RESEARCH 2005-2010 STRATEGIC THEMES & GOALS

A. ENERGY & RESOURCES THEME


STRATEGIC GOALS:
A1. Provide guidance on techniques and move 30% towards net zero-energy use bldgs by 2008, 50% by 2012, and 70% by 2015 A2. Produce by 2015 new residential and light commercial bldgs that use 70% less energy based on ASHRAE 90.2-2001 A3. Develop by 2015 economically viable applications of renewable energy that reduce conventional energy usage by 25% A4. Develop systems and components that reduce energy use in supermarkets by 30% by 2015 A5. Optimize & make consistent ASHRAE standards 90, 62, AND 55 for energy efficiency & IEQ for indoor built environments A6. Develop integrated best practices design methods that optimize energy eff., life cycle cost, IEQ, and environmental impact A7. Develop methods for measured bldg.(energy, cost, emissions) & occupant (comfort, health, productivity) performance. A8. Establish benchmark data on energy use in industrial refrigeration

RESEARCH 2010-2015 STRATEGIC THEMES & GOALS


GOAL #
1 Maximize the actual operational energy performance of buildings and facilities

Progress toward Advanced Energy Design Guide (AEDG) and cost-effective net-zero-energy (NZE) buildings

To reduce significantly the energy consumption for HVAC&R, water heating and lighting in existing homes.

Significantly advance our understanding of the impact of indoor environmental quality (IEQ) on work performance, health symptoms and perceived environmental quality in offices, providing a basis for improvements in ASHRAE standards, guidelines, HVAC&R designs and operation practices.

Support the development of ASHRAE energy standards and reduce effort required to demonstrate compliance

B. INDOOR ENVIRONMENTAL QUALITY THEME


STRATEGIC GOALS:
B1. Make improvements in occupant health and comfort that yield 20% increase in productivity by 2015 B2. Provide optimal indoor environment for bldgs, vehicles, & facilities with respect to comfort, productivity, health, & safety B3. Understand better how contagious viruses are transmitted in indoor environments and develop countermeasures B4. Develop self-diagnostic inspection methods for HVAC systems that minimize impacts on comfort, health, & productivity 8 Facilitate use of natural and low global warming potential (GWP) synthetic refrigerants and seek methods to reduce refrigerant charge 7 Support development of tools, procedures and methods suitable for designing low energy buildings 6 Building Information Modeling (BIM) of energy efficient, high-performing buildings

C. TOOLS AND APPLICATIONS THEME


STRATEGIC GOALS:
C1. Develop more effective tools that will improve the productivity of the design process by 25% by 2015 C2. Develop dual path standards where paths are a) Prescriptive based, and b) Performance based C3. Develop methods to allow a designer to accurately model a bldg in virtual reality in no more than 1 week by 2010 C4. Develop a measurement-based rating system to establish the environmental performance of a bldg & its systems C5. Develop self-calibrating & low-cost sensor systems that measure control variables (comfort, health, productivity) C6. Establish design tools to improve the installed energy eff. of HVAC&R systems and components C7. Provide design guidance for bldgs. and systems to address the past and expected change in climatic conditions

Support the development of improved HVAC&R components ranging from residential through commercial to provide improved system efficiency , affordability, reliability and safety

10

Significantly increase the understanding of energy efficiency , environmental quality and the design of buildings in engineering and architectural education

11

Understand influences of HVAC&R on airborne pathogen transmission in public spaces and develop effective control strategies

D. EQUIPMENT, COMPONENTS & MATERIALS THEME


STRATEGIC GOALS:
D1. Establish techniques to improve energy eff. & reliability of HVAC&R components D2. Continue research into new alternative and natural refrigerants D3. Improve performance and reliability and minimize the environmental impacts of working fluids and materials D4. Advance ASHRAE's role in the safety and security of food distribution D5. Develop reliable, durable, and self-correcting sensor technology for monitoring IEQ, pollutants, energy conservation, & FDD D6. Move one or more non-traditional technologies to market readiness by 2010 D7. Develop techniques that reduce the installed energy use of HVAC&R system auxiliary equipment 50% by 2015

E. EDUCATION & OUTREACH THEME


STRATEGIC GOALS:
E1. Make the results of ASHRAE research available to the technical committee E2. Ensure that ASHRAE research has an international impact

ASHRAE RESEARCH IMPLEMENTATION PLAN


RESPONSIBLE TC/TG EST. COST

- ANNUAL 2011 EDITION


RESEARCH STRATEGIC PLAN GOALS SUPPORTED 1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE EST. DURATION (Months) CO-SPONSOR TCs

TOPIC #

STATUS

TITLE

===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ Solicited Research Projects That Could Potentially be Funded by 2011 Fall or 2012 Winter Meeting Based on Bids Received in Spring 2011: MODELING PERSON-TO-PERSON CONTAMINANT TRANSPORT IN A MECHANICAL VENTILATION SPACE EXTENSION OF THE CLOTHING INSULATION DATABASE FOR STANDARD 55 AND ISO 7730 TO PROVIDE DATA FOR NON-WESTERN CLOTHING ENSEMBLES, INCLUDING DATA ON THE EFFECT OF POSTURE AND AIR MOVEMENT ON THAT INSULATION CHP DESIGN GUIDE UPDATE TO THE COGENERATION DESIGN GUIDE (1996) ROLE OF HVAC SYSTEMS IN THE TRANSMISSION OF INFECTIOUS AGENTS IN BUILDINGS AND INTERMODAL TRANSPORTATION REQUIREMENT SATISFIED

1458

TRP

4.10

150,000

24

B3

None

1504 1592 1603

TRP TRP TRP

2.01

140,000

15

A5, B1, B2

None

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

1.10

65,000

12

C6 A5, A6, A7, B1, B2, B3

None

9.03

500,000

24

None

Research Projects That Could Potentially Bid in fall 2011 or spring 2012 - Rebids, Approved, and Conditionally Approved TRPs:

1399 1447 1462 1491 1529

TRP-R TRP TRP TRP TRP

9.11

SURVEY OF PARTICLE PRODUCTION RATES FROM PROCESS ACTIVITIES IN PHARMACEUTICAL AND BIOLOGICAL CLEAN ROOMS

260,000

24

A1, A6, A7, B2, C1, C2, C6, D1, D7 A1, A6, B2, C1 A1, A2, B2, C1, D3, E1

None

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

5.06

PERFORMANCE OF PRESSURIZED STAIRWELLS WITH OPEN DOORS ACTIVE MECHANISMS FOR ENHANCING HEAT AND MASS TRANSFER IN SORPTION FLUIDS LITERATURE AND PRODUCT REVIEW AND COST BENEFIT ANALYSIS OF COMMERCIALLY AVAILABLE OZONE AIR CLEANING FOR HVAC SYSTEMS FULL-FREQUENCY NUMERICAL MODELING OF SOUND TRANSMISSION AND RADIATION IN LINED DUCTS A HEAT TRANSFER AND FRICTION FACTOR CORRELATION FOR LOW AIRSIDE REYNOLDS NUMBER APPLICATIONS OF COMPACT HEAT EXCHANGERS EXPANSION AND UPDATE ADPI FOR OVERHEAD MIXING SYSTEMS IN BOTH COOLING AND HEATING CHARACTERIZATION OF LIQUID REFRIGERANT FLOW EMERGING FROM A FLOODED EVAPORATOR TUBE BUNDLE DEVELOPMENT OF THE ASHRAE DESIGN GUIDE FOR DEDICATED OUTDOOR - AIR SYSTEMS DEVELOP ALTERNATE SET-UP GUIDELINES FOR UNITARY AIR CONDITIONER TEST CONFIGURATIONS WHICH CANNOT ADHERE TO ASHRAE SPECIFIED DUCT DIMENSIONS AND EXTERNAL PRESSURE TAP LOCATIONS

125,000

18

None

8.03

150,000

24

None SSPC 62.1 None

8 9

EHC 2.06

150,000 130,000

18 24

#4 C1, C3

10

1535 1546 1556 1565

TRP-C TRP TRP TRP-R

8.04

200,000

24

A6, C1, D3 A1, B2, C6, C7, D1

None

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

11

5.03

120,000

24

None

12

1.03

190,000

30

C1, C6, D1 A1, A5, A6, B1, C1

None

13

8.10

150,000

24

5.05

14

1581

TRP-R

8.11

100,000

12

A2, A7, C1, C3, D1, D7

6.03

REQUIREMENT SATISFIED

RESEARCH STRATEGIC PLAN GOALS SUPPORTED

TOPIC #

STATUS

TITLE

===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ THERMAL-FLUID BEHAVIOR OF MIXED REFRIGERANTS FOR CRYOGENIC APPLICATIONS D1, D2, A4, C6 REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

15

1602 1616 1634 1651

TRP TRP TRP-C TRP

10.04

150,000

24

None

16

4.01

REVISE LOAD CALCULATION APPLICATIONS MANUAL (2009) GUIDE FOR SUSTAINABLE REFRIGERATED FACILITIES AND REFRIGERATION SYSTEMS DEVELOPMENT OF MAXIMUM TECHNICALLY ACHIEVABLE ENERGY TARGETS FOR COMMERCIAL BUILDINGS (ULTRA LOW ENERGY USE BUILDING SET

100,000

18

E1, #10 #1, #2, #8, #10

None 10.01 10.05

17

REF

400,000

24

18

MTG-ET

250,000

18

#2, #5

None

1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE

EST. DURATION (Months)

RESPONSIBLE TC/TG

CO-SPONSOR TCs

EST. COST

RESEARCH STRATEGIC PLAN GOALS SUPPORTED

TOPIC #

STATUS

TITLE

===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ Work statements which have not been approved yet by RAC for Bid:

19

1450 1500 1513

WS WS WS

TRANSPORT OF CONTAMINANTS FROM GARAGES ATTACHED OR SSPC 62.2 INTEGRAL TO LOW-RISE RESIDENTIAL BUILDINGS

175,000

30

B2 A1, A2, A5, A6, B2, C1, C6

4.03

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

20

5.03

A DESIGNER'S GUIDE FOR THE SELECTION OF AIR TERMINAL UNITS LIQUID/VAPOR SEPARATING VELOCITIES FOR INDUSTRIAL REFRIGERATION SYSTEMS

120,000

24

None

21

10.3

100,000

18

D1, D2

10.01

22

1514 1561 1566 1576 1579 1587 1588 1607

WS WS WS WS WS WS WS WS

10.10

DEVELOPMENT OF A DESIGN GUIDE FOR SYSTEM INTEGRATION OF THERMAL ENERGY RECOVERY IN INDUSTRIAL REFRIGERATION SYSTEMS

150,000

18

A7, D1, D2

None

REQUIREMENT SATISFIED

23

4.02

PROCEDURES TO ADJUST OBSERVED CLIMATIC DATA FOR REGIONAL OR MESOSCALE VARIATIONS EQUATIONS TO ESTIMATE EVAPORATION RATES FROM WETTED SURFACES IN NATATORIUMS, COMMERCIAL AND INSTITUTIONAL BUILDING AND MEAT PROCESSING PLANTS TES SYSTEM PERFORMANCE METRICS RELATED TO CARBON EMISSION REDUCTIONS AT THE POWER GENERATION SOURCE

200,000

24

A6, A7, B2, C7, D1

None 1.12 8.12

REQUIREMENT SATISFIED

24

8.10

300,000

24

A1, A6, A7, B2, C1, D1

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

25

6.09

100,000

18

A6 B1, B2, B3, A2, A5

1.10

26

2.03

TESTING AND EVALUATION OF OZONE FILTERS FOR IMPROVING IAQ IMPROVED TOOLS FOR CONTROL LOOP PERFORMANCE MEASUREMENTS AND EVALUATION REPRESENTATIVE LAYER-BY-LAYER DESCRIPTIONS FOR FENESTRATION SYSTEMS WITH SPECIFIED BULK PROPERTIES SUCH AS U-FACTOR AND SHGC DESIGN AND UTILIZATION OF THERMAL ENERGY STORAGE TO INCREASE THE EFFECTIVENESS OF WIND ENERGY RESOURCES

175,000

24

None

27

7.09

100,000

24

A6, A7, C4

1.04

28

4.07

75,000

12

A1, A2, C1 A6, B2, C1, C6, D1

4.05

29

6.09

35,000

12

None

30

1608 1610 1624

WS WS WS

8.11

COMPREHENSIVE PERFORMANCE RATING (CPR) FOR LIGHT COMMERCIAL UNITARY HVAC, PHASE 1 DEVELOPMENT OF A TRANSPOSITION MODEL FOR CLEAR-SKY SOLAR IRRADIANCE

185,000

18

A2, A7, B4, D1, D5 A6, B2, C1, C6, D1

7.06

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

31

4.02

70,000

18

None

32

2.01

EFFECTIVE ENERGY-EFFICIENT SCHOOL CLASSROOM VENTILATION

195,000

36

#4

None

1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE

EST. DURATION (Months)

RESPONSIBLE TC/TG

CO-SPONSOR TCs

EST. COST

RESEARCH STRATEGIC PLAN GOALS SUPPORTED

TOPIC #

STATUS

TITLE

===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================

33

1640

WS

6.06

HOT WATER USE IN OFFICE BUILDINGS

199,000

20

#1, #2, #8, #10

None

REQUIREMENT SATISFIED

1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE

EST. DURATION (Months)

RESPONSIBLE TC/TG

CO-SPONSOR TCs

EST. COST

RESEARCH STRATEGIC PLAN GOALS SUPPORTED

TOPIC #

STATUS

TITLE

===== ======== =========== ========== ============================================================== ============ ======= =========== ======== ================ Additional Research Projects that could Potentially Bid in Fall 2012 - Research Topic Acceptance Request (RTAR) approved by RAC for development into a work statement: A1, A3, A5, A6, B1, C1, E, E2 C2

34 35

1498 1600 1614 1615

RTAR RTAR RTAR RTAR

9.04 5.06

DESIGN GUIDANCE FOR OUTDOOR AIR VENTILATION OF WATER LOOP HEAT PUMP SYSTEM - Conditional Acceptance METHODS TO INCREASE MAXIMUM VELOCITY OF MAKE-UP AIR FOR ATRIUM SMOKE MANAGEMENT

100,000 130,000

12 24

None None

DEC. 15, 2011 AUG. 15, 2011

36

5.10

EVALUATION OF EFFECTIVENESS OF UV SYSTEMS

225,000

12

A7, D1, E1

None

AUG. 15, 2012

37

7.05

DETECTION AND DIAGNOSTIC (FDD) METHODS FOR SUPERMARKETS

75,000

18

A4, B4

10.7

MAY 15, 2012

38

1618

RTAR

9.06

LITERATURE SEARCH AND RISK ASSESSMENT FOR ESTABLISHING A LOW LIMIT OF RELATIVE HUMIDITY LEVELS IN HEALTH CARE SPACES

50,000

A1, A6

None

MAY 15, 2012

39

1619

RTAR

9.09

DATA CENTER GASEOUS CONTAMINATION LIMITS AND MEANS OF MONITORING

180,000

18

A1, A5, D7, E1, E2

None

DEC. 15, 2012

40

1628

RTAR

3.04

PHYSICAL PROPERTIES MEASUREMENTS OF HFO-1234yf / LUBRICANT MIXTURES - CONDITIONALLY ACCEPTED

100,000

12

#8, #9, D2, D3, D6

None

AUG. 15, 2012

41

1629

RTAR

5.03

TESTING AND MODELING ENERGY PERFORMANCE OF ACTIVE CHILLED BEAM SYSTEMS - CONDITIONALLY ACCEPTED

100,000

24

#1, #2, #5, #6, #7

None

MAY 15, 2013

42

1631

RTAR

5.10

COMMERCIAL APPLIANCE EMISSIONS FOR OPERATION WITH TYPE I OR TYPE II HOODS - CONDITIONALLY ACCEPTED

300,000

24

A7, D1, D3, E1

None

AUG. 15, 2012

43

1635

RTAR

4.03

SIMPLIFIED PROCEDURE FOR CALCULATING EXHAUST/INTAKE SEPARATION DINSTANCES

50,000

12

#9, #10

None

DEC. 15, 2012

44

1639

RTAR

1.04

COMPARATIVE LAB AND FIELD EVALUATIO OF BUILDING PRESSURE CONTROL METHODS - CONDITIONALLY ACCEPTED

199,000

36

#1, #2, #7, #9, #11

None

MAY 15, 2013

45

1645 1649

RTAR RTAR

8.04

DEVELOPMENT OF NEW ACCELERATED CORROSION TESTS FOR ALL ALUMINUM MICROCHANNEL AND TUBE AND FIN HEAT EXCHANGERS THE IMPACT OF HIGHER EFFICIENCY REPLACEMENT FILTERS ON IAQ IN LOW RISE RESIDENTIAL BUILDINGS WITH CENTRAL HVAC SYSTEMS CONDITIONALLY ACCEPTED

180,000

36

#1, #9, #10

None

MAY 15, 2013

46

2.04

250,000

18

#4

None

MAY 15, 2013

Additional Project Funds that could be Committed by January 2013 $7,448,000

1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE

EST. DURATION (Months)

RESPONSIBLE TC/TG

CO-SPONSOR TCs

EST. COST

================

REQUIREMENT SATISFIED

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

REQUIREMENT SATISFIED

RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED

================ REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED REQUIREMENT SATISFIED

RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED

================

FEB. 1, 2012

OCT. 1, 2012

OCT. 1, 2011

OCT. 1, 2012

OCT. 1, 2012

JULY 1, 2013

FEB. 1, 2013

FEB. 01, 2013

JULY 1, 2013

JULY 1, 2013

OCT. 1, 2013

OCT. 1, 2013

FEB. 1, 2014

OCT. 1, 2014

RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED

================

JULY 1, 2015

RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED

================

FEB. 1, 2014 OCT. 1, 2013

OCT. 1, 2014

JULY 1, 2014

JULY 1, 2014

FEB. 1, 2015

OCT. 1, 2014

JUL. 1, 2015

OCT. 1, 2014

FEB. 1, 2015

JUL. 1, 2015

JUL. 1, 2015

JUL. 1, 2015

RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED

RETURNED RESEARCH TOPIC ACCEPTANCE REQUESTS (RTARS) (These topics are NOT on the Society's Research Implementation Plan yet, but the TCs were encouraged to resubmit.)
EST. DURATION (Months) RESPONSIBLE TC/TG/SSPC CO-SPONSOR TCs RESEARCH STRATEGIC PLAN GOALS SUPPORTED EST. COST

TOPIC #

STATUS

TITLE

SUBMISSION HISTORY

===== ======== =========== ======= ============================================================== ============ ======= =========== ======== ========================================

1511 1540

RTAR RTAR

7.05

A BUILDING SYSTEMS EMULATION TOOL FOR BUILDING OPERATORS DEVELOPMENT OF A METHODOLOGY FOR THE METHODOLOGY FOR THE MEASUREMENT OF TURBULENCE INTENSITY AT A LABORATORY FUME HOOD FACE

180,000

24

A7, B4

REC. 07.08, RET. 07.10 REC. 08.12, RET. 09.01

9.10

100,000

18

REC. 08.03, RET. 08.04 REC. 08.09, RET. 09.01

1574 1599 1601 1609 1623 1625 1626 1627

RTAR RTAR RTAR RTAR RTAR RTAR RTAR RTAR

7.03

TRAINING REQUIREMENTS FR ADVANCED BUILDING OPERATION (HIGH PERFORMANCE BUILDINGS, GREEN BUILDINGS, LEED , ETC.) TO OPTIMIZE SUSTAINABILITY AND ACHIEVING DESIGN EXPECTATIONS ASSESSMENT OF MEASUREMENT TECHNIQUES FOR LEAK FLOW RATE (LFR) OF COMPONENTS AND SYSTEMS NUMERICAL SEISMIC MODELING OF HVAC&R ISOLATION/RESTRAINT SYSTEMS DEFINING THE CAPABILITIES,NEEDS AND CURRENT LIMITATIONS OF BUILDING INFORMATION MODELING (BIM) IN OPERATION AND MAINTENANCE DEVELOP A METHOD FOR TESTING THE MIST REMOVAL EFFICIENCY AND AIR FLOW RESISTANCE OF OIL MIST COLLECTORS APPLICATION OF ASHRAE 62.1 INDOOR AIR QUALITY PROCEDURES

58,000

REC. 08.10, RET. 09.01

3.08

150,000

12

REC. 09.08, RET. 09.10

2.07

90,000

24

A6

REC. 09.08, RET. 09.10 REC. 09.12, RET. 10.01 REC. 10.08, RET. 10.10 REC. 11.05, RET. 11.06

7.03

150,000

18

A6, C1

7 8

5.04 2.03

150,000 250,000

24 18

#9, A1 A6, B2, C6

REC. 10.08, RET. 10.10 REC. 10.08, RET. 10.10

2.04

ENERGY IMPLICATIONS OF AIR FILTRATION IN COMMERCIAL BUILDINGS MEASUREMENT OF ENERGY PERFORMANCE OF ASHRAE ENERGY DESIGN GUIDES (AEDG) UPDATE THE SCIENTIFIC EVIDENCE FOR SPECIFYING LOWER LIMIT RELATIVE HUMIDITY LEVELS FOR COMFORT, HEALTH AND IEQ IN OCCUPIED SPACES DESIGN EVALUATION OF HIGH ACCURACY RELATIVE HUMIDITY (RH) SENSORS FOR PSYCHROMETRIC TESTING ABSORPTION REFRIGERATION CYCLE TRAINING SIMULATOR FOR SUSTAINABLE RESOURCE USE IMPROVED COMPRESSOR PERFORMANCE MODELING METHODOLOGY FOR US IN SYSTEM SIMULATION PROGRAMS EVALUATION OF THE ABILITY OF COOLING TOWER DRIFT ELIMINATORS TO REMOVE LEGIONELLA FROM EFFUENT AIR STREAM

250,000

24

#2, #5, #7

REC. 10.08, RET. 10.10

10

2.08

145,000

14

REC. 10.08, RET. 10.10 REC. 11.01, RET. 11.02 REC. 10.08, RET. 10.10 REC. 10.12, RET.11.01

11

1630 1636 1638 1642 1643 1644 1647

RTAR RTAR RTAR RTAR RTAR RTAR RTAR

5.11

150,000

18

#4, #11

12

1.02

75,000

12

REC. 10.12, RET. 11.01 REC. 10.12, RET. 11.01 REC. 11.05, RET. 11.06

13

8.03

75,000

15

14

8.11

150,000

24

C1, D1

REC. 11.05, RET. 11.06

15

3.06

120,000

18

#4, #11

REC. 11.05, RET. 11.06

16

5.06

SMOKE CONTROL IN LONG ATRIA

150,000

18

#7, #9

REC. 11.05, RET. 11.06

17

7.06

ECONOMIC ENVELOPE COST DATA BASE IN SUPPORT OF STANDARD 90.1 TRAINING REQUIREMENTS FOR SUSTAINABLE, HIGH PERFORMANCE BUILDING OPERATION TO OPTIMIZE OPERATIONS AND ACHIEVING DESIGN EXPECTATIONS

425,000

12

A1

REC. 11.05, RET. 11.06

7.03 18 1650 RTAR 72,000 18 #10 REJECTED RTARS: Topics that were judged not suitable for the ASHRAE research program as presented. LITERATURE SEARCH FOR CURRENT HVAC DUCT DESIGN GUIDELINES FOR JUSTICE FACILITIES AND/OR STANDARDS WORLDWIDE AS WELL AS TG9.JF AT FEDERAL, STATE, COUNTY AND LOCALS LEVELS DEVELOP A MATHEMATICAL MODEL TO DETERMINE THE OPTIMUM AIR FLOW REQUIREMENTS FOR A SAFE, ENERGY EFFICIENT LABORATORY ENVIRONMENT A STUDY OF FLOW CAPACITY AND LEAKAGE CHARACTERISTICS IN 4-WAY REVERSING VALVES THE EFFECT OF ACTIVE AND PASSIVE CHILLED BEAMS ON LABORATORY FUME HOOD PERFORMANCE

REC. 11.05, RET. 11.06

19

1520

RTAR

50,000

#1?

REC. 10.07, RET. 10.10 REC.10.12, REJ.11.01

20

1541 1549 1570 1571 1572 1573 1621 1648

RTAR RTAR RTAR RTAR RTAR RTAR RTAR RTAR

9.10

150,000

24

REC. 08.03, RET. 08.04 REC. 08.09, REJ. 09.01 REC. 08.03, RET. 08.04 REC. 11.05, REJ. 11.06 REC. 08.09, RET. 09.01 REC. 09.08, REJ. 09.10

21

8.08

150,000

24

A1, D3

22

9.10 SSPC 41 9.10

125,000

18

23 24

SEARCHABLE DATABASE OF ASHRAE STANDARD CROSS REFERENCES LABORATORY DESIGN GUIDE REVISION TECHNICAL ASSISTANCE DETERMINATION OF SUITABLE REPLACEMENT FOR SF6 WHEN USED AS A TRACER GAS IN ACCORDANCE WITH ASHRAE METHODS OF TEST 110 AND 129 DRIVING RAIN: IMPACT ON DURABILITY, INDOOR HUMIDITY AND ENERGY EFFICIENCY DEVELOPING MODELS TO REPRESENT EXISTING BUILDING STOCK ENERGY PERFORMANCE

50,000 30,000

9 18

E1 ?

REC. 08.09, REJ. 09.01 REC. 08.09, REJ. 09.01 REC. 08.09, RET. 09.01 REC. 09.08, REJ. 09.10

25

9.10

60,000

18

? A1, A6, B2, C7, E1, E2

26

4.04

250,000

24

REC. 10.05, REJ. 10.06

27

7.06

200,000

#7

REC. 11.05, REJ. 11.06

DROPPED TOPICS FROM RESEARCH IMPLEMENTATION PLAN (The following topics have been dropped from the Research Implementation Plan for various reasons.)
EST. DURATION (Months) RESEARCH STRATEGIC PLAN GOALS SUPPORTED 1st DRAFT OF WORK STATEMENT DUE TO RAC BY THIS DATE CO-SPONSOR TCs

RESPONSIBLE TC/TG/SSPC

EST. COST

TOPIC #

STATUS

TITLE

REASON FOR DROP

===== ======== =========== ======= =============================================================== ========== ======= ======= ======== ==================== ================ ================

1368

RTAR

4.05

DEVELOP LOCAL CONVECTIVE HEAT TRANSFER COEFFICIENTS FOR INDOOR AND OUTDOOR SURFACES OF FENESTRATION SYSTEMS

135,000

24

A6, C6

None

May 15, 2009

1414 1425

RTAR RTAR

4.05

DETERMINATION OF THE U-FACTORS, SOLAR HEAT GAIN COEFFICIENTS AND VISIBLE TRANSMITTANCES OF STANDARD FENESTRATION UNITS MADE FROM REPRESENTATIVE FENESTRATION FRAME AND GLAZING SYSTEMS TO UPDATE TABLES 4, 6, 13, 15, AND 16 IN THE FENESTRATION CHAPTER OF HANDBOOK OF FUNDAMENTALS CHARACTERIZATION OF INFILTRATION, VENTILATION AND IAQ IN MIDAND HIGH-RISE MULTI-FAMILY BUILDINGS

45,000

16

A1, A2

None

May 15, 2009

4.03

185,000

24

A1, B2

None

May 15, 2008

1426 1434 1435 1445 1446

RTAR RTAR RTAR WS RTAR

4.03

OCCUPANT RESPONSE TO THE NOISE OF RESIDENTIAL VENTILATION FANS REFRIGERATED FACILITIES DOORWAY INFILTRATION AIR ENERGY REDUCTION

100,000

18

10.05

160,000

18

A5 A6, A8, C6, D1, D7, E1 A6, A8, C6, D1 A2, A7, B1, B2

None Topic time expired from plan due to lack of activity.

May 15, 2009

None

May 15, 2008

10.09

OPTIMIZING BLAST FREEZER EFFECTIVENESS ENERGY CONSERVATION, AIR-CONDITIONING AND PRODUCTIVITY IN HOTHUMID TROPICAL REGIONS

50,000

18

2.01

175,000

36

None EHC 2.05 5.12 7.06

May 15, 2008 REQUIREMENT SATISFIED

3.04

PHYSICAL PROPERTIES MEASUREMENTS OF CO2 / LUBRICANT MIXTURES THE DEVELOPMENT OF A COMPUTATIONAL FLUID DYNAMICS MODEL TO REPRESENT THE PERFORMANCE OF A ROUND FLOOR (SWIRL OR INDUCTION TYPE) OUTLET USED IN UNDERFLOOR AIR DISTRIBUTION EVALUATION OF THE IMPACT OF A MONOCHLORAMINE DISINFECTION ON LEGIONELLA COLONIZATION OF AN INSTITUTIONAL SERVICE WATER SYSTEM AND ON THE INCIDENCE OF HEALTH CARE ASSOCIATED LEGIONNAIRES' DISEASE (LD)

75,000

D2, D3

None

May 15, 2008

1465

RTAR

4.10

100,000

18

C1, C3

None

August 15, 2008

10

1479

RTAR

3.06

25,000

24

B2, B3, E1, E2

None Topic time expired from display on plan due to no WS draft. TC can reactivate on plan by submitting WS draft and getting it approved by deadline noted in far left column

May 15, 2009

11

1483 1494 1496 1497 1502 1513 1514 1543 1545 1548 1563

RTAR RTAR RTAR RTAR TRP-R RTAR RTAR RTAR WS RTAR RTAR

SSPC 90.1

STANDARD 90.1 LINKED CRITERIA SLECTION ANALYSIS BASED ON PERFORMANCE WITH DESIGN PACKAGES PROCEDURES TO GENERATE HOURLY CLIMATIC DATA FROM SPARSE DATA SETS MOISTURE TRANSPORT IN CONSTRUCTION MATERIALS & ASSEMBLIES AT LOW TEMPERATURES VENT PERFORMANCE MODEL FOR ALL CATEGORIES, MULTI-STORY AND MULTI-UNIT FOR GAS & OIL FIRED FURNANCES, BOILERS AND WATER HEATERS

250,000

18

A1, A5, A6 A6, C1, C6, E2 A6, B2, C2

None

August 15, 2009

12

4.02

75,000

12

None

May 15, 2009

13

4.04

190,000

24

None

August 15, 2009

14

6.10

150,000

18

C1, C3, D1 A7, B2, C6

None

AUG. 15, 2010 REQUIREMENT SATISFIED

15

1.04

USER INTERFACE DESIGN FOR ADVANCED SYSTEM OPERATION

240,000

24

7.09

Replaced by URP-1633 after no bids received Topic time expired from display on plan due to no WS draft. TC can reactivate on plan by submitting WS draft and getting it approved by deadline noted in far left column

REQUIREMENT SATISFIED

16

10.03

LIQUID/VAPOR SEPARATING VELOCITIES FOR INDUSTRIAL REFRIGERATION SYSTEMS

100,000

18

D1, D2

None

AUG. 15, 2010

OCT. 2012

17

10.01

THERMAL ENERGY RECOVERY FROM INDUSTRIAL REFRIGERATION SYSTEMS

100,000

12

A7, D1, D2

None

AUG. 15, 2010

18

7.05

DEMAND RESPONSE OPTIMIZATION PROTOCOL AND INTEGRATED TRAINING

120,000

18

A1 A1, B2, C6, C7, D1

None

MAY 15, 2010 REQUIREMENT SATISFIED

JULY 2012

19

5.03

NON-STEADY STATE OVERHEAD HEATING AND AIR CHANGE EFFECTIVENESS IN-DUCT FULL-SCALE LABORATORY-EVALUATED COMPARISON OF PHOTOCATALYTIC OXIDATION (PCO) FILTERS VERSUS DRY-SCRUBBING MEDIA FILTERS

TC Dropped Topic None Topic time expired from display on plan due to no WS draft. TC can reactivate on plan by submitting WS draft and getting it approved by deadline noted in far left column

120,000

24

20

2.03

150,000

24

A2, A5, B1, B3

None

MAY 15, 2010

21

6.03

IMPACT OF DUCT LEAKAGE ON INDOOR AIR QUALITY IN RESIDENTIAL SYSTEMS

175,000

18

B2, B3 C1, D2, D1, A1, A6, A7

None

AUG. 15, 2010

22

1577

RTAR

8.04

TUBE-TO-TUBE CONDUCTION EFFECTS IN FINNED TUBE HEAT EXCHANGERS

200,000

24

None

DEC. 15, 2010

RAC APPROVAL FOR BID REQUIRED BY THIS DATE OR DROPPED JULY 2011 JULY 2011 JULY 2010 JULY 2011 JULY 2010 JULY 2010 JULY 2010 JULY 2010 OCT. 2010 JULY 2011 OCT. 2011 JULY 2011 OCT. 2011 OCT. 2012 OCT. 2012 JULY 2012 JULY 2012 OCT. 2012 FEB. 2013