Вы находитесь на странице: 1из 51

PROYECTO

DISEO ESTRUCTURAL EDIFICACION DE 3 NIVIELES DE USO VIVIENDA


Y COMERCIO UBICADA EN LA CLL 25 N 10-13
YOPAL - CASANARE

MEMORIAS DE CLCULO

EDIGSON PREZ HENAO


Ing. Civil MP 15202-243198 BYC
Ing. Mecnico MP 230-58438 CN

PROPIETARIO: MARIA DEL TRANSITO SALAMANCA S.

DISEO

| EDIGSON PREZ HENAO

JUNIO DE 2013
DISEO DE ESTRUCTURA
1.0 DATOS GENERALES
PROYECTO:

EDIFICACION 3 NIVELES

Localizacin:

Calle 25 No 10 13 Municipio de Yopal Casanare

Uso:

VIVIENDA

Altura total del edificio:

10.0 m mx. (Aprox.)

Material:

Concreto reforzado, acero estructural.

Tipo cimentacin:

Zapatas y vigas de cimentacin.

2.0 PARMETROS DE DISEO


Zona de amenaza ssmica:
Coeficiente de aceleracin:
Coeficiente de importancia:

Alta
Aa= 0.30
I= 1.0

Estructuras con capacidad especial de Disipacin de Energa (D.E.S)


Coeficiente de capacidad de disipacin de energa: Ro= 5.67
Coeficientes para tener en cuenta irregularidad: a=0.9, p=0.9
3.0 PARAMETROS DE SUELO
Segn estudio de suelos:
Perfil de suelo tipo:
Av:
Ae:
Ad:
Fa:
Fv:

D
0.20
0.15
0.06
1.20
2.00

Capacidad portante del suelo:

Factor de Seguridad del estudio de suelos:


PROPIETARIO: MARIA DEL TRANSITO SALAMANCA S.

adm=

1.38 kg/cm2 promedio (para


cargas gravitacionales)
FS= 3
DISEO

| EDIGSON PREZ HENAO

4.0 MATERIALES
Concreto:
3000 psi (21 MPa)
Concreto Solados:
2000 psi (14 Mpa)
Acero de Refuerzo (principal y estribos):
60.000 psi (420 MPa)
Acero estructural:
ASTM-A36, ASTM A570 G33, A-37
Soldadura:
E6013, E70XX, E60XX
5.0 CARGAS DE DISEO
Carga Muerta:

Peso propio de las estructuras (Tomado directamente por el programa


durante el anlisis; densidad concreto 2400 kg/m3 (ver memorias).
Peso de mampostera ( ver memorias)
Peso cubierta

Carga viva:

180 Kg/m2 para entrepiso


35 kg/m2 para cubiertas P> 20%.
50 kg/m2 para cubiertas P< 20%.

Carga ssmica:
Se realiz un anlisis de fuerza horizontal equivalente utilizando directamente el
programa de anlisis ajustndolo al espectro de diseo especificado por la norma
NSR-10 y comparando con el procedimiento especificado por la misma norma;
teniendo en cuenta para tal efecto la carga debida al peso propio de la estructura
y el peso muros.
5.0 COMBINACIONES DE CARGA
Se utilizaron las combinaciones de carga especificados por la norma N.S.R-10
(ver combinaciones especificadas segn reportes del diseo)

7.0 OTROS PARMETROS


Control de derivas: Se realiz un control de derivas al 1% de la altura entrepiso.

PROPIETARIO: MARIA DEL TRANSITO SALAMANCA S.

DISEO

| EDIGSON PREZ HENAO

8.0 CDIGO DE DISEO


Norma Colombiana de Diseo y Construccin Sismo Resistente N.S.R-10
9.0 PROGRAMA DE DISEO
STAADPRO V8i
DV-CAD
Interfase grfica para diseo y despiece de vigas y columnas

10.0 TIPO DE ANLISIS REALIZADO


Anlisis elstico para la determinacin de fuerzas y desplazamientos; modelando
vigas y columnas como elementos tipo FRAME, losas mediante elementos finitos
tipo PLACA. El elemento tipo placa utilizado por el programa usado, es un
elemento finito de tres cuatro nudos, el cual puede resistir esfuerzos de flexin,
cortante y de membrana.
10.0 DESCRIPCIN DEL SOFTWARE DE ANALISIS
STAAD.Pro
es la eleccin del profesional de la ingeniera estructural de acero, hormign,
madera, aluminio, y el diseo de acero conformado en fro de prcticamente
cualquier estructura que incluye alcantarillas, plantas petroqumicas, tneles,
puentes, pilotes, y mucho ms a travs de su entorno de modelado flexible y
avanzada caractersticas, y la colaboracin de datos con fluidez
Permite a los ingenieros estructurales para analizar y disear prcticamente
cualquier tipo de estructura a travs de su entorno de modelado flexible y
caractersticas avanzadas y la colaboracin de datos con fluidez.

Modelado flexible es proporcionada por un entorno grfico el estado de la


tcnica y el diseo soporta ms de 70 cdigos internacionales y ms de 20
cdigos de los Estados Unidos en 7 idiomas.
Una matriz de anlisis estructural avanzado y caractersticas de diseo se
incluyen tales como la certificacin nuclear con 10CFR Parte 50, 10CFR
21, ASME NQA-1-2000, la historia tiempo y empuje sobre el anlisis y el
anlisis de cable (lineal y no lineal).

Tomado de la pgina de BENTLEY.COM


PROPIETARIO: MARIA DEL TRANSITO SALAMANCA S.

DISEO

| EDIGSON PREZ HENAO

PROYECTO:
EDIFICIACION 3 NIVELES VIVIENDA

AVALUO DE CARGAS
SISTEMA PLACAFCIL BLOQUELON

Placa

0.05

2.4 T/m

0.120 T/m

1.20

kN/m

Mortero pega

0.02

2.2 T/m

0.044 T/m

0.44

kN/m

Acabados sup

0.015

2.2 T/m

0.033 T/m

0.33

kN/m

Bloqueln

0.053 T/m

0.53

kN/m

Muros divisorios

0.320 T/m

3.20

kN/m

Pefiles

0.005 T/m

0.05

kN/m

D.L.=

0.576 T/m

5.76

kN/m

L.L.=

0.180 T/m

1.80

kN/m

CARGA VIVA
VIVIENDA

PROYECTO:
EDIFICIACION 3 NIVELES VIVIENDA

AVALUO DE CARGAS

CUBIERTA

Cubierta

CARGA MUERTA:
Teja eternit
Iluminacion y Ductos
Cieloraso
Estructura metlica

0.022
0.010
0.015
0.035
0.082

CARGAS VIVAS:
Pprom= 26.70%

T/m
T/m
T/m
T/m
T/m

0.22
0.10
0.15
0.35
0.82

kN/m
kN/m
kN/m
kN/m
kN/m

0.035 T/m

0.35

kN/m

CARGAS DE VIENTO:
(No relevantes pues la pendiente de la cubierta implica una carga viva de 35 kg/m2)

RESUMEN

C.M.=

0.082 T/m

0.82

kN/m

C.V.=

0.035 T/m

0.35

kN/m

REACCIONES DE NODOS DE SOPORTE CARGA MUERTA

Node
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

L/C
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

Force-X Mton
0.165
0.064
0.045
-0.148
0.161
0.051
0.125
-0.461
0.034
-0.362
0.161
0.037
0.167
0.061
0.043
-0.144
PESO DE
EDIFICACION

Force-Y Mton Force-Z Mton


6.783
0.245
12.597
0.175
15.73
0.083
13.304
0.134
12.003
-0.167
20.075
-0.045
19.71
0.091
19.438
0.094
19.768
-0.05
19.322
-0.089
12.789
0.036
20.589
-0.094
9.053
-0.12
14.472
-0.066
15.883
-0.086
13.367
-0.141

244.883 TON

Moment-X
MTon-m
0.015
0.045
0.064
0.051
-0.021
-0.002
0.011
0.016
-0.002
-0.016
0.009
-0.014
-0.02
-0.041
-0.063
-0.052

Moment-Y
MTon-m
-0.001
-0.002
0
0.001
0
0
0.004
0.005
-0.004
-0.006
0
0
0.001
0.002
0.001
0.001

Moment-Z
MTon-m
0.009
0.003
-0.025
-0.04
0.006
0.006
-0.028
-0.005
-0.015
0.001
0.01
0.009
0.005
-0.001
-0.030
-0.045

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Job Information
Engineer
Name:
Date:

Checked

Approved

16-Jun-13

Structure Type

SPACE FRAME

Number of Nodes
Number of Elements
Number of Plates

514
318
300

Highest Node
Highest Beam
Highest Plate

Number of Basic Load Cases


Number of Combination Load Cases

514
720
612

4
114

Included in this printout are data for:


The Whole Structure
All
Included in this printout are results for load cases:
Type
L/C
Primary
Primary
Primary
Primary
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Print Time/Date: 02/07/2013 13:54

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Name

SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
DERIVAS 1.0D
D+L
1.2 D + 0.75L
D+W
D + 0.7 EX
D+ 0.7 EZ
D - 0.7 EX
D - 0.7 EZ
D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)
D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)
D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)
D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)
D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)
D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)
D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)
D + 0.75W + 0.75L
D + 0.75 (0.7EX) + 0.75L
D + 0.75 (0.7EZ) + 0.75L
D - 0.75 (0.7EX) + 0.75L
D - 0.75 (0.7EZ) + 0.75L
D + 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L
D + 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L
STAAD.Pro for Windows 20.07.04.12

Print Run 1 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Job Information Cont...


Type

L/C

Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination

28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Print Time/Date: 02/07/2013 13:54

Name
D - 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L
D - 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L
D + 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L
D + 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L
D - 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L
D - 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L
0.6D + W
0.6 D + 0.7EX
0.6 D + 0.7EZ
0.6 D - 0.7EX
0.6 D - 0.7EZ
0.6D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)
0.6D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)
0.6D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)
0.6D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)
0.6D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)
0.6D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)
0.6D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
0.6D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)
DISEO 1.4 D
1.2D + 1.6L
1.2D + (L 0.8W)
1.2D + (L 0.8W)
1.2D + 1.6W + 1.0L
1.2D + 1.0EX + 1.0L
1.2D + 1.0EZ + 1.0L
1.2D - 1.0EX + 1.0L
1.2D - 1.0EZ + 1.0L
1.2D + 1.0EX + 0.3EZ + 1.0L
1.2D + 1.0EX - 0.3EZ + 1.0L
1.2D - 1.0EX + 0.3EZ + 1.0L
1.2D - 1.0EX - 0.3EZ + 1.0L
1.2D + 1.0EZ + 0.3EX + 1.0L
1.2D + 1.0EZ - 0.3EX + 1.0L
1.2D - 1.0EZ + 0.3EX + 1.0L
1.2D - 1.0EZ - 0.3EX + 1.0L
0.9D + 1.6W
0.9D + 1.0EX
0.9D + 1.0EZ
0.9D - 1.0EX
0.9D - 1.0EZ
0.9D + 1.0EX + 0.3EZ
0.9D + 1.0EX - 0.3EZ
0.9D - 1.0EX + 0.3EZ
0.9D - 1.0EX - 0.3EZ
STAAD.Pro for Windows 20.07.04.12

Print Run 2 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Job Information Cont...


Type

L/C

Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination
Combination

73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117

Print Time/Date: 02/07/2013 13:54

Name
0.9D + 1.0EZ + 0.3EX
0.9D + 1.0EZ - 0.3EX
0.9D - 1.0EZ + 0.3EX
0.9D - 1.0EZ - 0.3EX
ZAPATAS D
D+L
D + 0.75L
D+W
D + 0.7 EX
D + 0.7 EZ
D - 0.7 EZ
D - 0.7 EZ
D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)
D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)
D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)
D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)
D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)
D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)
D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)
D + 0.75W + 0.75L
D + 0.75 (0.7EX) + 0.75L
D + 0.75 (0.7EZ) + 0.75L
D - 0.75 (0.7EX) + 0.75L
D - 0.75 (0.7EZ) + 0.75L
D + 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L
D + 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L
D - 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L
D - 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L
D + 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L
D + 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L
D - 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L
D - 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L
0.6D + W
0.6 D + 0.7EX
0.6 D + 0.7EZ
0.6 D - 0.7EX
0.6 D - 0.7EZ
0.6D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)
0.6D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)
0.6D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)
0.6D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)
0.6D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)
0.6D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)
0.6D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
STAAD.Pro for Windows 20.07.04.12

Print Run 3 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Job Information Cont...


Type

L/C

Combination
Combination

117
118

Name
0.6D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
0.6D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)

3D Rendered View (Input data was modified after picture taken)

Basic Load Cases


Number
1
2
3
4

Name
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA

Print Time/Date: 02/07/2013 13:54

STAAD.Pro for Windows 20.07.04.12

Print Run 4 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases


Comb.

Combination L/C Name

5
6

DERIVAS 1.0D
D+L

1.2 D + 0.75L

8
9

D+W
D + 0.7 EX

10

D+ 0.7 EZ

11

D - 0.7 EX

12

D - 0.7 EZ

13

D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)

14

D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)

15

D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)

16

D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)

17

D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)

18

D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)

19

D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)

20

D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)

21

D + 0.75W + 0.75L

22

D + 0.75 (0.7EX) + 0.75L

23

D + 0.75 (0.7EZ) + 0.75L

Print Time/Date: 02/07/2013 13:54

Primary
3
3
4
3
4
3
1
3
2
3
1
3
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
3
4
1
3
4
2
3

Primary L/C Name


CARGA MUERTA
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
CARGA MUERTA
CARGA VIVA
SISMO X
CARGA MUERTA
CARGA VIVA
SISMO Z
CARGA MUERTA

STAAD.Pro for Windows 20.07.04.12

Factor
1.00
1.00
1.00
1.20
0.75
1.00
0.70
1.00
0.70
1.00
-0.70
1.00
-0.70
1.00
0.70
0.21
1.00
0.70
-0.21
1.00
-0.70
0.21
1.00
-0.70
-0.21
1.00
0.21
0.70
1.00
-0.21
0.70
1.00
0.21
-0.70
1.00
-0.21
-0.70
1.00
1.00
0.75
0.52
1.00
0.75
0.52
1.00
Print Run 5 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.

24

25

26

27

28

29

30

31

32

33

34
35
36
37

Combination L/C Name

Primary

4
1
3
4
D - 0.75 (0.7EZ) + 0.75L
2
3
4
D + 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D + 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D + 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
D + 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
0.6D + W
3
0.6 D + 0.7EX
1
3
0.6 D + 0.7EZ
2
3
0.6 D - 0.7EX
1
D - 0.75 (0.7EX) + 0.75L

Print Time/Date: 02/07/2013 13:54

Primary L/C Name


CARGA VIVA
SISMO X
CARGA MUERTA
CARGA VIVA
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X

STAAD.Pro for Windows 20.07.04.12

Factor
0.75
-0.52
1.00
0.75
-0.52
1.00
0.75
0.52
0.16
1.00
0.75
0.52
-0.16
1.00
0.75
-0.52
0.16
1.00
0.75
-0.52
-0.16
1.00
0.75
0.16
0.52
1.00
0.75
-0.16
0.52
1.00
0.75
0.16
-0.52
1.00
0.75
-0.16
-0.52
1.00
0.75
0.60
0.70
0.60
0.70
0.60
-0.70
Print Run 6 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.

Combination L/C Name

38

0.6 D - 0.7EZ

39

0.6D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)

40

0.6D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)

41

0.6D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)

42

0.6D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)

43

0.6D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)

44

0.6D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)

45

0.6D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)

46

0.6D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)

47
48

DISEO 1.4 D
1.2D + 1.6L

49

1.2D + (L 0.8W)

50
51

1.2D + (L 0.8W)
1.2D + 1.6W + 1.0L

52

1.2D + 1.0EX + 1.0L

53

1.2D + 1.0EZ + 1.0L

54

1.2D - 1.0EX + 1.0L

55

1.2D - 1.0EZ + 1.0L

Print Time/Date: 02/07/2013 13:54

Primary
3
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
3
3
4
3
4
3
3
4
1
3
4
2
3
4
1
3
4
2

Primary L/C Name


CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
CARGA MUERTA
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
CARGA MUERTA
CARGA VIVA
SISMO X
CARGA MUERTA
CARGA VIVA
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
CARGA MUERTA
CARGA VIVA
SISMO Z

STAAD.Pro for Windows 20.07.04.12

Factor
0.60
-0.70
0.60
0.70
0.21
0.60
0.70
-0.21
0.60
-0.70
0.21
0.60
-0.70
-0.21
0.60
0.21
0.70
0.60
-0.21
0.70
0.60
0.21
-0.70
0.60
-0.21
-0.70
0.60
1.40
1.20
1.60
1.20
1.00
1.20
1.20
1.00
0.20
1.20
1.00
0.20
1.20
1.00
-0.20
1.20
1.00
-0.20
Print Run 7 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.

Combination L/C Name

56

1.2D + 1.0EX + 0.3EZ + 1.0L

57

1.2D + 1.0EX - 0.3EZ + 1.0L

58

1.2D - 1.0EX + 0.3EZ + 1.0L

59

1.2D - 1.0EX - 0.3EZ + 1.0L

60

1.2D + 1.0EZ + 0.3EX + 1.0L

61

1.2D + 1.0EZ - 0.3EX + 1.0L

62

1.2D - 1.0EZ + 0.3EX + 1.0L

63

1.2D - 1.0EZ - 0.3EX + 1.0L

64
65

0.9D + 1.6W
0.9D + 1.0EX

66

0.9D + 1.0EZ

67

0.9D - 1.0EX

68

0.9D - 1.0EZ

69

0.9D + 1.0EX + 0.3EZ

Print Time/Date: 02/07/2013 13:54

Primary
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
3
1
3
2
3
1
3
2
3
1
2

Primary L/C Name


CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z

STAAD.Pro for Windows 20.07.04.12

Factor
1.20
1.00
0.20
0.06
1.20
1.00
0.20
-0.06
1.20
1.00
-0.20
0.06
1.20
1.00
-0.20
-0.06
1.20
1.00
0.06
0.20
1.20
1.00
-0.06
0.20
1.20
1.00
0.06
-0.20
1.20
1.00
-0.06
-0.20
1.20
1.00
0.90
0.20
0.90
0.20
0.90
-0.20
0.90
-0.20
0.90
0.20
0.06
Print Run 8 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.

Combination L/C Name

70

0.9D + 1.0EX - 0.3EZ

71

0.9D - 1.0EX + 0.3EZ

72

0.9D - 1.0EX - 0.3EZ

73

0.9D + 1.0EZ + 0.3EX

74

0.9D + 1.0EZ - 0.3EX

75

0.9D - 1.0EZ + 0.3EX

76

0.9D - 1.0EZ - 0.3EX

77
78

ZAPATAS D
D+L

79

D + 0.75L

80
81

D+W
D + 0.7 EX

82

D + 0.7 EZ

83

D - 0.7 EZ

84

D - 0.7 EZ

85

D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)

86

D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)

87

D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)

Print Time/Date: 02/07/2013 13:54

Primary
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
1
2
3
3
3
4
3
4
3
1
3
2
3
1
3
2
3
1
2
3
1
2
3
1
2
3

Primary L/C Name


CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
CARGA MUERTA
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA

STAAD.Pro for Windows 20.07.04.12

Factor
0.90
0.20
-0.06
0.90
-0.20
0.06
0.90
-0.20
-0.06
0.90
0.06
0.20
0.90
-0.06
0.20
0.90
0.06
-0.20
0.90
-0.06
-0.20
0.90
1.00
1.00
1.00
1.20
0.75
1.00
0.14
1.00
0.14
1.00
-0.14
1.00
-0.14
1.00
0.14
0.04
1.00
0.14
-0.04
1.00
-0.14
0.04
1.00
Print Run 9 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

10

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.
88

89

90

91

92

93
94

95

96

97

98

99

100

101

Combination L/C Name


D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)

Primary

1
2
3
D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)
1
2
3
D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)
1
2
3
D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
1
2
3
D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)
1
2
3
D + 0.75W + 0.75L
3
4
D + 0.75 (0.7EX) + 0.75L
1
3
4
D + 0.75 (0.7EZ) + 0.75L
2
3
4
D - 0.75 (0.7EX) + 0.75L
1
3
4
D - 0.75 (0.7EZ) + 0.75L
2
3
4
D + 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D + 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EX)) + 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EX)) - 0.3(0.75(0.7EZ))+ 0.75L 1
2
3
4

Print Time/Date: 02/07/2013 13:54

Primary L/C Name


SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
CARGA MUERTA
CARGA VIVA
SISMO X
CARGA MUERTA
CARGA VIVA
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
CARGA MUERTA
CARGA VIVA
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA

STAAD.Pro for Windows 20.07.04.12

Factor
-0.14
-0.04
1.00
0.04
0.14
1.00
-0.04
0.14
1.00
0.04
-0.14
1.00
-0.04
-0.14
1.00
1.00
0.75
0.10
1.00
0.75
0.10
1.00
0.75
-0.10
1.00
0.75
-0.10
1.00
0.75
0.10
0.03
1.00
0.75
0.10
-0.03
1.00
0.75
-0.10
0.03
1.00
0.75
-0.10
-0.03
1.00
0.75
Print Run 10 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

11

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.
102

103

104

105

106
107
108
109
110
111

112

113

114

115

116

117

Combination L/C Name

Primary

D + 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L 1


2
3
4
D + 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EZ)) + 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
D - 1.0(0.75(0.7EZ)) - 0.3(0.75(0.7EX))+ 0.75L 1
2
3
4
0.6D + W
3
0.6 D + 0.7EX
1
3
0.6 D + 0.7EZ
2
3
0.6 D - 0.7EX
1
3
0.6 D - 0.7EZ
2
3
0.6D + 1.0 (0.7 EX) + 0.3 (0.7 EZ)
1
2
3
0.6D + 1.0 (0.7 EX) - 0.3 (0.7 EZ)
1
2
3
0.6D - 1.0 (0.7 EX) + 0.3 (0.7 EZ)
1
2
3
0.6D - 1.0 (0.7 EX) - 0.3 (0.7 EZ)
1
2
3
0.6D + 1.0 (0.7 EZ) + 0.3 (0.7 EX)
1
2
3
0.6D + 1.0 (0.7 EZ) - 0.3 (0.7 EX)
1
2
3
0.6D - 1.0 (0.7 EZ) + 0.3 (0.7 EX)
1
2

Print Time/Date: 02/07/2013 13:54

Primary L/C Name


SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
SISMO X
SISMO Z
CARGA MUERTA
CARGA VIVA
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
CARGA MUERTA
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA
SISMO X
SISMO Z

STAAD.Pro for Windows 20.07.04.12

Factor
0.03
0.10
1.00
0.75
-0.03
0.10
1.00
0.75
0.03
-0.10
1.00
0.75
-0.03
-0.10
1.00
0.75
0.60
0.14
0.60
0.14
0.60
-0.14
0.60
-0.14
0.60
0.14
0.04
0.60
0.14
-0.04
0.60
-0.14
0.04
0.60
-0.14
-0.04
0.60
0.04
0.14
0.60
-0.04
0.14
0.60
0.04
-0.14
Print Run 11 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

12

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Combination Load Cases Cont...


Comb.

118

Combination L/C Name

Primary
3
1
2
3

0.6D - 1.0 (0.7 EZ) - 0.3 (0.7 EX)

Primary L/C Name

Factor

CARGA MUERTA
SISMO X
SISMO Z
CARGA MUERTA

0.60
-0.04
-0.14
0.60

Y
ZX

Load 4

Whole Structure

Section Properties
Prop
3
4
5
6
7
8
9
10
11

Section
Rect 0.40x0.35
Rect 0.30x0.25
Rect 0.30x0.20
Rect 0.40x0.30
Rect 0.30x0.20
Rect 0.25x0.15
Rect 0.20x0.25
Rect 0.30x0.30
Rect 0.30x0.20

Print Time/Date: 02/07/2013 13:54

Area
(cm2)
1.4E+3
750.000
600.000
1.2E+3
600.000
375.000
500.000
900.000
600.000

Iyy
(cm4)
143E+3
39.1E+3
20E+3
90E+3
20E+3
7.03E+3
26E+3
67.5E+3
20E+3

Izz
(cm4)
187E+3
56.3E+3
45E+3
160E+3
45E+3
19.5E+3
16.7E+3
67.5E+3
45E+3

J
(cm4)
272E+3
77.5E+3
47E+3
194E+3
47E+3
17.6E+3
34.2E+3
114E+3
47E+3

Material
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE

STAAD.Pro for Windows 20.07.04.12

Print Run 12 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

13

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Plate Thickness
Prop
1
2

Node A
(cm)
12.000
15.000

Node B
(cm)
12.000
15.000

Node C
(cm)
12.000
15.000

Node D
(cm)
12.000
15.000

Material
CONCRETE
CONCRETE

Y
X
Z

Load 3

Whole Structure

Print Time/Date: 02/07/2013 13:54

STAAD.Pro for Windows 20.07.04.12

Print Run 13 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

14

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Y
X
Z

Load 4

Supports
Node

X
(kN/mm)

Y
(kN/mm)

Z
(kN/mm)

65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

Print Time/Date: 02/07/2013 13:54

rX
rY
rZ
(kN-m/deg) (kN-m/deg) (kN-m/deg)
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed

STAAD.Pro for Windows 20.07.04.12

Print Run 14 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

File

MARIA DEL TRANSITO SALAMANCA SERRANO

X = 0.150 Mton
Y = 17.532 Mton
Z = 0.117 Mton
MX = 0.048 MTon-m
MY = -0.003 MTon-m
MZ = -0.053 MTon-m

Date16-Jun-13

X = 0.086 Mton
Y = 30.292 Mton
Z = 0.036 Mton
MX = 0.002 MTon-m
MY = 0.001 MTon-m
MZ = -0.057 MTon-m

X = 0.131 Mton
Y = 22.746 Mton
Z = -0.001 Mton
MX = 0.096 MTon-m
MY = -0.002 MTon-m
MZ = -0.090 MTon-m

X = -0.164 Mton
Y = 18.564 Mton
Z = 0.104 Mton
MX = 0.079 MTon-m
MY = 0.000 MTon-m
MZ = -0.107 MTon-m
X = 0.359 Mton
Y = 29.800 Mton
Z = 0.296 Mton
MX = 0.029 MTon-m
MY = 0.008 MTon-m
MZ = -0.061 MTon-m

X = 0.163 Mton
Y = 29.581 Mton
Z = 0.090 Mton
MX = -0.006 MTon-m
MY = -0.000 MTon-m
MZ = -0.054 MTon-m
X
Z

X = -0.950 Mton
Y = 29.575 Mton
Z = 0.337 Mton
MX = 0.051 MTon-m
MY = 0.008 MTon-m
MZ = 0.017 MTon-m

X = -0.847 Mton
Y = 29.414 Mton
Z = -0.345 Mton
MX = -0.064 MTon-m
Load 48
MY = -0.018 MTon-m
MZ = 0.085 MTon-m

X = 0.150 Mton
Y = 16.511 Mton
Z = -0.157 Mton
MX = -0.036 MTon-m
MY = 0.002 MTon-m
MZ = -0.091 MTon-m
X = 0.146 Mton
Y = 17.945 Mton
Z = 0.092 Mton
MX = 0.011 MTon-m
MY = -0.000 MTon-m
MZ = -0.121 MTon-m

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

X = 0.225 Mton
Y = 8.546 Mton
Z = 0.265 Mton
MX = 0.003 MTon-m
MY = -0.001 MTon-m
MZ = -0.044 MTon-m

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

15

Part

Software licensed to ING CIVIL


Job Title

Sheet No

X = 0.200 Mton
Y = 12.568 Mton
Z = -0.218 Mton
MX = -0.013 MTon-m
MY = -0.001 MTon-m
MZ = -0.094 MTon-m

X = 0.120 Mton
Y = 21.174 Mton
Z = -0.225 Mton
MX = -0.015 MTon-m
MY = 0.001 MTon-m
MZ = -0.067 MTon-m

X = 0.253 Mton
X = 0.241 Mton
Y = 22.782 Mton
Y = 29.210 Mton
Z = -0.156 Mton
Z = -0.095 Mton
MX = -0.052 MTon-m
MX = -0.009 MTon-m MY = 0.004 MTon-m
MY = -0.012 MTon-m MZ = -0.061 MTon-m
MZ = 0.008 MTon-m

X = -0.263 Mton
Y = 18.638 Mton
Z = -0.140 Mton
MX = -0.091 MTon-m
MY = 0.005 MTon-m
MZ = -0.070 MTon-m

Whole Structure (Input data was modified after picture taken)

Node Displacement Summary


Node
Max X
Min X
Max Y
Min Y
Max Z
Min Z
Max rX
Min rX
Max rY
Min rY
Max rZ
Min rZ
Max Rst

100
100
354
301
100
100
300
300
205
205
372
371
97

Print Time/Date: 02/07/2013 13:54

L/C

X
(cm)

Y
(cm)

1:SISMO X
0.02
6.47
41:0.6D - 1.0 (0.7 EX) -4.57
+ 0.3 (0.7 EZ)
-0.04
1:SISMO X
3.62
2.14
16:D - 1.0 (0.7 EX) - 0.3
-2.54
(0.7 EZ) -1.71
2:SISMO Z
-0.24
-0.03
20:D - 1.0 (0.7 EZ) - 0.3
-1.17
(0.7 EX) -0.01
2:SISMO Z
0.32
0.06
19:D - 1.0 (0.7 EZ) + 0.3
0.53
(0.7 EX) 0.36
2:SISMO Z
0.07
0.27
46:0.6D - 1.0 (0.7 EZ) -0.17
- 0.3 (0.7 EX)-0.32
41:0.6D - 1.0 (0.7 EX) -2.51
+ 0.3 (0.7 EZ)
-1.21
1:SISMO X
3.68
1.64
2:SISMO Z
0.32
0.04

Z
(cm)
0.03
1.44
0.11
-0.80
6.95
-4.87
3.60
-2.46
0.86
-0.60
0.74
0.07
6.95

Resultant
(cm)
6.47
4.79
4.21
3.17
6.95
5.01
3.61
2.54
0.90
0.70
2.89
4.03
6.95

STAAD.Pro for Windows 20.07.04.12

rX
(rad)
0.000
0.001
0.000
-0.002
0.005
-0.003
0.010
-0.007
0.007
-0.005
0.002
0.000
0.005

rY
(rad)
0.000
-0.000
0.001
-0.000
-0.000
-0.000
-0.001
0.001
0.003
-0.002
-0.001
0.001
-0.000

rZ
(rad)
-0.000
0.000
-0.011
0.008
0.000
0.000
-0.000
-0.002
-0.002
0.003
0.008
-0.011
-0.000

Print Run 15 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

16

Part

Software licensed to ING CIVIL


Job Title

Sheet No

MARIA DEL TRANSITO SALAMANCA SERRANO

File

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

6.17 cm
6.37 cm
4.76 cm
6.39 cm

4.94 cm

2.34 cm
4.94 cm

2.43 cm

0.09 cm
2.43 cm

0.10 cm

Y
X
Z

0.10 cm

Load 1 : Displacement
Displacement - cm

Whole Structure Displacements 10cm:1m 1 SISMO X (Input data was modified after picture taken)

Print Time/Date: 02/07/2013 13:54

STAAD.Pro for Windows 20.07.04.12

Print Run 16 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

17

Part

Software licensed to ING CIVIL


Job Title

Sheet No

MARIA DEL TRANSITO SALAMANCA SERRANO

File

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

5.85 cm
6.27 cm
4.56 cm
5.84 cm

4.98 cm

4.56 cm

2.56 cm

2.30 cm

0.11 cm

2.30 cm

0.09 cm

Y
X
Z

0.09 cm

Load 2 : Displacement
Displacement - cm

Whole Structure Displacements 10cm:1m 2 SISMO Z (Input data was modified after picture taken)

Print Time/Date: 02/07/2013 13:54

STAAD.Pro for Windows 20.07.04.12

Print Run 17 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIGSON PEREZ

Ref

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

By
Client

Rev

18

Part

Software licensed to ING CIVIL


Job Title

Sheet No

File

MARIA DEL TRANSITO SALAMANCA SERRANO

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Beam Displacement Detail Summary


Displacements shown in italic indicate the presence of an offset
Beam
L/C
d
X
(m)
(cm)
Max X
Min X
Max Y
Min Y
Max Z
Min Z
Max Rst

135
135
685
696
135
135
132

1:SISMO X
1.082
6.48
41:0.6D - 1.0 (0.7 EX)1.082
+ 0.3 (0.7 EZ)
-4.57
42:0.6D - 1.0 (0.7 EX)0.900
- 0.3 (0.7 EZ)-1.68
1:SISMO X
2.960
2.43
2:SISMO Z
3.607
-0.24
20:D - 1.0 (0.7 EZ) - 0.3
3.607
(0.7 EX) -1.17
2:SISMO Z
3.607
0.32

Y
(cm)
-0.08
0.02
0.53
-0.78
-0.03
-0.01
0.04

Z
(cm)
0.07
1.33
-0.51
-0.05
6.95
-4.87
6.95

Resultant
(cm)
6.48
4.76
1.84
2.56
6.95
5.01
6.95

Beam Force Detail Summary


Sign convention as diagrams:- positive above line, negative below line except Fx where positive is compression. Distance d is given from
beam end A.
Axial
Shear
Torsion
Bending
Beam
L/C
d
Fx
Fy
Fz
Mx
My
Mz
(m)
(Mton)
(Mton)
(Mton)
(MTon-m) (MTon-m) (MTon-m)
Max Fx
Min Fx
Max Fy
Min Fy
Max Fz
Min Fz
Max Mx
Min Mx
Max My
Min My
Max Mz
Min Mz

633
632
625
204
192
633
715
624
640
646
146
146

2:SISMO Z
0.000
107.318
2:SISMO Z
0.000
-104.851
2:SISMO Z
0.000
0.000
2:SISMO Z
0.000
0.000
2:SISMO Z
0.000
-15.567
2:SISMO Z
0.000
107.318
1:SISMO X
0.000
0.000
2:SISMO Z
0.000
8.044
2:SISMO Z
0.000
81.816
2:SISMO Z
2.900
-34.241
1:SISMO X
0.000
-9.163
41:0.6D - 1.0 (0.7 EX)0.000
+ 0.3 (0.7 EZ)
18.519

10.705
-11.155
32.191
-37.872
18.868
10.705
3.066
-14.277
2.177
-4.283
15.825
-11.251

-29.965
-22.442
0.000
-0.000
21.441
-29.965
0.000
14.144
-16.739
-13.769
0.017
-2.368

-0.955
-0.788
-1.914
-0.035
-0.226
-0.955
4.799
-5.389
0.447
0.147
-0.082
0.099

18.205
16.829
-0.000
0.000
3.114
18.205
-0.000
-6.462
29.893
-21.774
-0.038
4.702

3.563
-3.226
8.233
2.229
-3.174
3.563
0.969
-3.201
2.051
5.686
31.169
-22.116

Base Pressure Summary


Node
Max FX
Min FX
Max FY
Min FY
Max FZ
Min FZ

65
65
65
65
65
65

Print Time/Date: 02/07/2013 13:54

L/C
1:SISMO X
1:SISMO X
1:SISMO X
1:SISMO X
1:SISMO X
1:SISMO X

FX
FY
FZ
(MTon/m2) (MTon/m2) (MTon/m2)
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

STAAD.Pro for Windows 20.07.04.12

Print Run 18 of 19

Job No

EDIFICACION CLL 25 N10-13


YOPAL -CASANARE

EDIFICACION 3 NIVELES VIVIENDA Y COMERCIO

EDIGSON PEREZ

Ref
By

Client

Rev

19

Part

Software licensed to ING CIVIL


Job Title

Sheet No

MARIA DEL TRANSITO SALAMANCA SERRANO

File

Date16-Jun-13

Chd

EDIFICIO GILBERTO .std Date/Time 02-Jul-2013 13:42

Base Pressure Summary Cont...


Node

Print Time/Date: 02/07/2013 13:54

L/C

FX
FY
FZ
(MTon/m2) (MTon/m2) (MTon/m2)

STAAD.Pro for Windows 20.07.04.12

Print Run 19 of 19

PROYECTO:

EDIFICIACION 3 NIVELES VIVIENDA

Grupo de uso

Peso de edificacion

w=

244 Tn

Altura de la edificacion

h=

6.7

Perfil del suelo

perfil D
(Segn estudio de suelos)

(Altura de ultimo nivel de entrepiso)

UBICACION DEL PROYECTO:

YOPAL-CASANRAE
ZONA DE AMENAZA SISMICA
ALTA

Segn los parmetros de diseo tenemos que :


I=
1
Aa=
0.3
Ct= 0.047
Av=
0.2
=
0.90
Ae=
0.15
Ad=
0.06
Fa=
1.2
Fv=
2.00
Entonces :
0.90

Ta=

0.047 x

Sa=

2.5 x Aa x Fax I

Vs=

Sa x w

3.472

=
=

0.14

T0=
TC =
TL =

0.9

219.6

ton

0.111111
0.533333
4.8

PROYECTO:

TC

TL

0.11111
0.15333
0.19556
0.23778
0.28
0.32222
0.36444
0.40667
0.44889
0.49111
0.53333
0.74667
0.96
1.17333
1.38667
1.6
1.81333
2.02667
2.24
2.45333
2.66667
2.88
3.09333
3.30667
3.52
3.73333
3.94667
4.16
4.37333
4.58667
4.8
4.9
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8

0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.9
0.6429
0.5
0.4091
0.3462
0.3
0.2647
0.2368
0.2143
0.1957
0.18
0.1667
0.1552
0.1452
0.1364
0.1286
0.1216
0.1154
0.1098
0.1047
0.1
0.098
0.096
0.0941
0.0923
0.0906
0.0889
0.0873
0.0857
0.0842
0.0828

Espectro de diseo
1.0
0.8
Sa (m/s2)

T0

EDIFICIACION 3 NIVELES VIVIENDA

0.6
0.4
0.2
0.0
0.0

1.0

2.0

3.0

4.0
T (s)

5.0

6.0

7.0

EJE DE ELEMTO A ANALIZAR

E-1

SISMO EN SENTIDO X

caso de carga 1 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA
NIVEL 2

17

NIVEL 1

CIMENTACION

max

(cm)

(cm)

1.41

2.5

0.564

OK

2.42

2.5

0.968

OK

2.26

2.6

0.869

OK

cal

max

(cm)

(cm)

1.29

2.5

0.516

OK

2.26

2.5

0.904

OK

2.22

2.6

0.854

OK

4.77
2.5
2.35
2.6
0

0.09

SISMO EN SENTIDO Z

caso de carga 2 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA

5.86
2.5

33

NIVEL 2

17

NIVEL 1

CIMENTACION

6.18
2.5

33

cal

4.57
2.5
2.31
2.6
0

0.09

1. El anlisis se realiz con la inercia de las vigas y columnas completa.


% Indica INDICE DE FLEXIBILIDAD

EJE DE ELEMTO A ANALIZAR

E-4

SISMO EN SENTIDO X

caso de carga 1 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA
NIVEL 2

17

NIVEL 1

CIMENTACION

max

(cm)

(cm)

1.39

2.5

0.556

OK

2.43

2.5

0.972

OK

2.25

2.6

0.865

OK

cal

max

(cm)

(cm)

1.3

2.5

0.520

OK

2.42

2.5

0.968

OK

2.46

2.6

0.946

OK

4.77
2.5
2.34
2.6
0

0.09

SISMO EN SENTIDO Z

caso de carga 2 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA

6.29
2.5

33

NIVEL 2

17

NIVEL 1

CIMENTACION

6.16
2.5

33

cal

4.99
2.5
2.57
2.6
0

0.11

1. El anlisis se realiz con la inercia de las vigas y columnas completa.


% Indica INDICE DE FLEXIBILIDAD

EJE DE ELEMTO A ANALIZAR

A-4

SISMO EN SENTIDO X

caso de carga 1 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA
NIVEL 2

17

NIVEL 1

CIMENTACION

max

(cm)

(cm)

1.43

2.5

0.57

OK

2.5

2.5

1.00

OK

2.34

2.6

0.90

OK

cal

max

(cm)

(cm)

1.3

2.5

0.520

OK

2.42

2.5

0.968

OK

2.46

2.6

0.946

OK

4.95
2.5
2.44
2.6
0

0.1

SISMO EN SENTIDO Z

caso de carga 2 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA

6.29
2.5

33

NIVEL 2

17

NIVEL 1

CIMENTACION

6.38
2.5

33

cal

4.99
2.5
2.57
2.6
0

0.11

1. El anlisis se realiz con la inercia de las vigas y columnas completa.


% Indica INDICE DE FLEXIBILIDAD

EJE DE ELEMTO A ANALIZAR

A-1

SISMO EN SENTIDO X

caso de carga 1 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA
NIVEL 2

17

NIVEL 1

CIMENTACION

max

(cm)

(cm)

1.45

2.5

0.58

OK

2.5

2.5

1.00

OK

2.34

2.6

0.90

OK

cal

max

(cm)

(cm)

1.29

2.5

0.516

OK

2.26

2.5

0.904

OK

2.22

2.6

0.854

OK

4.95
2.5
2.44
2.6
0

0.1

SISMO EN SENTIDO Z

caso de carga 2 software

SECCION DE ELEMENTO (.35X.40)


ALTURA DE
ENTREPISO
NODOS
NIVEL
(m)

DESPLAZAMIENTO
TOTAL
(cm)

49

CUBIERTA

5.86
2.5

33

NIVEL 2

17

NIVEL 1

CIMENTACION

6.4
2.5

33

cal

4.57
2.5
2.31
2.6
0

0.09

1. El anlisis se realiz con la inercia de las vigas y columnas completa.


% Indica INDICE DE FLEXIBILIDAD

REACCIONES DE NODOS PARA LAS COMBINACIONES


DE DISEO DE ZAPATAS

C-4

EJE ESTRUCTURAL
EXCENTRICA
Node
74

L/C
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118

Force-Y
Mton
19.322
23.214
26.105
19.322
24.881
34.347
13.763
4.297
29.389
20.374
18.27
9.255
36.014
32.679
5.965
2.63
22.241
26.41
33.509
18.072
10.973
29.791
23.03
21.452
14.691
34.78
32.239
12.243
9.702
11.593
17.152
26.618
6.034
-3.431
21.66
12.645
10.541
1.527
28.286
24.95
-1.764
-5.099

sismo
no
no
no
no
no
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
no
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
no
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo

max
q adm area reque.
Tn
(tn/m2)
m2
36.014
18.3954 1.957772052
26.41

seccion
cuadrada
1.39920
1.3992

DISEO ZAPATAS

ZAPATA EXCENTRICA e-1


P1=

12.80

b=
c=
bCOL=

0.70
1.40
0.4
0.15
3.1

e=
L=

DATO DEL SUELO

adm=
adm=

TON
m
m
m
m
m

2
18.3954 Ton/m

13.8

Areqcal=
bcal=
ccal=

Ton/m

0.97 m2
0.70 m
1.40 m

d=
0.5 m
L-d=
2.6 m
L-e=
2.95 m
R=
0.65 Ton
c=
1.04 m
DIMENSIONES REQUERIDAS
b=
0.70
c=
1.40
0.50 ok
b/c=

contacto=

ZAPATA COLUMNA INTERIOR e-2


P2

m2
m2

contacto=

Ton/m2

ok

d'zap=

dzap=
Area cortante(d/2)=
Vd=
Vu=
at(d/2)=

c'=

0.50 m

vu(d/2)=

hzap=

0.30 m

vu(d/2)=

m
m
ton
ton

0.05 m

f'czap=
dim max col=
dim min col=
ton/m2=

3.29
210.00
6.53

Kg/cm2
2
Kg/cm
Kg/cm2

CALCULO REFUERZO FLEXION ZAPATA

=
Vczap=
0.5
1.1 f'c =
Revision:

<fVc zap OK
Ratio vu/vc
0.50

0.25
0.5
6.1
10.43
1.05

m
m2
ton
ton
m
2
39.7 ton/m
2
3.97 kg/cm

210.00
0.40
0.35
1.142857143
18.29
15.94
Ok

kg/cm
m
m

kg/cm2
2
kg/cm
Ratio:

REFUERZO SENTIDO PERPENDICULAR A VIGA DE BALANCEO

ACCION EN UNA DIRECCION


Area cortante(d)=
0.32
V(d)=
7.85

m2
ton

Md=
Mu=

Ton-cm
Ton-cm

Vu(d)=
at(d)=

13.35
0.80

ton
m

Ton-cm
cm
cm
cm
cm
ton/cm2
ton/cm2

vu(d)=
vu(d)=
Vczap=
Revision=

66.8
6.7
6.53
No ok

ton/m
kg/cm2
kg/cm2
Ratio:

Mu=
b=
h=
d'=
d=
f'c=
Fy=
K=
rcal=
rmin=
rmax=
rusar=
Areq=
Barra No=
Usar=

1.20
2.04
204.16
70
30
5
25
0.210
4.2
0.004666621
0.00125
0.00330
0.015
0.0033
5.775
5
2.9

0.0020
140.00
25.00
7.00
5
3.5

Vczap
15.94
0.2493

1.0

CALCULO REFUERZO FLEXION ZAPATA


brazo=
0.625 m
Md=
2.4 ton-m/m
Mu=
4.1 ton-m/m
Mu=
407.5 Ton-cm/m
b=
100.0 cm

cm2
No
5

Cada
23.99

cm

REFUERZO SENTIDO PARALELO A LA VIGA DE BALANCEO


r usar=
b=
d=
Areq=
No
Usar=

ok

REVISION CORTANTE
ACCION EN DOS DIRECCIONES
al(col)=
0.4 m
at(col)
0.35 m
hzap=
0.3 m

2
13.73 Ton/m

0.05
0.25
4.80
5.76
32.94

12.273

m
m

DISEO ZAPATA

DISENO DE ZAPATAS
CORTANTE
Revision al borde de la viga
0.4
Ancho Viga balanceo=

rec=
dzap=
Vd(bv)=
Vu(bv)=
vu(bv)=
f'czap=
Vczap=

16.36 TON

A=
1.14
a=
1.07
Dimensiones adoptadas
aL=
0.80
at=
1.60

cm
cm
cm2
No
5

Cada
39.59

cm

h=
d'=
d=
f'c=
Fy=
K=
rcal=
rmin=

30.0
5.0
25.0
0.21
4.2
0.00652
0.00176
0.00330

cm
cm
cm
ton/cm2
2
ton/cm

rmax=
0.015
rusar=
0.0033
Areq=
8.25 cm2/m
Direccion paralela a viga balanceo
Usar=
6.7
No5
C/.
Direccion perpendicular a viga balanceo
Usar=
3.3
No6
C/.

24.00 cm
24.00 cm

REACCIONES DE NODOS PARA LAS COMBINACIONES


DE DISEO DE ZAPATAS

E-1

EJE ESTRUCTURAL
EXCENTRICA
Node
65

L/C
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118

Force-Y
Mton
6.783
7.026
8.322
6.783
1.768
3.415
11.798
10.151
0.758
2.779
10.787
12.808
1.91
4.919
8.647
11.656
6.966
3.204
4.439
10.727
9.492
2.447
3.962
9.969
11.484
3.293
5.586
8.345
10.638
4.07
-0.945
0.702
9.085
7.438
-1.955
0.065
8.074
10.095
-0.803
2.206
5.933
8.942

sismo
no
no
no
no
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
no
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
no
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo
sismo

max
q adm
Tn
(tn/m2)
12.808
13.8
8.322

area reque.
m2
0.92812

seccion
rectangular
0.681
1.362

Proyecto:EDIFICIO GILBERTO
1/VG AR

B=0.20 H=0.25 L=3.31


M=-1.14
A=1.62

B=0.20 H=0.25 L=2.12


M=-1.05 M=-1.09
A=1.48 A=1.54

M=0.54
A=1.29
v=-1.09

B=0.20 H=0.25 L=2.70


M=-0.99 M=-1.04
A=1.39 A=1.47

M=0.56
A=1.29

v=-1.01

v=1.08 v=-1.26

v=-1.21

M=-1.20
A=1.71
M=0.55
A=1.29

v=1.19 v=-1.18

v=-1.12

v=1.22

1P/VG AR

B=0.15 H=0.25 L=3.46


M=-0.39
A=0.97

B=0.15 H=0.25 L=2.27


M=-0.36 M=-0.33
A=0.97 A=0.97

M=0.33
A=0.97
v=-0.35

B=0.15 H=0.24 L=2.85


M=-0.23 M=-0.29
A=0.97 A=0.92

M=0.17
A=0.97

v=-0.27

v=0.44 v=-0.38

v=-0.33

M=-0.38
A=0.92
M=0.20
A=0.92

v=0.35 v=-0.36

v=-0.30

v=0.32

2/VG AR

B=0.20 H=0.25 L=3.31


M=-1.48
A=2.13

B=0.20 H=0.25 L=2.12


M=-1.26 M=-1.44
A=1.80 A=2.07

M=0.37
A=1.29
v=-1.10

B=0.20 H=0.25 L=2.70


M=-1.33 M=-1.32
A=1.90 A=1.89

M=0.36
A=1.29

v=-0.63

v=1.02 v=-1.39

v=-1.08

M=-1.59
A=2.31
M=0.40
A=1.29

v=1.31 v=-1.14

v=0.86

v=1.25

3/VG AR

B=0.20 H=0.25 L=3.31


M=-1.76
A=2.57

B=0.20 H=0.25 L=1.47


M=-1.58 M=-1.55
A=2.29 A=2.24

M=0.44
A=1.29
v=-1.38

v=-0.70

INGENIERO EDIGSON PEREZ

B=0.20 H=0.25 L=3.35


M=-1.57 M=-1.54
A=2.27 A=2.23

M=0.39
A=1.29
v=1.34 v=-1.95

v=1.65

M=-1.75
A=2.56
M=0.44
A=1.29

v=1.99 v=-1.32

v=0.68

v=1.37

Proyecto:EDIFICIO GILBERTO
4/VG AR

B=0.20 H=0.25 L=3.31


M=-1.10
A=1.56

B=0.20 H=0.25 L=1.47


M=-1.03 M=-0.54
A=1.45 A=1.29

M=0.28
A=1.29
v=-0.80

B=0.20 H=0.25 L=3.35


M=-0.59 M=-1.02
A=1.29 A=1.44

M=0.15
A=1.29

v=-0.49

v=0.78 v=-0.72

v=0.61

M=-1.15
A=1.63
M=0.29
A=1.29

v=0.77 v=-0.77

v=0.51

v=0.83

A/VG AR

B=0.20 H=0.25 L=0.30


M=-1.04
A=1.47

B=0.20 H=0.25 L=2.30


M=-0.77 M=-0.70
A=1.29 A=1.29

M=0.26
A=1.29
v=-1.02

M=-1.14 M=-0.99
A=1.62 A=1.39
M=0.28
A=1.29

v=0.00

v=-0.81 v=-0.78

B=0.20 H=0.25 L=2.55


M=-0.97
A=1.37

v=0.76

M=-1.03
A=1.45
M=0.26
A=1.29

v=1.07 v=-0.89

v=0.40

v=1.00

B=0.20 H=0.25 L=0.68


M=-1.38 M=-0.60
A=1.98 A=1.29

M=0.34
A=1.29
v=-1.04

B=0.20 H=0.25 L=3.15

M=-0.15
A=1.29
M=0.15
A=1.29

v=0.74

v=1.07 v=-2.42

v=-0.52

v=-0.52

B/VG AR

B=0.20 H=0.30 L=1.95


M=-1.40
A=1.62

B=0.20 H=0.30 L=0.30


M=-0.91 M=-0.63
A=1.62 A=1.62

M=0.35
A=1.62
v=-1.51

v=-1.14

INGENIERO EDIGSON PEREZ

B=0.20 H=0.30 L=0.10


M=-1.84 M=-0.91
A=2.08 A=1.62

M=0.55
A=1.62
v=0.99 v=2.87

v=2.98

M=-0.31
A=1.62
M=0.23
A=1.62

v=3.05 v=-3.42

v=-3.39

v=-3.37

Proyecto:EDIFICIO GILBERTO

B=0.20 H=0.30 L=0.18


M=-0.41
A=1.62

B=0.20 H=0.30 L=0.15


M=-0.17 M=-0.14
A=1.62 A=1.62

M=0.10
A=1.62
v=-0.82

M=-0.03
A=1.62
M=0.00
A=1.62

v=-0.79

v=-0.76 v=-0.48

v=-0.45

v=-0.42

B(1)/VG AR

B=0.20 H=0.30 L=0.10


M=-1.06
A=1.62

B=0.20 H=0.30 L=0.10


M=-0.77 M=-0.72
A=1.62 A=1.62

M=0.71
A=1.62
v=-1.20

B=0.20 H=0.30 L=2.30


M=-0.55 M=-0.75
A=1.62 A=1.62

M=0.69
A=1.62

v=-1.18

v=-1.16 v=-0.75

v=-0.73

M=-1.20
A=1.62
M=0.30
A=1.62

v=-0.71 v=-0.81

v=0.82

v=1.13

B(2)/VG AR

B=0.20 H=0.30 L=3.21


M=-1.02
A=1.62

M=-1.14
A=1.62
M=0.28
A=1.62

v=-0.90

v=0.44

v=1.06

C/VG AR

B=0.20 H=0.25 L=0.30


M=-1.12
A=1.59

B=0.20 H=0.25 L=2.30


M=-0.73 M=-0.74
A=1.29 A=1.29

M=0.28
A=1.29
v=-1.35

v=0.00

INGENIERO EDIGSON PEREZ

B=0.20 H=0.25 L=3.15


M=-1.21 M=-1.02
A=1.72 A=1.44

M=0.30
A=1.29
v=-0.84 v=-0.81

v=0.83

M=-1.11
A=1.57
M=0.28
A=1.29

v=1.14 v=-0.90

v=0.44

v=1.05

Proyecto:EDIFICIO GILBERTO

B=0.20 H=0.25 L=1.95


M=-1.27
A=1.81

B=0.20 H=0.26 L=0.30


M=-0.83 M=-0.70
A=1.29 A=1.36

M=0.32
A=1.29
v=-1.35

B=0.20 H=0.25 L=0.68


M=-1.78 M=-0.89
A=2.46 A=1.29

M=0.63
A=1.36

v=-0.98

v=0.93 v=2.54

v=2.65

M=-0.22
A=1.29
M=0.22
A=1.29

v=2.72 v=-3.57

v=-0.81

v=-0.81

D/VG AR

B=0.20 H=0.25 L=0.30


M=-1.02
A=1.44

B=0.20 H=0.25 L=2.30


M=-0.75 M=-0.69
A=1.29 A=1.29

M=0.25
A=1.29
v=-1.01

M=-1.13 M=-1.00
A=1.60 A=1.41
M=0.28
A=1.29

v=0.00

v=-0.77 v=-0.76

B=0.20 H=0.25 L=2.55


M=-0.95
A=1.34

v=0.76

M=0.34
A=1.29

v=1.06 v=-0.89

v=1.06 v=-2.42

v=-0.39

v=-2.39

v=0.99

B=0.20 H=0.26 L=0.43


M=-0.23 M=-0.28
A=1.29 A=1.36

M=0.15
A=1.29

v=0.73

M=-1.01
A=1.42
M=0.25
A=1.29

B=0.20 H=0.25 L=0.10


M=-1.37 M=-0.60
A=1.97 A=1.29

v=-1.03

B=0.20 H=0.25 L=3.15

M=-0.07
A=1.36
M=0.07
A=1.36

v=-2.37 v=-0.53

v=0.00

v=-0.39

ESC/VG AR

B=0.30 H=0.30 L=0.10


M=-0.20
A=2.44

B=0.30 H=0.30 L=0.11


M=-0.22 M=-0.26
A=2.44 A=2.44

M=0.09
A=2.44
v=-2.98

v=-2.97

INGENIERO EDIGSON PEREZ

B=0.30 H=0.30 L=0.12


M=-0.06 M=-0.13
A=2.44 A=2.44

M=0.22
A=2.44
v=-2.97 v=-1.25

v=-1.22

M=-0.14
A=2.44
M=0.28
A=2.44

v=-1.20 v=-2.23

v=-2.20

v=-2.17

Proyecto:EDIFICIO GILBERTO

B=0.30 H=0.30 L=0.12


M=-0.29
A=2.44

B=0.30 H=0.30 L=0.11


M=-0.53 M=-0.57
A=2.44 A=2.44

M=0.85
A=2.44
v=-3.08

B=0.30 H=0.30 L=0.76


M=-0.87 M=-0.86
A=2.44 A=2.44

M=1.51
A=2.44

v=-3.05

v=-3.02 v=-2.61

v=-2.58

M=-0.44
A=2.44
M=0.70
A=2.44

v=-2.55 v=2.31

v=2.42

v=2.54

VLA/VG AR

B=0.15 H=0.25 L=3.46


M=-0.13
A=0.97

B=0.15 H=0.25 L=1.62


M=-0.37 M=-0.29
A=0.97 A=0.97

M=0.15
A=0.97
v=-0.31

B=0.15 H=0.25 L=3.50


M=-0.13 M=-0.38
A=0.97 A=0.97

M=0.07
A=0.97

v=-0.24

v=0.38 v=-0.27

v=-0.17

M=0.16
A=0.97
v=0.20 v=-0.39

VLB/VG AR

B=0.15 H=0.25 L=3.51


M=-0.61
A=0.97

B=0.15 H=0.25 L=5.37


M=-0.67 M=-0.26
A=0.97 A=0.97

M=0.28
A=0.97
v=-0.79

v=-0.73

INGENIERO EDIGSON PEREZ

M=-0.64
A=0.97
M=0.16
A=0.97

v=0.74 v=-0.31

v=-0.24

M=-0.14
A=0.97

v=0.80

v=-0.31

v=0.31

Proyecto:EDIFICIO GILBERTO
D/VG CINTA

B=0.15 H=0.25 L=2.75


M=-0.66
A=0.97

B=0.15 H=0.25 L=3.21


M=-0.63 M=-0.58
A=0.97 A=0.97

M=0.22
A=0.97
v=-0.79

v=0.24

INGENIERO EDIGSON PEREZ

B=0.15 H=0.25 L=3.16


M=-0.53 M=-0.45
A=0.97 A=0.97

M=0.24
A=0.97
v=0.84 v=-0.79

v=0.09

M=-0.67
A=0.97
M=0.24
A=0.97

v=0.78 v=-0.71

v=0.13

v=0.76

Proyecto:EDIFICIO GILBERTO
1/PISO1

B=0.25 H=0.30 L=2.75


M=-3.22
A=3.73

B=0.25 H=0.30 L=0.36


M=-1.67 M=-1.72
A=2.03 A=2.05

M=0.81
A=2.03
v=-2.00

B=0.25 H=0.30 L=2.12


M=-3.27 M=-4.24
A=3.79 A=5.05

M=2.01
A=2.33

v=-1.67

v=1.71 v=2.16

v=2.66

M=-4.25
A=5.06
M=1.06
A=2.03

v=3.15 v=-4.70

v=2.80

v=4.74

B=0.25 H=0.30 L=2.70


M=-4.26
A=5.07

M=-4.38
A=5.23
M=1.10
A=2.03

v=-4.51

v=-2.12

v=4.42

2/PISO1

B=0.25 H=0.30 L=2.75


M=-4.80
A=5.81

B=0.25 H=0.30 L=0.36


M=-1.94 M=-1.88
A=2.18 A=2.38

M=1.59
A=2.03
v=-4.77

v=3.65 v=4.08

B=0.25 H=0.30 L=2.70


M=-5.62
A=6.97
M=1.52
A=2.26
v=-7.07

M=-4.99 M=-5.16
A=6.07 A=6.31
M=1.62
A=2.03

v=-2.10

M=-5.58
A=6.92

B=0.25 H=0.30 L=2.12

v=-2.20

INGENIERO EDIGSON PEREZ

v=6.93

v=5.06

M=-5.13
A=6.27
M=1.29
A=2.03

v=6.03 v=-6.68

v=-2.84

v=6.67

Proyecto:EDIFICIO GILBERTO
3/PISO1

B=0.25 H=0.30 L=3.31


M=-6.18
A=7.81

B=0.25 H=0.30 L=1.47


M=-5.99 M=-5.04
A=7.52 A=6.14

M=2.11
A=2.71
v=-7.11

B=0.25 H=0.30 L=3.35


M=-5.05 M=-6.04
A=6.16 A=7.60

M=1.26
A=2.03

v=1.59

v=7.16 v=-6.35

v=4.63

M=-6.20
A=7.84
M=2.14
A=2.76

v=6.35 v=-7.19

v=-1.56

v=7.13

4/PISO1

B=0.25 H=0.30 L=3.31


M=-4.99
A=6.07

B=0.25 H=0.30 L=1.47


M=-4.78 M=-4.15
A=5.78 A=4.93

M=1.31
A=2.03
v=-5.03

B=0.25 H=0.30 L=3.35


M=-4.13 M=-4.78
A=4.90 A=5.78

M=1.04
A=2.03

v=1.60

v=5.06 v=-4.88

v=-4.07

M=-4.99
A=6.07
M=1.34
A=2.03

v=4.89 v=-5.06

v=-1.56

v=5.02

A/PISO1

B=0.25 H=0.30 L=2.70


M=-3.92
A=4.62

B=0.25 H=0.30 L=3.15


M=-3.67 M=-3.28
A=4.30 A=3.80

M=0.98
A=2.03
v=-2.70

v=2.65 v=-2.10

B=0.25 H=0.30 L=0.60


M=-0.04
A=2.03
M=0.00
A=2.03
v=-1.51

M=-3.23 M=-3.77
A=3.74 A=4.43
M=0.82
A=2.03

v=-2.36

M=-1.27
A=2.03

B=0.25 H=0.30 L=2.55

v=-1.41

INGENIERO EDIGSON PEREZ

v=-1.31

v=-1.72

M=-4.13
A=4.90
M=1.03
A=2.03

v=2.08 v=-2.81

v=2.61

v=2.93

Proyecto:EDIFICIO GILBERTO
B/PISO1

B=0.25 H=0.30 L=2.70


M=-3.85
A=4.53

M=-3.58
A=4.18
M=0.96
A=2.03

v=-2.66

v=-2.32

v=2.58

B(1)/PISO1

B=0.25 H=0.30 L=1.97


M=-4.37
A=5.22

B=0.25 H=0.30 L=0.33


M=-2.74 M=-2.22
A=3.13 A=2.65

M=1.09
A=2.03
v=-3.56

B=0.25 H=0.30 L=0.60


M=-5.53 M=-1.67
A=6.84 A=2.03

M=2.65
A=3.31

v=-3.31

v=-3.07 v=9.32

v=9.39

M=-0.07
A=2.03
M=0.00
A=2.03

v=9.46 v=-1.98

v=-1.88

v=-1.78

B(2)/PISO1

B=0.25 H=0.30 L=3.21


M=-3.24
A=3.75

M=-3.17
A=3.67
M=0.81
A=2.03

v=-2.05

v=-1.66

v=2.03

C/PISO1

B=0.25 H=0.30 L=2.70


M=-3.65
A=4.27

B=0.25 H=0.30 L=3.15


M=-3.39 M=-3.08
A=3.94 A=3.55

M=0.91
A=2.03
v=-2.53

v=-2.20

INGENIERO EDIGSON PEREZ

B=0.25 H=0.30 L=1.97


M=-3.15 M=-4.38
A=3.64 A=5.23

M=0.79
A=2.03
v=2.47 v=-1.99

v=1.65

M=-2.73
A=3.12
M=1.10
A=2.03

v=2.02 v=-3.58

v=-3.33

v=-3.08

Proyecto:EDIFICIO GILBERTO

B=0.25 H=0.30 L=0.33


M=-2.18
A=2.62

B=0.25 H=0.30 L=0.60


M=-5.49 M=-1.65
A=6.78 A=2.03

M=2.56
A=3.21
v=9.33

M=-0.08
A=2.03
M=0.00
A=2.03

v=9.40

v=9.47 v=-1.95

v=-1.85

v=-1.76

C(1)/PISO1

B=0.20 H=0.30 L=2.85


M=-1.34
A=1.62

M=-1.12
A=1.62
M=0.34
A=1.62

v=-1.05

v=-0.78

v=0.95

D/PISO1

B=0.25 H=0.30 L=2.70


M=-3.74
A=4.39

B=0.25 H=0.30 L=3.15


M=-3.53 M=-3.16
A=4.12 A=3.65

M=0.94
A=2.03
v=-2.59

v=2.56 v=-2.04

B=0.25 H=0.30 L=0.60


M=-0.04
A=2.03
M=0.00
A=2.03
v=-1.50

M=-3.13 M=-3.62
A=3.62 A=4.24
M=0.79
A=2.03

v=-2.25

M=-1.27
A=2.03

B=0.25 H=0.30 L=2.55

v=-1.41

INGENIERO EDIGSON PEREZ

v=-1.31

v=-1.66

M=-4.02
A=4.76
M=1.00
A=2.03

v=2.02 v=-2.71

v=2.54

v=2.86

Proyecto:EDIFICIO GILBERTO
ESC/PISO1

B=0.25 H=0.20 L=2.02


M=-0.99
A=1.91

M=-0.01
A=1.20
M=0.27
A=1.20

v=-9.75

v=-9.73

v=1.26

VLA/PISO1

B=0.15 H=0.30 L=3.41


M=-1.05
A=1.22

B=0.15 H=0.30 L=1.57


M=-1.06 M=-0.77
A=1.22 A=1.22

M=0.67
A=1.22
v=-1.31

v=0.43

INGENIERO EDIGSON PEREZ

B=0.15 H=0.30 L=3.45


M=-0.78 M=-1.07
A=1.22 A=1.22

M=0.19
A=1.22
v=1.46 v=-0.87

v=0.37

M=-1.05
A=1.22
M=0.68
A=1.22

v=0.88 v=-1.47

v=-0.42

v=1.31

Proyecto:EDIFICIO GILBERTO
1/PISO 2

B=0.25 H=0.30 L=2.75


M=-2.46
A=2.79

B=0.25 H=0.30 L=0.36


M=-1.22 M=-1.27
A=2.03 A=2.03

M=0.62
A=2.03
v=-1.60

B=0.25 H=0.30 L=2.12


M=-2.55 M=-3.35
A=2.90 A=3.89

M=1.46
A=2.03

v=-1.28

v=1.29 v=1.71

v=2.21

M=-3.38
A=3.93
M=0.85
A=2.03

v=2.70 v=-3.99

v=2.10

v=4.03

B=0.25 H=0.30 L=2.70


M=-3.43
A=3.99

M=-3.50
A=4.08
M=0.88
A=2.03

v=-3.92

v=-1.54

v=3.88

2/PISO 2

B=0.25 H=0.30 L=2.75


M=-4.08
A=4.83

B=0.25 H=0.30 L=0.36


M=-1.51 M=-1.45
A=2.03 A=2.03

M=1.42
A=2.03
v=-4.40

v=3.26 v=3.63

B=0.25 H=0.30 L=2.70


M=-4.80
A=5.81
M=1.65
A=2.03
v=-6.51

M=-4.29 M=-4.33
A=5.11 A=5.17
M=1.10
A=2.03

v=-1.73

M=-4.79
A=5.79

B=0.25 H=0.30 L=2.12

v=-1.65

INGENIERO EDIGSON PEREZ

v=6.43

v=4.61

M=-4.32
A=5.15
M=1.08
A=2.03

v=5.59 v=-6.01

v=-2.17

v=6.02

Proyecto:EDIFICIO GILBERTO
3/PISO 2

B=0.25 H=0.30 L=3.31


M=-5.44
A=6.71

B=0.25 H=0.30 L=1.47


M=-5.34 M=-3.89
A=6.57 A=4.59

M=2.09
A=2.47
v=-6.74

B=0.25 H=0.30 L=3.35


M=-3.93 M=-5.42
A=4.64 A=6.68

M=0.98
A=2.03

v=1.20

v=6.77 v=-5.11

v=3.39

M=-5.48
A=6.77
M=2.14
A=2.50

v=5.11 v=-6.82

v=-1.18

v=6.78

4/PISO 2

B=0.25 H=0.30 L=3.31


M=-4.13
A=4.90

B=0.25 H=0.30 L=1.47


M=-4.01 M=-2.65
A=4.74 A=3.02

M=1.42
A=2.03
v=-4.59

B=0.25 H=0.30 L=3.35


M=-2.76 M=-4.08
A=3.16 A=4.83

M=0.69
A=2.03

v=1.14

v=4.60 v=-3.29

v=2.53

M=-4.21
A=5.01
M=1.47
A=2.03

v=3.34 v=-4.63

v=-1.14

v=4.64

A/PISO 2

B=0.25 H=0.30 L=2.70


M=-2.95
A=3.39

B=0.25 H=0.30 L=3.15


M=-2.79 M=-2.56
A=3.20 A=2.92

M=0.74
A=2.03
v=-2.09

v=2.05 v=-1.70

B=0.25 H=0.30 L=0.60


M=-0.04
A=2.03
M=0.00
A=2.03
v=-1.45

M=-2.63 M=-2.77
A=3.00 A=3.17
M=0.66
A=2.03

v=-1.76

M=-1.21
A=2.03

B=0.25 H=0.30 L=2.55

v=-1.35

INGENIERO EDIGSON PEREZ

v=-1.25

v=1.36

M=-3.15
A=3.64
M=0.79
A=2.03

v=1.74 v=-2.10

v=1.99

v=2.31

Proyecto:EDIFICIO GILBERTO
B/PISO 2

B=0.25 H=0.30 L=2.70


M=-2.99
A=3.44

M=-2.76
A=3.16
M=0.75
A=2.03

v=-2.12

v=-1.79

v=2.01

B(1)/PISO 2

B=0.25 H=0.30 L=1.97


M=-3.46
A=4.03

B=0.25 H=0.30 L=0.33


M=-2.18 M=-1.57
A=2.46 A=2.03

M=0.87
A=2.03
v=-2.90

B=0.25 H=0.30 L=0.60


M=-4.30 M=-1.65
A=5.13 A=2.03

M=1.79
A=2.19

v=-2.65

v=2.45 v=7.69

v=7.76

M=-0.07
A=2.03
M=0.00
A=2.03

v=7.83 v=-1.97

v=-1.87

v=-1.78

B(2)/PISO 2

B=0.25 H=0.30 L=3.21


M=-2.60
A=2.96

M=-2.62
A=2.99
M=0.65
A=2.03

v=-1.70

v=1.34

v=1.72

C/PISO 2

B=0.25 H=0.30 L=2.70


M=-2.85
A=3.27

B=0.25 H=0.30 L=3.15


M=-2.63 M=-2.49
A=3.00 A=2.83

M=0.71
A=2.03
v=-2.03

v=-1.70

INGENIERO EDIGSON PEREZ

B=0.25 H=0.30 L=1.97


M=-2.64 M=-3.39
A=3.01 A=3.94

M=0.66
A=2.03
v=1.93 v=-1.66

v=1.36

M=-1.98
A=2.22
M=0.85
A=2.03

v=1.74 v=-2.81

v=-2.57

v=-2.32

Proyecto:EDIFICIO GILBERTO

B=0.25 H=0.30 L=0.33


M=-1.58
A=2.03

B=0.25 H=0.30 L=0.60


M=-4.43 M=-1.65
A=5.30 A=2.03

M=1.82
A=2.21
v=7.71

M=-0.07
A=2.03
M=0.00
A=2.03

v=7.78

v=7.85 v=-1.96

v=-1.86

v=-1.77

C(1)/PISO 2

B=0.20 H=0.30 L=2.85


M=-1.07
A=1.62

M=-0.87
A=1.62
M=0.27
A=1.62

v=-0.88

v=-0.61

v=0.76

D/PISO 2

B=0.25 H=0.30 L=2.70


M=-2.83
A=3.24

B=0.25 H=0.30 L=3.15


M=-2.71 M=-2.50
A=3.10 A=2.84

M=0.71
A=2.03
v=-2.02

v=2.00 v=-1.67

B=0.25 H=0.30 L=0.60


M=-0.04
A=2.03
M=0.00
A=2.03
v=-1.43

M=-2.56 M=-2.67
A=2.92 A=3.05
M=0.64
A=2.03

v=1.69

M=-1.20
A=2.03

B=0.25 H=0.30 L=2.55

v=-1.33

INGENIERO EDIGSON PEREZ

v=-1.24

v=1.32

M=-3.09
A=3.57
M=0.77
A=2.03

v=1.70 v=-2.03

v=1.95

v=2.27

Proyecto:EDIFICIO GILBERTO
ESC/PISO 2

B=0.25 H=0.20 L=2.02


M=-1.23
A=2.42

M=-0.63
A=1.58
M=0.43
A=1.20

v=-8.04

v=-8.03

v=8.04

VLA/PISO 2

B=0.15 H=0.30 L=3.41


M=-0.84
A=1.22

B=0.15 H=0.30 L=1.57


M=-0.99 M=-0.55
A=1.22 A=1.22

M=0.59
A=1.22
v=-1.24

v=0.35

INGENIERO EDIGSON PEREZ

B=0.15 H=0.30 L=3.45


M=-0.57 M=-1.00
A=1.22 A=1.22

M=0.14
A=1.22
v=1.38 v=-0.64

v=-0.13

M=-0.85
A=1.22
M=0.60
A=1.22

v=0.64 v=-1.39

v=-0.34

v=1.25