Waste dump area

Spreading ( topsoil )

Revegetation

Clear, grubbing & topsoil removal

Drilling & blasting overburden Overburden removal Coal mining

Storage coal ( ROM )

Crusher facilities

35 Km Coal Hauling to Port

Shipping Oversea Conveyor2,5 Km

Mine Stockyard

Overland Conveyor 4 Km

Port Stockyard

Jenjang pada Lapisan Batubara


Parit/Drainage

Seam 6

Seam 7

40o

Seam Dip 10

Seam 8

Not to scale

3m 2m

Diagram Alir Batubara di Mine Stockyard


1200 X 600 mm GRIZZLY - 600 mm 200 tons Hopper
STAMLER FEEDER BREAKER TRAMP METAL MAGNET

TWIN BOOM STACKER

METAL DETECTOR

-200 mm

-200 mm

Swamp Sampler

C1-1
CRUSHE R

C1-5
Belt 1050 mm 35 o Trough 1100TPH 1.43m/s

C-2
Belt 1050 mm 35 o Trough 1100TPH 1.43m/s

-50 mm
BELT SCALE 4 IDLERS

C12

C-3
Belt 1050 mm 35 o Trough 1100TPH 1.43m/s

NOTE : 1. UNLESS NOTED OTHERWISE: ALL BELTS ARE - 1050 mm 35 TROUGH 1100 tph 1.10 m/s

Cross Belt Sample

MAGNET

Reclaim Feeders

MAGNE T CrossBelt Sample

C 4

C 8

C9

Sample Collector

TRUCK LOADING STATION 300 T

Coal Transport to Port 34 Km

PIT
Pit 1 Pit 2 Seam 2 Seam 3 Seam 6
20% 10%

Quality pit - CV - TS - Ash

Diagram Alir Kontrol Kualitas Batubara


Pit 4 Seam 8 EX
5%

Pit 3 Seam 7 Seam 8


20% 5%

Pit 5 Seam 13
25%

15%

Twin Boom Stacker

ROM
S8 EX S 13 S2 S3 S6 S7 S8

MINE STOCKYARD
Crusher System Reclaim Feeder

Truc k Loa d

SHIP LOADER
Coal Transport to Port 34 Km
Truck Dump Bin

C25-1

C25-2

C25-3

Conveyor 6 Km
C25-4

Result Quality CV : 6700 Ash: 5.0 Ts : 0.8 1.0

PORT STOCKYARD
C24-1 C24-2 C24-3 C24-4

Diagram Alir Kontrol Kualitas Batubara


- Nilai Kalori (CV) diluent - % Sulfur - % Ash - % Na20 in Ash

PI Quality T pit :

% Na20 in Coal + % Ash Proportion % Na20 Product % Moisture

Pit 1 Seam 2

Pit 2 Seam 3

Seam 6

Pit 3 Seam 7

Seam 8

Pit 4 Seam 8 EX

Pit 5 Seam 13

ROM
15% S2 20% S3 10% 20% 5% 5% 25%

S6 S7

Crusher System

S8

Belt Conveyor

Alur Pengangkutan Batubara dari Tambang ke Pelabuhan


ROM STOCK PILE
1 - 7 Km

77,000 t

4 Km HAULING

BARGE ISLAND STOCK PILE

BARGE LOADER

PITHAULING
MINE STOCKYARD
34 Km HAULING 40 - 80 t 2.5 hour cycle

10,000 t

140,000 t

PORT STOCKYARD

6.5 Km HAULING
CONVEYOR 2000 t/hr

SHIP LOADER

350,000 t

Reshape Waste Dump


OVERBURDEN DUMP CONSTRUCTION
OVERALL SLOPE 4 : 1 CUT & FILL B Y DO ZER T O SH APE THE FINAL DUMP FACE

3% 20 m - 150

Cut & Fill


20 m

3% - 140

- 130

Non Acid Generating Waste


50 m - 120

Impermeable Material

Original Ground

Potential Acid Forming waste Including coal seam roof and floor discards

Figure 1