CONSTRUCTION

S.N O.
1 2 3 4 5 6 7 8 9 10 11 12 13 0 MONTH 1st MONTH 1st 2nd 3rd 4th 5th 2nd MONTH 6th 7th 8th 9th 3rd MONTH 10th 11th 12th 13th 4th MONTH 14th 15th

DESCRIPTION
RELEASE OF LOI SITE MOBILIZATION & RECEPT OF DRAWING BOILER STEEL STRUCTURE ASSEMBLY & ERECTION BOILER STRUCTURE PLATFORM BOILER DRUM. PRESSURE PART 1st PASS ASSEMBLY & ERECTION PRESSURE PART 2nd PASS ASSEMBLY & ERECTION HYDROTEST (INTERNAL) HYDROTEST (3rd PRTY) CHEMICAL CLEANING APH MILL ROTARY EQUIPMENT (ID, FD, PA FAN)

QTY.

UNIT

14 15 16 17 18 19 20 21 22 23 24

DUCTING SOOTBLOWER & PIPING ROOF STRUCTURE/ SKIN CASING, DRUM HOUSE ENCLOSURE STEAM BLOWING ESP TG MAIN CONDENSER TG EQUIPMENTS TG PIPING CHP AHP

25 MANPOWER

100

200

250

350

400

NOTE:-

Also enclosing the micro schedule of Boiler Hydreo test in Sheet-II

GANNON DUNKERLEY & CO., LTD (MED) UCTION SCHEDULE (PRELIMINERY) OF BTG,ESP,MILL,CHP,AHP & MANPOWER CONSIDERING HYDRO T
5th MONTH 16th 17th 18th 19th 20th 21st 6th MONTH 22nd 23rd 24th 25th 7th MONTH 26th 27th 28th 29th 8th MONTH 30th 31th 32th 33th 9th MONTH 34th 35th 36th 37th

MONTH

450

500

700

750

750

SHEET-I

DRO TEST WITH IN 8 MONTHS


10th MONTH 38th 39th 40th 41th 11th MONTH 42th 43th 44th 45th 12th MONTH 46th 47th 48th 49th 13th MONTH 50th 51th 52th 53th 54th

14th MO

ALKALI FLUSHING HYDRO TEST

750

750

500

400

40

FOR GANNON DUNKERLEY & CO. LTD.


B.C.CHATTERJEE GENERAL MANAGER

ET-I

4th MONTH 55th 56th

400

D.

S.N O.
1 2 3 4 5 6 7 8 9 10 11

0 MONTH

3rd MONTH 3rd 14th 15th 16th 17th

4th MONTH 18th 19th 20th 21st

5th MONTH 22nd 23rd 24th 25th

6th MONTH 26th 27th 28th

DESCRIPTION
Left Side W.W With Outlet Header Erection Right Side W.W With Outlet Header Erection Front Side W.W With Outlet Header Erection Screen Tube With Header Erection Rear Water Wall RH Finishing Header. RH Finishing Coil. RH Platen Header. RH Platen Coil. Burnner With Corner Panel. All Hangers.

QTY.

UNIT

1st

2nd

12

SH Platen Header Inlet&Outlet.

13

SH Platen Coil.

14

Rear Arch Buckstay.

15

Extended W.W With Header Left & Right.

16

Rear Arch Panel.

17

Rear Buckstay.

18

Front S Panel.

19 20 21 22 23

Right S Panel. Left Side Buckstay. Right Side Buckstay. Front Side Buckstay. Down Comer.

24

Supply Tube (Down Comer).

25

Riser Tube.

26

Radiant Roof Front.

27 28 29 30 31 32 33 34 35 36 37 38

Radiant Roof Rear. Divisional Header Inlet and Outlet. Divisional Panel. Steem Cool Spacer. Drain and Vent. Fin Welding. Corner Connection Buckstay. SH Finishing Inlet Header. SH Finishing Outlet Header. SH Finishing Outlet Coil. Radient.Roof Outlet Header. Rear Back Pass Wall.

Page 6 of 12

39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

Eco Hanging Header. LTSH Outlet Header. Eco Inlet Header. B.P Front Wall With Buckstay. Vertical LTSH. Hanger Tube Suspension. Back Pass Left Wall. Back Pass Right Wall. LTSH Coil. ECO Coil. Main Feed Water Tube Erection Upto Valve (Including Valve Erection). Intermediate header. ECO Outlet Header. ECO Hanger Tube. ECO Inlet Header Loose Tube. Temporary Piping For Hydro Test. Hydro Test (Internal). Hydro Test (Third Party).

FOR

Page 7 of 12

SHEET-II

7th MONTH 29th 30th 31th 32th 33th

8th MONTH 34th 35th 36th

TOTAL

Page 8 of 12

FOR GANNON DUNKERLEY & CO. LTD.


B.C.CHATTERJEE GENERAL MANAGER

Page 9 of 12

CO
S.N O. 1 2 3 4 5 6 7 8 9 HYDRA TRAILOR CRANE- 75MT CRANE - 50MT CRANE - 18MT WELDING RECTIFIER WELDING GENERATOR WINCH 2MT WINCH 3MT 0 MONTH DESCRIPTION QTY. UNIT 1st MONTH 2nd MONTH 3rd MONTH 4th MONTH

5 4 5 1 2 200 10 4 6 8 30 50 100 100 50 1 1 1

2 2 1 1 30 20 20 -

2 2 1 1 30 2 2 2 10 30 30 10 -

4 3 2 1 1 50 5 2 2 4 20 40 40 20 1

5 4 2 1 2 80 5 2 3 6 10 30 50 50 30 1

5 4 4 1 2 120 10 4 4 6 30 50 70 70 40 1

10 WINCH 5MT 11 CHAIN PULLY BLOCK 1MT 12 CHAIN PULLY BLOCK 2MT

13 CHAIN PULLY BLOCK 3MT

14 CHAIN PULLY BLOCK 5MT 15 CHAIN PULLY BLOCK 10MT 16 HYDRO TEST PUMP 17 FEED PUMP 18 COMPRESSOR 19 GRINDING MACHINE 20 LIFTING ACCESSROIES 21 SMALL TOOLS 22 THIRIDO LIGHT

GANNON DUNKERLEY & CO., LTD (MED) CONSTRUCTION SCHEDULE (PRELIMINERY)Unit-III EQUIPMENT DEPLOYMENT SCHEDULE
5th MONTH 6th MONTH 7th MONTH 8th MONTH 9th MONTH

ONTH

10th MON

5 4 5 1 2 180 10 4 6 8 30 50 100 100 50 1

5 4 5 1 2 200 10 4 6 8 30 50 100 100 50 1

5 4 5 1 2 200 10 4 6 8 30 50 100 100 50 1 1 1

5 4 5 1 2 200 10 4 6 8 30 50 100 100 50 1 1 1


AS PER REQUIREMENRT AS PER REQUIREMENRT AS PER REQUIREMENRT

5 4 5 1 2 200 10 4 6 8 30 50 100 100 50 1 1 1

5 4 3 1 2 200 10 4 6 8 30 50 100 100 50 1 1 1

20

SHEET-III

10th MONTH

11th MONTH

12th MONTH

13th MONTH

14th MONTH

5 4 3 1 2 200 10 4 6 8 30 50 100 100 50 1 1 1

5 4 3 1 200 10 4 6 8 30 50 100 100 50 1 1 1

5 4 3 1 200 10 4 6 8 30 50 100 100 50 1 1 1

5 4 2 150 10 4 6 8 20 30 60 50 50 -

2 2 1 100 -

FOR GANNON DUNKERLEY & CO. LTD.


B.C.CHATTERJEE GENERAL MANAGER