BELT TEAR SWITCH

SW4321E22P

Left Hand Side Monitoring Unit-LH

Right Hand Side Monitoring Unit-RH

Schematic Connection Diagram

Other Conveyor Safety Products


Pull Cord Switch Belt Sway Switch

In our search for excellence there is no finishing line. We are committed to all round development with focus on
Quality Reliability Integrity

To Detect Torn Belt Condition & Provide Tripping / Warning Command


CONSTRUCTION
A set consists of a) Pair of monitoring units with mounting frame. b) Pair of sensor ropes-each 5mtrs. long. c) Rope clamps - 08 Nos. d) Hooks 02 Nos.

MONITORING UNITS
Enclosure : Cast Aluminium Degree of Protection: IP65 Actuation : By splinters of the torn belt. Reset : Manual Contact Arrangement : 2 NO + 2 NC Contact Rating : 10 Amp. Res. @110/240 V AC 50 Hz

Zero Speed Switch

Heavy Duty Limit Switch

OPERATION / ACTUATION
Toggle Limit Switch Rotary Cam Limit Switch

JAYASHREE ELECTRODEVICES PVT.LTD.

Regd. Office : 101, Prabodhan Apartment, 64/9 Erandwane, Pune - 411 004. India Tel : +91 20 2543 7736. Fax : +91 20 2543 7253. E-mail :hosales@jayashree-electrodevices.org

Works : W1, F-2 Block, M.I.D.C. Pimpri, Pune - 411 018. India. Tel : +91 20 27472873, 30681323 Fax : +91 20 30681326 E-mail : jeremon@jayashree-electrodevices.org

AKASH GRAPHIC 2544 8775

JAYASHREE ELECTRODEVICES PVT. LTD.

Web : www.jayashree-electrodevices.com

The Monitoring units are to be fixed in inclined position in the direction of the belt movement as shown. The unit is provided with two 5 metre long rope lengths. Appropriate length to be cut while fixing the rope in positions as shown. The splinters, resulting from tearing of the belt, will push out the cross connected sensing rope to actuate the switch. The potential free contacts of the switch are to be wired into appropriate warning / tripping circuit. The switch can be reset by operating the reset lever. Rope to be manually refixed in position while re-starting the belt operation.

Location of Monitoring Units