RAYADAH INVESTMENT COMPANY

HANMI INTERNATIONAL (KSA) LTD.

ZUHAIR FAYEZ PARTNERSHIP

AL-BAWANI CO.

PROJECT: ITCC (17TH PARCEL PROJECT) COMMENTS SHEET

(SUBMITTAL NO. DCS-EM-206) REV.0. SUBJECT: - FIRE DETECTION FOR NOVEC-1230 SYSTEM (RD-03 & RD-04) MANUFACTURE/SUPPLIER: -- EQUIPMENTS & TECHNICAL SERVICES CO. LTD. COMMENTS: --- (ALL COMMENTS) CODE B
1. POWER REQUIREMENTS OF NOVAC SYSTEM SHALL BE AS PER MANUFACTURER REQUIREMENTS. 2. COORDINATE WITH OTHER SYSTEM FOR INTERLOCKING & INTERFACING. 3. ACCUATING OF NOVAC SYSTEM SHALL BE AS PER APPROVED SEQUENCE OF OPERATION OF BMS. 4. CONTROL WIRING SHALL BE AS PER MANUFACTURER RECOMMENDATIONS. 5. WORK SHALL BE AS PER STANDARD PRACTICES. 6. FOR OTHER COMMENTS, REFER TO SUBMITTED SHEETS AS MARKED AND NOTED. PREPARED BY: NADEEM-UDDIN SENIOR ELECTRICAL ENGINEER /ZFP NOTED BY: __________________ ENGR. MOSTAFA AL-WAKEEL MEP MANAGER/ZFP ____________________ ENGR. ANEES MALLICK PROJECT MANAGER /ZFP NOTED BY: ____________________ ENGR. FATIH TURKMEN ZFP-ITCC PROJECT DIRECTOR

Вам также может понравиться