The purpose of this document is to offer different pathways to achieving a successful design and conclusion of a constructed and operational
sewage treatment plant after the decision to go ahead has been made.
The first step should be an in house forum of the stakeholders to look at the parameters of the project, these should include;
Once the above and any other required parameters are known we can move on to the next step. A number of feasibility studies will have to be
undertaken to determine, as a minimum;
Obviously different states may have differing concerns, so any studies that are required should be identified at the first ‘Parameters’ forum.
Once all the above information is known, and the type and size of the facility agreed upon, then construction requirements and costs can be
developed and a detailed proposal formed for consideration.
Feasibility Study
EIA Studies/Report
Geotechnical Survey
Detailed construction design.
Detailed mechanical design.
Detailed electrical design
Detailed gas exstraction and storage design
Operations manual.
Maintenance manual.
Product recovery (gas, water, fertiliser) manual.
Land farm recommendations.
Operation and maintenance for a minimum of 3 years proposal.
We hope this helps our client in their deliberations and look forward to a successful business partnership in cleaning up Nigeria.