EXPEDIENTE TECNICO

PROYECTO
OBRA
FECHA

CENTRO DE SALUD
CENTRO DE SALUD

Item

Descripcion

Unid

Metrado

Precio
Unitario

Parcial

ESTRUCTURAS
01

OBRAS PROVISIONALES

01.02

ALMACEN, OFICINA Y CASETA DE GUARDIANIA

GLB

01.04

CARTEL DE OBRA 2.40 x 3.60

PZA

01.06

CERCO PROVISIONAL DE ESTERAS

01.08
01.09
02
02.02

AGUA PARA LA CONSTRUCCION

GLB

ELECTRICIDAD PARA LA CONSTRUCCION

GLB

DEMOLICION DE ALBAILERIA

M2

DEMOLICION DE ELEMENTOS ESTRUCTURALES

M3

02.02.06

DEMOLICION ESCALERA DE CONCRETO

M3

02.02.08

DEMOLICION DE PISO / LOSA DE CONCRETO

M3

02.02.10

DEMOLICION DE COLUMNAS Y VIGUETAS DE AMARRE

M3

02.02.12

PICADO DE ESTRCUTURAS EXISTENTE

M3

02.02.14

ELIMINACION DE DESMONTE

M3

TRATAMIENTO C/EPOXICO P/PEGAR CONC VIEJO CON CONCRETO NUEVO

M2

02.04.04

RESANE CON GROUT Y PLASTIFICANTE

M3

02.04.06

TRATAMIENTO C/EPOXICO P/ANCLAJE DE ACERO

M2

LIMPIEZA DE TERRENO

02.06.04

TRAZO Y REPLANTEO PRELIMINAR

02.06.05

TRANSPORTE VERTICAL DE MATERIALES

M2
M2
GLB

NIVELACION DE TERRENO Y APISONADO C/20cm

M2

03.04

EXCAVACION ZANJAS

M3

03.06

RELLENO COMPACTADO C/EQUIPO MAT/PROPIO

M3

ELIMINACION MATERIAL EXCEDENTE ACARREADO

M3

CIMIENTO CORRIDO 1:10+30% P.G.

M3

04.04

SOLADO PARA ZAPATAS e=4", 1:12 CEM/HORM

M2

SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M.

M3

SOBREC. REF. ENCOFRADO Y DESENCOFRADO

M2

04.08
05
05.01
05.01.01
05.01.02
05.02

ZAPATAS, CONCRETO F'C=210 KG/CM2

M3

ZAPATAS, ACERO fy = 4200 kg/cm2

KG

COLUMNAS, CONCRETO 175 KG/CM2

M3

COLUMNAS, CONCRETO 210 KG/CM2

M3

COLUMNAS, ENCOFRADO Y DESENCOFRADO

M2

COLUMNAS, ACERO fy = 4200 kg/cm2

KG

VIGAS, CONCRETO F'C=175 KG/CM2

M3

05.04.02

VIGAS, CONCRETO F'C=210 KG/CM2

M3

05.04.04

VIGAS, ENCOFRADO Y DESENCOFRADO

M2

VIGAS, ACERO fy = 4200 kg/cm2

KG

LOSA ALIGERADA, CONCRETO F'C=210 KG/CM2

M3

05.06.04

LOSA ALIGERADA, ENCOFRADO Y DESENCOFRADO

M2

05.06.08
05.08

LOSA ALIGERADA, ACERO fy = 4200 kg/cm2

KG

LOSA ALIGERADA, LADR. HUECO 12x30x30

UND

LOSAS MACIZAS, CONCRETO F'C=210 KG/CM2

M3

05.08.04

LOSAS MACIZAS, ENCOFRADO Y DESENCOFRADO

M2

LOSAS MACIZAS, ACERO fy = 4200 kg/cm2

KG

05.10

TANQUES ELEVADOS, CONCRETO F'C=210 KG/CM2

M3

05.10.04

TANQUES ELEVADOS, ENCOFRADO Y DESENCOFRADO

M2

TANQUES ELEVADOS, ACERO fy = 4200 kg/cm2

KG

05.11

298.67
3.89

15.60
38.31
561.89
4,491.55

380.63
341.61
35.98
3.89

7.26
17.95
115.93
1,794.63

299.32
321.28
34.20
3.89

15.62
177.94
446.43
1,472.15

316.26
28.63
3.89
1.88

1.07
4.29
165.00

321.28
38.30
3.89

7.90
60.50
519.24

341.61
39.72
3.89

28.98
108.04
889.26

341.61
45.60
3.89

181.34
438.06

49.99
45.73
13.43
16.71
14.41
55.43
8.65
23.44

TANQUE ELEVADO

05.10.02
05.10.06

1.28
17.89

LOSA MACIZA

05.08.02
05.08.06

143.61
27.17
216.08
25.33

LOSA ALIGERADA

05.06.02
05.06.06

1.49
0.26
0.84
11.16

VIGAS

05.04.01

05.06

2.04
22.72
11.63
14.20

COLUMNAS

05.02.04

05.04.06

17.50
9.45
6.11
4.51

ZAPATAS

05.02.02

05.04

0.91
1.19
3,750.00

OBRAS DE CONCRETO ARMADO

05.02.01

05.02.06

17.50
17.50
1.00

OBRAS DE CONCRETO SIMPLE

04.02
04.06

29.23
745.59
169.25

MOVIMIENTO DE TIERRAS

03.02

04

81.14
3.90
20.12

TRABAJOS PRELIMINARES

02.06.02

03.08

9.26
33.81
181.70
26.73
194.10
135.28
28.05

VARIOS

02.04.02

03

96.32
0.98
1.77
1.47
1.85
3.00
26.19

DEMOLICIONES

02.02.04

02.06

1,485.44
661.08
11.09
400.00
500.00

TRABAJOS PRELIMINARES

02.02.02

02.04

1.00
1.00
120.00
1.00
1.00

ESCALERAS

05.11.01

ESCALERAS, CONCRETO F'C=210 KG/CM2

05.11.02

ESCALERAS, ENCOFRADO Y DESENCOFRADO

M2

05.11.03

ESCALERAS, ACERO fy = 4200 kg/cm2

KG

M3

ARQUITECTURA
09
09.01
09.02
10

MUROS Y TABIQUES DE ALBAILERIA


MURO DE LADRILLO KK CV SOGA, MEZCLA 1:5

M2

MURO DE LADRILLO KK SOGA, MEZCLA 1:5

M2

REVOQUES, ENLUCIDOS Y MOLDURAS

10.01

TARRAJEO PRIMARIO 1:5

M2

10.02

TARRAJEO EN EXTERIORES 1:5, E=1.5 CM

M2

10.03

TARRAJEO EN INTERIORES 1:5, E=1.5CM

M2

10.04

TARRAJEO CON BARITINA

M2

10.05

VESTIDURA DE DERRAMES EN VANOS

903.58
289.89
1,448.31
78.01
660.66

M2

842.01

11
11.01
12

CIELORRASOS
CIELORRASOS 1:5, E=1.5 CM
PISOS Y PAVIMENTOS

1,485.44
661.08
1,330.80
400.00
500.00
891.92
33.13
321.61
39.29
359.09
405.84
734.63
2,371.72
2,907.80
3,405.31
15.93
20.83
3,750.00
35.70
214.70
71.06
64.04
213.98
7.06
181.51
282.68
382.30
69.59
5,937.83
13,087.08
20,216.80
17,472.13
2,173.06
5,766.98
3,964.81
6,981.11
4,939.98
5,094.42
1,736.61
2,767.64
343.77
164.31
641.85
2,698.72
2,403.06
2,019.84
9,899.86
4,926.62
3,459.22
9,065.19
20,032.48
12,135.08
4,844.06
20,870.15
4,324.09
5,714.71
19,736.71
-

EXPEDIENTE TECNICO
PROYECTO
OBRA
FECHA

CENTRO DE SALUD
CENTRO DE SALUD

Item

Descripcion

Unid

12.01

CONTRAPISO DE 40 MM.

12.02

PISO (101,102,109) DE PORCELANATO ANTIDESLIZANTE 0.40x0.40m. COLOR CLARO M2

12.03

PISO (103,104) DE VINILICO 0.30x0.30m. E = 2.4mm. COLOR CLARO

M2

12.04

PISO (105) DE PORCELANATO LISO BRILLANTE 0.40x0.40m. COLOR OSCURO

M2

12.05

PISO (106) DE CERAMICO NACIONAL VITRIFICADO 0.30x0.30m.

M2

12.06

PISO (112,113) DE CERAMICO NACIONAL VITRIFICADO 0.30x0.30m.

M2

12.07

PISO (108) DE VINILICO FLEXIBLE NO CONDUCTIVO EN ROLLO e=2mm

M2

PISO (111,206) DE CEMENTO PULIDO Y BRUADO S/COLOREAR E=2"

M2

12.08
13

M2

CONTRAZOCALO SANITARIO DE GRANITO PULIDO h=0.10m.

13.02

CONTRAZOCALO DE MADERA CEDRO DE 4" RODON 1"

CONTRAZOCALO SANITARIO VINILICO CON COVE FORMER 2mm.

CONTRAZOCALO CEMENTO S/COLOREAR H = 10 CM PULIDO

13.04
14

20.57
75.87
44.08
75.87
56.97
60.12
36.43
28.99

243.69
311.92
46.50
13.80

76.56
10.17
23.93
7.65
95.71
89.41
36.43

ZOCALOS

14.01

ZOCALO CERAMICO NACIONAL VITRIFICADO C/LISTELO

M2

14.02

ZOCALO CERAMICO NACIONAL VITRIFICADO

M2

14.03

ZOCALO VINILICO FLEXIBLE E=2mm

M2

536.84
212.69
127.50

16

Precio
Unitario

1,277.07
225.64
318.97
49.49
93.53
154.38
49.06
402.10

CONTRAZOCALOS

13.01
13.03

Metrado

REVESTIMIENTO DE GRADAS
M2

101.20

32.00

18.01

P-2, P-13 PUERTA CONTRAPLACADA CON MIRILLA Y SOBRELUZ

M2

18.02

P-3 PUERTA CONTRAPLACADA CON PLANCHA METALICA Y SOBRELUZ

M2

18.03

P-4, P-05 PUERTA PARA RAYOS X

M2

18.04

P-7, P-14 PUERTA CONTRAPLACADA

M2

18.05

P-8, P-11 PUERTA CONTRAPLACADA C/SOBRELUZ

M2

18.06

P-9, P-10, P-12 PUERTA CONTRAPLACADA DE 2 HOJAS

M2

52.81
14.16
5.90
24.70
49.56
54.90

295.12
960.95
1,500.95
289.85
268.79
540.69

8.52
6.00

115.94
144.56

16.85
19.00
2.00

77.25
86.72
222.39

70.00
63.00

15.20
25.30

24.84
157.61

578.97
30.13

289.89
1,526.31
842.01
147.13

9.32
9.32
6.86
5.11

300.00
1.00

0.81
3,458.60

16.01
18

18.07
18.07.01
18.07.02
19

REVESTIMIENTO GRADAS C/MORTERO 1:4 X 2CM. +PULIDO 1:2 X 1CM.


CARPINTERIA DE MADERA

TABIQUES
TABIQUERIA DE MELANINA PARA BAOS
PUERTAS DE MELANINA

M
UND

CARPINTERIA METALICA Y HERRERIA

19.01

BARANDA METALICAS

19.02

CERCO METALICO

19.03

PUERTA METALICA

UND

20
20.01
20.02
21
21.01
21.02
22

CERRAJERIA
BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"

PZA

CHAPA C/SEGURO INTERIOR Y LLAVE EXTERIOR 1GOLP

UND

VIDRIOS CRISTALES Y SIMILARES


VIDRIO TEMPLADO

M2

VIDRIOS DOBLES NACIONALES

M2

PINTURA

22.01

PINTURA EN EXTERIORES

M2

22.02

PINTURA EN INTERIORES

M2

PINTURA EN CIELORRASOS

M2

PINTURA PARA MADERA

M2

22.03
22.04
23

VARIOS, LIMPIEZA, JARDINERIA

23.01

LIMPIEZA FINAL DE OBRA

23.02

TRANSPORTE VERTICAL DE MATERIALES

M2
GLB

INSTALACIONES SANITARIAS
20.00.00
20.01.00

APARATOS SANITARIOS Y ACCESORIOS


APARATOS SANITARIOS

20.01.01

INODORO BLANCO C/ACC Y FLUXOMETRO

pza

20.01.02

LAVATORIO DE LOSA BLANCA DE PRIMERA C/ACCESORIOS

PZA

URINARIO BLANCO C/FLUXOMETRO Y ACCESORIOS

PZA

LAVADERO DE UNA POZA DE ACERO INOXIDABLE

pza

20.01.03
20.01.04
20.02.00

DUCHA SIMPLE CON GRIFERIA

20.02.02

JABONERA DE LOSA BLANCA

pza

20.02.03

TOALLERA DE METAL CROMADO

und

20.02.04

PAPELERA DE LOZA BLANCA

und

20.02.05

GANCHOS PARA SSHH

und

20.02.06

BARRA PARA CORTINA

pza

20.02.07

BARRA PARA DISCAPACITADOS

pza

20.03.01
20.03.02
21.00.00
21.01.00

und

COLOCACION DE APARATOS SANITARIOS

UND

COLOCACION DE ACCESORIOS SANITARIOS

pza

56.00
87.00

79.05
15.01

37.00
1.00
79.00

131.74
114.14
70.38

116.25
98.10
12.90

20.39
17.76
16.04

60.35
60.35
53.05

17.05
30.86
17.43

SALIDAS DE DESAGUE
SALIDA DESAGUE PVC SAP 4"

pto

SALIDA DESAGUE PVC SAP 3"

pto

21.01.03

SALIDA DESAGUE PVC SAP 2"

pto

RED DE DISTRIBUCION DE DESAGUE

21.02.01

TUBERIA PVC SAL 4"

21.02.02

TUBERIA PVC SAL 3"

21.02.03

TUBERIA PVC SAL 2"

REDES COLECTORAS

21.03.01

EXCAVACION DE ZANJAS

21.03.02

RELLENO DE ZANJA

21.03.03

TUBERIA PVC SAL 6"

21.04.00

320.00
18.00
18.00
16.00
12.00
22.00
28.00

RED DE DESAGUE Y VENTILACION

21.01.02

21.03.00

13.00
13.00
13.00
20.00
13.00
13.00
2.00

INSTAL Y/O COLOCACION DE APARATOS Y ACCESORIOS

21.01.01

21.02.00

230.00
230.00
410.00
375.00

ACCESORIOS VARIOS

20.02.01

20.03.00

20.00
29.00
4.00
4.00

ADITAMENTOS VARIOS

Parcial

26,269.33
17,119.31
14,060.20
3,754.81
5,328.40
9,281.33
1,787.26
11,656.88
18,656.91
3,172.23
1,112.75
105.57
51,380.96
19,016.61
4,644.83
3,238.40
15,585.29
13,607.05
8,855.61
7,159.30
13,321.23
29,683.88
987.81
867.36
1,301.66
1,647.68
444.78
1,064.00
1,593.90
14,381.61
4,748.79
2,701.77
14,225.21
5,776.19
751.83
243.00
3,458.60
4,600.00
6,670.00
1,640.00
1,500.00
4,160.00
234.00
234.00
320.00
156.00
286.00
56.00
4,426.80
1,305.87
4,874.38
114.14
5,560.02
2,370.34
1,742.26
206.92
1,028.97
1,862.40
924.66
-

EXPEDIENTE TECNICO
PROYECTO
OBRA
FECHA

CENTRO DE SALUD
CENTRO DE SALUD

Item

Descripcion

Unid

3.00
8.00
4.00
3.00

173.92
184.26
241.61
208.24

62.40

14.85

PTO

29.00

80.79

2.00
24.30
4.00
1.00
5.00
15.95
5.60
36.47
101.23
20.20

78.07
72.69
28.54
28.75
43.86
19.56
17.34
11.55
10.70
10.03

27.80
27.80
27.80

17.05
30.86
10.70
140.97
112.89
97.04
88.84
79.54
130.81

pza

21.04.02

SUMIDERO DE BRONCE 3"

pza

21.04.03

SUMIDERO DE BRONCE 4"

pza

VALV. GLOBO DE 3"

21.05.00

CAMARAS DE INSPECCION

pza

21.05.01

CAJA DE REG.ALB.10"x20" C/TAPA CONCRETO

UND

21.05.02

CAJA DE REG.ALB.12"x24" C/TAPA CONCRETO

UND

CAJA DE REG.ALB.18"x24" C/TAPA CONCRETO

UND

CAJA DE REG.ALB.24"x24" C/TAPA CONCRETO

UND

21.05.03
21.05.04
21.06.00
21.06.01
22.00.00
22.01.00
22.01.01
22.02.00

SISTEMA DE VENTILACION
TUBERIA DE VENTILACION PVC 2" SAL
SISTEMA DE AGUA FRIA
SALIDAS DE AGUA FRIA
SALIDA AGUA FRIA TUBERIA PVC-SAP 1/2"
RED DE DISTRIBUCION

22.02.01

TUBERIA DE ACERO SCHEDULE - 40 - 1 1/2"

22.02.02

TUBERIA DE ACERO SCHEDULE - 40 - 1 1/4"

22.02.03

CODO DE ACERO SCHEDULE 90 x 1 1/2"

und

22.02.04

CODO DE ACERO SCHEDULE 90 x 1 1/4"

und

22.02.05

TEE DE ACERO SCHEDULE 1 1/4" x 1 1/4"

und

22.02.06

TUBERIA PVC CLASE 10 - 1 1/2"

22.02.07

TUBERIA PVC CLASE 10 - 1 1/4"

22.02.08

TUBERIA PVC CLASE 10 - 1"

22.02.09

TUBERIA PVC CLASE 10 - 3/4"

22.02.10

TUBERIA PVC CLASE 10 - 1/2"

22.03.00

m
m

REDES DE ALIMENTACION

22.03.01

EXCAVACION DE ZANJAS

22.03.02

RELLENO DE ZANJA

22.03.03

TUBERIA PVC CLASE 10 - 3/4"

22.04.00

LLAVES Y VALVULAS

22.04.01

VALVULA DE COMPUERTA 1 1/2"

UND

22.04.02

VALVULA DE COMPUERTA 1 1/4"

UND

22.04.03

VALVULA DE COMPUERTA 1"

UND

22.04.04

VALVULA DE COMPUERTA 3/4"

UND

22.04.05

VALVULA DE COMPUERTA 1/2"

UND

22.04.06

VALVULA CHECK 1/2"

UND

2.00
4.00
2.00
10.00
27.00
4.00

23.00.00
23.01.00

Precio
Unitario

18.83
23.48
26.65
141.41

SUMIDERO DE BRONCE 2"

21.04.04

Metrado

30.00
1.00
21.00
1.00

21.04.01

SISTEMA DE AGUA CALIENTE


SALIDAS DE AGUA CALIENTE
pto

26.00

74.57

23.02.01

TUBERIA H3 3/4"

23.02.02

TUBERIA H3 1/2"

45.40
68.50

18.89
14.63

6.00
24.00

88.84
79.54

147.70
13.00

19.72
37.48

glb

2.00
1.00
1.00
3.00
1.00

1,524.83
97.81
18.40
21.90
262.39

und

11.00

2,217.15

23.01.01
23.02.00

23.03.00

SALIDA AGUA CALIENTE TUB H3 1/2"


RED DE DISTRIBUCION DE AGUA CALIENTE

LLAVES Y VALVULAS

23.03.01

VALVULA DE COMPUERTA 3/4"

UND

23.03.02

VALVULA DE COMPUERTA 1/2"

UND

24.00.00
24.01.00

SISTEMA DE AGUA DE LLUVIA


RED DE RECOLECCION DE AGUAS PLUVIALES

24.01.01

TUBERIA PVC SAL 3"

24.01.02

SUMIDERO DE 3"

25.00.00
25.01.00

m
UND

VARIOS
ACCESORIOS CISTERNA Y TANQUE ELEVADO

25.01.01

ELECTROBOMBA POT. = 0.75 HP

und

25.01.02

VALVULA FLOTADORA 3/4"

UND

25.01.03

BOYA DE CONTROL DE NIVEL P/TANQUE ELEVADO

UND

25.01.04

CANASTILLA DE 1 1/2"

UND

25.01.05

PRUEBA HIDRAULICA Y DESINFECCION DE CISTERNA Y TANQUE ELEVADO

25.02.00
25.02.01

THERMAS
THERMA SOLAR 250 LTS INC. SUM - INST

INSTALACIONES ELECTRICAS
29.00.00

SALIDAS PARA INSTALACIONES ELECTRICAS

29.01.00

SALIDA PARA CENTROS DE LUZ

PTO

29.02.00

SALIDA DE PARED

PTO

29.03.00

SALIDA P/ TOMACORRIENTE BIPOLAR DOBLE C/TIERRA EMPOTRADO

PTO

29.04.00

SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES

PTO

29.05.00

SALIDA P/ TOMACORRIENTE FUERZA BIPOLAR DOBLE C/TIERRA EMPOTRADO

PTO

29.06.00

SALIDA DE INTERRUPTOR UNIPOLAR SIMPLE 10A P/EMPOTRAR

PTO

29.07.00

SALIDA DE INTERRUPTOR UNIPOLAR DOBLE 10A P/EMPOTRAR

PTO

29.08.00

SALIDA DE INTERRUPTOR CONMUITACION SIMPLE 10A P/EMPOTRAR

PTO

29.09.00
30.00.00

SALIDA DE INTERRUPTOR UNIPOLAR TRIPLE 10A P/EMPOTRAR

PTO

22.64
23.17
40.68
29.08
53.10
29.31
32.53
30.38
35.70

11.00
33.00

29.26
33.47

650.00
155.00
426.00
226.00
124.00
26.00
64.00

10.71
7.91
11.19
8.08
11.59
12.39
12.65

CAJAS DE PASO ELECTRICAS

30.01.00

CAJA DE FIERRO GALVANIZADO 100X100X80 MM. INC. TAPA

UND

30.02.00

CAJA DE FIERRO GALVANIZADO 150X150X100 MM. INC. TAPA

UND

31.00.00

144.00
7.00
124.00
26.00
1.00
61.00
25.00
14.00
3.00

TUBERIAS ELECTRICAS

31.01.00

INSTALACION TUBOS EMPOTRADA 3/4" PVC-SEL

31.02.00

INSTALACION CURVAS EMPOTRADA 3/4" PVC-SEL

31.03.00

INSTALACION TUBOS EMPOTRADA 3/4" PVC-SAP

31.04.00

INSTALACION CURVAS EMPOTRADA 3/4" PVC-SAP

31.05.00

INSTALACION TUBOS EMPOTRADA 1" PVC-SAP

31.06.00

INSTALACION CURVAS EMPOTRADA 1" PVC-SAP

31.07.00

INSTALACION TUBOS EMPOTRADA 1 1/2" PVC-SAP

M
PZA
M
PZA
M
PZA
M

Parcial

564.90
23.48
559.65
141.41
521.76
1,474.08
966.44
624.72
926.64
2,342.91
156.14
1,766.37
114.16
28.75
219.30
311.98
97.10
421.23
1,083.16
202.61
473.99
857.91
297.46
281.94
451.56
194.08
888.40
2,147.58
523.24
1,938.82
857.61
1,002.16
533.04
1,908.96
2,912.64
487.24
3,049.66
97.81
18.40
65.70
262.39
24,388.65
3,260.16
162.19
5,044.32
756.08
53.10
1,787.91
813.25
425.32
107.10
321.86
1,104.51
6,961.50
1,226.05
4,766.94
1,826.08
1,437.16
322.14
809.60

EXPEDIENTE TECNICO
PROYECTO
OBRA
FECHA

CENTRO DE SALUD
CENTRO DE SALUD

Item

Descripcion

31.08.00

INSTALACION CURVAS EMPOTRADA 1 1/2" PVC-SAP

31.09.00

INSTALACION TUBOS EMPOTRADA 3" PVC-SAP

31.10.00

INSTALACION CURVAS EMPOTRADA 3" PVC-SAP

31.11.00
32.00.00

INSTALACION TUBOS SUBTERRANEOS 4" CAV

Unid
PZA
M
PZA
M

INSTALACION CONDUCTOR ELECTRICO THW 2.5 MM2

32.02.00

INSTALACION CONDUCTOR ELECTRICO THW 4 MM2

32.03.00

INSTALACION CONDUCTOR ELECTRICO THW 6 MM2

32.04.00

INSTALACION CONDUCTOR ELECTRICO THW 10 MM2

32.05.00

INSTALACION CONDUCTOR ELECTRICO TW 2.5 MM2

32.06.00

INSTALACION CONDUCTOR ELECTRICO TW 4 MM2

32.07.00

INSTALACION CONDUCTOR ELECTRICO NYY 1X6 MM2

32.08.00

INSTALACION CONDUCTOR ELECTRICO NYY 1X10 MM2

32.09.00

INSTALACION CONDUCTOR ELECTRICO NYY 3-1X10 MM2

32.10.00

INSTALACION CONDUCTOR ELECTRICO NYY 3-1X16 MM2

32.11.00

INSTALACION CONDUCTOR ELECTRICO NYY 3-1X35 MM2

32.12.00

INSTALACION CONDUCTOR ELECTRICO NYY 3-1X120 MM2

TABLEROS DISTRIBUCION CAJA METALICA CON 12 POLOS

PZA

33.02.00

TABLEROS DISTRIBUCION CAJA METALICA CON 18 POLOS

PZA

33.03.00

TABLEROS DISTRIBUCION CAJA METALICA CON 26 POLOS

PZA

33.04.00

TABLEROS DISTRIBUCION CAJA METALICA CON 30 POLOS

PZA

33.05.00

TABLEROS DISTRIBUCION CAJA METALICA CON 48 POLOS

PZA

33.06.00

TABLEROS DISTRIBUCION CAJA METALICA CON 70 POLOS

PZA

33.07.00

TABLERO TRANFERENCIA AUTOMATICA

PZA

FLUORESCENTE RECTO 2 X 36 W INCLUYENDO EQUIPO Y REJILLA

PZA

34.02.00

FLUORESCENTE RECTO 2 X 36 W INCLUYENDO EQUIPO Y PANTALLA

PZA

34.03.00

FLUORESCENTE RECTO 1 X 36 W INCLUYENDO EQUIPO Y PANTALLA

PZA

34.04.00

EQUIPO DE ILUMINACION CIALITICA P/SALA DE CIRUGIA

PZA

34.05.00

EQUIPO DE ILUMINACION DE EMERGENCIA

PZA

34.06.00

EQUIPO DE ILUMINACION PARA EXTERIORES

PZA

34.07.00

EQUIPO DE ILUMINACION PARA INTERIORES ESTANDAR

PZA

34.09.00

EQUIPO DE ILUMINACION PARA EXTERIOR HERMETICO

35.00.00

1,280.00
870.00
10.00
100.00
435.00
35.00
45.00
55.00
105.00
15.00
29.00
60.00

1.90
2.49
3.01
3.88
1.82
2.46
5.63
7.26
15.51
19.53
26.62
47.22

1.00
4.00
2.00
1.00
1.00
1.00
1.00

628.93
773.33
618.91
886.87
1,099.15
7,013.13
11,991.98

61.00
66.00
9.00
2.00
26.00
2.00
6.00
4.00

192.56
144.66
104.33
10,599.28
224.37
333.37
24.23
44.06

5.00
3.00

800.65
614.88

186.76
1,122.42
175.32
1,305.20
2,432.00
2,166.30
30.10
388.00
791.70
86.10
253.35
399.30
1,628.55
292.95
771.98
2,833.20
628.93
3,093.32
1,237.82
886.87
1,099.15
7,013.13
11,991.98
11,746.16
9,547.56
938.97
21,198.56
5,833.62
666.74
145.38
176.24
4,003.25
1,844.64

1.00
1.00
1.00

132,021.80
5,502.60
150,258.00

132,021.80
5,502.60
150,258.00

ILUMINACION ELECTRICA

34.01.00

PZA

ELECTRICOS VARIOS

35.01.00

POZO A TIERRA P/PROTECCION ELECTRICA

UND

35.03.00

BUZON DE CONCRETO TENDIDO SUBTERRANEO

UND

OTRAS INSTALACIONES
01

OTRAS INSTALCIONES

01.01

INSTALACIONES DE OXIGENO Y VACIO (Segun Anexo N 01)

GLB

01.02

INSTALACIONES ELECTRICAS DE AMBIENTES EXISTENTES (Segun Anexo N 02)

GLB

01.04

INSTALACIONES DEL ASCENSOR (Segun Anexo N 04)

GLB

COSTO DIRECTO
GASTOS GENERALES
TOTAL PRESUPUESTO

Parcial

13.34
14.39
14.61
32.63

TABLEROS DE DISTRIBUCION ELECTRICA

33.01.00

34.00.00

Precio
Unitario

14.00
78.00
12.00
40.00

CONDUCTORES ELECTRICOS

32.01.00

33.00.00

Metrado

10.00%

1,083,909.55
108,390.95
1,192,300.50