CALENDARIO DE ADQUISICION DE MATERIALES DE OBRA

OBRA:
UBICACIN:
FORMULA
PRESUPUESTO DE COSTO DIRECTO: S/.

AMPLIACIN Y MEJORAMIENTO DE LOS SERVICIOS EN EL PALACIO MUNICIPAL DE CHURUBAMBA DISTRITO DE CHURUBAMBA - HUNUCO - HUNUCO
CHURUBAMBA, CHURUBAMBA, HUNUCO
MODALIDAD: CONTRATO
SISTEMA DE DESAGUE
PLAZO DE EJEC.: 120 DIAS CALENDARIO
533,666.51

DESCRIPCION

UND

CANTIDAD

PRECIO

S/.

MANO DE OBRA

PRESUPUESTO
S/.

136,180.97

1 MES

28,588.22

2 MES

3 MES

59,037.71

4 MES

5,892.78

136,180.97

750.85

500.57

2,502.84

2,601.07

1,734.05

8,670.24

22,619.62

0.00

75,398.74

5,182.84

3,887.13

0.00

12,957.09

7,316.33

12,803.58

12,803.58

3,658.17

36,581.67

70.39

0.00

0.00

0.00

70.39

381,047.10

125,377.94

119,761.76

111,900.02

24,007.39

381,047.10

3,297.04

3,297.04

3,297.04

4.24

1,205.01

1,205.01

1,205.01

75.10

4.24

318.42

318.42

318.42

kg

182.09

4.24

772.08

772.08

772.08

CLAVOS PARA MADERA CON CABEZA DE 4"

kg

27.36

4.24

115.99

115.99

115.99

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

kg

14,306.13

3.30

47,210.22

47,210.22

47,210.22

ARENA FINA

m3

30.21

67.80

2,048.14

PIEDRA GRANDE DE 8"

m3

14.16

67.80

960.25

960.25

PIEDRA MEDIANA DE 6"

m3

0.71

67.80

47.85

47.85

ARENA GRUESA

m3

41.82

67.80

2,835.47

ARENA GRUESA PARA ASENTAR LADRILLO

m3

14.03

67.80

951.17

951.17

BALDOSA ACUSTICA INCLUIDO ACCESORIOS 30 X 30 cm X 8 mm

m2

528.57

42.37

22,395.38

11,197.69

CONECTOR TIPO AB COPPERWELD DE 5/8"

pza

1.00

15.50

15.50

15.50

15.50

CONDUCTOR DE Cu TW DE 2.5 MM2

1,203.38

1.02

1,227.45

1,227.45

1,227.45

CONDUCTOR DE Cu TW DE 4 MM2

837.08

1.55

1,297.48

1,297.48

1,297.48

CONDUCTOR DE COBRE DESNUDO TEMPLE DURO DE 10 MM2

20.00

3.50

70.00

70.00

70.00

INODORO TANQUE BAJO NORMAL BLANCO INCLUYE ACCESORIOS

12.00

466.20

5,594.40

5,594.40

5,594.40

LAVATORIO 23"X17" PARA GRIFERIA 4" BLANCO CON ACCESORIOS

12.00

105.93

1,271.16

1,271.16

1,271.16

PAPELERA CON EJE 15 X 15 cm BLANCA

12.00

23.50

282.00

282.00

282.00

OPERADOR DE EQUIPO LIVIANO

hh

222.47

11.25

2,502.84

500.57

750.85

CAPATAZ

hh

693.62

12.50

8,670.24

1,734.05

2,601.07

OPERARIO

hh

6,702.11

11.25

75,398.74

15,079.75

37,699.37

OFICIAL

hh

1,328.93

9.75

12,957.09

3,887.13

PEON

hh

4,877.56

7.50

36,581.67

OPERARIO TOPOGRAFO

hh

6.26

11.25

70.39

ALAMBRE NEGRO RECOCIDO # 16

kg

777.60

4.24

ALAMBRE NEGRO RECOCIDO # 8

kg

284.20

CLAVOS PARA MADERA CON CABEZA DE 2 1/2"

kg

CLAVOS PARA MADERA CON CABEZA DE 3"

MATERIALES

42,662.26

TOTAL

2,048.14

2,048.14
960.25
47.85

2,835.47

2,835.47
951.17
11,197.69

22,395.38

CALENDARIO DE ADQUISICION DE MATERIALES DE OBRA


OBRA:
UBICACIN:
FORMULA
PRESUPUESTO DE COSTO DIRECTO: S/.

AMPLIACIN Y MEJORAMIENTO DE LOS SERVICIOS EN EL PALACIO MUNICIPAL DE CHURUBAMBA DISTRITO DE CHURUBAMBA - HUNUCO - HUNUCO
CHURUBAMBA, CHURUBAMBA, HUNUCO
MODALIDAD: CONTRATO
SISTEMA DE DESAGUE
PLAZO DE EJEC.: 120 DIAS CALENDARIO
533,666.51

DESCRIPCION

UND

CANTIDAD

PRECIO

S/.

PRESUPUESTO
S/.

1 MES

2 MES

3 MES

4 MES

TOTAL

LLAVE PARA LAVATORIO CROMADA 1/2"

12.00

46.61

559.32

559.32

559.32

REGISTRO DE BRONCE DE 4"

12.00

12.72

152.64

152.64

152.64

SUMIDERO CROMADO DE 2"

10.00

8.48

84.80

84.80

84.80

TOMACORRIENTE BIPOLAR DOBLE CON TOMA A TIERRA DE BACKELITA


UND

50.00

10.50

525.00

525.00

525.00

TOMACORRIENTE BIPOLAR DOBLE BACKELITA

UND

26.00

8.50

221.00

221.00

221.00

INTERRUPTOR SIMPLE BIPOLAR BAKELITA

UND

36.00

7.50

270.00

270.00

270.00

INTERRUPTOR DOBLE BIPOLAR BAKELITA

UND

15.00

8.50

127.50

127.50

127.50

INTERRUPTOR TERMOMAGNETICO DE 2 X 15A X 240V TIPO DIN

UND

8.00

45.00

360.00

360.00

360.00

INTERRUPTOR TERMOMAGNETICO DE 2 X 20A X 240V TIPO DIN

UND

4.00

55.00

220.00

220.00

220.00

INTERRUPTOR TERMOMAGNETICO DE 2 X 60A X 240V TIPO DIN

UND

3.00

75.00

225.00

225.00

225.00

INTERRUPTOR TERMOMAGNETICO DE 3 X 20A X 240V

UND

8.00

65.00

520.00

520.00

520.00

CAJA RECTANGULAR GALVANIZADA LIVIANA DE 4" X 2 1/8"

21.00

2.20

46.20

46.20

46.20

CAJA OCTOGONAL GALVANIZADA LIVIANA 100 mm X 40 mm

UND

77.00

2.20

169.40

169.40

169.40

CAJA RECTANGULAR GALVANIZADA 100x50x50 MM., E=3 MM.

UND

127.00

2.20

279.40

279.40

PLACA DE SALIDA DE TELEVISION Y TELEFONO

1.00

7.80

7.80

7.80

7.80

PLACA DE SALIDA DE INTERNET

20.00

12.40

248.00

248.00

248.00

FLUORESCENTE CIRCULAR FORMALUX FC-1/32

12.00

45.00

540.00

540.00

540.00

FLUORESCENTE RECTO ISPE 2X40 W C/EQ + PANTALLA

35.00

75.00

2,625.00

2,625.00

2,625.00

FLUORESCENTE RECTO ISPE 1X40 W C/EQ + PANTALLA

30.00

65.00

1,950.00

1,950.00

1,950.00

INTERRUPTOR TERMOMAGNETICO 3x60 A., 240 V.

UND

3.00

65.00

195.00

195.00

195.00

INTERRUPTOR TERMOMAGNETICO 2x25 A., 240 V.

UND

3.00

65.00

195.00

195.00

195.00

INTERRUPTOR TERMOMAGNETICO 2x10 A., 240 V.

UND

6.00

65.00

390.00

390.00

390.00

TABLERO DE FG TRIFASICO DE 3 POLOS 800x600x200 MM.

UND

3.00

120.00

360.00

360.00

360.00

TABLERO DE FG TRIFASICO DE 15 POLOS 400x300x200 MM.

UND

4.00

154.00

616.00

616.00

LADRILLO DE ARCILLA PARA TECHO h=15 cm

2,243.40

2.12

4,756.01

LADRILLO KING KONG ARCILLA 18 HUECOS 9x13x23 cm. - 2.70 Kg.

UND

17,664.67

0.66

11,658.68

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

2,336.66

16.53

38,625.05

1.00

35.00

35.00

BUZON DE CONCRETO PREFABRICADO DE 0.40x0.40x0.60 M. INCLUYE UND


TAPA

279.40

4,756.01
11,658.68
19,312.53

11,587.52

616.00
4,756.01
11,658.68

7,725.01

38,625.05

35.00

35.00

CALENDARIO DE ADQUISICION DE MATERIALES DE OBRA


OBRA:
UBICACIN:
FORMULA
PRESUPUESTO DE COSTO DIRECTO: S/.

AMPLIACIN Y MEJORAMIENTO DE LOS SERVICIOS EN EL PALACIO MUNICIPAL DE CHURUBAMBA DISTRITO DE CHURUBAMBA - HUNUCO - HUNUCO
CHURUBAMBA, CHURUBAMBA, HUNUCO
MODALIDAD: CONTRATO
SISTEMA DE DESAGUE
PLAZO DE EJEC.: 120 DIAS CALENDARIO
533,666.51

DESCRIPCION

UND

CANTIDAD

PRECIO

S/.

CONTRAZOCALO DE PORCELANATO 10 X 20 cm

CERRADURA PUERTA PRINCIPAL

PRESUPUESTO
S/.

1 MES

2 MES

3 MES

4 MES

TOTAL

198.27

29.66

5,880.79

5,880.79

5,880.79

pza

3.00

59.32

177.96

177.96

177.96

CERRADURA DE 02 GOLPES TIPO FORTE

UND

13.00

50.84

660.92

660.92

660.92

BISAGRA CAPUCHINA PLOMA 3" X 3"

par

44.00

7.62

335.28

335.28

335.28

CERRADEURA DE PERILLA EPOLEG BAO

8.00

29.66

237.28

237.28

CINTA AISLANTE

UND

7.60

2.50

19.00

19.00

19.00

VARILLA DE COBRE PURO COPERWELD 5/8" X 2.40 m

pza

1.00

125.00

125.00

125.00

125.00

OCRE

kg

0.96

12.70

12.20

12.20

12.20

CARBON VEGETAL GRANULADO (SACO x 60 KG.)

UND

2.00

45.00

90.00

FRAGUA TIPO CELIMA

kg

51.72

5.92

306.19

PISO CERAMICO PORCELANATO DE 40 x 40 cm.

m2

586.14

46.61

27,319.78

VIDRIO SISTEMA NOVA 6mm

m2

13.02

75.00

976.50

PEGAMENTO PARA PVC AGUA FORDUIT

gal

1.38

76.27

105.63

105.63

PEGAMENTO PARA PVC 1/4 gl

0.96

21.18

20.40

20.40

PEGAMENTO PARA CERAMICAS

39.25

13.60

533.86

533.86

PEGAMENTO PARA PISO PORCELANATO

bls

145.15

18.65

2,707.11

1,353.56

1,353.56

2,707.11

CINTA TEFLON

pza

1.00

1.50

1.50

1.50

1.50

CINTA TEFLON

UND

1.68

1.50

2.52

2.52

FLETE TERRESTRE DESDE HUANUCO A CHURUBAMBA

glb

1.00

12,188.00

12,188.00

HORMIGON (PUESTO EN OBRA)

m3

17.40

67.80

1,179.63

HORMIGON DE RIO SELECCIONADO

m3

213.24

67.80

14,457.95

TEKNOPOR DE 3/4"

m2

61.38

5.50

337.61

337.61

337.61

LIJA # 80 (PLIEGO)

85.29

1.80

153.52

153.52

153.52

AGUA

m3

158.42

0.50

79.21

SAL GRANULADA (SACO x 50 KG.)

UND

1.00

25.00

25.00

CASETA DE GUARDIANIA

glb

1.00

750.00

750.00

750.00

750.00

INSTALACION PROVISIONAL DE AGUA Y DESAGUE

glb

1.00

250.00

250.00

250.00

250.00

INSTALACION PROVISIONAL DE ENERGIA ELECTRICA

glb

1.00

300.00

300.00

300.00

300.00

237.28

90.00
306.19
13,659.89

13,659.89

27,319.78
976.50

6,094.00

2,437.60

976.50
105.63
20.40
533.86

1,828.20

2.52
1,828.20

1,179.63
7,228.98

90.00
306.19

12,188.00
1,179.63

7,228.98

14,457.95

79.21

79.21
25.00

25.00

CALENDARIO DE ADQUISICION DE MATERIALES DE OBRA


OBRA:
UBICACIN:
FORMULA
PRESUPUESTO DE COSTO DIRECTO: S/.

AMPLIACIN Y MEJORAMIENTO DE LOS SERVICIOS EN EL PALACIO MUNICIPAL DE CHURUBAMBA DISTRITO DE CHURUBAMBA - HUNUCO - HUNUCO
CHURUBAMBA, CHURUBAMBA, HUNUCO
MODALIDAD: CONTRATO
SISTEMA DE DESAGUE
PLAZO DE EJEC.: 120 DIAS CALENDARIO
533,666.51

DESCRIPCION

UND

CANTIDAD

PRECIO

S/.

PRESUPUESTO
S/.

1 MES

2 MES

3 MES

4 MES

TOTAL

ALMACEN TECHADO

glb

1.00

2,500.00

2,000.00

2,000.00

OFICINA

glb

1.00

1,500.00

1,000.00

1,000.00

TANQUE ELEVADO ETERNIT 1.0 m3

pza

1.00

680.00

680.00

680.00

680.00

CAJA DE DESAGUE DE 12"X24"

2.00

29.66

59.32

59.32

59.32

CERCO DE MADERA Y TRIPLAY

glb

1.00

500.00

501.00

PISO CERAMICO DE 30 x 30 cm. ANTIDESLIZANTE

m2

164.89

27.12

4,471.93

MADERA TORNILLO

p2

8,290.36

3.40

26,529.15

REGLA DE MADERA TORNILLO CEPILLADA

p2

68.54

4.50

308.43

PUERTA DE MADERA TORNILLO TABLERO REBAJADO SEGUN DISEO m2

20.55

280.00

6,164.55

2,000.00
1,000.00

501.00

501.00
4,471.93

13,264.58

4,471.93

13,264.58

26,529.15

308.43

308.43
6,164.55

6,164.55

MADERA EUCALIPTO ROLLIZO 3" X 3 m

pza

507.80

7.50

3,300.70

3,300.70

MADERA PARA DURMIENTES

p2

571.28

3.40

1,828.08

1,828.08

ANDAMIO DE MADERA

p2

34.94

3.40

111.81

111.81

MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO

p2

32.98

3.40

105.55

105.55

TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 12" X 24"

pza

2.00

33.90

67.80

67.80

PINTURA ESMALTE SINTETICO

gal

0.94

45.00

42.23

42.23

42.23

PINTURA LATEX SUPERMATE

gal

34.22

25.42

869.92

869.92

869.92

PINTURA BASE IMPRIMANTE

kg

111.82

4.50

503.19

503.19

503.19

PINTURA SELLADOR PARA MUROS

gal

34.15

18.48

631.11

631.11

631.11

PUERTA METALICA CON SEGURIDAD SEGUN DISEO

m2

10.08

152.55

1,537.73

1,537.73

1,537.73

PUERTA PRINCIPAL CON MARCOS DE TUBO ACERO Y VIDRIO TEMPLADO


m2 SEGUN DISEO13.91
I/INSTALACION
635.60

9,669.19

9,669.19

9,669.19

3,300.70
1,828.08
111.81
105.55
67.80

CRUCETAS DE 3 mm.

2,512.40

0.05

125.62

UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1/2"

20.00

5.93

118.60

118.60

NIPLE DE FIERRO GALVANIZADO DE 1/2" X 1 1/2"

20.00

2.50

50.00

50.00

50.00

BARANDA DE TUBO DE FIERRO NEGRO DE 2"

36.91

85.00

3,137.14

3,137.14

3,137.14

TUBERIA PVC SAP PRESION C-10 C/R. 3/4" X 5m

23.20

12.00

278.40

278.40

278.40

TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 1/2"

52.09

9.50

494.88

494.88

494.88

TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 3/4"

27.60

12.00

331.20

331.20

331.20

REDUCCION PVC SAP PARA AGUA A PRESION DE 3/4" A 1/2"

UND

16.00

2.20

35.20

35.20

35.20

125.62

125.62
118.60

CALENDARIO DE ADQUISICION DE MATERIALES DE OBRA


OBRA:
UBICACIN:
FORMULA
PRESUPUESTO DE COSTO DIRECTO: S/.

AMPLIACIN Y MEJORAMIENTO DE LOS SERVICIOS EN EL PALACIO MUNICIPAL DE CHURUBAMBA DISTRITO DE CHURUBAMBA - HUNUCO - HUNUCO
CHURUBAMBA, CHURUBAMBA, HUNUCO
MODALIDAD: CONTRATO
SISTEMA DE DESAGUE
PLAZO DE EJEC.: 120 DIAS CALENDARIO
533,666.51

DESCRIPCION

UND

CANTIDAD

PRECIO

S/.

PRESUPUESTO
S/.

1 MES

2 MES

3 MES

4 MES

TOTAL

CODO PVC SAP PARA AGUA CON ROSCA DE 3/4" X 90

83.04

1.50

124.56

124.56

124.56

CODO PVC SAP PARA AGUA A PRESION DE 1/2"x90

UND

36.00

1.20

43.20

43.20

43.20

TEE PVC SAP PARA AGUA A PRESION DE 1/2"

UND

20.00

1.50

30.00

30.00

30.00

TUBERIA PVC SAL PARA DESAGUE DE 2"

18.42

3.85

70.90

70.90

70.90

TUBERIA PVC SAL PARA DESAGUE DE 4"

49.21

7.35

361.68

361.68

361.68

CODO PVC SAL DE 2" X 90

22.00

3.20

70.40

70.40

70.40

CODO PVC SAL DE 4" X 90

36.00

4.80

172.80

172.80

172.80

RAMAL TEE SIMPLE PVC SAL DE 2"

12.00

4.50

54.00

54.00

54.00

TEE SANITARIA SIMPLE PVC SAL DE 4"

60.00

7.50

450.00

450.00

450.00

TEE SANITARIA SIMPLE CON REDUCCION PVC SAL 4"A 2"

12.00

7.50

90.00

90.00

90.00

TUBERIA PVC SAL 2" X 3 m

pza

33.29

11.50

382.85

382.85

382.85

TUBERIA PVC SAL 4" X 3 m

pza

26.60

22.00

585.20

585.20

585.20

CODO PVC SAL 2" X 45

pza

27.30

3.20

87.36

87.36

87.36

YEE PVC SAL DE 2" X 2"

pza

6.00

4.50

27.00

27.00

27.00

YEE PVC SAL DE 4" X 2"

pza

10.00

7.50

75.00

75.00

75.00

YEE PVC SAL DE 4" X 4"

pza

4.20

7.50

31.52

31.52

31.52

TUBERIA PVC SEL PARA INSTALACIONES ELECTRICAS DE 5/8" X 3m u

186.20

3.50

651.70

651.70

651.70

TUBERIA PVC SEL PARA INSTALACIONES ELECTRICAS DE 3/4"

190.08

1.25

237.60

237.60

237.60

CURVA PVC SEL PARA INSTALACIONES ELECTRICAS 5/8"

1.00

0.50

0.50

0.50

0.50

CURVA PVC SEL PARA INSTALACIONES ELECTRICAS 3/4"

40.00

0.50

20.00

20.00

20.00

UNION SP PVC SEL P/INST. ELECT. DE 20 MM.

pza

408.00

0.50

204.00

204.00

204.00

VALVULA COMPUERTA DE BRONCE DE 1/2"

10.00

14.50

145.00

145.00

145.00

VIDRIO TEMPLADO MAS ACCESORIOS ARENADO DE E=10 mm INCLUIDO


m2INSTALACION 281.12

228.80

64,319.45

32,159.73

64,319.45

CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M

glb

1.00

750.00

750.00

750.00

750.00

SC DEMOLICION CONSTRUCCION EXISTENTE

glb

1.00

20,000.00

20,000.00

20,000.00

20,000.00

32,159.73

CALENDARIO DE ADQUISICION DE MATERIALES DE OBRA


OBRA:
UBICACIN:
FORMULA
PRESUPUESTO DE COSTO DIRECTO: S/.

AMPLIACIN Y MEJORAMIENTO DE LOS SERVICIOS EN EL PALACIO MUNICIPAL DE CHURUBAMBA DISTRITO DE CHURUBAMBA - HUNUCO - HUNUCO
CHURUBAMBA, CHURUBAMBA, HUNUCO
MODALIDAD: CONTRATO
SISTEMA DE DESAGUE
PLAZO DE EJEC.: 120 DIAS CALENDARIO
533,666.51

DESCRIPCION

UND

CANTIDAD

PRECIO

S/.

EQUIPOS

PRESUPUESTO
S/.

16,438.44

1 MES

10,071.90

2 MES

3,328.76

3 MES

3,037.78

4 MES

TOTAL

0.00

16,438.44

MEZCLADORA DE CONCRETO DE 9 -11p3

hm

7.62

25.42

193.76

CAMION VOLQUETE 4 X 2 210-280 HP 8 m3

hm

31.13

101.70

2,902.16

CIZALLA PARA CORTE DE FIERRO

hm

448.58

3.00

1,345.73

COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP

hm

4.59

21.20

97.22

CARGADOR SOBRE LLANTAS 125 HP 2.5 yd3

hm

7.77

169.50

1,316.30

1,316.30

RETROEXCAVADOR SOBRE LLANTAS 58 HP 1 yd3

hm

13.93

135.60

1,888.28

1,888.28

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

82.31

16.95

1,395.07

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3

hm

131.19

25.42

3,334.76

NIVEL TOPOGRAFICO CON TRIPODE

he

6.29

8.50

53.49

53.49

TEODOLITO

hm

6.23

12.50

77.90

77.90

77.90

HERRAMIENTAS MANUALES

glb

1.00

3,833.77

3,833.77

3,833.77

3,833.77

193.76

193.76

2,902.16

2,902.16
672.87

672.87

1,345.73

97.22

97.22
1,316.30
1,888.28

697.54

697.54

1,395.07

1,667.38

1,667.38

3,334.76
53.49

0.00
TOTAL

533,666.51

164,038.05

182,128.23

157,600.06

29,900.17

533,666.51