ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Electrical Transient Analyzer Program


ETAP PowerStation

Motor Starting Analysis


Static

Swing

Load

Total

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

Synchronous
Genenerator

Power
Grid

Induction
Machines

Total

Number of Buses:

Number of Branches:

Number of Machines:

Generator

Synchronous
Motor

Prestart Loading:

Design Category, Normal Loading

Method of Solution:

Newton-Raphson

Max. No. of Iterations:

99

Precision of Solution:

0.00010 MW and Mvar

System Frequency:

60

Unit System:

English

Project Filename:

systemused

Output Filename:

C:\ETAP 400\PowerStation\systemused\Untitled.MS1

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS Input Data

Bus
ID

Initial Voltage
Type

kV

Bus1

Swing

Bus2

Load

Bus3

Load

Total Nunmber of Buses: 3

% Mag.

Ang.

69.000

100.0

0.0

13.800

100.0

0.0

4.160

100.0

0.0

Generator
MW

0.000

Motor Load

Mvar

0.000

MW

0.000

Mvar

0.000

Static Load
MW

0.000

Mvar

0.000

Mvar Limits
Max.

Min.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

2-WINDING TRANSFORMER Input Data

Transformer
ID

Rating
MVA

T1

40.000

T2

2.500

Prim. kV

Sec. kV

69.000

13.800

13.800

4.160

Z Variation
%Z
8.000
5.500

X/R
27.3
10.7

+ 5%

- 5%

% Tap Setting
% Tol.

Prim.

Adjusted

Sec.

%Z
0
0

Phase Shift
Type

Angle

8.0000

Std Pos. Seq.

0.0

5.5000

Std Pos. Seq.

0.0

2-Winding Transformer Load Tap Changer (LTC) Settings


Transformer Load Tap Changer Setting
Transformer
ID

Connected Buses ("*" LTC Side)


Primary Bus ID

Secondary Bus ID

% Min.
Tap

% Max.
Tap

% Step

Regulated Bus ID

%V

kV

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH CONNECTIONS
CKT/Branch
ID

Connected Bus ID
Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

T1

2W XFMR

Bus1

Bus2

0.73

19.99

20.00

T2

2W XFMR

Bus2

Bus3

20.53

219.04

220.00

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

MACHINE Input Data

Machine
ID
Gen1

Connected Bus
Type
Gen

ID
Bus1

Total Connected Machines ( = 1 ): 23.529 MVA

* Indicates the reactance used for machine representation

% Impedance
(Machine Base)

Rating
MVA
23.529

kV
69.000

X"

X' *

0.25

12.00

23.00

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

SWITCHING MOTORS

Motor

Nameplate

Locked-Rotor

Starting Device
Switch Off

ID
Mtr1

Type
Ind.

Qty
1

HP/kW
1,000.0

kV
4.000

RPM
1800

FLA
124.5

%PF
92.4

%Eff
93.6

%LRC
650.00

%PF
15.59

Type
None

%Tap

kvar

%Ws

Sec.

Equipment Cable ID

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

MOTOR STARTING EVENTS

Time Event
Name

Switching Load
Time
0.00 Mtr1

ID

Type

Action

Ind. MTR

Switch On

St. Category
Normal

% Loading

Load Change
Time

Start

Begin

100.0

Final
100.0

0.00

End
0.00

Motor Load
MW

Mvar

Static Load
MW

Mvar

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: MS

Filename:

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT @ T = 0.00Bus

Voltage

Generation

Motor Load

Static Load

MW

MW

Load Flow

kV

%Mag.

* Bus1

69.000

100.000

0.0

Bus2

13.800

100.000

0.0

ID

Ang.

MW

Mvar

Mvar

Mvar

ID
Bus2
Gen1
Bus1
Bus3

Bus3

4.160

100.000

0.0

Bus2

* Gen1

69.000

100.000

0.0

Bus1

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

MW

XFMR
Mvar

Amp

%PF

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: MS

Filename:

systemused

Page:

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT @ T = 0.00+


Bus
ID
* Bus1

Bus2

Voltage
kV

%Mag.

69.000

95.120

13.800

94.119

Generation

Ang.
-0.4

-0.5

MW

Mvar
0

Motor Load

Static Load

MW

MW

Mvar
0

Load Flow

Mvar
0

ID
0

MW

XFMR
Mvar

Amp

%PF

Bus2

0.71

4.74

42

14.74

Gen1

-0.71

-4.74

42

14.74

Bus1

-0.70

-4.69

211

14.85

Bus3

0.70

4.69

211

14.85

Bus3

4.160

83.058

-0.9

0.65

4.13

Bus2

-0.65

-4.13

699

15.59

* Gen1

69.000

100.000

0.0

0.71

4.99

Bus1

0.71

4.99

42

14.07

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: MS

Filename:

systemused

Page:

10

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT @ T = 1.00+


Bus
ID
* Bus1

Bus2

Voltage
kV

%Mag.

69.000

99.646

13.800

99.571

Generation

Ang.
-0.4

-0.5

MW

Mvar
0

Motor Load

Static Load

MW

MW

Mvar
0

Load Flow

Mvar
0

ID
0

MW

XFMR
Mvar

Amp

%PF

Bus2

0.80

0.35

91.64

Gen1

-0.80

-0.35

91.64

Bus1

-0.80

-0.35

37

91.70

Bus3

0.80

0.35

37

91.70

Bus3

4.160

98.657

-1.5

0.80

0.33

Bus2

-0.80

-0.33

121

92.37

* Gen1

69.000

100.000

0.0

0.80

0.36

Bus1

0.80

0.36

91.32

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: MS

Filename:

systemused

Page:

11

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT @ T = 2.00+


Bus
ID
* Bus1

Bus2

Voltage
kV

%Mag.

69.000

99.646

13.800

99.571

Generation

Ang.
-0.4

-0.5

MW

Mvar
0

Motor Load

Static Load

MW

MW

Mvar
0

Load Flow

Mvar
0

ID
0

MW

XFMR
Mvar

Amp

%PF

Bus2

0.80

0.35

91.64

Gen1

-0.80

-0.35

91.64

Bus1

-0.80

-0.35

37

91.70

Bus3

0.80

0.35

37

91.70

Bus3

4.160

98.657

-1.5

0.80

0.33

Bus2

-0.80

-0.33

121

92.37

* Gen1

69.000

100.000

0.0

0.80

0.36

Bus1

0.80

0.36

91.32

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: MS

Filename:

systemused

Page:

12

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT @ T = 3.00+


Bus
ID
* Bus1

Bus2

Voltage
kV

%Mag.

69.000

99.646

13.800

99.571

Generation

Ang.
-0.4

-0.5

MW

Mvar
0

Motor Load

Static Load

MW

MW

Mvar
0

Load Flow

Mvar
0

ID
0

MW

XFMR
Mvar

Amp

%PF

Bus2

0.80

0.35

91.64

Gen1

-0.80

-0.35

91.64

Bus1

-0.80

-0.35

37

91.70

Bus3

0.80

0.35

37

91.70

Bus3

4.160

98.657

-1.5

0.80

0.33

Bus2

-0.80

-0.33

121

92.37

* Gen1

69.000

100.000

0.0

0.80

0.36

Bus1

0.80

0.36

91.32

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

13

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

MOTOR ACCELERATION
Motor ID : Mtr1
Time
(Sec.)

Current
(% of FLA)

Terminal
V (%)

Bus
V (%)

kW

kvar
4132.27

0.000

561.47

83.06

83.06

652.02

0.040

97.46

98.62

98.66

796.75

330.46

0.080

97.46

98.62

98.66

796.75

0.120

97.46

98.62

98.66

0.160

97.46

98.62

0.200

97.46

0.240

97.46

0.280

97.46

0.320
0.360

Time
(Sec.)

Current
(% of FLA)

Terminal
V (%)

Bus
V (%)

kW

kvar
330.46

0.020

97.46

98.62

98.66

796.75

0.060

97.46

98.62

98.66

796.75

330.46

330.46

0.100

97.46

98.62

98.66

796.75

330.46

796.75

330.46

0.140

97.46

98.62

98.66

796.75

330.46

98.66

796.75

330.46

0.180

97.46

98.62

98.66

796.75

330.46

98.62

98.66

796.75

330.46

0.220

97.46

98.62

98.66

796.75

330.46

98.62

98.66

796.75

330.46

0.260

97.46

98.62

98.66

796.75

330.46

98.62

98.66

796.75

330.46

0.300

97.46

98.62

98.66

796.75

330.46

97.46

98.62

98.66

796.75

330.46

0.340

97.46

98.62

98.66

796.75

330.46

97.46

98.62

98.66

796.75

330.46

0.380

97.46

98.62

98.66

796.75

330.46

0.400

97.46

98.62

98.66

796.75

330.46

0.420

97.46

98.62

98.66

796.75

330.46

0.440

97.46

98.62

98.66

796.75

330.46

0.460

97.46

98.62

98.66

796.75

330.46

0.480

97.46

98.62

98.66

796.75

330.46

0.500

97.46

98.62

98.66

796.75

330.46

0.520

97.46

98.62

98.66

796.75

330.46

0.540

97.46

98.62

98.66

796.75

330.46

0.560

97.46

98.62

98.66

796.75

330.46

0.580

97.46

98.62

98.66

796.75

330.46

0.600

97.46

98.62

98.66

796.75

330.46

0.620

97.46

98.62

98.66

796.75

330.46

0.640

97.46

98.62

98.66

796.75

330.46

0.660

97.46

98.62

98.66

796.75

330.46

0.680

97.46

98.62

98.66

796.75

330.46

0.700

97.46

98.62

98.66

796.75

330.46

0.720

97.46

98.62

98.66

796.75

330.46

0.740

97.46

98.62

98.66

796.75

330.46

0.760

97.46

98.62

98.66

796.75

330.46

0.780

97.46

98.62

98.66

796.75

330.46

0.800

97.46

98.62

98.66

796.75

330.46

0.820

97.46

98.62

98.66

796.75

330.46

0.840

97.46

98.62

98.66

796.75

330.46

0.860

97.46

98.62

98.66

796.75

330.46

0.880

97.46

98.62

98.66

796.75

330.46

0.900

97.46

98.62

98.66

796.75

330.46

0.920

97.46

98.62

98.66

796.75

330.46

0.940

97.46

98.62

98.66

796.75

330.46

0.960

97.46

98.62

98.66

796.75

330.46

0.980

97.46

98.62

98.66

796.75

330.46

1.000

97.46

98.62

98.66

796.75

330.46

1.020

97.46

98.62

98.66

796.75

330.46

1.040

97.46

98.62

98.66

796.75

330.46

1.060

97.46

98.62

98.66

796.75

330.46

1.080

97.46

98.62

98.66

796.75

330.46

1.100

97.46

98.62

98.66

796.75

330.46

1.120

97.46

98.62

98.66

796.75

330.46

1.140

97.46

98.62

98.66

796.75

330.46

1.160

97.46

98.62

98.66

796.75

330.46

1.180

97.46

98.62

98.66

796.75

330.46

1.200

97.46

98.62

98.66

796.75

330.46

1.220

97.46

98.62

98.66

796.75

330.46

1.240

97.46

98.62

98.66

796.75

330.46

1.260

97.46

98.62

98.66

796.75

330.46

1.280

97.46

98.62

98.66

796.75

330.46

1.300

97.46

98.62

98.66

796.75

330.46

1.320

97.46

98.62

98.66

796.75

330.46

1.340

97.46

98.62

98.66

796.75

330.46

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

14

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Motor ID : Mtr1
Time
(Sec.)

Current
(% of FLA)

Terminal
V (%)

Bus
V (%)

kW

kvar

Time
(Sec.)

Current
(% of FLA)

330.46

1.380

97.46

Terminal
V (%)

Bus
V (%)

kW

kvar

98.62

330.46

1.360

97.46

98.62

98.66

796.75

98.66

796.75

1.400

97.46

98.62

98.66

796.75

330.46

1.420

97.46

98.62

98.66

796.75

330.46

1.440

97.46

98.62

98.66

796.75

330.46

1.460

97.46

98.62

98.66

796.75

330.46

1.480

97.46

98.62

98.66

796.75

330.46

1.500

97.46

98.62

98.66

796.75

330.46

1.520

97.46

98.62

98.66

796.75

330.46

1.540

97.46

98.62

98.66

796.75

330.46

1.560

97.46

98.62

98.66

796.75

330.46

1.580

97.46

98.62

98.66

796.75

330.46

1.600

97.46

98.62

98.66

796.75

330.46

1.620

97.46

98.62

98.66

796.75

330.46

1.640

97.46

98.62

98.66

796.75

330.46

1.660

97.46

98.62

98.66

796.75

330.46

1.680

97.46

98.62

98.66

796.75

330.46

1.700

97.46

98.62

98.66

796.75

330.46

1.720

97.46

98.62

98.66

796.75

330.46

1.740

97.46

98.62

98.66

796.75

330.46

1.760

97.46

98.62

98.66

796.75

330.46

1.780

97.46

98.62

98.66

796.75

330.46

1.800

97.46

98.62

98.66

796.75

330.46

1.820

97.46

98.62

98.66

796.75

330.46

1.840

97.46

98.62

98.66

796.75

330.46

1.860

97.46

98.62

98.66

796.75

330.46

1.880

97.46

98.62

98.66

796.75

330.46

1.900

97.46

98.62

98.66

796.75

330.46

1.920

97.46

98.62

98.66

796.75

330.46

1.940

97.46

98.62

98.66

796.75

330.46

1.960

97.46

98.62

98.66

796.75

330.46

1.980

97.46

98.62

98.66

796.75

330.46

2.000

97.46

98.62

98.66

796.75

330.46

2.020

97.46

98.62

98.66

796.75

330.46

2.040

97.46

98.62

98.66

796.75

330.46

2.060

97.46

98.62

98.66

796.75

330.46

2.080

97.46

98.62

98.66

796.75

330.46

2.100

97.46

98.62

98.66

796.75

330.46

2.120

97.46

98.62

98.66

796.75

330.46

2.140

97.46

98.62

98.66

796.75

330.46

2.160

97.46

98.62

98.66

796.75

330.46

2.180

97.46

98.62

98.66

796.75

330.46

2.200

97.46

98.62

98.66

796.75

330.46

2.220

97.46

98.62

98.66

796.75

330.46

2.240

97.46

98.62

98.66

796.75

330.46

2.260

97.46

98.62

98.66

796.75

330.46

2.280

97.46

98.62

98.66

796.75

330.46

2.300

97.46

98.62

98.66

796.75

330.46

2.320

97.46

98.62

98.66

796.75

330.46

2.340

97.46

98.62

98.66

796.75

330.46

2.360

97.46

98.62

98.66

796.75

330.46

2.380

97.46

98.62

98.66

796.75

330.46

2.400

97.46

98.62

98.66

796.75

330.46

2.420

97.46

98.62

98.66

796.75

330.46

2.440

97.46

98.62

98.66

796.75

330.46

2.460

97.46

98.62

98.66

796.75

330.46

2.480

97.46

98.62

98.66

796.75

330.46

2.500

97.46

98.62

98.66

796.75

330.46

2.520

97.46

98.62

98.66

796.75

330.46

2.540

97.46

98.62

98.66

796.75

330.46

2.560

97.46

98.62

98.66

796.75

330.46

2.580

97.46

98.62

98.66

796.75

330.46

2.600

97.46

98.62

98.66

796.75

330.46

2.620

97.46

98.62

98.66

796.75

330.46

2.640

97.46

98.62

98.66

796.75

330.46

2.660

97.46

98.62

98.66

796.75

330.46

2.680

97.46

98.62

98.66

796.75

330.46

2.700

97.46

98.62

98.66

796.75

330.46

2.720

97.46

98.62

98.66

796.75

330.46

2.740

97.46

98.62

98.66

796.75

330.46

2.760

97.46

98.62

98.66

796.75

330.46

2.780

97.46

98.62

98.66

796.75

330.46

2.800

97.46

98.62

98.66

796.75

330.46

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: MS

systemused

Page:

15

Date:

04-15-2013

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Motor ID : Mtr1
Time
(Sec.)

Current
(% of FLA)

Terminal
V (%)

Bus
V (%)

kW

kvar

Time
(Sec.)

Current
(% of FLA)

330.46

2.840

97.46

Terminal
V (%)

Bus
V (%)

kW

kvar

98.62

330.46

2.820

97.46

98.62

98.66

796.75

98.66

796.75

2.860

97.46

98.62

98.66

796.75

330.46

2.880

97.46

98.62

98.66

796.75

330.46

2.900

97.46

98.62

98.66

796.75

330.46

2.920

97.46

98.62

98.66

796.75

330.46

2.940

97.46

98.62

98.66

796.75

330.46

2.960

97.46

98.62

98.66

796.75

330.46

2.980

97.46

98.62

98.66

796.75

330.46

3.000

97.46

98.62

98.66

796.75

330.46