KOBOLD INSTRUMENTS PRODUCT GUIDE ================================================================================================== Product Description Lead Time To Customer ================================================================================================== A2/A5* Flow Transmitter w/ LED

Display 4 weeks AFK Humidity/Temperature Sensor 6-8 weeks ADI Display 4-6 weeks AUF Electronic Display Stock BEA* Flow Indicator 3 weeks BVB* Manifold Valve 1-2 weeks BVO Flowmeter 1 week CG Cable Gland Stock DAA Flow Indicator 1 week DAF Flow Indicator 1 week DAH Flow Indicator 1 week DAK Flow Indicator 4 weeks DAR Flow Indicator 6 weeks DAT Flow Indicator 6 weeks DDA Controller/Transmiiter 4 weeks DF-K, MA, WM Flow Sensor 1 week DFA Controller/Transmitter 3 weeks DFB Flowmeter/Counter/Batcher 4-5 weeks DFM Controller/Transmitter 3 weeks DFT Paddle Flowmeter 2 weeks DIG Paddle Flowmeter 1 week DKB Flow Indicator 1 week DKF Flow Indicator 1 week DMI Magnetic Flowmeter Stock (some 6 weeks) DPE* Turbine Wheel Flowmeter 4 weeks DPF76 Pressure Gauge 4 wks / 8 wks nonstd. DPL Flow Sensor 1 week DPM* Flow Sensor 1 week DPT* Paddle Flow Meter 4 weeks DRB* Turbine Wheel Flowmeter 4 weeks DRF22 Pressure Gauge 5 wks / 9 wks nonstd. DRF26 Pressure Gauge 5 wks / 9 wks nonstd. DRF34 Pressure Gauge 5 wks / 9 wks nonstd. DRG* Paddle Flow Sensor 2 weeks/(Z340 - 4 weeks) DRG26 Pressure Gauge 5 wks / 9 wks nonstd. DRG64 Pressure Gauge 5 wks / 9 wks nonstd. DRH* Paddle Flow Sensor 2 weeks/(Z340 - 4 weeks) DRM* Diaphragm Seal 5 wks / 10 wks nonstd. DRS* Flowmeter Turbine 1 week/(Z340 - 4 weeks) DRZ Flowmeter 4 weeks DSF26 Pressure Gauge 4-5 weeks DST Controller/Transmitter 2 weeks DSV Flowmeter 1 week DTK Flow Sensor 3 weeks

4/7/2008, H:\MARKETING MASTER\TRAINING BOOK \NEW Distributor Packet Information\delete.xls

Page 1 of 5

KOBOLD INSTRUMENTS PRODUCT GUIDE ================================================================================================== Product Description Lead Time To Customer ================================================================================================== DTM* Temperature Gauge 4 - 5 weeks DTS Temperature Switch 6 weeks DVM/DVO Flowmeter/Switch 1 week (check with mfg) DVW Flowmeter with Switch 6 weeks DVZ Compact Vortex Flow Meter 4 weeks DWS* Flow Switch 7 weeks DWU* Flowmeter/Switch 6 weeks LCD/12 weeks Mechanical DZF26 Pressure Gauge 10 weeks EDM Flowmeter/Counter 2 weeks EX Relay Stock FPS Flow Switch Stock FT Conduit Adaptor Stock INT Controller Stock to 2 weeks KAL Flow Switch Stock-1 week KAL-A,K Flow Transmitter, Switch Stock-1 week (P03R option 2 weeks) KAL-D Flow Switch Stock-1 week KAL-L Flow Switch 1 week KAS Pressure Switch 4 weeks KDF Flowmeter 1 week (chemraz seals 3-4 weeks) KDG Flowmeter 1 week (chemraz seals 3-4 weeks) KDK* Flowmeter 4 weeks KDM* Flowmeter 4 weeks KDP* Lo Flow Armored Flowmeter 4 weeks KDV* Flowmeter 4-5 weeks KEL* Flowmeter 4 to 5 weeks KFF Flowmeter 4 weeks KFG Flowmeter 3 weeks KFR Flowmeter Stock to 2 weeks KMI* Flowmeter 4 - 6 weeks KPA Pressure Transducer Stock to 8 weeks KPG Pressure Transducer 2 weeks/ 12 wks nonstd. KPH Pressure Switch Stock KPK Pressure Transducer 2 weeks/ 12 wks nonstd. KPS Pressure Switch 5 weeks KPW* Pressure Transducer 2 weeks/ 10 wks nonstd. KRT Pressure Switch 6 weeks KSK Flowmeter 1 week KSK Flowmeter (PVDF) 3-4 weeks KSM Flowmeter to 120 1 week KSM Flowmeter 200 to 600 Stock to 3 weeks KSR* Flow Switch 4 weeks KSV Flowmeter Stock to 1 week KTL Temperature Switch 4 - 6 weeks KTX Temperature Switch 4 - 6 weeks

4/7/2008, H:\MARKETING MASTER\TRAINING BOOK \NEW Distributor Packet Information\delete.xls

Page 2 of 5

KOBOLD INSTRUMENTS PRODUCT GUIDE ================================================================================================== Product Description Lead Time To Customer ================================================================================================== LNK Level Switch 6 - 7 weeks LPS Flow Switch Stock MAN-SD Digital Pressure Gauge Stock - 4 weeks MAS* Flowmeter 3 -4 weeks MFR Magnetic Filter Stock - 3 weeks MID* Magnetic Inductive Flow Meter 5-6 wks (SS: 7-8 wks, Larger sizes: 8-10 wks) MRT Controller Stock to 3 weeks MSR Latching Relay Stock to 4 weeks NAE Level Switch Stock-6 weeks NBK* Bypass Level Indicator 4 weeks (with Option "T" 6 weeks) NBK (04)* Tank Top Mntd. Level Indicator 4 weeks (with Option "T" 6 weeks) NBK-M* Mini Economical Level Indicator 4 weeks (with Option "T" 6 weeks) NCB Level Switch Stock to 2 weeks NCG* Custom Level Switch 2 weeks NCM* Custom Level Switch 2 weeks NCP Level Switch Stock NCS Level Switch Stock NDM Rotating Vane Level Monitor 3 Weeks Std/6-8 Weeks Special NDT Level Switch Stock NE Electrode Relay Stock to 3 weeks NEH* Level Switch 1 week (VF option 3 weeks-Germany) NEK* Level Switch 1 week NEK Compact Conductive Level Switch Stock-1 week NEL* Level Switch 1 week NEO Ultrasonic Level Transmitter Stock NGS Level Switch 2-6 weeks (NGS-2100 2 wks/NGS-2200 6 wks) NK Level Switch Stock NKP Level Switch 1 week NM* Level Transmitter 6 - 8 weeks NMF Level Monitor 4 weeks NML* Level Transducer 3 weeks (J & RT options 4 wks) NMT* Level Transmitter 8 weeks NNE Level Switch 3 weeks NQ Level Switch Stock (6 wks nonstd.) NRA Flow Regulators Stock-4 weeks NRE Flow Regulators Stock-4 weeks NRF* Level Switch 3 weeks NSE Float Switch 6 weeks NSM Float Switch Stock (6 wks nonstd.) NSP Float Switch Stock / 6 wks nonstd. NST Float Switch 6 weeks NTB* Level Transducer 6 - 8 weeks NUS Ultrasonic Level Transmitter Stock NV Level Switch 1 week

4/7/2008, H:\MARKETING MASTER\TRAINING BOOK \NEW Distributor Packet Information\delete.xls

Page 3 of 5

KOBOLD INSTRUMENTS PRODUCT GUIDE ================================================================================================== Product Description Lead Time To Customer ================================================================================================== NVI Vibrating Level Switch Stock to 4 weeks NVM Needle Valve Stock-3 weeks NWP Level Switch Stock NWS Vibrating Level Switch Stock OME* Flowmeter 4 - 5 weeks OMP* Positive Displacement Flowmeter 3 - 4 weeks OPT Level Switch Stock - 3 weeks OVZ Flowmeter 4 weeks (some stock) PDA Digital Pressure Transmitter 4 - 5 weeks (some stock) PDD Compact Elec. Pres. Switch Stock - 4 weeks PGS Pressure Gauge Stock PME Mag. Induct. Flowmeter/Monitor Stock PMG Flowmeter 4-5 wks/Hastelloy & Remote Versions 6-8 wks PPS Flow Switch Stock PS Flow Switch 1 week PSR Flow Switch 1 week R2/R5* Flow Transmitter 4 weeks RA Flow Regulator Stock-4 weeks RCD* Differential Pressure Flowmeter 4-6 weeks RCM* Flowmeter 2 weeks RE Flow Regulator Stock-4 weeks REG Regulating Valve 1 week REL Power Supply 3 weeks S Flow Switch 1 week/(BSP connection-3 weeks) S2/S25* Flowmeter/Switch 4 weeks S02/S05* Flowmeter 4 weeks SCH Pressure Switch 4 - 5 weeks SCI Signal Conditioner 3 weeks SEN Pressure Transducer Stock - 5 weeks (non std. 6-8 weeks) SFL Flow Sensor 2 weeks, SS 4 weeks SMF Flowmeter 1 week/(BSP connection-3 weeks) SMN Flow Switch Stock SMO Flowmeter 1 week/(BSP connection-3 weeks) SMV Flowmeter 1 week/(BSP connection-3 weeks) SMW* Flowmeter 1 week/(BSP connection-3 weeks) SP* Flow Switch 4 weeks SRT Flow Controller 3 weeks ST Thermometer Stock to 2 weeks (limited model availability) SV Flowmeter 1 week SVN* Flow Switch 3 weeks SWK Flow Switch Stock to 1 weeks TBS Temperature Switch 3 weeks TDA Temperature Transmitter 3 weeks TDD Temperature Switch Stock - 3 weeks

4/7/2008, H:\MARKETING MASTER\TRAINING BOOK \NEW Distributor Packet Information\delete.xls

Page 4 of 5

KOBOLD INSTRUMENTS PRODUCT GUIDE ================================================================================================== Product Description Lead Time To Customer ================================================================================================== TED Level Switch Stock to 3 weeks TMA Temperature Sensor 3 weeks TNF* Capillary Thermometer 4 - 6 weeks TNS* Rigid Stem Thermometer 4 - 6 weeks TSA Temperature Sensor 3 weeks TSH Thermowell 4 - 5 weeks TSP Temperature Transmitter 3 weeks TSR* Temp. Switch/Transmitter 3 weeks TST* Integrated Temperature Transmitter 3 weeks TUR* Flowmeter 5 weeks TWR* Temperature Switch 3 weeks UV Flowmeter 3 weeks V1/V15* Flow Switch 4 weeks VKA* Flowmeter 1 week VKG* Flowmeter 1 week VKM* Flowmeter 1 week VKP Flowmeter 1 week WM Totalizing Flowmeter Stock ZAG Controller/Transmitter 4 weeks ZDM* Flowmeter 4-5 weeks NOTE(1): Stock items can be shipped the same day as order is received, subject to quantity on hand and order being received prior to 2:30 p.m. EST. NOTE(2): U.S. Mfg. items are standard units only, as indicated in the latest volume of the KOBOLD catalog. Subject to quantity limitations and time of day order received. Consult factory for delivery of non-standard configurations. NOTE (3): * Additional information is needed (see KOBOLD catalog for "how to order" information).

4/7/2008, H:\MARKETING MASTER\TRAINING BOOK \NEW Distributor Packet Information\delete.xls