25
0.52
1.00
1.84
0.25
0.46
1.00
3.22
0.25
0.81
1.00
8.16
0.25
2.04
1.00
88.11
0.25
22.03
1.00
4.78
0.25
1.20
1.00
2.07
0.25
0.52
1.00
1.84
0.25
0.46
1.00
3.35
0.25
0.84
1.00
5.81
0.25
1.45
1.00
68.34
0.25
17.09
1.00
4.55
0.25
1.14
1.00
1.95
0.25
0.49
1.00
1.84
0.25
0.46
1.00
3.45
0.25
0.86
1.00
7.27
0.25
1.82
1.00
59.59
0.25
14.90
1.00
4.83
0.25
1.21
1.00
2.07
0.25
0.52
1.00
1.84
0.25
0.46
1.00
52.52
0.25
13.13
1.00
31.34
0.25
7.84
1.00
56.63
0.25
14.16
1.00
89.84
0.25
22.46
1.00
1.84
0.25
0.46
1.00
2.47
0.25
0.62
1.00
11.42
0.25
2.86
1.00
3.50
0.25
0.88
1.00
181.19
0.25
45.30
1.00
4.88
0.25
1.22
1.00
3.80
0.25
0.95
1.00
4.49
0.25
1.12
1.00
4.59
0.25
1.15
1.00
115.55
0.25
28.89
1.00
2.88
0.25
0.72
1.00
3.85
0.25
0.96
Baden 01
1.00
16.77
0.80
13.42
Baden 02
1.00
16.60
0.80
13.28
Baden 03
1.00
15.87
0.80
12.70
Baden 04
1.00
24.10
0.80
19.28
Baden 05
1.00
12.37
0.80
9.90
Baden 06
1.00
12.40
0.80
9.92
Baden 07
1.00
12.40
0.80
9.92
Baden 08
1.00
12.55
0.80
10.04
Badenes
Metrado
total (m2)
Partida N
01.02.02
Grafico
Descripcin
Cantidad
4.00
Largo
(m)
Ancho
(m)
4,720.09
Unidad:
Alto
(m)
Metrado Parcial
100.00
400.00
Metrado
total (m)
Partida N
01.03.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
400.00
Unidad:
m3
Alto
(m)
Metrado Parcial
1.00
253.56
253.56
1.00
238.89
238.89
1.00
204.07
204.07
1.00
591.27
591.27
Sardineles de cuneta
Jr. Yawar Jasha (oeste)
1.00
3.69
0.15
0.30
0.17
1.00
6.31
0.15
0.30
0.28
1.00
108.05
0.15
0.30
4.86
1.00
4.77
0.15
0.30
0.21
1.00
2.07
0.15
0.30
0.09
1.00
1.84
0.15
0.30
0.08
1.00
123.33
0.15
0.30
5.55
1.00
3.71
0.15
0.30
0.17
1.00
8.77
0.15
0.30
0.39
7 de 29
1.00
103.25
0.15
0.30
4.65
1.00
4.66
0.15
0.30
0.21
1.00
2.07
0.15
0.30
0.09
1.00
1.84
0.15
0.30
0.08
1.00
3.35
0.15
0.30
0.15
1.00
5.96
0.15
0.30
0.27
1.00
94.28
0.15
0.30
4.24
1.00
4.65
0.15
0.30
0.21
1.00
2.07
0.15
0.30
0.09
1.00
1.84
0.15
0.30
0.08
1.00
3.22
0.15
0.30
0.14
1.00
8.16
0.15
0.30
0.37
1.00
88.11
0.15
0.30
3.96
1.00
4.78
0.15
0.30
0.22
1.00
2.07
0.15
0.30
0.09
1.00
1.84
0.15
0.30
0.08
1.00
3.35
0.15
0.30
0.15
1.00
5.81
0.15
0.30
0.26
1.00
68.34
0.15
0.30
3.08
1.00
4.55
0.15
0.30
0.20
1.00
1.95
0.15
0.30
0.09
1.00
1.84
0.15
0.30
0.08
1.00
3.45
0.15
0.30
0.16
1.00
7.27
0.15
0.30
0.33
1.00
59.59
0.15
0.30
2.68
1.00
4.83
0.15
0.30
0.22
1.00
2.07
0.15
0.30
0.09
1.00
1.84
0.15
0.30
0.08
1.00
52.52
0.15
0.30
2.36
1.00
31.34
0.15
0.30
1.41
1.00
56.63
0.15
0.30
2.55
1.00
89.84
0.15
0.30
4.04
1.00
1.84
0.15
0.30
0.08
1.00
2.47
0.15
0.30
0.11
1.00
11.42
0.15
0.30
0.51
1.00
3.50
0.15
0.30
0.16
1.00
181.19
0.15
0.30
8.15
1.00
4.88
0.15
0.30
0.22
1.00
3.80
0.15
0.30
0.17
1.00
4.49
0.15
0.30
0.20
1.00
4.59
0.15
0.30
0.21
1.00
115.55
0.15
0.30
5.20
1.00
2.88
0.15
0.30
0.13
1.00
3.85
0.15
0.30
0.17
Baden 01
1.00
16.77
0.80
0.25
3.35
Baden 02
1.00
16.60
0.80
0.25
3.32
Baden 03
1.00
15.87
0.80
0.25
3.17
Baden 04
1.00
24.10
0.80
0.25
4.82
Baden 05
1.00
12.37
0.80
0.25
2.47
Baden 06
1.00
12.40
0.80
0.25
2.48
Baden 07
1.00
12.40
0.80
0.25
2.48
Baden 08
1.00
12.55
0.80
0.25
2.51
Badenes
Metrado
total (m3)
Partida N
01.03.02
Grafico
Cantidad
Largo
(m)
Ancho
(m)
1,372.27
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
723.23
723.23
1.00
629.72
629.72
1.00
452.49
452.49
1.00
2284.06
2,284.06
Metrado
total (m2)
Partida N
01.03.03
Grafico
Cantidad
Largo
(m)
Ancho
(m)
4,089.50
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
723.23
723.23
1.00
629.72
629.72
1.00
452.49
452.49
1.00
2284.06
2,284.06
Metrado
total (m2)
4,089.50
8 de 29
Partida N
01.03.04
Grafico
Base: Relleno con Afirmado y/o Material Granular E=8" inc. compactacin equipo pesado (inc conformacion)
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
723.23
723.23
1.00
629.72
629.72
1.00
452.49
452.49
1.00
2284.06
2,284.06
Metrado
total (m2)
Partida N
01.03.05
Grafico
Sub Base: Relleno con Afirmado y/o Material Granular E=8" inc. compactacin equipo pesado (inc
conformacion)
Ancho
Descripcin
Cantidad
Largo (m)
(m)
4,089.50
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
723.23
723.23
1.00
629.72
629.72
1.00
452.49
452.49
1.00
2284.06
2,284.06
Metrado
total (m2)
Partida N
01.03.06
Grafico
Encimado de Buzn de Concreto Existente max=1.50m para adecuacion a pavimentacion posterior H maxr
40 cm
Ancho
Descripcin
Cantidad
Largo (m)
(m)
4,089.50
Unidad:
Und
Alto
(m)
Metrado Parcial
Bz - 2
1.00
1.00
Bz - 3
1.00
1.00
Bz - 7
1.00
1.00
Bz - 6
1.00
1.00
Bz - 10
1.00
1.00
Bz - 12
1.00
1.00
Metrado
total (Und)
Partida N
01.04.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
6.00
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
723.23
723.23
1.00
629.72
629.72
1.00
452.49
452.49
1.00
2284.06
2,284.06
Metrado
total (m2)
Partida N
01.04.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
4,089.50
Unidad:
m2
Alto
(m)
Metrado Parcial
Pavimento de concreto
Jr. Yawar Jasha (del 0+000 al a+112.038)
Longitudinal
3.00
Transversal
38.00
112.03
18.00
4.00
Longitudinal
3.00
96.93
Transversal
33.00
6.40
0.15
50.41
0.15
36.48
72.00
6.40
0.15
43.62
0.15
31.68
0.15
31.19
0.15
23.04
3.00
Transversal
24.00
69.31
6.40
1.00
51.52
0.15
7.73
lado izquierdo
1.00
51.36
0.15
7.70
lado izquierdo
1.00
3.00
0.15
0.45
1.00
7.43
0.15
1.11
1.00
11.94
0.15
1.79
1.00
0.85
0.15
0.13
1.00
9.81
0.15
1.47
5.00
1.30
0.15
0.98
Longitudinal
3.00
303.30
0.15
136.49
Transversal
102.00
0.15
97.92
lado derecho
6.40
Metrado
total (m2)
Partida N
01.05.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
537.07
Unidad:
Alto
(m)
Metrado Parcial
Pavimento de concreto
Jr. Yawar Jasha (del 0+000 al a+112.038)
Longitudinal
3.00
Transversal
38.00
112.03
336.09
18.00
4.00
72.00
Longitudinal
3.00
96.93
290.79
Transversal
33.00
6.40
6.40
243.20
211.20
3.00
69.31
207.93
9 de 29
24.00
Transversal
6.40
153.60
1.00
51.52
51.52
lado izquierdo
1.00
51.36
51.36
lado izquierdo
1.00
3.00
3.00
1.00
7.43
7.43
1.00
11.94
11.94
1.00
0.85
0.85
1.00
9.81
9.81
5.00
1.30
6.50
Longitudinal
3.00
303.30
909.90
Transversal
102.00
lado derecho
6.40
652.80
Metrado
total (m)
Partida N
01.06.01.01
Grafico
Descripcin
Cantidad
Largo
(m)
3,219.92
Unidad:
m2
Alto
(m)
Metrado Parcial
Ancho
(m)
Pavcimento
Jr. Yawar Jasha (oeste)
42.00
0.03100
1.30
83.00
0.03100
2.57
37.00
0.03100
1.15
36.00
0.03100
1.12
29.00
0.03100
0.90
26.00
0.03100
0.81
83.00
0.03100
2.57
107.00
0.03100
3.32
Metrado
total (m2)
Partida N
01.06.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
13.73
Unidad:
m3
Alto
(m)
Metrado Parcial
Ancho
(m)
(Area CAD)
Jr. Yawar Jasha (oeste)
1.00
3.69
0.03100
0.11
1.00
6.31
0.03100
0.20
1.00
108.05
0.03100
3.35
1.00
4.77
0.03100
0.15
1.00
2.07
0.03100
0.06
1.00
1.84
0.03100
0.06
1.00
123.33
0.03100
3.82
1.00
3.71
0.03100
0.12
1.00
8.77
0.03100
0.27
1.00
103.25
0.03100
3.20
1.00
4.66
0.03100
0.14
1.00
2.07
0.03100
0.06
1.00
1.84
0.03100
0.06
1.00
3.35
0.03100
0.10
1.00
5.96
0.03100
0.18
94.28
0.03100
2.92
1.00
4.65
0.03100
0.14
1.00
2.07
0.03100
0.06
1.00
1.84
0.03100
0.06
1.00
3.22
0.03100
0.10
1.00
8.16
0.03100
0.25
1.00
88.11
0.03100
2.73
1.00
4.78
0.03100
0.15
1.00
2.07
0.03100
0.06
1.00
1.84
0.03100
0.06
1.00
3.35
0.03100
0.10
1.00
5.81
0.03100
0.18
1.00
68.34
0.03100
2.12
1.00
4.55
0.03100
0.14
1.00
1.95
0.03100
0.06
1.00
1.84
0.03100
0.06
1.00
3.45
0.03100
0.11
1.00
7.27
0.03100
0.23
1.00
59.59
0.03100
1.85
1.00
4.83
0.03100
0.15
1.00
2.07
0.03100
0.06
1.00
1.84
0.03100
0.06
1.00
52.52
0.03100
1.63
1.00
31.34
0.03100
0.97
1.00
56.63
0.03100
1.76
89.84
0.03100
2.79
1.00
1.84
0.03100
0.06
1.00
2.47
0.03100
0.08
1.00
11.42
0.03100
0.35
1.00
3.50
0.03100
0.11
1.00
1.00
10 de 29
1.00
181.19
0.03100
5.62
1.00
4.88
0.03100
0.15
1.00
3.80
0.03100
0.12
1.00
4.49
0.03100
0.14
1.00
4.59
0.03100
0.14
1.00
115.55
0.03100
3.58
1.00
2.88
0.03100
0.09
1.00
3.85
0.03100
0.12
Metrado
total (m3)
Partida N
02.02.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
41.24
Unidad:
m2
Alto
(m)
Metrado Parcial
2.00
3.69
0.30
2.00
6.31
0.30
2.21
3.79
2.00
108.05
0.30
64.83
2.00
4.77
0.30
2.86
2.00
2.07
0.30
1.24
2.00
1.84
0.30
1.10
2.00
123.33
0.30
74.00
2.00
3.71
0.30
2.23
2.00
8.77
0.30
5.26
2.00
103.25
0.30
61.95
2.00
4.66
0.30
2.80
2.00
2.07
0.30
1.24
2.00
1.84
0.30
1.10
2.00
3.35
0.30
2.01
2.00
5.96
0.30
3.58
2.00
94.28
0.30
56.57
2.00
4.65
0.30
2.79
2.00
2.07
0.30
1.24
2.00
1.84
0.30
1.10
2.00
3.22
0.30
1.93
2.00
8.16
0.30
4.90
2.00
88.11
0.30
52.87
2.00
4.78
0.30
2.87
2.00
2.07
0.30
1.24
2.00
1.84
0.30
1.10
2.00
3.35
0.30
2.01
2.00
5.81
0.30
3.49
2.00
68.34
0.30
41.00
2.00
4.55
0.30
2.73
2.00
1.95
0.30
1.17
2.00
1.84
0.30
1.10
2.00
3.45
0.30
2.07
2.00
7.27
0.30
4.36
2.00
59.59
0.30
35.75
2.00
4.83
0.30
2.90
2.00
2.07
0.30
2.00
1.84
0.30
1.10
2.00
52.52
0.30
31.51
2.00
31.34
0.30
18.80
2.00
56.63
0.30
33.98
2.00
89.84
0.30
53.90
2.00
1.84
0.30
1.10
2.00
2.47
0.30
1.48
2.00
11.42
0.30
6.85
2.00
3.50
0.30
2.10
2.00
181.19
0.30
108.71
2.00
4.88
0.30
2.93
2.00
3.80
0.30
2.28
2.00
4.49
0.30
2.00
4.59
0.30
2.75
2.00
115.55
0.30
69.33
2.00
2.88
0.30
1.73
2.00
3.85
0.30
2.31
1.24
2.69
Metrado
total (m2)
Partida N
02.02.03
Grafico
Descripcin
Cantidad
1.00
Largo
(m)
Ancho
(m)
798.22
Unidad:
m3
Alto
(m)
Metrado Parcial
3.69
0.15
0.40
0.22
1.00
6.31
0.15
0.40
0.38
1.00
108.05
0.15
0.40
6.48
1.00
4.77
0.15
0.40
0.29
1.00
2.07
0.15
0.40
0.12
1.00
1.84
0.15
0.40
0.11
1.00
123.33
0.15
0.40
7.40
1.00
3.71
0.15
0.40
0.22
1.00
8.77
0.15
0.40
0.53
1.00
103.25
0.15
0.40
6.20
1.00
4.66
0.15
0.40
0.28
1.00
2.07
0.15
0.40
0.12
1.00
1.84
0.15
0.40
0.11
11 de 29
1.00
3.35
0.15
0.40
0.20
1.00
5.96
0.15
0.40
0.36
1.00
94.28
0.15
0.40
5.66
1.00
4.65
0.15
0.40
0.28
1.00
2.07
0.15
0.40
0.12
1.00
1.84
0.15
0.40
0.11
1.00
3.22
0.15
0.40
0.19
1.00
8.16
0.15
0.40
0.49
1.00
88.11
0.15
0.40
5.29
1.00
4.78
0.15
0.40
0.29
1.00
2.07
0.15
0.40
0.12
1.00
1.84
0.15
0.40
0.11
1.00
3.35
0.15
0.40
0.20
1.00
5.81
0.15
0.40
0.35
1.00
68.34
0.15
0.40
4.10
1.00
4.55
0.15
0.40
0.27
1.00
1.95
0.15
0.40
0.12
1.00
1.84
0.15
0.40
0.11
1.00
3.45
0.15
0.40
0.21
1.00
7.27
0.15
0.40
0.44
1.00
59.59
0.15
0.40
3.58
1.00
4.83
0.15
0.40
0.29
1.00
2.07
0.15
0.40
0.12
1.00
1.84
0.15
0.40
0.11
1.00
52.52
0.15
0.40
3.15
1.00
31.34
0.15
0.40
1.88
1.00
56.63
0.15
0.40
3.40
1.00
89.84
0.15
0.40
5.39
1.00
1.84
0.15
0.40
0.11
1.00
2.47
0.15
0.40
0.15
1.00
11.42
0.15
0.40
0.69
1.00
3.50
0.15
0.40
0.21
1.00
181.19
0.15
0.40
10.87
1.00
4.88
0.15
0.40
0.29
1.00
3.80
0.15
0.40
0.23
1.00
4.49
0.15
0.40
0.27
1.00
4.59
0.15
0.40
0.28
1.00
115.55
0.15
0.40
6.93
1.00
2.88
0.15
0.40
0.17
1.00
3.85
0.15
0.40
0.23
Metrado
total (m3)
Partida N
01.06.03.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
79.82
Unidad:
m2
Alto
(m)
Metrado Parcial
Badenes
Baden 01
2.00
16.77
0.15
5.03
Baden 02
2.00
16.60
0.15
4.98
Baden 03
2.00
15.87
0.15
4.76
Baden 04
2.00
24.10
0.15
7.23
Baden 05
2.00
12.37
0.15
3.71
Baden 06
2.00
12.40
0.15
3.72
Baden 07
2.00
12.40
0.15
3.72
Baden 08
2.00
12.55
0.15
3.77
Metrado
total (m2)
Partida N
01.06.03.02
Grafico
Descripcin
Cantidad
Largo
(m)
36.92
Unidad:
m3
Ancho
(m)
Alto
(m)
Metrado Parcial
Badenes
Baden 01
1.00
16.77
0.80
0.15
2.01
Baden 02
1.00
16.60
0.80
0.15
1.99
Baden 03
1.00
15.87
0.80
0.15
1.90
Baden 04
1.00
24.10
0.80
0.15
2.89
Baden 05
1.00
12.37
0.80
0.15
1.48
Baden 06
1.00
12.40
0.80
0.15
1.49
Baden 07
1.00
12.40
0.80
0.15
1.49
Baden 08
1.00
12.55
0.80
0.15
1.51
Metrado
total (m3)
Partida N
01.07.01
Grafico
Cantidad
Largo
(m)
Ancho
(m)
14.77
Unidad:
Und
Alto
(m)
Metrado Parcial
2.00
2.00
Metrado
total (Und)
2.00
12 de 29
Partida N
01.07.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
20.00
20.00
Metrado
total (Und)
Partida N
01.07.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
20.00
Unidad:
Und
Alto
(m)
Metrado Parcial
20.00
20.00
Metrado
total (Und)
Partida N
01.07.04
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
20.00
Unidad:
Und
Alto
(m)
Metrado Parcial
1.00
1.00
Metrado
total (Und)
Partida N
01.08.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
1.00
Unidad:
Alto
(m)
Metrado Parcial
longitudinal
Jr. Yawar Jasha (oeste)
1.00
126.73
126.73
1.00
247.63
247.63
1.00
112.15
112.15
1.00
108.18
108.18
1.00
85.84
85.84
1.00
79.05
79.05
1.00
246.06
246.06
1.00
317.38
317.38
1.00
112.03
112.03
1.00
96.93
96.93
1.00
69.31
69.31
1.00
303.30
303.30
central
Metrado
total (m)
Partida N
01.09.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
1,904.59
Unidad:
m2
Alto
(m)
Metrado Parcial
todo el pavimento
1.00
4720.09
4,720.09
Metrado
total (m2)
Partida N
02.01.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
4,720.09
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
11.96
0.80
9.57
1.00
6.31
0.80
5.05
Metrado
total (m2)
Partida N
02.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
14.62
Unidad:
m2
Alto
(m)
Metrado Parcial
1.00
250.15
250.15
1.00
244.28
244.28
1.00
165.32
165.32
1.00
152.48
152.48
1.00
135.39
135.39
1.00
119.33
119.33
1.00
117.30
117.30
1.00
89.51
89.51
1.00
39.31
39.31
1.00
88.43
88.43
1.00
208.59
208.59
1.00
344.85
344.85
1.00
103.91
0.15
15.59
1.00
99.10
0.15
14.87
1.00
90.15
0.15
13.52
1.00
84.33
0.15
12.65
1.00
64.57
0.15
9.69
1.00
55.66
0.15
8.35
13 de 29
1.00
111.41
0.15
16.71
1.00
122.98
0.15
18.45
1.00
54.26
0.15
8.14
21.00
1.30
0.15
4.10
42.00
1.40
0.15
8.82
28.00
0.40
0.15
1.68
26.00
0.85
0.15
3.32
18.00
0.85
0.15
2.30
20.00
0.40
0.15
1.20
rampas discapacitados
21.00
1.00
1.40
29.40
14.00
0.40
1.00
5.60
13.00
0.85
1.00
11.05
9.00
0.85
1.00
7.65
10.00
0.40
1.00
Rampas
4.00
area verde
Jr. Yawar Jasha (oeste)
1.00
30.19
30.19
1.00
28.70
28.70
1.00
66.63
66.63
1.00
63.27
63.27
1.00
48.67
48.67
1.00
40.00
40.00
1.00
109.57
109.57
Metrado
total (m2)
Partida N
02.01.03
Grafico
Descripcin
Cantidad
1.00
Largo
(m)
Ancho
(m)
2,539.03
Unidad:
Alto
(m)
Metrado Parcial
100.00
100.00
Metrado
total (m)
Partida N
02.02.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
100.00
Unidad:
m3
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
250.15
0.15
37.52
1.00
244.28
0.15
36.64
1.00
165.32
0.15
24.80
1.00
152.48
0.15
22.87
1.00
135.39
0.15
20.31
1.00
119.33
0.15
17.90
1.00
117.30
0.15
17.60
1.00
89.51
0.15
13.43
1.00
39.31
0.15
5.90
1.00
88.43
0.15
13.26
1.00
208.59
0.15
31.29
1.00
344.85
0.15
51.73
1.00
103.91
0.15
0.30
4.68
1.00
99.10
0.15
0.30
4.46
1.00
90.15
0.15
0.30
4.06
1.00
84.33
0.15
0.30
3.79
1.00
64.57
0.15
0.30
2.91
1.00
55.66
0.15
0.30
2.50
1.00
111.41
0.15
0.30
5.01
1.00
122.98
0.15
0.30
5.53
1.00
54.26
0.15
0.30
2.44
21.00
1.30
0.15
0.30
1.23
42.00
1.40
0.15
0.30
2.65
28.00
0.40
0.15
0.30
0.50
26.00
0.85
0.15
0.30
0.99
18.00
0.85
0.15
0.30
0.69
20.00
0.40
0.15
0.30
0.36
rampas discapacitados
21.00
1.00
1.40
0.15
4.41
14.00
0.40
1.00
0.15
0.84
13.00
0.85
1.00
0.15
1.66
9.00
0.85
1.00
0.15
1.15
10.00
0.40
1.00
0.15
0.60
Rampas
area verde
Jr. Yawar Jasha (oeste)
1.00
30.19
1.00
28.70
0.20
5.74
1.00
66.63
0.20
13.33
1.00
63.27
0.20
12.65
1.00
48.67
0.20
9.73
1.00
40.00
0.20
8.00
1.00
109.57
0.20
21.91
0.20
Metrado
total (m3)
6.04
421.11
14 de 29
Partida N
02.02.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
m2
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
250.15
250.15
1.00
244.28
244.28
1.00
165.32
165.32
1.00
152.48
152.48
1.00
135.39
135.39
1.00
119.33
119.33
1.00
117.30
117.30
1.00
89.51
89.51
1.00
39.31
39.31
1.00
88.43
88.43
1.00
208.59
208.59
1.00
344.85
344.85
21.00
1.00
1.40
14.00
0.40
1.00
29.40
5.60
13.00
0.85
1.00
11.05
9.00
0.85
1.00
7.65
10.00
0.40
1.00
4.00
Metrado
total (m2)
Partida N
02.02.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
2,012.64
Unidad:
m3
Alto
(m)
Metrado Parcial
1.00
134.21
134.21
Arena gruesa
1.00
202.47
202.47
arena fina
1.00
29.87
29.87
hormigon
1.00
815.40
815.40
tierra agrcola
1.00
82.72
82.72
afirmado
1.00
2519.00
2,519.00
piedra chancada
Metrado
total (m3)
Partida N
02.02.04
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
8153.00
8,153.00
Metrado
total (Und)
Partida N
02.02.05
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
m3
Alto
(m)
Metrado Parcial
3,783.67
Metrado
total (m3)
Partida N
02.02.06
Grafico
Descripcin
Cantidad
8,153.00
Unidad:
3783.67
3,783.67
Largo
(m)
Ancho
(m)
3,783.67
Unidad:
Und
Alto
(m)
Metrado Parcial
8.00
8.00
4.00
4.00
7.00
7.00
3.00
3.00
4.00
4.00
5.00
5.00
6.00
6.00
Metrado
total (Und)
Partida N
02.02.07
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
37.00
Unidad:
m2
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
250.15
250.15
1.00
244.28
244.28
1.00
165.32
165.32
1.00
152.48
152.48
1.00
135.39
135.39
1.00
119.33
119.33
1.00
117.30
117.30
1.00
89.51
89.51
1.00
39.31
39.31
1.00
88.43
88.43
1.00
208.59
208.59
1.00
344.85
344.85
15 de 29
Rampas
rampas discapacitados
21.00
1.00
1.40
14.00
0.40
1.00
5.60
13.00
0.85
1.00
29.40
11.05
9.00
0.85
1.00
7.65
10.00
0.40
1.00
4.00
Metrado
total (m2)
Relleno con Afirmado y/o Material Granular E=6" inc. compactacin equipo liviano
Partida N
02.02.08
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
2,012.64
Unidad:
m2
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
250.15
250.15
1.00
244.28
244.28
1.00
165.32
165.32
1.00
152.48
152.48
1.00
135.39
135.39
1.00
119.33
119.33
1.00
117.30
117.30
1.00
89.51
89.51
1.00
39.31
39.31
1.00
88.43
88.43
1.00
208.59
208.59
1.00
344.85
344.85
21.00
1.00
1.40
14.00
0.40
1.00
5.60
13.00
0.85
1.00
29.40
11.05
9.00
0.85
1.00
7.65
10.00
0.40
1.00
4.00
Metrado
total (m2)
Partida N
02.03.01.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
2,012.64
Unidad:
m2
Alto
(m)
Metrado Parcial
2.00
103.91
0.30
62.35
2.00
99.10
0.30
59.46
2.00
90.15
0.30
54.09
2.00
84.33
0.30
50.60
2.00
64.57
0.30
38.74
2.00
55.66
0.30
33.40
2.00
111.41
0.30
66.85
2.00
122.98
0.30
73.79
2.00
54.26
0.30
32.56
42.00
1.30
0.30
16.38
84.00
1.40
0.30
35.28
56.00
0.40
0.30
6.72
52.00
0.85
0.30
13.26
36.00
0.85
0.30
9.18
40.00
0.40
0.30
4.80
Metrado
total (m2)
Partida N
02.03.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
557.44
Unidad:
m3
Ancho
(m)
Alto
(m)
Metrado Parcial
1.00
103.91
0.15
0.40
6.23
1.00
99.10
0.15
0.40
5.95
1.00
90.15
0.15
0.40
5.41
1.00
84.33
0.15
0.40
5.06
1.00
64.57
0.15
0.40
3.87
1.00
55.66
0.15
0.40
3.34
1.00
111.41
0.15
0.40
6.68
1.00
122.98
0.15
0.40
7.38
1.00
54.26
0.15
0.40
3.26
21.00
1.30
0.15
0.40
1.64
42.00
1.40
0.15
0.40
3.53
28.00
0.40
0.15
0.40
0.67
26.00
0.85
0.15
0.40
1.33
18.00
0.85
0.15
0.40
0.92
20.00
0.40
0.15
0.40
0.48
Metrado
total (m3)
Partida N
02.03.02.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
55.74
Unidad:
m2
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
250.15
250.15
1.00
244.28
244.28
1.00
165.32
165.32
16 de 29
1.00
152.48
152.48
1.00
135.39
135.39
1.00
119.33
119.33
1.00
117.30
117.30
1.00
89.51
89.51
1.00
39.31
39.31
1.00
88.43
88.43
1.00
208.59
208.59
1.00
344.85
344.85
Metrado
total (m2)
Partida N
02.03.02.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
1,954.94
Unidad:
m2
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
37.00
1.85
0.10
6.85
37.00
1.85
0.10
6.85
32.00
1.40
0.10
4.48
32.00
1.40
0.10
4.48
23.00
1.40
0.10
3.22
23.00
1.40
0.10
3.22
101.00
1.45
0.10
14.65
101.00
1.50
0.10
15.15
Metrado
total (m2)
Partida N
02.03.02.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
58.89
Unidad:
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
37.00
1.85
68.45
37.00
1.85
68.45
32.00
1.40
44.80
32.00
1.40
44.80
23.00
1.40
32.20
23.00
1.40
32.20
101.00
1.45
146.45
101.00
1.50
151.50
Metrado
total (m)
Partida N
02.03.03.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
588.85
Unidad:
m2
Alto
(m)
Metrado Parcial
Rampas
rampas discapacitados
21.00
3.80
0.10
7.98
14.00
2.40
0.10
3.36
13.00
2.85
0.10
3.71
9.00
2.85
0.10
2.57
10.00
2.40
0.10
2.40
Metrado
total (m2)
Rampas - C:H F'c= 175 kg/cm2 E=0.10m incluye acabado y bruado c/mezcla inc curado
Partida N
02.03.03.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
20.01
Unidad:
m2
Alto
(m)
Metrado Parcial
Rampas
rampas discapacitados
21.00
1.00
1.40
14.00
0.40
1.00
29.40
5.60
13.00
0.85
1.00
11.05
9.00
0.85
1.00
7.65
10.00
0.40
1.00
4.00
Metrado
total (m2)
Partida N
02.04.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
57.70
Unidad:
m2
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
250.15
250.15
1.00
244.28
244.28
1.00
165.32
165.32
1.00
152.48
152.48
1.00
135.39
135.39
1.00
119.33
119.33
1.00
117.30
117.30
1.00
89.51
89.51
1.00
39.31
39.31
1.00
88.43
88.43
1.00
208.59
208.59
1.00
344.85
344.85
Metrado
total (m2)
1,954.94
17 de 29
Partida N
02.04.02
Grafico
Descripcin
Cantidad
Largo
Ancho
(m)
(m)
Unidad:
Alto
(m)
Metrado Parcial
Veredas
Jr. Yawar Jasha (oeste)
1.00
112.03
112.03
1.00
112.03
112.03
1.00
96.93
96.93
1.00
96.93
96.93
1.00
69.31
69.31
1.00
69.31
69.31
1.00
303.30
303.30
1.00
303.30
303.30
Metrado
total (m)
Partida N
02.04.03
Grafico
Descripcin
Cantidad
Largo
Ancho
(m)
(m)
1,163.14
Unidad:
Und
Alto
(m)
Metrado Parcial
Veredas
del item 02.04.01: adoquines en vereda (50 un / m2)
50.00
1954.94
97,747.00
Metrado
total (Und)
Partida N
03.01.01
Grafico
Descripcin
Cantidad
31.00
Zapatas de bancas
Largo
(m)
1.50
97,747.00
Unidad:
m3
Ancho
(m)
Alto
(m)
Metrado Parcial
0.50
0.15
4.49
Metrado
total (m3)
Partida N
03.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
4.49
Unidad:
kg
N piezas
Peso Un
Metrado Parcial
Veredas
acero en zapata de banca
31.00
1.50
3.00
0.25
34.88
31.00
0.45
8.00
0.25
27.90
Metrado
total (kg)
Partida N
03.01.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
31.00
Bancas
62.78
31.00
Metrado
total (Und)
Partida N
03.01.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
31.00
Bancas
31.00
31.00
Metrado
total (Und)
Partida N
03.02.01.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
31.00
Unidad:
m2
Alto
(m)
Metrado Parcial
area verde
Jr. Yawar Jasha (oeste)
1.00
30.19
30.19
1.00
28.70
28.70
1.00
66.63
66.63
1.00
63.27
63.27
1.00
48.67
48.67
1.00
40.00
40.00
1.00
109.57
109.57
Metrado
total (m2)
387.03
18 de 29
Partida N
03.02.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
m3
Alto
(m)
Metrado Parcial
6.04
area verde
Jr. Yawar Jasha (oeste)
1.00
30.19
0.20
1.00
28.70
0.20
5.74
1.00
66.63
0.20
13.33
1.00
63.27
0.20
12.65
1.00
48.67
0.20
9.73
1.00
40.00
0.20
8.00
1.00
109.57
0.20
21.91
Metrado
total (m3)
Partida N
03.02.01.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
77.41
Unidad:
m3
Alto
(m)
Metrado Parcial
6.04
area verde
Jr. Yawar Jasha (oeste)
1.00
30.19
0.20
1.00
28.70
0.20
5.74
1.00
66.63
0.20
13.33
1.00
63.27
0.20
12.65
1.00
48.67
0.20
9.73
1.00
40.00
0.20
8.00
1.00
109.57
0.20
21.91
Metrado
total (m3)
Partida N
03.02.01.04
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
77.41
Unidad:
Und
Alto
(m)
Metrado Parcial
area verde
Jr. Yawar Jasha (oeste)
10.00
10.00
10.00
10.00
8.00
8.00
8.00
8.00
7.00
7.00
7.00
7.00
30.00
30.00
Metrado
total (Und)
Partida N
03.02.02.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
80.00
Unidad:
m2
Alto
(m)
Metrado Parcial
area verde
Jr. Yawar Jasha (oeste)
1.00
30.19
30.19
1.00
28.70
28.70
1.00
66.63
66.63
1.00
63.27
63.27
1.00
48.67
48.67
1.00
40.00
40.00
1.00
109.57
109.57
Metrado
total (m2)
Partida N
03.02.02.02
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
387.03
Unidad:
Und
Alto
(m)
Metrado Parcial
area verde
Jr. Yawar Jasha (oeste)
10.00
10.00
10.00
10.00
8.00
8.00
8.00
8.00
7.00
7.00
7.00
7.00
30.00
30.00
Metrado
total (Und)
Partida N
03.02.02.03
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
80.00
Unidad:
m2
Alto
(m)
Metrado Parcial
area verde
Jr. Yawar Jasha (oeste)
10.00
30.19
301.90
10.00
28.70
287.00
10.00
66.63
666.30
10.00
63.27
632.70
10.00
48.67
486.70
10.00
40.00
400.00
10.00
109.57
1,095.70
Metrado
total (m2)
3,870.30
19 de 29
Riego de plantones
Partida N
03.02.02.04
Grafico
Descripcin
Cantidad
Largo
Ancho
(m)
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
area verde
Jr. Yawar Jasha (oeste)
10.00
10.00
100.00
10.00
10.00
100.00
10.00
8.00
80.00
10.00
8.00
80.00
10.00
7.00
70.00
10.00
7.00
70.00
10.00
30.00
300.00
Metrado
total (Und)
Partida N
04.01.01
Grafico
Descripcin
Cantidad
Largo
Ancho
(m)
(m)
800.00
Unidad:
Und
Alto
(m)
Metrado Parcial
postes
10.00
10.00
Metrado
total (Und)
Partida N
04.01.02
Grafico
Descripcin
Cantidad
Largo
(m)
10.00
Unidad:
m3
Ancho
(m)
Alto
(m)
Metrado Parcial
1.00
80.00
0.40
0.60
19.20
1.00
80.00
0.40
0.60
19.20
Metrado
total (m3)
Partida N
04.01.03
Grafico
Descripcin
Cantidad
Largo
(m)
38.40
Unidad:
m3
Ancho
(m)
Alto
(m)
Metrado Parcial
1.00
80.00
0.40
0.60
19.20
1.00
80.00
0.40
0.60
19.20
Metrado
total (m3)
Partida N
04.02.01
Grafico
Descripcin
Cantidad
Largo
Ancho
(m)
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
10.00
farolas
38.40
10.00
Metrado
total (Und)
Partida N
04.02.02
Grafico
Descripcin
cable entre postes
Cantidad
Largo
Ancho
(m)
(m)
10.00
Unidad:
Alto
(m)
Metrado Parcial
1.00
12.00
12.00
4.00
20.00
80.00
4.00
20.00
80.00
10.00
5.00
50.00
Metrado
total (m)
Partida N
04.02.03
Grafico
Cantidad
Largo
(m)
Ancho
(m)
222.00
Unidad:
Und
Alto
(m)
Metrado Parcial
1.00
Metrado
total (Und)
Partida N
05.01
Grafico
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
1.00
Unidad:
m3
Alto
(m)
Metrado Parcial
1372.27
1.50
1.50
14.62
21.92
1.50
421.11
631.67
2,058.40
Metrado
total (m3)
Partida N
05.02
Grafico
Descripcin
del item 05.01
Cantidad
1.00
Largo
(m)
Ancho
(m)
2,711.99
Unidad:
m3
Alto
(m)
Metrado Parcial
2711.99
2,711.99
Metrado
total (m3)
2,711.99
20 de 29
Partida N
06.01
Grafico
Cantidad
Largo
(m)
Ancho
(m)
Unidad:
Und
Alto
(m)
Metrado Parcial
1.00
1.00
Metrado
total (Und)
Partida N
06.02
Grafico
Kit de herramientas
Descripcin
Cantidad
Largo
(m)
Ancho
(m)
1.00
Unidad:
Und
Alto
(m)
Metrado Parcial
1.00
1.00
Metrado
total (Und)
1.00
Pg 21 de 29
Insumo
Unidad
Cantidad
Precio S/.
Parcial S/.
hh
26,150.89
2.8125
73,549.39
BARRO PREPARADO
m3
96.19
20.00
1,923.86
m3
199.62
10.00
1,996.18
m3
34.60
120.00
4,151.40
bol
707.68
23.00
16,276.53
YESO DE 28 Kg
bol
169.75
14.00
2,376.53
kg
622.39
2.00
1,244.78
MADERA TORNILLO
p2
525.59
3.50
1,839.56
p2
650.53
3.50
2,276.86
2.35
587.15
3,120.00
3,120.00
IMPLEMENTOS DE SEGURIDAD
est
1.00
109,342.22
hh
5.28
6.25
32.98
JEFE DE CUADRILLA
hh
1,888.96
6.25
11,805.99
ASISTENTE DE CUADRILLA
hh
40.17
5.00
200.84
kg
9.60
4.50
43.22
kg
60.10
4.50
270.46
ALAMBRE NEGRO # 8
kg
1.02
4.50
4.59
kg
65.04
4.50
292.69
Und
6.00
4.00
24.00
146.45
3.50
512.59
m3
6.60
120.00
791.96
m3
19.75
10.00
197.46
m3
109.99
20.00
2,199.88
m3
12.50
30.00
375.12
ARENA GRUESA
m3
81.45
80.00
6,515.62
m3
330.24
14.00
4,623.35
14,417.20
0.50
7,208.60
kg
ARENA FINA
TIERRA DE CHACRA O VEGETAL
TEJAS DE ARCILLA DE 32 cm X 15 cm
Und
6,487.84
0.70
4,541.49
ADOBE 40x40x0.08cm
Und
11,882.64
0.10
1,188.26
IMPRESION DE BANNERS
m2
8.65
50.00
432.50
274.28
0.60
164.57
YESO
kg
27.69
0.50
13.84
THINNER CORRIENTE
gl
0.19
16.00
3.00
SOLDADURA
kg
4.50
15.00
67.50
LIJA
Und
1.76
3.00
5.28
gl
38.89
14.00
544.50
HORMIGON (CONFETILLADO)
m3
101.42
30.00
3,042.45
Und
2.00
3.00
6.00
ALQUILER DE LOCAL
mes
3.00
100.00
300.00
KEROSENE
hja
1.88
3.00
5.63
AGUA
m3
112.12
1.00
112.12
Und
1.00
351.10
351.10
37.41
0.20
7.48
Und
2.00
25.00
50.00
REGLA DE MADERA
p2
12.02
4.50
54.11
pza
6.98
80.00
558.00
pza
1.88
75.00
140.63
pza
0.13
45.00
5.74
PINTURA LATEX
gl
3.87
30.00
116.00
PINTURA ANTICORROSIVA
gl
0.38
38.00
14.25
gl
8.85
25.00
221.16
PINTURA ESMALTE
gl
0.38
38.00
14.25
PINTURA DE TRAFICO
gl
3.28
50.00
163.90
XILOL
gl
0.82
40.00
32.78
pln
2.85
120.00
342.45
2.35
4,896.77
HOJAS DE SIERRA
Und
0.08
4.00
0.30
MIRAS Y JALONES
hm
5.28
3.00
15.83
CORDEL
PRUEBA ROTURA DE PROBETA
Pg 22 de 29
Insumo
Unidad
Cantidad
Precio S/.
Parcial S/.
hm
20.66
35.00
723.10
CAMION VOLQUETE DE 6 m3
hm
110.22
110.00
12,123.95
SOLDADORA ELECTRICA
hm
40.00
20.00
800.00
hm
204.34
15.00
3,065.09
hm
4.26
20.00
85.12
TEODOLITO
hm
5.28
30.00
158.32
HERRAMIENTAS MANUALES
est
1.00
2,740.00
2,740.00
72,206.80
0.00
181,549.02
23 de 29
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CEMENTERIO DE MARAYCUCHO DEL DISTRITO DE ACRAQUIA, PROVINCIA DE TAYACAJA - HUANCAVELICA
N
N
N
N
01
Unidad
Metrado
Otros
Cofinanciamiento
Metrado
MONC
Total Unitario
August/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
Otros
Cofinanciamiento
Valorizacin
Mensual
OBRAS PROVISIONALES
01.01
Und
1.00
01.02
mes
3.00
01.03
m2
424.52
0.75
01.04
m2
111.72
10.47
01.05
m3
0.48
45.00
01.06
274.28
0.11
02
MES 1 -
45.00
182.63
468.56
696.18
696.18
1.00
100.00
100.00
300.00
1.00
-0.00
0.75
318.43
424.52
318.43
10.47
1,169.15
111.72
1,169.15
0.60
45.00
45.00
21.60
0.48
21.60
0.71
195.42
274.28
30.86
182.63
468.56
696.18
100.00
100.00
-0.00
318.43
1,169.15
21.60
164.57
195.42
OBRAS PRELIMINARES
02.01
m2
329.14
0.56
0.56
185.14
329.14
185.14
02.02
m2
329.14
0.14
0.01
0.65
0.79
259.79
329.14
44.43
2.90
212.46
259.79
1.51
234.86
03
185.14
MOVIMIENTO DE TIERRAS
03.01
Corte en Terreno Rocoso (Manual , inc insumos para rotura de roca por calentamiento)
m3
388.93
30.00
13.99
45.50
17,696.35
155.57
4,667.18
2,176.51
7,078.54
03.02
m3
159.01
37.50
-0.00
37.50
5,962.86
63.60
2,385.14
-0.00
2,385.14
03.03
m2
198.77
0.75
-0.00
0.75
149.10
79.51
59.64
-0.00
59.64
03.04
m3
198.77
6.43
26.82
33.25
6,609.00
79.51
511.12
2,132.48
2,643.60
03.05
m3
712.32
6.43
-0.00
6.43
4,579.15
284.93
1,831.66
-0.00
1,831.66
03.06
m3
712.32
4.69
14.66
19.35
13,783.82
201.39
944.02
2,952.95
3,896.97
04
04.01
m3
218.64
15.00
-0.00
15.00
3,279.58
87.46
1,311.83
-0.00
1,311.83
04.02
kg
603.42
0.50
-0.00
0.50
301.77
241.37
120.71
-0.00
120.71
04.03
m3
119.26
20.45
-0.00
20.45
2,439.40
47.70
975.76
-0.00
975.76
04.04
m3
22.36
15.00
-0.00
15.00
335.40
8.94
134.16
-0.00
04.05
m3
159.01
22.50
22.50
3,577.73
63.60
1,431.09
04.06
m3
119.26
15.00
15.00
1,788.89
47.70
715.56
04.07
m3
343.50
22.50
22.50
7,728.75
137.40
3,091.50
05
ESTRUCTURAS
05.01
05.01.01
CIMIENTOS Y SOBRECOMIENTOS
-0.00
05.01.01.01
112.09
18.75
29.21
43.41
91.37
10,242.00
05.01.01.02
m3
31.26
20.25
85.10
40.13
145.48
4,547.70
05.01.01.03
m2
208.37
4.50
8.13
6.75
19.39
4,040.09
05.02
05.02.01
COLUMNAS
05.02.01.01
m2
0.40
5.63
18.06
8.37
32.05
12.82
05.02.01.02
m3
6.00
30.94
307.83
87.10
425.87
2,555.21
05.02.01.03
kg
27.78
0.23
4.20
4.42
122.79
134.16
1,431.09
-0.00
715.56
3,091.50
24 de 29
N
N
N
N
05.02.02
MES 1 -
Unidad
Metrado
Otros
Cofinanciamiento
Metrado
MONC
Total Unitario
August/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
Otros
Cofinanciamiento
Valorizacin
Mensual
VIGAS
05.02.02.01
m3
0.32
25.31
307.83
87.05
420.19
134.46
05.02.02.02
m2
3.25
7.50
23.49
10.36
41.34
134.37
05.02.02.03
kg
42.79
0.23
4.20
4.42
189.13
05.03
05.03.01
MOVIMIENTO DE TIERRAS
05.03.01.01
m3
2.16
9.00
9.00
19.44
2.16
19.44
05.03.01.02
m2
6.00
1.13
1.13
6.75
6.00
6.75
05.03.01.03
m2
6.00
0.75
-0.00
0.75
4.50
6.00
4.50
-0.00
4.50
05.03.01.04
m3
0.45
6.43
26.82
33.25
14.96
0.45
2.89
12.07
14.96
05.03.01.05
m2
6.00
2.50
6.72
4.13
13.35
80.09
6.00
15.00
40.32
24.77
80.09
05.03.01.06
m2
4.20
2.50
4.83
4.13
11.46
48.12
4.20
10.50
20.29
17.34
48.12
05.03.01.07
m3
1.44
31.50
223.79
64.39
319.68
460.33
1.44
45.36
322.26
92.72
460.33
kg
17.23
0.23
4.20
4.42
76.16
17.23
3.88
72.28
76.16
0.45
174.96
388.80
174.96
0.49
190.51
388.80
69.98
34.15
307.35
307.35
14,417.00
1,621.91
1,621.91
05.03.01.08
06
SARDINELES Y VEREDAS
06.01
OBRAS PRELIMINARES
06.01.01
m2
388.80
0.45
06.01.02
m2
388.80
0.18
06.02
0.07
0.24
6.75
174.96
27.22
93.31
190.51
MOVIMIENTO DE TIERRAS
06.02.01
m3
34.15
9.00
9.00
307.35
06.02.02
m3
100.85
9.00
9.00
907.65
06.02.03
m2
438.12
0.75
-0.00
0.75
328.63
06.02.04
m3
54.76
6.43
26.82
33.25
1,820.74
06.02.05
m3
113.98
6.43
-0.00
6.43
732.72
06.02.06
m3
113.98
4.69
14.66
19.35
2,205.58
06.03
06.03.01
SARDINEL DE CONCRETO
06.03.01.01
34.15
3.07
8.35
3.40
14.81
505.87
06.03.01.02
m3
3.07
18.00
277.89
60.79
356.68
1,094.99
06.03.01.03
m2
10.24
4.50
3.91
7.14
15.55
159.21
06.03.01.04
Pintado de sardineles
68.29
1.00
3.44
4.44
302.91
14,417.00
0.11
0.11
1,621.91
06.04
06.04.01
ACARREO ADOQUINES
06.04.01.01
19.44
Und
25 de 29
N
N
N
N
06.04.02
MES 1 -
Unidad
Metrado
Otros
Cofinanciamiento
Metrado
MONC
Total Unitario
August/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
Otros
Cofinanciamiento
Valorizacin
Mensual
06.04.02.01
m3
37.94
18.00
60.79
356.68
13,532.25
37.94
682.92
06.04.02.02
m2
379.40
0.37
8.03
8.40
3,188.82
379.40
142.24
3,046.58
3,188.82
06.04.02.03
379.40
3.51
28.86
32.37
12,282.13
379.40
1,331.69
10,950.43
12,282.13
06.04.03
277.89
m2
0.70
0.14
0.65
0.79
0.55
0.70
0.09
06.04.03.02
m3
0.43
37.50
-0.00
37.50
16.13
0.43
16.12
06.04.03.03
m3
0.05
6.43
26.82
33.25
1.66
0.05
06.04.03.04
m3
0.54
6.43
-0.00
6.43
3.47
0.54
06.04.03.05
m3
0.54
4.69
14.66
19.35
10.45
06.04.03.06
m3
1.04
30.94
282.30
78.91
392.15
06.04.03.07
m2
12.36
3.75
14.00
5.25
23.00
06.04.03.08
kg
51.68
0.23
4.20
06.04.03.09
m2
12.36
1.79
Und
1.00
07.02
Und
2.00
0.94
08
ARQUITECTURA
08.01
MUROS Y TABIQUES
08.01.01
Und
11,882.00
0.35
08.01.02
Und
11,882.00
0.09
08.01.03
m2
565.84
3.00
08.01.04
282.08
3.00
0.01
4.54
0.45
0.55
-0.00
16.12
0.32
1.34
1.66
3.47
-0.00
3.47
0.54
2.53
7.92
10.45
407.83
1.04
32.18
293.59
82.07
407.83
284.24
12.36
46.35
173.04
64.85
284.24
4.42
228.43
51.68
11.63
216.80
228.43
6.09
12.42
153.51
12.36
22.07
75.30
153.51
351.10
351.10
351.10
1.00
351.10
351.10
25.00
25.94
51.87
2.00
50.00
51.87
0.27
0.06
0.68
8,061.94
0.09
2.78
1,069.38
3.87
9.65
5,458.09
20.16
23.16
6,534.30
2,740.00
2,740.00
28413.03
67999.41
m2
565.84
4.50
1.70
3.33
9.53
5,394.21
09.02
m2
565.84
4.50
6.02
5.14
15.66
8,858.23
09.03
Contrazocalo de cemento h=0.40m mezcla C:A 1:4 Inc. espesor de mez 2.0cm
282.08
1.88
1.64
5.13
8.64
2,437.68
m2
7.50
30.00
288.61
318.61
2,389.61
10.01
11
1.87
m2
15.00
1.25
5.25
6.50
97.54
11.02
m2
68.05
0.75
5.64
6.39
435.06
m2
9.28
0.64
1.63
2.27
21.08
2,740.00
2,740.00
2,740.00
1.00
3,120.00
3,120.00
1.00
12
56.13
CARPINTERIA METALICA
11.01
11.03
0.01
09.01
10
13,532.25
PRUEBAS Y ENSAYOS
07.01
09
2,306.18
06.04.03.01
07
10,543.15
VARIOS
12.01
Kit de herramientas
Und
1.00
12.02
Und
1.00
3,120.00
181,549.02
3,120.00
15016.38
4951.00
1959.84
6910.84
24570.00
19967.38
30372.87
74910.24
18,450.98
200,000.00
100.00%
3,120.00
24570.00
37.46%
26 de 29
MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CEMENTERIO DE MARAYCUCHO DEL DISTRITO DE ACRAQUIA, PROVINCIA DE TAYACAJA - HUANCAVELICA
N
N
N
N
01
MES 2 Partidas
Unidad
MONC
Cartel de obra impresin banner de 3.60 m x 2.40 m (Soporte de Madera)
Und
01.02
mes
01.03
m2
01.04
m2
01.05
m3
01.06
Cofinanciamiento
Valorizacin
Mensual
Metrado
MONC
Otros
Cofinanciamiento
Valorizacin
Mensual
1.00
100.00
100.00
1.00
100.00
100.00
OBRAS PRELIMINARES
02.01
m2
02.02
m2
03
Otros
MES 4 -
O ctober/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
OBRAS PROVISIONALES
01.01
02
Metrado
MES 3 -
September/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
MOVIMIENTO DE TIERRAS
03.01
Corte en Terreno Rocoso (Manual , inc insumos para rotura de roca por calentamiento)
m3
116.68
3,500.38
1,632.38
5,308.91
116.68
3,500.38
1,632.38
5,308.91
03.02
m3
47.70
1,788.86
-0.00
1,788.86
47.70
1,788.86
-0.00
1,788.86
03.03
m2
59.63
44.73
-0.00
44.73
59.63
44.73
-0.00
44.73
03.04
m3
59.63
383.34
1,599.36
1,982.70
59.63
383.34
1,599.36
1,982.70
03.05
m3
131.61
846.08
-0.00
846.08
295.78
1,901.41
-0.00
1,901.41
03.06
m3
255.47
1,197.52
3,745.90
4,943.42
255.47
1,197.52
3,745.90
4,943.42
1,967.75
04
176.15
04.01
m3
131.18
1,967.75
-0.00
04.02
kg
362.05
181.06
-0.00
181.06
04.03
m3
71.56
1,463.64
-0.00
1,463.64
04.04
m3
13.42
201.24
-0.00
04.05
m3
95.41
2,146.64
04.06
m3
71.56
1,073.33
04.07
m3
206.10
4,637.25
05
ESTRUCTURAS
05.01
05.01.01
CIMIENTOS Y SOBRECOMIENTOS
201.24
2,146.64
-0.00
1,073.33
4,637.25
05.01.01.01
112.09
2,101.70
3,274.15
4,866.15
10,242.00
05.01.01.02
m3
31.26
633.02
2,660.23
1,254.46
4,547.70
05.01.01.03
m2
208.37
937.67
1,694.88
1,407.54
4,040.09
05.02
05.02.01
COLUMNAS
05.02.01.01
m2
0.40
2.25
7.22
3.35
12.82
05.02.01.02
m3
6.00
185.63
1,846.98
522.60
2,555.21
05.02.01.03
kg
27.78
6.25
116.54
122.79
176.15
Metrado
no considerar
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
MONC
Otros
Cofinanciamiento
Valorizacin
Mensual
27 de 29
N
N
N
N
05.02.02
MES 2 Partidas
Unidad
Metrado
MES 3 -
September/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
MONC
Otros
Cofinanciamiento
Valorizacin
Mensual
MONC
Otros
Cofinanciamiento
Valorizacin
Mensual
VIGAS
05.02.02.01
m3
0.32
8.10
98.51
27.86
134.46
05.02.02.02
m2
3.25
24.38
76.33
33.66
134.37
05.02.02.03
kg
42.79
9.63
179.50
189.13
05.03
05.03.01
MOVIMIENTO DE TIERRAS
05.03.01.01
m3
05.03.01.02
m2
05.03.01.03
m2
05.03.01.04
m3
05.03.01.05
m2
05.03.01.06
m2
05.03.01.07
m3
05.03.01.08
kg
06
SARDINELES Y VEREDAS
06.01
OBRAS PRELIMINARES
06.01.01
m2
06.01.02
m2
06.02
Metrado
MES 4 -
O ctober/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
MOVIMIENTO DE TIERRAS
06.02.01
m3
06.02.02
m3
50.43
453.83
453.83
50.43
453.83
06.02.03
m2
219.06
164.32
-0.00
164.32
219.06
164.32
-0.00
164.32
06.02.04
m3
27.38
176.01
734.36
910.37
27.38
176.01
734.36
910.37
06.02.05
m3
56.99
366.36
-0.00
366.36
56.99
366.36
-0.00
366.36
06.02.06
m3
56.99
267.15
835.64
1,102.79
56.99
267.15
835.64
1,102.79
06.03
06.03.01
SARDINEL DE CONCRETO
06.03.01.01
34.15
104.78
285.07
116.02
505.87
06.03.01.02
m3
3.07
55.26
853.12
186.61
1,094.99
06.03.01.03
m2
10.24
46.08
40.05
73.07
159.21
06.03.01.04
Pintado de sardineles
68.29
68.30
234.62
302.91
06.04
06.04.01
ACARREO ADOQUINES
06.04.01.01
Und
453.83
Metrado
no considerar
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
MONC
Otros
Cofinanciamiento
Valorizacin
Mensual
28 de 29
N
N
N
N
06.04.02
MES 2 Partidas
Unidad
MONC
Concreto F'c = 175 kg/cm2 c/mezcladora inc curado
m3
06.04.02.02
m2
06.04.02.03
Cofinanciamiento
Valorizacin
Mensual
Metrado
MONC
m2
06.04.03.02
m3
06.04.03.03
m3
06.04.03.04
m3
06.04.03.05
m3
06.04.03.06
m3
06.04.03.07
m2
06.04.03.08
kg
06.04.03.09
m2
Cofinanciamiento
Valorizacin
Mensual
PRUEBAS Y ENSAYOS
07.01
Und
07.02
Und
08
ARQUITECTURA
08.01
MUROS Y TABIQUES
08.01.01
Und
11,882.00
4,157.51
08.01.02
Und
11,882.00
1,069.38
08.01.03
m2
565.84
1,697.58
08.01.04
282.08
846.27
09
Otros
06.04.03.01
07
Otros
MES 4 -
O ctober/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
06.04.02.01
06.04.03
Metrado
MES 3 -
September/2008
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
3,184.38
720.05
8,061.94
1,573.04
2,187.48
5,458.09
5,688.03
6,534.30
1,069.38
09.01
m2
565.84
2,546.28
961.93
1,886.00
5,394.21
09.02
m2
565.84
2,546.28
3,406.36
2,905.59
8,858.23
09.03
Contrazocalo de cemento h=0.40m mezcla C:A 1:4 Inc. espesor de mez 2.0cm
282.08
528.93
461.93
1,446.82
2,437.68
m2
7.50
225.00
2,164.61
2,389.61
10
10.01
11
CARPINTERIA METALICA
11.01
m2
15.00
18.75
78.79
97.54
11.02
m2
68.05
51.04
384.01
435.06
m2
9.28
5.97
15.12
21.08
9763.78
26124.15
59824.81
4355.81
1724.24
6080.05
14119.59
27848.38
65904.85
11.03
12
VARIOS
12.01
Kit de herramientas
12.02
Und
Und
25042.50
25042.50
11012.68
17669.63
53724.81
3911.67
1548.43
5460.10
14924.35
19218.06
59184.91
29.59%
23936.89
23936.89
32.95%
Metrado
no considerar
Valorizacin Desagregada
Aporte del Programa
Aporte del O.E.
MONC
Otros
Cofinanciamiento
Valorizacin
Mensual
FORMATO N 22
USO DEL INSUMO MANO DE OBRA NO CALIFICADA (RECURSO - PARTICIPANTE)
PROYECTO: MEJORAMIENTO DE LA INFRAESTRUCTURA DEL CEMENTERIO DE MARAYCUCHO DEL DISTRITO DE ACRAQUIA, PROVINCIA DE TAYACAJA - HUANCAVELICA
PERIODO
Promedio participantes x mes:
MES 1
MES 2
MES 3
52
53
51
Semana
01
Da
1-5
Semana
02
Da
6 - 10
Semana
03
Da
11 - 15
Semana
04
Da
16 - 20
Da
21
a) N das tiles
05
05
05
05
b) N de Participantes
52
52
52
112.50
112.50
5,850.00
5,850.00
Mano de Obra No
Calificada (MONC)
Semana
05
Da
22 - 25
Semana
06
Da
26 - 30
Semana
07
Da
31 - 35
Semana
08
Da
36 - 40
Semana
09
Da
41 - 42
01
04
05
05
05
52
52
53
53
53
112.50
112.50
22.50
90.00
112.50
5,850.00
5,850.00
1,170.00
4,770.00
5,962.50
Promedio
General
52
Da
43 - 45
Semana
10
Da
46 - 50
Semana
11
Da
51 - 55
Semana
12
Da
56 - 60
Semana
13
Da
61 - 63
TOTAL
02
03
05
05
05
03
63
53
53
51
51
51
50
50
112.50
112.50
45.00
67.50
112.50
112.50
112.50
67.50
5,962.50
5,962.50
2,385.00
3,442.50
5,737.50
5,737.50
5,625.00
3,375.00
c) Monto por
compensacin econmica
= (N de das x S/, 16,00)
d) Total de MONC =(b x c)
MONTOS TOTALES POR MES
24,570.00
25,042.50
23,917.50
52
73,530.00