Capitulo I

Definicin de Campos de Accin

Planeamiento de Minado
Henry Braes

Campos de Accin
Finantial Optimization
Capital and operational cost
Revenue
Cash Flow Statement
Rate of return

Refined Ore Reserves

Ore Reserves Analysis

Cutoff
C t ff grade
d
Marginal analysis
Design alternatives

Break even Analisis


Drill Hole evaluation
Pit Design
Marginal analisis

Circular
Analysis

Equipment and Facilities

Production Scheduling

Capital
Equipment selection
Operating cost
Capital depreciation
Selective mining

Preproduction cost
Working room
Sequencing
Reclamation
Operating schedule
Finantial
Constranints

Campos de Accin
Informacin bsica
Diseo Mina
Parmetros geomtricos: Forma del yacimiento,
Geotecnia
Parmetros econmicos: Precio, modelo geometalrgico,
g , refinacin
Estimacin de Reservas

Planificacin
Mineral expuesto
Optimizacin CutOff
Botaderos,
Botaderos pila lixiviacin y/o relavera
.

Campos de Accin
Seleccin de equipos
Tecnologa
Distancia de acarreo

Estimacin de Costos y Capital


Estudio Impacto ambiental
Plan de Cierre
Benchmarking

Evaluacin
Etapas de madurez
Tamao Optimo
Riesgo

Campos de Accin
Reservas
Tipo de yacimiento
Tipo de metal (es)

Capital
Pequeo inversionista
Gran inversionista
Bolsa de valores

Campos de Accin
Tamao de Operacin
Minero artesanal, < 25 tpd
Pequeo minero,
minero < 250 tpd
Pequea minera, 250-1000 tpd
Mediana minera
minera, 1000
1000-5000
5000
Gran Minera > 5,000 tph

Nuevos Conceptos
Seguridad
Indicadores de seguridad

Medio Ambiente
Contaminacin vs. impacto
Vertimientos
Incidentes ambientales

Relaciones Comunitarias
Desarrollo sostenible

Indicadores de gestin
Total cash cost
Precio de accin

Efecto del Tiempo


Efecto del Tiempo en el Valor Actual Neto
Tasa: 15%
Periodo
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
0

VAN
6
7
8
9
11
12
14
16
19
21
25
28
33
38
43
50
57
66
76
87
100

Ao del Ingreso

Flujo Caja

0
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20 Tasa. 0 0%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100
0 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
100

Efecto del Tiempo en la Inversion de Capital


Tasa: 15%
Periodo
0
0 - 5
0 - 10

VAN
0
(100) -100
(75) -50
(62) -50

Ao del Inversin
1
0
0
0

2
0
0
0

3
0
0
0

4
5
0
0
0 -50
0
0

6
0
0
0

7
0
0
0

8
0
0
0

9 10
0
0
0
0
0 -50

11
0
0
0

Flujo Caja

12
0
0
0

13
0
0
0

14
0
0
0

15
0
0
0

16
0
0
0

17
0
0
0

18
0
0
0

19
0
0
0

20 Tasa. 0 0%
0
-100
0
-100
0
-100

Capitulo I
Planificacin Estratgica de Minado

Planeamiento de Minado
Henry Braes

Planificacin Estratgica de Minado


Optimizar diseo de mina
Optimizar
O
secuencia de minado
Optimizar ley de corte operacional con la
finalidad de alimentar a planta con mineral
disponible que aporta mayor valor
Optimizar la capacidad de planta y tamao de
mina.
mina
Optimizar las necesidades infraestructura y
equipos.
q p
Optimizar las operaciones.

Generar de Valor para los Accionistas

Planificacin Estratgica de Minado


Optimizar
p
Diseo de Mina ((Determinar reservas))
Definir limite final, no necesariamente el que genera
mayor VAN
Definir mineral Probado+Probable
Probado Probable
Definir mineral Posible para usar en plan Largo Plazo

Optimizar
O ti i
Secuencia
S
i de
d Explotacin
E l t i
Minar sectores de bajo costo por metal, postergando
a futuro los sectores de alto costo por metal
Disminuir efecto del precio de metal en el plan

El rea operativa no debe ser excesivamente grande


Minar mejores leyes en los primeros aos
Ratio estril mineral bajas en los primeros aos.
Diferir inversin de capital a futuro

Optimizar Diseo de Mina


SELECCIN DE FASES

Pit Sh
Shellll
solucion para
Limite Final

Pit
7
8
10
14
20
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Pit Price
182
189
203
231
273
322
329
336
343
350
357
364
371
378
385
392
399
406
413
420
427
441
448
455
462
476
483
490
497
504
511
518
525
539
546
553
560
567
574
581
588
609
616
630
644
651
658
665
686
693
700

Mineral
40,796
29,835
47 513
47,513
68,472
69,617
53,641
6,659
3,888
3,770
4,897
8,544
2,898
5,889
3,430
2,608
2,321
1,411
3,208
4,004
1,853
3,193
4,308
803
1,137
731
1,208
2,397
568
590
984
323
297
1,329
1,289
128
1,360
1,040
134
193
108
133
359
91
98
211
107
1,440
391
110
120
215

Au gpt
0.92
0.73
0 62
0.62
0.53
0.41
0.31
0.07
0.54
(0.32)
0.53
0.13
0.52
(
(0.07)
)
0.51
0.51
0.51
0.51
(0.61)
0.50
0.50
0.50
(0.37)
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
(2.49)
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48

%Cu
0.45
0.71
0 73
0.73
0.63
0.52
0.37
0.56
(0.26)
0.55
0.55
0.15
0.54
(
(0.05)
)
0.53
0.53
0.53
0.53
(0.59)
0.52
0.52
0.52
0.52
0.52
(2.78)
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51

Waste
21,570
22,214
40 090
40,090
63,574
63,029
42,626
1,829
3,550
125
(2,117)
11,969
(676)
10,586
4,983
(408)
(2,249)
1,124
4,273
4,884
2,095
9,438
4,179
791
1,587
1,671
1,041
13,224
2,662
321
8,584
1,042
754
7,411
5,555
(3)
8,442
4,607
(72)
1,424
77
(71)
468
838
740
1,591
719
12,690
3,573
912
1,272
3,046

Oz Au
1,207,068
696,380
955 103
955,103
1,143,804
902,274
541,455
50,334
31,889
28,936
32,847
69,984
19,463
52,660
26,027
15,613
12,627
8,811
19,524
25,553
11,208
26,775
23,175
4,502
6,620
4,393
6,291
19,759
4,405
2,758
12,625
1,915
1,844
9,329
8,584
513
9,503
7,034
538
1,642
464
453
1,619
741
870
1,527
745
11,140
2,710
677
851
1,809

TM Cu
18,455,249
21,220,716
34 286 987
34,286,987
43,531,541
35,817,207
20,540,093
2,143,176
1,345,260
1,020,850
1,197,946
2,914,084
685,539
1,921,387
1,089,518
603,977
414,697
382,759
965,062
1,110,090
500,911
1,015,190
1,092,269
192,691
284,773
208,420
263,183
914,189
192,547
114,473
400,266
91,637
71,615
467,292
371,948
19,638
473,200
287,230
15,946
66,064
17,152
16,720
58,479
33,700
27,857
65,652
30,168
479,255
136,481
35,644
44,863
98,687

Ventas
1,641.48
1,385.51
1 941 65
1,941.65
2,247.91
1,549.96
735.35
59.03
48.51
23.09
16.57
123.60
10.88
74.38
42.67
10.65
0.81
12.65
35.32
35.09
16.19
46.58
32.72
5.71
8.54
7.24
7.80
40.10
7.84
2.80
21.14
3.19
2.17
20.34
17.13
0.33
20.80
13.97
0.11
3.23
0.32
0.13
1.60
1.59
1.30
2.86
1.47
22.96
5.95
1.62
2.01
4.43

Costo
(899.59)
(759.82)
(1 284 72)
(1,284.72)
(1,725.96)
(1,306.90)
(653.08)
(53.25)
(43.99)
(21.01)
(15.11)
(113.58)
(10.03)
(
(68.21)
)
(39.36)
(9.85)
(0.75)
(11.76)
(32.92)
(32.84)
(15.20)
(43.96)
(30.80)
(5.39)
(8.07)
(6.85)
(7.41)
(38.22)
(7.50)
(2.68)
(20.31)
(3.07)
(2.10)
(19.67)
(16.59)
(0.32)
(20.17)
(13.57)
(0.11)
(3.15)
(0.31)
(0.12)
(1.57)
(1.56)
(1.28)
(2.83)
(1.46)
(22.80)
(5.92)
(1.62)
(2.01)
(4.44)

Rentabilidad
Utilidad
741.88
82.5%
625.69
82.3%
656 93
656.93
51 1%
51.1%
521.95
30.2%
243.06
18.6%
82.27
12.6%
5.78
10.9%
4.52
10.3%
2.08
9.9%
1.47
9.7%
10.02
8.8%
0.85
8.5%
6.17
9.0%
%
3.31
8.4%
0.80
8.1%
0.06
8.2%
0.89
7.6%
2.40
7.3%
2.24
6.8%
0.99
6.5%
2.62
6.0%
1.93
6.3%
0.32
5.9%
0.47
5.9%
0.39
5.6%
0.39
5.2%
1.88
4.9%
0.34
4.5%
0.12
4.4%
0.83
4.1%
0.12
3.9%
0.08
3.6%
0.67
3.4%
0.54
3.2%
0.01
3.4%
0.63
3.1%
0.41
3.0%
0.00
2.8%
0.08
2.5%
0.01
2.3%
0.00
2.4%
0.03
1.9%
0.03
1.6%
0.02
1.2%
0.03
1.0%
0.01
0.9%
0.16
0.7%
0.03
0.4%
0.00
0.2%
(0.00)
0.0%
(0.01)
-0.2%

Optimizar Secuencia de Explotacin


Pit

Price

Ore

Waste

Oz Au

TM Cu

Revenue

182

10 4%
10.4%

5 5%
5.5%

20 0%
20.0%

9 3%
9.3%

25 4%
25.4%

189

7.6%

5.7%

11.6%

10.7%

21.4%

10

203

12.2%

10.2%

15.8%

17.3%

22.5%

14

231

17.5%

16.2%

19.0%

22.0%

17.8%

20

273

17.8%

16.1%

15.0%

18.1%

8.3%

27

322

13.7%

10.9%

9.0%

10.4%

2.8%

44

448

16.3%

13.9%

7.6%

9.4%

1.6%

72

700

4.4%

21.5%

2.0%

2.7%

0.2%

SELECCIN DE FASES
Pit
7
8
10
14
20
27
44
72

Pit Price
182
189
203
231
273
322
448
700

Mineral
40,796
29,835
47,513
68,472
69,617
53,641
63,684
17,091

Au gpt
0.92
0.73
0.62
0.53
0.41
0.31
0.20
0.26

%Cu
0.45
0.71
0.73
0.63
0.52
0.37
0.33
0.29

Waste
21,570
22,214
40,090
63,574
63,029
42,626
54,376
84,105

Oz Au
1,207,068
696,380
955,103
1,143,804
902,274
541,455
459,927
121,360

TM Cu
18,455,249
21,220,716
34,286,987
43,531,541
35,817,207
20,540,093
18,595,406
5,287,079

Ventas
1,641
1,386
1,942
2,248
1,550
735
594
223

Costo
(900)
(760)
(1,285)
(1,726)
(1,307)
(653)
(548)
(216)

Utilidad
742
626
657
522
243
82
46
7

Rentabilidad
82.5%
82.3%
51.1%
30.2%
18.6%
12.6%
8.5%
3.4%

Planificacin Estratgica de Minado


Optimizar Ley de Corte Operacional
Aplicar Teora de Lane, alimentar la planta con el
mineral disponible que aporta mayor valor
Mejorar Plan de produccin

Optimizar la capacidad de Planta y Mina


Tamao optimo
Basado en Mercado y tipo de producto

Tamao Optimo
VAN vs Capacidad de Planta
800
700

500

1,200

400

1,000
200
100
-

20,000

40,000

60,000

80,000

C
Capacidad
id d de
d Planta
Pl t Diaria
Di i

VA
AN (M$) @10%

300

800
600
400
120,000

100,000

200

900

VAN vs. Ley de Corte

800

20

40

60

80

100 120 140 160 180 200 220 240 260

Ritmo de Produccin (ktpd)

700

VAN (US$ M)

VA
AN (US$ M)

600

600
500
400
300
200
100
-

0.05

0.10

0.15

0.20

0.25

Ley de Corte a Planta

0.30

0.35

0.40

Tamao Optimo
1,200

800
600
400
200
0

20

40

60

80

100 120 140 160 180 200 220 240 260

Ritmo de Produccin (ktpd)

% VAN

VAN
N (M$) @10%

1,000

100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
0

100

200
Ritmo (ktpd)

300

400

Tamao Optimo

AMC Consultant

Optimizar Diseo de Mina

OP Optimization Using Software for Design an CutOff grades


grades, JJ. Moriamez
350

3,500
NPV

2,500

200

2,000

Ritmo

150

1,500

100

1,000

50

500
Lc

1.4

1.3

1.2

1.1

0.9

0.8

0.7

0.6

0.5

NPV (M$)

3,000

250

0.4

Ritmo (ktp
pd)

300

Planificacin Estratgica de Minado


Optimizar las Necesidad de Infraestructura
Requerimiento de equipos: Selectividad y flexibilidad
Expansiones de pilas, botaderos, capacidad de
planta
Costos
C t yC
Capital:
it l E
Estimacin
ti
i b
base cero

Optimizar
p
las Operaciones
p

Determinar Cuello de Botella y Mejora Continua


Productividad de equipos
Dilucin y Recuperacin de Mineral
Mineral expuesto
Recuperacin metalrgica
Restricciones Operaciones: Clima, Ambientales, la
organizacin

Poltica Financiera
Poltica de Inversiones (crecimiento)

Exploracin Brownfield
Exploracin Greenfield
Adquisicin
Fusin de empresas (Merge)
Evaluacin de ROA

Poltica de Financiamiento
Menor costo
Menor
M
Ri
Riesgo

Poltica de Reparto
p
de Utilidades
Reparto de utilidades a accionistas

Ambiente de la inversin minera


Capital intensivo
100,000 tpd, US$ 1,500M
20,000 tpd,
p US$ 450M

Largo periodo de pre-produccin


Cerro Corona
Quellaveco

Alto riesgo
Precio de metal
Reservas minerales
Parmetros operativos

Recursos no renovables

Capitulo I
Seleccin de Mtodos de Minado

Planeamiento de Minado
Henry Braes

Seleccin Mtodo de Minado

Seleccin Mtodo de Minado


COSTO DE OPERACIN

Corte y Relleno
Block Caving
Open Pit

Capacidad
Planta

Mina y
Desarrollo

1,000
,
50,000
50,000

15.00
3.50
1.20

Planta

19.66
4.19
4.19

G&A

5.48
0.71
0.71

Seleccin Mtodo de Minado


Open Pit @50,000
Precio
Mina
3.50
2.00
1.25
1.00
0.75

Planta

1.20
1.20
1.20
1.20
1.20

G&A

4.19
4.19
4.19
4.19
4.19

0.71
0.71
0.71
0.71
0.71

Ley de
Corte
0.08
0.16
0.32
0.53
2.46

Curva Tonelaje Ley


14,000

2.50

12,000
2.00
10,000
,
1.50

8,000
6,000

1.00

4,000
0.50
2,000
-

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

Seleccin Mtodo de Minado


Productividad
Ancho de tajeo
Seleccion de equipos

Seleccin Mtodo de Minado


Camaras y Pilares
Yacimientos horizontales o
inclinado < 30 grados
Yacimiento planos y de
espesor limitado
(sedimentario)
Roca de buena estabilidad

Altamente mecanizado

Seleccin Mtodo de Minado


Camaras y Pilares
Sistema escalonado

Seleccin Mtodo de Minado


Tajeo por Subniveles
Yacimientos verticales a
subverticales
Anchos variables pero
consistente
Buena
B
calidad
lid d d
de cajas
j
Altamente mecanizado

Seleccin Mtodo de Minado


Corte y relleno
Yacimientos verticales a sub
verticales
Ancho variable
Mecanizado, muchos
accesos
Uso de relaves como relleno
Baja
j dilucin y alta
recuperacin

Seleccin Mtodo de Minado


Camaras-Almacen (Shirinkage)
Yacimientos verticales a
subverticales (>48 grados)
Ancho variable
Cajas buenas
Equipo
E i cautivo
ti
Baja dilucin y alta
recuperacin

Seleccin Mtodo de Minado


Tajeos Largos (Long Wall)
Yacimiento horizontal a
subhorizontal
Mantos
Roca dura/Blanda
Altamente
Alt
t mecanizado
i d en
carbon

Seleccin Mtodo de Minado


Hundimiento por subniveles
Yacimiento grandes
g
Leyes bajas regularmente
Roca dura
Altamente mecanizado

Seleccin Mtodo de Minado


Hundimiento en bloque
Yacimiento grandes
Leyes bajas regularmente
Roca blanda
Altamente mecanizable

Seleccin del Mtodo en


Funcin del Valor

3500
3000
PC

2000
1500
1000
500

Lc (Cueq)

0.9

0.8

0.7

0.6

0.4
0.5

0.3

0
0.2

I p = 4.7 R( Ktpd )

SLC

2500

0.1

I m = 1.2 R( Ktpd )

Tonelajje (Mt)

Estimacin de Inversiones

2.00
1.80
1.60
1.40
1.20
1 00
1.00
0.80
0.60
0.40
0.20
0.00

SLS

%Cu
ueq

Panel Caving
3.2
4.7
12.5
0.63
789
0.93
12
65 8
65.8
309.0
946.8
413.0
0.33

1.4

25.0
4.7
12.5
2.38
0
0.00
12
00
0.0
0.0
0.0
0.0

Sub Level Caving Block Caving


7.5
4.5
4.7
4.7
12.5
12.5
0.98
0.74
247
527
1.28
1.05
12
12
20 6
20.6
43 9
43.9
96.7
206.4
296.4
632.4
139.8
335.7
0.36
0.40

1.3

Costo Mina ($/t)


Costo Planta ($/t)
RF
Lc
T (Mt)
Lm
t
Ktpd
Ip(M$)
Im(M$)
V
IVAN

Sub Level Stoping


10.0
4.7
12.5
1.18
100
1.50
12
83
8.3
39.2
120.0
70.8
0.44

1.1
1.2

C&F

Seleccin Mtodo de Minado


No metlico

Metlico

Capitulo I

Planeamiento de Minado
Henry Braes

Вам также может понравиться