Вы находитесь на странице: 1из 14

AVAILABLE DATA FOR DESIGN

Width of the river


=
Size of the bed particle
=
High flood level of the river =
Pond level
=
D/s water level corresponding
to the pond level discharge
in the river
=

310.000 m
1.180 mm
186.000 m
184.000 m

183.500 m

Safe exit gradient

Bed slope

= 1/1486

ASSUMPTION

R.L. of the datum = 170.000 m


DATA CORRESPONDING TO THE RIVER CROSS-SECTION

S.No:

Horizontal
distance from
left bank of river
(m)

Bed level of the


river (m)

S.NO:

Horizontal distance
from left bank of
river
(m)

Bed level of
the river
(m)

- 30.000

201.200

14.

25.000

179.700

2.

- 25.000

200.200

15.

30.000

179.400

3.

- 20.000

199.200

16.

35.000

179.100

4.

-15.000

198.200

17.

40.000

178.800

5.

- 10.000

196.800

18.

45.000

178.200

6.

- 5.000

195.100

19.

50.000

177.550

7.

0.000

193.400

20.

55.000

176.900

8.

5.000

188.000

21.

60.000

176.900

9.

8.750

186.000

22.

65.000

176.900

11.

10.000

185.350

23.

70.000

176.900

12.

15.000

183.450

24.

75.000

177.100

13.

20.000

181.600

25.

80.000

177.200

26.

85.000

177.300

49.

200.000

175.450

27.

90.000

177.350

50.

205.000

175.700

28.

95.000

177.370

51.

210.000

176.650

29.

100.000

177.400

52.

215.000

177.550

30.

105.000

176.900

53.

220.000

178.450

31.

110.000

176.400

54.

225.000

179.400

32.

115.000

175.850

55.

230.000

180.400

33.

120.000

175.820

56.

235.000

181.400

34.

125.000

175.800

57.

240.000

182.450

35.

130.000

175.800

58.

245.000

183.400

36.

135.000

175.500

59.

250.000

185.500

37.

140.000

175.200

60.

250.050

186.000

38.

145.000

174.850

61.

255.000

189.500

39.

150.000

175.200

62.

260.000

193.500

40.

155.000

175.500

63.

265.000

194.750

41.

160.000

175.830

64.

270.000

196.100

42.

165.000

175.630

65.

275.000

197.450

43.

170.000

175.450

66.

280.000

198.750

44.

175.000

175.200

67.

45.

180.000

175.100

68.

46.

185.000

175.000

69.

47.

190.000

174.900

70.

48.

195.000

175.200

71.

CALCULATION OF WETTED PERIMETER & WETTED AREA

RANGE OF
STRIP
(m)

WIDTH
OF
STRIP
(m)

HEIGHT

AVG.
HEIGHT
(m)

AREA
OTHER
THAN
WETTED
AREA
(m2)

H1-H2

8.750 - 10.00

1.250

16.000

15.350

15.675

19.594

.650

1.4089

10.00 - 15.00

5.000

15.350

13.450

14.400

72.000

1.900

5.349

15.00 - 20.00

5.000

13.450

11.600

12.525

62.625

1.850

5.3313

20.00 - 25.00

5.000

11.600

9.700

10.650

53.250

1.900

5.349

25.00 - 30.00

5.000

9.700

9.400

9.550

47.750

.300

5.009

30.00 - 35.00

5.000

9.400

9.100

9.250

46.250

.300

5.009

35.00 - 40.00

5.000

9.100

8.800

8.950

44.750

.300

5.009

40.00 - 45.00

5.000

8.800

8.200

8.400

42.000

.600

5.348

45.00 - 50.00

5.000

8.200

7.550

7.875

39.375

.650

5.042

50.00 - 55.00

5.000

7.550

6.900

3.495

17.475

.650

5.042

55.00 - 60.00

5.000

6.900

6.900

6.900

34.500

0.000

5.000

60.00 - 65.00

5.000

6.900

6.900

6.900

34.500

0.000

5.000

65.00 - 70.00

5.000

6.900

6.900

6.900

34.500

0.000

5.000

70.00 - 75.00

5.000

6.900

7.100

7.000

35.000

.200

5.004

75.00 - 80.00

5.000

7.100

7.200

7.150

35.750

.100

5.001

80.00 - 85.00

5.000

7.200

7.300

7.250

36.250

.100

5.001

85.00 - 90.00

5.000

7.300

7.350

7.325

36.625

.050

5.000

90.00 - 95.00

5.000

7.350

7.370

7.360

36.800

.020

5.000

95.00 - 100.0

5.000

7.370

7.400

7.385

36.925

.030

5.000

100.0-105.0

5.000

7.400

6.900

7.150

35.750

.500

5.025

105.0 - 110.0

5.000

6.900

6.400

6.650

33.250

.500

5.025

110.0 - 115.0

5.000

6.400

5.850

6.125

30.625

1.094

5.118

H1
(m)

HEIGHT
H2
(m)

WETTED
PERIMETER

(m)

(m)

115.0 - 120.0

5.000

5.850

5.820

5.835

29.175

.03

5.000

120.0 - 125.0

5.000

5.820

5.800

5.810

29.05

.02

5.000

125.0 - 130.0

5.000

5.800

5.800

5.800

29.000

0.000

5.000

130.0 - 135.0

5.000

5.800

5.500

5.650

28.250

.300

5.009

135.0 - 140.0

5.000

5.500

5.200

5.350

26.750

.300

5.009

140.0 -145.0

5.000

5.200

4.850

5.025

25.125

.350

5.012

145.0 - 150.0

5.000

4.850

5.200

5.025

25.125

- .350

5.012

150.0 -155.0

5.000

5.200

5.500

5.350

26.750

.300

5.009

155.0 - 160.0

5.000

5.500

5.830

5.665

28.325

.330

5.011

160.0 - 165.0

5.000

5.830

5.630

5.730

28.650

.200

5.004

165.0 - 170.0

5.000

5.630

5.450

5.540

27.700

.180

5.003

170.0 - 175.0

5.000

5.450

5.200

5.325

26.625

.250

5.006

175.0 - 180.0

5.000

5.200

5.100

5.150

25.750

.100

5.001

180.0 - 185.0

5.000

5.100

5.000

5.050

25.250

.100

5.001

185.0 - 190.0

5.000

5.000

4.900

4.950

24.750

.100

5.001

190.0 - 195.0

5.000

4.900

5.200

5.050

25.250

.300

5.009

195.0 - 200.0

5.000

5.200

5.450

5.325

26.625

- .250

5.006

200.0 - 205.0

5.000

5.450

5.700

5.575

37.875

.350

5.012

205.0 - 210.0

5.000

5.700

6.650

6.175

30.875

.050

5.000

210.0 - 215.0

5.000

6.650

7.550

7.100

35.500

1.100

5.120

215.0 - 220.0

5.000

7.550

8.450

8.000

40.000

1.100

5.120

220.0 - 225.0

5.000

8.450

9.400

8.925

44.625

.950

5.089

225.0 - 230.0

5.000

9.400

10.400

9.900

49.500

1.000

5.099

230.0 - 235.0

5.000

10.400

11.400

10.900

54.500

1.000

5.099

235.0 - 240.0

5.000

11.400

12.450

11.925

59.625

1.050

5.109

240.0 - 245.0

5.000

12.450

13.400

12.925

64.625

1.050

5.109

245.0 - 250.0

5.000

13.400

15.500

14.450

72.250

2.100

5.423

250.0 -250.05

0.050

15.500

16.000

15.750

.7875

.500

5.025

AREA OTHER THAN


WETTED AREA
WETTED PERIMETER
TOTAL AREA
WETTED AREA

=
=
=
=

1813.852 m2
249.3692 m
3860.8 m2
2046.948 m2

CALCULATION OF DISCHARGE AND VELOCITY

VELOCITY

(1/n)* R(2/3)*S(1/2)
(1/.035)*(2046.948/249.3692)(2/3) * (1/1486)(1/2)

=
=

DISCHARGE

3.016 m/sec
=

A*V
= 2046.948*3.016
= 6173.6 m3/sec

WETTED PERIMETER = 4.75* Q(1/2)


= 373.22 m
UNDERSLUICE

6 BAYS ( 13 m each )
5 PIERS ( 2 m each )

=
=

78 m
10 m

TOTAL

88 m

2.5 m

DIVIDE WALL

PORTION

OTHER BARRAGE BAYS

25 BAYS ( 10m each) =


24 PIERS ( 1.5m each) =
TOTAL

250m
36m
286m

TOTAL PROVIDED WATERWAY

376.5m

CALCULATION OF AFFLUX

BED
LEVEL
(m)

DISTANCE FROM THE LEFT


ABUTMENT TO THE CENTER
LINE OF PIER
(m)

HEIGHT OF
PIER
BETWEEN
H.F.L & BED
LEVEL (m)

THICKNESS
OF PIER

AREA
OF
PIER

(m)
(m2)

198.600

13

194.800

26

185.800

39

0.2

0.4

180.800

52

5.2

10.4

179.200

65

6.8

13.6

179.000

67

7.0

2.5

17.5

177.900

77

8.1

1.5

12.15

176.900

87

9.1

1.5

13.65

176.900

97

9.1

1.5

13.65

177.100

107

8.9

1.5

13.35

177.300

117

8.7

1.5

13.05

177.400

127

8.6

1.5

12.09

176.700

137

9.3

1.5

13.95

175.850

147

10.15

1.5

15.225

175.800

157

10.20

1.5

15.3

175.450

167

10.55

1.5

15.825

174.950

177

10.05

1.5

15.075

175.650

187

10.35

1.5

15.525

175.600

197

10.4

1.5

15.600

175.200

207

10.9

1.5

16.350

175.000

217

11

1.5

16.500

175.400

227

10.6

1.5

15.900

176.150

237

9.85

1.5

14.770

177.900

247

8.1

1.5

12.150

179.800

257

6.2

1.5

9.300

181.700

267

4.2

1.5

6.300

184.100

277

1.9

1.5

2.850

191.000

287

1.5

0.000

TOTAL AREA OF THE PIER BETWEEN H.F.L AND BED LEVEL OF THE RIVER
= 320.465 m2

AFFLUX = [{V2/(2*g) + .0152}*{(A2/a2) - 1}]


=
=

[{{ 2.9682/(2*9.81)} + {.0512}} *{(2046.9482/(2046.948 - 320.465)2 ) - 1}]


.200 m

CHECK
1.) THE CREST LEVEL OF THE UNDER -SLUICE PORTION IS 174.850 m
2.) THE CREST LEVEL OF OTHER BARRAGE BAY PORTION IS 1-1.5 m HIGHER THAN
UNDERSLUICE PORTION.
HENCE KEEPING IT 1.3 m HIGHER = 176.150 m
3.) H.F.L BEFORE THE BARRAGE CONSTRUCTION = 186.000 m
4.) AFFLUX = .200 m
5.) U/S H.F.L = D/S H.F.L + AFFLUX
= 186.000 + .200
= 186.200 m
6.) AVERAGE DISCHARGE INTENSITY (q) = 6173.6 / 376.5 = 16.397 m2/sec

7.) SCOUR DEPTH

(R) = 1.350 {q

/f}(1/3)

= 1.35{(16.3972 /(1.76* 1.18.5))}(1/3)


= 7.000 m
8.) VELOCITY OF APPROACH = q/R = 16.397 / 7 = 2.342 m/sec
9.) VELOCITY HEAD = V2/( 2* g) = 0.279 m
10.) U/S T.E.L = U/S H.F.L + VELOCITY HEAD
= 186.200 + 0.279
=

186.479 m

11.) HEAD (i/c velocity head) OVER THE UNDER SLUICE CREST
= U/S T.E.L - UNDERSLUICE CREST LEVEL
=

186.479 - 174.850

11.629 m

12.) HEAD (i/c velocity head ) OVER OTHER BARRAGE PORTION


=

U/S T.E.L - OTHER BARRAGE CREST LEVEL

186.479 - 176.150

10.329 m

13.) DISCHARGE PASSING THROUGH UNDERSLUICE IS GIVEN BY


Q1 = 1.7 * (L - KnH) H (3/2)
=

1.7 * [ 78 - {(.1)*(12)*(11.629)}] * (11.625)(3/2)

4315.762 m3/sec

14.) DISCHARGE OVER OTHER BARRAGE PORTION IS GIVEN BY


Q2

1.84 * ( L- KnH) H(3/2)

1.84 * [ 250 - { (.1)* (50) * (10.329)}] * (10.329)(3/2)


12115.7 m3/sec

15.) TOTAL DISCHARGE THAT CAN PASS THROUGH BARRAGE


Q1 + Q2

16431.458 m3/sec

16.) TOTAL DISCHARGE IS GREATER THAN ACTUAL DISCHARGE


16431.458 m3/sec

>

6173.6 m3/sec

HENCE THE ASSUMED WATER WAY AND THE CREST LEVELS ARE IN ORDER

DESIGN OF UNDERSLUICE PORTION


1.) HIGH FLOOD FLOW CONDITION
a.) ASSUMING NO CONCENTRATION AND RETROGRESSION
U/S T.E.L = D/S H.F.L + VELOCITY HEAD + AFFLUX
=

186.000 + 0.279 + 0.200

D/S T.EL

186.479 m

HEAD LOSS ( HL )

DISCHARGE INTENSITY
BETWEEN THE PIER (q)

186.279 m

0.2000 m

CH3/2

1.7 * ( 11.625) 3/2

67.381 m2/sec

b.) HIGH FLOOD DISCHARGE CONDITION WITH 20% CONCENTRATION AND .5 m


RETROGRESSION

THE DISCHARGE INTENSITY IS INCREASED BY 20% THEREFORE NEW DISCHARGE


INTENSITY IS
(q)
=
1.2 * 67.381
=

80.8574 m2 /sec

NEW HEAD ( i/c velocity head ) REQUIRED FOR THIS DISCHARGE INTENSITY TO PASS
H
=
(80.8574 / 1.7) (2/3) = 13.127 m
U/S T.E.L LEVEL = 174.850 + 13.127
=

187.977 m

D/S T.E.L LEVEL = D/S H.F.L - 0.5 + VELOCITY HEAD


=

186 - 0.5 + 0.275

=
HEAD LOSS (HL)

185.775 m
=

187.977 - 185.775
2.20 m