Progress toward Advanced Energy Design Guide (AEDG) and cost-effective net-zero-energy (NZE) buildings
To reduce significantly the energy consumption for HVAC&R, water heating and lighting in existing homes.
Significantly advance our understanding of the impact of indoor environmental quality (IEQ) on work performance, health symptoms and perceived environmental quality in offices, providing a basis for improvements in ASHRAE standards, guidelines, HVAC&R designs and operation practices.
Support the development of ASHRAE energy standards and reduce effort required to demonstrate compliance
Support the development of improved HVAC&R components ranging from residential through commercial to provide improved system efficiency , affordability, reliability and safety
10
Significantly increase the understanding of energy efficiency , environmental quality and the design of buildings in engineering and architectural education
11
Understand influences of HVAC&R on airborne pathogen transmission in public spaces and develop effective control strategies
TOPIC #
STATUS
TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ Solicited Research Projects That Could Potentially be Funded by 2011 Fall or 2012 Winter Meeting Based on Bids Received in Spring 2011: MODELING PERSON-TO-PERSON CONTAMINANT TRANSPORT IN A MECHANICAL VENTILATION SPACE EXTENSION OF THE CLOTHING INSULATION DATABASE FOR STANDARD 55 AND ISO 7730 TO PROVIDE DATA FOR NON-WESTERN CLOTHING ENSEMBLES, INCLUDING DATA ON THE EFFECT OF POSTURE AND AIR MOVEMENT ON THAT INSULATION CHP DESIGN GUIDE UPDATE TO THE COGENERATION DESIGN GUIDE (1996) ROLE OF HVAC SYSTEMS IN THE TRANSMISSION OF INFECTIOUS AGENTS IN BUILDINGS AND INTERMODAL TRANSPORTATION REQUIREMENT SATISFIED
1458
TRP
4.10
150,000
24
B3
None
2.01
140,000
15
A5, B1, B2
None
1.10
65,000
12
None
9.03
500,000
24
None
Research Projects That Could Potentially Bid in fall 2011 or spring 2012 - Rebids, Approved, and Conditionally Approved TRPs:
9.11
SURVEY OF PARTICLE PRODUCTION RATES FROM PROCESS ACTIVITIES IN PHARMACEUTICAL AND BIOLOGICAL CLEAN ROOMS
260,000
24
A1, A6, A7, B2, C1, C2, C6, D1, D7 A1, A6, B2, C1 A1, A2, B2, C1, D3, E1
None
REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED
5.06
PERFORMANCE OF PRESSURIZED STAIRWELLS WITH OPEN DOORS ACTIVE MECHANISMS FOR ENHANCING HEAT AND MASS TRANSFER IN SORPTION FLUIDS LITERATURE AND PRODUCT REVIEW AND COST BENEFIT ANALYSIS OF COMMERCIALLY AVAILABLE OZONE AIR CLEANING FOR HVAC SYSTEMS FULL-FREQUENCY NUMERICAL MODELING OF SOUND TRANSMISSION AND RADIATION IN LINED DUCTS A HEAT TRANSFER AND FRICTION FACTOR CORRELATION FOR LOW AIRSIDE REYNOLDS NUMBER APPLICATIONS OF COMPACT HEAT EXCHANGERS EXPANSION AND UPDATE ADPI FOR OVERHEAD MIXING SYSTEMS IN BOTH COOLING AND HEATING CHARACTERIZATION OF LIQUID REFRIGERANT FLOW EMERGING FROM A FLOODED EVAPORATOR TUBE BUNDLE DEVELOPMENT OF THE ASHRAE DESIGN GUIDE FOR DEDICATED OUTDOOR - AIR SYSTEMS DEVELOP ALTERNATE SET-UP GUIDELINES FOR UNITARY AIR CONDITIONER TEST CONFIGURATIONS WHICH CANNOT ADHERE TO ASHRAE SPECIFIED DUCT DIMENSIONS AND EXTERNAL PRESSURE TAP LOCATIONS
125,000
18
None
8.03
150,000
24
8 9
EHC 2.06
150,000 130,000
18 24
#4 C1, C3
10
8.04
200,000
24
None
11
5.03
120,000
24
None
12
1.03
190,000
30
None
13
8.10
150,000
24
5.05
14
1581
TRP-R
8.11
100,000
12
6.03
REQUIREMENT SATISFIED
TOPIC #
STATUS
TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ THERMAL-FLUID BEHAVIOR OF MIXED REFRIGERANTS FOR CRYOGENIC APPLICATIONS D1, D2, A4, C6 REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED
15
10.04
150,000
24
None
16
4.01
REVISE LOAD CALCULATION APPLICATIONS MANUAL (2009) GUIDE FOR SUSTAINABLE REFRIGERATED FACILITIES AND REFRIGERATION SYSTEMS DEVELOPMENT OF MAXIMUM TECHNICALLY ACHIEVABLE ENERGY TARGETS FOR COMMERCIAL BUILDINGS (ULTRA LOW ENERGY USE BUILDING SET
100,000
18
17
REF
400,000
24
18
MTG-ET
250,000
18
#2, #5
None
RESPONSIBLE TC/TG
CO-SPONSOR TCs
EST. COST
TOPIC #
STATUS
TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ Work statements which have not been approved yet by RAC for Bid:
19
WS WS WS
TRANSPORT OF CONTAMINANTS FROM GARAGES ATTACHED OR SSPC 62.2 INTEGRAL TO LOW-RISE RESIDENTIAL BUILDINGS
175,000
30
4.03
20
5.03
A DESIGNER'S GUIDE FOR THE SELECTION OF AIR TERMINAL UNITS LIQUID/VAPOR SEPARATING VELOCITIES FOR INDUSTRIAL REFRIGERATION SYSTEMS
120,000
24
None
21
10.3
100,000
18
D1, D2
10.01
22
WS WS WS WS WS WS WS WS
10.10
DEVELOPMENT OF A DESIGN GUIDE FOR SYSTEM INTEGRATION OF THERMAL ENERGY RECOVERY IN INDUSTRIAL REFRIGERATION SYSTEMS
150,000
18
A7, D1, D2
None
REQUIREMENT SATISFIED
23
4.02
PROCEDURES TO ADJUST OBSERVED CLIMATIC DATA FOR REGIONAL OR MESOSCALE VARIATIONS EQUATIONS TO ESTIMATE EVAPORATION RATES FROM WETTED SURFACES IN NATATORIUMS, COMMERCIAL AND INSTITUTIONAL BUILDING AND MEAT PROCESSING PLANTS TES SYSTEM PERFORMANCE METRICS RELATED TO CARBON EMISSION REDUCTIONS AT THE POWER GENERATION SOURCE
200,000
24
REQUIREMENT SATISFIED
24
8.10
300,000
24
REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED
25
6.09
100,000
18
1.10
26
2.03
TESTING AND EVALUATION OF OZONE FILTERS FOR IMPROVING IAQ IMPROVED TOOLS FOR CONTROL LOOP PERFORMANCE MEASUREMENTS AND EVALUATION REPRESENTATIVE LAYER-BY-LAYER DESCRIPTIONS FOR FENESTRATION SYSTEMS WITH SPECIFIED BULK PROPERTIES SUCH AS U-FACTOR AND SHGC DESIGN AND UTILIZATION OF THERMAL ENERGY STORAGE TO INCREASE THE EFFECTIVENESS OF WIND ENERGY RESOURCES
175,000
24
None
27
7.09
100,000
24
A6, A7, C4
1.04
28
4.07
75,000
12
4.05
29
6.09
35,000
12
None
30
WS WS WS
8.11
COMPREHENSIVE PERFORMANCE RATING (CPR) FOR LIGHT COMMERCIAL UNITARY HVAC, PHASE 1 DEVELOPMENT OF A TRANSPOSITION MODEL FOR CLEAR-SKY SOLAR IRRADIANCE
185,000
18
7.06
31
4.02
70,000
18
None
32
2.01
195,000
36
#4
None
RESPONSIBLE TC/TG
CO-SPONSOR TCs
EST. COST
TOPIC #
STATUS
TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================
33
1640
WS
6.06
199,000
20
None
REQUIREMENT SATISFIED
RESPONSIBLE TC/TG
CO-SPONSOR TCs
EST. COST
TOPIC #
STATUS
TITLE
===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ Additional Research Projects that could Potentially Bid in Fall 2012 - Research Topic Acceptance Request (RTAR) approved by RAC for development into a work statement: A1, A3, A5, A6, B1, C1, E, E2 C2
34 35
9.04 5.06
DESIGN GUIDANCE FOR OUTDOOR AIR VENTILATION OF WATER LOOP HEAT PUMP SYSTEM - Conditional Acceptance METHODS TO INCREASE MAXIMUM VELOCITY OF MAKE-UP AIR FOR ATRIUM SMOKE MANAGEMENT
100,000 130,000
12 24
None None
36
5.10
225,000
12
A7, D1, E1
None
37
7.05
75,000
18
A4, B4
10.7
38
1618
RTAR
9.06
LITERATURE SEARCH AND RISK ASSESSMENT FOR ESTABLISHING A LOW LIMIT OF RELATIVE HUMIDITY LEVELS IN HEALTH CARE SPACES
50,000
A1, A6
None
39
1619
RTAR
9.09
180,000
18
None
40
1628
RTAR
3.04
100,000
12
None
41
1629
RTAR
5.03
TESTING AND MODELING ENERGY PERFORMANCE OF ACTIVE CHILLED BEAM SYSTEMS - CONDITIONALLY ACCEPTED
100,000
24
None
42
1631
RTAR
5.10
COMMERCIAL APPLIANCE EMISSIONS FOR OPERATION WITH TYPE I OR TYPE II HOODS - CONDITIONALLY ACCEPTED
300,000
24
None
43
1635
RTAR
4.03
50,000
12
#9, #10
None
44
1639
RTAR
1.04
COMPARATIVE LAB AND FIELD EVALUATIO OF BUILDING PRESSURE CONTROL METHODS - CONDITIONALLY ACCEPTED
199,000
36
None
45
1645 1649
RTAR RTAR
8.04
DEVELOPMENT OF NEW ACCELERATED CORROSION TESTS FOR ALL ALUMINUM MICROCHANNEL AND TUBE AND FIN HEAT EXCHANGERS THE IMPACT OF HIGHER EFFICIENCY REPLACEMENT FILTERS ON IAQ IN LOW RISE RESIDENTIAL BUILDINGS WITH CENTRAL HVAC SYSTEMS CONDITIONALLY ACCEPTED
180,000
36
None
46
2.04
250,000
18
#4
None
RESPONSIBLE TC/TG
CO-SPONSOR TCs
EST. COST
================
REQUIREMENT SATISFIED
REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED
REQUIREMENT SATISFIED
================
FEB. 1, 2012
OCT. 1, 2012
OCT. 1, 2011
OCT. 1, 2012
OCT. 1, 2012
JULY 1, 2013
FEB. 1, 2013
JULY 1, 2013
JULY 1, 2013
OCT. 1, 2013
OCT. 1, 2013
FEB. 1, 2014
OCT. 1, 2014
================
JULY 1, 2015
================
OCT. 1, 2014
JULY 1, 2014
JULY 1, 2014
FEB. 1, 2015
OCT. 1, 2014
JUL. 1, 2015
OCT. 1, 2014
FEB. 1, 2015
JUL. 1, 2015
JUL. 1, 2015
JUL. 1, 2015
RETURNED RESEARCH TOPIC ACCEPTANCE REQUESTS (RTARS) (These topics are NOT on the Society's Research Implementation Plan yet, but the TCs were encouraged to resubmit.)
EST. DURATION (Months) RESPONSIBLE TC/TG/SSPC CO-SPONSOR TCs RESEARCH STRATEGIC PLAN GOALS SUPPORTED EST. COST
TOPIC #
STATUS
TITLE
SUBMISSION HISTORY
===== ======== =========== ======= ============================================================== ============ ======= =========== ======== ========================================
1511 1540
RTAR RTAR
7.05
A BUILDING SYSTEMS EMULATION TOOL FOR BUILDING OPERATORS DEVELOPMENT OF A METHODOLOGY FOR THE METHODOLOGY FOR THE MEASUREMENT OF TURBULENCE INTENSITY AT A LABORATORY FUME HOOD FACE
180,000
24
A7, B4
9.10
100,000
18
7.03
TRAINING REQUIREMENTS FR ADVANCED BUILDING OPERATION (HIGH PERFORMANCE BUILDINGS, GREEN BUILDINGS, LEED , ETC.) TO OPTIMIZE SUSTAINABILITY AND ACHIEVING DESIGN EXPECTATIONS ASSESSMENT OF MEASUREMENT TECHNIQUES FOR LEAK FLOW RATE (LFR) OF COMPONENTS AND SYSTEMS NUMERICAL SEISMIC MODELING OF HVAC&R ISOLATION/RESTRAINT SYSTEMS DEFINING THE CAPABILITIES,NEEDS AND CURRENT LIMITATIONS OF BUILDING INFORMATION MODELING (BIM) IN OPERATION AND MAINTENANCE DEVELOP A METHOD FOR TESTING THE MIST REMOVAL EFFICIENCY AND AIR FLOW RESISTANCE OF OIL MIST COLLECTORS APPLICATION OF ASHRAE 62.1 INDOOR AIR QUALITY PROCEDURES
58,000
3.08
150,000
12
2.07
90,000
24
A6
REC. 09.08, RET. 09.10 REC. 09.12, RET. 10.01 REC. 10.08, RET. 10.10 REC. 11.05, RET. 11.06
7.03
150,000
18
A6, C1
7 8
5.04 2.03
150,000 250,000
24 18
2.04
ENERGY IMPLICATIONS OF AIR FILTRATION IN COMMERCIAL BUILDINGS MEASUREMENT OF ENERGY PERFORMANCE OF ASHRAE ENERGY DESIGN GUIDES (AEDG) UPDATE THE SCIENTIFIC EVIDENCE FOR SPECIFYING LOWER LIMIT RELATIVE HUMIDITY LEVELS FOR COMFORT, HEALTH AND IEQ IN OCCUPIED SPACES DESIGN EVALUATION OF HIGH ACCURACY RELATIVE HUMIDITY (RH) SENSORS FOR PSYCHROMETRIC TESTING ABSORPTION REFRIGERATION CYCLE TRAINING SIMULATOR FOR SUSTAINABLE RESOURCE USE IMPROVED COMPRESSOR PERFORMANCE MODELING METHODOLOGY FOR US IN SYSTEM SIMULATION PROGRAMS EVALUATION OF THE ABILITY OF COOLING TOWER DRIFT ELIMINATORS TO REMOVE LEGIONELLA FROM EFFUENT AIR STREAM
250,000
24
#2, #5, #7
10
2.08
145,000
14
REC. 10.08, RET. 10.10 REC. 11.01, RET. 11.02 REC. 10.08, RET. 10.10 REC. 10.12, RET.11.01
11
5.11
150,000
18
#4, #11
12
1.02
75,000
12
REC. 10.12, RET. 11.01 REC. 10.12, RET. 11.01 REC. 11.05, RET. 11.06
13
8.03
75,000
15
14
8.11
150,000
24
C1, D1
15
3.06
120,000
18
#4, #11
16
5.06
150,000
18
#7, #9
17
7.06
ECONOMIC ENVELOPE COST DATA BASE IN SUPPORT OF STANDARD 90.1 TRAINING REQUIREMENTS FOR SUSTAINABLE, HIGH PERFORMANCE BUILDING OPERATION TO OPTIMIZE OPERATIONS AND ACHIEVING DESIGN EXPECTATIONS
425,000
12
A1
7.03 18 1650 RTAR 72,000 18 #10 REJECTED RTARS: Topics that were judged not suitable for the ASHRAE research program as presented. LITERATURE SEARCH FOR CURRENT HVAC DUCT DESIGN GUIDELINES FOR JUSTICE FACILITIES AND/OR STANDARDS WORLDWIDE AS WELL AS TG9.JF AT FEDERAL, STATE, COUNTY AND LOCALS LEVELS DEVELOP A MATHEMATICAL MODEL TO DETERMINE THE OPTIMUM AIR FLOW REQUIREMENTS FOR A SAFE, ENERGY EFFICIENT LABORATORY ENVIRONMENT A STUDY OF FLOW CAPACITY AND LEAKAGE CHARACTERISTICS IN 4-WAY REVERSING VALVES THE EFFECT OF ACTIVE AND PASSIVE CHILLED BEAMS ON LABORATORY FUME HOOD PERFORMANCE
19
1520
RTAR
50,000
#1?
20
9.10
150,000
24
REC. 08.03, RET. 08.04 REC. 08.09, REJ. 09.01 REC. 08.03, RET. 08.04 REC. 11.05, REJ. 11.06 REC. 08.09, RET. 09.01 REC. 09.08, REJ. 09.10
21
8.08
150,000
24
A1, D3
22
125,000
18
23 24
SEARCHABLE DATABASE OF ASHRAE STANDARD CROSS REFERENCES LABORATORY DESIGN GUIDE REVISION TECHNICAL ASSISTANCE DETERMINATION OF SUITABLE REPLACEMENT FOR SF6 WHEN USED AS A TRACER GAS IN ACCORDANCE WITH ASHRAE METHODS OF TEST 110 AND 129 DRIVING RAIN: IMPACT ON DURABILITY, INDOOR HUMIDITY AND ENERGY EFFICIENCY DEVELOPING MODELS TO REPRESENT EXISTING BUILDING STOCK ENERGY PERFORMANCE
50,000 30,000
9 18
E1 ?
REC. 08.09, REJ. 09.01 REC. 08.09, REJ. 09.01 REC. 08.09, RET. 09.01 REC. 09.08, REJ. 09.10
25
9.10
60,000
18
26
4.04
250,000
24
27
7.06
200,000
#7
DROPPED TOPICS FROM RESEARCH IMPLEMENTATION PLAN (The following topics have been dropped from the Research Implementation Plan for various reasons.)
EST. DURATION (Months) RESEARCH STRATEGIC PLAN GOALS SUPPORTED 1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE CO-SPONSOR TCs
RESPONSIBLE TC/TG/SSPC
EST. COST
TOPIC #
STATUS
TITLE
===== ======== =========== ======= =============================================================== ========== ======= ======= ======== ==================== ================ ================
1368
RTAR
4.05
DEVELOP LOCAL CONVECTIVE HEAT TRANSFER COEFFICIENTS FOR INDOOR AND OUTDOOR SURFACES OF FENESTRATION SYSTEMS
135,000
24
A6, C6
None
1414 1425
RTAR RTAR
4.05
DETERMINATION OF THE U-FACTORS, SOLAR HEAT GAIN COEFFICIENTS AND VISIBLE TRANSMITTANCES OF STANDARD FENESTRATION UNITS MADE FROM REPRESENTATIVE FENESTRATION FRAME AND GLAZING SYSTEMS TO UPDATE TABLES 4, 6, 13, 15, AND 16 IN THE FENESTRATION CHAPTER OF HANDBOOK OF FUNDAMENTALS CHARACTERIZATION OF INFILTRATION, VENTILATION AND IAQ IN MIDAND HIGH-RISE MULTI-FAMILY BUILDINGS
45,000
16
A1, A2
None
4.03
185,000
24
A1, B2
None
4.03
OCCUPANT RESPONSE TO THE NOISE OF RESIDENTIAL VENTILATION FANS REFRIGERATED FACILITIES DOORWAY INFILTRATION AIR ENERGY REDUCTION
100,000
18
10.05
160,000
18
A5 A6, A8, C6, D1, D7, E1 A6, A8, C6, D1 A2, A7, B1, B2
None
10.09
OPTIMIZING BLAST FREEZER EFFECTIVENESS ENERGY CONSERVATION, AIR-CONDITIONING AND PRODUCTIVITY IN HOTHUMID TROPICAL REGIONS
50,000
18
2.01
175,000
36
3.04
PHYSICAL PROPERTIES MEASUREMENTS OF CO2 / LUBRICANT MIXTURES THE DEVELOPMENT OF A COMPUTATIONAL FLUID DYNAMICS MODEL TO REPRESENT THE PERFORMANCE OF A ROUND FLOOR (SWIRL OR INDUCTION TYPE) OUTLET USED IN UNDERFLOOR AIR DISTRIBUTION EVALUATION OF THE IMPACT OF A MONOCHLORAMINE DISINFECTION ON LEGIONELLA COLONIZATION OF AN INSTITUTIONAL SERVICE WATER SYSTEM AND ON THE INCIDENCE OF HEALTH CARE ASSOCIATED LEGIONNAIRES' DISEASE (LD)
75,000
D2, D3
None
1465
RTAR
4.10
100,000
18
C1, C3
None
10
1479
RTAR
3.06
25,000
24
None Topic time expired from display on plan due to no WS draft. TC can reactivate on plan by submitting WS draft and getting it approved by deadline noted in far left column
11
1483 1494 1496 1497 1502 1513 1514 1543 1545 1548 1563
RTAR RTAR RTAR RTAR TRP-R RTAR RTAR RTAR WS RTAR RTAR
SSPC 90.1
STANDARD 90.1 LINKED CRITERIA SLECTION ANALYSIS BASED ON PERFORMANCE WITH DESIGN PACKAGES PROCEDURES TO GENERATE HOURLY CLIMATIC DATA FROM SPARSE DATA SETS MOISTURE TRANSPORT IN CONSTRUCTION MATERIALS & ASSEMBLIES AT LOW TEMPERATURES VENT PERFORMANCE MODEL FOR ALL CATEGORIES, MULTI-STORY AND MULTI-UNIT FOR GAS & OIL FIRED FURNANCES, BOILERS AND WATER HEATERS
250,000
18
None
12
4.02
75,000
12
None
13
4.04
190,000
24
None
14
6.10
150,000
18
None
15
1.04
240,000
24
7.09
Replaced by URP-1633 after no bids received Topic time expired from display on plan due to no WS draft. TC can reactivate on plan by submitting WS draft and getting it approved by deadline noted in far left column
REQUIREMENT SATISFIED
16
10.03
100,000
18
D1, D2
None
OCT. 2012
17
10.01
100,000
12
A7, D1, D2
None
18
7.05
120,000
18
None
JULY 2012
19
5.03
NON-STEADY STATE OVERHEAD HEATING AND AIR CHANGE EFFECTIVENESS IN-DUCT FULL-SCALE LABORATORY-EVALUATED COMPARISON OF PHOTOCATALYTIC OXIDATION (PCO) FILTERS VERSUS DRY-SCRUBBING MEDIA FILTERS
TC Dropped Topic None Topic time expired from display on plan due to no WS draft. TC can reactivate on plan by submitting WS draft and getting it approved by deadline noted in far left column
120,000
24
20
2.03
150,000
24
None
21
6.03
175,000
18
None
22
1577
RTAR
8.04
200,000
24
None
RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED JULY 2011 JULY 2011 JULY 2010 JULY 2011 JULY 2010 JULY 2010 JULY 2010 JULY 2010 OCT. 2010 JULY 2011 OCT. 2011 JULY 2011 OCT. 2011 OCT. 2012 OCT. 2012 JULY 2012 JULY 2012 OCT. 2012 FEB. 2013