Вы находитесь на странице: 1из 11

OBRA:

MODALIDAD:
PROPIETARIO:
PROCESO
CONTRATISTA
PLAZO:
INICIO DE OBRA:
TERMINO DE OBRA:
RESIDENTE:
SUPERVISOR:
INFORME N:
PERIODO DE TRABAJO
LOCALIDAD:
DISTRITO:
PROVINCIA:
REGION:

PRESUPUESTO
COSTO DIRECTO TOTAL :

ELABORADO POR : ING HECTOR FABIAN NAMUCHE LAZARO

"CONSTRUCCION DE PAVIMENTO RIGIDO Y VEREDAS


AVENIDA 28 DE OCTUBRE, JR. PROGRESO, JR. BOLIVAR Y JR.
LIMA, EN EL DISTRITO DE CASCAS, PROVINCIA DE GRAN
CHIMU - LA LIBERTAD
POR CONTRATA A SUMA ALZADA
MUNICIPALIDAD PROVINCIAL DE GRAN CHIMU
ADP N 005-2012-MPGCH-PRIMERA CONVOCATORIA
CONSORCIO LIBERTAD

120 DIAS CALENDARIO


1/23/2013
5/22/2013
ING. WILSON PORTALES ARIAS
RESA COINSEC SAUCEDA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA.

DO POR : ING HECTOR FABIAN NAMUCHE LAZARO

1
23/01/2013 AL 28/02/2013
CASCAS
CASCAS
GRAN CHIMU
LA LIBERTAD

S/. 1,557,958.21
S/. 1,148,090.06

EMPRESA CONSTRUCTORA

EMPRESA DE SERVICIOS MULTIPLES L&K S.A.C.


DETALLE DE CANCELACION AL CONTRATISTA N 01
DEL 23/01/2013 AL 28/02/2013
PROCESO DE ADJUDICACION
OBRA
PROPIETARIO
CONTRATISTA
MODALIDAD
RESIDENTE DE OBRA
SUPERVISOR DE OBRA
PRESUPUESTO ADJUDICADO
PRESUPUESTO S/IGV
COSTO DIRECTO TOTAL
INICIO DE OBRA
TERMINO DE OBRA
PLAZO DE EJECUCION

: ADP N 005-2012-MPGCH-PRIMERA CONVOCATORIA


"CONSTRUCCION DE PAVIMENTO RIGIDO Y VEREDAS AVENIDA 28 DE OCTUBRE, JR.
:
PROGRESO, JR. BOLIVAR Y JR. LIMA, EN EL DISTRITO DE CASCAS, PROVINCIA DE GRAN
: MUNICIPALIDAD PROVINCIAL DE GRAN CHIMU
: CONSORCIO LIBERTAD
: POR CONTRATA A SUMA ALZADA
: : ING. WILSON PORTALES ARIAS
: EMPRESA COINSEC SAUCEDA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA.
:
S/. 1,557,958.21
:
#REF!
:
S/. 1,148,090.06
: 1/23/2013
: 5/22/2013
: 120 DIAS CALENDARIO

VALORIZACION
31/12/10

DESCRIPCION
A:

VALORIZACION BRUTA : (VB)


TOTAL VALORIZACION BRUTA (VB)
REAJUSTE POR POLINOMICA "K"

B:

DESCUENTOS : (D)
AMORTIZACION DE ADELANTOS
ADELANTO DIRECTO
ADELANTO POR MATERIALES

AL

#REF!
#REF!
1.00 S/

#REF!

20.00%
40.00%

#REF!
#REF!

C:

VALORIZACION NETA: (VN = VB-D)

#REF!

D:

MONTO NETO

#REF!

IGV (19%)

#REF!

E:

MONTO A FACTURAR

#REF!

F:

RETENCION FONDO DE GARANTIA 10 % SE PRESENTO CARTA E FIANZA

S/

PRIMERA AMORTIZACION EFECTUADA DE RETENCION

S/

G:

MONTO EN EFECTIVO A CANCELAR AL CONTRATISTA:

Son: TREINTA MIL NOVENTA Y CINCO CON 60/100 NUEVOS SOLES

#REF!

EMPRESA CONTRATISTA "DIEGO EL CONSTRUCTOR S.A.C."

EMPRESA CONSTRUCTORA

EMPRESA DE SERVICIOS MULTIPLES L&K S.A.C.


RESUMEN DE VALORIZACION MENSUAL N 01

PROPIETARIO

: "CONSTRUCCION DE PAVIMENTO RIGIDO Y VEREDAS AVENIDA 28 DE OCTUBRE, JR. PROGRESO, JR. BOLIVAR Y JR. LIMA,
EN EL DISTRITO DE CASCAS, PROVINCIA DE GRAN CHIMU - LA LIBERTAD
: MUNICIPALIDAD PROVINCIAL DE GRAN CHIMU INICIO DE OBRA
1/23/2013

CONTRATISTA

: CONSORCIO LIBERTAD

TERMINO DE OBRA

5/22/2013

MODALIDAD

: POR CONTRATA A SUMA ALZADA

PLAZO DE EJEC.

120 DIAS CALENDARIO

RESIDENTE DE OBRA

: ING. WILSON PORTALES ARIAS

PRESUPUESTO ADJUDICADO

SUPERVISOR DE OBRA

PRESUPUESTO
S/IGV LIMITADA.
: EMPRESA COINSEC SAUCEDA EMPRESA INDIVIDUAL
DE RESPONSABILIDAD

PERIODO DE TRABAJO AL

: 23/01/2013 AL 28/02/2013

OBRA

COSTO DIRECTO TOTAL

MONTO
DESCRIPCION

A: VALORIZACION CONTRACTUAL
FORMULA 01 : GENERAL
#REF!
#REF!
#REF!
TOTAL (A)
FACTOR DE RELACIN
AVANCE FISICO DE OBRA MOC

TOTAL
B: MONTO NETO A PAGAR
EN EFECTIVO (VN-D)

VALORIZACION

CONTRATO

S/. 1,557,958.21
#REF!
S/. 1,148,090.06

% DE AVANCE
ACUMULADO

SALDO POR
VALORIZAR

(s/IGV)

ANTERIOR

ACTUAL

ACUMULADO

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

1.00

#REF!

#REF!

RESUMEN DE VALORIZACION MENSUAL N 01


DEL PRESUPUESTO DE 04 FORMULAS

MUNICIPALIDAD DISTRITAL DE GUADALUPITO

OBRA
PROPIETARIO

: "CONSTRUCCION DE PAVIMENTO RIGIDO Y VEREDAS AVENIDA 28 DE OCTUBRE, JR. PROGRESO, JR. BOLIVAR Y JR. LIMA, EN EL DISTRITO DE CASCAS, PROVINCIA DE GRAN CHIMU : MUNICIPALIDAD PROVINCIAL DE GRAN CHIMU

MODALIDAD
RESIDENTE
INSPECTOR
PERIODO

: POR CONTRATA A SUMA ALZADA


INICIO DE OBRA
: ING. WILSON PORTALES ARIAS
TERMINO DE OBRA
: EMPRESA COINSEC SAUCEDA EMPRESA INDIVIDUAL DE RESPONSABILIDAD PLAZO
LIMITADA.
DE EJEC.
: 23/01/2013 AL 28/02/2013
TOTAL PRESUP.
COSTO DIRECTO TOTAL

CODIGO
DESCRIPCION

PRESUPUESTO BASE

1,148,090.06

FORMULA 01 : GENERAL

1/23/2013
5/22/2013
120 DIAS CALENDARIO
S/. 1,557,958.21
S/. 1,148,090.06
VALORIZACION ANTERIOR

PARCIAL

PARTIDA
1.00

:
:
:
:
:

UBICACIN:

29.68%

PARCIAL
340,773.14

LOCALIDAD
DISTRITO
PROVINCIA
REGION

VALORIZACION ACTUAL
%
2.55%

PARCIAL
29,299.34

VALORIZACION ACUM.
%
32.23%

PARCIAL
370,072.48

: CASCAS
: CASCAS
: GRAN CHIMU
: LA LIBERTAD

SALDO POR VALORIZAR


%
67.77%

PARCIAL
778,017.59

2.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

3.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

4.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

COSTO DIRECTO

#REF!

SUB TOTAL PRESUPUESTO

#REF!

FACTOR DE RELACION = 1.00


TOTAL VALORIZADO

1.00

#REF!

#REF!

#REF!

#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

RESUMEN EJECUTADO

Pgina 5

VALORIZACIN DE OBRA N 01

CONSORCIO LIBERTAD

FORMULA 01 : GENERAL
OBRA
PROPIETARIO
PROCESO
MODALIDAD
RESIDENTE
SUPERVISOR
PERIODO

: "CONSTRUCCION DE PAVIMENTO RIGIDO Y VEREDAS AVENIDA 28 DE OCTUBRE, JR. PROGRESO, JR. BOLIVAR Y JR. LIMA, EN EL DISTRITO DE CASCAS, PROVINCIA DE GRAN CHIMU - LA LIBERTAD
: MUNICIPALIDAD PROVINCIAL DE GRAN CHIMU
: ADP N 005-2012-MPGCH-PRIMERA CONVOCATORIA
INICIO DE OBRA
1/23/2013
: POR CONTRATA A SUMA ALZADA
:
TERMINO DE OBRA
5/22/2013
: ING. WILSON PORTALES ARIAS
:
PLAZO DE EJEC.
: EMPRESA COINSEC SAUCEDA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA.
:
120 DIAS CALENDARIO
TOTAL PRESUP.
S/. 1,557,958.21
: 23/01/2013 AL 28/02/2013
:
COSTO DIRECTO TOTAL
S/. 1,148,090.06
:
PRESUPUESTO BASE
METRADO
PARCIAL

CODIGO
DESCRIPCION
PARTIDA

UNID.

CANT.

P.U.

COSTO

UBICACIN:
LOCALIDAD
DISTRITO
PROVINCIA
REGION

VAL. ANTERIOR
METRADO

PARCIAL

: CASCAS
: CASCAS
: GRAN CHIMU
: LA LIBERTAD

VALORIZACION ACTUAL
%

METRADO

PARCIAL

VALORIZACION ACUM.
%

METRADO

PARCIAL

SALDO POR VALORIZAR


%

METRADO

PARCIAL

FORMULA 01 : GENERAL
01
01.01

CONSTRUCCION DE PAVIMENTO RIGIDO

970,528.06

OBRAS PROVICIONALES

13,833.77

01.01.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINA

gb

1.00

8,336.00

8,336.00

0.50

4,168.00

50.00%

0.25

2,084.00

25.00%

0.75

6,252.00

75.00%

0.25

2,084.00

25.00%

01.01.02

DESVIO Y MANTENIMIENTO DE TRANSITO

gb

1.00

1,860.43

1,860.43

0.25

465.11

25.00%

0.50

930.22

50.00%

0.75

1,395.32

75.00%

0.25

465.11

25.00%

01.01.03

CARTEL DE IDENTIFICACION DE LA OBRA DE 8.5 X 3.30 m

1.00

2,458.90

2,458.90

1.00

2,458.90

100.00%

0.00

0.00%

1.00

2,458.90

100.00%

01.01.04

LOCAL PARA DEPOSITO Y/O GUARDIANIA

mes

4.00

294.61

1,178.44

1.00

294.61

25.00%

1.00

294.61

25.00%

2.00

589.22

50.00%

2.00

589.22

50.00%

m2

5,000.00

0.74

1,433.86

1,061.06

28.68%

3,000.00

2,220.00

60.00%

4,433.86

3,281.06

88.68%

566.14

418.94

11.32%

01.02
01.02.01
01.03

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

3,700.00

MOVIMIENTO DE TIERRAS

3,700.00
57,494.67

01.03.01

CORTE EN TERRENO NATURAL A NIVEL DE SUB RASANTE, CON EQUIPO

m3

2,243.82

8.76

19,655.86

713.05

6,246.32

31.78%

0.00%

713.05

6,246.32

31.78%

1,530.77

13,409.54

68.22%

01.03.02

RELLENO CON MATERIAL PROPIO

294.25

10.58

3,113.17

44.38

469.54

15.08%

0.00%

44.38

469.54

15.08%

249.87

2,643.63

84.92%

01.03.03

EXCAVACION DE ZANJAS PARA CIMENTACION

m3
m3

132.08

77.06

10,178.08

132.08

10,178.08

100.00%

0.00%

132.08

10,178.08

100.00%

01.03.04

EXCAVACION DE ZANJAS PARA CANALETA

m3

66.46

78.56

5,221.10

01.03.05

ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIENTO

m3

2,629.45

7.35

7,438.49

38.49%

0.00%

1,012.04

01.04

PAVIMENTO RIGIDO

19,326.46

1,012.04

66.46

5,221.10

100.00%

7,438.49

38.49%

1,617.41

11,887.97

61.51%

664,013.84

01.04.01

PREPARACION DE LA SUB RASANTE

m2

5,000.00

3.38

16,900.00

1,433.86

4,846.45

28.68%

0.00%

1,433.86

4,846.45

28.68%

3,566.14

12,053.55

71.32%

01.04.02

BASE DE AFIRMADO e=0.20 m

m2

5,000.00

22.55

112,750.00

1,433.86

32,333.54

28.68%

0.00%

1,433.86

32,333.54

28.68%

3,566.14

80,416.46

71.32%

01.04.03

ENCOFRADO Y DESENCOFRADO

604.70

69.74

42,171.78

69.43

4,842.05

11.48%

0.00%

69.43

4,842.05

11.48%

535.27

37,329.73

88.52%

01.04.04

CONCRETO F'c=210 kg/cm2 e=0.20 m EN PAVIMENTO RIGIDO

m2
m2

5,000.00

81.28

406,400.00

552.18

44,881.19

11.04%

0.00%

552.18

44,881.19

11.04%

4,447.82

361,518.81

88.96%

01.04.05

kg

807.84

9.64

7,787.58

121.13

1,167.69

14.99%

0.00%

121.13

1,167.69

14.99%

686.71

6,619.89

85.01%

01.04.06

COLOCACION DE PASAJUNTA DE ACERO LISO 1/2"


CURADO DE CONCRETO CON ADITIVO

5,000.00

8.02

40,100.00

552.18

4,428.48

11.04%

0.00%

552.18

4,428.48

11.04%

4,447.82

35,671.52

88.96%

01.04.07

JUNTAS DE DILATACION EN PAVIMENTO e=1"

m2
m

1,630.30

23.25

37,904.48

1,630.30

37,904.48

100.00%

01.05

CONSTRUCCION DE CANALETAS

01.05.01

ENCOFRADO Y DESENCOFRADO

m2

332.28

69.74

23,173.21

332.28

23,173.21

100.00%

01.05.02

CONCRETO F'c=210 kg/cm2

m3

56.23

422.30

23,745.93

56.23

23,745.93

100.00%

01.06

46,919.14

CONSTRUCCION DE MURO DE CONTENCION

184,566.64

01.06.01

ENCOFRADO Y DESENCOFRADO DE CIMENTACION MURO DE CONTENCION

m2

73.60

72.62

5,344.83

73.60

5,344.83

100.00%

0.00

01.06.02

ENCOFRADO Y DESENCOFRADO CARAVISTA MURO DE CONTENCION

m2

522.80

85.64

44,772.59

392.80

33,639.39

75.13%

130.00

01.06.03

CONCRETO F'c=210 kg/cm2 PARA CIMENTACION DE MURO DE CONTENCION

422.30

55,777.38

132.08

55,777.38

100.00%

0.00

CONCRETO F'c=210 kg/cm2 PARA MURO DE CONTENCION

m3
m3

132.08

01.06.04

88.03

422.30

37,175.07

58.78

24,822.79

66.77%

29.25

01.06.05

ACERO F'Y=4200 kg/cm2 GRADO 60

kg

7,415.09

5.45

40,412.24

7,415.09

40,412.24

100.00%

0.00

01.06.06

JUNTAS DE DILATACION EN MURO DE CONTENCION E=1"

57.00

17.94

1,022.58

42.00

753.48

73.68%

15.00

01.06.07

TUBERIA DE DRENAJE INSTALACION CADA 10.00 M

5.25

11.80

61.95

3.90

46.02

74.29%

1.35

501.01

370.75

02
02.01
02.01.01
02.02

CONSTRUCCION DE VEREDAS

0.00%

73.60

5,344.83

100.00%

24.87%

522.80

44,772.59

100.00%

0.00%

0.00%

132.08

55,777.38

100.00%

33.23%

88.03

37,175.07

100.00%

0.00%

0.00%

7,415.09

40,412.24

100.00%

269.10

26.32%

57.00

1,022.58

100.00%

0.00%

15.93

25.71%

5.25

61.95

100.00%

0.00%

30.92%

0.00%

501.01

370.75

30.92%

1,119.34

828.31

69.08%

12,352.28

177,562.00

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

11,133.20

1,199.06
m2

1,620.35

0.74

MOVIMIENTO DE TIERRAS

1,199.06
10,276.85

02.02.01

CORTE EN TERRENO NATURAL PARA VEREDAS e=10 CM

2.73

4,423.56

501.01

1,367.76

30.92%

0.00%

501.01

1,367.76

30.92%

1,119.34

3,055.80

69.08%

NIVELACION Y COMPACTACION FINAL DE LA SUB RASANTE DE VEREDAS

m2
m2

1,620.35

02.02.02

1,620.35

2.69

4,358.74

501.01

1,347.72

30.92%

0.00%

501.01

1,347.72

30.92%

1,119.34

3,011.02

69.08%

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE CON ESPONJAMIENTO

m3

203.34

7.35

1,494.55

62.63

460.33

30.80%

0.00%

62.63

460.33

30.80%

140.71

1,034.22

69.20%

149719031.xlsx.ms_office

Pgina 6

VALORIZACIN DE OBRA N 01

CONSORCIO LIBERTAD

FORMULA 01 : GENERAL
OBRA
PROPIETARIO
PROCESO
MODALIDAD
RESIDENTE
SUPERVISOR
PERIODO

: "CONSTRUCCION DE PAVIMENTO RIGIDO Y VEREDAS AVENIDA 28 DE OCTUBRE, JR. PROGRESO, JR. BOLIVAR Y JR. LIMA, EN EL DISTRITO DE CASCAS, PROVINCIA DE GRAN CHIMU - LA LIBERTAD
: MUNICIPALIDAD PROVINCIAL DE GRAN CHIMU
: ADP N 005-2012-MPGCH-PRIMERA CONVOCATORIA
INICIO DE OBRA
1/23/2013
: POR CONTRATA A SUMA ALZADA
:
TERMINO DE OBRA
5/22/2013
: ING. WILSON PORTALES ARIAS
:
PLAZO DE EJEC.
: EMPRESA COINSEC SAUCEDA EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA.
:
120 DIAS CALENDARIO
TOTAL PRESUP.
S/. 1,557,958.21
: 23/01/2013 AL 28/02/2013
:
COSTO DIRECTO TOTAL
S/. 1,148,090.06
:
PRESUPUESTO BASE
METRADO
PARCIAL

CODIGO
DESCRIPCION
PARTIDA
02.03

UNID.

CANT.

P.U.

CONCRETO SIMPLE

COSTO

UBICACIN:
LOCALIDAD
DISTRITO
PROVINCIA
REGION

VAL. ANTERIOR
METRADO

PARCIAL

: CASCAS
: CASCAS
: GRAN CHIMU
: LA LIBERTAD

VALORIZACION ACTUAL
%

METRADO

PARCIAL

VALORIZACION ACUM.
%

METRADO

PARCIAL

SALDO POR VALORIZAR


%

METRADO

PARCIAL

148,833.61

02.03.01

BASE DE HORMIGON PARA VEREDAS e=10 CM

m2

1,620.35

9.68

15,684.99

501.01

4,849.78

30.92%

0.00%

501.01

4,849.78

30.92%

1,119.34

10,835.21

69.08%

02.03.02

ENCOFRADO Y DESENCOFRADO PARA VEREDAS

m2

180.58

31.81

5,744.25

62.80

1,997.67

34.78%

0.00%

62.80

1,997.67

34.78%

117.78

3,746.58

65.22%

02.03.03

VEREDA DE CONCRETO F'c=140 kg/cm2 E= 10 cm INCLUYE ACABADO Y BRUADO

m2

1,620.35

68.11

110,362.04

501.01

34,123.79

30.92%

0.00%

501.01

34,123.79

30.92%

1,119.34

76,238.25

69.08%

02.03.04

CURADO DE CONCRETO CON ADITIVO

m2

1,620.35

8.02

12,995.21

501.01

4,018.10

30.92%

0.00%

501.01

4,018.10

30.92%

1,119.34

8,977.11

69.08%

02.03.05

JUNTAS DE DILATACION CADA 4.00 m e= 1/2"

408.80

9.90

4,047.12

408.80

4,047.12

100.00%

02.04

VARIOS

0.00%

17,252.48

02.04.01

REPOSICION DE CAJA S DE AGUA

112.00

72.00

8,064.00

40.00

2,880.00

35.71%

0.00%

40.00

2,880.00

35.71%

72.00

5,184.00

64.29%

02.04.02

REPOSICION DE CAJAS DE DESAGUE

112.00

82.04

9,188.48

40.00

3,281.60

35.71%

0.00%

40.00

3,281.60

35.71%

72.00

5,906.88

64.29%

1,148,090.06

29.68%

COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDADES 5%

TOTAL VALORIZADO

2.55%

29,299.34

32.23%

370,072.47

67.77%

778,017.59

10.00%

114,809.01

34,077.31

2,929.93

37,007.25

5.00%

57,404.50

17,038.66

1,464.97

18,503.62

38,900.87

1,320,303.57

391,889.11

33,694.24

425,583.34

894,720.23

SUB TOTAL PRESUPUESTO


IMPUESTOS I.G.V. 18%

340,773.14

18%

237,654.64
1,557,958.21

149719031.xlsx.ms_office

77,801.77

6,064.96

76,605.00

161,049.64

39,759.20

502,188.34

1,055,769.87

Pgina 7

CODIGO
DESCRIPCION
PARTIDA
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.04.05
01.04.06
01.04.07
01.05
01.05.01
01.05.02
01.06
01.06.01
01.06.02
01.06.03
01.06.04
01.06.05
01.06.06
01.06.07
02
02.01
02.01.01
02.02
02.02.01
02.02.02
02.02.03
02.03
02.03.01
02.03.02
02.03.03
02.03.04
02.03.05
02.04
02.04.01
02.04.02

METRADO TOTAL
UNID.

CANT.

METRADO ACTUAL
METRADO

CONSTRUCCION DE PAVIMENTO RIGIDO


OBRAS PROVICIONALES
MOVILIZACION Y DESMOVILIZACION
gb
DE 1.00
EQUIPO Y MAQUINA 0.50
50.00%
DESVIO Y MANTENIMIENTO
gb DE TRANSITO
1.00
0.25
25.00%
CARTEL DE IDENTIFICACION
u DE LA OBRA1.00
DE 8.5 X 3.30 m
1.00
100.00%
LOCAL PARA DEPOSITO mes
Y/O GUARDIANIA4.00
1.00
25.00%
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO m2
5,000.00
1,433.86
28.68%
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO NATURAL
m3 A NIVEL2,243.82
DE SUB RASANTE, CON
713.05
EQUIPO
31.78%
RELLENO CON MATERIALm3
PROPIO
294.25
44.38
15.08%
EXCAVACION DE ZANJASm3
PARA CIMENTACION
132.08
132.08
100.00%
EXCAVACION DE ZANJASm3
PARA CANALETA
66.46
ELIMINACION DE MATERIAL
m3 EXCEDENTE
2,629.45
CON ESPONJAMIENTO
1,012.04
38.49%
PAVIMENTO RIGIDO
PREPARACION DE LA SUB
m2
RASANTE 5,000.00
1,433.86
28.68%
BASE DE AFIRMADO e=0.20
m2 m
5,000.00
1,433.86
28.68%
ENCOFRADO Y DESENCOFRADO
604.70
69.43
11.48%
m2
CONCRETO F'c=210 kg/cm2
m2 e=0.20 m EN
5,000.00
PAVIMENTO RIGIDO552.18
11.04%
kg DE ACERO807.84
121.13
14.99%
COLOCACION DE PASAJUNTA
LISO 1/2"
CURADO DE CONCRETO m2
CON ADITIVO 5,000.00
552.18
11.04%
JUNTAS DE DILATACION EN
m PAVIMENTO
1,630.30
e=1"
CONSTRUCCION DE CANALETAS
ENCOFRADO Y DESENCOFRADO
m2
332.28
CONCRETO F'c=210 kg/cm2
56.23
m3
CONSTRUCCION DE MURO DE CONTENCION
ENCOFRADO Y DESENCOFRADO
m2
DE CIMENTACION
73.60
MURO DE CONTENCION
73.60
100.00%
ENCOFRADO Y DESENCOFRADO
m2
CARAVISTA
522.80
MURO DE CONTENCION
392.80
75.13%
CONCRETO F'c=210 kg/cm2
132.08 DE MURO DE
132.08
CONTENCION100.00%
m3 PARA CIMENTACION
CONCRETO F'c=210 kg/cm2
m3 PARA MURO
88.03
DE CONTENCION 58.78
66.77%
ACERO F'Y=4200 kg/cm2kgGRADO 60 7,415.09
7,415.09
100.00%
JUNTAS DE DILATACION EN
m MURO DE CONTENCION
57.00
E=1"
42.00
73.68%
TUBERIA DE DRENAJE INSTALACION
m
CADA
5.25
10.00 M
3.90
74.29%
CONSTRUCCION DE VEREDAS
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO m2
1,620.35
501.01
30.92%
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO NATURAL
1,620.35e=10 CM
501.01
30.92%
m2 PARA VEREDAS
NIVELACION Y COMPACTACION
m2
FINAL 1,620.35
DE LA SUB RASANTE DE
501.01
VEREDAS
30.92%
ELIMINACION DE MATERIAL
CON ESPONJAMIENTO
62.63
30.80%
m3 EXCEDENTE203.34
CONCRETO SIMPLE
BASE DE HORMIGON PARA
m2 VEREDAS e=10
1,620.35
CM
501.01
30.92%
ENCOFRADO Y DESENCOFRADO
m2
PARA VEREDAS
180.58
62.80
34.78%
VEREDA DE CONCRETO m2
F'c=140 kg/cm2
1,620.35
E= 10 cm INCLUYE ACABADO
501.01 Y BRUADO
30.92%
CURADO DE CONCRETO m2
CON ADITIVO 1,620.35
501.01
30.92%
JUNTAS DE DILATACION CADA
m
4.00 m e=
408.80
1/2"
VARIOS
REPOSICION DE CAJA S DE
U AGUA
112.00
40.00
35.71%
REPOSICION DE CAJAS DEUDESAGUE 112.00
40.00
35.71%
29.68%

METRADO ACUMULADO
METRADO

0.50
0.25
1.00
1.00
1,433.86
713.05
44.38
132.08
1,012.04
1,433.86
1,433.86
69.43
552.18
121.13
552.18
73.60
392.80
132.08
58.78
7,415.09
42.00
3.90

501.01
501.01
501.01
62.63
501.01
62.80
501.01
501.01
40.00
40.00
29.68%

10.00%
5.00%
18%

METRADO ACUMULADO

SALDO POR VALORIZAR

METRADO

PARCIAL

64.29% TRUE
64.29% TRUE

8,336.00
1,860.43
2,458.90
1,178.44
3,700.00
19,655.86
3,113.17
10,178.08
5,221.10
19,326.46
16,900.00
112,750.00
42,171.78
406,400.00
7,787.58
40,100.00
37,904.48
23,173.21
23,745.93
5,344.83
44,772.59
55,777.38
37,175.07
40,412.24
1,022.58
61.95
1,199.06
4,423.56
4,358.74
1,494.55
15,684.99
5,744.25
110,362.04
12,995.21
4,047.12
8,064.00
9,188.48

TRUE

#########

50.00%
25.00%
100.00%
25.00%

0.50
0.75
3.00

4,168.00
1,395.32
883.83

50.00%
75.00%
75.00%

28.68%

3,566.14

2,638.94

71.32% TRUE

31.78%
15.08%
100.00%
38.49%

1,530.77
249.87
66.46
1,617.41

13,409.54
2,643.63
5,221.10
11,887.97

68.22%
84.92%
100.00%
61.51%

TRUE

28.68%
28.68%
11.48%
11.04%
14.99%
11.04%
-

3,566.14
3,566.14
535.27
4,447.82
686.71
4,447.82
1,630.30

12,053.55
80,416.46
37,329.73
361,518.81
6,619.89
35,671.52
37,904.48

71.32%
71.32%
88.52%
88.96%
85.01%
88.96%
100.00%

TRUE

332.28
56.23

23,173.21
23,745.93

100.00%
75.13%
100.00%
66.77%
100.00%
73.68%
74.29%

130.00
29.25
15.00
1.35

11,133.20
12,352.28
269.10
15.93

30.92%

1,119.34

828.31

69.08% TRUE

30.92%
30.92%
30.80%

1,119.34
1,119.34
140.71

3,055.80
3,011.02
1,034.22

69.08% TRUE
69.08% TRUE
69.20% TRUE

30.92%
34.78%
30.92%
30.92%
-

1,119.34
117.78
1,119.34
1,119.34
408.80

10,835.21
3,746.58
76,238.25
8,977.11
4,047.12

35.71%
35.71%

72.00
72.00
70.32%

5,184.00
5,906.88
807,316.92

TRUE
TRUE
TRUE
TRUE

TRUE
TRUE
TRUE
TRUE

TRUE
TRUE
TRUE
TRUE
TRUE
TRUE

100.00% TRUE
100.00% TRUE
24.87%
33.23%
26.32%
25.71%

69.08%
65.22%
69.08%
69.08%
100.00%

TRUE
TRUE
TRUE
TRUE
TRUE
TRUE
TRUE

TRUE
TRUE
TRUE
TRUE
TRUE

0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
100.00%

100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
100.00%
0.00%

80,731.70
40,365.84
928,414.46
0.00
928,414.46

TRUE
TRUE
TRUE
TRUE
TRUE

114,809.01
57,404.50
#########
#########