Вы находитесь на странице: 1из 2

JOB NO.

: KBR-J6491 CLIENT: YANBU EXPORT REFINERY PROJECT (YERP) AREA / UNIT: 160 Fire Protection System LOCATION: Yanbu, Saudi Arabia

PRELIMINARY PROCESS HAZARDS REGISTER DOCUMENT NO. 160-YER-HS-PSM-0102

PROJECT: DATE: REVISION:

YANBU_6491 13 May 2008 FF

SOURCE PPHA

ACTION ACTION NO ASSIGNED TO Review Fire Water piping between Fire Water 160.006 P. Pilgrim Storage Tank, 150-D-0001, and pump suctions to ensure that pump suction heads are satisfied when all pumps are running Add independent level indication with low alarm to Fire Water Storage Tank, 150-D-0001 160.007 P. Pilgrim

RESOLUTION Pump suction piping was reviewed and pump inlet nozzle piping has been revised to insure adequate NPSH.

STATUS Answered

REMARKS

PPHA

LT-0002 has been added to provide an independent level indication and low alarm.

Answered

PPHA

Specify that all Post Indicator Valves are provided from the same supplier to ensure easy replacement and maintenance (with warehouse spares) Team also supports uniformity for additional fire protection equipment (e.g. hydrants, monitors, etc.)

160.008 YERP - J. Hobbs

This action will be captured on the Open Answered Issues List to ensure the EPC Contractor follows through and provides the required consistency/standardization for Fire Protection and Gas Detection components. In addition to this, some work has already been done during FEED identifying various components and manufacturers.

General Confidential Page 2 of 2