Alamat : Jl. D.I. Panjaitan Kav. 9 Lt. 6 , Jakarta 13340 Indonesia, Phone : +62-21 -8192808, 8508640, 8508650, Fax : +62-21-8198040
PROJECT NAME
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL
CLIENT
CONSULTANT
LOCATION
PESANGGARAN - MAKASSAR
DOCUMENT TITLE
DOCUMENT NUMBER :
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
REV A
DATE 05 Feb 13
PREP'D SYN
APPRV'D AA
CHK'D
PDG APPRV'D
DATE
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASSAR) REVISI PROCEDURE OF NUMBERING SYSTEM HALAMAN : 2/7 :A
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
REVISION LIST
Rev. No.
Paragraph
Page
Description
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASSAR) REVISI PROCEDURE OF NUMBERING SYSTEM HALAMAN : 3/7 :A
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
TABLE OF CONTENT
1. SCOPE .................................................................................................................................. 4 2. DEFINITION .......................................................................................................................... 4 2.1. Definition ......................................................................................................................... 4 2.2. Project Name and Contract Number .............................................................................. 4 3. CORRESPONDENCE NUMBERING ................................................................................... 4 4. MINUTES OF MEETING (MOM) .......................................................................................... 5 5. DOCUMENT NUMBERING SYSTEM .................................................................................. 5
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASSAR) REVISI PROCEDURE OF NUMBERING SYSTEM HALAMAN : 4/7 :A
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
1. SCOPE This Document prescribed the rules for numbering documents and equipment regarding the works for FEED Eastern Indonesia LNG Transportation and Receiving Terminal. 2. DEFINITION 2.1. Definition PDG PMC GOVERNMENT WIKA VENDOR : PT. Pertadaya Gas : PT. Bintang Persada Abadi : The Government of Republic of Indonesia : PT. Wijaya Karya (Persero) Tbk. : All equipment and service supplier
2.2. Project Name and Contract Number Project Name Contract Number : FEED Eastern Indonesia LNG Transportation and Receiving Terminal (PROJECT). :
3. CORRESPONDENCE NUMBERING Numbering of correspondence by letter, facsimile, telex, etc. Shall be made as follows. FPM-XXX-001
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASSAR) REVISI PROCEDURE OF NUMBERING SYSTEM HALAMAN : 5/7 :A
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
Numbering of Minutes of Meeting shall be made as follows. FPM-MOM-X-001 PROJECT Initial Category Code for MOM Location of Meeting (see Note 2) Serial Number (3 digits format)
5. DOCUMENT NUMBERING SYSTEM Document numbering system is defined as follow: FPMXXXXXXXXX001AX PROJECT Initial PROJECT Location (see Note 3) Discipline Originator (see Note 4) Note 3 : PROJECT Location Code Document paper size (see Note 6) Serial Number (3 digits) Document type (see Note 5)
Location
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASSAR) REVISI PROCEDURE OF NUMBERING SYSTEM HALAMAN : 6/7 :A
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
PSG MKS Note 4 : Discipline Originator Code GEN PCT PRO HSE MEC PIP PL ELE INS TEL CIV Note 5 : Document Type Code GEN PFD UFD HMB PID SPC PCD LST CAL DS DWG IF TQ RM RPT RW RC SCH BOM MTO
Pesanggaran Makassar Description General Project Control & Scheduling Process Health, Safety, and Environment Mechanical Piping Pipeline Electrical Instrumentation Telecommunication Civil Description General Document Process Flow Diagram Utility Flow Diagram Heat & Mass Balance Piping & Instrumentation Diagram Specification Procedure List Calculation Datasheet Drawing Information Technical Query Monthly Report General Report Weekly Report Closeout Report Schedule Bill of Material Material Take Off
Note 6 : Document paper size Code Paper Size A0 841 mm X 1189 mm A1 594 mm X 841 mm
FRONT END ENGINEERING DESIGN (FEED) OF EASTERN INDONESIA LNG TRANSPORTATION AND RECEIVING TERMINAL (PESANGGARAN & MAKASSAR) REVISI PROCEDURE OF NUMBERING SYSTEM HALAMAN : 7/7 :A
FPM-PSG-GEN-GEN-001-A4 FPM-MKS-GEN-GEN-001-A4
A3 A4
Sample: FPM-PSG-PRO-CAL-001-A4 This is a Process Calculation document, first sequence with paper size A4.