CIVIL WORKS

NO 1.9

ITEM/ AREA Switch Gear Building Floor wall painting Replacement of main doors. Tiling of control room Change of doors

COST (GH) 17,125.90 4.514.89

PROJECT COMPLETION DATE March 28,2012 September 13,2011

1.10

Control building

9,659.76 21,355.65 11,962.20 4,846.00 15,840.00

December 3,2009 On-going May 20,2009 March 25,2009 March 24,2009

1.13 1.14 1.15

Switchyard works Oily water waste separator Completion of sheds over BOP

LCO, FIRE ARRESTER, VENT AND NEUTRALISATION PUMPS SKID FUEL TREATMENT SHEDS FIRE WATER PUMPS DEMINERALIZED PLANT AND WATER BOOSTER PUMPS

20,200.00 19,090.00 16,445.00

May 15,2009 Feb 26,2009 March 17, 2009

1.16

CEM (Control, emission and monitoring systems) Total

3,648.61 144,688.01

February 13,2012