Академический Документы
Профессиональный Документы
Культура Документы
ATRIUM
ENLIGHTENMENT HALL
CENTRAL PODIUM
MODERN HALL
ATRIUM LOBBY MAIN STORAGE/DOCKING MAIN STORAGE/DOCKING CLASSICAL HALL ENLIGHTENMENT HALL INDUST RIAL HALL MODERN HALL INFORMATION HALL COMMERERATION HALL THEATRE/AUCTION THEATRE/AUCTION STORAGE THEATRE/AUCTION STORAGE MANAGEMENT CONFERENCE UTILITY EMPLOYEE BREAK ROOM RESTROOMS RESTROOMS
17536 SF 2159 SF 934 SF 934 SF 3544 SF 3565 SF 3544 3544 3544 3544 SF SF SF SF
WINDMILLS
2 2
Area Schedule (Gross Building) Name Area Perimeter GRND FLOOR 47332 SF 1394' - 9 11/32" 2ND FLOOR 21900 SF 605' - 0 1/16"
www.autodesk.com/revit
2151 SF 530 SF
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
5/22/2013 1:12:00 PM
A101(A)
1" = 50'-0"
CONFERENCE UTILITY
I EMPLOYEE BREAK I IF ROOM F IG F G F GG
2 WOMEN'S BATHROOM
MANAGEMENT
Area Schedule (Gross Building) Name Area Perimeter GRND FLOOR 47332 SF 1394' - 9 11/32" 2ND FLOOR 21900 SF 605' - 0 1/16"
www.autodesk.com/revit
MEN'S BATHROOM
ATRIUM LOBBY MAIN STORAGE/DOCKING MAIN STORAGE/DOCKING CLASSICAL HALL ENLIGHTENMENT HALL INDUST RIAL HALL MODERN HALL INFORMATION HALL COMMERERATION HALL THEATRE/AUCTION THEATRE/AUCTION STORAGE THEATRE/AUCTION STORAGE MANAGEMENT CONFERENCE UTILITY EMPLOYEE BREAK ROOM RESTROOMS RESTROOMS
17536 SF 2159 SF 934 SF 934 SF 3544 SF 3565 SF 3544 3544 3544 3544 SF SF SF SF
2151 SF 530 SF
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
5/22/2013 1:12:02 PM
A101(B)
1" = 50'-0"
Family and Type Overhead-Rolling: 8' x 6'-6" Single-Flush-Dbl Acting: 30" x 80" Single-Flush: 32" x 84" Single-Flush: 36" x 84" 2 6 5 12
Count
Door Schedule Head Height 6' - 6" 6' - 8" 7' - 0" 7' - 0"
Sill Height 0' - 0" 0' - 0" 0' - 0" 0' - 0" 8' - 0" 2' - 6" 2' - 8" 3' - 0"
Width
SCHEDULES
Family and Type Combination Rtp with Trim: 36" x 48" Combination Rtp with Trim: 48" x 72" 2
Count
Width
18
7' - 0"
1' - 0"
4' - 0"
www.autodesk.com/revit
5/22/2013 1:12:03 PM
A102
THEATRE/AUCTION ROOM THEATRE/AUCTION STORAGE THEATRE/AUCTION STORAGE INDUSTRIAL HALL MEN'S BATHROOM WOMEN'S BATHROOM INFORMATION HALL
ATRIUM
40' - 0"
246' - 1 13/32"
ENLIGHTENMENT HALL
CENTRAL PODIUM
MODERN HALL
25' - 0"
40' - 0"
Windmills will be positioned farther away (brought closer to model to be shown on scale)
Central Podium raises 1', a small step or slope will allow people to transition onto it.
Slivers extending from the central podium are glass-encased ravines of water, flowing into the fountain within the Atrium.
LOBBY
48' - 10 5/32"
www.autodesk.com/revit
CLASSICAL HALL
14' - 0"
44' - 0"
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
FLOOR PLAN
5/22/2013 1:12:05 PM
A103(A)
1" = 40'-0"
Labels were too large, contact Antonio Page for further info.
Employees will enter through elevators & sprial staircases in 1st Floor supply docks.
www.autodesk.com/revit
26' - 9 7/8"
40' - 1 1/4"
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
5/22/2013 1:12:07 PM
A103(B)
1" = 40'-0"
RENDER
www.autodesk.com/revit
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
A104(A)
5/22/2013 1:12:08 PM
RENDER 2
www.autodesk.com/revit
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
A104(B)
5/22/2013 1:12:08 PM
ELEVATION VIEWS
These elevation views are also sectional views, due to the innards of the building being shown with each transitioning view.
www.autodesk.com/revit
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
5/22/2013 1:12:10 PM
A105
1" = 50'-0"
2 WINDMILLS SOLARPANELS 1
2 2 2
3
www.autodesk.com/revit
Photograph of avaliable site that this project will be built upon.
2 2
A106
5/22/2013 1:12:11 PM
Green Roof can be accessed via 2nd floor door or express ladderway located next to loading dock garage doors.
Plants will be watered via sprinklers that will use recycled storm water or water used within ravines inside.
Plants in the front will be watered the same way as the Green Roof.
GREENROOF
I could not locate the vanilla green roof flooring option, so, I improvised.
www.autodesk.com/revit
Project number Project Number Date 5/5/13 Drawn by ANTONIO PAGE Checked by ANTHONY MOON Scale
LANDSCAPING
5/22/2013 1:12:11 PM
A108