PROYECTO: Mejoramiento del Sistema de Agua Potable Y Saneamiento de la Localidad de Pampa Moreno"
UBICACIN : LOCALIDAD: PAMAPA MORENO, DIST.: MOLINOPAMPA, PROV.: CHACHAPOYAS, DPTO.AMAZONAS
BASE DE DATOS:
N VIVIENDAS
DENSIDAD
POBLACION ACTUAL
TASA DE CRECIMIENTO
r=
PERIODO DE DISEO
T=
DOTACION
D=
Po =
K1 =
K2 =
L=
7
6.00
42
2.50
20
95.00
1.20
1.30
0.89
HAB.
%
AOS
LT/HAB/DIA
KM
CALCULO DE CAUDALES:
POBLACION FUTURA :
CONTRIBUCION DOMESTICA:
Pf = Po ( 1 + r / 100 )^n
CAUDAL PROMEDIO
Qp
Qmd = K1xQp
= Pf x D / 86400
Qmh= K2 x (Qp )
QC = 0.80 x Qmh
CAUDAL DE INFILTRACION:
Qinf
= 20000 x L / 86400
Qmhc total
69
0.08
0.09
0.10
0.08
0.21
0.284
HAB.
LT/SEG
LT/SEG
LT/SEG
LT/SEG
LT/SEG.
LT/SEG.
PRESUPUESTO
PROYECTO: Mejoramiento del Sistema de Agua Potable Y Saneamiento de la Localidad de Pampa Moreno"
UBICACIN : LOCALIDAD: PAMAPA MORENO, DIST.: MOLINOPAMPA, PROV.: CHACHAPOYAS, DPTO.AMAZONAS
ITEM
DESCRIPCION
UNIDAD CANTIDAD
01 .-
01.00
01.01
01.02
01.03
01.04
01.05
01.06
TRABAJOS PRELIMINARES
CARTEL DE OBRA
LIMPIEZA INICIAL Y FINAL DE OBRA EN FORMA MANUAL (Aprom=5.00m)
TRAZO, NIVELACION Y REPLANTEO INICIAL DE ZANJAS
TRAZO, NIVELACION Y REPLANTEO DURANTE LA INSTALACION
DEMOLICION DE PAVIMENTO EXISTENTE (a=1.20m)
REPOSICION DE PAVIMENTO DEMOLIDO (a=1.20m)
02.00
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
02.12
02.13
02.14
02.15
02.16
02.17
02.18
02.19
02.20
02.21
02.22
02.23
02.24
02.25
02.26
02.27
02.28
02.29
02.30
02.31
02.32
02.33
02.34
02.35
02.36
02.37
02.38
02.39
02.40
02.41
02.42
02.43
02.44
02.45
02.46
02.47
02.48
MOVIMIENTO DE TIERRAS
EXCAVACION ZANJAS MANUAL, H<=1.50 M., TN
EXCAVACION ZANJAS MANUAL 1.50<H<=2.00 M., TN
EXCAVACION ZANJAS MANUAL 2.00<H<=2.50 M., TN
EXCAVACION ZANJAS MANUAL 2.50<H<=3.00 M., TN
EXCAVACION ZANJAS MANUAL 3.00<H<=3.50 M., TN
EXCAVACION ZANJAS MANUAL, H<=1.50 M., TS
EXCAVACION ZANJAS MANUAL 1.50<H<=2.00 M., TS
EXCAVACION ZANJAS MANUAL 2.00<H<=2.50 M., TS
EXCAVACION ZANJAS MANUAL 2.50<H<=3.00 M., TS
EXCAVACION ZANJAS MANUAL 3.00<H<=3.50 M., TS
EXCAVACION ZANJAS MANUAL 3.50<H<=4.00 M., TS
EXCAVACION ZANJAS MANUAL 4.00<H<=5.00 M., TS
EXCAVACION ZANJAS MANUAL 5.00<H<=6.00 M., TS
EXCAVACION ZANJAS MANUAL, H>6.00 M., TS
REFINE, NIVELACION Y FONDOS P' TUB., A=0.65M. TN
REFINE, NIVELACION Y FONDOS P' TUB., A=0.65M. TS
ENTIBADO DE ZANJAS C/MADERA H<=2.00M TN/TS
ENTIBADO DE ZANJAS C/MADERA H<=2.50M TN/TS
ENTIBADO DE ZANJAS C/MADERA H<=3.00M TN/TS
ENTIBADO DE ZANJAS C/MADERA H<=3.50M TN/TS
ENTIBADO DE ZANJAS C/MADERA H<=4.00M TN/TS
ENTIBADO DE ZANJAS C/MADERA H<=5.00M TN/TS
ENTIBADO DE ZANJAS C/MADERA H<=6.00M TN/TS
ENTIBADO DE ZANJAS C/MADERA H>6.00M TN/TS
DRENAJE P/INSTALACION DE TUBERIAS H<=2.00M
DRENAJE P/INSTALACION DE TUBERIAS H<=2.50M
DRENAJE P/INSTALACION DE TUBERIAS H<=3.00M
DRENAJE P/INSTALACION DE TUBERIAS H<=3.50M
DRENAJE P/INSTALACION DE TUBERIAS H<=4.00M
DRENAJE P/INSTALACION DE TUBERIAS H<=5.00M
DRENAJE P/INSTALACION DE TUBERIAS H<=6.00M
DRENAJE P/INSTALACION DE TUBERIAS H>6.00M
CAMA DE APOYO C/ARENA e=0.10m, A=0.70m TN
CAMA DE APOYO C/GRAVILLA OVERSIZE e=0.10m, A=0.70m TN/TS
RELLENO LATERAL DE TUB. C/ARENA TN
RELLENO LATERAL DE TUB. C/ARENA TN/TS
RELL. Y APIS. ZANJA TN S/CLAVE TUB. C/MAT. PROPIO (e=0.30m, a=0.70m)
RELL. Y APIS. ZANJA TN/TS S/CLAVE TUB. C/MAT. PROPIO (e=0.30m, a=0.70m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=1.50m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=2.00m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=2.50m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=3.00m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=3.50m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=4.00m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=5.00m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H<=6.00m)
RELL. Y COMP. C/EQUIP. TN C/MAT. PROPIO (a=0.70m, H>6.00m)
ELIMINACION DE MATERIAL EXCEDENTE DMT = 5 Km
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
M3
600.03
03.00
03.01
03.02
03.03
03.04
03.05
03.06
03.07
TUBERIAS
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 200MM (8'')
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 250MM (10'')
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 300MM (12'')
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 350MM (14'')
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-20 400MM (16'')
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 400MM (16'')
SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 450MM (18'')
ML
ML
ML
ML
ML
ML
ML
888.64
04.00
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.08
BUZONES
BUZON TIPO I TN, D=1.20m, Prof.<=1.50m
BUZON TIPO II TN/TS, 1.20M, 1.50<H<=2.00 M.
BUZON TIPO II TN/TS , 1.20M, 2.00<H<=3.00 M.
BUZON TIPO III TN/TS, D=1.50m, Prof.<=4.00m
BUZON TIPO III TN/TS, D=1.50m, Prof.<=5.00m
BUZON TIPO III TN/TS, D=1.50m, Prof.<=6.00m
BUZON TIPO III TN/TS, D=1.50m, Prof.>6.00m
ELIMINACION DE MATERIAL EXCEDENTE DMT = 5 Km
UND
UND
UND
UND
UND
UND
UND
M3
13.00
1.00
3.00
05.00
05.01
05.02
05.03
05.04
05.05
05.06
05.07
05.08
CAIDAS ESPECIALES
CAIDA DE BUZON TIPO II, H<=2.00m C/TUB. PVC
CAIDA DE BUZON TIPO II, H<=2.50m C/TUB. PVC
CAIDA DE BUZON TIPO III, H<=3.00m C/TUB. PVC
CAIDA DE BUZON TIPO III, H<=3.50m C/TUB. PVC
CAIDA DE BUZON TIPO III, H<=4.00m C/TUB. PVC
CAIDA DE BUZON TIPO III, H<=5.00m C/TUB. PVC
CAIDA DE BUZON TIPO III, H<=6.00m C/TUB. PVC
CAIDA DE BUZON TIPO III, H>6.00m C/TUB. PVC
UND
UND
UND
UND
UND
UND
UND
UND
16.00
06.00
06.01
06.02
UND
ML
134.00
888.64
UND
M2
ML
ML
M2
M2
Pgina 2 de 99
1.00
4,443.20
888.64
888.64
1,066.37
1,066.37
107.73
80.88
100.00
600.03
288.61
107.73
80.88
100.00
107.73
80.88
100.00
600.03
288.61
600.03
288.61
600.03
288.61
107.73
80.88
100.00
435.43
#REF!
#REF!
18.08
P. UNITARIO
S/.
PARCIAL
S/.
TOTAL
S/.
PRESUPUESTO DE FINANCIAMIENTO
PROYECTO: Mejoramiento del Sistema de Agua Potable Y Saneamiento de la Localidad de Pampa Moreno"
UBICACIN : LOCALIDAD: PAMAPA MORENO, DIST.: MOLINOPAMPA, PROV.: CHACHAPOYAS, DPTO.AMAZONAS
ITEM
DESCRIPCION
01 .-
COSTO DIRECTO
02 .-
GASTOS GENERALES
COEF. CANTIDAD
P. UNITARIO
PARCIAL
TOTAL
S/.
S/.
S/.
9,345.36
13,950.00
1.00
3.50
2,400.00
8,400.00
MAESTRO DE OBRA
1.00
3.00
1,200.00
3,600.00
1.00
3.50
300.00
1,050.00
UTILES DE ESCRITORIO
1.00
3.00
100.00
300.00
1.00
3.00
200.00
600.00
03 .-
COSTO DE LA OBRA
23,295.36
04 .-
3,000.00
05 .-
26,295.36
PARCIAL
S/.
00.00
TOTAL
S/.
0.010
5.00
0.05
0.017
0.027
0.053
0.013
0.013
0.027
0.050
1.55
4.22
1.25
7.00
7.62
1.47
0.18
0.03
0.11
0.07
0.09
0.10
0.04
0.01
TOTAL: S/.
2.228
0.050
1.25
2.79
2.79
0.14
TOTAL: S/.
2.79
0.14
2.92
3.463
0.050
1.25
4.33
4.33
0.22
TOTAL: S/.
4.33
0.22
4.55
5.195
0.050
1.25
6.49
6.49
0.32
TOTAL: S/.
6.49
0.32
6.82
12.987
0.050
1.25
16.23
16.23
0.81
TOTAL: S/.
16.23
0.81
17.05
(1.25)
HH
5% MANO DE OBRA
15.152
0.050
1.25
18.94
18.94
0.95
TOTAL: S/.
18.94
0.95
19.89
0.200
0.050
1.25
0.25
0.25
0.01
TOTAL: S/.
0.25
0.01
0.26
0.039
0.080
0.050
15.00
1.25
0.10
0.59
0.10
0.01
TOTAL: S/.
0.59
0.10
0.01
0.69
0.129
1.290
0.129
0.050
4.22
1.25
10.17
2.16
0.54
1.61
1.31
0.11
TOTAL: S/.
02.38 RELL. Y APIS. ZANJA TN/TS S/CLAVE TUB. C/MAT. PROPIO (e=0.30m,
ML a=0.70m)
Rendimiento:
46.00 ML/DIA
OPERARIO
(1.00)
HH
0.174
4.22
0.73
#REF!
#REF!
Rendimiento:
0.66 ML/DIA
PEON
DESGASTE DE HERRAMIENTAS
0.18
0.24
0.49
#REF!
Pgina 4 de 99
2.16
1.42
3.58
0.216
2.162
0.216
0.050
4.22
1.25
10.17
3.61
0.91
2.70
2.20
0.18
TOTAL: S/.
0.258
2.581
0.258
0.050
4.22
1.25
10.17
4.32
1.09
3.23
2.62
0.22
TOTAL: S/.
0.308
3.077
0.308
0.050
4.22
1.25
10.17
5.15
1.30
3.85
3.13
0.26
TOTAL: S/.
1.333
0.050
1.25
1.67
1.67
0.08
TOTAL: S/.
03.01 SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 200MM
ML (8'')
Rendimiento:
60.00 ML/DIA
PEGAMENTO PLASTICO PVC
GL
TUBERIA DESAGUE PVC- 6"
ML
OPERARIO
(1.00)
HH
PEON
(2.00)
HH
DESGASTE DE HERRAMIENTAS
5% MANO DE OBRA
0.004
1.030
0.133
0.267
0.050
80.00
19.82
4.22
1.25
0.90
0.32
20.42
0.56
0.33
0.04
TOTAL: S/.
0.001
0.060
0.006
0.080
0.100
0.200
0.050
40.00
0.30
18.00
10.00
4.22
1.25
0.67
0.04
0.02
0.11
0.80
0.42
0.25
0.03
TOTAL: S/.
2.310
1.080
1.240
19.260
0.090
0.970
0.990
15.960
1.000
0.360
29.540
15.200
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
5.78
2.75
3.10
27.93
3.60
38.80
39.60
287.28
130.00
3.60
59.08
64.14
#REF!
#REF!
Rendimiento:
80.00 ML/DIA
ARENA GRUESA
LADRILLO K.K DE ARCILLA 9X14X24
CEMENTO PORTLAND TIPO I
AGUA
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
00.00
TOTAL
S/.
2.91
1.91
4.82
3.61
2.38
5.99
4.32
2.84
7.15
5.15
3.39
8.54
1.67
0.08
1.75
20.74
0.90
0.04
21.68
#REF!
M3
UN
BL
M3
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
0.97
0.67
0.03
1.67
UND
(1.90)
Pgina 5 de 99
KG
KG
KG
KG
M3
M3
M3
BL
UN
M3
P2
HH
601.52
0.940
1.080
1.560
19.260
0.120
1.160
1.180
19.160
1.000
0.440
37.150
18.400
12.000
43.200
0.050
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
1.25
177.61
2.35
2.75
3.90
27.93
4.80
46.40
47.20
344.88
130.00
4.40
74.30
77.65
45.96
54.00
8.88
TOTAL: S/.
1.310
1.080
2.200
19.260
0.180
1.530
1.540
25.540
1.000
0.580
52.380
25.600
16.000
63.200
0.050
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
1.25
248.31
3.28
2.75
5.50
27.93
7.20
61.20
61.60
459.72
130.00
5.80
104.76
108.03
61.28
79.00
12.42
TOTAL: S/.
1.690
7.680
2.840
136.960
0.240
1.890
1.910
31.930
1.000
0.720
67.610
40.800
27.200
96.000
0.050
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
1.25
396.35
4.23
19.58
7.10
198.59
9.60
75.60
76.40
574.74
130.00
7.20
135.22
172.18
104.18
120.00
19.82
TOTAL: S/.
Pgina 6 de 99
00.00
TOTAL
S/.
142.91
7.15
751.57
688.91
177.61
8.88
875.40
869.74
248.31
12.42
1,130.46
1,238.26
396.35
19.82
1,654.43
PARCIAL
S/.
00.00
TOTAL
S/.
0.160
0.030
1.25
0.20
0.20
0.01
TOTAL: S/.
0.20
0.01
0.21
P2
(1.00)
HH
(4.00)
HH
(1.00)
HM
3% MANO DE OBRA
0.010
0.016
0.064
0.016
0.030
2.00
4.22
1.25
7.62
0.15
0.02
0.07
0.08
0.12
0.00
TOTAL: S/.
0.02
2.286
0.030
1.25
2.86
2.86
0.09
TOTAL: S/.
2.86
0.09
2.94
1.333
0.030
1.25
1.67
1.67
0.05
TOTAL: S/.
1.67
0.05
1.72
KG
HH
HH
P2
3% MANO DE OBRA
0.010
0.400
0.400
0.030
0.030
2.50
4.22
3.83
2.50
3.22
0.03
1.69
1.53
0.08
0.10
TOTAL: S/.
0.03
0.190
0.065
0.267
0.133
1.067
0.030
18.00
40.00
4.22
3.83
1.25
2.97
3.42
2.60
1.13
0.51
1.33
0.09
TOTAL: S/.
0.540
0.550
8.430
1.778
1.778
8.889
0.030
40.00
40.00
18.00
4.22
3.83
1.25
25.42
21.60
22.00
151.74
7.50
6.81
11.11
0.76
TOTAL: S/.
0.100
0.100
4.000
0.800
0.800
0.050
2.50
2.50
2.00
4.22
3.83
6.44
0.25
0.25
8.00
3.38
3.06
0.32
TOTAL: S/.
#REF!
#REF!
#REF!
Rendimiento:
500.00 M2/DIA
MADERA TORNILLO O SIMILAR
TOPOGRAFO
PEON
TEODOLITO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
20.00 M2/DIA
CLAVOS 2" - 4"
OPERARIO
OFICIAL
REGLA DE MADERA
DESGASTE DE HERRAMIENTAS
#REF!
0.15
0.13
0.29
#REF!
(1.00)
(1.00)
Pgina 7 de 99
3.22
0.17
3.42
6.02
2.97
0.09
9.08
195.34
25.42
0.76
221.53
8.50
6.44
0.32
15.26
#REF!
#REF!
#REF!
#REF!
00.00
TOTAL
S/.
1.70
0.26
0.01
1.97
#REF!
#REF!
Rendimiento:
12.00 M2/DIA
CLAVOS 2" - 4"
KG
ARENA FINA
M3
CEMENTO PORTLAND TIPO I
BL
ADITIVO IMPERMEABILIZANTE PARA MORTERO
KG
AGUA
M3
OPERARIO
(1.00)
HH
PEON
(1.00)
HH
ANDAMIO DE MADERA
P2
DESGASTE DE HERRAMIENTAS
3% MANO DE OBRA
0.022
0.030
0.370
0.800
0.030
0.667
0.667
0.580
0.030
2.50
40.00
18.00
6.50
10.00
4.22
1.25
2.50
3.65
0.06
1.20
6.66
5.20
0.30
2.81
0.83
1.45
0.11
TOTAL: S/.
#REF!
Rendimiento:
15.00 M2/DIA
CLAVOS 2" - 4"
ARENA FINA
CEMENTO PORTLAND TIPO I
AGUA
MADERA TORNILLO O SIMILAR
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
0.010
0.016
0.180
0.015
0.201
0.533
0.267
0.050
2.50
40.00
18.00
10.00
2.00
4.22
1.25
2.58
0.03
0.64
3.24
0.15
0.40
2.25
0.33
0.13
TOTAL: S/.
0.004
1.030
0.080
0.160
0.050
80.00
50.00
4.22
1.25
0.54
0.32
51.50
0.34
0.20
0.03
TOTAL: S/.
1.000
2.000
4.000
0.050
700.00
4.22
1.25
13.44
700.00
8.44
5.00
0.67
TOTAL: S/.
700.00
1.000
1.333
0.050
25.00
4.22
5.63
25.00
5.63
0.28
TOTAL: S/.
25.00
5.63
0.28
30.91
#REF!
Rendimiento:
100.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
4.00 UN/DIA
VALVULA COMPUERTA 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 UN/DIA
CODO PVC SAP 8"X45
OPERARIO
DESGASTE DE HERRAMIENTAS
13.42
3.65
1.56
18.62
#REF!
KG
M3
BL
M3
P2
(1.00)
HH
(0.50)
HH
5% MANO DE OBRA
4.46
2.58
0.13
7.17
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
51.82
0.54
0.03
52.38
#REF!
UN
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
13.44
0.67
714.11
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
Pgina 8 de 99
#REF!
Rendimiento:
CANASTILLA BRONCE 8"
15.00
5.63
0.28
20.91
#REF!
0.00 UN/DIA
UN
1.000
60.00
60.00
S/.
60.00
60.00
19.30
3.38
1.00
0.22
TOTAL: S/.
19.30
TOTAL:
#REF!
00.00
TOTAL
S/.
#REF!
Rendimiento:
10.00 UN/DIA
PLANCHA Fo. Go. 3/16"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
M2
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
Pgina 9 de 99
0.193
0.800
0.800
0.050
100.00
4.22
1.25
4.38
4.38
0.22
23.89
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rendimiento:
50.00 M2/DIA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
500.00 M2/DIA
MADERA TORNILLO O SIMILAR
TOPOGRAFO
PEON
TEODOLITO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
3.50 M3/DIA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 M3/DIA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 M3/DIA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
20.00 M2/DIA
CLAVOS 2" - 4"
OPERARIO
OFICIAL
REGLA DE MADERA
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
60.00 M2/DIA
CEMENTO PORTLAND TIPO I
HORMIGON
OPERARIO
OFICIAL
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
9.00 M3/DIA
ARENA GRUESA
PIEDRA CHANCADA 1/2"
CEMENTO PORTLAND TIPO I
OPERARIO
OFICIAL
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
ALAMBRE NEGRO No.08
CLAVOS 2" - 4"
PARCIAL
S/.
00.00
TOTAL
S/.
#REF!
(1.00)
HH
3% MANO DE OBRA
0.160
0.030
1.25
0.20
0.20
0.01
TOTAL: S/.
0.20
0.01
0.21
0.010
0.016
0.064
0.016
0.030
2.00
4.22
1.25
7.62
0.15
0.02
0.07
0.08
0.12
0.00
TOTAL: S/.
0.02
2.286
0.050
1.25
2.86
2.86
0.14
TOTAL: S/.
2.86
0.14
3.00
1.333
0.050
1.25
1.67
1.67
0.08
TOTAL: S/.
1.67
0.08
1.75
1.333
0.030
1.25
1.67
1.67
0.05
TOTAL: S/.
1.67
0.05
1.72
0.010
0.400
0.400
0.030
0.030
2.50
4.22
3.83
2.50
3.22
0.03
1.69
1.53
0.08
0.10
TOTAL: S/.
0.03
0.190
0.065
0.267
0.133
1.067
0.030
18.00
40.00
4.22
3.83
1.25
2.97
3.42
2.60
1.13
0.51
1.33
0.09
TOTAL: S/.
0.540
0.550
8.430
1.778
1.778
8.889
0.030
40.00
40.00
18.00
4.22
3.83
1.25
25.42
21.60
22.00
151.74
7.50
6.81
11.11
0.76
TOTAL: S/.
0.100
0.100
2.50
2.50
0.25
0.25
#REF!
P2
(1.00)
HH
(4.00)
HH
(1.00)
HM
3% MANO DE OBRA
0.15
0.13
0.29
#REF!
(1.00)
HH
5% MANO DE OBRA
#REF!
(1.00)
HH
5% MANO DE OBRA
#REF!
(1.00)
HH
3% MANO DE OBRA
#REF!
KG
HH
HH
P2
3% MANO DE OBRA
(1.00)
(1.00)
3.22
0.17
3.42
#REF!
BL
M3
(2.00)
HH
(1.00)
HH
(8.00)
HH
3% MANO DE OBRA
6.02
2.97
0.09
9.08
#REF!
M3
M3
BL
(2.00)
HH
(2.00)
HH
(10.00)
HH
3% MANO DE OBRA
#REF!
10.00 M2/DIA
KG
KG
Pgina 10 de 99
195.34
25.42
0.76
221.53
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rendimiento:
250.00 KG/DIA
ALAMBRE NEGRO No.16
ACERO CORRUGADO, FY=4200 KG/CM2
OPERARIO
OFICIAL
DESGASTE DE HERRAMIENTAS
00.00
TOTAL
S/.
8.50
6.44
0.32
15.26
#REF!
KG
KG
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
0.060
1.070
0.032
0.032
0.050
2.55
1.45
4.22
3.83
0.26
0.15
1.55
0.14
0.12
0.01
TOTAL: S/.
#REF!
#REF!
Rendimiento:
12.00 M2/DIA
CLAVOS 2" - 4"
KG
ARENA FINA
M3
CEMENTO PORTLAND TIPO I
BL
ADITIVO IMPERMEABILIZANTE PARA MORTERO
KG
AGUA
M3
OPERARIO
(1.00)
HH
PEON
(1.00)
HH
ANDAMIO DE MADERA
P2
DESGASTE DE HERRAMIENTAS
3% MANO DE OBRA
0.022
0.030
0.370
0.800
0.030
0.667
0.667
0.580
0.030
2.50
40.00
18.00
6.50
10.00
4.22
1.25
2.50
3.65
0.06
1.20
6.66
5.20
0.30
2.81
0.83
1.45
0.11
TOTAL: S/.
#REF!
Rendimiento:
15.00 M2/DIA
CLAVOS 2" - 4"
ARENA FINA
CEMENTO PORTLAND TIPO I
AGUA
MADERA TORNILLO O SIMILAR
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
0.010
0.016
0.180
0.015
0.201
0.533
0.267
0.050
2.50
40.00
18.00
10.00
2.00
4.22
1.25
2.58
0.03
0.64
3.24
0.15
0.40
2.25
0.33
0.13
TOTAL: S/.
4.46
1.050
1.333
0.050
40.00
1.25
1.67
42.00
1.67
0.08
TOTAL: S/.
42.00
1.67
0.08
43.75
1.030
1.333
0.050
40.00
1.25
1.67
41.20
1.67
0.08
TOTAL: S/.
41.20
1.67
0.08
42.95
1.000
1.333
0.050
20.00
4.22
5.63
20.00
5.63
0.28
TOTAL: S/.
20.00
5.63
0.28
25.91
1.000
1.333
0.050
25.00
4.22
5.63
25.00
5.63
0.28
TOTAL: S/.
25.00
5.63
0.28
30.91
#REF!
Rendimiento:
6.00 M2/DIA
ARENA GRUESA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 M2/DIA
GRAVA O CASCAJO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 UN/DIA
CODO PVC SAP 6"
OPERARIO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 UN/DIA
CODO PVC SAP 8"
OPERARIO
DESGASTE DE HERRAMIENTAS
#REF!
1.70
0.26
0.01
1.97
13.42
3.65
1.56
18.62
#REF!
KG
M3
BL
M3
P2
(1.00)
HH
(0.50)
HH
5% MANO DE OBRA
2.58
0.13
7.17
#REF!
M3
(1.00)
HH
5% MANO DE OBRA
#REF!
M3
(1.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
#REF!
Pgina 11 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rendimiento:
6.00 UN/DIA
TEE PVC SAP 8"
OPERARIO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
150.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 6"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
120.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
10.00 M2/DIA
CALAMINA GALVANIZADA
ALAMBRE NEGRO No.16
CLAVOS CALAMINA
MADERA TORNILLO O SIMILAR
OPERARIO
OFICIAL
DESGASTE DE HERRAMIENTAS
00.00
TOTAL
S/.
0.00
5.63
0.28
5.91
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
1.000
1.333
0.050
30.00
4.22
5.63
30.00
5.63
0.28
TOTAL: S/.
30.00
5.63
0.28
35.91
0.002
1.030
0.053
0.107
0.050
80.00
30.00
4.22
1.25
0.36
0.16
30.90
0.22
0.13
0.02
TOTAL: S/.
0.004
1.030
0.067
0.133
0.050
80.00
50.00
4.22
1.25
0.45
0.32
51.50
0.28
0.17
0.02
TOTAL: S/.
1.200
0.100
0.100
4.000
0.800
0.800
0.050
15.00
2.55
3.00
2.00
4.22
3.83
6.44
18.00
0.26
0.30
8.00
3.38
3.06
0.32
TOTAL: S/.
0.160
0.030
1.25
0.20
0.20
0.01
TOTAL: S/.
0.20
0.01
0.21
0.010
0.016
0.064
0.016
0.030
2.00
4.22
1.25
7.62
0.15
0.02
0.07
0.08
0.12
0.00
TOTAL: S/.
0.02
2.286
0.030
1.25
2.86
2.86
0.09
TOTAL: S/.
2.86
0.09
2.94
1.333
0.030
1.25
1.67
1.67
0.05
1.67
0.05
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
31.06
0.36
0.02
31.44
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
51.82
0.45
0.02
52.29
#REF!
UN
KG
KG
P2
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
26.56
6.44
0.32
33.32
#REF!
#REF!
Rendimiento:
50.00 M2/DIA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
500.00 M2/DIA
MADERA TORNILLO O SIMILAR
TOPOGRAFO
PEON
TEODOLITO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
3.50 M3/DIA
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 M3/DIA
PEON
DESGASTE DE HERRAMIENTAS
ML
(1.00)
HH
3% MANO DE OBRA
#REF!
P2
(1.00)
HH
(4.00)
HH
(1.00)
HM
3% MANO DE OBRA
0.15
0.13
0.29
ML
(1.00)
HH
3% MANO DE OBRA
ML
(1.00)
HH
3% MANO DE OBRA
Pgina 12 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rendimiento:
60.00 M2/DIA
CEMENTO PORTLAND TIPO I
HORMIGON
OPERARIO
OFICIAL
PEON
DESGASTE DE HERRAMIENTAS
ML
0.190
0.065
0.267
0.133
1.067
0.030
18.00
40.00
4.22
3.83
1.25
2.97
3.42
2.60
1.13
0.51
1.33
0.09
TOTAL: S/.
0.540
0.550
8.430
1.778
1.778
8.889
0.030
40.00
40.00
18.00
4.22
3.83
1.25
25.42
21.60
22.00
151.74
7.50
6.81
11.11
0.76
TOTAL: S/.
0.100
0.100
4.000
0.800
0.800
0.050
2.50
2.50
2.00
4.22
3.83
6.44
0.25
0.25
8.00
3.38
3.06
0.32
TOTAL: S/.
KG
KG
(1.00)
HH
(1.00)
HH
3% MANO DE OBRA
0.060
1.070
0.032
0.032
0.030
2.55
1.45
4.22
3.83
0.26
0.15
1.55
0.14
0.12
0.01
TOTAL: S/.
#REF!
#REF!
Rendimiento:
12.00 M2/DIA
CLAVOS 2" - 4"
KG
ARENA FINA
M3
CEMENTO PORTLAND TIPO I
BL
ADITIVO IMPERMEABILIZANTE PARA MORTERO
KG
AGUA
M3
OPERARIO
(1.00)
HH
PEON
(1.00)
HH
ANDAMIO DE MADERA
P2
DESGASTE DE HERRAMIENTAS
3% MANO DE OBRA
0.022
0.030
0.370
0.800
0.030
0.667
0.667
0.580
0.030
2.50
40.00
18.00
6.50
10.00
4.22
1.25
2.50
3.65
0.06
1.20
6.66
5.20
0.30
2.81
0.83
1.45
0.11
TOTAL: S/.
#REF!
Rendimiento:
100.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 6"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
0.004
1.030
0.080
0.160
0.050
80.00
30.00
4.22
1.25
0.54
0.32
30.90
0.34
0.20
0.03
TOTAL: S/.
0.004
1.030
0.080
80.00
17.00
4.22
0.32
17.51
0.34
#REF!
Rendimiento:
9.00 M3/DIA
ARENA GRUESA
PIEDRA CHANCADA 1/2"
CEMENTO PORTLAND TIPO I
OPERARIO
OFICIAL
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
10.00 M2/DIA
ALAMBRE NEGRO No.08
CLAVOS 2" - 4"
MADERA PARA ENCOFRADO
OPERARIO
OFICIAL
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
250.00 KG/DIA
ALAMBRE NEGRO No.16
0.651
ACERO CORRUGADO, FY=4200 KG/CM2
0.043
OPERARIO
OFICIAL
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
100.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 3"
OPERARIO
00.00
TOTAL
S/.
1.72
BL
M3
(2.00)
HH
(1.00)
HH
(8.00)
HH
3% MANO DE OBRA
6.02
2.97
0.09
9.08
UND
M3
M3
BL
(2.00)
HH
(2.00)
HH
(10.00)
HH
3% MANO DE OBRA
195.34
25.42
0.76
221.53
ML
KG
KG
P2
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
8.50
6.44
0.32
15.26
#REF!
1.70
0.26
0.01
1.97
13.42
3.65
1.56
18.62
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
31.22
0.54
0.03
31.78
#REF!
(1.00)
Pgina 13 de 99
GL
ML
HH
17.83
#REF!
#REF!
#REF!
#REF!
Rendimiento:
4.00 UN/DIA
VALVULA COMPUERTA 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 UN/DIA
CODO PVC SAP 8"X45
OPERARIO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 UN/DIA
YEE PVC SAL, 8"
OPERARIO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
CANASTILLA BRONCE 8"
#REF!
UN
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
1.000
2.000
4.000
0.050
700.00
4.22
1.25
13.44
700.00
8.44
5.00
0.67
TOTAL: S/.
700.00
1.000
1.333
0.050
25.00
4.22
5.63
25.00
5.63
0.28
TOTAL: S/.
25.00
5.63
0.28
30.91
1.000
1.333
0.050
15.00
4.22
5.63
15.00
5.63
0.28
TOTAL: S/.
15.00
5.63
0.28
20.91
1.000
60.00
60.00
S/.
60.00
60.00
19.30
3.38
1.00
0.22
TOTAL: S/.
19.30
13.44
0.67
714.11
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
#REF!
0.00 UN/DIA
UN
TOTAL:
#REF!
00.00
TOTAL
S/.
0.54
0.03
18.39
#REF!
Rendimiento:
10.00 UN/DIA
PLANCHA Fo. Go. 3/16"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
M2
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
Pgina 14 de 99
0.193
0.800
0.800
0.050
100.00
4.22
1.25
4.38
4.38
0.22
23.89
DESCRIPCION
UNIDAD
CANTIDAD
P. UNITARIO
S/.
PARCIAL
S/.
KG
KG
KG
KG
M3
M3
M3
M3
M3
UN
BL
KG
GL
BL
UN
M3
M3
P2
P2
M2
UN
ML
ML
ML
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
KG
UN
ML
UN
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.50
2.55
2.50
1.45
40.00
40.00
15.00
40.00
40.00
0.30
18.00
6.50
80.00
5.00
130.00
40.00
10.00
2.00
2.00
100.00
60.00
19.82
30.00
50.00
20.00
25.00
25.00
30.00
30.00
15.00
700.00
25.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
30.00
3.00
15.00
17.00
50.00
#REF!
#REF!
#REF!
MATERIALES
000001
000002
000003
000004
000005
000006
000007
000008
000009
000010
000011
000012
000013
000014
000015
000016
000017
000018
000019
000020
000021
000022
000023
000024
000025
000026
000027
000028
000029
000030
000031
000032
000033
000034
000035
000036
000037
000038
MANO DE OBRA
000032
000033
000034
000035
TOPOGRAFO
OPERARIO
OFICIAL
PEON
HH
HH
HH
HH
000036
000037
000038
000039
000040
000041
000042
EQUIPO Y HERRAMIENTAS
NIVEL TOPOGRAFICO
TEODOLITO
ANDAMIO DE MADERA
MIRAS Y JALONES
REGLA DE MADERA
COMPACTADORA VIBRATORIA T.PLANCHA, 4 HP
DESGASTE DE HERRAMIENTAS
HM
HM
P2
HM
P2
HM
GLB
000043
FLETE TERRESTRE
FLETE
GLB
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
4.22
4.22
3.83
1.25
7.00
7.62
2.50
1.47
2.50
10.17
1.00
6,568.00
TOTAL
S/.
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
S/.
#REF!
#REF!
#REF!
#REF!
888.64
600.03
TOTAL
S/.
5.00
2.00
4.22
1.25
7.00
7.62
1.47
0.18
0.03
0.04
0.10
0.09
0.16
0.18
0.03
0.01
TOTAL: S/.
2.228
0.050
1.25
2.79
2.79
0.14
TOTAL: S/.
2.79
0.14
2.92
3.463
0.050
1.25
4.33
4.33
0.22
TOTAL: S/.
4.33
0.22
4.55
5.195
0.050
1.25
6.49
6.49
0.32
TOTAL: S/.
6.49
0.32
6.82
12.987
0.050
1.25
16.23
16.23
0.81
TOTAL: S/.
16.23
0.81
17.05
1.25
18.94
18.94
0.95
TOTAL: S/.
18.94
0.95
19.89
1.25
0.25
0.25
0.01
TOTAL: S/.
0.25
0.01
0.26
0.039
0.080
0.050
15.00
1.25
0.10
0.59
0.10
0.01
TOTAL: S/.
0.59
0.10
0.01
0.69
4.22
1.25
10.17
2.16
0.54
1.61
1.31
0.11
TOTAL: S/.
2.38 RELL. Y APIS. ZANJA TN/TS S/CLAVE TUB. C/MAT. PROPIO (e=0.30m,
ML a=0.70m)
288.61
Rendimiento:
46.00 ML/DIA
33.00 OPERARIO
(1.00)
HH
0.174
35.00 PEON
(10.00)
HH
1.739
4.22
1.25
0.73
2.17
#REF!
#REF!
Rendimiento:
0.66 ML/DIA
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
(1.25)
HH
5% MANO DE OBRA
0.005
0.020
0.023
0.069
0.023
0.023
0.023
0.050
PARCIAL
S/.
0.18
0.38
0.63
#REF!
15.152
0.050
600.03
600.03
Pgina 16 de 99
0.07
0.200
0.050
2.16
1.42
3.58
2.91
0.216
2.162
0.216
0.050
4.22
1.25
10.17
3.61
0.91
2.70
2.20
0.18
TOTAL: S/.
0.258
2.581
0.258
0.050
4.22
1.25
10.17
4.32
1.09
3.23
2.62
0.22
TOTAL: S/.
0.308
3.077
0.308
0.050
4.22
1.25
10.17
5.15
1.30
3.85
3.13
0.26
TOTAL: S/.
1.333
0.050
1.25
1.67
1.67
0.08
TOTAL: S/.
3.01 SUMINISTRO E INSTAL. DE TUB. PVC-U UF NTP ISO 4435 S-25 200MM
ML (8'') 888.64
Rendimiento:
60.00 ML/DIA
13.00 PEGAMENTO PLASTICO PVC
GL
0.004
22.00 TUBERIA DESAGUE PVC- 6"
ML
1.030
33.00 OPERARIO
(1.00)
HH
0.133
35.00 PEON
(2.00)
HH
0.267
42.00 DESGASTE DE HERRAMIENTAS
5% MANO DE OBRA
0.050
80.00
19.82
4.22
1.25
0.90
0.32
20.42
0.56
0.33
0.04
TOTAL: S/.
40.00
0.30
18.00
10.00
4.22
1.25
0.67
0.04
0.02
0.11
0.80
0.42
0.25
0.03
TOTAL: S/.
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
5.78
2.75
3.10
27.93
3.60
38.80
39.60
287.28
130.00
3.60
59.08
64.14
36.77
#REF!
6.00
10.00
11.00
17.00
33.00
35.00
42.00
#REF!
Rendimiento:
80.00 ML/DIA
ARENA GRUESA
LADRILLO K.K DE ARCILLA 9X14X24
CEMENTO PORTLAND TIPO I
AGUA
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
M3
UN
BL
M3
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
UND
(1.90)
(1.20)
Pgina 17 de 99
KG
KG
KG
KG
M3
M3
M3
BL
UN
M3
P2
HH
HH
TOTAL
S/.
1.91
4.82
3.61
2.38
5.99
4.32
2.84
7.15
5.15
3.39
8.54
435.43
1.67
0.08
1.75
20.74
0.90
0.04
21.68
#REF!
0.001
0.060
0.006
0.080
0.100
0.200
0.050
0.97
0.67
0.03
1.67
13.00
2.310
1.080
1.240
19.260
0.090
0.970
0.990
15.960
1.000
0.360
29.540
15.200
9.600
601.52
Pgina 18 de 99
TOTAL
S/.
142.91
7.15
751.57
01.00
0.940
1.080
1.560
19.260
0.120
1.160
1.180
19.160
1.000
0.440
37.150
18.400
12.000
43.200
0.050
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
1.25
177.61
2.35
2.75
3.90
27.93
4.80
46.40
47.20
344.88
130.00
4.40
74.30
77.65
45.96
54.00
8.88
TOTAL: S/.
1.310
1.080
2.200
19.260
0.180
1.530
1.540
25.540
1.000
0.580
52.380
25.600
16.000
63.200
0.050
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
1.25
248.31
3.28
2.75
5.50
27.93
7.20
61.20
61.60
459.72
130.00
5.80
104.76
108.03
61.28
79.00
12.42
TOTAL: S/.
2.50
2.55
2.50
1.45
40.00
40.00
40.00
18.00
130.00
10.00
2.00
4.22
3.83
1.25
396.35
4.23
19.58
7.10
198.59
9.60
75.60
76.40
574.74
130.00
7.20
135.22
172.18
104.18
120.00
19.82
TOTAL: S/.
688.91
177.61
8.88
875.40
869.74
248.31
12.42
1,130.46
#REF!
1.690
7.680
2.840
136.960
0.240
1.890
1.910
31.930
1.000
0.720
67.610
40.800
27.200
96.000
0.050
1,238.26
396.35
19.82
1,654.43
#REF!
19.00
32.00
35.00
37.00
42.00
#REF!
Rendimiento:
500.00 M2/DIA
MADERA TORNILLO O SIMILAR
TOPOGRAFO
PEON
TEODOLITO
DESGASTE DE HERRAMIENTAS
#REF!
P2
(1.00)
HH
(4.00)
HH
(1.00)
HM
3% MANO DE OBRA
0.160
0.030
0.010
0.016
0.064
0.016
0.030
42.00
3.00
33.00
34.00
40.00
42.00
#REF!
KG
HH
HH
P2
3% MANO DE OBRA
(1.00)
(1.00)
3.200
0.030
1.333
0.030
0.20
0.01
TOTAL: S/.
0.20
0.01
0.21
2.00
4.22
1.25
7.62
0.15
0.02
0.07
0.08
0.12
0.00
TOTAL: S/.
0.02
1.25
4.00
4.00
0.12
TOTAL: S/.
4.00
0.12
4.12
1.25
1.67
1.67
0.05
TOTAL: S/.
1.67
0.05
1.72
2.50
4.22
3.83
2.50
3.22
0.03
1.69
1.53
0.08
0.10
TOTAL: S/.
0.03
18.00
40.00
4.22
3.83
1.25
2.97
3.42
2.60
1.13
0.51
1.33
0.09
TOTAL: S/.
40.00
40.00
18.00
4.22
3.83
1.25
25.42
21.60
22.00
151.74
7.50
6.81
11.11
0.76
TOTAL: S/.
2.50
2.50
2.00
4.22
3.83
6.44
0.25
0.25
8.00
3.38
3.06
0.32
TOTAL: S/.
0.15
0.13
0.29
#REF!
0.010
0.400
0.400
0.030
0.030
42.00
07.00
42.00
Pgina 19 de 99
1.25
0.20
#REF!
42.00
#REF!
Rendimiento:
20.00 M2/DIA
CLAVOS 2" - 4"
OPERARIO
OFICIAL
REGLA DE MADERA
DESGASTE DE HERRAMIENTAS
TOTAL
S/.
42.00
#REF!
PARCIAL
S/.
0.190
0.065
0.267
0.133
1.067
0.030
0.540
0.550
8.430
1.778
1.778
8.889
0.030
0.100
0.100
4.000
0.800
0.800
0.050
3.22
0.17
3.42
6.02
2.97
0.09
9.08
195.34
25.42
0.76
221.53
8.50
6.44
0.32
15.26
#REF!
3.00
5.00
11.00
17.00
19.00
33.00
35.00
42.00
#REF!
13.00
24.00
33.00
35.00
42.00
#REF!
31.00
33.00
35.00
42.00
#REF!
#REF!
#REF!
Rendimiento:
12.00 M2/DIA
CLAVOS 2" - 4"
KG
ARENA FINA
M3
CEMENTO PORTLAND TIPO I
BL
ADITIVO IMPERMEABILIZANTE PARA MORTERO
KG
AGUA
M3
OPERARIO
(1.00)
HH
PEON
(1.00)
HH
ANDAMIO DE MADERA
P2
DESGASTE DE HERRAMIENTAS
3% MANO DE OBRA
#REF!
#REF!
Rendimiento:
15.00 M2/DIA
CLAVOS 2" - 4"
ARENA FINA
CEMENTO PORTLAND TIPO I
AGUA
MADERA TORNILLO O SIMILAR
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
#REF!
Rendimiento:
100.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
4.00 UN/DIA
VALVULA COMPUERTA 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
6.00 UN/DIA
26.00 CODO PVC SAP 8"X45
33.00 OPERARIO
42.00 DESGASTE DE HERRAMIENTAS
#REF!
KG
M3
BL
M3
P2
(1.00)
HH
(0.50)
HH
5% MANO DE OBRA
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
Pgina 20 de 99
0.022
0.030
0.370
0.800
0.030
0.667
0.667
0.580
0.030
0.010
0.016
0.180
0.015
0.201
0.533
0.267
0.050
TOTAL
S/.
1.70
0.26
0.01
1.97
2.50
40.00
18.00
6.50
10.00
4.22
1.25
2.50
3.65
0.06
1.20
6.66
5.20
0.30
2.81
0.83
1.45
0.11
TOTAL: S/.
2.50
40.00
18.00
10.00
2.00
4.22
1.25
2.58
0.03
0.64
3.24
0.15
0.40
2.25
0.33
0.13
TOTAL: S/.
80.00
50.00
4.22
1.25
0.54
0.32
51.50
0.34
0.20
0.03
TOTAL: S/.
700.00
4.22
1.25
13.44
700.00
8.44
5.00
0.67
TOTAL: S/.
700.00
25.00
4.22
5.63
25.00
5.63
0.28
TOTAL: S/.
25.00
5.63
0.28
30.91
13.42
3.65
1.56
18.62
4.46
2.58
0.13
7.17
#REF!
0.004
1.030
0.080
0.160
0.050
51.82
0.54
0.03
52.38
#REF!
1.000
2.000
4.000
0.050
13.44
0.67
714.11
#REF!
1.000
1.333
0.050
#REF!
Rendimiento:
21.00 CANASTILLA BRONCE 8"
#REF!
20.00
33.00
35.00
42.00
15.00
5.63
0.28
20.91
#REF!
UN/DIA
UN
1.000
60.00
60.00
S/.
60.00
60.00
19.30
3.38
1.00
0.22
TOTAL: S/.
19.30
TOTAL:
#REF!
TOTAL
S/.
#REF!
Rendimiento:
10.00 UN/DIA
PLANCHA Fo. Go. 3/16"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
M2
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
Pgina 21 de 99
#REF!
0.193
0.800
0.800
0.050
100.00
4.22
1.25
4.38
4.38
0.22
23.89
#REF!
Rendimiento:
50.00 M2/DIA
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
19.00
32.00
35.00
37.00
42.00
#REF!
Rendimiento:
500.00 M2/DIA
MADERA TORNILLO O SIMILAR
TOPOGRAFO
PEON
TEODOLITO
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
3.00 M3/DIA
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
(1.00)
HH
3% MANO DE OBRA
#REF!
P2
(1.00)
HH
(4.00)
HH
(1.00)
HM
3% MANO DE OBRA
#REF!
#REF!
Rendimiento:
6.00 M3/DIA
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
(1.00)
HH
5% MANO DE OBRA
#REF!
#REF!
Rendimiento:
6.00 M3/DIA
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
(1.00)
HH
5% MANO DE OBRA
#REF!
#REF!
3.00
33.00
34.00
40.00
42.00
#REF!
11.00
16.00
33.00
34.00
35.00
42.00
#REF!
6.00
9.00
11.00
33.00
34.00
35.00
42.00
#REF!
Rendimiento:
20.00 M2/DIA
CLAVOS 2" - 4"
OPERARIO
OFICIAL
REGLA DE MADERA
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
60.00 M2/DIA
CEMENTO PORTLAND TIPO I
HORMIGON
OPERARIO
OFICIAL
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
9.00 M3/DIA
ARENA GRUESA
PIEDRA CHANCADA 1/2"
CEMENTO PORTLAND TIPO I
OPERARIO
OFICIAL
PEON
DESGASTE DE HERRAMIENTAS
#REF!
#REF!
Rendimiento:
1.00 ALAMBRE NEGRO No.08
3.00 CLAVOS 2" - 4"
#REF!
(1.00)
HH
3% MANO DE OBRA
#REF!
KG
HH
HH
P2
3% MANO DE OBRA
(1.00)
(1.00)
#REF!
BL
M3
(2.00)
HH
(1.00)
HH
(8.00)
HH
3% MANO DE OBRA
#REF!
M3
M3
BL
(2.00)
HH
(2.00)
HH
(10.00)
HH
3% MANO DE OBRA
#REF!
PARCIAL
S/.
TOTAL
S/.
1.25
0.20
0.20
0.01
TOTAL: S/.
0.20
0.01
0.21
2.00
4.22
1.25
7.62
0.15
0.02
0.07
0.08
0.12
0.00
TOTAL: S/.
0.02
1.25
3.33
3.33
0.17
TOTAL: S/.
3.33
0.17
3.50
1.25
1.67
1.67
0.08
TOTAL: S/.
1.67
0.08
1.75
1.25
1.67
1.67
0.05
TOTAL: S/.
1.67
0.05
1.72
2.50
4.22
3.83
2.50
3.22
0.03
1.69
1.53
0.08
0.10
TOTAL: S/.
0.03
18.00
40.00
4.22
3.83
1.25
2.97
3.42
2.60
1.13
0.51
1.33
0.09
TOTAL: S/.
40.00
40.00
18.00
4.22
3.83
1.25
25.42
21.60
22.00
151.74
7.50
6.81
11.11
0.76
TOTAL: S/.
2.50
2.50
0.25
0.25
#REF!
0.160
0.030
#REF!
0.010
0.016
0.064
0.016
0.030
Pgina 22 de 99
0.13
0.29
#REF!
2.667
0.050
#REF!
1.333
0.050
#REF!
1.333
0.030
#REF!
0.010
0.400
0.400
0.030
0.030
3.22
0.17
3.42
#REF!
0.190
0.065
0.267
0.133
1.067
0.030
6.02
2.97
0.09
9.08
#REF!
0.540
0.550
8.430
1.778
1.778
8.889
0.030
#REF!
10.00 M2/DIA
KG
KG
0.15
0.100
0.100
195.34
25.42
0.76
221.53
#REF!
3.00
5.00
11.00
12.00
17.00
33.00
35.00
38.00
42.00
#REF!
3.00
5.00
11.00
17.00
19.00
33.00
35.00
42.00
#REF!
Rendimiento:
250.00 KG/DIA
ALAMBRE NEGRO No.16
ACERO CORRUGADO, FY=4200 KG/CM2
OPERARIO
OFICIAL
DESGASTE DE HERRAMIENTAS
KG
KG
(1.00)
HH
(1.00)
HH
5% MANO DE OBRA
0.060
1.070
0.032
0.032
0.050
#REF!
#REF!
Rendimiento:
15.00 M2/DIA
CLAVOS 2" - 4"
ARENA FINA
CEMENTO PORTLAND TIPO I
AGUA
MADERA TORNILLO O SIMILAR
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
#REF!
Rendimiento:
6.00 M2/DIA
6.00 ARENA GRUESA
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
#REF!
Rendimiento:
6.00 M2/DIA
8.00 GRAVA O CASCAJO
35.00 PEON
42.00 DESGASTE DE HERRAMIENTAS
#REF!
#REF!
Rendimiento:
6.00 UN/DIA
25.00 CODO PVC SAP 6"
33.00 OPERARIO
42.00 DESGASTE DE HERRAMIENTAS
#REF!
#REF!
Rendimiento:
6.00 UN/DIA
27.00 CRUZ PVC SAP 6"
33.00 OPERARIO
42.00 DESGASTE DE HERRAMIENTAS
#REF!
#REF!
KG
M3
BL
M3
P2
(1.00)
HH
(0.50)
HH
5% MANO DE OBRA
#REF!
M3
(1.00)
HH
5% MANO DE OBRA
#REF!
M3
(1.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
#REF!
UN
(1.00)
HH
5% MANO DE OBRA
#REF!
Pgina 23 de 99
6.44
0.32
15.26
#REF!
#REF!
#REF!
Rendimiento:
12.00 M2/DIA
CLAVOS 2" - 4"
KG
ARENA FINA
M3
CEMENTO PORTLAND TIPO I
BL
ADITIVO IMPERMEABILIZANTE PARA MORTERO
KG
AGUA
M3
OPERARIO
(1.00)
HH
PEON
(1.00)
HH
ANDAMIO DE MADERA
P2
DESGASTE DE HERRAMIENTAS
3% MANO DE OBRA
#REF!
#REF!
#REF!
TOTAL
S/.
8.50
0.022
0.030
0.370
0.800
0.030
0.667
0.667
0.580
0.030
0.010
0.016
0.180
0.015
0.201
0.533
0.267
0.050
2.55
1.45
4.22
3.83
0.26
0.15
1.55
0.14
0.12
0.01
TOTAL: S/.
2.50
40.00
18.00
6.50
10.00
4.22
1.25
2.50
3.65
0.06
1.20
6.66
5.20
0.30
2.81
0.83
1.45
0.11
TOTAL: S/.
2.50
40.00
18.00
10.00
2.00
4.22
1.25
2.58
0.03
0.64
3.24
0.15
0.40
2.25
0.33
0.13
TOTAL: S/.
4.46
40.00
1.25
1.67
42.00
1.67
0.08
TOTAL: S/.
42.00
1.67
0.08
43.75
40.00
1.25
1.67
41.20
1.67
0.08
TOTAL: S/.
41.20
1.67
0.08
42.95
20.00
4.22
5.63
20.00
5.63
0.28
TOTAL: S/.
20.00
5.63
0.28
25.91
25.00
4.22
5.63
25.00
5.63
0.28
TOTAL: S/.
25.00
5.63
0.28
30.91
1.70
0.26
0.01
1.97
13.42
3.65
1.56
18.62
2.58
0.13
7.17
#REF!
1.050
1.333
0.050
#REF!
1.030
1.333
0.050
#REF!
1.000
1.333
0.050
#REF!
1.000
1.333
0.050
#REF!
#REF!
13.00
24.00
33.00
35.00
42.00
#REF!
Rendimiento:
150.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 6"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
Rendimiento:
120.00 ML/DIA
PEGAMENTO PLASTICO PVC
TUBERIA PVC SAP CLASE 7.5, 8"
OPERARIO
PEON
DESGASTE DE HERRAMIENTAS
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
#REF!
GL
ML
(1.00)
HH
(2.00)
HH
5% MANO DE OBRA
TOTAL
S/.
30.00
5.63
0.28
35.91
#REF!
0.002
1.030
0.053
0.107
0.050
80.00
30.00
4.22
1.25
0.36
0.16
30.90
0.22
0.13
0.02
TOTAL: S/.
80.00
50.00
4.22
1.25
0.45
0.32
51.50
0.28
0.17
0.02
TOTAL: S/.
6,568.00
6,568.00
TOTAL: S/.
31.06
0.36
0.02
31.44
#REF!
0.004
1.030
0.067
0.133
0.050
51.82
0.45
0.02
52.29
3.00 FLETE
1.01 FLETE TERRESTRE
Rendimiento:
43.00 FLETE TERRESTRE
42.00
GLB
01.00
GLB/DIA
GLB
Pgina 24 de 99
1.000
6,568.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
4.44
17.77
20.44
61.32
20.44
20.44
20.44
8.14
1,336.87
83.55
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
120.01
7.50
23.40
48.00
3.00
23.40
77.40
774.04
77.40
64.71
50.22
501.89
Pgina 25 de 99
#REF!
#REF!
#REF!
#REF!
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
50.22
41.96
580.43
36.28
3.55
915.30
118.19
237.27
39.77
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
30.03
14.04
16.12
250.38
1.17
12.61
12.87
207.48
13.00
4.68
384.02
197.60
124.80
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
30.03
14.04
16.12
250.38
1.17
12.61
12.87
207.48
Pgina 26 de 99
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
436.80
92.89
0.94
1.08
1.56
19.26
0.12
1.16
1.18
19.16
1.00
0.44
37.15
18.40
12.00
43.20
8.88
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.94
1.08
1.56
19.26
0.12
1.16
1.18
19.16
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 27 de 99
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
6.72
0.25
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
134.40
5.04
55.99
2.10
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
7.98
2.73
11.21
5.59
44.81
3.74
7.98
3.78
3.85
59.01
12.45
12.45
62.22
5.34
4.20
4.20
168.00
33.60
33.60
13.52
3.78
3.85
59.01
4.20
4.20
Pgina 28 de 99
1.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.00
#REF!
3.00
#REF!
4.00
#REF!
5.00
6.00
7.00
8.00
9.00
10.00
11.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 29 de 99
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 30 de 99
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 31 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 32 de 99
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1.00
Pgina 33 de 99
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
4.44
17.77
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 34 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
3.55
915.30
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
13.00
4.68
384.02
Pgina 35 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
12.00
13.00
14.00
15.00
16.00
17.00
18.00
1.00
0.44
37.15
#REF!
#REF!
#REF!
Pgina 36 de 99
19.00
20.00
21.00
22.00
23.00
24.00
12.00
#REF!
13.00
#REF!
14.00
#REF!
15.00
#REF!
16.00
#REF!
17.00
#REF!
18.00
#REF!
19.00
#REF!
20.00
21.00
22.00
23.00
24.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2.73
168.00
Pgina 37 de 99
#REF!
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 38 de 99
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 39 de 99
#REF!
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 40 de 99
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 41 de 99
12.00
#REF!
13.00
#REF!
14.00
#REF!
15.00
#REF!
16.00
#REF!
17.00
#REF!
18.00
#REF!
19.00
#REF!
20.00
#REF!
21.00
#REF!
22.00
#REF!
23.00
#REF!
24.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 42 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
20.44
61.32
1,336.87
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
120.01
48.00
77.40
774.04
50.22
501.89
Pgina 43 de 99
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
580.43
118.19
237.27
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
197.60
124.80
Pgina 44 de 99
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
436.80
18.40
12.00
43.20
#REF!
#REF!
#REF!
Pgina 45 de 99
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
6.72
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
134.40
55.99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
11.21
5.59
44.81
12.45
12.45
62.22
33.60
33.60
Pgina 46 de 99
25.00
#REF!
26.00
#REF!
27.00
#REF!
28.00
#REF!
29.00
#REF!
30.00
#REF!
31.00
#REF!
32.00
#REF!
#REF!
#REF!
33.00
#REF!
34.00
#REF!
35.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 47 de 99
#REF!
#REF!
25.00
#REF!
26.00
#REF!
27.00
#REF!
28.00
#REF!
29.00
#REF!
30.00
#REF!
31.00
#REF!
32.00
#REF!
#REF!
#REF!
33.00
#REF!
34.00
35.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 48 de 99
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 49 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 50 de 99
#REF!
#REF!
#REF!
#REF!
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 51 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
20.44
20.44
20.44
8.14
83.55
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
7.50
3.00
77.40
64.71
Pgina 52 de 99
#REF!
#REF!
#REF!
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
50.22
41.96
36.28
39.77
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 53 de 99
#REF!
#REF!
#REF!
36.00
37.00
38.00
39.00
40.00
41.00
42.00
92.89
8.88
#REF!
Pgina 54 de 99
43.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
0.25
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5.04
2.10
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3.74
5.34
13.52
Pgina 55 de 99
36.00
#REF!
#REF!
#REF!
37.00
#REF!
38.00
#REF!
39.00
#REF!
40.00
#REF!
41.00
#REF!
42.00
#REF!
43.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 56 de 99
36.00
#REF!
#REF!
#REF!
37.00
#REF!
38.00
#REF!
39.00
#REF!
40.00
#REF!
41.00
#REF!
42.00
#REF!
43.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 57 de 99
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 58 de 99
#REF!
#REF!
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 59 de 99
#REF!
#REF!
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 60 de 99
#REF!
#REF!
#REF!
#REF!
#REF!
Pgina 61 de 99
Pgina 62 de 99
Pgina 63 de 99
Pgina 64 de 99
Pgina 65 de 99
Pgina 66 de 99
Pgina 67 de 99
Pgina 68 de 99
Pgina 69 de 99
Pgina 70 de 99
Pgina 71 de 99
Pgina 72 de 99
Pgina 73 de 99
Pgina 74 de 99
Pgina 75 de 99
Pgina 76 de 99
Pgina 77 de 99
Pgina 78 de 99
Pgina 79 de 99
Pgina 80 de 99
Pgina 81 de 99
Pgina 82 de 99
Pgina 83 de 99
Pgina 84 de 99
Pgina 85 de 99
Pgina 86 de 99
Pgina 87 de 99
1.00
DATOS GENERALES
1.01
POR PESO
DESCRIPCION
CEMENTO
FIERRO, ALAMBRE Y CLAVOS.
YESO
TAPA DE BUZON
OTROS MAT. Y ACCESORIOS (5%)
1.02
UNIDAD
BL
KG
BL
UN
KG
POR VOLUMEN
FLETE TERRESTRE
CAPAC. DEL CAMION EN VOLUMEN (M3) :
CAPAC. DEL CAMION EN PESO
(KG) :
DESCRIPCION
FLETE POR PESO
FLETE POR VOLUMEN
3.00
20.00
20,000.00
PESO TOTAL
232,732.50
500.00
0.03
TOTAL
5,818.00
750.00
6,568.00
TOTAL
FLETE FLUVIAL
CAPAC. DEL BOTE EN VOLUMEN
CAPAC. DEL BOTE EN PESO
DESCRIPCION
FLETE POR PESO
FLETE POR VOLUMEN
(M3) :
(KG) :
PESO TOTAL
NUM. VIAJES
4.00
S/.
FLETE EN ACEMILA
COSTO ACEMILA POR DIA (INC. ARRIERO) S/.
NUMERO DE VIAJES POR DIA:
COSTO POR VIAJE
S/.
DESCRIPCION
TUBOS PVC SAP 6"
TUBOS PVC SAP 8"
TUBOS CSN 6"
TUBOS CSN 8"
CEMENTO X 42.5 KG.
PESO RESTO DE MATERIALES
5.00
PESO PARCIAL
PESO TOTAL (KG)
63,750.00
10,500.00
500.00
146,900.00
11,082.50
232,732.50
DESCRIPCION
TUB. DESAGUE PVC, 6"
TUB. DESAGUE PVC, 8"
TUB. DESAGUE PVC , 10"
TUB. DESAGUE PVC , 12"
TUB. DESAGUE PVC, 14"
2.00
CANTIDAD
PESO UNIT. (KG.)
1,500.00
42.50
10,500.00
1.00
20.00
25.00
1,130.00
130.00
11,082.50
1.00
2.00
UNIDAD
TUB
TUB
TUB
TUB
BL
KG
CANTIDAD
CAP. DE CARGA
8.00
6.00
2.00
2.00
2.00
85.00
COSTO TOTAL FLETE EN ACEMILAS :
NUM. DE VIAJES
FLETE
S/.
RESUMEN
DESCRIPCION
FLETE TERRESTRE
FLETE FLUVIAL
FLETE EN ACEMILAS
6,568.00
S/.
6,568.00
EXCAVAC.
Y REFINE
ENCOF. Y
ELIMIN. DE CONCRETO ACERO DE ENLUC. 1:2 CANALETA ACERO MU
DESENCOF. DESMONTE F'C=175
TAPA
E=1.5 CM.
CONC.140
RO Y FOND.
CUADRILLA:
OPERARIO
1.00
2.00
1.00
1.00
1.00
1.00
OFICIAL
1.00
2.00
1.00
1.00
PEON
1.00
0.50
1.00
10.00
0.50
0.50
0.50
RENDIMIENTO DIARIO
H= 1.50
2.50 M3
10.00 M2
6.00 M3
9.00 M3
250.00 KG
12.00 M2
0.50 M3
KG
H= 2.00
2.25
10.00
6.00
9.00
250.00
12.00
0.50
H= 3.00
2.00
10.00
6.00
9.00
250.00
12.00
0.50
H= 4.00
1.50
8.00
6.00
9.00
250.00
10.00
0.50
250.00
H= 5.00
1.00
8.00
6.00
9.00
250.00
10.00
0.50
200.00
3.18 M3
METRADO
H = 1.50
2.65 M3
7.49 M2
1.65 M3
18.00 KG
5.65 M2
0.13 M3
KG
4.24
H = 2.00
3.53
9.38
1.99
18.00
7.54
0.13
6.36
H = 3.00
5.30
13.15
2.65
18.00
11.31
0.13
8.48
H = 4.00
7.07
16.92
3.32
18.00
15.08
0.13
110.00
10.60
H = 5.00
8.84
20.69
3.99
18.00
18.85
0.13
130.00
C A N T I D A D
INSUMO
UND
H
ALAMBRE NEGRO No.08
KG 1.50
0.75
1.56
2.00
0.94
3.00
1.31
4.00
1.69
5.00
2.07
ALAMBRE NEGRO No.16
KG 1.50
1.08
2.00
1.08
3.00
1.08
4.00
1.08
6.60
5.00
1.08
7.80
CLAVOS 2" - 4"
KG 1.50
1.12
0.11
2.00
1.41
0.15
3.00
1.97
0.23
4.00
2.54
0.30
5.00
3.10
0.38
ACERO CORRUGADO, FY=4200 KG/CM2
KG 1.50
19.26
2.00
19.26
3.00
19.26
4.00
19.26
117.70
5.00
19.26
139.10
ARENA FINA
M3 1.50
0.09
2.00
0.12
3.00
0.18
4.00
0.24
5.00
0.30
ARENA GRUESA
M3 1.50
0.91
0.07
2.00
1.09
0.07
3.00
1.46
0.07
4.00
1.83
0.07
5.00
2.19
0.07
PIEDRA CHANCADA 1/2"
M3 1.50
0.91
0.08
2.00
1.09
0.08
3.00
1.46
0.08
4.00
1.83
0.08
5.00
2.19
0.08
CEMENTO PORTLAND TIPO I
BL 1.50
13.92
1.13
0.91
2.00
16.74
1.51
0.91
3.00
22.37
2.26
0.91
4.00
28.00
3.02
0.91
5.00
33.63
3.77
0.91
TAPA CONCRETO P, BUZON C/MARCO
UNF.F.,
1.50
D=0.60 M.
2.00
3.00
4.00
5.00
AGUA
M3 1.50
0.32
0.02
0.03
2.00
0.39
0.02
0.03
3.00
0.52
0.03
0.03
4.00
0.65
0.05
0.03
5.00
0.78
0.06
0.03
MADERA PARA ENCOFRADO
P2 1.50
27.27
2.26
2.00
34.13
3.02
3.00
47.86
4.52
4.00
61.58
6.03
5.00
75.30
7.54
OPERARIO
JOR 1.50
0.75
0.37
0.07
0.47
0.26
2.00
0.94
0.44
0.07
0.63
0.26
3.00
1.31
0.59
0.07
0.94
0.26
4.00
2.11
0.74
0.07
1.51
0.26
0.44
5.00
2.59
0.89
0.07
1.88
0.26
0.65
OFICIAL
JOR 1.50
0.75
0.37
0.07
2.00
0.94
0.44
0.07
3.00
1.31
0.59
0.07
4.00
2.11
0.74
0.07
0.44
5.00
2.59
0.89
0.07
0.65
PEON
JOR 1.50
1.06
0.37
0.53
1.83
0.24
0.13
2.00
1.57
0.47
0.71
2.21
0.31
0.13
3.00
2.65
0.66
1.06
2.95
0.47
0.13
4.00
4.71
1.06
1.41
3.69
0.75
0.13
0.22
5.00
8.84
1.29
1.77
4.43
0.94
0.13
0.33
TOTAL
2.31
0.94
1.31
1.69
2.07
1.08
1.08
1.08
7.68
8.88
1.24
1.56
2.20
2.84
3.48
19.26
19.26
19.26
136.96
158.36
0.09
0.12
0.18
0.24
0.30
0.97
1.16
1.53
1.89
2.26
0.99
1.18
1.54
1.91
2.28
15.96
19.16
25.54
31.93
38.31
1.00
1.00
1.00
1.00
1.00
0.36
0.44
0.58
0.72
0.86
29.54
37.15
52.38
67.61
82.84
1.90
2.30
3.20
5.10
6.30
1.20
1.50
2.00
3.40
4.20
4.20
5.40
7.90
12.00
17.70
q/Q
Bzi
Bzf
q/Q
v/V
y/D
10
10
11
11
12
13
14
14
15
15
16
16
12
0.037
0.037
0.070
0.070
0.027
0.027
0.087
0.087
0.040
0.040
0.048
0.048
0.137
0.137
0.101
0.101
0.137
0.137
0.137
0.137
0.137
0.137
0.048
0.048
0.085
0.085
0.125
0.125
0.047
0.047
0.469
0.469
0.574
0.574
0.426
0.426
0.617
0.617
0.481
0.481
0.516
0.516
0.700
0.700
0.641
0.641
0.700
0.700
0.700
0.700
0.700
0.700
0.516
0.516
0.612
0.612
0.680
0.680
0.511
0.511
0.129
0.129
0.177
0.177
0.111
0.111
0.199
0.199
0.134
0.134
0.148
0.148
0.250
0.250
0.213
0.213
0.250
0.250
0.250
0.250
0.250
0.250
0.148
0.148
0.196
0.196
0.238
0.238
0.146
0.146
12
17
17
FINAL
0.137
0.137
0.068
0.068
0.700
0.700
0.569
0.569
0.250
0.250
0.174
0.174
Condiciones de diseo
Cota de llegada a la laguna
Caudales de Diseo
Caudal maximo horario al final 2029
Cota de tapa del buzon de arranque
= .g.Rh.S
Parmetros de Diseo
0.021 0.049 0.088 0.137 0.195 0.262 0.336 0.416 0.500 0.586
RELACION DE VELOCIDAD (v / V)
0.400 0.520 0.620 0.700 0.770 0.840 0.920 0.950 1.000 1.035
0.469
0.469
0.574
0.574
0.426
0.426
0.617
0.617
0.481
0.481
0.516
0.516
0.700
0.700
0.641
0.641
0.700
0.700
0.700
0.700
0.700
0.700
0.516
0.516
0.612
0.612
0.680
0.680
0.511
0.511
0.700
0.700
0.569
0.569
= .g.Rh.S
Parmetros de Diseo
Tension tractiva mnima
Mayor Valor d/D=
1.0004
1.0114
1.0211
1.0304
1.0391
1.0471
1.054 1.060
0.021
0.049
0.088
0.137
1.1399
1.1395
1.1387
1.1374
1.1358
1.1337
1.131 1.128
0.100
0.150
0.200
0.250
N DE VELOCIDAD (v / V)
RELACION DE PROF
0.129
0.129
0.177
0.177
0.111
0.111
0.199
0.199
0.134
0.134
0.148
0.148
0.250
0.250
0.213
0.213
0.250
0.250
0.250
0.250
0.250
0.250
0.148
0.148
0.196
0.196
0.238
0.238
0.146
0.146
0.250
0.250
0.174
0.174
0.671
0.754
0.837
0.907
0.977
0.600
0.650
0.700
0.750
0.800
LONG.
INICIAL. FINAL
TRAMO
No.
No.
(ML)
LINEA DE ALCANTARILLADO
Bz - 1
Bz - 2
49.94
Bz - 2
Bz - 3
49.87
Bz - 3
Bz - 4
50.01
Bz - 4
Bz - 5
50.02
Bz - 5
Bz - 6
50.01
Bz - 6
Bz - 7
50.04
Bz - 7
Bz - 8
49.99
Bz - 8
Bz - 9
50.16
Bz - 9
Bz - 10
50.01
Bz - 10
Bz - 11
57.73
Bz - 11
Bz - 12
49.99
Bz - 13
Bz - 14
50.02
Bz - 14
Bz - 15
49.92
Bz - 15
Bz - 16
50.04
Bz - 16
Bz - 12
50.00
Bz - 12
Bz - 17
30.89
Bz - 17
FINAL
100.00
0.013
C. REAL
Inicial
Final
q
C. ASUMIDO
Inicial
Final
q
0.02
0.02
0.03
0.03
0.05
0.05
0.06
0.06
0.08
0.08
0.10
0.10
0.11
0.11
0.13
0.13
0.14
0.14
0.16
0.16
0.18
0.18
0.02
0.02
0.03
0.03
0.05
0.05
0.06
0.06
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
0.25
0.25
0.28
0.28
1.50
1.50
1.50
1.50
DIAM NOMINAL
MM
3.00
3.10
4.00
4.90
6.20
7.70
8.70
9.80
125
160
200
250
315
355
400
MM
110
4
DIAM.
Interior
D
m
COTA TAPA
PROF. TUBERIA
COTA FONDO
GRAD.
BUZON
INICIAL
FINAL
(M)
INICIAL FINAL
TUBERIA
INICIAL
FINAL
S
(O/OO)
PULG
DIAM.
Nominal
DN
(mm)
5
6
CAUDAL VELOC.
66.946
160
0.1520
40.86
2.250
8
RELAC.
10
12
14
RELAC. VELOC.REAL RELAC.
Q
V
CAUDAL VELOC.
(LT/SEG) (M/SEG) fq=q/Q
fv=v/V
2,461.25
2,457.91
1.20
1.20
2,460.05
2,456.71
2,457.91
2,457.00
1.20
1.20
2,456.71
2,455.80
18.246
160
0.1520
21.33
1.175
2,457.00
2,450.71
1.20
1.20
2,455.80
2,449.51
125.746
160
0.1520
56.00
3.084
2,450.71
2,450.11
1.20
1.20
2,449.51
2,448.91
12.046
160
0.1520
17.33
0.955
2,450.11
2,447.25
1.20
1.20
2,448.91
2,446.05
57.146
160
0.1520
37.75
2.079
2,447.25
2,445.27
1.20
1.20
2,446.05
2,444.07
39.546
160
0.1520
31.41
1.730
2,445.27
2,445.39
1.20
1.56
2,444.07
2,443.83
4.796
160
0.1520
10.94
0.602
2,445.39
2,444.59
1.56
1.20
2,443.83
2,443.39
8.846
160
0.1520
14.85
0.818
2,444.59
2,444.54
1.20
1.39
2,443.39
2,443.15
4.796
160
0.1520
10.94
0.602
2,444.54
2,445.08
1.39
2.21
2,443.15
2,442.87
4.796
160
0.1520
10.94
0.602
2,445.08
2,445.04
2.21
2.41
2,442.87
2,442.63
4.796
160
0.1520
10.94
0.602
2,448.75
2,446.81
1.20
1.20
2,447.55
2,445.61
38.846
160
0.1520
31.13
1.714
2,446.81
2,446.19
1.20
1.20
2,445.61
2,444.99
12.446
160
0.1520
17.62
0.970
2,446.19
2,445.90
1.20
1.20
2,444.99
2,444.70
5.746
160
0.1520
11.97
0.659
2,445.90
2,445.04
1.20
2.41
2,444.70
2,442.63
41.346
160
0.1520
32.11
1.769
2,445.04
2,444.50
2.41
2.02
2,442.63
2,442.48
4.796
160
0.1520
10.94
0.602
2,444.50
2,444.50
2.02
3.98
2,442.48
2,440.52
19.646
160
0.1520
22.14
1.219
v = V.fv
(M/SEG)
16
Tirante y (m)
Radio
Tensin Trac
y = fd . D
Hidraulico (m)
(Pa)
ALTURA
Inicial
inicial
Inicial
fd=y/D
Final
Final
Final
Veloc critica
Vc
m/s
0.037
0.037
0.070
0.070
0.027
0.027
0.087
0.087
0.040
0.040
0.048
0.048
0.137
0.137
0.101
0.101
0.137
0.137
0.137
0.137
0.137
0.137
0.048
0.048
0.085
0.085
0.125
0.125
0.047
0.047
0.469
0.469
0.574
0.574
0.426
0.426
0.617
0.617
0.481
0.481
0.516
0.516
0.700
0.700
0.641
0.641
0.700
0.700
0.700
0.700
0.700
0.700
0.516
0.516
0.612
0.612
0.680
0.680
0.511
0.511
1.055
1.055
0.674
0.674
1.313
1.313
0.589
0.589
1.001
1.001
0.892
0.892
0.422
0.422
0.525
0.525
0.422
0.422
0.422
0.422
0.422
0.422
0.884
0.884
0.594
0.594
0.449
0.449
0.905
0.905
0.129
0.129
0.177
0.177
0.111
0.111
0.199
0.199
0.134
0.134
0.148
0.148
0.250
0.250
0.213
0.213
0.250
0.250
0.250
0.250
0.250
0.250
0.148
0.148
0.196
0.196
0.238
0.238
0.146
0.146
0.020
0.020
0.027
0.027
0.017
0.017
0.030
0.030
0.020
0.020
0.023
0.023
0.038
0.038
0.032
0.032
0.038
0.038
0.038
0.038
0.038
0.038
0.023
0.023
0.030
0.030
0.036
0.036
0.022
0.022
0.012
0.012
0.017
0.017
0.011
0.011
0.018
0.018
0.013
0.013
0.014
0.014
0.022
0.022
0.020
0.020
0.022
0.022
0.022
0.022
0.022
0.022
0.014
0.014
0.018
0.018
0.021
0.021
0.014
0.014
8.01
8.01
2.96
2.96
13.03
13.03
2.18
2.18
7.12
7.12
5.46
5.46
1.05
1.05
1.69
1.69
1.05
1.05
1.05
1.05
1.05
1.05
5.37
5.37
2.22
2.22
1.20
1.20
5.64
5.64
2.08
2.08
2.42
2.42
1.93
1.93
2.55
2.55
2.12
2.12
2.23
2.23
2.80
2.80
2.63
2.63
2.80
2.80
2.80
2.80
2.80
2.80
2.23
2.23
2.54
2.54
2.75
2.75
2.22
2.22
0.137
0.137
0.068
0.068
0.700
0.700
0.569
0.569
0.422
0.422
0.693
0.693
0.250
0.250
0.174
0.174
0.038
0.038
0.027
0.027
0.022
0.022
0.016
0.016
1.05
1.05
3.14
3.14
2.80
2.80
2.40
2.40
EMISOR
97
FINAL
No.
LONG.
TRAMO
(ML)
0.013
C. REAL
Inicial
Final
q
C. ASUMIDO
Inicial
Final
q
1 Condiciones de diseo
Profundidad de arranque de 1er tubo
Cota de llegada a la laguna
DIAM NOMINAL
COTA TAPA
PROF. TUBERIA
COTA FONDO
GRAD.
BUZON
INICIAL
FINAL
(M)
INICIAL FINAL
TUBERIA
INICIAL
FINAL
S
(O/OO)
2,460.05
2,441.50
2 Caudales de Diseo
Caudal maximo horario al inicio al 2029
Caudal maximo horario al final 2029
0.282
0.284
2,461.25
2,460.05
2,457.91
2,444.50
2,441.50
msnm
msnm
Longitud buzones
(RED)
lps
lps
888.64
98.83
122.19
lps
lps
MM
3.00
3.10
4.00
4.90
6.20
7.70
8.70
9.80
MM
110
125
160
200
250
315
355
400
PULG
DIAM.
Nominal
DN
(mm)
4
DIAM.
Interior
D
m
5
6
CAUDAL VELOC.
8
RELAC.
10
12
14
RELAC. VELOC.REAL RELAC.
Q
V
CAUDAL VELOC.
(LT/SEG) (M/SEG) fq=q/Q
fv=v/V
v = V.fv
(M/SEG)
16
Tirante y (m)
Radio
Tensin Trac
y = fd . D
Hidraulico (m)
(Pa)
ALTURA
Inicial
inicial
Inicial
fd=y/D
Final
Final
Final
Veloc critica
Vc
m/s
(1.20)
(3.00)
3 Formulas de aplicacin
Formula de Manning
Q = 0.312*D^(8/3)*S^(0.5)/n
V = 0.397*(D^2/3)*(S^0.5)/n
Formula de la tensin tractiva
= .g.Rh.S
4 Parmetros de Diseo
Coeficiente de Rugosidad (n):
Tension tractiva mnima
Valor Max. y/D =
Mayor Valor d/D=
0.013
1.00 Pa
0.75
0.25 O.K.
L. TOTAL =
888.64
L RED =
757.75
EMISOR =
130.89
98
H. BUZ.
TIPO TERRENO
INICIAL
(M.)
TN TS TR
H<=
1.50
H<=
1.50
(ML.)
H<=
6.00
H>
6.00
160
250
315
355
400
450
500
630
1.20
1.20
160
1.20
1.20
49.94
49.94
1.00
49.87
1.20
1.20
160
1.20
1.20
49.87
49.87
1.00
50.01
1.20
1.20
160
1.20
1.20
50.01
50.01
1.00
50.02
1.20
1.20
160
1.20
1.20
50.02
50.02
1.00
50.01
1.20
1.20
160
1.20
1.20
50.01
50.01
1.00
50.04
1.20
1.20
160
1.20
1.20
50.04
50.04
1.00
49.99
1.20
1.56
160
1.38
1.20
49.99
49.99
1.00
50.16
1.56
1.20
160
1.38
1.56
50.16
50.16
10
50.01
1.20
1.39
160
1.30
1.20
50.01
50.01
1.00
10
11
57.73
1.39
2.21
160
1.80
1.39
57.73
1.00
11
12
49.99
2.21
2.41
160
2.31
2.21
13
14
50.02
1.20
1.20
160
1.20
1.20
50.02
50.02
1.00
14
15
49.92
1.20
1.20
160
1.20
1.20
49.92
49.92
1.00
15
16
50.04
1.20
1.20
160
1.20
1.20
50.04
50.04
1.00
16
12
50.00
1.20
2.41
160
1.81
1.20
50.00
1.00
EMISOR
12
17
30.89
2.41
2.02
160
2.21
2.41
17
FINAL
100.00
2.02
3.98
160
3.00
2.02
888.64
ml
L. TOTAL =
SUB- TOTAL =
SUB- TOTAL =
TOTAL =
57.73
49.99
30.89
600.03
600.03 ml
888.64
107.73
288.61 ml
ml
80.88
1.00
49.99
50.00
H<=
6.00
1.00
30.89
1.00
100.00
100.00
1.00
100.00
888.64
888.64 ml
13.00
1.00
3.00
17.00 und
99
H>
6.00