Вы находитесь на странице: 1из 537

Report : CPMR055

Run by : Taneja, Manmeet


Report Date: 05-08-09 03:47 PM

CPMR055: Projects By Ward, Phase, Work Category,


Work Type (Address-level Date Period)
Project Status = Active, Completed

Publication Status = Not Publ, Prev Publ, Publ

Program = All

Sub Program = All

Department = Streets AND Sanitation

Project Manager = All

Bureau = All

Constr Phase Only? = No

Include Only Work Types of Selected Dept? = Yes

Work Category = All

Work Type = All

Geography = Ward

Geo Result = All

Address Date Period = None

From Date = 1/1/2008

To Date = 12/31/2008

Fund Source =All

Report Type =Verification


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 2

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N STAVE ST FROM W FRANCIS PL TO N CALIFORNIA AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,746 100
300 06 / 32146 ON N WOLCOTT AVE FROM W DIVISION ST TO N MILWAUKEE AVE 1.0 05/01/07 10/31/07 3,900 06/29/07 07/27/07 2,342 100
300 06 / 32277 ON N WOOD ST FROM W DIVISION ST TO N MILWAUKEE AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32146 ON W CRYSTAL ST FROM N DAMEN AVE TO N WOLCOTT AVE .0 05/01/07 10/31/07 3,900 06/28/07 07/27/07 2,000 100
300 06 / 32277 ON W ELLEN ST FROM N WOOD ST TO N HERMITAGE AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32146 ON W POTOMAC AVE FROM N DAMEN AVE TO N WOLCOTT AVE .0 05/01/07 10/31/07 3,900 06/15/07 07/20/07 2,000 100
300 06 0308 / 5414 ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,086 100
210 06 0243 / 4480 N ASHLAND AVE AND W CHICAGO AVE .0 12/27/06 01/26/07 250 12/27/06 01/26/07 638 100
210 06 0240 / 4477 N ASHLAND AVE AND W DIVISION ST .0 10/10/05 07/31/06 1,500 10/10/05 08/08/06 317 100
281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Totals per Design/Engineering 1.0 13,450 11,128


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 3

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON N ARTESIAN AVE FROM W NORTH AVE TO W WABANSIA AVE 5.0 03/07/03 03/08/03 2,075 03/07/03 03/07/03 1,507 100
300 09 / 33067 ON N CLAREMONT AVE FROM W POTOMAC AVE TO W HIRSCH ST 4.0 10/22/08 10/24/08 1,600 10/22/08 10/24/08 1,002 100
300 07 0032 / 5455 ON N LEAVITT ST FROM W SUPERIOR ST TO W DIVISION ST 8.0 04/18/06 11/18/06 3,200 09/22/06 10/10/06 1,616 100
300 05 0001 / 5116 ON N MARSHFIELD AVE FROM W NORTH AVE TO W WABANSIA AVE 5.0 04/04/05 11/18/05 2,000 07/30/05 08/05/05 0 100
300 07 0001 / 5424 ON N ROCKWELL ST FROM W NORTH AVE TO W BLOOMINGDALE AVE 8.0 12/01/06 11/23/06 3,200 12/01/06 11/23/06 3,200 100
300 07 0001 / 5424 ON N WASHTENAW AVE FROM W ALTGELD ST TO W FULLERTON AVE 5.0 11/01/06 11/24/06 2,000 12/01/06 11/23/06 2,000 100
300 07 0001 / 5424 ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0032 / 5455 ON N WINCHESTER AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 05 0001 / 5116 ON N WINNEBAGO AVE FROM W MOFFAT ST TO N WESTERN AVE 7.0 04/04/05 11/18/05 2,800 07/30/05 08/05/05 0 100
300 07 0032 / 5455 ON N WOLCOTT AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 09 / 33067 ON W BLOOMINGDALE AVE FROM N WINNEBAGO AVE TO N ROCKWELL 8.0 06/16/08 06/20/08 3,200 06/16/08 06/20/08 2,008 100
ST
Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08
300 05 0001 / 5116 ON W CHESTNUT ST FROM N GREENVIEW AVE TO N ASHLAND AVE 5.0 04/04/05 11/18/05 2,000 07/30/05 08/05/05 0 100
300 06 0122 / 5275 ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE 10.56 12/01/03 12/01/03 4,224 11/15/03 11/20/03 4,290 100
300 06 0069 / 5233 ON W CORTEZ ST FROM N CAMPBELL AVE TO N CALIFORNIA AVE 5.0 1,875 01/10/03 01/10/03 2,590 100
300 07 0032 / 5455 ON W CORTEZ ST FROM N DAMEN AVE TO N WESTERN AVE 7.50 04/18/06 11/18/06 3,000 09/22/06 10/10/06 1,515 100
300 05 0001 / 5116 ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST 4.0 04/04/05 11/18/05 1,600 07/30/05 08/05/05 0 100
300 05 0001 / 5116 ON W FRY ST FROM N GREENVIEW AVE TO N ASHLAND AVE 5.0 04/04/05 11/18/05 2,000 07/30/05 08/05/05 0 100
300 09 / 33067 ON W HADDON AVE FROM N ROCKWELL ST TO N CALIFORNIA AVE 3.50 06/16/08 06/20/08 1,400 06/16/08 06/20/08 879 100

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08
300 07 0032 / 5455 ON W IOWA ST FROM N DAMEN AVE TO N HONORE ST 3.50 04/18/06 11/18/06 1,400 09/22/06 10/10/06 707 100
300 07 0001 / 5424 ON W LE MOYNE ST FROM N DAMEN AVE TO N HOYNE AVE 5.0 04/18/06 11/18/06 2,200 04/18/06 11/18/06 2,200 100
300 05 0001 / 5116 ON W PEARSON ST FROM N GREENVIEW AVE TO N ASHLAND AVE 5.0 04/04/05 11/18/05 2,000 07/30/05 08/05/05 0 100
300 07 0032 / 5455 ON W SUPERIOR ST FROM N LEAVITT ST TO N OAKLEY BLVD 2.0 04/18/06 11/18/06 800 09/22/06 10/10/06 404 100
300 09 / 33067 ON W THOMAS ST FROM N ROCKWELL ST TO N CALIFORNIA AVE 7.0 06/16/08 06/20/08 2,800 06/16/08 06/20/08 1,757 100

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08
302 00 0092 / 5774 1700 N CAMPBELL AVE 1.0 01/13/03 01/13/03 225 01/10/03 01/10/03 203 100
302 00 0092 / 5774 826 N PAULINA ST 1.0 02/09/03 02/09/03 225 02/07/03 02/07/03 203 100
302 00 0092 / 5774 1543 W CHESTNUT ST 1.0 0 01/30/01 01/30/01 203 100
302 00 0092 / 5774 2500 W CORTEZ ST 1.0 0 01/16/02 01/16/02 203 100
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 4

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
210 06 0022 / 4297 2701-2753 W HADDON AVE 5.0 0 02/21/02 02/21/02 1,875 100
300 06 0069 / 5233 2701-2753 W HADDON AVE 5.0 1,875 02/21/02 02/21/02 1,875 100

Totals per 250 Watt Changeout 135.06 50,899 31,853

Work Type: 400 Watt Changeout Fixtures


300 03 0033 / 4904 ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE 6.30 03/10/05 03/20/05 2,520 0
300 07 0032 / 5455 ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE 4.50 04/18/06 11/18/06 1,800 09/07/06 10/10/06 909 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST 4.50 04/18/06 11/18/06 1,800 09/07/06 10/10/06 909 100
300 07 0032 / 5455 ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 1,600 09/07/06 10/10/06 808 100
300 07 0032 / 5455 ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST 4.50 04/18/06 11/18/06 1,800 09/07/06 10/10/06 909 100

Totals per 400 Watt Changeout 23.80 9,520 3,535

Totals per Lighting/Electrical 2,967,039 1,916,761


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 5

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0092 / 5774 835 N ASHLAND AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1010 N ASHLAND AVE 1.0 0 12/10/01 12/10/01 236 100
302 00 0092 / 5774 1216 N CLEAVER ST 1.0 0 10/19/01 10/19/01 236 100
805 06 1481 / 7667 1530 N ELK GROVE AVE 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
302 00 0092 / 5774 1306 N GREENVIEW AVE 1.0 0 12/14/01 12/14/01 236 100
302 00 0092 / 5774 1039 N HONORE ST 1.0 0 11/07/01 11/07/01 236 100
805 06 1868 / 8054 862 N MARSHFIELD AVE 1.0 09/29/95 09/29/95 0 09/29/95 09/29/95 300 100
805 06 1736 / 7922 1428 N MILWAUKEE AVE 1.0 06/11/97 06/11/97 0 06/11/97 06/11/97 300 100
300 06 0139 / 5289 2137 N MILWAUKEE AVE 1,080.0 03/01/06 09/01/06 26,704 05/22/06 06/01/06 32,631 100
805 06 1920 / 8106 1631 N MOZART ST 1.0 04/08/96 04/08/96 0 04/08/96 04/08/96 300 100
302 00 0092 / 5774 1216 N NOBLE ST 1.0 0 10/19/01 10/19/01 236 100
805 06 0447 / 6633 2145 N STAVE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0092 / 5774 1403 N WICKER PARK AVE 1.0 0 08/22/01 08/22/01 236 100
805 06 1737 / 7923 1501 N WICKER PARK AVE 1.0 06/11/97 06/11/97 0 06/11/97 06/11/97 300 100
302 00 0092 / 5774 1053 N WINCHESTER AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1142 N WOLCOTT AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1339 N WOLCOTT AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1100 N WOOD ST 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1208 N WOOD ST 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1506 N WOOD ST 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 2735 W ARMITAGE AVE 1.0 0 05/08/01 05/08/01 236 100
302 00 0092 / 5774 1600 W BEACH AVE 1.0 0 03/26/01 03/26/01 236 100
302 00 0092 / 5774 1632 W BEACH AVE 1.0 0 10/19/01 10/19/01 236 100
302 00 0092 / 5774 1607 W CHICAGO AVE 1.0 0 10/19/01 10/19/01 236 100
302 00 0092 / 5774 1855 W CHICAGO AVE 1.0 0 07/17/01 07/17/01 236 100
302 00 0092 / 5774 1424 W DIVISION ST 1.0 0 10/19/01 10/19/01 236 100
805 06 2086 / 8272 1652 W DIVISION ST 1.0 08/28/96 08/28/96 0 08/28/96 08/28/96 300 100
302 00 0092 / 5774 1807 W DIVISION ST 1.0 0 10/19/01 10/19/01 236 100
302 00 0092 / 5774 2006 W DIVISION ST 1.0 0 03/29/01 03/29/01 236 100
805 06 1775 / 7961 2006 W DIVISION ST 1.0 04/16/97 04/16/97 0 04/16/97 04/16/97 300 100
302 00 0092 / 5774 1901 W ERIE ST 1.0 0 12/10/01 12/10/01 236 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 6

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0092 / 5774 2344 W ERIE ST 1.0 0 12/10/01 12/10/01 236 100
805 06 1139 / 7325 2654 W HOMER ST 1.0 03/23/95 03/23/95 0 03/23/95 03/23/95 300 100
302 00 0092 / 5774 2330 W HURON ST 1.0 0 12/10/01 12/10/01 236 100
805 06 1914 / 8100 2624 W NORTH AVE 1.0 03/08/96 03/08/96 0 03/08/96 03/08/96 300 100
805 06 1915 / 8101 2634 W NORTH AVE 1.0 11/16/95 11/16/95 0 11/16/95 11/16/95 300 100
302 00 0092 / 5774 1635 W PIERCE AVE 1.0 0 11/28/01 11/28/01 236 100
805 06 0584 / 6770 2725 W PRINDIVILLE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0450 / 6636 1701 W SUPERIOR ST 1.0 10/04/95 10/04/95 0 10/04/95 10/04/95 300 100
302 00 0092 / 5774 2026 W SUPERIOR ST 1.0 0 06/27/01 06/27/01 236 100
302 00 0092 / 5774 1814 W THOMAS ST 1.0 0 11/28/01 11/28/01 236 100
805 06 1690 / 7876 2637 W THOMAS ST 1.0 07/02/97 07/02/97 0 07/02/97 07/02/97 300 100
805 06 0365 / 6551 2219 W WABANSIA AVE 1.0 08/29/96 08/29/96 0 08/29/96 08/29/96 300 100

Totals per Alley Lighting/Lamps 1,122.0 26,704 43,503

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 2058 N WESTERN AVE 1,540.0 06/01/07 12/31/07 45,337 07/01/07 09/01/07 45,337 100

Work Type: Arterial Strt Lighting/Lamps Blocks


300 07 0001 / 5424 ON N LEAVITT ST FROM N MILWAUKEE AVE TO W WABANSIA AVE .50 04/18/06 11/18/06 3,500 11/21/06 11/21/06 0 100
300 07 0001 / 5424 ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0

Totals per Arterial Strt Lighting/Lamps .50 3,500 0

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 1951 W DIVISION ST 1,510.0 0 05/08/02 05/11/02 27,494 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 7

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0198 / 5323 LATHROP HOMES 03/12/01 04/10/01 215,250 03/29/01 04/04/01 67,170 100
300 06 0167 / 5306 N FRANCISCO AVE AND W WABANSIA AVE 2.50 0 06/01/99 06/01/99 539 100
300 06 0167 / 5306 2600 N HOYNE AVE 2.0 0 05/19/99 05/19/99 702 100
302 00 0092 / 5774 1701 N MOZART ST 1.0 0 03/14/01 03/14/01 471 100
302 00 0092 / 5774 2215 W NORTH AVE 1.0 0 03/16/01 03/16/01 471 100

Totals per Flood Light Install 6.50 215,250 69,353

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Projects


300 06 0117 / 5271 2800 N DAMEN AVE 1.0 4,000 0

Work Type: Loop Lighting Blocks


281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 07 0032 / 5455 ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE 4.50 04/18/06 11/18/06 6,075 09/22/06 10/10/06 3,853 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST 4.50 04/18/06 11/18/06 6,075 09/22/06 10/10/06 3,853 100
300 07 0032 / 5455 ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 5,400 09/22/06 10/10/06 3,425 100
300 07 0032 / 5455 ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST 4.50 04/18/06 11/18/06 6,075 09/22/06 10/10/06 3,853 100
300 11 / 32222 ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST 13.86 11/01/07 12/01/07 18,843 03/13/08 04/04/08 17,538 100
300 06 0122 / 5275 ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE 10.56 12/01/03 12/06/03 14,256 11/28/03 12/04/03 14,709 100

Totals per Ornamental - Piggyback Lighting 41.92 56,724 47,231


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 8

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental Lighting Blocks
300 11 / 32190 ON N ASHLAND AVE FROM W DIVISION ST TO N MILWAUKEE AVE 2.0 06/20/07 07/03/07 13,000 06/20/07 07/03/07 10,342 100
300 11 / 32190 ON N MILWAUKEE AVE FROM N PAULINA ST TO N DAMEN AVE 2.0 08/27/07 09/27/07 150,000 08/27/07 09/07/07 149,999 100
300 06 0119 / 5273 1200 N ASHLAND AVE 1.0 06/01/99 12/01/99 160,000 05/13/99 12/14/99 123,364 100
281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0

Totals per Ornamental Lighting 5.0 323,000 283,705

Work Type: POD Camera Pole Poles


281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2058 N WESTERN AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 9

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32190 ON N DAMEN AVE FROM W SCHILLER ST TO W EVERGREEN AVE 1.0 05/30/07 07/20/07 58,750 05/30/07 07/17/07 36,740 100
300 11 / 32190 ON N HONORE ST FROM N WICKER PARK AVE TO N MILWAUKEE AVE 1.0 05/30/07 07/20/07 48,750 05/30/07 07/17/07 36,740 100
300 11 / 32190 ON N HONORE ST FROM W DIVISION ST TO W ELLEN ST 1.0 02/21/08 04/21/08 55,000 0 0
300 11 / 32190 ON N MARION CT FROM W DIVISION ST TO W ELLEN ST 1.0 02/21/08 04/21/08 55,000 0 0
300 07 0001 / 5424 ON N POINT ST FROM W ARMITAGE AVE TO W HENRY CT 1.0 06/28/06 08/31/06 65,000 07/07/06 10/24/06 65,000 100
300 06 0298 / 5405 ON N STAVE ST FROM W ARMITAGE AVE TO W FRANCIS PL 2.0 06/25/05 08/01/05 0 08/22/05 10/14/05 102,254 100
300 06 0308 / 5414 ON N STAVE ST FROM W FRANCIS PL TO N CALIFORNIA AVE 2.0 06/06/06 07/01/06 150,000 07/07/06 10/24/06 126,534 100
300 11 / 32190 ON N WICKER PARK AVE FROM N WOOD ST TO N DAMEN AVE 1.0 05/30/07 07/20/07 62,500 05/30/07 07/17/07 36,470 100
300 06 / 32146 ON N WOLCOTT AVE FROM W DIVISION ST TO N MILWAUKEE AVE 2.0 12/05/07 05/29/08 282,042 0 25
300 06 / 32277 ON N WOOD ST FROM W DIVISION ST TO N MILWAUKEE AVE .0 05/04/08 12/31/08 0 0 0
300 07 0001 / 5424 ON W ATTRILL ST FROM N MILWAUKEE AVE TO N STAVE ST 1.0 06/28/06 08/31/06 32,000 07/07/06 10/24/06 32,000 100
300 06 / 32146 ON W CRYSTAL ST FROM N DAMEN AVE TO N WOLCOTT AVE 1.50 12/05/07 06/26/08 282,042 0 25
300 06 / 32277 ON W ELLEN ST FROM N WOOD ST TO N HERMITAGE AVE .0 05/04/08 12/31/08 0 0 0
300 07 0001 / 5424 ON W EVERGREEN AVE FROM N MILWAUKEE AVE TO N DAMEN AVE 1.0 08/01/06 10/01/06 85,000 09/11/06 11/15/06 87,303 100
300 07 0001 / 5424 ON W FRANCIS PL FROM N MILWAUKEE AVE TO N POINT ST 1.0 06/28/06 08/31/06 39,000 07/07/06 10/24/06 39,000 100
300 06 / 32146 ON W POTOMAC AVE FROM N DAMEN AVE TO N WOLCOTT AVE 2.0 10/05/07 01/31/08 282,042 02/18/08 0 100
300 07 0001 / 5424 ON W PRINDIVILLE ST FROM N MILWAUKEE AVE TO N STAVE ST 1.0 06/28/06 08/31/06 32,000 07/07/06 10/24/06 32,000 100
300 07 0001 / 5424 ON W ST GEORGES CT FROM N MILWAUKEE AVE TO N STAVE ST 1.0 06/28/06 08/31/06 32,000 07/07/06 10/24/06 32,000 100
300 06 0308 / 5414 ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE .50 03/09/06 05/09/06 49,164 03/09/06 04/28/06 31,842 100
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0

Totals per Residntl Staggered Lighting 21.0 1,610,290 657,883

Work Type: Residntl Strt Lighting/Lamps Blocks


300 03 0001 / 4872 ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE .50 06/01/04 09/01/04 40,000 05/29/04 07/09/04 40,000 100
300 03 0035 / 4906 ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE 06/01/04 09/01/04 40,000 05/24/04 07/09/04 40,000 100
300 06 0235 / 5349 ON N WASHTENAW AVE FROM N ELSTON AVE TO W BELMONT AVE 1.0 09/06/03 11/06/03 77,813 09/10/03 11/06/03 68,263 100
300 06 0235 / 5349 ON W FLETCHER ST FROM N ELSTON AVE TO N ROCKWELL ST 1.0 09/06/03 11/06/03 77,813 09/10/03 11/06/03 68,264 100
300 06 0267 / 5375 ON W SUPERIOR ST FROM N WESTERN AVE TO N ROCKWELL AVE 1.0 07/20/04 09/20/04 80,185 07/12/04 10/15/04 90,227 100
300 03 0032 / 4903 ON W WABANSIA AVE FROM N ASHLAND AVE TO N WOOD ST 1.50 10/01/04 12/15/04 92,500 10/08/04 01/21/05 42,715 100

Totals per Residntl Strt Lighting/Lamps 5.0 408,311 349,469


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 10

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Arterial Locations
281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 2000 W SUPERIOR ST 3.0 0 01/03/01 01/03/01 1,135 100

Totals per Short Arm Installs - Residntl 3.0 0 1,135

Work Type: Strt Light Pole Painting Locations


300 11 / 32190 ON N ASHLAND AVE FROM N MILWAUKEE AVE TO W DIVISION ST 13.0 06/20/07 06/20/07 3,250 07/03/07 07/03/07 2,600 100
300 03 0033 / 4904 ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE 7.49 03/01/05 03/20/05 1,988 0
300 07 0001 / 5424 ON N ELK GROVE AVE FROM N WOOD ST TO W NORTH AVE 11.0 04/18/06 11/18/06 1,200 06/01/06 06/10/06 0 100
300 07 0001 / 5424 ON N WASHTENAW AVE FROM W ALTGELD ST TO W FULLERTON AVE 5.0 09/21/06 09/28/06 1,000 08/22/06 08/22/06 721 100
300 04 0216 / 5114 ON N WESTERN AVE FROM W BLOOMINGDALE AVE TO W HOMER ST 19.0 05/01/06 11/01/06 4,110 05/17/06 07/24/06 4,110 100
300 07 0001 / 5424 ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 11 / 32190 ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE 4.95 05/15/07 06/01/07 1,089 05/15/07 06/01/07 1,089 100
300 05 0001 / 5116 ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST 31.0 04/04/05 11/18/05 6,200 07/25/05 08/20/05 4,415 100
300 07 0001 / 5424 ON W HURON ST FROM N ASHLAND AVE TO N WOOD ST 9.0 04/18/06 11/18/06 1,800 06/01/06 07/01/06 0 0
300 07 0001 / 5424 ON W LE MOYNE ST FROM N DAMEN AVE TO N HOYNE AVE 5.0 04/18/06 11/18/06 1,000 0 0
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0

Totals per Strt Light Pole Painting 105.44 21,637 12,935

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 2717 N ELSTON AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Lighting Blocks


300 06 0111 / 5266 ON N CALIFORNIA AVE FROM W FULLERTON AVE TO W DIVERSEY AVE .52 08/01/00 09/30/00 0 11/01/98 12/15/98 5,504 100
300 03 0001 / 4872 2700 N ARTESIAN AVE 1.0 10/15/04 10/25/04 2,075 10/15/04 10/15/04 1,348 100
300 06 0117 / 5271 2033-2049 W DIVERSEY AVE .50 13,110 10/23/99 11/30/99 9,425

Totals per Strt Lighting 2.02 15,185 16,277

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2137 N MILWAUKEE AVE 1,712.0 03/01/04 12/01/04 8,902 09/26/06 09/28/06 18,644 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 11

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2788 / 8974 1799 N ARTESIAN AVE 6.0 03/31/94 03/31/94 0 03/31/94 03/31/94 4,500 100
805 06 2928 / 9114 1795 N CALIFORNIA AVE 6.0 03/18/94 03/18/94 0 03/18/94 03/18/94 4,500 100
805 06 2300 / 8486 2895 N CALIFORNIA AVE 12.0 06/20/96 06/20/96 0 06/20/96 06/20/96 9,000 100
805 06 2789 / 8975 1799 N CAMPBELL AVE 6.0 06/01/94 06/01/94 0 06/01/94 06/01/94 4,500 100
300 06 0217 / 5337 3181 N ELSTON AVE 193.0 12/29/03 01/09/04 10,848 12/30/03 01/02/04 14,760 100
805 06 2744 / 8930 1798 N FAIRFIELD AVE 6.0 06/09/94 06/09/94 0 06/09/94 06/09/94 4,500 100
805 06 2790 / 8976 1799 N MAPLEWOOD AVE 6.0 04/07/94 04/07/94 0 04/07/94 04/07/94 4,500 100
805 06 2765 / 8951 1774 N MILWAUKEE AVE 10.0 04/22/94 04/22/94 0 04/22/94 04/22/94 7,500 100
805 06 2362 / 8548 1795 N ROCKWELL ST 10.0 10/03/95 10/03/95 0 10/03/95 10/03/95 7,500 100
805 06 2476 / 8662 1795 N TALMAN AVE 10.0 10/06/95 10/06/95 0 10/06/95 10/06/95 7,500 100
805 06 2743 / 8929 1798 N WASHTENAW AVE 6.0 06/01/94 06/01/94 0 06/01/94 06/01/94 4,500 100
805 06 2223 / 8409 1798 N WESTERN AVE 6.0 12/09/96 12/09/96 0 12/09/96 12/09/96 4,500 100
805 06 2640 / 8826 1798 N WINNEBAGO AVE 8.0 12/14/94 12/14/94 0 12/14/94 12/14/94 6,000 100
302 00 0071 / 5759 2600 W DIVERSEY AVE 0 10/20/98 10/28/98 10,473 100
805 06 2363 / 8549 2640 W DIVERSEY AVE 12.0 06/01/92 06/01/92 0 06/01/92 06/01/92 9,000 100
300 06 0099 / 5260 1951 W DIVISION ST 2,792.0 06/01/03 07/09/03 156,932 07/01/03 07/10/03 103,719 100
302 00 0070 / 5758 2200 W FULLERTON AVE 0 06/12/97 06/19/97 14,272 100
302 00 0072 / 5760 2200 W FULLERTON AVE 1.0 0 09/28/99 10/19/99 38,301 100
302 00 0071 / 5759 2430 W LOGAN BLVD 0 03/01/98 03/26/98 33,883 100
805 06 2711 / 8897 2301 W MOFFAT ST 6.0 12/31/91 12/31/91 0 12/31/91 12/31/91 4,500 100
805 06 2421 / 8607 1525 W NORTH AVE 14.0 10/01/91 10/01/91 0 10/01/91 10/01/91 10,500 100

Totals per Underpass Lighting 3,110.0 167,780 308,408


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 12

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N ELSTON AVE AND N LEAVITT ST .50 0 10/24/02 10/24/02 5,037 100
210 06 0219 / 4459 N WESTERN AVE AND N MILWAUKEE AVE 1.0 03/31/05 04/01/05 10,563 04/01/05 04/01/05 10,489 100
210 06 0219 / 4459 N WESTERN AVE AND W ARMITAGE AVE .50 04/01/05 04/02/05 5,282 04/07/05 04/07/05 4,523 100
210 06 0219 / 4459 N WESTERN AVE AND W CHICAGO AVE .50 04/15/05 04/15/05 5,282 04/10/05 04/10/05 4,004 100
210 06 0219 / 4459 N WESTERN AVE AND W DIVISION ST .50 03/28/05 03/29/05 5,282 03/16/05 03/16/05 5,042 100
210 06 0219 / 4459 N WESTERN AVE AND W FULLERTON AVE .50 04/04/05 04/05/05 5,282 03/25/05 03/25/05 4,523 100
210 06 0219 / 4459 N WESTERN AVE AND W NORTH AVE 1.0 03/30/05 03/31/05 10,563 03/04/05 03/04/05 8,008 100
210 06 0219 / 4459 N WESTERN AVE AND W POTOMAC AVE .50 03/29/05 03/30/05 5,282 03/08/05 03/08/05 3,824 100
210 06 0219 / 4459 N WESTERN AVE AND W SCHUBERT AVE 1.0 04/07/05 04/08/05 10,563 03/10/05 03/10/05 8,527 100
210 06 0219 / 4459 W LOGAN BLVD AND N WESTERN AVE 1.0 04/06/05 04/07/05 10,563 03/18/05 03/18/05 15,333 100

Totals per LED Signal Head Install 7.0 68,660 69,309

Work Type: New Signal Locations


210 06 0171 / 4420 N ASHLAND AVE AND W DIVISION ST 1.0 07/09/07 08/08/07 138,240 05/01/07 05/25/07 117,195 100
300 11 / 32190 W CHICAGO AVE AND N WOLCOTT AVE 1.0 10/01/07 12/01/07 300,000 01/10/08 07/21/08 265,845 100
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0

Totals per New Signal 2.0 438,240 383,040

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 N ASHLAND AVE AND W CHICAGO AVE .0 03/15/06 05/08/07 6,000 01/26/07 02/09/07 2,994 100

10713013 Note Last Updated on 03-APR-08


210 06 0240 / 4477 N ASHLAND AVE AND W DIVISION ST 8.0 11/01/05 06/22/07 15,000 11/01/05 10/03/06 10,562 100

Completed by Operations Division on 10/3/06 Note Last Updated on 30-MAY-07


Totals per Pedestrian Countdown Signal Install 8.0 21,000 13,556

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N OAKLEY AVE AND W DIVISION ST .50 2,000 07/11/01 07/12/01 131 100

Work Type: Signals Intersections


300 06 0096 / 5258 1514 N ASHLAND AVE 34.0 10/01/03 10/08/03 0 09/20/03 10/01/03 5,376 100

Totals per Traffic 574,184 1,305,586


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 13

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
300 06 0199 / 5324 N WESTERN AVE AND W POTOMAC AVE .50 9,573 02/26/01 04/27/01 79,240 100
300 09 / 33067 W CHICAGO AVE AND N WOLCOTT AVE 1.0 08/19/08 08/29/08 32,000 08/19/08 08/29/08 32,000 100
814 06 0153 / 16367 1200 N CLEAVER ST 1.0 09/03/96 09/03/96 0 09/03/96 09/03/96 87,656 100
814 06 0283 / 16495 2700 N ELSTON AVE 1.0 11/29/91 11/29/91 0 11/29/91 11/29/91 123,207 100
814 06 0284 / 16496 2800 N ELSTON AVE 1.0 12/04/91 12/04/91 0 12/04/91 12/04/91 123,207 100
814 06 0285 / 16497 3000 N ELSTON AVE 1.0 12/06/91 12/06/91 0 12/06/91 12/06/91 123,207 100
814 06 0201 / 16413 3000 N LEAVITT ST 1.0 03/17/92 03/17/92 0 03/17/92 03/17/92 106,743 100
300 06 0117 / 5271 1200 N NOBLE ST 1.0 2,000 686
814 06 0051 / 16268 2667 W DIVERSEY AVE 1.0 03/02/95 03/02/95 0 03/02/95 03/02/95 61,595 100
814 06 0086 / 16302 2668 W DIVERSEY AVE 1.0 09/28/94 09/28/94 0 09/28/94 09/28/94 49,756 100
814 06 0122 / 16336 1500 W NORTH AVE 1.0 09/13/93 09/13/93 0 09/13/93 09/13/93 46,166 100

Totals per TSM Install 10.50 43,573 833,463

Work Type: Traffic Equipment Painting Locations


300 11 / 32190 ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE 1.65 05/15/07 06/01/07 512 05/15/07 06/01/07 512 100
300 05 0001 / 5116 ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST 1.0 04/04/05 11/18/05 200 07/25/05 08/20/05 200 100
300 11 / 32190 2702 W CORTEZ ST .0 03/01/07 12/31/07 0 0 0

Totals per Traffic Equipment Painting 2.65 712 712

Totals per Construction Phase 3,541,223 3,222,347

Totals for Ward 01 3,554,673 3,233,475


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 14

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0300 / 5407 ABLA HOMES (CHA) .0 01/15/05 04/15/05 0 01/15/05 09/30/05 23,208 100
300 06 0289 / 5396 ROCKWELL GARDENS 1.0 12/01/04 02/28/05 0 12/01/04 07/26/06 1,984 100
300 05 0002 / 5117 ON S RICHMOND ST FROM W JACKSON BLVD TO W VAN BUREN ST .0 08/06/06 08/07/06 0 08/06/06 08/07/06 0 0
300 06 0308 / 5414 ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,389 100
300 06 0308 / 5414 ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 274 100
300 05 0002 / 5117 ON W MONROE ST FROM S DAMEN AVE TO S LEAVITT ST .0 08/06/06 08/07/06 0 08/06/06 08/07/06 0 0
210 06 0240 / 4477 E VAN BUREN ST AND S MICHIGAN AVE .0 10/10/05 07/31/06 1,200 10/10/05 09/13/06 940 100
300 06 0292 / 5399 S CANAL ST AND W 14TH PL 1.0 5,000 04/26/05 12/10/05 1,065 100
210 06 0209 / 4452 S CANAL ST AND W ROOSEVELT RD 1.0 07/01/04 12/31/04 0 07/01/04 12/31/04 4,921 100
210 06 0240 / 4477 S CLARK ST AND W CONGRESS PKWY .0 10/10/05 07/31/06 1,200 10/10/05 02/15/06 235 100
300 06 0292 / 5399 S JEFFERSON ST AND W 14TH PL 1.0 3,000 04/16/05 1,454 25
210 06 0207 / 4450 S MICHIGAN AVE AND E JACKSON BLVD .0 07/01/04 12/30/04 750 09/02/04 09/10/04 460 100
281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
300 06 0278 / 5386 1400 S BLUE ISLAND AVE .0 07/01/04 09/30/04 0 0 0
300 06 0292 / 5399 1101 S CANAL ST 1.0 02/03/05 03/08/05 2,000 01/13/05 835 80
300 06 0292 / 5399 607 S JEFFERSON ST 1.0 03/03/05 03/10/05 1,500 03/03/05 03/10/05 979 100
300 06 0292 / 5399 1240 S LEAVITT ST 1.0 03/15/05 03/19/05 3,000 03/15/05 05/11/05 1,274 100
300 06 0292 / 5399 610 S MICHIGAN AVE 1.0 4,000 07/25/05 08/31/05 0 100
300 06 0292 / 5399 1620 S MICHIGAN AVE 1.0 10/24/04 10/28/04 1,000 10/24/04 10/28/04 336 100
300 06 0292 / 5399 409 S MORGAN ST 1.0 1,000 06/06/05 07/22/05 603 100
300 06 0282 / 5390 1600 S PRAIRIE AVE 1.0 12/06/04 01/05/05 3,000 12/01/04 03/09/05 2,707 100
300 06 0292 / 5399 225 S SANGAMON ST 1.0 05/26/05 07/19/05 1,500 05/26/05 07/19/05 634 100
300 06 0292 / 5399 1255 S STATE ST 1.0 07/25/05 07/25/05 2,000 07/25/05 07/25/05 896 100
300 06 0282 / 5390 550 W ADAMS ST .0 08/20/04 12/31/04 1,000 08/20/04 12/31/04 1,000 100
300 06 0292 / 5399 550 W ADAMS ST .0 01/20/05 12/21/05 0 01/20/05 01/17/06 0 100
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 520 W ROOSEVELT RD .0 01/24/05 03/01/05 1,500 01/24/05 04/15/05 0 0
150 06 / 32900 1065-1400 W ROOSEVELT RD .0 12/06/06 08/24/07 66,000 05/16/07 10/11/07 50,000 100

Totals per Design/Engineering 13.0 98,650 96,194


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 15

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0002 / 5425 ON S INDIANA AVE FROM E 16TH ST TO E 18TH ST 4.0 04/18/06 11/18/06 1,400 0 0
300 07 0002 / 5425 ON S MICHIGAN AVE FROM E 16TH ST TO E 18TH ST 4.0 04/18/06 11/18/06 1,400 0 0

Totals per 250 Watt Changeout 8.0 2,800 0

Totals per Lighting/Electrical 5,938,898 4,502,081


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 16

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 09 / 33068 ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE 3.0 01/28/09 02/02/09 1,200 01/28/09 02/02/09 958 100
300 09 / 33068 ON E 14TH PL FROM S STATE ST TO S WABASH AVE 2.0 01/28/09 02/02/09 800 01/28/09 02/02/09 644 100
300 09 / 33068 ON E 18TH ST FROM S INDIANA AVE TO S PRAIRIE AVE 4.0 05/27/08 06/13/08 1,600 07/09/08 07/10/08 1,283 100
300 09 / 33068 ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 06/16/08 06/20/08 400 07/18/08 09/02/08 322 100

MATERIAL ORDERED Note Last Updated on 28-JUL-08


300 09 / 33068 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 06/16/08 06/20/08 400 07/18/08 07/21/08 322 100

MATERIAL ORDERED Note Last Updated on 28-JUL-08


300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 8.16 05/28/08 06/20/08 3,400 05/28/08 06/06/08 2,555 100
300 09 / 33068 ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR 8.60 05/28/08 06/20/08 3,612 04/01/08 12/01/08 2,692 100
300 09 / 33068 ON E CULLERTON ST FROM S INDIANA AVE TO S CALUMET AVE 9.0 05/29/08 06/20/08 3,600 07/09/08 07/10/08 2,880 100
300 09 / 33068 ON S CALUMET AVE FROM E 18TH ST TO E 21ST ST 9.0 05/29/08 06/20/08 3,600 07/09/08 07/10/08 2,880 100
300 09 / 33068 ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST 4.0 06/02/08 06/13/08 1,800 06/02/08 06/05/08 1,288 100
300 06 0251 / 5361 ON S CLINTON ST FROM W HARRISON ST TO W POLK ST 12.0 08/15/05 08/20/05 4,800 08/10/05 08/15/05 5,037 100
300 09 / 33068 ON S CLINTON ST FROM W VAN BUREN ST TO W HARRISON ST 3.0 10/15/08 10/17/08 1,200 10/15/08 10/17/08 966 100
300 09 / 33068 ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST 17.0 03/28/08 04/04/08 6,800 03/28/08 04/04/08 5,474 100
300 09 / 33068 ON S DENVIR AVE FROM W CONGRESS PKWY TO W HARRISON ST 12.0 4,800 0 0
300 09 / 33068 ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST 15.0 12/17/08 01/23/09 6,000 12/17/08 01/23/09 4,830 100
300 09 / 33068 ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST 8.0 03/28/08 04/04/08 3,200 03/28/08 04/04/08 2,576 100
300 09 / 33068 ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST 7.38 05/29/08 06/20/08 2,952 04/01/08 12/01/08 2,310 100
300 06 0225 / 5340 ON S INDIANA AVE FROM E CERMAK RD TO E ROOSEVELT RD 100.0 09/01/03 09/10/03 40,000 09/02/03 09/09/03 32,580 100
300 06 0251 / 5361 ON S JEFFERSON ST FROM W HARRISON ST TO W POLK ST 13.0 08/15/05 08/20/05 5,200 08/10/05 08/15/05 5,037 100
300 09 / 33068 ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST 9.0 12/01/08 12/09/08 3,600 12/01/08 12/03/08 3,398 100
300 09 / 33068 ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD 13.0 01/05/09 01/30/09 5,200 01/12/09 01/22/09 6,434 100
300 07 0002 / 5425 ON S MICHIGAN AVE FROM E ROOSEVELT RD TO E 14TH ST 12.0 04/18/06 11/18/06 5,150 06/21/06 06/21/06 0 100
300 06 0122 / 5275 ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST 6.0 08/01/04 08/15/04 2,500 06/10/04 06/10/04 1,506 100
300 09 / 33068 ON S WABASH AVE FROM E 23RD ST TO E 24TH PL 5.0 06/16/08 06/20/08 2,000 06/16/08 06/20/08 1,610 100
300 09 / 33068 ON S WABASH AVE FROM E 29TH ST TO E 30TH ST 5.0 06/16/08 06/20/08 2,000 07/10/08 07/15/08 1,610 100

MATERIALS ORDERED Note Last Updated on 28-JUL-08


300 09 / 33068 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST 3.0 06/09/08 06/13/08 1,400 06/09/08 06/13/08 966 100
300 09 / 33068 ON S WESTERN AVE FROM W POLK ST TO W CONGRESS PKWY 25.0 12/08/08 12/29/08 10,000 12/08/08 12/29/08 8,561 100
300 09 / 33068 ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD 4.50 06/09/08 06/13/08 1,800 06/09/08 06/13/08 1,449 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 17

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 09 / 33068 ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE 17.0 12/18/08 01/08/09 6,800 12/18/08 01/08/09 3,719 100
300 09 / 33068 ON W FIFTH AVE FROM W MONROE ST TO S MOZART ST 12.0 01/08/09 02/20/09 4,800 01/08/09 02/20/09 4,760 100
300 06 0251 / 5361 ON W HARRISON ST FROM S CLINTON ST TO S JEFFERSON ST 13.0 08/15/05 08/20/05 5,200 08/10/05 08/15/05 5,037 100
300 07 0002 / 5425 ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD 42.0 04/18/06 11/18/06 17,150 10/20/06 10/21/06 0 100
300 09 / 33068 ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST 10.0 07/07/08 07/11/08 4,000 07/07/08 07/11/08 3,220 100
300 06 0251 / 5361 ON W POLK ST FROM S CLINTON ST TO S JEFFERSON ST 13.0 08/15/05 08/20/05 5,200 08/10/05 08/15/05 5,037 100
300 09 / 33068 ON W POLK ST FROM S DEARBORN ST TO S CLARK ST 1.0 03/28/08 04/04/08 414 03/28/08 04/04/08 322 100
300 09 / 33068 ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE 2.0 10/13/08 10/17/08 800 10/06/08 10/08/08 800 100
300 09 / 33091 ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST 4.0 02/01/08 12/31/08 1,600 09/08/08 09/09/08 1,328 100
300 09 / 33068 ON W WILCOX ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE 7.0 06/09/08 06/13/08 3,000 06/09/08 06/13/08 2,254 100
300 09 / 33068 1400-1500 S LOOMIS ST 6.0 06/30/08 07/01/08 2,400 08/07/08 08/12/08 1,932 100

Totals per 400 Watt Changeout 446.64 180,378 128,577


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 18

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0095 / 5777 ON S STATE ST FROM E VAN BUREN ST TO W CONGRESS PKWY 17.0 12,750 04/11/01 04/16/01 16,763 100
302 00 0092 / 5774 ON W WASHBURNE AVE FROM S DAMEN AVE TO S LEAVITT ST 9.0 0 04/03/01 04/04/01 2,121 100
302 00 0095 / 5777 72 E ROOSEVELT DR 5.0 3,750 12/05/97 12/09/97 4,542 100
805 06 0749 / 6935 1300 S ASHLAND AVE 1.0 10/26/95 10/26/95 0 10/26/95 10/26/95 300 100
805 06 1521 / 7707 615 S CALIFORNIA AVE 1.0 10/31/97 10/31/97 0 10/31/97 10/31/97 300 100
805 06 1522 / 7708 625 S CALIFORNIA AVE 1.0 10/31/97 10/31/97 0 10/31/97 10/31/97 300 100
302 00 0095 / 5777 520 S FEDERAL ST 8.0 6,000 11/19/97 11/19/97 7,267 100
302 00 0095 / 5777 130 S FRANKLIN ST 3.0 2,250 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 230 S FRANKLIN ST 1.0 750 10/23/02 10/29/02 400 100
805 06 1190 / 7376 1320 S INDIANA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1191 / 7377 1340 S INDIANA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1192 / 7378 1360 S INDIANA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1542 / 7728 1603 S INDIANA AVE 1.0 10/23/97 10/23/97 0 10/23/97 10/23/97 300 100
805 06 1543 / 7729 1607 S INDIANA AVE 1.0 10/23/97 10/23/97 0 10/23/97 10/23/97 300 100
302 00 0095 / 5777 410 S MICHIGAN AVE 14.0 10,500 06/14/00 06/20/00 6,481 100
302 00 0095 / 5777 600 S MICHIGAN AVE 6.0 4,500 11/29/97 12/03/97 5,671 100
302 00 0095 / 5777 820 S MICHIGAN AVE 3.0 2,250 11/10/97 11/19/97 4,052 100
302 00 0095 / 5777 1100 S MICHIGAN AVE 3.0 2,250 05/30/00 05/30/00 1,517 100
302 00 0092 / 5774 1402 S MICHIGAN AVE 1.0 0 10/31/01 10/31/01 236 100
302 00 0092 / 5774 1416 S MICHIGAN AVE 1.0 0 10/31/01 10/31/01 236 100
302 00 0092 / 5774 1456 S MICHIGAN AVE 1.0 0 10/31/01 10/31/01 236 100
302 00 0092 / 5774 1504-1522 S MICHIGAN AVE 3.0 0 10/31/01 10/31/01 707 100
302 00 0092 / 5774 2740 S MICHIGAN AVE 1.0 0 02/07/01 02/07/01 236 100
300 06 0078 / 5241 1200 S STATE ST 28.0 11/06/02 11/14/02 21,675 11/06/02 11/14/02 21,661 100
302 00 0095 / 5777 819 S WABASH AVE 3.0 2,250 11/10/97 11/19/97 4,052 100
302 00 0092 / 5774 1235 S WABASH AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1243 S WABASH AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1259 S WABASH AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1301 S WABASH AVE 1.0 0 11/28/01 11/28/01 236 100
302 00 0092 / 5774 1423 S WABASH AVE 1.0 0 10/31/01 10/31/01 236 100
302 00 0092 / 5774 1439 S WABASH AVE 1.0 0 10/31/01 10/31/01 236 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 19

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0380 / 6566 2102 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0381 / 6567 2134 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
302 00 0095 / 5777 402 S WELLS ST 1.0 750 10/23/02 10/29/02 400 100
302 00 0095 / 5777 405 S WELLS ST 6.0 4,500 11/17/97 11/17/97 5,892 100
302 00 0095 / 5777 408 S WELLS ST 1.0 750 10/23/02 10/29/02 400 100
302 00 0095 / 5777 420 S WELLS ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0092 / 5774 1330 W FILLMORE ST 1.0 0 09/19/01 09/19/01 236 100
302 00 0092 / 5774 1359 W FILLMORE ST 1.0 0 09/19/01 09/19/01 236 100
302 00 0092 / 5774 1421 W FILLMORE ST 1.0 0 09/19/01 09/19/01 236 100
302 00 0092 / 5774 1439-1447 W FILLMORE ST 2.0 0 10/01/01 10/01/01 471 100
805 06 1978 / 8164 1000 W MONROE ST 1.0 09/13/96 09/13/96 0 09/13/96 09/13/96 300 100
805 06 1979 / 8165 1020 W MONROE ST 1.0 09/13/96 09/13/96 0 09/13/96 09/13/96 300 100
805 06 0425 / 6611 1401 W TAYLOR ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0426 / 6612 1431 W TAYLOR ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0092 / 5774 2060 W WASHINGTON BLVD 1.0 0 02/27/01 02/27/01 236 100
302 00 0092 / 5774 2160 W WASHINGTON BLVD 1.0 0 02/27/01 02/27/01 236 100
805 06 0500 / 6686 2704 W WASHINGTON BLVD 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100
805 06 0382 / 6568 2936 W WASHINGTON BLVD 1.0 04/21/95 04/21/95 0 04/21/95 04/21/95 300 100
302 00 0092 / 5774 2010 W WASHINGTON ST 1.0 0 01/17/01 01/17/01 236 100
302 00 0092 / 5774 2118 W WASHINGTON ST 1.0 0 02/27/01 02/27/01 236 100
302 00 0092 / 5774 2134 W WASHINGTON ST 1.0 0 02/27/01 02/27/01 236 100

Totals per Alley Lighting/Lamps 149.0 76,425 93,445

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 1234 S MICHIGAN AVE 5,217.0 06/01/07 12/31/07 153,588 09/01/07 09/15/07 0 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 20

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0198 / 5323 ABLA HOMES (CHA) 03/04/01 03/24/01 92,650 03/14/01 03/24/01 80,334 100
300 06 0198 / 5323 HARRISON COURTS 02/24/01 05/24/01 12,506 05/31/01 05/31/01 6,400 100
300 06 0198 / 5323 LOOMIS COURTS 03/05/01 03/30/01 46,258 03/26/01 03/29/01 28,420 100
300 06 0198 / 5323 ROCKWELL GARDENS 02/20/01 03/08/01 71,050 03/01/01 03/13/01 52,194 100
300 07 0042 / 5465 ON W MADISON ST FROM WACKER DR TO CANAL ST 1.0 01/10/07 01/31/07 500 500 100
300 06 0167 / 5306 W JACKSON BLVD AND S FRANCISCO AVE 1.50 0 12/08/99 12/08/99 527 100
302 00 0092 / 5774 1020 S CLINTON ST 1.0 0 05/11/01 05/11/01 471 100
302 00 0092 / 5774 558 W DE KOVEN ST 1.0 0 05/11/01 05/11/01 471 100
302 00 0092 / 5774 560 W DE KOVEN ST 1.0 0 05/11/01 05/11/01 471 100
302 00 0092 / 5774 521 W TAYLOR ST 1.0 0 05/11/01 05/11/01 471 100
302 00 0092 / 5774 529 W TAYLOR ST 1.0 0 05/11/01 05/11/01 471 100

Totals per Flood Light Install 7.50 222,964 170,730

Work Type: Lighting Imprvmnts Blocks


302 00 0094 / 5776 ON W TAYLOR ST FROM S MORGAN ST TO S ASHLAND AVE 3.0 0 03/08/98 08/01/99 565,355 100
281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0
150 06 / 32900 1065-1400 W ROOSEVELT RD .0 08/21/07 12/30/10 998,725 10/15/07 0 35

Totals per Lighting Imprvmnts 3.0 998,725 565,355


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 21

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0300 / 5407 ABLA HOMES (CHA) .0 05/01/05 12/31/05 1,100,000 03/25/05 10/17/06 736,191 100
300 06 0289 / 5396 ROCKWELL GARDENS 1.0 08/01/05 12/31/06 150,000 08/01/05 12/31/06 91,855 100
281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
300 06 0278 / 5386 1400 S BLUE ISLAND AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0
300 06 0292 / 5399 607 S JEFFERSON ST .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

not issued Note Last Updated on 01-NOV-07


607 Jefferson was constructed by private contractor. Job cannot be marked complete until material loaned to contractor by BOE is returned to BOE inventory. Note Last Updated on 17-JAN-07
300 06 0292 / 5399 1240 S LEAVITT ST .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0
300 06 0292 / 5399 610 S MICHIGAN AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Still open for construction Note Last Updated on 01-NOV-07


300 06 0292 / 5399 1620 S MICHIGAN AVE .0 03/01/05 12/31/05 10,217 09/05/05 10/05/05 9,309 100
300 06 0292 / 5399 409 S MORGAN ST .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Not construction job Note Last Updated on 01-NOV-07


300 06 0292 / 5399 225 S SANGAMON ST .0 03/01/05 12/31/05 7,008 10/12/05 10/18/05 7,790 100
300 06 0292 / 5399 1255 S STATE ST .0 03/01/05 12/31/05 9,473 01/03/06 03/18/06 3,262 100
300 06 0282 / 5390 550 W ADAMS ST .0 10/06/04 10/31/07 0 10/06/04 03/11/05 12,996 100
300 06 0292 / 5399 550 W ADAMS ST 1.0 02/17/05 03/15/06 143,600 02/17/05 03/15/06 141,332 100

Project has been completed.(100%) Note Last Updated on 01-SEP-06


281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 520 W ROOSEVELT RD 1.0 03/01/05 12/31/05 0 07/05/05 09/09/05 610 100

Totals per Lighting Imprvmnts 3.0 1,420,298 1,003,345

Work Type: Loop Lighting Blocks


281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0

Totals per Loop Lighting .0 0 0


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 22

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 09 / 33068 ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE 2.0 01/28/09 02/02/09 2,700 01/28/09 02/02/09 2,000 100
300 09 / 33068 ON E 14TH PL FROM S STATE ST TO S WABASH AVE 1.0 01/28/09 02/02/09 1,350 01/28/09 02/02/09 1,000 100
300 09 / 33068 ON E 14TH ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 01/28/09 02/02/09 1,350 01/28/09 02/02/09 1,000 100
300 07 0002 / 5425 ON E 18TH ST FROM S PRAIRIE AVE TO S CALUMET AVE 1.0 11/01/06 12/01/06 225,951 11/02/06 05/07/07 0 100
300 09 / 33068 ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 08/25/08 09/05/08 1,350 07/18/08 09/02/08 1,350 100

MATERIAL ORDERED Note Last Updated on 28-JUL-08


300 09 / 33068 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 08/25/08 09/05/08 1,350 08/20/08 09/02/08 1,350 100

MATERIAL ORDERED Note Last Updated on 28-JUL-08


300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 10.88 11/24/08 12/05/08 14,688 11/24/08 12/05/08 12,462 100
300 09 / 33068 ON E 31ST ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 13.76 12/15/08 12/31/08 18,576 12/01/08 12/09/08 15,760 100
300 09 / 33068 ON S CALUMET AVE FROM E 18TH ST TO E CERMAK RD 13.0 01/19/09 01/23/09 17,550 01/19/09 01/23/09 13,167 100
300 09 / 33068 ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST 4.0 07/28/08 08/14/08 5,400 07/28/08 08/14/08 4,580 100
300 09 / 33068 ON S CLINTON ST FROM W HARRISON ST TO W VAN BUREN ST 7.0 10/15/08 10/21/08 9,450 10/15/08 10/21/08 8,213 100
300 09 / 33068 ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST 11.0 03/28/08 04/04/08 22,000 03/28/08 04/04/08 12,452 100
300 09 / 33068 ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST 11.0 12/17/08 01/23/09 14,850 12/17/08 01/23/09 6,253 100
300 09 / 33068 ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST 8.0 03/28/08 04/04/08 16,000 03/28/08 04/04/08 9,160 100
300 09 / 33068 ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST 10.0 12/03/08 12/09/08 13,500 12/03/08 12/09/08 11,505 100
300 09 / 33068 ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD 11.0 01/12/09 01/30/09 14,850 01/14/09 01/22/09 21,786 100
300 09 / 33068 ON S WABASH AVE FROM E 23RD ST TO E 24TH PL 5.0 08/25/08 09/05/08 6,750 08/25/08 09/05/08 5,725 100
300 09 / 33068 ON S WABASH AVE FROM E 29TH ST TO E 30TH ST 5.0 08/25/08 09/05/08 6,750 07/10/08 07/15/08 5,725 100

MATERIALS ORDERED Note Last Updated on 28-JUL-08


300 09 / 33068 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST 3.0 07/28/08 08/15/08 4,050 07/28/08 08/15/08 3,425 100
300 09 / 33068 ON S WESTERN AVE FROM W POLK ST TO W CONGRESS PKWY 24.0 01/05/09 02/02/09 32,400 01/05/09 02/02/09 21,167 100
300 09 / 33068 ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD 4.50 07/28/08 08/08/08 9,000 07/28/08 08/08/08 5,153 100
300 09 / 33068 ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE 13.0 12/18/08 01/08/09 17,550 12/18/08 01/08/09 12,593 100
300 09 / 33068 ON W FIFTH AVE FROM W MONROE ST TO S MOZART ST 12.0 01/08/09 02/20/09 16,200 01/08/09 02/20/09 15,919 100
300 09 / 33068 ON W HARRISON ST FROM S OAKLEY BLVD TO S MAPLEWOOD AVE 32.0 10/06/08 10/30/08 43,200 09/18/08 09/30/08 36,640 100
300 09 / 33068 ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST 7.0 08/25/08 08/29/08 9,450 08/25/08 08/29/08 8,015 100
300 09 / 33068 ON W POLK ST FROM S DEARBORN ST TO S CLARK ST 2.0 03/28/08 04/04/08 2,700 03/28/08 04/04/08 2,290 100
300 09 / 33068 ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE 2.0 10/20/08 10/24/08 2,700 10/09/08 10/16/08 2,864 100
300 09 / 33091 ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST 4.0 02/01/08 12/31/08 5,400 10/06/08 10/16/08 4,620 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 23

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 09 / 33068 ON W WILCOX ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE 6.0 07/30/08 08/15/08 8,100 07/30/08 08/15/08 6,870 100
300 09 / 33068 1400-1500 S LOOMIS ST 6.0 08/04/08 08/08/08 8,700 08/07/08 08/12/08 6,870 100

Totals per Ornamental - Piggyback Lighting 232.14 553,865 259,913

Work Type: Ornamental Lighting Blocks


281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0

Totals per Ornamental Lighting .0 0 0

Work Type: POD Camera Pole Poles


281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0

Totals per POD Camera Pole .0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 429 S DEARBORN ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 07 0002 / 5425 ON S CLAREMONT AVE FROM W FLOURNOY ST TO W POLK ST 1.0 04/18/06 11/18/06 65,000 11/21/06 04/13/07 43,295 100
300 07 0002 / 5425 ON S FRANCISCO AVE FROM W WILCOX ST TO W VAN BUREN ST 1.0 04/18/06 11/18/06 80,000 09/01/06 10/27/06 51,733 100
300 09 / 33069 ON S PRAIRIE AVE FROM E 33RD BLVD TO E 35TH ST 1.48 96,200 04/01/08 12/01/08 0 0
300 06 0298 / 5405 ON S PRAIRIE AVE FROM E 35TH ST TO E 37TH ST 2.0 0 10/06/05 12/20/05 148,781 100
300 05 0002 / 5117 ON S RICHMOND ST FROM W JACKSON BLVD TO W VAN BUREN ST 1.0 10/01/05 11/18/05 85,250 10/31/05 03/22/06 41,060 100
300 06 0308 / 5414 ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD 2.0 06/06/06 08/09/06 149,100 05/31/06 07/31/06 115,344 100

Project has been completed as 07/31/2006 Note Last Updated on 25-AUG-06


300 09 / 33068 ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE 1.0 18,000 0 0
300 06 0308 / 5414 ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE 1.0 07/31/06 09/22/06 70,814 07/25/06 03/23/07 40,204 100
300 05 0002 / 5117 ON W MONROE ST FROM S DAMEN AVE TO S LEAVITT ST 2.0 10/01/05 11/18/05 170,000 11/18/05 03/22/06 134,342 100
300 07 0002 / 5425 ON W WILCOX ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD 2.0 04/18/06 11/18/06 150,000 09/01/06 10/27/06 103,465 100

Totals per Residntl Staggered Lighting 14.48 884,364 678,224


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 24

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 03 0002 / 4873 ON S GILES AVE FROM E 31ST ST TO E 35TH ST 1.76 09/15/04 11/15/04 281,600 09/09/04 12/31/04 162,916 100
300 06 0235 / 5349 ON W ADAMS ST FROM S WESTERN AVE TO S LEAVITT ST 2.0 09/15/03 12/15/03 167,970 09/05/03 11/04/03 137,598 100
300 06 0267 / 5375 ON W MONROE ST FROM S WESTERN AVE TO S LEAVITT ST 2.0 10/01/04 12/30/04 147,450 10/09/04 12/10/04 121,950 100

Totals per Residntl Strt Lighting/Lamps 5.76 597,020 422,464

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Arterial .0 0 0

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 2332 W FLOURNOY ST 2.0 0 06/14/01 06/14/01 756 100
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Residntl 2.0 0 756


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 25

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 09 / 33068 ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE 3.0 09/17/08 09/19/08 900 09/17/08 09/19/08 630 100
300 09 / 33068 ON E 18TH ST FROM S INDIANA AVE TO S PRAIRIE AVE 3.0 05/27/08 06/13/08 900 07/09/08 07/10/08 630 100
300 06 0081 / 5244 ON E 18TH ST FROM S WABASH AVE TO S INDIANA AVE 5.92 0 05/23/98 05/23/98 376 100
300 09 / 33068 ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 06/09/08 06/13/08 300 07/18/08 09/02/08 630 100
300 09 / 33068 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE 1.0 08/18/08 08/20/08 300 08/18/08 08/20/08 210 100
300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 7.48 05/28/08 06/20/08 1,870 06/06/07 06/10/08 1,571 100
300 09 / 33068 ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR 8.60 05/28/08 06/20/08 2,150 06/13/07 06/24/08 1,806 100
302 00 0077 / 5765 ON E 35TH ST FROM S STATE ST TO S DR MARTIN LUTHER KING JR DR 17.50 0 08/25/99 08/31/99 1,529 100
300 09 / 33068 ON E CULLERTON ST FROM S INDIANA AVE TO S CALUMET AVE 9.0 05/29/08 06/20/08 2,700 07/15/08 07/22/08 1,890 100
300 06 0081 / 5244 ON E JACKSON BLVD FROM S STATE ST TO S MICHIGAN AVE 27.0 0 05/02/98 05/03/98 1,715 100
300 06 0081 / 5244 ON E VAN BUREN ST FROM S STATE ST TO S MICHIGAN AVE 27.0 0 05/02/98 05/03/98 1,715 100
300 11 / 32191 ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST 13.43 11/14/08 12/15/08 3,358 11/14/08 12/15/08 2,686 100
300 11 / 32191 ON N FRANCISCO AVE FROM W MADISON ST TO W LAKE ST 3.0 11/14/08 12/15/08 600 11/14/08 12/15/08 600 100
300 11 / 32191 ON N SACRAMENTO BLVD FROM W WALNUT ST TO W WARREN BLVD 18.0 11/14/08 12/15/08 4,500 11/14/08 12/15/08 3,600 100
300 09 / 33068 ON N WESTERN AVE FROM W MADISON ST TO W LAKE ST 22.0 06/02/08 06/13/08 4,400 06/02/08 06/13/08 4,620 100
300 11 / 32191 ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST 34.40 11/14/08 12/16/08 8,600 11/14/08 12/16/08 6,880 100
300 09 / 33068 ON S CALUMET AVE FROM E 18TH ST TO E 21ST ST 9.0 05/29/08 06/20/08 2,700 05/29/08 06/20/08 1,890 100
300 09 / 33068 ON S CALUMET AVE FROM E 18TH ST TO E CERMAK RD 3.0 08/21/08 08/29/08 900 08/21/08 08/29/08 630 100
300 09 / 33068 ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST 4.0 06/02/08 06/13/08 1,200 06/02/08 06/13/08 840 100
300 06 0081 / 5244 ON S CLARK ST FROM W MADISON ST TO W VAN BUREN ST 37.0 0 05/17/98 05/23/98 2,350 100
300 09 / 33068 ON S CLINTON ST FROM W VAN BUREN ST TO W HARRISON ST 7.0 10/13/08 10/17/08 2,100 10/13/08 10/17/08 1,470 100
300 09 / 33068 ON S DAMEN AVE FROM W JACKSON BLVD TO W OGDEN AVE 17.20 06/02/08 06/20/08 3,440 06/02/08 06/13/08 3,612 100
300 09 / 33068 ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST 19.0 07/16/08 07/31/08 3,800 07/16/08 07/31/08 3,990 100
300 09 / 33068 ON S DENVIR AVE FROM W CONGRESS PKWY TO W HARRISON ST 4.0 06/02/08 06/30/08 1,200 06/02/08 06/26/08 840 100
300 09 / 33068 ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST 11.0 09/09/08 09/24/08 3,300 09/09/08 09/24/08 2,310 100
300 11 / 32191 ON S FRANCISCO AVE FROM W MADISON ST TO W MONROE ST 2.0 11/14/08 12/16/08 500 11/14/08 12/16/08 400 100
300 09 / 33068 ON S HAMILTON AVE FROM W ADAMS ST TO W JACKSON BLVD 2.0 04/01/08 04/21/08 400 04/01/08 04/21/08 420 100
300 09 / 33068 ON S HOYNE AVE FROM W ADAMS ST TO W GLADYS AVE 4.0 04/01/08 04/21/08 800 04/01/08 04/21/08 840 100
300 09 / 33068 ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST 7.38 05/29/08 06/20/08 1,845 05/29/08 06/20/08 1,550 100
300 06 0225 / 5340 ON S INDIANA AVE FROM E CERMAK RD TO E ROOSEVELT RD 94.0 09/01/03 09/07/03 40,030 08/28/03 09/05/03 28,910 100
300 09 / 33068 ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST 10.0 11/24/08 11/25/08 3,000 11/24/08 11/25/08 2,100 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 26

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0081 / 5244 ON S LA SALLE ST FROM W MADISON ST TO W VAN BUREN ST 23.50 0 05/13/98 05/16/98 1,493 100
300 09 / 33068 ON S LAFLIN ST FROM W POLK ST TO W FILLMORE ST 4.41 06/02/08 06/13/08 1,323 06/02/08 06/13/08 926 100
300 09 / 33068 ON S LEAVITT ST FROM W ADAMS ST TO W JACKSON BLVD 3.0 06/02/08 06/20/08 900 06/02/08 06/20/08 630 100
300 09 / 33068 ON S LEAVITT ST FROM W JACKSON BLVD TO W VAN BUREN ST 4.0 06/02/08 06/20/08 800 06/02/08 06/20/08 840 100
300 09 / 33068 ON S LEAVITT ST FROM W MADISON ST TO W MONROE ST 5.0 04/01/08 04/23/08 1,000 04/01/08 04/23/08 1,050 100
300 09 / 33068 ON S LEAVITT ST FROM W VAN BUREN ST TO W CONGRESS PKWY 6.0 10/29/08 11/06/08 1,800 10/29/08 11/06/08 1,260 100
300 09 / 33068 ON S LOOMIS ST FROM W JACKSON BLVD TO W HARRISON ST 16.0 06/02/08 06/20/08 4,800 06/02/08 06/20/08 3,360 100
300 09 / 33068 ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD 11.0 01/05/09 01/09/09 3,300 01/05/09 01/09/09 2,310 100
300 09 / 33068 ON S MAPLEWOOD AVE FROM W CONGRESS PKWY TO W HARRISON ST 4.0 04/01/08 04/22/08 1,200 04/01/08 04/22/08 840 100
300 09 / 33068 ON S MORGAN ST FROM W CONGRESS PKWY TO W VAN BUREN ST 2.0 11/12/08 11/17/08 600 11/12/08 11/17/08 420 100
300 09 / 33068 ON S OAKLEY BLVD FROM W JACKSON BLVD TO W VAN BUREN ST 4.0 06/02/08 06/20/08 1,200 06/02/08 06/20/08 840 100
300 11 / 32191 ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST 10.44 11/14/08 12/16/08 2,610 11/14/08 12/16/08 2,088 100
300 09 / 33068 ON S PAULINA ST FROM W VAN BUREN ST TO W CONGRESS PKWY 4.0 09/16/08 09/19/08 1,200 09/16/08 09/19/08 840 100
300 06 0108 / 5263 ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST 6.0 08/10/04 08/11/04 1,500 07/23/04 07/28/04 1,476 100
300 11 / 32191 ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST 17.20 11/14/08 12/16/08 4,300 11/14/08 12/16/08 3,440 100
300 06 0081 / 5244 ON S STATE ST FROM E MADISON ST TO W CONGRESS PKWY 4.0 0 05/23/98 05/23/98 254 100
300 09 / 33068 ON S WABASH AVE FROM E 23RD ST TO E 24TH PL 5.0 06/09/08 06/13/08 1,500 06/09/08 06/13/08 1,050 100
300 09 / 33068 ON S WABASH AVE FROM E 29TH ST TO E 30TH ST 5.0 06/09/08 06/13/08 1,500 06/09/08 06/13/08 1,050 100
300 06 0081 / 5244 ON S WABASH AVE FROM E MADISON ST TO E BALBO AVE 74.10 0 05/08/98 05/17/98 4,769 100
300 06 0081 / 5244 ON S WABASH AVE FROM E MADISON ST TO E CONGRESS PKWY 3.20 0 05/23/98 05/23/98 203 100
300 09 / 33068 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST 3.0 06/09/08 06/13/08 900 06/03/08 06/13/08 630 100
300 09 / 33068 ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST 68.40 06/02/08 06/20/08 13,680 06/05/08 07/09/08 14,364 100
300 09 / 33068 ON W ADAMS ST FROM S LEAVITT ST TO S DAMEN AVE 15.0 06/02/08 06/13/08 4,500 06/02/08 06/13/08 3,150 100
300 09 / 33068 ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE 13.0 10/07/08 10/22/08 3,900 10/07/08 10/22/08 2,730 100
300 09 / 33068 ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD 18.24 06/02/08 06/20/08 5,472 06/02/08 06/26/08 3,830 100
300 06 0081 / 5244 ON W ADAMS ST FROM S STATE ST TO S JEFFERSON ST 50.0 0 04/25/98 05/03/98 3,175 100
300 09 / 33068 ON W ADAMS ST FROM S WESTERN AVE TO S CAMPBELL AVE 6.0 04/01/08 04/25/08 1,800 04/01/08 04/25/08 1,260 100
300 09 / 33068 ON W CONGRESS PKWY FROM S FRANCISCO AVE TO S MAPLEWOOD 9.75 10/07/08 10/22/08 2,925 10/07/08 10/22/08 2,048 100
AVE
300 09 / 33068 ON W CONGRESS PKWY FROM S MAPLEWOOD AVE TO S LEAVITT ST 20.0 04/01/08 04/21/08 6,000 04/01/08 04/21/08 4,200 100
300 11 / 32191 ON W FIFTH AVE FROM S SACRAMENTO BLVD TO S MOZART ST 19.0 11/14/08 12/15/08 4,750 11/14/08 12/15/08 3,800 100
300 09 / 33068 ON W GLADYS AVE FROM S WASHTENAW AVE TO S CALIFORNIA AVE 7.0 11/17/08 12/01/08 1,400 11/17/08 12/01/08 1,470 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 27

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 07 0002 / 5425 ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD 22.0 04/18/06 11/18/06 5,500 10/20/06 10/21/06 0 100
300 09 / 33068 ON W HARRISON ST FROM S MAPLEWOOD AVE TO S SACRAMENTO BLVD 31.20 08/13/08 09/09/08 9,360 08/13/08 09/09/08 6,552 100
300 11 / 32191 ON W HARRISON ST FROM S RACINE AVE TO S MORGAN ST 17.0 11/14/08 12/15/08 3,400 11/14/08 12/15/08 3,400 100
300 09 / 33068 ON W JACKSON BLVD FROM S DAMEN AVE TO S LEAVITT ST 13.0 11/06/08 12/01/08 3,900 11/06/08 12/01/08 2,730 100
300 09 / 33068 ON W JACKSON BLVD FROM S LEAVITT ST TO S WESTERN AVE 15.0 06/02/08 06/20/08 4,500 06/02/08 06/20/08 3,150 100
300 11 / 32191 ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE 29.64 11/14/08 12/15/08 7,410 11/14/08 12/15/08 5,928 100
300 06 0081 / 5244 ON W JACKSON BLVD FROM S STATE ST TO S JEFFERSON ST 107.0 0 04/25/98 05/03/98 6,795 100
300 09 / 33068 ON W LAKE ST FROM N SACRAMENTO BLVD TO N ALBANY AVE 6.0 10/09/08 10/17/08 1,800 10/09/08 10/17/08 1,260 100
300 09 / 33068 ON W MADISON ST FROM S DAMEN AVE TO S SACRAMENTO BLVD 73.0 02/01/08 04/11/08 21,900 02/01/08 04/11/08 15,330 100
300 06 0081 / 5244 ON W MADISON ST FROM S STATE ST TO S DESPLAINES ST 44.50 0 05/04/98 05/10/98 2,826 100
300 07 0042 / 5465 ON W MADISON ST FROM WACKER DR TO CANAL ST 2.0 04/18/06 11/18/06 500 08/14/06 09/01/06 395 100
300 09 / 33068 ON W MONROE ST FROM S CAMPBELL AVE TO S FRANCISCO AVE 20.0 06/02/08 06/20/08 6,000 06/02/08 06/20/08 4,200 100
300 09 / 33068 ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST 7.0 07/01/08 07/07/08 2,100 07/01/08 07/10/08 1,470 100
300 06 0081 / 5244 ON W MONROE ST FROM S STATE ST TO S JEFFERSON ST 45.0 0 05/04/98 05/10/98 2,858 100
300 09 / 33068 ON W OGDEN AVE FROM W VAN BUREN ST TO W CONGRESS PKWY 4.0 09/17/08 09/23/08 1,200 09/17/08 09/23/08 840 100
300 11 / 32191 ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE 31.92 11/14/08 12/16/08 7,980 11/14/08 12/16/08 6,384 100
300 06 0081 / 5244 ON W VAN BUREN ST FROM S STATE ST TO S JEFFERSON ST 106.0 0 04/25/98 05/03/98 6,731 100
300 09 / 33068 ON W WARREN BLVD FROM N DAMEN AVE TO N WESTERN AVE 20.0 06/02/08 06/20/08 6,000 06/18/08 06/30/08 4,200 100
300 11 / 32191 ON W WARREN BLVD FROM N SACRAMENTO BLVD TO N WESTERN AVE 47.0 11/14/08 12/15/08 11,750 11/14/08 12/15/08 9,400 100
300 11 / 32191 ON W WASHINGTON BLVD FROM N ALBANY AVE TO N WESTERN AVE 51.0 11/14/08 12/16/08 12,750 11/14/08 12/16/08 10,200 100
300 09 / 33068 ON W WASHINGTON BLVD FROM N DAMEN AVE TO N WESTERN AVE 22.0 06/02/08 06/20/08 6,600 06/24/08 07/01/08 4,620 100
300 09 / 33068 ON W WILCOX ST FROM S ROCKWELL ST TO S CALIFORNIA AVE 12.0 06/02/08 06/20/08 3,600 06/26/08 07/07/08 2,520 100
300 09 / 33068 1400-1500 S LOOMIS ST 6.0 06/25/07 06/27/08 1,800 06/25/08 06/27/08 1,260 100
300 06 0081 / 5244 500 S STATE ST 4.0 0 05/23/98 05/23/98 254 100
300 06 0191 / 5316 300-400 W ROOSEVELT RD 60.0 11/01/00 11/20/00 21,000 10/30/00 11/15/00 21,000 100

Totals per Strt Light Pole Painting 1,669.41 309,703 277,337


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 28

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Replacmnt/Reloc Blocks
281 00 / 33670 W POLK ST AND S STATE ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1611 W HARRISON ST .0 01/01/08 12/31/08 0 0 0
300 06 0191 / 5316 300-400 W ROOSEVELT RD 1.0 01/01/01 05/01/01 142,200 01/10/01 03/19/01 0 100

Totals per Strt Light Pole Replacmnt/Reloc 1.0 142,200 0

Work Type: Strt Lighting Blocks


300 06 0074 / 5237 500-12000 S HOLDEN CT 03/01/98 04/15/00 145,000 03/03/98 03/30/00 137,485 100
300 06 0233 / 5347 11 S WACKER DR 12/31/02 12/31/04 220,000 10/22/02 26,157 40

Totals per Strt Lighting 365,000 163,642


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 29

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0251 / 5361 ON S CLINTON ST FROM W HARRISON ST TO W POLK ST 8.0 08/15/05 08/20/05 7,892 08/11/05 09/19/05 6,808 100
300 06 0251 / 5361 ON S JEFFERSON ST FROM W HARRISON ST TO W POLK ST 8.0 08/15/05 08/20/05 7,892 08/11/05 09/19/05 6,808 100
300 06 0251 / 5361 ON W HARRISON ST FROM S CLINTON ST TO S JEFFERSON ST 8.0 08/15/05 08/20/05 7,892 08/01/05 09/14/05 6,796 100
300 06 0251 / 5361 ON W POLK ST FROM S CLINTON ST TO S JEFFERSON ST 8.0 08/15/05 08/20/05 7,892 08/01/05 09/14/05 6,796 100
805 06 2741 / 8927 1015 N MICHIGAN AVE 52.0 01/01/93 01/01/93 0 01/01/93 01/01/93 39,000 100
805 06 2708 / 8894 1501 S ASHLAND AVE 22.0 06/05/94 06/05/94 0 06/05/94 06/05/94 16,500 100
805 06 2706 / 8892 1595 S ASHLAND AVE 30.0 06/06/94 06/06/94 0 06/06/94 06/06/94 22,500 100
302 00 0070 / 5758 1520 S BLUE ISLAND AVE 0 05/14/97 05/21/97 14,742 100
302 00 0070 / 5758 1550 S BLUE ISLAND AVE 0 05/14/97 05/21/97 24,170 100
805 06 2312 / 8498 498 S CANAL ST 13.0 05/18/94 05/18/94 0 05/18/94 05/18/94 9,750 100
805 06 2695 / 8881 1515 S CANAL ST 6.0 04/21/94 04/21/94 0 04/21/94 04/21/94 4,500 100
805 06 2694 / 8880 1595 S CANAL ST 6.0 04/22/94 04/22/94 0 04/22/94 04/22/94 4,500 100
805 06 2839 / 9025 1598 S CLARK ST 3.0 12/09/93 12/09/93 0 12/09/93 12/09/93 2,250 100
302 00 0070 / 5758 1500 S DAMEN AVE 0 10/05/97 10/20/97 22,318 100
805 06 2139 / 8325 1500 S DAMEN AVE 49.0 10/20/97 10/20/97 0 10/20/97 10/20/97 36,750 100
302 00 0070 / 5758 510 S DESPLAINES ST 0 07/08/97 07/15/97 13,318 100
805 06 2140 / 8326 510 S DESPLAINES ST 21.0 07/15/97 07/15/97 0 07/15/97 07/15/97 15,750 100
805 06 2596 / 8782 2430 S DR MARTIN LUTHER KING JR DR 30.0 06/25/95 06/25/95 0 06/25/95 06/25/95 22,500 100
805 06 2597 / 8783 2490 S DR MARTIN LUTHER KING JR DR 30.0 06/25/95 06/25/95 0 06/25/95 06/25/95 22,500 100
805 06 2593 / 8779 599 S FRANKLIN ST 12.0 02/24/94 02/24/94 0 02/24/94 02/24/94 9,000 100
805 06 2598 / 8784 1595 S INDIANA AVE 8.0 05/03/93 05/03/93 0 05/03/93 05/03/93 6,000 100
302 00 0070 / 5758 500 S JEFFERSON ST 0 07/24/97 07/31/97 16,090 100
805 06 2118 / 8304 500 S JEFFERSON ST 16.0 07/31/97 07/31/97 0 07/31/97 07/31/97 12,000 100
805 06 2890 / 9076 1501 S LAFLIN ST 14.0 02/11/94 02/11/94 0 02/11/94 02/11/94 10,500 100
805 06 2856 / 9042 1595 S LAFLIN ST 40.0 02/11/94 02/11/94 0 02/11/94 02/11/94 30,000 100
302 00 0071 / 5759 2300 S LAKE SHORE DR 0 06/05/98 06/19/98 23,274 100
805 06 2664 / 8850 2300 S LAKE SHORE DR 25.0 12/14/94 12/14/94 0 12/14/94 12/14/94 18,750 100
805 06 2665 / 8851 2300 S LAKE SHORE DR 25.0 12/31/94 12/31/94 0 12/31/94 12/31/94 18,750 100
805 06 2689 / 8875 2300 S LAKE SHORE DR 25.0 12/14/94 12/14/94 0 12/14/94 12/14/94 18,750 100
805 06 2901 / 9087 1501 S LOOMIS ST 20.0 12/07/93 12/07/93 0 12/07/93 12/07/93 15,000 100
805 06 2886 / 9072 1595 S LOOMIS ST 30.0 12/19/93 12/19/93 0 12/19/93 12/19/93 22,500 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 30

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2614 / 8800 1595 S MICHIGAN AVE 14.0 12/11/93 12/11/93 0 12/11/93 12/11/93 10,500 100
805 06 2583 / 8769 1505 S PAULINA ST 22.0 06/09/95 06/09/95 0 06/09/95 06/09/95 16,500 100
805 06 2582 / 8768 1595 S PAULINA ST 26.0 06/09/95 06/09/95 0 06/09/95 06/09/95 19,500 100
302 00 0070 / 5758 1530 S THROOP ST 0 05/20/97 06/03/97 13,193 100
805 06 2160 / 8346 1530 S THROOP ST 14.0 01/01/91 01/01/91 0 01/01/91 01/01/91 10,500 100
805 06 2161 / 8347 1530 S THROOP ST 18.0 06/03/97 06/03/97 0 06/03/97 06/03/97 13,500 100
805 06 2525 / 8711 1501 S WOOD ST 22.0 06/29/95 06/29/95 0 06/29/95 06/29/95 16,500 100
805 06 2707 / 8893 1598 W 16TH ST 6.0 05/24/94 05/24/94 0 05/24/94 05/24/94 4,500 100
805 06 2226 / 8412 130 W CONGRESS PKWY 64.0 12/09/96 12/09/96 0 12/09/96 12/09/96 48,000 100
805 06 2882 / 9068 930 W HARRISON ST 11.0 09/25/93 09/25/93 0 09/25/93 09/25/93 8,250 100
805 06 2933 / 9119 2545 W JACKSON BLVD 8.0 03/01/94 03/01/94 0 03/01/94 03/01/94 6,000 100
805 06 2936 / 9122 2600 W MADISON ST 8.0 03/02/94 03/02/94 0 03/02/94 03/02/94 6,000 100
805 06 2939 / 9125 2631 W MAYPOLE AVE 8.0 03/08/94 03/08/94 0 03/08/94 03/08/94 6,000 100
805 06 2776 / 8962 2545 W MONROE ST 6.0 12/23/94 12/23/94 0 12/23/94 12/23/94 4,500 100
805 06 2677 / 8863 101 W POLK ST 12.0 09/18/92 09/18/92 0 09/18/92 09/18/92 9,000 100
805 06 2775 / 8961 2579 W VAN BUREN ST 6.0 04/06/94 04/06/94 0 04/06/94 04/06/94 4,500 100
302 00 0070 / 5758 2600 W WARREN BLVD 0 09/08/97 09/15/97 7,403 100
805 06 2125 / 8311 2600 W WARREN BLVD 8.0 09/15/97 09/15/97 0 09/15/97 09/15/97 6,000 100
805 06 2209 / 8395 2631 W WARREN BLVD 6.0 12/31/95 12/31/95 0 12/31/95 12/31/95 4,500 100
302 00 0070 / 5758 2600 W WASHINGTON BLVD 0 11/20/97 12/02/97 14,078 100
805 06 2126 / 8312 2600 W WASHINGTON BLVD 8.0 12/02/97 12/02/97 0 12/02/97 12/02/97 6,000 100
805 06 2208 / 8394 2631 W WASHINGTON BLVD 6.0 12/31/95 12/31/95 0 12/31/95 12/31/95 4,500 100

Totals per Underpass Lighting 782.0 31,568 738,294


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 31

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 ON W ROOSEVELT RD FROM S RUBLE ST TO S DESPLAINES ST 1.0 0 04/29/02 04/29/02 9,181 100
210 06 0219 / 4459 N WESTERN AVE AND W LAKE ST .50 03/24/05 03/25/05 5,282 03/01/05 03/01/05 4,365 100
210 06 0219 / 4459 N WESTERN AVE AND W WARREN BLVD 1.0 03/22/05 03/23/05 10,563 03/14/05 03/14/05 6,925 100
210 06 0219 / 4459 N WESTERN AVE AND W WASHINGTON BLVD 1.0 03/23/05 03/24/05 10,563 03/15/05 03/15/05 6,925 100
210 06 0130 / 4389 S CANAL ST AND W ROOSEVELT RD 1.0 0 04/23/02 04/23/02 6,410 100
210 06 0130 / 4389 S CLARK ST AND W JACKSON BLVD .50 0 10/09/01 10/09/01 3,257 100
210 06 0219 / 4459 S CLARK ST AND W VAN BUREN ST 1.0 04/19/05 04/19/05 10,563 04/14/05 04/15/05 6,925 100
210 06 0130 / 4389 S COLUMBUS DR AND E BALBO AVE .50 0 02/06/02 02/06/02 6,231 100
210 06 0130 / 4389 S COLUMBUS DR AND E CONGRESS DR .50 0 03/06/02 03/06/02 4,728 100
210 06 0130 / 4389 S COLUMBUS DR AND E JACKSON BLVD .50 0 01/17/02 01/17/02 4,856 100
210 06 0130 / 4389 S COLUMBUS DR AND E ROOSEVELT RD 1.0 0 02/20/02 02/20/02 11,457 100
210 06 0130 / 4389 S DEARBORN ST AND W JACKSON BLVD .50 0 10/09/01 10/09/01 3,257 100
210 06 0219 / 4459 S DEARBORN ST AND W VAN BUREN ST 1.0 04/22/05 04/22/05 10,563 04/17/05 04/17/05 6,925 100
210 06 0130 / 4389 S FRANKLIN ST AND W ADAMS ST 1.0 0 10/02/01 10/02/01 6,108 100
210 06 0130 / 4389 S FRANKLIN ST AND W JACKSON BLVD 1.0 0 10/08/01 10/08/01 6,513 100
210 06 0130 / 4389 S FRANKLIN ST AND W MONROE ST 1.0 0 09/25/01 09/25/01 6,918 100
210 06 0130 / 4389 S FRANKLIN ST AND W VAN BUREN ST 1.0 0 10/23/01 10/23/01 6,513 100
210 06 0219 / 4459 S FRANKLIN ST AND W VAN BUREN ST 1.0 04/23/05 04/23/05 10,563 04/18/05 04/18/05 6,203 100
210 06 0130 / 4389 S INDIANA AVE AND E ROOSEVELT RD 1.0 0 02/26/02 02/26/02 7,729 100
210 06 0130 / 4389 S JEFFERSON ST AND W ROOSEVELT RD 1.0 0 04/26/02 04/26/02 8,539 100
210 06 0130 / 4389 S MICHIGAN AVE AND E 14TH ST 1.0 0 11/29/01 11/29/01 12,035 100
210 06 0130 / 4389 S MICHIGAN AVE AND E JACKSON BLVD .50 0 11/04/02 11/04/02 5,132 100
210 06 0130 / 4389 S MICHIGAN AVE AND E VAN BUREN ST 1.0 0 11/04/02 11/04/02 8,518 100
210 06 0120 / 4379 S MORGAN ST AND W MONROE ST 1.0 04/01/01 06/01/01 12,700 03/21/01 03/26/01 672 100
210 06 0130 / 4389 S PAULINA ST AND W ROOSEVELT RD 1.0 0 01/09/02 01/09/02 6,410 100
210 06 0130 / 4389 S WABASH AVE AND E JACKSON BLVD .50 0 10/09/01 10/09/01 2,395 100
210 06 0130 / 4389 S WABASH AVE AND E VAN BUREN ST 1.0 0 10/25/01 10/25/01 7,272 100
210 06 0130 / 4389 S WELLS ST AND W ADAMS ST .50 0 10/04/01 10/04/01 3,459 100
210 06 0175 / 4423 S WELLS ST AND W CONGRESS PKWY 1.0 04/14/03 04/17/03 16,000 04/14/03 04/17/03 13,664 100
210 06 0130 / 4389 S WELLS ST AND W JACKSON BLVD .50 0 10/10/01 10/10/01 2,940 100
210 06 0130 / 4389 S WELLS ST AND W MONROE ST .50 0 10/04/01 10/04/01 3,662 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 32

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 S WELLS ST AND W VAN BUREN ST 1.0 04/20/05 04/20/05 10,563 04/15/05 04/15/05 6,203 100
210 06 0219 / 4459 S WESTERN AVE AND W CONGRESS PKWY 1.0 03/18/05 03/19/05 10,563 03/21/05 03/21/05 6,800 100
210 06 0219 / 4459 S WESTERN AVE AND W HARRISON ST 1.0 03/17/05 03/18/05 10,563 03/22/05 03/22/05 8,008 100
210 06 0219 / 4459 S WESTERN AVE AND W JACKSON BLVD 1.0 03/20/05 03/21/05 10,563 03/23/05 03/23/05 8,007 100
210 06 0219 / 4459 S WESTERN AVE AND W VAN BUREN ST 1.0 03/19/05 03/20/05 10,563 03/30/05 03/30/05 6,800 100
210 06 0130 / 4389 S WOOD ST AND W ROOSEVELT RD 1.0 0 01/09/02 01/09/02 8,539 100
210 06 0175 / 4423 W VAN BUREN ST AND S CLARK ST 1.0 06/06/03 06/11/03 17,000 06/06/03 06/11/03 16,020 100
210 06 0130 / 4389 840 S CANAL ST 1.0 0 09/28/01 09/28/01 4,738 100

Totals per LED Signal Head Install 33.50 156,612 261,235

Work Type: Left Turn Arrow Locations


210 06 0209 / 4452 S CANAL ST AND W ROOSEVELT RD 1.0 09/20/04 10/08/04 97,100 09/14/04 09/28/04 88,687 100
210 06 0231 / 4470 S RACINE AVE AND W ROOSEVELT RD .0 03/01/08 12/01/08 109,720 0 0
300 07 0002 / 5425 W HARRISON ST AND S STATE ST 1.0 04/18/06 11/18/06 40,000 0 0
300 06 0078 / 5241 1600 W FLOURNOY ST 1.0 04/01/98 12/01/98 6,500 08/13/99 08/17/99 5,981 100

Totals per Left Turn Arrow 3.0 253,320 94,668

Work Type: New Signal Locations


300 06 0283 / 5391 ON S ASHLAND AVE FROM W OGDEN AVE TO W MADISON ST 1.0 09/01/04 09/30/04 11,150 09/09/04 09/09/04 11,150 100
300 11 / 32191 E 13TH ST AND S MICHIGAN AVE 1.0 06/03/08 06/30/08 165,000 06/03/08 06/30/08 165,000 100
210 06 0073 / 4337 1500 S CLARK ST 1.0 05/15/01 12/01/01 175,000 05/16/01 07/23/01 84,034 100

Totals per New Signal 3.0 351,150 260,184

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0240 / 4477 E VAN BUREN ST AND S MICHIGAN AVE 6.0 05/01/06 09/30/06 9,500 03/28/06 03/28/06 5,688 100
210 06 / 32280 S CANAL ST AND W JACKSON BLVD .0 05/04/08 12/31/08 11,682 0 0
210 06 0240 / 4477 S CLARK ST AND W CONGRESS PKWY 12.0 05/01/06 06/01/06 5,632 03/28/06 03/28/06 6,446 100
210 06 0207 / 4450 S MICHIGAN AVE AND E JACKSON BLVD .50 12/01/04 12/15/04 5,179 12/01/04 12/08/04 5,255 100
210 06 / 32280 W ADAMS ST AND S CANAL ST .0 05/04/08 12/31/08 11,356 0 0

Totals per Pedestrian Countdown Signal Install 18.50 43,349 17,389


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 33

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Removal Temp Wiring - Signals Crossings
300 06 0197 / 5322 N CALIFORNIA AVE AND W LAKE ST .50 2,000 07/18/01 04/08/02 1,285 100
300 06 0197 / 5322 N SACRAMENTO AVE AND W LAKE ST 2.0 8,000 07/18/01 07/19/01 1,780 100
300 06 0197 / 5322 S DAMEN AVE AND W 14TH ST 2.0 8,000 08/09/01 08/09/01 0 100
300 06 0197 / 5322 S RACINE AVE AND W CONGRESS PKWY 2.0 8,000 10/12/01 04/08/02 693 100
300 06 0197 / 5322 S SACRAMENTO AVE AND W FIFTH AVE .50 2,000 07/18/01 07/19/01 1,948 100
300 06 0197 / 5322 S WABASH AVE AND E 24TH ST 1.0 04/18/01 04/19/01 4,000 04/18/01 04/19/01 2,445 100
300 06 0197 / 5322 W 14TH ST AND S BLUE ISLAND AVE .50 2,000 09/11/01 09/12/01 1,328 100
300 06 0197 / 5322 W ROOSEVELT RD AND S LOOMIS ST 1.0 12,000 07/02/01 08/01/01 18,249 100
300 06 0197 / 5322 1758 W JACKSON BLVD 1.0 8,000 11/19/01 11/19/01 13,649 100

Totals per Removal Temp Wiring - Signals 10.50 54,000 41,376

Work Type: Signal Realignment Intersections


300 06 0199 / 5324 W JACKSON BLVD AND S CANAL ST 1.0 08/30/01 08/30/01 2,090 08/22/01 08/22/01 2,013 100

Totals per Traffic 1,541,740 3,928,167


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 34

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0232 / 4471 ON W 14TH ST FROM S BLUE ISLAND AVE TO S RACINE AVE 2.0 04/15/05 11/15/05 338,000 04/07/05 01/11/06 303,511 100
210 06 0020 / 4295 S BLUE ISLAND AVE AND W 16TH ST 05/18/00 07/15/00 82,500 05/18/00 09/25/00 95,886 100
210 06 0021 / 4296 W WASHINGTON ST AND N HOYNE AVE 1.0 05/01/01 08/01/01 132,000 04/03/01 07/05/01 136,385 100
814 06 0351 / 16549 200 N CALIFORNIA AVE 1.0 09/26/96 09/26/96 0 09/26/96 09/26/96 117,950 100
814 06 0276 / 16488 844 N CLARK ST 1.0 05/22/89 05/22/89 0 05/22/89 05/22/89 59,113 100
814 06 0380 / 16570 100 N WESTERN AVE 1.0 04/25/97 04/25/97 0 04/25/97 09/22/97 200,000 100
814 06 0369 / 16559 700 S ASHLAND AVE 1.0 10/13/95 10/13/95 0 10/13/95 10/13/95 160,943 100
300 06 0117 / 5271 1200 S CLINTON ST 1.0 30,000 02/19/99 09/23/99 40,562 100
814 06 0308 / 16520 400 S DAMEN AVE 1.0 05/17/89 05/17/89 0 05/17/89 05/17/89 87,789 100
814 06 0337 / 16536 500 S DAMEN AVE 1.0 05/16/89 05/16/89 0 05/16/89 05/16/89 87,789 100
814 06 0309 / 16521 999 S DESPLAINES ST 1.0 07/26/90 07/26/90 0 07/26/90 07/26/90 95,000 100
814 06 0184 / 16396 2400 S DR MARTIN LUTHER KING JR DR 1.0 03/02/94 03/02/94 0 03/02/94 03/02/94 120,000 100
814 06 0183 / 16395 2500 S DR MARTIN LUTHER KING JR DR 1.0 02/24/94 02/24/94 0 02/24/94 02/24/94 120,000 100
814 06 0093 / 16309 2559 S DR MARTIN LUTHER KING JR DR 1.0 01/28/94 01/28/94 0 01/28/94 01/28/94 98,691 100
814 06 0091 / 16307 3100 S DR MARTIN LUTHER KING JR DR 1.0 02/07/94 02/07/94 0 02/07/94 02/07/94 98,691 100
814 06 0213 / 16425 2199 S INDIANA AVE 1.0 11/03/94 11/03/94 0 11/03/94 11/03/94 120,000 100
814 06 0211 / 16423 2400 S INDIANA AVE 1.0 10/25/94 10/25/94 0 10/25/94 10/25/94 120,000 100
814 06 0190 / 16402 200 S JEFFERSON ST 1.0 01/31/92 01/31/92 0 01/31/92 01/31/92 88,990 100
814 06 0212 / 16424 2200 S MICHIGAN AVE 1.0 10/28/94 10/28/94 0 10/28/94 10/28/94 120,000 100
814 06 0215 / 16427 2400 S MICHIGAN AVE 1.0 10/25/94 10/25/94 0 10/25/94 10/25/94 120,000 100
814 06 0386 / 16574 400 S MORGAN ST 1.0 10/31/95 10/31/95 0 10/31/95 10/31/95 104,565 100
814 06 0079 / 16295 1400 S STATE ST 1.0 04/07/96 04/07/96 0 04/07/96 04/07/96 118,870 100
814 06 0257 / 16469 400 S WESTERN AVE 1.0 08/16/89 08/16/89 0 08/16/89 08/16/89 74,970 100
814 06 0255 / 16467 500 S WESTERN AVE 1.0 08/18/89 08/18/89 0 08/18/89 08/18/89 74,970 100
814 06 0253 / 16465 800 S WESTERN AVE 1.0 09/22/89 09/22/89 0 09/22/89 09/22/89 74,970 100
814 06 0345 / 16543 405 W JACKSON BLVD 1.0 04/23/97 05/09/97 0 04/23/97 05/09/97 73,473 100
814 06 0186 / 16398 421 W JACKSON BLVD 1.0 04/23/97 04/23/97 0 04/23/97 05/09/97 200,000 100
814 06 0055 / 16272 713 W TAYLOR ST 1.0 09/29/89 09/29/89 0 09/29/89 09/29/89 90,000 100

Totals per TSM Install 28.0 582,500 3,203,118


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 35

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 09 / 33068 ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE 2.0 06/09/08 06/13/08 400 07/18/08 09/02/08 338 100
300 09 / 33068 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE 2.0 06/09/08 06/13/08 400 08/18/08 08/20/08 300 100
300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE .68 05/28/08 06/20/08 136 04/01/08 12/01/08 85 100
300 09 / 33068 ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR .86 05/28/08 06/20/08 172 04/01/08 12/01/08 73 100
300 11 / 32191 ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST 11.06 11/14/08 12/15/08 3,784 11/14/08 12/15/08 3,561 100
300 11 / 32191 ON N SACRAMENTO BLVD FROM W WALNUT ST TO W WARREN BLVD 13.0 11/14/08 12/15/08 4,655 11/14/08 12/15/08 4,186 100
300 09 / 33068 ON N WESTERN AVE FROM W MADISON ST TO W LAKE ST 5.0 06/02/08 06/13/08 1,391 04/01/08 12/01/08 0 100
300 11 / 32191 ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST 20.64 11/14/08 12/16/08 7,061 11/14/08 12/16/08 6,646 100
300 09 / 33068 ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST 5.0 04/01/08 12/01/08 700 04/01/08 12/01/08 0 0
300 09 / 33068 ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST 8.0 04/01/08 12/01/08 1,860 04/01/08 12/01/08 1,600 100
300 09 / 33068 ON S LEAVITT ST FROM W JACKSON BLVD TO W VAN BUREN ST 3.0 06/02/08 06/20/08 878 04/01/08 12/01/08 0 100
300 09 / 33068 ON S LOOMIS ST FROM W JACKSON BLVD TO W HARRISON ST 3.0 06/02/08 06/20/08 600 04/01/08 12/01/08 0 0
300 09 / 33068 ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD 1.0 01/05/09 01/09/09 200 01/05/09 01/09/09 85 100
300 09 / 33068 ON S OAKLEY BLVD FROM W JACKSON BLVD TO W VAN BUREN ST 3.0 06/02/08 06/20/08 878 04/01/08 12/01/08 0 100
300 11 / 32191 ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST 32.19 11/14/08 12/16/08 12,180 11/14/08 12/16/08 10,365 100
300 11 / 32191 ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST 10.32 3,696 0 0
300 09 / 33068 ON S WABASH AVE FROM E 23RD ST TO E 24TH PL 2.0 06/09/08 06/13/08 400 04/01/08 12/01/08 232 100
300 09 / 33068 ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST 18.05 06/02/08 06/20/08 5,020 04/01/08 12/01/08 0 100
300 09 / 33068 ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE 5.0 10/07/08 10/22/08 2,050 10/07/08 10/22/08 1,625 100
300 09 / 33068 ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD 6.08 06/02/08 06/20/08 1,691 04/01/08 12/01/08 0 100
300 11 / 32191 ON W FIFTH AVE FROM S SACRAMENTO BLVD TO S MOZART ST 1.0 11/14/08 12/15/08 200 11/14/08 12/15/08 200 100
300 07 0002 / 5425 ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD 22.0 04/18/06 11/18/06 8,750 10/20/06 10/21/06 0 100
300 09 / 33068 ON W JACKSON BLVD FROM S LEAVITT ST TO S WESTERN AVE 8.0 06/02/08 06/20/08 2,344 04/01/08 12/01/08 0 100
300 11 / 32191 ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE 12.16 11/14/08 12/15/08 4,484 11/14/08 12/15/08 3,916 100
300 09 / 33068 ON W MADISON ST FROM S DAMEN AVE TO S SACRAMENTO BLVD 14.0 02/01/08 04/11/08 3,894 04/01/08 12/01/08 0 100
300 09 / 33068 ON W MONROE ST FROM S CAMPBELL AVE TO S FRANCISCO AVE 6.0 06/02/08 06/20/08 1,669 04/01/08 12/01/08 0 100
300 09 / 33068 ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST 4.0 07/01/08 07/07/08 2,000 07/01/08 07/07/08 1,540 100
300 09 / 33068 ON W POLK ST FROM S DEARBORN ST TO S CLARK ST 3.0 04/01/08 12/01/08 780 04/01/08 12/01/08 450 100
300 11 / 32191 ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE 5.32 11/14/08 12/16/08 1,862 11/14/08 12/16/08 1,713 100
300 09 / 33068 ON W WARREN BLVD FROM N DAMEN AVE TO N WESTERN AVE 7.0 06/02/08 06/20/08 1,947 04/01/08 12/01/08 0 100
300 11 / 32191 ON W WARREN BLVD FROM N SACRAMENTO BLVD TO N WESTERN AVE 17.0 11/14/08 12/15/08 6,550 11/14/08 12/15/08 5,474 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 36

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 11 / 32191 ON W WASHINGTON BLVD FROM N ALBANY AVE TO N WESTERN AVE 18.0 11/14/08 12/16/08 6,750 11/14/08 12/16/08 5,796 0
300 09 / 33068 ON W WASHINGTON BLVD FROM N DAMEN AVE TO N WESTERN AVE 8.0 06/02/08 06/20/08 2,226 04/01/08 12/01/08 0 100
300 09 / 33068 ON W WILCOX ST FROM S ROCKWELL ST TO S CALIFORNIA AVE 4.0 06/02/08 06/20/08 1,112 04/01/08 12/01/08 0 100
300 09 / 33068 S ASHLAND AVE AND W CONGRESS PKWY 1.0 3,200 0 0
300 09 / 33068 S RACINE AVE AND W VAN BUREN ST 1.0 2,800 0 0

Totals per Traffic Equipment Painting 283.36 98,719 48,185

Work Category: Transit


Work Type: Two-way Conversion Locations
210 06 0165 / 4416 ON S FINANCIAL PL FROM W JACKSON BLVD TO W VAN BUREN ST 1.0 10/15/02 12/02/02 20,000 10/07/02 10/11/02 3,618 100

Totals per Construction Phase 7,500,637 8,433,866

Totals for Ward 02 7,599,287 8,530,059


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 37

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0244 / 5354 ROBERT TAYLOR A (CHA) .0 04/08/08 06/08/09 0 0 0
300 06 0244 / 5354 ROBERT TAYLOR B (CHA) 1.0 10/29/02 06/30/03 0 03/20/06 04/04/06 14,346 100
300 06 0243 / 5353 STATEWAY GARDENS 1.0 06/28/01 0 06/28/01 43,054 70
300 06 0313 / 5419 WENTWORTH GARDEN (CHA) .0 04/17/06 09/29/06 70,000 04/17/06 09/30/06 35,000 100
300 06 0308 / 5414 ON S VINCENNES AVE FROM E 43RD ST TO E 45TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,721 100
300 06 0292 / 5399 1725 S CLARK ST 1.0 02/15/05 03/04/05 1,000 11/05/04 03/18/05 789 100
281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
300 06 0282 / 5390 5546 S STATE ST 1.0 11/04/04 01/03/05 800 11/19/04 01/03/05 800 100
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 5014 S WELLS ST 1.0 02/15/05 02/22/05 800 01/04/05 04/05/05 609 100
300 06 0292 / 5399 1512 W 47TH ST 1.0 03/01/05 03/30/05 2,000 03/08/05 05/17/05 1,539 100

Totals per Design/Engineering 6.0 74,600 98,858


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 38

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON E 42ND ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES 4.0 0 05/21/02 05/21/02 1,125 100
AVE
300 06 0069 / 5233 ON E 44TH ST FROM S INDIANA AVE TO S VINCENNES AVE 7.0 0 02/28/02 03/05/02 1,582 100
300 06 0069 / 5233 ON E 45TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 4.0 04/15/02 04/15/02 840 04/12/02 04/12/02 812 100
302 00 0092 / 5774 ON E 45TH ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES 4.0 01/28/02 01/28/02 840 01/25/02 01/25/02 812 100
AVE
300 06 0069 / 5233 ON E 45TH ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR 8.0 0 02/28/02 03/05/02 1,809 100
302 00 0092 / 5774 ON E 45TH ST FROM S MICHIGAN AVE TO S INDIANA AVE 3.0 01/28/02 01/28/02 609 01/25/02 01/25/02 609 100
300 09 / 33069 ON E 46TH PL FROM S VINCENNES AVE TO S ST LAWRENCE AVE 3.0 06/23/08 06/27/08 1,200 06/23/08 06/27/08 792 100

Materials Ordered Note Last Updated on 12-JUN-08


300 06 0069 / 5233 ON E 46TH ST FROM S INDIANA AVE TO S CALUMET AVE 7.0 0 02/28/02 03/05/02 2,625 100
300 06 0069 / 5233 ON E 48TH ST FROM S WABASH AVE TO S VINCENNES AVE 7.0 0 02/28/02 03/05/02 2,625 100
300 09 / 33069 ON E 50TH PL FROM S ST LAWRENCE AVE TO S VINCENNES AVE 2.75 06/25/08 06/27/08 1,100 06/25/08 06/26/08 756 100

Materials Ordered Note Last Updated on 12-JUN-08


300 11 / 32192 ON S CALUMET AVE FROM E 42ND ST TO E 44TH ST 8.0 12/19/07 04/03/08 2,800 12/19/07 12/19/07 1,171 100
300 06 0069 / 5233 ON S CALUMET AVE FROM E 43RD ST TO E 48TH ST 25.0 0 02/28/02 03/05/02 5,653 100
300 11 / 32192 ON S CALUMET AVE FROM E 49TH ST TO E 53RD ST 12.0 12/19/07 04/03/08 4,200 12/19/07 12/19/07 1,756 100
300 11 / 32192 ON S DR MARTIN LUTHER KING JR DR FROM E 42ND ST TO E 44TH ST 8.0 12/19/07 04/04/08 2,800 12/19/07 12/19/07 1,171 100
300 06 0069 / 5233 ON S PRAIRIE AVE FROM E 43RD ST TO E 48TH ST 25.0 0 02/28/02 03/05/02 5,653 100
300 11 / 32192 ON S PRAIRIE AVE FROM E 47TH ST TO E 48TH ST 4.0 12/19/07 04/04/08 1,400 12/19/07 12/19/07 586 100
300 11 / 32192 ON S PRAIRIE AVE FROM E 51ST ST TO E 53RD ST 11.0 10/01/07 10/05/07 4,600 10/09/07 10/09/07 1,610 100
302 00 0092 / 5774 ON S VINCENNES AVE FROM E 47TH ST TO E 44TH ST 13.0 01/28/02 01/28/02 2,730 01/25/02 01/25/02 2,639 100
300 09 / 33069 ON S WELLS ST FROM W PERSHING RD TO W ROOT ST 3.0 07/21/08 07/22/08 1,200 06/25/08 06/27/08 849 100

Materials ordered Note Last Updated on 12-JUN-08


300 06 0069 / 5233 456 E 42ND ST 1.0 0 05/21/02 05/21/02 375 100
302 00 0092 / 5774 4501 S MARSHFIELD AVE 3.0 0 02/23/01 02/23/01 617 100

Totals per 250 Watt Changeout 162.75 24,319 35,627

Totals per Lighting/Electrical 7,956,351 3,793,625


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 39

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 09 / 33068 ON E 14TH PL FROM S STATE ST TO S WABASH AVE 2.0 01/28/09 02/02/09 800 01/28/09 02/02/09 644 100
300 09 / 33068 ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR 1.40 05/28/08 06/20/08 588 04/01/08 12/01/08 438 100
300 11 / 32192 ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST 139.0 12/01/07 01/01/08 56,600 09/25/07 10/24/07 39,708 100
300 05 0003 / 5118 ON S DR MARTIN LUTHER KING JR DR FROM E 46TH ST TO E 48TH ST 30.0 07/01/06 08/01/06 4,400 0
300 09 / 33068 ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST 1.62 05/29/08 06/20/08 648 04/01/08 12/01/08 507 100
300 09 / 33069 ON S MICHIGAN AVE FROM E 42ND ST TO E 43RD ST 7.0 06/26/08 06/27/08 2,800 06/26/08 06/27/08 2,080 100

Materials Ordered Note Last Updated on 12-JUN-08


300 06 0225 / 5340 ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST 06/05/03 06/13/03 5,000 06/05/03 06/13/03 9,026 100
300 09 / 33068 E 31ST ST AND S INDIANA AVE 7.0 06/02/08 06/20/08 2,800 06/02/08 06/06/08 2,191 100
300 09 / 33069 S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD 2.0 10/31/08 10/31/08 800 10/31/08 10/31/08 546 100

Totals per 400 Watt Changeout 190.02 74,436 55,140


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 40

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0069 / 5233 436 E 46TH ST 1.0 0 02/26/02 02/26/02 350 100
302 00 0092 / 5774 447 E BOWEN AVE 1.0 0 01/18/02 01/18/02 236 100
302 00 0092 / 5774 469 E BOWEN AVE 1.0 0 12/04/01 12/04/01 236 100
302 00 0092 / 5774 4300 S CALUMET AVE 1.0 0 01/10/02 01/10/02 236 100
300 06 0139 / 5289 4645 S DR MARTIN LUTHER KING JR DR 973.0 03/01/06 09/01/06 24,388 04/01/06 05/10/06 29,398 100
302 00 0092 / 5774 4645 S DR MARTIN LUTHER KING JR DR 28.0 0 02/01/01 12/31/01 6,598 100
805 06 1781 / 7967 5224 S INDIANA AVE 1.0 04/29/97 04/29/97 0 04/29/97 04/29/97 300 100
805 06 1863 / 8049 4611 S MARSHFIELD AVE 1.0 07/03/96 07/03/96 0 07/03/96 07/03/96 300 100
805 06 0410 / 6596 2103 S STATE ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0444 / 6630 2111 S STATE ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0445 / 6631 2123 S STATE ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0446 / 6632 2147 S STATE ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 1517 / 7703 5659 S UNION AVE 1.0 10/30/97 10/30/97 0 10/30/97 10/30/97 300 100
805 06 0396 / 6582 4729 S VINCENNES AVE 1.0 08/31/95 08/31/95 0 08/31/95 08/31/95 300 100
805 06 0400 / 6586 1802 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0401 / 6587 1810 S WABASH AVE 1.0 02/14/95 02/14/95 0 02/14/95 02/14/95 300 100
805 06 0402 / 6588 1812 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0386 / 6572 1832 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0404 / 6590 1848 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0395 / 6581 1910 S WABASH AVE 1.0 02/14/95 02/14/95 0 02/14/95 02/14/95 300 100
805 06 0376 / 6562 1940 S WABASH AVE 1.0 02/14/95 02/14/95 0 02/14/95 02/14/95 300 100
805 06 0377 / 6563 2004 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0379 / 6565 2042 S WABASH AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
300 06 0069 / 5233 520 W GARFIELD BLVD 1.0 0 02/26/02 02/26/02 350 100
300 06 0069 / 5233 540 W GARFIELD BLVD 1.0 0 02/26/02 02/26/02 350 100

Totals per Alley Lighting/Lamps 1,024.0 24,388 42,854

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 4645 S DR MARTIN LUTHER KING JR DR 1,088.0 06/01/07 12/31/07 32,030 10/18/07 10/24/07 31,062 100
300 06 0238 / 5352 4645 S DR MARTIN LUTHER KING JR DR 1,495.0 06/22/07 12/31/07 44,012 10/01/07 10/24/07 42,682 100

Totals per Arterial Group Relamping 2,583.0 76,042 73,744


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 41

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Strt Lighting/Lamps Installations
300 06 0053 / 5228 4645 S DR MARTIN LUTHER KING JR DR 2,488.0 0 07/06/02 07/09/02 45,302 100

Work Type: Direct Burial Cable Locations


300 06 0277 / 5385 STATEWAY GARDENS 1.0 05/01/04 05/31/04 25,000 05/01/04 27,782 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 ROBERT TAYLOR A (CHA) 56.0 01/19/01 01/31/01 96,104 01/19/01 01/31/01 49,020 100
300 06 0198 / 5323 ROBERT TAYLOR B (CHA) 56.0 01/19/01 01/31/01 0 01/19/01 01/31/01 37,447 100
300 06 0198 / 5323 STATEWAY GARDENS 44.0 01/02/01 01/16/01 251,500 01/02/01 01/16/01 146,728 100
300 06 0198 / 5323 WENTWORTH GARDEN (CHA) 06/11/01 06/13/01 23,024 04/16/01 04/20/01 23,024 100
300 06 0167 / 5306 E 35TH ST AND S WABASH AVE 3.0 0 06/10/99 06/10/99 1,053 100
302 00 0092 / 5774 W 45TH PL AND S PRINCETON AVE 2.0 0 05/02/01 05/02/01 941 100
302 00 0092 / 5774 W 45TH ST AND S PRINCETON AVE 3.0 0 05/02/01 05/02/01 1,412 100
302 00 0092 / 5774 4502 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4514 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4526 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4534 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4540 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4550 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4558 S PRINCETON AVE 1.0 0 08/25/01 08/25/01 404 100
302 00 0092 / 5774 4600 S PRINCETON AVE 2.0 0 05/02/01 05/02/01 941 100
300 06 0167 / 5306 4600 S STEWART AVE 1.0 0 07/20/99 07/20/99 351 100
300 09 / 33069 4420 S VINCENNES AVE 3.0 07/28/08 07/29/08 1,500 07/28/08 07/29/08 1,245 100
302 00 0092 / 5774 43 W 24TH ST 1.0 0 11/14/01 11/14/01 404 100
302 00 0092 / 5774 239 W SWANN ST 1.0 0 04/05/01 04/05/01 471 100

Totals per Flood Light Install 179.0 372,128 265,865

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts .0 0 0


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 42

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0244 / 5354 ROBERT TAYLOR A (CHA) .0 06/26/09 04/06/10 0 0 0
300 06 0244 / 5354 ROBERT TAYLOR B (CHA) 1.0 05/01/06 12/31/07 1,576,800 06/05/06 467,688 95
300 06 0243 / 5353 STATEWAY GARDENS .0 01/02/04 12/15/06 2,027,600 12/15/03 12/15/06 68,140 8
300 06 0313 / 5419 WENTWORTH GARDEN (CHA) .0 05/01/07 09/28/07 686,000 02/17/06 12/18/06 14,126 100
300 06 0292 / 5399 1725 S CLARK ST .0 03/31/05 04/12/05 12,136 03/31/05 04/12/05 10,573 100
281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
300 06 / 33449 3700-3900 S VINCENNES AVE .0 06/04/08 07/15/08 36,000 06/20/08 35,755 60
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 5014 S WELLS ST .0 03/01/05 12/31/05 6,065 05/20/05 06/06/05 4,184 100
300 06 0292 / 5399 1512 W 47TH ST .0 03/01/05 12/31/05 12,587 06/28/05 07/05/05 11,160 100

Totals per Lighting Imprvmnts 1.0 4,357,188 611,626

Work Type: Lighting Imprvmnts Projects


300 06 0110 / 5265 ON S STATE ST FROM W 27TH ST TO W 30TH ST 1.0 11/10/98 12/01/98 12,500 11/01/98 01/20/99 5,998 100
300 06 0201 / 5325 E 41ST ST AND S INDIANA AVE 1.0 0 623 100
300 06 0110 / 5265 2900-3000 S FEDERAL ST 1.0 11/01/98 12/01/98 12,500 11/01/98 01/20/99 5,998 100

Totals per Lighting Imprvmnts 3.0 25,000 12,619

Work Type: Loop Lighting Blocks


281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per Loop Lighting .0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33068 ON E 14TH PL FROM S STATE ST TO S WABASH AVE 1.0 01/28/09 02/02/09 1,350 01/28/09 02/02/09 1,000 100
300 09 / 33068 ON E 31ST ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 2.24 12/15/08 12/31/08 3,024 12/01/08 12/09/08 2,566 100
300 09 / 33069 S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD 4.0 10/31/08 10/31/08 5,400 10/31/08 10/31/08 4,193 100

Totals per Ornamental - Piggyback Lighting 7.24 9,774 7,759


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 43

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental Lighting Blocks
300 03 0003 / 4874 4600-4700 S DR MARTIN LUTHER KING JR DR .0 11/29/06 12/08/06 0 0 75
281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
300 11 / 32192 5627 S SHIELDS AVE 1.0 1,000 0 0
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per Ornamental Lighting 1.0 1,000 0

Work Type: POD Camera Pole Poles


281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per POD Camera Pole .0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5046 S STATE ST .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 44

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 09 / 33069 ON E 38TH ST FROM S GILES AVE TO S DR MARTIN LUTHER KING JR DR 1.0 65,000 0 0
300 09 / 33069 ON E 42ND ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES 1.0 65,000 0 0
AVE
300 09 / 33069 ON S CALUMET AVE FROM E 38TH ST TO E PERSHING RD 1.0 65,000 04/01/08 12/01/08 0 0
300 07 0003 / 5426 ON S CALUMET AVE FROM E 45TH ST TO E 47TH ST 2.0 04/15/07 06/15/07 170,000 03/01/07 05/04/07 112,739 100
300 09 / 33069 ON S CALUMET AVE FROM E 51ST ST TO E 53RD ST 2.0 04/02/08 05/13/08 155,000 04/01/08 12/01/08 140,000 100
300 09 / 33069 ON S CHAMPLAIN AVE FROM E 45TH ST TO E 46TH ST .50 04/02/08 05/13/08 37,500 04/01/08 12/01/08 20,204 100
300 09 / 33069 ON S FORRESTVILLE AVE FROM E 43RD ST TO E 44TH ST .50 32,500 0 0
300 09 / 33069 ON S FORRESTVILLE AVE FROM E 44TH ST TO E 43RD ST .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33069 ON S GILES AVE FROM E 37TH ST TO E PERSHING RD 2.0 03/10/08 05/09/08 130,000 04/01/08 12/01/08 117,868 100
300 09 / 33069 ON S JUSTINE ST FROM W 45TH ST TO W 46TH ST 1.0 03/10/08 05/09/08 60,000 04/01/08 12/01/08 62,057 100
300 09 / 33069 ON S LOWE AVE FROM W 51ST ST TO W 54TH ST 3.0 02/18/08 05/09/08 275,000 04/01/08 12/01/08 187,621 100
300 09 / 33069 ON S PRAIRIE AVE FROM E 33RD BLVD TO E 35TH ST .52 33,800 04/01/08 12/01/08 0 0
300 07 0003 / 5426 ON S PRINCETON AVE FROM W 53RD ST TO W GARFIELD BLVD 2.0 05/01/07 07/01/07 200,000 03/21/07 07/06/07 110,513 100
300 07 0003 / 5426 ON S PRINCETON AVE FROM W GARFIELD BLVD TO W 57TH ST 2.0 04/20/07 07/01/07 200,000 03/12/07 06/14/07 101,516 100
300 09 / 33069 ON S ST LAWRENCE AVE FROM E 47TH ST TO E 48TH ST .50 32,500 04/01/08 12/01/08 0 0
300 06 0308 / 5414 ON S VINCENNES AVE FROM E 43RD ST TO E 45TH ST 2.0 03/16/06 12/31/06 224,237 09/18/06 04/06/07 167,169 100
300 07 0003 / 5426 ON S VINCENNES AVE FROM E 45TH ST TO E 47TH ST 2.0 04/10/07 06/10/07 170,000 03/19/07 06/15/07 111,580 100
300 09 / 33069 ON S WABASH AVE FROM E 42ND ST TO E 43RD ST 1.0 65,000 04/01/08 12/01/08 0 0
300 05 0011 / 5126 ON W 46TH ST FROM S STEWART AVE TO S UNION AVE 1.0 04/04/05 11/18/05 85,000 09/08/05 11/11/05 50,929 100
300 07 0003 / 5426 ON W 49TH PL FROM S UNION AVE TO S HALSTED ST 1.0 04/01/07 06/01/07 56,000 03/09/07 05/04/07 42,760 100
300 07 0003 / 5426 ON W 50TH PL FROM S HALSTED ST TO S PEORIA ST 1.0 04/01/07 06/01/07 85,000 03/09/07 05/04/07 42,760 100
300 07 0003 / 5426 ON W 50TH PL FROM S UNION AVE TO S HALSTED ST 1.0 04/01/07 06/01/07 57,000 03/09/07 05/04/07 42,760 100
300 07 0003 / 5426 ON W 50TH ST FROM S HALSTED ST TO S PEORIA ST 1.0 04/01/07 06/01/07 85,000 03/09/07 05/04/07 42,760 100
300 07 0003 / 5426 ON W 50TH ST FROM S UNION AVE TO S HALSTED ST 1.0 04/01/07 06/01/07 57,000 03/09/07 05/04/07 42,760 100
300 07 0003 / 5426 E 43RD ST AND S VERNON AVE 1.0 04/15/07 05/15/07 42,500 03/19/07 06/15/07 12,345 100

Totals per Residntl Staggered Lighting 31.02 2,448,037 1,408,341


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 45

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 03 0002 / 4873 ON S GILES AVE FROM E 31ST ST TO E 35TH ST .24 09/15/04 11/15/04 38,400 09/09/04 12/31/04 22,216 100
300 06 0166 / 5305 ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST 1.0 10,023 11/07/00 11/11/00 0 100
300 06 0193 / 5318 ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST 1.0 0 11/07/00 11/11/00 34,869 100
300 06 0267 / 5375 ON S VINCENNES AVE FROM E 47TH ST TO E 48TH ST 2.0 10/01/04 12/30/04 176,292 10/21/04 12/21/04 143,894 100
300 06 0235 / 5349 ON W 54TH PL FROM S WALLACE ST TO S HALSTED ST 2.0 06/30/03 08/29/03 122,274 06/18/03 10/03/03 129,873 100

Totals per Residntl Strt Lighting/Lamps 6.24 346,989 330,852

Work Type: Short Arm Installs - Arterial Locations


302 00 0092 / 5774 4521 S MARSHFIELD AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4541 S MARSHFIELD AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4621 S MARSHFIELD AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4647 S MARSHFIELD AVE 1.0 0 02/23/01 02/23/01 378 100
281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 4517 S PAULINA ST 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4539 S PAULINA ST 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4619 S PAULINA ST 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4645 S PAULINA ST 1.0 0 02/23/01 02/23/01 378 100
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Arterial 8.0 0 3,024

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Residntl .0 0 0


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 46

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0081 / 5244 ON E 18TH ST FROM S WABASH AVE TO S INDIANA AVE 2.08 0 05/23/98 05/23/98 132 100
300 09 / 33068 ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR 1.40 05/28/08 06/20/08 350 06/13/07 06/24/08 294 100
302 00 0077 / 5765 ON E 35TH ST FROM S STATE ST TO S DR MARTIN LUTHER KING JR DR 17.50 0 08/25/99 08/31/99 1,529 100
300 09 / 33069 ON E 46TH PL FROM S VINCENNES AVE TO S ST LAWRENCE AVE 3.0 06/23/08 06/27/08 600 06/23/08 06/27/08 378 0
302 00 0077 / 5765 ON S CLARK ST FROM W 17TH ST TO W 18TH ST 9.50 0 11/11/99 11/12/99 830 100
300 11 / 32192 ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST 125.0 07/20/07 08/10/07 27,500 07/20/07 08/10/07 27,500 100
300 05 0003 / 5118 ON S DR MARTIN LUTHER KING JR DR FROM E 46TH ST TO E 48TH ST 28.0 04/04/05 11/18/05 7,000 08/20/05 08/24/05 6,056 100
300 06 0108 / 5263 ON S DR MARTIN LUTHER KING JR DR FROM E 55TH ST TO E 69TH ST 90.0 05/28/03 06/15/03 21,500 07/01/03 07/28/03 22,120 100
300 09 / 33068 ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST 1.62 05/29/08 06/20/08 405 05/29/08 06/20/08 340 100
302 00 0077 / 5765 ON S STATE ST FROM W 17TH ST TO E 18TH ST 19.0 0 11/11/99 11/12/99 1,660 100
300 09 / 33069 ON S WELLS ST FROM W PERSHING RD TO W ROOT ST 5.0 06/10/08 06/26/08 1,000 06/10/08 06/13/08 650 100
300 06 0225 / 5340 ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST 05/30/03 06/17/03 3,625 05/30/03 06/17/03 5,285 100
300 09 / 33069 S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD 4.0 10/29/08 10/29/08 1,200 10/29/08 10/29/08 840 100
300 06 0081 / 5244 1800 S WABASH AVE 2.0 0 05/23/98 05/23/98 127 100

Totals per Strt Light Pole Painting 308.10 63,180 67,741

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 4100 S MICHIGAN AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1935 S WABASH AVE .0 01/01/08 12/31/08 0 0 0

Totals per Strt Light Pole Replacmnt/Reloc .0 0 0

Work Type: Strt Lighting Blocks


300 06 0225 / 5340 ON W TREMONT ST FROM S NORMAL AVE TO S STEWART AVE 2.0 01/05/04 01/30/04 50,000 05/06/03 01/09/04 37,760 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 4645 S DR MARTIN LUTHER KING JR DR 4,144.0 03/01/04 12/01/04 21,549 07/31/06 09/15/06 45,128 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 47

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0072 / 5760 330 E 40TH ST 1.0 0 05/04/00 05/04/00 1,935 100
805 06 2344 / 8530 1540 E 47TH DR 10.0 06/04/93 06/04/93 0 06/04/93 06/04/93 7,500 100
302 00 0071 / 5759 4000 S CALUMET AVE 0 12/13/98 12/14/98 3,105 100
300 06 0099 / 5260 4645 S DR MARTIN LUTHER KING JR DR 664.0 07/15/03 07/23/03 37,321 07/15/03 07/23/03 27,122 100
302 00 0071 / 5759 4830 S HALSTED ST 0 10/30/98 11/04/98 5,625 100
805 06 2387 / 8573 3901 S LA SALLE ST 6.0 07/18/95 07/18/95 0 07/18/95 07/18/95 4,500 100
302 00 0072 / 5760 5800 S LOWE AVE 1.0 0 03/27/00 03/29/00 6,370 100
805 06 2962 / 9148 5801 S LOWE AVE 6.0 01/21/93 01/21/93 0 01/21/93 01/21/93 4,500 100
805 06 2579 / 8765 4005 S MICHIGAN AVE 4.0 03/29/95 03/29/95 0 03/29/95 03/29/95 3,000 100
805 06 2264 / 8450 4901 S MORGAN ST 12.0 10/18/94 10/18/94 0 10/18/94 10/18/94 9,000 100
805 06 2280 / 8466 4901 S MORGAN ST 12.0 10/18/94 10/18/94 0 10/18/94 10/18/94 9,000 100
805 06 2551 / 8737 4005 S PRAIRIE AVE 4.0 04/12/95 04/12/95 0 04/12/95 04/12/95 3,000 100
302 00 0071 / 5759 4000 S PRINCETON AVE 0 11/08/98 11/13/98 4,654 100
805 06 2629 / 8815 1595 S STATE ST 12.0 11/08/93 11/08/93 0 11/08/93 11/08/93 9,000 100
302 00 0071 / 5759 4910 S UNION AVE 0 12/04/98 12/09/98 6,594 100
805 06 2841 / 9027 1598 S WABASH AVE 12.0 12/28/93 12/28/93 0 12/28/93 12/28/93 9,000 100
805 06 2577 / 8763 4020 S WABASH AVE 8.0 05/07/93 05/07/93 0 05/07/93 05/07/93 6,000 100
302 00 0071 / 5759 4000 S WELLS ST 0 11/27/98 12/01/98 4,654 100
302 00 0072 / 5760 3900 S WENTWORTH AVE 1.0 0 02/03/00 02/04/00 3,400 100
805 06 2643 / 8829 105 W 18TH ST 10.0 10/18/93 10/18/93 0 10/18/93 10/18/93 7,500 100
805 06 2702 / 8888 116 W 27TH ST 8.0 03/30/94 03/30/94 0 03/30/94 03/30/94 6,000 100
805 06 2699 / 8885 100 W 33RD ST 12.0 07/02/91 07/02/91 0 07/02/91 07/02/91 9,000 100
805 06 2700 / 8886 98 W 35TH ST 14.0 03/28/91 03/28/91 0 03/28/91 03/28/91 10,500 100
805 06 2701 / 8887 109 W 37TH ST 8.0 04/11/94 04/11/94 0 04/11/94 04/11/94 6,000 100
302 00 0071 / 5759 400 W 42ND PL 0 06/18/98 06/30/98 29,086 100
302 00 0071 / 5759 400 W 42ND ST 0 05/23/98 06/03/98 18,347 100
805 06 2803 / 8989 39 W 43RD ST 42.0 09/01/92 09/01/92 0 09/01/92 09/01/92 31,500 100
805 06 2538 / 8724 331 W 43RD ST 28.0 12/31/91 12/31/91 0 12/31/91 12/31/91 21,000 100
302 00 0070 / 5758 400 W 43RD ST 0 12/03/97 12/12/97 16,069 100
805 06 2154 / 8340 400 W 43RD ST 43.0 12/01/97 12/12/97 0 12/01/97 12/12/97 32,250 100
805 06 2696 / 8882 149 W 44TH ST 20.0 08/03/94 08/03/94 0 08/03/94 08/03/94 15,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 48

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2703 / 8889 149 W 45TH PL 12.0 06/20/94 06/20/94 0 06/20/94 06/20/94 9,000 100
805 06 2698 / 8884 160 W 46TH ST 12.0 04/06/94 04/06/94 0 04/06/94 04/06/94 9,000 100
805 06 2520 / 8706 401 W 46TH ST 50.0 08/01/91 08/01/91 0 08/01/91 08/01/91 37,500 100
805 06 2791 / 8977 117 W 47TH ST 14.0 01/01/93 01/01/93 0 01/01/93 01/01/93 10,500 100
805 06 2561 / 8747 499 W 47TH ST 12.0 05/17/93 05/17/93 0 05/17/93 05/17/93 9,000 100
805 06 2628 / 8814 499 W 47TH ST 16.0 04/04/93 04/04/93 0 04/04/93 04/04/93 12,000 100
805 06 2548 / 8734 105 W 51ST ST 24.0 02/04/94 02/04/94 0 02/04/94 02/04/94 18,000 100
805 06 2479 / 8665 330 W 51ST ST 51.0 10/14/95 10/14/95 0 10/14/95 10/14/95 38,250 100
805 06 2480 / 8666 330 W 51ST ST 9.0 10/14/95 10/14/95 0 10/14/95 10/14/95 6,750 100
805 06 2481 / 8667 330 W 51ST ST 32.0 10/14/95 10/14/95 0 10/14/95 10/14/95 24,000 100
805 06 2483 / 8669 330 W 51ST ST 20.0 10/14/95 10/14/95 0 10/14/95 10/14/95 15,000 100
805 06 2484 / 8670 330 W 51ST ST 27.0 10/14/95 10/14/95 0 10/14/95 10/14/95 20,250 100
805 06 2485 / 8671 330 W 51ST ST 8.0 10/14/95 10/14/95 0 10/14/95 10/14/95 6,000 100
805 06 2486 / 8672 330 W 51ST ST 8.0 10/14/95 10/14/95 0 10/14/95 10/14/95 6,000 100
805 06 2505 / 8691 330 W 51ST ST 15.0 10/14/95 10/14/95 0 10/14/95 10/14/95 11,250 100
805 06 2506 / 8692 330 W 51ST ST 16.0 10/14/95 10/14/95 0 10/14/95 10/14/95 12,000 100
805 06 2497 / 8683 629 W 51ST ST 13.0 10/14/95 10/14/95 0 10/14/95 10/14/95 9,750 100
805 06 2498 / 8684 629 W 51ST ST 8.0 10/14/95 10/14/95 0 10/14/95 10/14/95 6,000 100
805 06 2500 / 8686 629 W 51ST ST 9.0 10/14/95 10/14/95 0 10/14/95 10/14/95 6,750 100
805 06 2501 / 8687 629 W 51ST ST 17.0 10/14/95 10/14/95 0 10/14/95 10/14/95 12,750 100
805 06 2502 / 8688 629 W 51ST ST 16.0 10/14/95 10/14/95 0 10/14/95 10/14/95 12,000 100
805 06 2503 / 8689 629 W 51ST ST 12.0 10/14/95 10/14/95 0 10/14/95 10/14/95 9,000 100
805 06 2504 / 8690 629 W 51ST ST 10.0 10/14/95 10/14/95 0 10/14/95 10/14/95 7,500 100
805 06 2359 / 8545 101 W 53RD ST 12.0 02/02/94 02/02/94 0 02/02/94 02/02/94 9,000 100
805 06 2487 / 8673 699 W 54TH PL 28.0 10/20/94 10/20/94 0 10/20/94 10/20/94 21,000 100
805 06 2678 / 8864 105 W 57TH ST 12.0 07/19/94 07/19/94 0 07/19/94 07/19/94 9,000 100
805 06 2826 / 9012 595 W 57TH ST 12.0 03/05/93 03/05/93 0 03/05/93 03/05/93 9,000 100
805 06 2847 / 9033 599 W 58TH ST 8.0 10/17/94 10/17/94 0 10/17/94 10/17/94 6,000 100
805 06 2339 / 8525 500 W GARFIELD BLVD 16.0 03/29/93 03/29/93 0 03/29/93 03/29/93 12,000 100
805 06 2950 / 9136 127 W PERSHING RD 12.0 01/01/91 01/01/91 0 01/01/91 01/01/91 9,000 100
805 06 2563 / 8749 61 W ROOT ST 12.0 01/24/94 01/24/94 0 01/24/94 01/24/94 9,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 49

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
Totals per Underpass Lighting 1,461.0 37,321 722,461
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 50

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S ARCHER AVE AND S STATE ST 1.0 0 01/14/02 01/14/02 6,427 100
210 06 0130 / 4389 S CLARK ST AND S ARCHER AVE .50 0 09/10/01 09/10/01 4,472 100

Totals per LED Signal Head Install 1.50 0 10,899

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S DR MARTIN LUTHER KING JR DR AND E 37TH ST .50 03/16/01 04/20/01 2,000 03/16/01 06/07/01 2,748 100
300 06 0197 / 5322 S INDIANA AVE AND E 43RD ST 1.0 4,000 04/12/01 04/27/01 7,914 100
300 06 0197 / 5322 S MICHIGAN AVE AND E 43RD ST 1.0 04/20/01 04/25/01 4,000 04/20/01 04/25/01 4,362 100
300 06 0197 / 5322 S WABASH AVE AND E 41ST ST 1.0 04/24/01 05/01/01 4,000 04/12/01 04/13/01 144 100

Totals per Removal Temp Wiring - Signals 3.50 14,000 15,168

Work Type: Signal Removal Locations


300 06 0117 / 5271 3500 S WABASH AVE 1.0 5,255 07/17/99 08/26/99 2,371 100

Work Type: Signals Intersections


300 06 0096 / 5258 4645 S DR MARTIN LUTHER KING JR DR 61.0 08/18/03 08/25/03 0 08/20/03 08/25/03 9,645 100

Work Type: TSM Install Locations


814 06 0281 / 16493 4500 S ASHLAND AVE 1.0 08/23/90 08/23/90 0 08/23/90 08/23/90 90,100 100
814 06 0115 / 16330 3900 S DR MARTIN LUTHER KING JR DR 1.0 04/26/94 04/26/94 0 04/26/94 04/26/94 188,654 100
814 06 0214 / 16426 2400 S STATE ST 1.0 10/25/94 10/25/94 0 10/25/94 10/25/94 120,000 100
814 06 0346 / 16544 2400 S STATE ST 1.0 08/01/96 08/01/96 0 08/01/96 04/04/97 200,000 100
814 06 0142 / 16356 1600 S WABASH AVE 1.0 09/24/97 09/24/97 0 09/24/97 09/24/97 200,000 100
814 06 0126 / 16340 1800 S WABASH AVE 1.0 09/24/97 09/24/97 0 09/24/97 09/24/97 200,000 100
814 06 0127 / 16341 2000 S WABASH AVE 1.0 09/24/97 09/24/97 0 09/24/97 09/24/97 200,000 100
814 06 0100 / 16315 3900 S WABASH AVE 1.0 04/25/94 04/25/94 0 04/25/94 04/25/94 85,397 100

Totals per TSM Install 8.0 0 1,284,151

Totals per Traffic 35,033 1,337,314


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 51

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 09 / 33068 ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR .14 05/28/08 06/20/08 28 04/01/08 12/01/08 12 100
300 11 / 32192 ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST 33.0 07/20/07 08/10/07 11,550 07/20/07 08/10/07 11,550 100
300 09 / 33068 E 31ST ST AND S INDIANA AVE 10.0 06/02/08 06/20/08 3,800 06/02/08 06/20/08 3,225 100
300 09 / 33069 S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD 2.0 10/29/08 10/29/08 400 10/29/08 10/29/08 294 100

Totals per Traffic Equipment Painting 45.14 15,778 15,081

Totals per Construction Phase 7,991,384 5,130,939

Totals for Ward 03 8,065,984 5,229,797


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 52

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0245 / 5355 IDA B WELLS HOMES .0 03/01/02 02/28/03 0 03/01/02 02/28/05 57,776 100
300 06 0308 / 5414 ON S GREENWOOD AVE FROM E 47TH ST TO E 49TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,592 100
300 06 / 32146 ON S WOODLAWN AVE FROM E HYDE PARK BLVD TO E 55TH ST 1.0 05/01/07 10/31/07 6,000 2,500 100
300 06 0282 / 5390 353 E 26TH ST 1.0 11/05/04 12/14/04 1,000 11/01/04 12/14/04 1,859 100

Totals per Design/Engineering 2.0 7,000 64,727


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 53

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 09 / 33069 ON E 50TH PL FROM S ST LAWRENCE AVE TO S VINCENNES AVE 2.25 06/25/08 06/27/08 900 06/25/08 06/26/08 619 100

Materials Ordered Note Last Updated on 12-JUN-08


300 05 0005 / 5120 ON S DREXEL AVE FROM E 53RD ST TO E 55TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
300 06 0122 / 5275 700 E 40TH ST 2.0 12/10/03 12/10/03 950 12/08/03 12/08/03 1,106 100

Totals per 250 Watt Changeout 9.25 3,850 2,980

Work Type: 400 Watt Changeout Fixtures


300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 3.84 05/28/08 06/20/08 1,600 05/28/08 06/06/08 1,202 100
300 09 / 33069 ON E OAKWOOD BLVD FROM S VINCENNES AVE TO S DREXEL BLVD 10.0 06/26/08 06/27/08 4,000 06/26/08 06/27/08 3,000 100

Materials Ordered Note Last Updated on 12-JUN-08


Totals per 400 Watt Changeout 13.84 5,600 4,202

Work Type: Alley Lighting/Lamps Installations


805 06 1049 / 7235 ON E 53RD ST FROM S WOODLAWN AVE TO S KIMBARK AVE 1.0 03/07/97 03/07/97 0 03/07/97 03/07/97 300 100
300 06 0096 / 5258 449 E 35TH ST 589.0 03/01/03 09/01/03 15,284 03/01/06 09/01/06 17,796 0
302 00 0092 / 5774 449 E 35TH ST 12.0 0 04/02/01 11/28/01 2,828 100
302 00 0092 / 5774 4105 S DREXEL AVE 1.0 0 06/08/01 06/08/01 236 100
300 06 0139 / 5289 4646 S DREXEL AVE 626.0 03/01/06 09/01/06 14,445 04/01/06 04/15/06 18,914 100
302 00 0092 / 5774 4646 S DREXEL BLVD 8.0 0 01/31/01 01/15/02 1,885 100
805 06 1544 / 7730 4141 S ELLIS AVE 1.0 10/23/97 10/23/97 0 10/23/97 10/23/97 300 100
805 06 0341 / 6527 4239 S LANGLEY AVE 1.0 02/14/95 02/14/95 0 02/14/95 02/14/95 300 100

Totals per Alley Lighting/Lamps 1,239.0 29,729 42,559

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 4659 S COTTAGE GROVE AVE 1,275.0 06/01/07 12/31/07 37,536 10/15/07 10/24/07 36,401 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 449 E 35TH ST 5,122.0 0 07/17/02 07/20/02 93,262 100
300 06 0053 / 5228 4646 S DREXEL BLVD 2,154.0 0 07/14/02 07/17/02 39,220 100

Totals per Arterial Strt Lighting/Lamps 7,276.0 0 132,482

Totals per Lighting/Electrical 8,881,404 5,538,004


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 54

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0198 / 5323 IDA B WELLS HOMES 04/25/01 05/15/01 85,465 04/20/01 05/11/01 107,793 100
300 06 0198 / 5323 LAKE PARK PLACE (CHA) 05/16/01 05/17/01 9,000 05/12/01 05/14/01 7,512 100
300 06 0198 / 5323 WASHINGTON PARK HOMES (CHA) 03/09/01 06/29/01 13,200 06/02/01 06/02/01 8,569 100
300 06 0167 / 5306 4715 S ELLIS AVE 2.0 0 05/20/99 05/20/99 188 100
300 06 0167 / 5306 4731 S ELLIS AVE 2.0 0 05/20/99 05/20/99 188 100
300 06 0167 / 5306 4752 S ELLIS AVE 2.0 0 05/20/99 05/20/99 188 100
300 06 0072 / 5235 5300 S HYDE PARK BLVD 08/03/01 09/28/01 0 07/05/01 07/05/01 2,382

Totals per Flood Light Install 6.0 107,665 126,820

Work Type: Lighting Imprvmnts Installations


300 06 0245 / 5355 IDA B WELLS HOMES .0 10/01/04 05/29/07 1,561,200 12/12/03 04/01/07 873,579 100
300 06 0227 / 5342 LAKE PARK PLACE (CHA) 107.0 05/01/02 12/15/05 1,727,200 06/12/02 950,168 80
300 06 0210 / 5333 ON S DREXEL BLVD FROM E 41ST ST TO E BOWEN AVE 90.0 07/23/02 12/15/05 2,225,200 08/14/02 02/01/06 1,617,480 100
300 06 / 33449 600-800 E 37TH ST .0 06/04/08 07/15/08 72,000 06/20/08 71,510 60
300 06 / 33449 3700-3900 S VINCENNES AVE .0 06/04/08 07/15/08 36,000 06/20/08 35,755 60

Totals per Lighting Imprvmnts 197.0 5,621,600 3,548,492

Work Type: Lighting Imprvmnts Projects


300 06 0282 / 5390 353 E 26TH ST .0 10/06/04 10/31/04 0 06/30/06 06/30/06 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 5.12 11/24/08 12/05/08 6,912 11/24/08 12/05/08 5,864 100

Work Type: Ornamental Lighting Blocks


300 06 0063 / 5230 ON E 53RD ST FROM S WOODLAWN AVE TO S HARPER AVE 3.0 0 11/28/97 09/30/98 988 100
300 09 / 33071 ON S INGLESIDE AVE FROM E 53RD ST TO E 54TH ST 1.0 135,000 0 0

Totals per Ornamental Lighting 4.0 135,000 988

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 4659 S COTTAGE GROVE AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 55

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 09 / 33070 ON E 40TH ST FROM S VINCENNES AVE TO S COTTAGE GROVE AVE 2.0 146,250 04/01/08 12/01/08 0 0
300 09 / 33070 ON E 41ST ST FROM S ST LAWRENCE AVE TO S VINCENNES AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 11 / 32193 ON E 42ND ST FROM S COTTAGE GROVE AVE TO S ST LAWRENCE AVE 2.0 04/01/08 06/02/08 145,000 11/08/07 12/21/07 109,326 100
300 07 0004 / 5427 ON E 50TH ST FROM S CHAMPLAIN AVE TO S FORRESTVILLE AVE 1.0 07/10/06 08/18/06 65,000 01/08/07 05/07/07 56,412 100
300 07 0004 / 5427 ON E BOWEN AVE FROM S COTTAGE GROVE AVE TO S ST LAWRENCE 2.0 07/05/06 09/01/06 170,000 03/13/07 05/11/07 101,516 100
AVE
300 09 / 33070 ON E BOWEN AVE FROM S ST LAWRENCE AVE TO S VINCENNES AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 09 / 33069 ON S CHAMPLAIN AVE FROM E 45TH ST TO E 46TH ST .50 04/02/08 05/13/08 37,500 04/01/08 12/01/08 20,204 100
300 05 0004 / 5119 ON S CHAMPLAIN AVE FROM E 47TH ST TO E 49TH ST 2.0 09/01/05 10/15/05 170,000 08/22/05 10/07/05 108,764 100
300 07 0004 / 5427 ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST .50 07/17/06 09/08/06 21,250 09/01/06 11/27/06 0 100
300 07 0005 / 5428 ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST .50 04/01/07 06/01/07 21,250 09/01/06 11/27/06 0 100
300 09 / 33070 ON S ELLIS AVE FROM E 41ST ST TO E 43RD ST 2.0 146,250 04/01/08 12/01/08 0 0
300 05 0004 / 5119 ON S ELLIS AVE FROM E 45TH ST TO E 47TH ST 2.0 04/04/05 11/18/05 80,000 07/05/05 08/15/05 0 100
300 06 0298 / 5405 ON S ELLIS AVE FROM E 45TH ST TO E 47TH ST 2.0 06/01/05 07/01/05 0 07/05/05 09/07/05 141,762 100
300 09 / 33070 ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST .50 32,500 04/01/08 12/01/08 0 0
300 09 / 33071 ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST .50 32,500 0 0
300 07 0004 / 5427 ON S ELLIS AVE FROM E OAKWOOD BLVD TO E 41ST ST 2.0 06/19/06 08/18/06 190,000 06/19/06 01/15/07 0 100
300 09 / 33069 ON S FORRESTVILLE AVE FROM E 43RD ST TO E 44TH ST .50 32,500 0 0
300 09 / 33069 ON S FORRESTVILLE AVE FROM E 44TH ST TO E 43RD ST .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 06 0308 / 5414 ON S GREENWOOD AVE FROM E 47TH ST TO E 49TH ST 2.0 06/06/06 08/06/06 106,834 05/15/06 07/26/06 93,887 100
300 09 / 33070 ON S INGLESIDE AVE FROM E 53RD ST TO E 54TH ST 1.0 65,000 04/01/08 12/01/08 0 0
300 07 0004 / 5427 ON S LANGLEY AVE FROM E 47TH ST TO E 49TH ST 2.0 06/26/06 08/18/06 170,000 06/23/06 09/01/06 114,972 100
300 09 / 33069 ON S ST LAWRENCE AVE FROM E 47TH ST TO E 48TH ST .50 32,500 04/01/08 12/01/08 0 0
300 06 / 32146 ON S WOODLAWN AVE FROM E HYDE PARK BLVD TO E 55TH ST 4.0 12/05/07 06/30/08 326,440 0 0

Totals per Residntl Staggered Lighting 31.50 2,120,774 746,843


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 56

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 03 0004 / 4875 ON E 50TH PL FROM S CHAMPLAIN AVE TO S COTTAGE GROVE AVE 2.0 11/01/04 12/31/04 160,000 11/24/04 04/01/05 101,483 100
300 06 0267 / 5375 ON S EVANS AVE FROM E 47TH ST TO E 49TH ST 2.0 10/01/04 12/01/04 186,059 08/27/04 11/19/04 178,444 100
300 06 0235 / 5349 ON S GREENWOOD AVE FROM E 43RD ST TO E 45TH ST 2.0 06/15/03 08/15/03 161,392 06/12/03 09/18/03 141,143 100
300 03 0004 / 4875 ON S GREENWOOD AVE FROM E 45TH ST TO E 47TH ST 2.0 10/15/04 12/15/04 160,000 11/15/04 04/01/05 107,774 100
300 06 0166 / 5305 ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST 1.0 10,023 11/07/00 11/11/00 0 100
300 06 0193 / 5318 ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST 1.0 0 11/07/00 11/11/00 34,869 100

Totals per Residntl Strt Lighting/Lamps 10.0 677,474 563,713

Work Type: Strt Light Pole Painting Locations


300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE 3.52 05/28/08 06/20/08 880 06/06/07 06/10/08 739 100
300 04 0216 / 5114 ON E 47TH ST FROM S DREXEL BLVD TO S GREENWOOD AVE 19.0 05/01/06 11/01/06 4,109 05/17/06 06/22/06 4,109 100
300 04 0216 / 5114 ON E 55TH ST FROM S ELLIS AVE TO S WOODLAWN AVE 14.50 05/01/06 11/01/06 3,100 05/17/06 09/09/06 3,100 100
300 11 / 32193 ON S COTTAGE GROVE AVE FROM E PERSHING RD TO E 51ST ST 112.0 06/01/07 08/01/07 24,640 06/01/07 06/21/07 24,640 100
302 00 0076 / 5764 5200 S CORNELL AVE 5.0 06/04/98 06/04/98 0 06/04/98 06/04/98 85 100

Totals per Strt Light Pole Painting 154.02 32,729 32,673

Work Type: Strt Lighting Blocks


300 06 0134 / 5287 ON E 38TH PL FROM S VINCENNES AVE TO S LANGLEY AVE 1.0 08/01/99 09/30/99 16,333 08/01/99 09/01/99 6,158 100
300 06 0134 / 5287 ON E 38TH ST FROM S VINCENNES AVE TO S LANGLEY AVE 1.0 08/01/99 09/30/99 16,334 08/01/99 09/01/99 6,159 100
300 03 0004 / 4875 ON S LAKE PARK AVE FROM E 43RD ST TO E 46TH ST 3.0 08/30/04 09/08/04 12,500 08/30/04 09/13/04 6,721 100
300 06 0134 / 5287 600-699 E 37TH PL 1.0 08/01/99 09/30/99 16,333 08/01/99 09/01/99 6,158 100

Totals per Strt Lighting 6.0 61,500 25,196

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 449 E 35TH ST 1,730.0 03/01/04 12/01/04 8,996 07/31/06 09/11/06 18,839 100
300 06 0139 / 5289 4646 S DREXEL AVE 1,730.0 03/01/04 12/01/04 8,996 09/08/06 09/11/06 18,839 100

Totals per Traffic Signal Regrouping 3,460.0 17,992 37,678


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 57

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0099 / 5260 449 E 35TH ST 280.0 07/10/03 07/14/03 15,737 07/10/03 07/14/03 10,810 100
805 06 2147 / 8333 1405 E 47TH DR 46.0 06/04/93 06/04/93 0 06/04/93 06/04/93 34,500 100
805 06 2108 / 8294 1550 E 53RD ST 22.0 01/02/92 01/02/92 0 01/02/92 01/02/92 16,500 100
302 00 0070 / 5758 1600 E 53RD ST 0 10/24/97 11/01/97 17,176 100
302 00 0071 / 5759 1600 E 55TH ST 0 07/10/98 07/20/98 24,196 100
805 06 2164 / 8350 1538 E HYDE PARK BLVD 24.0 12/31/95 12/31/95 0 12/31/95 12/31/95 18,000 100
302 00 0070 / 5758 1600 E HYDE PARK BLVD 0 06/24/97 07/03/97 15,848 100
805 06 2116 / 8302 1600 E HYDE PARK BLVD 42.0 07/03/97 07/03/97 0 07/03/97 07/03/97 31,500 100
805 06 2403 / 8589 1045 E OAKWOOD BLVD 10.0 03/03/96 03/03/96 0 03/03/96 03/03/96 7,500 100
805 06 2404 / 8590 1057 E OAKWOOD BLVD 10.0 03/03/96 03/03/96 0 03/03/96 03/03/96 7,500 100
300 06 0099 / 5260 4646 S DREXEL AVE 130.0 07/24/03 07/25/03 7,306 07/24/03 07/25/03 4,082 100
805 06 2859 / 9045 405 W 31ST ST 26.0 02/26/90 02/26/90 0 02/26/90 02/26/90 19,500 100
805 06 2853 / 9039 401 W 33RD ST 32.0 02/12/89 02/12/89 0 02/12/89 02/12/89 24,000 100

Totals per Underpass Lighting 622.0 23,043 231,112


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 58

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S CORNELL AVE AND E 47TH ST 1.0 0 11/05/02 11/05/02 1,850 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S DR MARTIN LUTHER KING JR DR AND E 37TH ST .50 03/16/01 04/20/01 2,000 03/16/01 06/07/01 2,748 100
300 06 0197 / 5322 S LAKE PARK AVE AND E 55TH ST 1.50 6,000 04/08/02 04/08/02 0 100

Totals per Removal Temp Wiring - Signals 2.0 8,000 2,748

Work Type: Signals Intersections


300 06 0096 / 5258 449 E 35TH ST 83.0 07/07/03 07/13/03 0 07/03/06 10/11/06 13,124 100
300 06 0096 / 5258 4646 S DREXEL AVE 40.0 08/18/03 08/25/03 0 08/13/03 08/20/03 6,325 100

Totals per Signals 123.0 0 19,449

Work Type: TSM Install Locations


814 06 0092 / 16308 400 E 29TH ST 1.0 02/01/94 02/01/94 0 02/01/94 02/01/94 98,691 100
814 06 0090 / 16306 700 E 31ST DR 1.0 02/09/94 02/09/94 0 02/09/94 02/09/94 98,691 100
814 06 0094 / 16310 790 E 31ST DR 1.0 02/15/94 02/15/94 0 02/15/94 02/15/94 98,691 100
814 06 0095 / 16311 3099 S COTTAGE GROVE AVE 1.0 02/02/94 02/02/94 0 02/02/94 02/02/94 98,691 100
814 06 0243 / 16455 3099 S COTTAGE GROVE AVE 1.0 01/01/94 01/01/94 0 01/01/94 01/01/94 120,000 100
814 06 0101 / 16316 4300 S DREXEL BLVD 1.0 03/18/94 03/18/94 0 03/18/94 03/18/94 125,859 100
814 06 0165 / 16377 5500 S LAKE PARK AVE 1.0 08/01/96 02/07/97 0 08/01/96 02/07/97 200,000 100
814 06 0310 / 16522 3900 S VINCENNES AVE 1.0 01/10/89 01/10/89 0 01/10/89 01/10/89 85,266 100

Totals per TSM Install 8.0 0 925,889

Work Type: Traffic Equipment Painting Locations


300 09 / 33068 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE .32 05/28/08 06/20/08 64 04/01/08 12/01/08 40 100
300 11 / 32193 ON S COTTAGE GROVE AVE FROM E PERSHING RD TO E 51ST ST 56.0 06/01/07 08/01/07 20,400 06/01/07 08/01/07 20,400 100

Totals per Traffic Equipment Painting 56.32 20,464 20,440

Totals per Traffic 28,464 970,376

Totals per Construction Phase 8,909,868 6,508,379

Totals for Ward 04 8,916,868 6,573,106


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 59

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON E 67TH ST FROM S JEFFERY BLVD TO S STONY ISLAND AVE 4.0 04/01/08 08/30/08 260,000 04/15/08 0 90
300 06 0275 / 5383 ON E 72ND ST FROM S STONY ISLAND AVE TO S CORNELL AVE .0 10/01/04 06/30/05 0 10/01/04 06/30/05 2,675 100
210 10 0025 / 4565 E 71ST ST AND S DORCHESTER AVE .0 03/01/03 12/31/04 0 06/11/02 06/25/04 4,059 100
210 06 / 32040 E MARQUETTE DR AND S RICHARDS DR .0 09/02/06 10/27/06 6,000 09/02/06 10/27/06 0 100
300 06 0282 / 5390 S DREXEL AVE AND S SOUTH CHICAGO AVE 1.0 08/04/04 01/25/05 4,000 11/01/04 02/15/05 1,755 100
300 06 0292 / 5399 S DREXEL AVE AND S SOUTH CHICAGO AVE .0 01/20/05 12/21/05 0 01/20/05 12/21/05 0 0
281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 1532 E 76TH ST 1.0 06/06/05 07/19/05 2,000 05/13/05 07/19/05 0 100

Totals per Design/Engineering 6.0 272,000 8,489


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 60

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0005 / 5428 ON E 54TH ST FROM S COTTAGE GROVE AVE TO S DREXEL AVE 5.0 04/18/06 11/18/06 2,000 06/21/06 06/21/06 0 100
300 09 / 33071 ON E 61ST ST FROM S HARPER AVE TO S STONY ISLAND AVE 5.0 10/24/08 10/24/08 2,000 10/24/08 10/24/08 1,375 100
300 03 0005 / 4876 ON E 66TH PL FROM S STONY ISLAND AVE TO S BLACKSTONE AVE 9.0 06/18/04 06/21/04 3,500 06/11/04 06/15/04 1,742 100
302 00 0092 / 5774 ON E 67TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE 3.0 01/21/02 01/23/02 0 01/29/02 01/29/02 618 100
302 00 0092 / 5774 ON E 68TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE 3.0 01/21/02 01/23/02 0 01/29/02 01/29/02 618 100
300 03 0005 / 4876 ON E 68TH ST FROM S DORCHESTER AVE TO S STONY ISLAND AVE 10.0 06/01/05 06/10/05 4,000 05/06/05 05/19/05 1,978 100
300 03 0005 / 4876 ON E 68TH ST FROM S HARPER AVE TO S DORCHESTER AVE 15.0 06/01/05 06/10/05 6,000 05/06/05 05/19/05 2,967 100
300 06 0069 / 5233 ON E 68TH ST FROM S STONY ISLAND AVE TO S EAST END AVE 4.0 0 04/12/02 04/12/02 1,500 100
302 00 0092 / 5774 ON E 69TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE 3.0 01/21/02 01/23/02 0 01/29/02 01/29/02 618 100
300 03 0005 / 4876 ON E 69TH ST FROM S CREGIER AVE TO S JEFFERY BLVD 10.0 06/01/05 06/10/05 4,000 05/06/05 05/19/05 1,978 100
300 07 0005 / 5428 ON E 69TH ST FROM S DORCHESTER AVE TO S DANTE AVE 3.0 04/18/06 11/18/06 1,200 06/21/06 06/21/06 0 100
302 00 0092 / 5774 ON E 70TH PL FROM S PAXTON AVE TO S OGLESBY AVE 2.0 01/21/02 01/23/02 0 01/29/02 01/29/02 412 100
300 03 0005 / 4876 ON E 70TH PL FROM S PAXTON AVE TO S SOUTH SHORE DR 5.0 06/01/04 06/21/04 1,875 06/11/04 06/15/04 968 100
302 00 0092 / 5774 ON E 70TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE 3.0 01/21/02 01/23/02 0 01/29/02 01/29/02 618 100
300 03 0005 / 4876 ON E 70TH ST FROM S CRANDON AVE TO S SOUTH SHORE DR 6.0 06/18/04 06/21/04 2,250 06/11/04 06/15/04 1,161 100
300 03 0005 / 4876 ON E 70TH ST FROM S JEFFERY BLVD TO S SOUTH SHORE DR 10.0 06/01/05 06/10/05 4,000 05/06/05 05/19/05 1,978 100
300 06 0225 / 5340 ON E 70TH ST FROM S PAXTON AVE TO S CRANDON AVE 17.0 11/15/03 11/16/03 1,500 11/05/03 11/07/03 3,298 100
302 00 0092 / 5774 ON E 72ND ST FROM S JEFFERY BLVD TO S MERRILL AVE 8.0 05/09/03 05/09/03 3,200 05/06/03 05/06/03 3,000 100
300 06 0122 / 5275 ON E 73RD ST FROM S JEFFERY BLVD TO S MERRILL AVE 4.0 05/20/03 05/22/03 3,000 05/06/03 05/06/03 946 100
300 06 0225 / 5340 ON E 73RD ST FROM S UNIVERSITY AVE TO S BLACKSTONE AVE 17.0 11/15/03 11/17/03 6,375 11/05/03 11/07/03 3,298 100
300 03 0005 / 4876 ON S BENNETT AVE FROM E 72ND ST TO E 73RD ST 10.0 06/01/05 06/10/05 4,000 05/06/05 05/19/05 1,978 100
300 03 0005 / 4876 ON S BLACKSTONE AVE FROM E 67TH PL TO E 68TH ST 10.0 06/01/05 06/10/05 4,000 05/06/05 05/19/05 1,978 100
302 00 0092 / 5774 ON S CHAPPEL AVE FROM E 71ST ST TO E 67TH ST 20.0 01/21/02 01/23/02 0 01/28/02 01/28/02 4,120 100
302 00 0092 / 5774 ON S CHAPPEL AVE FROM E 71ST ST TO E 67TH ST 15.0 02/04/02 02/04/02 3,150 02/01/02 02/01/02 3,045 100
302 00 0092 / 5774 ON S CHAPPEL AVE FROM E 73RD ST TO E 75TH ST 10.0 05/09/03 05/09/03 4,000 05/06/03 05/06/03 3,750 100
302 00 0092 / 5774 ON S CLYDE AVE FROM E 71ST ST TO E 67TH ST 20.0 01/21/02 01/23/02 0 01/28/02 01/28/02 4,120 100
302 00 0092 / 5774 ON S CLYDE AVE FROM E 71ST ST TO E 67TH ST 16.0 02/04/02 02/04/02 3,360 02/01/02 02/01/02 3,248 100
300 05 0005 / 5120 ON S CORNELL AVE FROM E 53RD ST TO E 55TH ST 10.0 04/04/05 11/18/05 4,000 07/06/05 07/21/05 2,510 100
300 05 0005 / 5120 ON S CORNELL AVE FROM E 67TH ST TO E 69TH ST 10.0 04/04/05 11/18/05 4,000 07/06/05 07/21/05 2,510 100
300 09 / 33071 ON S CORNELL AVE FROM E 69TH ST TO E 71ST ST 6.0 05/13/08 05/16/08 2,400 05/13/08 05/16/08 1,534 100
300 03 0005 / 4876 ON S CORNELL AVE FROM E 71ST ST TO E 72ND ST 5.0 06/01/05 06/10/05 2,000 05/06/05 05/19/05 989 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 61

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 ON S CRANDON AVE FROM E 71ST ST TO E 67TH ST 20.0 01/21/02 01/23/02 0 01/28/02 01/28/02 4,120 100
302 00 0092 / 5774 ON S CRANDON AVE FROM E 71ST ST TO E 67TH ST 17.0 02/04/02 02/04/02 3,570 02/01/02 02/01/02 3,451 100
300 06 0069 / 5233 ON S CREGIER AVE FROM E 67TH ST TO E 69TH ST 11.0 11/01/03 11/03/03 4,368 03/21/03 03/21/03 2,408 100
302 00 0092 / 5774 ON S CREGIER AVE FROM E 67TH ST TO E 69TH ST 9.0 03/24/03 03/24/03 3,600 03/21/03 03/21/03 3,375 100
300 06 0225 / 5340 ON S DANTE AVE FROM E 69TH ST TO E 68TH ST 4.0 11/15/03 11/15/03 1,500 11/05/03 11/07/03 776 100
300 05 0005 / 5120 ON S DORCHESTER AVE FROM E 75TH ST TO E 76TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
300 05 0005 / 5120 ON S DREXEL AVE FROM E 53RD ST TO E 55TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
300 03 0005 / 4876 ON S EUCLID AVE FROM E 71ST ST TO E 74TH ST 15.0 06/01/05 06/10/05 6,000 05/06/05 05/19/05 2,967 100
300 03 0005 / 4876 ON S GREENWOOD AVE FROM E 71ST ST TO E 72ND ST 5.0 06/01/05 06/10/05 2,000 05/06/05 05/19/05 989 100
300 05 0005 / 5120 ON S GREENWOOD AVE FROM E 71ST ST TO E 72ND ST 5.0 04/04/05 11/18/05 2,200 07/06/05 07/21/05 1,255 100
300 03 0005 / 4876 ON S HARPER AVE FROM E 68TH ST TO E 71ST ST 15.0 06/01/05 06/10/05 6,000 05/06/05 05/19/05 2,967 100
300 05 0005 / 5120 ON S KENWOOD AVE FROM E 75TH ST TO E 76TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
300 05 0005 / 5120 ON S KENWOOD AVE FROM E MARQUETTE RD TO E 67TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
300 05 0005 / 5120 ON S KIMBARK AVE FROM E MARQUETTE RD TO E 67TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
302 00 0092 / 5774 ON S MERRILL AVE FROM E 71ST ST TO E 67TH ST 20.0 01/21/02 01/23/02 0 01/28/02 01/28/02 4,120 100
302 00 0092 / 5774 ON S MERRILL AVE FROM E 71ST ST TO E 67TH ST 16.0 02/04/02 02/04/02 3,360 02/01/02 02/01/02 3,248 100
300 05 0005 / 5120 ON S MERRILL AVE FROM E 72ND ST TO E 73RD ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
302 00 0092 / 5774 ON S MERRILL AVE FROM E 72ND ST TO E 73RD ST 4.0 05/09/03 05/09/03 1,600 05/06/03 05/06/03 1,500 100
300 05 0005 / 5120 ON S OGLESBY AVE FROM E 67TH ST TO E 69TH ST 10.0 04/04/05 11/18/05 4,000 07/06/05 07/21/05 2,510 100
300 07 0005 / 5428 ON S OGLESBY AVE FROM E 69TH ST TO E 70TH ST 4.0 04/18/06 11/18/06 1,600 06/21/06 06/21/06 0 100
300 03 0005 / 4876 ON S OGLESBY AVE FROM E 69TH ST TO E 72ND ST 9.0 06/18/04 06/21/04 3,375 06/11/04 06/15/04 1,742 100
302 00 0092 / 5774 ON S OGLESBY AVE FROM E 71ST ST TO E 67TH ST 20.0 01/21/02 01/23/02 0 01/30/02 01/30/02 4,120 100
302 00 0092 / 5774 ON S PAXTON AVE FROM E 71ST ST TO E 67TH ST 20.0 01/21/02 01/23/02 0 01/30/02 01/30/02 4,120 100
302 00 0092 / 5774 ON S PAXTON AVE FROM E 71ST ST TO E 67TH ST 17.0 02/04/02 02/04/02 3,570 02/01/02 02/01/02 3,451 100
300 06 0069 / 5233 ON S RIDGELAND AVE FROM E 67TH ST TO E 69TH ST 12.0 11/01/03 11/03/03 4,765 03/21/03 03/21/03 2,627 100
302 00 0092 / 5774 ON S RIDGELAND AVE FROM E 67TH ST TO E 69TH ST 10.0 03/24/03 03/24/03 4,000 03/21/03 03/21/03 3,750 100
300 05 0005 / 5120 ON S WOODLAWN AVE FROM E 71ST ST TO E 73RD ST 10.0 04/04/05 11/18/05 4,000 07/06/05 07/21/05 2,510 100
300 05 0005 / 5120 S KIMBARK AVE AND E 75TH ST 5.0 04/04/05 11/18/05 2,000 07/06/05 07/21/05 1,255 100
302 00 0092 / 5774 1600 E 68TH ST 4.0 04/15/02 04/15/02 840 04/12/02 04/12/02 840 100

Totals per 250 Watt Changeout 566.0 150,158 124,486


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 62

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 06 0225 / 5340 ON E 67TH PL FROM S BLACKSTONE AVE TO S STONY ISLAND AVE 16.0 11/15/03 11/16/03 6,400 11/05/03 11/07/03 3,104 100
300 09 / 33071 ON S SHORE DR FROM E 53RD ST TO E 56TH ST 14.0 06/23/08 06/27/08 5,600 09/04/08 09/12/08 4,410 100
300 09 / 33071 ON S STONY ISLAND AVE FROM E 61ST ST TO E 62ND ST 7.0 10/24/08 10/27/08 2,800 10/24/08 10/27/08 1,875 100

Totals per 400 Watt Changeout 37.0 14,800 9,389

Work Type: Alley Lighting/Lamps Installations


300 06 0096 / 5258 1900 E 71ST ST 1,611.0 03/01/03 09/01/03 42,079 03/01/06 09/01/06 48,675 0
805 06 0991 / 7177 1437 E 72ND PL 1.0 06/09/95 06/09/95 0 06/09/95 06/09/95 300 100
805 06 1858 / 8044 6907 S CRANDON AVE 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 300 100
805 06 1839 / 8025 6927 S CRANDON AVE 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 300 100
805 06 1820 / 8006 6949 S CRANDON AVE 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 300 100
805 06 1693 / 7879 6957 S CRANDON AVE 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 600 100
805 06 0415 / 6601 5216 S DREXEL AVE 1.0 05/23/95 05/23/95 0 05/23/95 05/23/95 300 100
805 06 2085 / 8271 5228 S DREXEL AVE 1.0 05/23/95 05/23/95 0 05/23/95 05/23/95 300 100
805 06 1994 / 8180 5232 S DREXEL AVE 1.0 05/23/95 05/23/95 0 05/23/95 05/23/95 300 100
805 06 1865 / 8051 5240 S DREXEL AVE 1.0 05/23/95 05/23/95 0 05/23/95 05/23/95 300 100
805 06 0552 / 6738 7251 S EUCLID AVE 1.0 05/09/95 05/09/95 0 05/09/95 05/09/95 300 100
805 06 2066 / 8252 5605 S KIMBARK AVE 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 2068 / 8254 5631 S KIMBARK AVE 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 2069 / 8255 5647 S KIMBARK AVE 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 2070 / 8256 5700 S KIMBARK AVE 1.0 04/12/96 04/12/96 0 04/12/96 04/12/96 300 100
805 06 1835 / 8021 5317 S MARYLAND AVE 1.0 01/11/95 01/11/95 0 01/11/95 01/11/95 300 100
805 06 1742 / 7928 7500 S MERRILL AVE 1.0 05/16/97 05/16/97 0 05/16/97 05/16/97 300 100
805 06 0467 / 6653 7010 S WOODLAWN AVE 1.0 10/05/95 10/05/95 0 10/05/95 10/05/95 300 100
805 06 1002 / 7188 1140 W 75TH ST 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100

Totals per Alley Lighting/Lamps 1,629.0 42,079 54,375

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 1900 E 71ST ST 2,175.0 06/01/07 12/31/07 64,032 11/06/07 11/14/07 62,096 100

Totals per Lighting/Electrical 1,248,972 1,451,027


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 63

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Strt Lighting/Lamps Installations
300 06 0053 / 5228 1900 E 71ST ST 2,080.0 0 07/18/02 07/21/02 37,873 100

Work Type: Flood Light Install Fixtures


300 03 0005 / 4876 2132 E 72ND ST 4.0 09/01/04 09/04/04 2,000 09/01/04 09/01/04 1,600 100
300 03 0005 / 4876 6900 S DORCHESTER AVE 1.0 09/01/01 09/04/04 500 09/01/04 09/01/04 400 100
300 03 0005 / 4876 7401 S MERRILL AVE 1.0 09/01/04 09/04/04 500 09/01/04 09/01/04 400 100
300 03 0005 / 4876 7000 S OGLESBY AVE 1.0 09/01/04 09/04/04 500 09/01/04 09/01/04 400 100
300 03 0005 / 4876 7100 S OGLESBY AVE 1.0 09/01/04 09/04/04 500 09/01/04 09/01/04 400 100
300 06 0071 / 5234 7059 S SOUTH SHORE DR 01/01/00 12/30/00 0 09/11/00 09/13/00 6,750 100
300 09 / 33071 6230 S STONY ISLAND AVE 1.0 10/27/08 10/27/08 500 10/27/08 10/27/08 335 100
300 09 / 33071 6240 S STONY ISLAND AVE 1.0 10/27/08 10/27/08 500 10/27/08 10/27/08 335 100

Totals per Flood Light Install 10.0 5,000 10,620

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 S DREXEL AVE AND S SOUTH CHICAGO AVE 1.0 30,570 05/23/05 07/06/05 30,133 100
281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 1532 E 76TH ST .0 03/01/05 12/31/05 50,000 03/01/05 09/07/05 34,431 100

Totals per Lighting Imprvmnts 1.0 80,570 64,564

Work Type: Lighting Imprvmnts Projects


300 06 0282 / 5390 S DREXEL AVE AND S SOUTH CHICAGO AVE .0 10/06/04 10/31/04 0 06/01/05 06/28/07 30,132 100

Work Type: Loop Lighting Blocks


281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33071 ON S SHORE DR FROM E 53RD ST TO E 56TH ST 32.0 08/28/08 09/12/08 43,800 09/04/08 09/12/08 29,066 100

Work Type: Ornamental Lighting Blocks


281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 64

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: POD Camera Pole Poles
281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 1900 E 71ST ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32277 ON E 67TH ST FROM S JEFFERY BLVD TO S STONY ISLAND AVE .0 05/04/08 12/31/08 0 0 0
300 09 / 33071 ON E 70TH PL FROM S PAXTON AVE TO S SOUTH SHORE DR 2.0 135,000 0 0
300 11 / 32194 ON E 73RD ST FROM S DORCHESTER AVE TO S STONY ISLAND AVE 2.0 04/01/08 06/02/08 125,000 11/02/07 03/14/08 86,054 100

waiting for restoration Note Last Updated on 07-FEB-08


300 07 0004 / 5427 ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST .50 07/17/06 09/08/06 21,250 09/01/06 11/27/06 0 100
300 07 0005 / 5428 ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST .50 04/01/07 06/01/07 21,250 09/01/06 11/27/06 0 100
300 09 / 33070 ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST .50 32,500 04/01/08 12/01/08 0 0
300 09 / 33071 ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST .50 32,500 0 0
300 09 / 33071 ON S EVERETT AVE FROM E 55TH ST TO E 56TH ST 1.0 65,000 0 0

Totals per Residntl Staggered Lighting 7.0 432,500 86,054

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON S DOBSON AVE FROM E 71ST ST TO E 73RD ST 2.0 06/20/04 08/20/04 155,485 05/19/04 09/16/04 139,095 100
300 06 0235 / 5349 ON S WOODLAWN AVE FROM E 71ST ST TO E 69TH ST 2.0 05/02/03 07/02/03 153,524 05/02/03 06/06/03 153,912 100

Totals per Residntl Strt Lighting/Lamps 4.0 309,009 293,007

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 65

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 04 0216 / 5114 ON E 55TH ST FROM S ELLIS AVE TO S WOODLAWN AVE 14.50 05/01/06 11/01/06 3,100 05/17/06 09/09/06 3,100 100
300 06 0108 / 5263 ON E 63RD ST FROM S STATE ST TO S STONY ISLAND AVE 70.0 05/11/03 05/31/03 17,000 07/01/03 07/28/03 16,870 100
300 06 0108 / 5263 ON S COTTAGE GROVE AVE FROM E 60TH ST TO E 68TH ST 79.0 05/20/03 06/03/03 18,500 07/01/03 07/28/03 18,480 100
300 09 / 33071 ON S SHORE DR FROM E 53RD ST TO E 56TH ST 14.0 06/23/08 06/27/08 4,200 06/23/08 06/27/08 2,800 100

Totals per Strt Light Pole Painting 177.50 42,800 41,250

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 1008-1010 E 59TH ST .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Lighting Blocks


300 06 0275 / 5383 ON E 72ND ST FROM S STONY ISLAND AVE TO S CORNELL AVE .50 04/21/06 07/18/06 40,000 04/21/06 07/18/06 37,456 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 1900 E 71ST ST 2,183.0 03/01/04 12/01/04 11,352 07/31/06 08/25/06 23,773 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 66

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2634 / 8820 1601 E 55TH ST 22.0 01/23/92 01/23/92 0 01/23/92 01/23/92 16,500 100
302 00 0071 / 5759 1540 E 56TH ST 0 08/01/98 08/06/98 20,171 100
805 06 2527 / 8713 1538 E 57TH BLVD 22.0 01/23/92 01/23/92 0 01/23/92 01/23/92 16,500 100
302 00 0071 / 5759 1530 E 57TH ST 0 08/09/98 08/12/98 21,965 100
302 00 0070 / 5758 1500 E 59TH ST 0 07/15/97 07/22/97 17,507 100
805 06 2157 / 8343 1500 E 59TH ST 38.0 07/22/97 07/22/97 0 07/22/97 07/22/97 28,500 100
805 06 2199 / 8385 1500 E 59TH ST 30.0 01/23/92 01/23/92 0 01/23/92 01/23/92 22,500 100
302 00 0070 / 5758 1500 E 60TH ST 0 08/20/97 08/27/97 14,520 100
805 06 2128 / 8314 1500 E 60TH ST 20.0 08/27/97 08/27/97 0 08/27/97 08/27/97 15,000 100
805 06 2833 / 9019 1405 E 67TH ST 20.0 04/13/93 04/13/93 0 04/13/93 04/13/93 15,000 100
805 06 2622 / 8808 1305 E 70TH ST 34.0 01/30/95 01/30/95 0 01/30/95 01/30/95 25,500 100
805 06 2418 / 8604 1285 E 71ST ST 26.0 04/20/94 04/20/94 0 04/20/94 04/20/94 19,500 100
300 06 0099 / 5260 1900 E 71ST ST 229.0 07/28/03 07/30/03 12,872 07/28/03 07/30/03 7,232 100
805 06 2477 / 8663 1205 E 72ND ST 16.0 01/11/94 01/11/94 0 01/11/94 01/11/94 12,000 100
805 06 2446 / 8632 1205 E 73RD ST 22.0 12/27/93 12/27/93 0 12/27/93 12/27/93 16,500 100
805 06 2345 / 8531 1199 E 75TH ST 8.0 05/16/96 05/16/96 0 05/16/96 05/16/96 6,000 100
805 06 2342 / 8528 1200 E 75TH ST 27.0 03/26/96 03/26/96 0 03/26/96 03/26/96 20,250 100
302 00 0070 / 5758 1230 E 76TH ST 0 02/03/97 02/10/97 16,940 100
302 00 0070 / 5758 1240 E 76TH ST 0 02/03/97 02/10/97 10,400 100
302 00 0070 / 5758 1250 E 76TH ST 0 01/17/97 01/23/97 10,100 100
805 06 2180 / 8366 1436 E MIDWAY PLAISANCE 12.0 12/31/95 12/31/95 0 12/31/95 12/31/95 9,000 100
302 00 0070 / 5758 1500 E MIDWAY PLAISANCE 0 07/21/97 07/28/97 6,460 100
805 06 2121 / 8307 1500 E MIDWAY PLAISANCE 20.0 07/28/97 07/28/97 0 07/28/97 07/28/97 15,000 100
805 06 2184 / 8370 1500 E MIDWAY PLAISANCE 12.0 12/31/95 12/31/95 0 12/31/95 12/31/95 9,000 100
302 00 0070 / 5758 1510 E MIDWAY PLAISANCE 0 07/31/97 08/11/97 15,626 100
805 06 2122 / 8308 1510 E MIDWAY PLAISANCE 28.0 08/11/97 08/11/97 0 08/11/97 08/11/97 21,000 100
805 06 2610 / 8796 7605 S AVALON AVE 26.0 12/31/91 12/31/91 0 12/31/91 12/31/91 19,500 100
805 06 2464 / 8650 7105 S COTTAGE GROVE AVE 22.0 01/24/96 01/24/96 0 01/24/96 01/24/96 16,500 100
805 06 2396 / 8582 7189 S COTTAGE GROVE AVE 18.0 01/24/96 01/24/96 0 01/24/96 01/24/96 13,500 100
302 00 0070 / 5758 7720 S DANTE AVE 0 01/22/97 01/29/97 7,503 100
302 00 0070 / 5758 7730 S DANTE AVE 0 01/22/97 01/28/97 1,164 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 67

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0070 / 5758 7740 S DANTE AVE 0 01/28/97 02/04/97 4,506 100
805 06 2114 / 8300 7340 S GREENWOOD AVE 10.0 09/01/97 09/01/97 0 09/01/97 09/01/97 7,500 100
302 00 0070 / 5758 7420 S GREENWOOD AVE 0 10/13/97 10/20/97 4,290 100
805 06 2115 / 8301 7420 S GREENWOOD AVE 9.0 10/20/97 10/20/97 0 10/20/97 10/20/97 6,750 100
302 00 0070 / 5758 7430 S GREENWOOD AVE 0 09/10/97 09/17/97 5,818 100
302 00 0070 / 5758 7440 S GREENWOOD AVE 0 09/07/97 09/12/97 15,184 100
805 06 2113 / 8299 7440 S GREENWOOD AVE 16.0 09/12/97 09/12/97 0 09/12/97 09/12/97 12,000 100
805 06 2232 / 8418 7500 S SOUTH CHICAGO AVE 32.0 12/09/96 12/09/96 0 12/09/96 12/09/96 24,000 100

Totals per Underpass Lighting 719.0 12,872 546,886


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 68

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Left Turn Arrow Locations
300 05 0005 / 5120 E 71ST ST AND S COTTAGE GROVE AVE .50 10/15/06 12/15/06 30,000 0
210 06 0171 / 4420 E MARQUETTE RD AND S STONY ISLAND AVE .0 03/01/07 12/31/07 0 0 0
210 06 0072 / 4336 6700 S STONY ISLAND AVE 1.0 01/08/01 02/08/01 15,000 01/10/01 01/17/01 10,986 100

Totals per Left Turn Arrow 1.50 45,000 10,986

Work Type: New Signal Locations


210 06 / 32040 E MARQUETTE DR AND S RICHARDS DR .0 01/28/07 07/28/07 67,000 03/13/07 05/07/07 56,011 100
210 06 0171 / 4420 E MARQUETTE RD AND S STONY ISLAND AVE .0 03/01/07 12/31/07 0 0 0

Totals per New Signal .0 67,000 56,011

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S LAKE PARK AVE AND E 55TH ST 1.50 6,000 04/08/02 04/08/02 0 100

Work Type: Signals Intersections


300 06 0096 / 5258 1900 E 71ST ST 59.0 07/15/03 07/18/03 0 07/15/06 07/20/06 9,329 100

Work Type: TSM Install Locations


814 06 0137 / 16351 7500 S DORCHESTER AVE 1.0 04/16/93 04/16/93 0 04/16/93 04/16/93 72,118 100
271 00 0040 / 4789 7100 S JEFFERY AVE 1.0 0 12/02/98 01/25/99 165,315
814 06 0104 / 16319 7130 S JEFFERY BLVD 1.0 05/14/90 05/14/90 0 05/14/90 05/14/90 88,894 100
814 06 0133 / 16347 7300 S JEFFERY BLVD 1.0 02/10/94 02/10/94 0 02/10/94 02/10/94 109,097 100
814 06 0061 / 16277 5900 S STONY ISLAND AVE 1.0 02/23/96 02/23/96 0 02/23/96 02/23/96 318,966 100

Totals per TSM Install 5.0 0 754,390

Work Type: Traffic Equipment Painting Locations


300 09 / 33071 ON S SHORE DR FROM E 53RD ST TO E 56TH ST 2.0 06/23/08 06/27/08 400 06/23/08 06/27/08 239 100

Totals per Traffic 118,400 830,955

Totals per Construction Phase 1,367,372 2,281,982

Totals for Ward 05 1,639,372 2,290,471


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 69

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON E 90TH ST FROM S ST LAWRENCE AVE TO S COTTAGE GROVE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,266 100
210 06 0243 / 4480 E 83RD ST AND S COTTAGE GROVE AVE .0 10/15/06 11/15/06 500 10/15/06 06/07/06 1,500 100
210 06 0243 / 4480 E 95TH ST AND S MICHIGAN AVE .0 12/27/06 01/26/07 500 12/27/06 01/26/07 1,912 100
300 06 0292 / 5399 7636 S COTTAGE GROVE AVE 1.0 06/06/05 07/11/05 1,500 06/06/05 07/11/05 0 100

Totals per Design/Engineering 1.0 2,500 5,678


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 70

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 ON E 74TH ST FROM S DR MARTIN LUTHER KING JR DR TO S STATE ST 21.0 09/29/01 09/29/01 0 09/26/01 09/26/01 4,322 100
302 00 0092 / 5774 ON S CHAMPLAIN AVE FROM E 71ST ST TO E 75TH ST 17.0 0 09/27/01 09/27/01 3,499 100
302 00 0092 / 5774 ON S ST LAWRENCE AVE FROM E 71ST ST TO E 75TH ST 17.0 0 09/26/01 09/26/01 3,499 100
300 06 0069 / 5233 8200 S COTTAGE GROVE AVE 4.0 02/16/03 02/16/03 1,600 02/13/03 02/13/03 1,000 100
300 06 / 32495 7600-7800 S INDIANA AVE 11.0 08/01/07 08/15/07 2,200 08/18/07 08/18/07 2,200 100
300 06 / 32495 7600-7800 S MICHIGAN AVE 11.0 04/01/07 05/15/07 2,200 08/18/07 08/18/07 2,200 100
302 00 0092 / 5774 8201 S WABASH AVE 1.0 02/03/01 02/03/01 203 01/31/01 01/31/01 210 100
302 00 0092 / 5774 8205 S WABASH AVE 1.0 02/03/01 02/03/01 203 01/31/01 01/31/01 210 100

Totals per 250 Watt Changeout 83.0 6,406 17,140

Work Type: 400 Watt Changeout Fixtures


300 05 0006 / 5121 ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE 46.0 04/04/05 11/18/05 18,400 08/10/05 08/20/05 16,100 100
GROVE AVE
300 09 / 33072 ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE 63.0 05/12/08 07/11/08 25,200 05/12/08 05/23/08 19,845 100
300 06 0122 / 5275 ON S COTTAGE GROVE AVE FROM E 86TH ST TO E 87TH ST 6.0 05/09/03 05/09/03 2,400 05/06/03 05/06/03 2,250 100
300 05 0006 / 5121 ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST 60.0 04/04/05 11/18/05 24,000 08/10/05 08/20/05 21,000 100
300 07 0006 / 5429 ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST 192.0 10/10/06 11/10/06 76,800 10/10/06 11/01/06 0 100
300 11 / 32195 8700-9900 S DR MARTIN LUTHER KING JR DR 105.0 12/01/07 12/31/07 43,000 09/26/07 02/14/08 26,031 100

Totals per 400 Watt Changeout 472.0 189,800 85,226

Totals per Lighting/Electrical 1,547,479 1,333,025


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 71

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0983 / 7169 612 E 71ST ST 1.0 03/28/95 03/28/95 0 03/28/95 03/28/95 300 100
300 06 0096 / 5258 406 E 75TH ST 1,870.0 03/01/03 09/01/03 48,844 03/01/06 09/01/06 56,500 0
302 00 0092 / 5774 406 E 75TH ST 26.0 0 02/27/01 01/30/02 6,127 100
805 06 1011 / 7197 705 E 75TH ST 1.0 03/07/95 03/07/95 0 03/07/95 03/07/95 300 100
805 06 0866 / 7052 25 E 79TH ST 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
302 00 0092 / 5774 125 E 87TH ST 1.0 0 11/06/01 11/06/01 236 100
805 06 0756 / 6942 319 E 91ST ST 1.0 03/22/95 03/22/95 0 03/22/95 03/22/95 300 100
805 06 0757 / 6943 319 E 91ST ST 1.0 04/12/95 04/12/95 0 04/12/95 04/12/95 300 100
805 06 0758 / 6944 327 E 91ST ST 1.0 09/20/96 09/20/96 0 09/20/96 09/20/96 300 100
302 00 0092 / 5774 7536 S CALUMET AVE 1.0 0 03/02/01 03/02/01 236 100
805 06 0806 / 6992 8520 S CALUMET AVE 1.0 03/22/95 03/22/95 0 03/22/95 03/22/95 300 100
805 06 0808 / 6994 8520 S CALUMET AVE 1.0 04/12/95 04/12/95 0 04/12/95 04/12/95 300 100
805 06 0625 / 6811 7516 S EVANS AVE 1.0 03/07/95 03/07/95 0 03/07/95 03/07/95 300 100
805 06 0606 / 6792 7522 S EVANS AVE 1.0 03/07/95 03/07/95 0 03/07/95 03/07/95 300 100
805 06 1748 / 7934 7529 S EVANS AVE 1.0 05/21/97 05/21/97 0 05/21/97 05/21/97 300 100
805 06 1099 / 7285 6933 S GREEN ST 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 1746 / 7932 7445 S INDIANA AVE 1.0 05/21/97 05/21/97 0 05/21/97 05/21/97 300 100
805 06 1527 / 7713 7851 S INDIANA AVE 1.0 11/06/97 11/06/97 0 11/06/97 11/06/97 300 100
805 06 1625 / 7811 9416 S MICHIGAN AVE 1.0 09/12/97 09/12/97 0 09/12/97 09/12/97 300 100
805 06 0612 / 6798 6710 S PARNELL AVE 1.0 10/27/95 10/27/95 0 10/27/95 10/27/95 300 100
805 06 0613 / 6799 6740 S PARNELL AVE 1.0 10/27/95 10/27/95 0 10/27/95 10/27/95 300 100
805 06 0614 / 6800 6748 S PARNELL AVE 1.0 10/27/95 10/27/95 0 10/27/95 10/27/95 300 100
805 06 1684 / 7870 7030 S PERRY AVE 1.0 06/25/97 06/25/97 0 06/25/97 06/25/97 300 100
805 06 0554 / 6740 7042 S PERRY AVE 1.0 12/04/95 12/04/95 0 12/04/95 12/04/95 300 100
805 06 0551 / 6737 7102 S PRAIRIE AVE 1.0 04/12/95 04/12/95 0 04/12/95 04/12/95 300 100
805 06 0559 / 6745 7102 S PRAIRIE AVE 1.0 03/22/95 03/22/95 0 03/22/95 03/22/95 300 100
302 00 0092 / 5774 7158 S STATE ST 1.0 0 04/04/01 04/04/01 236 100
805 06 1794 / 7980 8237 S WABASH AVE 1.0 03/28/97 03/28/97 0 03/28/97 03/28/97 300 100

Totals per Alley Lighting/Lamps 1,922.0 48,844 70,235


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 72

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0238 / 5352 406 E 75TH ST 2,105.0 06/01/07 12/31/07 61,971 12/03/07 01/28/08 60,097 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 406 E 75TH ST 2,010.0 0 09/01/02 09/08/02 36,598 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 331 E 71ST ST 4.0 0 12/06/99 12/06/99 1,405 100

Work Type: Lighting Imprvmnts Installations


300 06 0256 / 5366 ON W 71ST ST FROM S PRINCETON AVE TO S WENTWORTH AVE 11.0 08/01/04 12/31/07 17,700 07/17/06 17,700 70

Traffic corner being redisgned; 08/22/07 Note Last Updated on 22-AUG-07


300 06 0292 / 5399 7636 S COTTAGE GROVE AVE .0 09/30/05 10/30/05 14,306 09/29/05 11/29/05 10,993 100

Totals per Lighting Imprvmnts 11.0 32,006 28,693

Work Type: Ornamental - Piggyback Lighting Fixtures


300 05 0006 / 5121 ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE 34.0 04/04/05 11/18/05 45,900 08/10/05 01/19/06 36,226 100
GROVE AVE
300 09 / 33072 ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE 56.0 06/30/08 07/31/08 75,600 08/11/08 09/02/08 56,016 100

MATERIALS ORDERED Note Last Updated on 28-JUL-08


300 05 0006 / 5121 ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST 52.0 04/04/05 11/18/05 70,200 08/10/05 01/23/06 60,397 100
300 07 0006 / 5429 ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST 159.0 10/10/06 11/10/06 214,650 10/10/06 12/17/06 0 100
300 11 / 32195 8700-9900 S DR MARTIN LUTHER KING JR DR 93.0 12/01/07 12/31/07 125,500 09/26/07 02/14/08 88,143 100

Totals per Ornamental - Piggyback Lighting 394.0 531,850 240,782

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 406 E 75TH ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0308 / 5414 ON E 90TH ST FROM S ST LAWRENCE AVE TO S COTTAGE GROVE AVE 2.0 03/16/06 12/31/06 165,753 06/05/06 08/07/06 115,994 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 73

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0267 / 5375 ON S FOREST AVE FROM E 95TH ST TO E 96TH ST 2.0 10/01/04 12/30/04 154,373 09/17/04 01/07/05 151,823 100
300 06 0235 / 5349 ON S LANGLEY AVE FROM E 81ST ST TO E 79TH ST 2.0 07/25/03 09/25/03 169,794 07/22/03 10/20/03 178,233 100

Totals per Residntl Strt Lighting/Lamps 4.0 324,167 330,056

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 7100 S STATE ST 7.0 0 04/06/01 04/06/01 2,647 100

Work Type: Strt Light Pole Painting Locations


300 05 0006 / 5121 ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE 34.0 04/04/05 11/18/05 8,500 08/10/05 08/20/05 7,354 100
GROVE AVE
300 09 / 33072 ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE 63.0 05/12/08 07/11/08 18,900 05/02/08 05/12/08 12,600 100
300 04 0216 / 5114 ON E 95TH ST FROM S MICHIGAN AVE TO S STATE ST 14.0 05/01/06 11/01/06 3,028 05/17/06 06/04/06 3,028 100
300 05 0006 / 5121 ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST 52.0 04/04/05 11/18/05 13,000 08/10/05 08/20/05 9,517 100
300 07 0006 / 5429 ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST 172.0 07/17/06 09/30/06 43,000 07/01/06 07/24/06 43,000 100
302 00 0076 / 5764 ON W 69TH ST FROM S HALSTED ST TO S ASHLAND AVE 2.46 06/27/98 06/30/98 0 06/27/98 06/30/98 42 100
300 11 / 32195 8700-9900 S DR MARTIN LUTHER KING JR DR 136.0 07/10/07 12/31/07 29,550 07/10/07 08/05/07 29,550 100
300 06 / 32495 7600-7800 S INDIANA AVE 11.0 04/01/07 05/15/07 1,200 03/30/07 04/03/07 1,200 100
300 06 / 32495 7600-7800 S MICHIGAN AVE 11.0 04/01/07 05/15/07 1,200 03/29/07 04/03/07 1,200 100

Totals per Strt Light Pole Painting 495.46 118,378 107,491

Work Type: Strt Lighting Blocks


300 06 0204 / 5327 ON E 74TH ST FROM S DR MARTIN LUTHER KING JR DR TO S STATE ST 18.0 10/02/01 10/02/01 3,780 09/27/01 09/27/01 3,780 100
300 06 0204 / 5327 ON S CHAMPLAIN AVE FROM E 71ST ST TO E 74TH ST 17.0 10/03/01 10/03/01 3,570 09/26/01 09/26/01 3,570 100
300 06 0204 / 5327 ON S ST LAWRENCE AVE FROM E 71ST ST TO E 74TH ST 17.0 10/06/01 10/06/01 3,570 09/27/01 09/27/01 3,520 100
300 06 0204 / 5327 7300 S MICHIGAN AVE 4.0 10/02/01 10/02/01 840 09/29/01 09/29/01 840 100

Totals per Strt Lighting 56.0 11,760 11,710

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 406 E 75TH ST 2,918.0 03/01/04 12/01/04 15,174 07/31/06 08/17/06 31,777 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 74

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2341 / 8527 720 E 71ST ST 20.0 03/22/96 03/22/96 0 03/22/96 03/22/96 15,000 100
805 06 2233 / 8419 798 E 71ST ST 17.0 03/22/96 03/22/96 0 03/22/96 03/22/96 12,750 100
300 06 0099 / 5260 406 E 75TH ST 736.0 07/31/03 08/11/03 41,370 07/31/03 08/07/03 28,594 100
805 06 2266 / 8452 9101 S DR MARTIN LUTHER KING JR DR 34.0 08/30/96 08/30/96 0 08/30/96 08/30/96 25,500 100
805 06 2430 / 8616 9001 S INDIANA AVE 22.0 02/25/94 02/25/94 0 02/25/94 02/25/94 16,500 100
805 06 2431 / 8617 6895 S KEEFE AVE 17.0 01/08/96 01/08/96 0 01/08/96 01/08/96 12,750 100
805 06 2434 / 8620 6895 S KEEFE AVE 13.0 01/08/96 01/08/96 0 01/08/96 01/08/96 9,750 100
805 06 2432 / 8618 6905 S ST LAWRENCE AVE 14.0 04/14/94 04/14/94 0 04/14/94 04/14/94 10,500 100
805 06 2433 / 8619 6906 S ST LAWRENCE AVE 22.0 04/14/94 04/14/94 0 04/14/94 04/14/94 16,500 100
805 06 2240 / 8426 205 W 66TH ST 8.0 04/29/93 04/29/93 0 04/29/93 04/29/93 6,000 100
805 06 2602 / 8788 395 W 71ST ST 12.0 02/14/95 02/14/95 0 02/14/95 02/14/95 9,000 100
302 00 0070 / 5758 600 W 71ST ST 0 07/15/97 07/22/97 6,330 100
805 06 2322 / 8508 726 W 83RD ST 18.0 03/12/93 03/12/93 0 03/12/93 03/12/93 13,500 100
805 06 2947 / 9133 331 W 88TH ST 6.0 12/21/93 12/21/93 0 12/21/93 12/21/93 4,500 100
805 06 2343 / 8529 245 W MARQUETTE RD 8.0 05/04/93 05/04/93 0 05/04/93 05/04/93 6,000 100

Totals per Underpass Lighting 947.0 41,370 193,174


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 75

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 S COTTAGE GROVE AVE AND E 85TH ST .50 04/24/05 04/24/05 5,282 04/19/05 04/19/05 2,910 100
210 06 0130 / 4389 S COTTAGE GROVE AVE AND E 86TH ST .50 0 10/04/02 10/04/02 925 100
210 06 0130 / 4389 S DR MARTIN LUTHER KING JR DR AND E 75TH ST 1.0 0 09/27/01 09/27/01 8,539 100
210 06 0130 / 4389 S INDIANA AVE AND E 69TH ST .50 0 05/21/02 05/21/02 3,662 100
210 06 0130 / 4389 S SOUTH CHICAGO AVE AND S KEEFE AVE .50 0 04/30/02 04/30/02 925 100
210 06 / 32276 W 75TH ST AND S STATE ST .0 04/01/07 02/28/08 16,768 05/01/08 05/31/08 13,106 100

Totals per LED Signal Head Install 3.0 22,050 30,067

Work Type: Left Turn Arrow Locations


300 05 0005 / 5120 E 71ST ST AND S COTTAGE GROVE AVE .50 10/15/06 12/15/06 30,000 0
300 06 / 32754 E 87TH ST AND S DR MARTIN LUTHER KING JR DR 1.0 11/01/08 01/31/09 47,000 0 0

Totals per Left Turn Arrow 1.50 77,000 0

Work Type: New Signal Locations


210 06 0164 / 4415 E 86TH ST AND S COTTAGE GROVE AVE .50 08/15/02 10/01/02 86,635 08/15/02 10/09/02 78,583 100

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 E 83RD ST AND S COTTAGE GROVE AVE .10 04/01/06 05/08/07 12,000 04/01/06 01/11/07 5,773 100
210 06 0243 / 4480 E 95TH ST AND S MICHIGAN AVE .0 03/15/06 05/08/07 12,000 01/15/07 02/15/07 5,661 100

Totals per Pedestrian Countdown Signal Install .10 24,000 11,434

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S ST LAWRENCE AVE AND E 75TH ST 1.0 4,000 05/02/01 05/21/01 8,428 100

Work Type: Signals Intersections


300 06 0096 / 5258 406 E 75TH ST 52.0 07/21/03 07/25/03 0 07/20/06 10/02/06 8,222 100

Totals per Traffic 426,327 1,342,161


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 76

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0163 / 4414 E 87TH ST AND S COTTAGE GROVE AVE .50 10/01/02 10/15/02 31,843 10/08/02 12/16/02 30,190 100
814 06 0176 / 16388 8100 S COTTAGE GROVE AVE 1.0 07/09/93 07/09/93 0 07/09/93 07/09/93 115,000 100
814 06 0174 / 16386 8200 S COTTAGE GROVE AVE 1.0 07/09/93 07/09/93 0 07/09/93 07/09/93 115,000 100
814 06 0175 / 16387 8300 S COTTAGE GROVE AVE 1.0 07/09/93 07/09/93 0 07/09/93 07/09/93 115,000 100
814 06 0311 / 16523 7100 S DR MARTIN LUTHER KING JR DR 1.0 01/02/89 01/02/89 0 01/02/89 01/02/89 84,162 100
814 06 0206 / 16418 8700 S DR MARTIN LUTHER KING JR DR 1.0 03/15/94 03/15/94 0 03/15/94 03/15/94 120,000 100
814 06 0062 / 16278 9700 S DR MARTIN LUTHER KING JR DR 1.0 06/07/96 06/07/96 0 06/07/96 06/07/96 108,744 100
210 06 0068 / 4332 9932 S DR MARTIN LUTHER KING JR DR 1.0 06/01/99 12/01/99 157,500 07/20/99 01/20/00 69,876 100
814 06 0208 / 16420 8700 S INDIANA AVE 1.0 03/15/94 03/15/94 0 03/15/94 03/15/94 120,000 100
814 06 0130 / 16344 7100 S LAFAYETTE AVE 1.0 04/01/93 04/01/93 0 04/01/93 04/01/93 91,815 100
814 06 0207 / 16419 8700 S ST LAWRENCE AVE 1.0 04/05/94 04/05/94 0 04/05/94 04/05/94 120,000 100
814 06 0156 / 16370 7100 S STATE ST 1.0 04/02/93 04/02/93 0 04/02/93 04/02/93 100,651 100

Totals per TSM Install 11.50 189,343 1,190,438

Work Type: Traffic Equipment Painting Locations


300 05 0006 / 5121 ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE 12.0 04/04/05 11/18/05 4,200 08/10/05 08/20/05 6,489 100
GROVE AVE
300 09 / 33072 ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE 2.0 05/12/08 07/11/08 400 05/02/08 05/12/08 239 100
300 05 0006 / 5121 ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST 12.0 04/04/05 11/18/05 4,200 08/10/05 08/20/05 4,903 100
300 07 0006 / 5429 ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST 44.0 07/17/06 09/30/06 14,500 07/01/06 07/24/06 3,359 100

Totals per Traffic Equipment Painting 70.0 23,300 14,990

Totals per Construction Phase 1,973,806 2,675,185

Totals for Ward 06 1,976,306 2,680,863


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 77

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
210 06 0158 / 5058 E 95TH ST AND S PAXTON AVE .0 08/15/05 12/31/05 0 08/15/05 12/31/05 2,326 100
281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 1847 E 95TH ST 1.0 06/29/05 1,000 06/29/05 0
300 06 0292 / 5399 7615 S MARQUETTE RD 1.0 1,000 03/30/05 05/09/05 0 100
300 06 0251 / 5361 9141 S SOUTH CHICAGO AVE .0 04/01/07 08/08/07 420 09/25/07 09/25/07 0 100

10/31/06 email from CDOT to remodify existing . No further information on this project. Note Last Updated on 26-FEB-07
Totals per Design/Engineering 2.0 2,420 2,326
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 78

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 09 / 33076 ON S MUSKEGON AVE FROM E 87TH ST TO E 89TH ST 10.0 10/24/08 10/24/08 4,000 10/24/08 10/24/08 3,487 100

Work Type: 400 Watt Changeout Fixtures


300 09 / 33073 ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 47.0 05/05/08 06/27/08 18,800 05/05/08 06/27/08 16,997 100
300 11 / 32196 ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 82.0 01/04/08 03/11/08 33,600 01/04/08 03/11/08 19,582 100
300 11 / 32196 7113-7900 S EXCHANGE AVE 100.0 03/01/07 12/31/07 0 09/11/07 09/25/07 0 0
300 06 0069 / 5233 9500 S JEFFERY AVE 9.0 10/14/02 10/14/02 3,600 10/11/02 10/11/02 3,375 100

Totals per 400 Watt Changeout 238.0 56,000 39,954

Work Type: Alley Lighting/Lamps Installations


300 06 0096 / 5258 2552 E 79TH ST 1,116.0 03/01/03 09/01/03 0 03/01/06 09/01/06 33,719 0
302 00 0092 / 5774 2552 E 79TH ST 11.0 0 03/23/01 01/10/02 2,592 100
805 06 1674 / 7860 9911 S CLYDE AVE 1.0 08/10/95 08/10/95 0 08/10/95 08/10/95 300 100
805 06 1575 / 7761 7859 S COLES AVE 1.0 03/13/95 03/13/95 0 03/13/95 03/13/95 300 100
805 06 1812 / 7998 7535 S CRANDON AVE 1.0 02/16/95 02/16/95 0 02/16/95 02/16/95 300 100
805 06 1903 / 8089 7816 S CRANDON AVE 1.0 07/31/96 07/31/96 0 07/31/96 07/31/96 300 100
805 06 0598 / 6784 7727 S EXCHANGE AVE 1.0 02/16/95 02/16/95 0 02/16/95 02/16/95 300 100
805 06 2045 / 8231 8418 S KINGSTON AVE 1.0 09/29/95 09/29/95 0 09/29/95 09/29/95 300 100
805 06 2046 / 8232 8439 S KINGSTON AVE 1.0 10/13/95 10/13/95 0 10/13/95 10/13/95 300 100
805 06 1515 / 7701 7622 S LUELLA AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1486 / 7672 7640 S LUELLA AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1855 / 8041 7700 S LUELLA AVE 1.0 06/12/96 06/12/96 0 06/12/96 06/12/96 300 100
805 06 1487 / 7673 7716 S LUELLA AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1488 / 7674 7740 S LUELLA AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 0571 / 6757 7935 S OGLESBY AVE 1.0 08/01/95 08/01/95 0 08/01/95 08/01/95 300 100

Totals per Alley Lighting/Lamps 1,140.0 0 40,211

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 2552 E 79TH ST 1,004.0 06/01/07 12/31/07 29,557 11/08/07 02/04/08 28,664 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2552 E 79TH ST 909.0 0 09/07/02 09/12/02 16,551 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 79

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
302 00 0092 / 5774 2629 E 91ST ST 1.0 0 07/03/01 07/03/01 471 100
302 00 0092 / 5774 2653 E 91ST ST 2.0 0 07/10/01 07/10/01 942 100
302 00 0092 / 5774 2705 E 91ST ST 1.0 0 07/10/01 07/10/01 471 100
302 00 0092 / 5774 2715 E 91ST ST 1.0 0 07/10/01 07/10/01 471 100
300 06 0167 / 5306 7400 S COLES AVE 1.0 0 05/25/99 05/25/99 351 100

Totals per Flood Light Install 6.0 0 2,706

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0

Work Type: Loop Lighting Blocks


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33073 ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 47.0 07/07/08 07/25/08 64,050 07/07/08 07/25/08 57,551 100
300 11 / 32196 ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 71.0 01/04/08 03/11/08 95,850 01/04/08 03/11/08 81,295 100
300 11 / 32196 7113-7900 S EXCHANGE AVE 90.0 03/01/07 12/31/07 0 09/11/07 0 0

Totals per Ornamental - Piggyback Lighting 208.0 159,900 138,846

Work Type: Ornamental Lighting Blocks


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0

Work Type: POD Camera Pole Poles


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 7129 S YATES BLVD .0 03/01/08 12/01/08 0 0 0

Totals per Lighting/Electrical 1,828,759 1,825,474


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 80

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0007 / 5430 ON S COLFAX AVE FROM E 75TH ST TO E 77TH ST 2.0 04/15/07 06/15/07 150,000 10/11/06 04/27/07 110,000 100
300 05 0007 / 5122 ON S ESSEX AVE FROM E 75TH ST TO E 77TH ST 2.0 11/01/05 04/01/06 170,000 09/20/05 11/11/05 96,164 100
300 07 0007 / 5430 ON S PHILLIPS AVE FROM E 75TH ST TO E 79TH ST 4.0 05/01/07 07/01/07 320,000 10/31/06 05/04/07 218,095 100
300 07 0007 / 5430 ON S SAGINAW AVE FROM S EXCHANGE AVE TO E 79TH ST 4.0 05/01/07 07/01/07 300,000 10/11/06 05/04/07 196,062 100
300 11 / 32196 7113-7900 S EXCHANGE AVE .0 03/01/07 12/31/07 0 0 0

Totals per Residntl Staggered Lighting 12.0 940,000 620,321

Work Type: Residntl Strt Lighting/Lamps Blocks


300 03 0007 / 4878 ON S COLFAX AVE FROM E 77TH ST TO E 79TH ST 2.0 05/15/04 07/15/04 163,500 04/26/04 06/04/04 146,004 100
300 06 0267 / 5375 ON S ESSEX AVE FROM E 77TH ST TO E 79TH ST 2.0 03/15/04 05/15/04 162,741 03/05/04 05/03/04 155,686 100
300 06 0235 / 5349 ON S KINGSTON AVE FROM E 77TH ST TO E 79TH ST 2.0 05/20/03 07/20/03 152,935 05/06/03 07/16/03 144,540 100

Totals per Residntl Strt Lighting/Lamps 6.0 479,176 446,230

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 8833 S MARQUETTE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 8843 S MARQUETTE AVE 1.0 0 02/13/01 02/13/01 378 100

Totals per Short Arm Installs - Arterial 2.0 0 756

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 8817 S MARQUETTE AVE 1.0 0 02/13/01 02/13/01 378 100

Totals per Short Arm Installs - Residntl 1.0 0 378

Work Type: Strt Light Pole Painting Locations


300 09 / 33073 ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 50.0 05/05/08 06/27/08 12,500 05/05/08 05/23/08 10,000 100
300 11 / 32196 ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 71.0 01/04/08 03/11/08 15,620 01/04/08 03/11/08 14,200 100
300 06 0199 / 5324 ON S JEFFERY AVE FROM E 95TH ST TO E 96TH ST 24.0 09/20/02 10/01/02 10,384 10/31/02 11/01/02 1,901 100
300 09 / 33073 ON S KINGSTON AVE FROM E 85TH ST TO E 86TH ST 4.0 800 0 0
300 11 / 32196 7113-7900 S EXCHANGE AVE 100.0 03/01/07 12/31/07 0 08/10/07 08/18/07 0 0

Totals per Strt Light Pole Painting 249.0 39,304 26,101


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 81

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Replacmnt/Reloc Blocks
281 00 / 33670 2565-2567 E 72ND PL .0 01/01/08 12/31/08 0 0 0

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2552 E 79TH ST 826.0 03/01/04 12/01/04 4,295 07/31/06 08/22/06 8,995 100

Work Type: Underpass Lighting Fixtures


300 06 0099 / 5260 2552 E 79TH ST 552.0 08/12/03 08/19/03 31,027 08/08/03 08/15/03 23,163 100
805 06 2470 / 8656 2901 E 92ND ST 29.0 12/14/95 12/14/95 0 12/14/95 12/14/95 21,750 100
805 06 2471 / 8657 2901 E 92ND ST 17.0 12/14/95 12/14/95 0 12/14/95 12/14/95 12,750 100
805 06 2472 / 8658 2605 E 95TH ST 10.0 12/14/95 12/14/95 0 12/14/95 12/14/95 7,500 100
302 00 0070 / 5758 8920 S COLFAX AVE 0 06/11/97 06/18/97 10,041 100
302 00 0070 / 5758 8930 S COLFAX AVE 0 06/11/97 06/18/97 15,267 100
805 06 2136 / 8322 9340 S COLFAX AVE 98.0 08/28/97 08/28/97 0 08/28/97 08/28/97 73,500 100
302 00 0070 / 5758 9430 S COLFAX AVE 0 08/14/97 08/28/97 26,341 100
302 00 0070 / 5758 9230 S EXCHANGE AVE 0 07/01/97 07/08/97 7,824 100
805 06 2142 / 8328 9230 S EXCHANGE AVE 15.0 07/08/97 07/08/97 0 07/08/97 07/08/97 11,250 100
302 00 0070 / 5758 9240 S EXCHANGE AVE 0 06/17/97 06/24/97 12,751 100
805 06 2612 / 8798 9499 S JEFFERY AVE 70.0 11/03/94 11/03/94 0 11/03/94 11/03/94 52,500 100
805 06 2417 / 8603 8870 S KINGSTON AVE 23.0 10/31/95 10/31/95 0 10/31/95 10/31/95 17,250 100
805 06 2416 / 8602 8880 S KINGSTON AVE 23.0 10/31/95 10/31/95 0 10/31/95 10/31/95 17,250 100
302 00 0070 / 5758 8050 S MARQUETTE AVE 0 07/02/97 07/10/97 3,491 100
302 00 0070 / 5758 9100 S MARQUETTE AVE 0 07/02/97 07/08/97 14,396 100
805 06 2146 / 8332 9123 S MARQUETTE AVE 15.0 07/10/97 07/10/97 0 07/10/97 07/10/97 11,250 100
805 06 2172 / 8358 9123 S MARQUETTE AVE 15.0 07/08/97 07/08/97 0 07/08/97 07/08/97 11,250 100
805 06 2248 / 8434 9499 S PAXTON AVE 78.0 10/08/96 10/08/96 0 10/08/96 10/08/96 58,500 100
805 06 2166 / 8352 8885 S SOUTH CHICAGO AVE 37.0 06/18/97 06/18/97 0 06/18/97 06/18/97 27,750 100
805 06 2171 / 8357 8885 S SOUTH CHICAGO AVE 13.0 07/08/97 07/08/97 0 07/08/97 07/08/97 9,750 100
805 06 2217 / 8403 9551 S STONY ISLAND EXTENSION WEST 9.0 10/01/91 10/01/91 0 10/01/91 10/01/91 6,750 100

Totals per Underpass Lighting 1,004.0 31,027 452,274


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 82

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Locations
300 09 / 33073 E 94TH ST AND S PAXTON AVE 1.0 44,500 0 0
300 09 / 33073 E 95TH ST AND S MANISTEE AVE 1.0 41,000 0 0

Totals per Underpass Lighting 2.0 85,500 0


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 83

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Flashing Yellow Warning Lights Locations
300 06 0251 / 5361 9141 S SOUTH CHICAGO AVE .0 08/01/07 10/01/07 33,580 07/02/07 08/15/07 34,879 100

Work Type: LED Signal Head Install Locations


210 06 0130 / 4389 S JEFFERY AVE AND E 95TH ST .50 0 10/30/02 10/30/02 925 100
210 06 0130 / 4389 S SOUTH SHORE DR AND E 75TH ST 1.0 0 11/19/01 11/19/01 8,539 100
210 06 0130 / 4389 S SOUTH SHORE DR AND E 83RD ST .50 0 10/23/01 10/23/01 4,270 100

Totals per LED Signal Head Install 2.0 0 13,734

Work Type: Signals Intersections


300 06 0096 / 5258 2552 E 79TH ST 13.0 07/18/03 07/24/03 0 07/16/06 10/21/06 2,056 100

Work Type: TSM Install Locations


210 06 0148 / 4400 E 75TH ST AND S YATES BLVD 1.0 09/01/03 11/01/03 200,000 08/15/03 10/17/03 120,661 100
210 06 0158 / 5058 E 95TH ST AND S PAXTON AVE 1.0 07/31/06 09/30/07 171,896 09/21/06 12/21/06 0 100

No finance info given in jcs Note Last Updated on 30-JAN-08


814 06 0060 / 16276 8300 S COLFAX AVE 1.0 11/09/95 11/09/95 0 11/09/95 11/09/95 125,000 100
814 06 0395 / 16582 8700 S COLFAX AVE 1.0 02/29/96 02/29/96 0 02/29/96 02/29/96 125,000 100
814 06 0371 / 16561 9299 S COLFAX AVE 1.0 05/23/96 05/23/96 0 05/23/96 05/23/96 129,704 100

Totals per TSM Install 5.0 371,896 500,365

Work Type: Traffic Equipment Painting Locations


300 09 / 33073 ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 3.0 05/05/08 06/27/08 600 05/05/08 05/23/08 252 100
300 11 / 32196 ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR 17.0 01/04/08 03/11/08 4,400 01/04/08 03/11/08 3,400 100
300 11 / 32196 7113-7900 S EXCHANGE AVE .0 03/01/07 12/31/07 0 0 0

Totals per Traffic Equipment Painting 20.0 5,000 3,652

Totals per Traffic 410,476 554,686

Totals per Construction Phase 2,239,235 2,380,160

Totals for Ward 07 2,241,655 2,382,486


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 84

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON S AVALON AVE FROM E 77TH ST TO E 78TH ST .0 04/01/08 08/30/08 0 0 0
300 06 0275 / 5383 ON S CREGIER AVE FROM E 92ND PL TO E 93RD ST .0 10/01/04 06/30/05 0 10/01/04 06/30/05 2,492 100
300 06 0308 / 5414 ON S INGLESIDE AVE FROM E 78TH ST TO E 80TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,046 100
300 06 / 32277 ON S KIMBARK AVE FROM E 78TH ST TO E 79TH ST .0 04/01/08 08/30/08 0 0 0
300 06 / 32277 ON S WOODLAWN AVE FROM E 78TH ST TO E 79TH ST .0 04/01/08 08/30/08 0 0 0
210 06 0243 / 4480 E 79TH ST AND S CREGIER AVE .0 01/08/07 01/26/07 500 01/08/07 01/26/07 1,275 100
281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Totals per Design/Engineering .0 500 5,813


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 85

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0122 / 5275 ON E 93RD ST FROM S COTTAGE GROVE AVE TO S KIMBARK AVE 8.0 11/01/03 11/02/03 3,200 11/07/03 11/10/03 5,501 100
300 11 / 32197 ON S AVALON AVE FROM E 77TH ST TO E 78TH ST 5.0 08/01/07 08/10/07 2,200 08/18/07 08/18/07 2,200 100
300 07 0008 / 5431 ON S AVALON AVE FROM E 91ST ST TO E 92ND ST 5.0 01/19/07 01/31/07 2,100 01/19/07 01/31/07 2,100 100
300 03 0005 / 4876 ON S CORNELL AVE FROM E 71ST ST TO E 72ND ST 5.0 06/01/05 06/10/05 2,000 05/06/05 05/19/05 989 100
300 11 / 32197 ON S EUCLID AVE FROM E 80TH ST TO E 81ST ST 5.0 08/01/07 08/10/07 2,200 08/17/07 08/17/07 2,200 100
300 07 0008 / 5431 ON S LUELLA AVE FROM E 81ST ST TO E 82ND ST 5.0 01/19/07 01/31/07 2,100 01/19/07 01/31/07 2,100 100
300 06 0069 / 5233 1000 E 80TH ST 2.0 05/25/02 05/25/02 406 05/22/02 05/22/02 420 100
302 00 0092 / 5774 1000 E 90TH ST 4.0 02/09/03 02/09/03 840 02/06/03 02/06/03 840 100
300 06 0069 / 5233 1500 E 93RD ST 4.0 10/18/02 10/18/02 840 10/15/02 10/15/02 812 100
300 06 0069 / 5233 8200 S CLYDE AVE 4.0 10/18/02 10/18/02 840 10/15/02 10/15/02 812 100
300 03 0008 / 4879 8700 S CLYDE AVE 5.0 12/01/04 12/30/04 2,075 05/18/05 05/18/05 1,174 100
300 06 0069 / 5233 9200 S CLYDE AVE 5.0 02/16/03 02/16/03 2,000 02/13/03 02/13/03 3,086 100
302 00 0092 / 5774 7200 S CONSTANCE AVE 5.0 04/15/02 04/15/02 1,050 04/12/02 04/12/02 0 100
300 06 0069 / 5233 7200-7299 S CONSTANCE AVE 5.0 0 04/12/02 04/12/02 1,875 100
300 06 0069 / 5233 8800 S CORNELL AVE 4.0 1,500 09/12/02 09/12/02 1,318 100
300 06 0069 / 5233 8900 S CORNELL AVE 3.0 03/12/03 03/14/03 1,125 03/12/03 03/12/03 663 100
302 00 0092 / 5774 8501-8505 S CREGIER AVE 2.0 10/02/01 10/02/01 412 09/29/01 09/29/01 412 100
300 06 0122 / 5275 9200 S DOBSON AVE 5.0 11/01/03 11/01/03 1,975 11/10/03 11/10/03 1,191 100
300 06 0069 / 5233 8200 S DREXEL AVE 4.0 02/16/03 02/16/03 1,600 02/13/03 02/13/03 1,000 100
300 06 0122 / 5275 8300 S DREXEL AVE 5.0 11/01/03 11/01/03 1,975 11/10/03 11/10/03 1,191 100
300 06 0069 / 5233 8200 S ELLIS AVE 4.0 02/16/03 02/16/03 1,600 02/13/03 02/13/03 1,000 100
300 03 0008 / 4879 8600 S EUCLID AVE 5.0 08/01/04 08/05/04 2,075 07/07/04 07/07/04 1,194 100
300 09 / 33074 8700-8800 S EUCLID AVE 5.0 02/01/08 12/31/08 2,000 08/04/08 08/05/08 1,230 100

MATERIAL ORDERED Note Last Updated on 28-JUL-08


300 03 0008 / 4879 7600 S INGLESIDE AVE 4.0 08/01/04 08/05/04 1,700 07/07/04 07/07/04 1,311 100
300 06 0069 / 5233 8200 S INGLESIDE AVE 4.0 02/16/03 02/16/03 1,600 02/13/03 02/13/03 1,000 100
300 06 0069 / 5233 8200 S MARYLAND AVE 4.0 02/16/03 02/16/03 1,600 02/13/03 02/13/03 1,000 100
300 03 0008 / 4879 7900 S MERRILL AVE 5.0 08/01/04 08/05/04 2,075 07/07/04 07/07/04 1,194 100

Totals per 250 Watt Changeout 121.0 43,088 37,813

Totals per Lighting/Electrical 1,235,551 1,606,085


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 86

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 05 0008 / 5123 ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE 13.0 04/04/05 11/18/05 5,400 08/01/05 08/05/05 4,550 100
300 06 0122 / 5275 ON S COTTAGE GROVE AVE FROM E 86TH ST TO E 87TH ST 6.0 05/09/03 05/09/03 2,400 05/06/03 05/06/03 2,250 100

Totals per 400 Watt Changeout 19.0 7,800 6,800


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 87

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1017 / 7203 1619 E 73RD ST 1.0 07/14/95 07/14/95 0 07/14/95 07/14/95 300 100
805 06 1621 / 7807 1061 E 80TH ST 1.0 09/11/97 09/11/97 0 09/11/97 09/11/97 300 100
805 06 0862 / 7048 1140 E 81ST ST 1.0 01/27/95 01/27/95 0 01/27/95 01/27/95 300 100
805 06 0751 / 6937 1503 E 85TH ST 1.0 07/21/95 07/21/95 0 07/21/95 07/21/95 300 100
805 06 0754 / 6940 1329 E 89TH ST 1.0 12/01/95 12/01/95 0 12/01/95 12/01/95 300 100
805 06 0755 / 6941 1333 E 89TH ST 1.0 11/28/95 11/28/95 0 11/28/95 11/28/95 300 100
300 06 0069 / 5233 1400 E 89TH ST 2.0 03/12/03 03/14/03 700 03/12/03 03/12/03 442 100
805 06 0759 / 6945 1101 E 93RD ST 1.0 10/13/95 10/13/95 0 10/13/95 10/13/95 300 100
805 06 0760 / 6946 1104 E 93RD ST 1.0 08/11/95 08/11/95 0 08/11/95 08/11/95 300 100
805 06 0762 / 6948 1125 E 93RD ST 1.0 10/13/95 10/13/95 0 10/13/95 10/13/95 300 100
805 06 0791 / 6977 1019 E 95TH ST 1.0 09/20/96 09/20/96 0 09/20/96 09/20/96 300 100
805 06 0867 / 7053 9526 S AVALON AVE 1.0 03/30/95 03/30/95 0 03/30/95 03/30/95 300 100
805 06 0868 / 7054 9536 S AVALON AVE 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 300 100
805 06 0823 / 7009 8718 S BLACKSTONE AVE 1.0 06/14/95 06/14/95 0 06/14/95 06/14/95 300 100
805 06 2002 / 8188 8222 S CHAPPEL AVE 1.0 06/19/95 06/19/95 0 06/19/95 06/19/95 300 100
805 06 1983 / 8169 8240 S CHAPPEL AVE 1.0 10/30/95 10/30/95 0 10/30/95 10/30/95 300 100
300 06 0139 / 5289 8539 S COTTAGE GROVE AVE 2,007.0 03/01/06 09/01/06 47,645 07/01/06 08/04/06 60,640 100

75& complete as of 07/26/06 Note Last Updated on 26-JUL-06


302 00 0092 / 5774 8539 S COTTAGE GROVE AVE 17.0 0 02/28/01 01/11/02 4,006 100
805 06 1623 / 7809 8826 S DORCHESTER AVE 1.0 09/11/97 09/11/97 0 09/11/97 09/11/97 300 100
805 06 1765 / 7951 9338 S EAST END AVE 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 1374 / 7560 7659 S JEFFERY BLVD 1.0 04/13/95 04/13/95 0 04/13/95 04/13/95 300 100
805 06 1662 / 7848 7736 S JEFFERY BLVD 1.0 08/05/97 08/05/97 0 08/05/97 08/05/97 300 100
805 06 1856 / 8042 8335 S LUELLA AVE 1.0 06/22/95 06/22/95 0 06/22/95 06/22/95 300 100
805 06 1857 / 8043 8738 S LUELLA AVE 1.0 12/12/95 12/12/95 0 12/12/95 12/12/95 300 100
805 06 1622 / 7808 7809 S MERRILL AVE 1.0 09/11/97 09/11/97 0 09/11/97 09/11/97 300 100
805 06 1823 / 8009 8114 S MERRILL AVE 1.0 02/20/97 02/20/97 0 02/20/97 02/20/97 300 100
805 06 0572 / 6758 8136 S OGLESBY AVE 1.0 05/30/96 05/30/96 0 05/30/96 05/30/96 300 100
805 06 0573 / 6759 8222 S OGLESBY AVE 1.0 08/29/95 08/29/95 0 08/29/95 08/29/95 300 100
805 06 0547 / 6733 7600 S PAXTON AVE 1.0 06/12/96 06/12/96 0 06/12/96 06/12/96 300 100
302 00 0092 / 5774 7901 S STONY ISLAND AVE 1.0 0 09/21/01 09/21/01 236 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 88

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0405 / 6591 9755 S UNIVERSITY AVE 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100

Totals per Alley Lighting/Lamps 2,054.0 48,345 73,424

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 8539 S COTTAGE GROVE AVE 1,750.0 06/01/07 12/31/07 51,520 11/15/07 01/05/08 49,962 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 8539 S COTTAGE GROVE AVE 1,622.0 0 08/15/02 08/27/02 29,534 100

Work Type: Flood Light Install Fixtures


302 00 0092 / 5774 1112 E 81ST PL 1.0 0 03/16/01 03/16/01 471 100

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0122 / 5275 1419 E 89TH ST 5.0 06/01/03 06/02/03 5,000 06/06/03 06/09/03 2,960 100
281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts 5.0 5,000 2,960

Work Type: Loop Lighting Blocks


281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 05 0008 / 5123 ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE 1.0 04/04/05 11/18/05 16,200 08/01/05 08/05/05 22,920 100

Work Type: Ornamental Lighting Blocks


281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Work Type: POD Camera Pole Poles


281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 8539 S COTTAGE GROVE AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 89

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32197 ON E 87TH PL FROM S COTTAGE GROVE AVE TO S DAUPHIN AVE 1.50 05/31/07 08/03/07 75,000 05/31/07 08/10/07 59,977 100
300 06 / 32277 ON S AVALON AVE FROM E 77TH ST TO E 78TH ST .0 05/04/08 12/31/08 0 0 0
300 11 / 32197 ON S DOBSON AVE FROM E 98TH ST TO E 99TH ST 1.0 06/18/07 07/27/07 80,000 06/13/07 09/21/07 55,303 100
300 11 / 32197 ON S DREXEL AVE FROM E 81ST ST TO E 82ND ST 1.0 08/15/07 10/22/07 80,000 08/15/07 09/28/07 31,966 100
300 11 / 32197 ON S ELLIS AVE FROM E 91ST ST TO E 93RD ST 2.0 06/18/07 08/03/07 150,000 06/11/07 08/31/07 96,984 100
300 06 0308 / 5414 ON S INGLESIDE AVE FROM E 78TH ST TO E 80TH ST 2.0 03/16/06 12/31/06 177,798 10/04/06 05/07/07 131,870 100
300 06 / 32277 ON S KIMBARK AVE FROM E 78TH ST TO E 79TH ST .0 05/04/08 12/31/08 0 0 0
300 06 / 32277 ON S WOODLAWN AVE FROM E 78TH ST TO E 79TH ST .0 05/04/08 12/31/08 0 0 0

Totals per Residntl Staggered Lighting 7.50 562,798 376,100

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON S DOBSON AVE FROM E 79TH ST TO E 81ST ST 2.0 09/15/04 11/15/04 140,663 08/11/04 10/04/04 135,926 100

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 9004 S DAUPHIN AVE 1.0 0 05/24/01 05/24/01 378 100
281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Residntl 1.0 0 378

Work Type: Strt Light Pole Painting Locations


300 05 0008 / 5123 ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE 12.0 04/04/05 11/18/05 3,000 09/01/05 10/20/05 2,812 100
302 00 0076 / 5764 ON E 83RD ST FROM S COTTAGE GROVE AVE TO S STONY ISLAND AVE 61.0 06/23/98 06/26/98 0 06/23/98 06/26/98 1,037 100
300 04 0216 / 5114 ON E 87TH ST FROM S COTTAGE GROVE AVE TO S INGLESIDE AVE 15.0 05/01/06 11/01/06 3,172 05/17/06 06/02/06 3,172 100
302 00 0077 / 5765 ON S DORCHESTER AVE FROM E 87TH ST TO E 88TH ST 6.0 0 07/16/99 07/16/99 524 100
302 00 0076 / 5764 7900 S JEFFERY AVE 8.0 08/01/98 08/01/98 0 08/01/98 08/01/98 136 100
302 00 0076 / 5764 8600 S JEFFERY AVE 9.0 08/02/98 08/02/98 0 08/02/98 08/02/98 153 100
302 00 0076 / 5764 8700 S STONY ISLAND AVE 17.0 07/19/98 07/20/98 0 07/19/98 07/20/98 289 100

Totals per Strt Light Pole Painting 128.0 6,172 8,123


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 90

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Replacmnt/Reloc Blocks
281 00 / 33670 8108 S STONY ISLAND AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Lighting Blocks


300 06 0247 / 5357 ON E 87TH PL FROM S CORNELL AVE TO S RIDGELAND AVE 1.50 09/15/03 11/30/03 109,000 09/09/03 11/07/03 108,367 100
300 03 0008 / 4879 ON E 87TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE 2.0 07/15/04 09/15/04 162,800 07/19/04 09/15/04 142,865 100
300 06 0275 / 5383 ON S CREGIER AVE FROM E 92ND PL TO E 93RD ST .50 40,000 08/22/05 01/10/06 66,342 100

Totals per Strt Lighting 4.0 311,800 317,574

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 8539 S COTTAGE GROVE AVE 1,645.0 03/01/04 12/01/04 8,554 07/31/06 08/22/06 17,914 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 91

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2607 / 8793 1160 E 76TH ST 42.0 02/27/95 02/27/95 0 02/27/95 02/27/95 31,500 100
805 06 2608 / 8794 1165 E 76TH ST 10.0 02/27/95 02/27/95 0 02/27/95 02/27/95 7,500 100
805 06 2337 / 8523 1195 E 79TH ST 30.0 08/07/93 08/07/93 0 08/07/93 08/07/93 22,500 100
805 06 2352 / 8538 1045 E 82ND ST 10.0 08/30/93 08/30/93 0 08/30/93 08/30/93 7,500 100
805 06 2604 / 8790 1045 E 82ND ST 27.0 08/30/93 08/30/93 0 08/30/93 08/30/93 20,250 100
805 06 2316 / 8502 1005 E 83RD ST 8.0 08/03/93 08/03/93 0 08/03/93 08/03/93 6,000 100
805 06 2331 / 8517 1005 E 83RD ST 10.0 08/03/93 08/03/93 0 08/03/93 08/03/93 7,500 100
805 06 2336 / 8522 1005 E 83RD ST 16.0 08/03/93 08/03/93 0 08/03/93 08/03/93 12,000 100
805 06 2492 / 8678 2110 E 85TH ST 13.0 12/08/95 12/08/95 0 12/08/95 12/08/95 9,750 100
805 06 2467 / 8653 2200 E 85TH ST 13.0 12/08/95 12/08/95 0 12/08/95 12/08/95 9,750 100
805 06 2367 / 8553 2220 E 86TH ST 12.0 02/15/94 02/15/94 0 02/15/94 02/15/94 9,000 100
805 06 2382 / 8568 2220 E 86TH ST 12.0 02/15/94 02/15/94 0 02/15/94 02/15/94 9,000 100
805 06 2324 / 8510 945 E 87TH ST 41.0 05/13/96 05/13/96 0 05/13/96 05/13/96 30,750 100
805 06 2373 / 8559 1290 E 87TH ST 10.0 10/18/95 10/18/95 0 10/18/95 10/18/95 7,500 100
805 06 2427 / 8613 845 E 91ST ST 10.0 08/03/93 08/03/93 0 08/03/93 08/03/93 7,500 100
805 06 2958 / 9144 835 E 93RD ST 26.0 08/02/93 08/02/93 0 08/02/93 08/02/93 19,500 100
302 00 0070 / 5758 830 E 95TH ST 0 06/12/97 06/19/97 18,592 100
805 06 2462 / 8648 1235 E 95TH ST 10.0 08/11/93 08/11/93 0 08/11/93 08/11/93 7,500 100
805 06 2615 / 8801 1495 E 95TH ST 30.0 12/20/94 12/20/94 0 12/20/94 12/20/94 22,500 100
300 06 0099 / 5260 8539 S COTTAGE GROVE AVE 598.0 08/20/03 08/27/03 33,611 08/18/03 08/25/03 24,521 100
805 06 2465 / 8651 9495 S COTTAGE GROVE AVE 28.0 11/07/95 11/07/95 0 11/07/95 11/07/95 21,000 100
805 06 2401 / 8587 7998 S EAST END AVE 11.0 10/07/93 10/07/93 0 10/07/93 10/07/93 8,250 100
805 06 2415 / 8601 7998 S EAST END AVE 9.0 10/05/93 10/05/93 0 10/05/93 10/05/93 6,750 100
805 06 2274 / 8460 7499 S GREENWOOD AVE 6.0 12/31/95 12/31/95 0 12/31/95 12/31/95 4,500 100
805 06 2635 / 8821 8301 S JEFFERY BLVD 17.0 11/01/94 11/01/94 0 11/01/94 11/01/94 12,750 100
805 06 2636 / 8822 8301 S JEFFERY BLVD 21.0 11/01/94 11/01/94 0 11/01/94 11/01/94 15,750 100
805 06 2617 / 8803 7901 S STONY ISLAND AVE 25.0 11/16/94 11/16/94 0 11/16/94 11/16/94 18,750 100
302 00 0072 / 5760 7940 S STONY ISLAND AVE 1.0 0 03/20/00 04/26/00 10,208 100
302 00 0072 / 5760 7950 S STONY ISLAND AVE 1.0 0 03/20/00 04/26/00 10,208 100
302 00 0072 / 5760 9440 S STONY ISLAND AVE 1.0 0 03/02/00 03/17/00 17,156 100
805 06 2637 / 8823 9499 S STONY ISLAND AVE 20.0 10/01/91 10/01/91 0 10/01/91 10/01/91 15,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 92

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2262 / 8448 9500 S STONY ISLAND EXTENSION WEST 10.0 12/31/96 12/31/96 0 12/31/96 12/31/96 7,500 100
805 06 2298 / 8484 9500 S STONY ISLAND EXTENSION WEST 6.0 12/31/96 12/31/96 0 12/31/96 12/31/96 4,500 100
805 06 2102 / 8288 9340 S WOODLAWN AVE 42.0 07/31/97 07/31/97 0 07/31/97 07/31/97 31,500 100
302 00 0070 / 5758 9490 S WOODLAWN AVE 0 07/24/97 07/31/97 12,751 100
805 06 2323 / 8509 837 W 87TH ST 24.0 06/05/96 06/05/96 0 06/05/96 06/05/96 18,000 100
805 06 2941 / 9127 865 W 88TH ST 16.0 12/10/93 12/10/93 0 12/10/93 12/10/93 12,000 100
805 06 2943 / 9129 905 W 89TH ST 12.0 12/08/93 12/08/93 0 12/08/93 12/08/93 9,000 100

Totals per Underpass Lighting 1,178.0 33,611 526,186


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 93

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 S COTTAGE GROVE AVE AND E 85TH ST .50 04/24/05 04/24/05 5,282 04/19/05 04/19/05 2,910 100
210 06 0130 / 4389 S COTTAGE GROVE AVE AND E 86TH ST .50 0 10/04/02 10/04/02 925 100
210 06 0130 / 4389 S JEFFERY AVE AND E 95TH ST .50 0 10/30/02 10/30/02 925 100
210 06 0130 / 4389 S WOODLAWN AVE AND E 83RD ST 1.0 0 07/12/02 07/12/02 6,867 100

Totals per LED Signal Head Install 2.50 5,282 11,627

Work Type: New Signal Locations


210 06 0190 / 4435 E 79TH ST AND S CREGIER AVE 1.0 10/15/04 01/31/05 190,000 09/08/04 02/10/05 148,195 100
210 06 0164 / 4415 E 86TH ST AND S COTTAGE GROVE AVE .50 08/15/02 10/01/02 86,635 08/15/02 10/09/02 78,583 100

Totals per New Signal 1.50 276,635 226,778

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 E 79TH ST AND S CREGIER AVE .0 03/03/06 05/08/07 12,000 03/16/07 03/20/07 4,040 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S DORCHESTER AVE AND E 83RD ST 1.0 4,000 05/09/01 06/07/01 10,897 100

Work Type: Signals Intersections


300 06 0096 / 5258 8539 S COTTAGE GROVE AVE 42.0 07/28/03 07/30/03 0 07/26/03 08/01/03 6,641 100

Work Type: TSM Install Locations


210 06 0163 / 4414 E 87TH ST AND S COTTAGE GROVE AVE .50 10/01/02 10/15/02 31,843 10/08/02 12/16/02 30,190 100
814 06 0210 / 16422 8699 S ANTHONY AVE 1.0 05/17/94 05/17/94 0 05/17/94 05/17/94 120,000 100
814 06 0205 / 16417 8655 S SOUTH CHICAGO AVE 1.0 05/23/94 05/23/94 0 05/23/94 05/23/94 120,000 100
210 06 0072 / 4336 8500 S YATES AVE 1.0 03/01/01 05/01/01 150,000 10/16/00 01/17/01 119,320 100

Totals per TSM Install 3.50 181,843 389,510

Totals per Traffic 479,759 649,492

Totals per Construction Phase 1,715,310 2,255,577

Totals for Ward 08 1,715,810 2,261,390


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 94

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32454 ALTEGELD GARDENS .0 04/02/07 12/31/07 276,000 08/31/07 5,500 25

Lighting project to include private streets being maintained by BOE forces Note Last Updated on 11-FEB-08
300 06 / 32455 PHILLIP MURRAY HOMES .0 04/02/07 12/10/08 28,000 11/02/07 24,000 95

Block 15 & 16 will be done together with Altgeld Gardens as they are bounded by each other Note Last Updated on 11-FEB-08
300 06 0308 / 5414 ON S WABASH AVE FROM E 105TH ST TO E 107TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,323 100
300 06 0292 / 5399 106 E 107TH ST 1.0 03/01/05 03/31/05 2,000 01/04/05 02/09/05 0 100
300 06 0292 / 5399 813 E 114TH ST 1.0 02/28/05 03/18/05 2,000 10/08/04 11/15/04 614 100

Totals per Design/Engineering 2.0 308,000 32,437


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 95

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 09 / 33075 ON E 117TH ST FROM S CALUMET AVE TO S FRONT AVE 3.0 09/08/08 09/12/08 1,200 09/03/08 09/03/08 675 100
300 09 / 33075 ON E 118TH PL FROM S MICHIGAN AVE TO S STATE ST 3.0 02/01/08 12/31/08 1,200 09/02/08 09/02/08 675 100

MATERIAL ORDERED Note Last Updated on 28-JUL-08


300 09 / 33075 ON E 118TH ST FROM S STATE ST TO S MICHIGAN AVE 2.0 09/02/08 09/03/08 800 09/02/08 09/03/08 450 100
300 09 / 33075 ON E 126TH ST FROM S STATE ST TO S MICHIGAN AVE 5.0 09/03/08 09/04/08 2,000 09/03/08 09/04/08 1,125 100
300 09 / 33075 ON S CALUMET AVE FROM E 108TH ST TO E 109TH ST 4.0 09/03/08 09/03/08 1,600 09/03/08 09/03/08 900 100
300 09 / 33075 ON S EBERHART AVE FROM E 107TH ST TO E 108TH ST 5.0 09/03/08 09/03/08 2,000 09/03/08 09/03/08 1,125 100
300 09 / 33075 ON S FOREST AVE FROM E 106TH ST TO E 107TH ST 5.0 09/04/08 09/04/08 2,000 09/04/08 09/04/08 1,125 100
300 09 / 33075 ON S INDIANA AVE FROM E 101ST ST TO E 102ND ST 3.0 09/08/08 09/10/08 1,200 09/03/08 09/03/08 675 100
300 09 / 33075 ON S INDIANA AVE FROM E 113TH ST TO E 114TH PL 6.0 09/05/08 09/05/08 2,400 09/05/08 09/05/08 1,350 100
300 09 / 33075 ON S LAFAYETTE AVE FROM W 122ND ST TO W 123RD ST 3.0 09/05/08 09/05/08 1,200 09/05/08 09/05/08 675 100
300 06 0069 / 5233 ON S MARYLAND AVE FROM E 104TH ST TO E 106TH ST 8.0 3,000 05/08/02 05/08/02 3,000 100
300 09 / 33075 ON S PERRY AVE FROM W 121ST ST TO W 122ND ST 4.0 09/08/08 09/08/08 1,600 09/08/08 09/08/08 900 100
300 09 / 33075 ON S PRAIRIE AVE FROM E 104TH ST TO E 106TH ST 8.0 09/02/08 09/02/08 3,200 09/02/08 09/02/08 1,575 100
300 09 / 33075 ON S VERNON AVE FROM E 101ST ST TO E 102ND ST 4.0 09/08/08 09/08/08 1,600 09/08/08 09/08/08 900 100
302 00 0092 / 5774 ON S WABASH AVE FROM E 105TH ST TO E 110TH ST 30.0 0 12/27/01 12/27/01 6,179 100
300 09 / 33075 ON S WALLACE ST FROM W 99TH ST TO W 101ST ST 5.0 09/08/08 09/12/08 2,000 09/02/08 09/03/08 1,125 100
302 00 0092 / 5774 11300-11399 S CALUMET AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11400-11499 S CALUMET AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11300-11399 S FOREST AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11400-11499 S FOREST AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 10100-10199 S PERRY AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 10200-10299 S PERRY AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11300-11399 S PRAIRIE AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11400-11499 S PRAIRIE AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11500-11599 S PRAIRIE AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 10059 S STATE ST 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 10900-10999 S VERNON AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11000-11099 S VERNON AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11100-11199 S VERNON AVE 5.0 0 10/04/01 10/05/01 1,029 100
302 00 0092 / 5774 11200-11299 S VERNON AVE 5.0 0 10/04/01 10/05/01 1,029 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 96

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
Totals per 250 Watt Changeout 164.0 27,236 36,067

Work Type: 400 Watt Changeout Fixtures


300 09 / 33075 ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE 56.0 11/17/08 12/08/08 22,400 12/15/08 01/09/09 18,928 100
300 09 / 33075 ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE 8.0 09/15/08 09/19/08 3,200 12/15/08 12/19/08 2,707 100
300 09 / 33075 ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE 7.0 12/15/08 01/09/09 2,800 12/15/08 01/09/09 2,366 100
300 09 / 33074 10000-10300 S COTTAGE GROVE AVE 21.0 09/22/08 10/03/08 8,400 12/16/08 12/29/08 8,400 100
300 06 / 33764 10000-11600 S MICHIGAN AVE 181.0 12/01/08 04/30/09 72,400 12/01/08 01/09/09 60,608 100

Totals per 400 Watt Changeout 273.0 109,200 93,009

Work Type: Alley Lighting/Lamps Installations


300 06 0204 / 5327 E 111TH ST AND S DR MARTIN LUTHER KING JR DR 2.0 08/15/01 08/15/01 640 10/03/01 10/03/01 640 100
300 06 0204 / 5327 E 111TH ST AND S VERNON AVE 2.0 08/15/01 08/15/01 640 10/03/01 10/03/01 640 100
300 06 0204 / 5327 400 E 111TH ST 2.0 08/15/01 08/15/01 640 09/29/01 09/29/01 640 100
300 06 0096 / 5258 34 E 112TH PL 1,898.0 03/01/03 09/01/03 49,575 03/01/06 09/01/06 57,346 0
302 00 0092 / 5774 34 E 112TH PL 39.0 0 03/16/01 01/24/02 9,190 100
805 06 0917 / 7103 362 E 119TH ST 1.0 06/07/95 06/07/95 0 06/07/95 06/07/95 300 100
302 00 0092 / 5774 221 E KENSINGTON AVE 1.0 0 03/23/01 03/23/01 236 100
805 06 0805 / 6991 10441 S CALUMET AVE 1.0 02/19/96 02/19/96 0 02/19/96 02/19/96 300 100
805 06 0324 / 6510 11431 S CHAMPLAIN AVE 1.0 01/03/95 01/03/95 0 01/03/95 01/03/95 300 100
805 06 1590 / 7776 12059 S INDIANA AVE 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
805 06 0316 / 6502 12438 S LA SALLE ST 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
302 00 0092 / 5774 11232 S MICHIGAN AVE 1.0 0 01/11/02 01/11/02 236 100
302 00 0092 / 5774 11000 S WABASH AVE 1.0 0 11/30/01 11/30/01 236 100

Totals per Alley Lighting/Lamps 1,951.0 51,495 70,664

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 34 E 112TH PL 1,536.0 06/01/07 12/31/07 45,219 01/22/08 02/13/08 43,852 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 34 E 112TH PL 1,541.0 0 09/09/02 09/14/02 28,059 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 97

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0198 / 5323 ALTGELD GARDENS (CHA) 02/05/01 02/28/01 139,000 02/05/01 02/28/01 138,085 100
300 06 0204 / 5327 E 111TH ST AND S DR MARTIN LUTHER KING JR DR 2.0 10/16/01 10/16/01 2,350 10/03/01 10/03/01 0 100
300 06 0071 / 5234 201 E 111TH ST 06/01/99 12/30/00 0 09/14/00 09/15/00 4,500 100

Totals per Flood Light Install 2.0 141,350 142,585

Work Type: Lighting Imprvmnts Installations


300 09 / 33074 10000-10300 S COTTAGE GROVE AVE 11.0 02/01/08 12/31/08 6,560 12/16/08 12/29/08 7,560 100

Work Type: Lighting Imprvmnts Projects


300 06 / 32454 ALTEGELD GARDENS .0 04/02/07 12/31/08 2,760,000 0 0
300 06 / 32455 PHILLIP MURRAY HOMES .0 04/02/07 12/31/08 500,000 0 0

Totals per Lighting Imprvmnts .0 3,260,000 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33075 ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE 56.0 11/24/08 12/24/08 75,600 12/15/08 01/09/09 64,176 100
300 09 / 33075 ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE 8.0 09/22/08 09/30/08 10,800 12/15/08 12/19/08 9,153 100
300 09 / 33075 ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE 7.0 12/15/08 01/09/09 9,450 12/15/08 01/09/09 8,022 100
300 09 / 33074 10000-10300 S COTTAGE GROVE AVE 21.0 10/06/08 10/24/08 28,350 01/23/09 01/29/09 27,953 100
300 06 / 33764 10000-11600 S MICHIGAN AVE 179.0 12/01/08 04/30/09 241,550 12/01/08 01/09/09 237,954 100

Totals per Ornamental - Piggyback Lighting 271.0 365,750 347,258

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 34 E 112TH PL .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 09 / 33075 ON S PRAIRIE AVE FROM E 100TH ST TO E 102ND ST 2.0 09/08/08 12/05/08 137,000 0 0
300 06 0308 / 5414 ON S WABASH AVE FROM E 105TH ST TO E 107TH ST 2.0 06/05/06 08/15/06 190,228 06/05/06 08/15/06 131,870 100

Project has been completed as of 08/15/2006 Note Last Updated on 25-AUG-06


Totals per Residntl Staggered Lighting 4.0 327,228 131,870

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S LANGLEY AVE FROM E 112TH ST TO E 114TH ST 2.0 03/26/03 05/21/03 166,636 03/26/03 06/01/03 156,226 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 98

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 10315 S MICHIGAN AVE 1.0 0 06/20/01 06/20/01 378 100
302 00 0092 / 5774 10316 S MICHIGAN AVE 1.0 0 06/20/01 06/20/01 378 100
302 00 0092 / 5774 10327 S MICHIGAN AVE 1.0 0 06/20/01 06/20/01 378 100
302 00 0092 / 5774 10328 S MICHIGAN AVE 1.0 0 06/20/01 06/20/01 378 100

Totals per Short Arm Installs - Residntl 4.0 0 1,512

Work Type: Strt Light Pole Painting Locations


300 09 / 33075 ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE 56.0 09/05/08 09/12/08 16,800 09/05/08 09/12/08 11,760 100
300 09 / 33075 ON E 111TH ST FROM S COTTAGE GROVE AVE TO S INDIANA AVE 16.0 02/01/08 12/31/08 4,800 11/12/08 11/21/08 4,515 100
300 09 / 33075 ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE 8.0 09/02/08 09/10/08 2,400 09/02/08 09/05/08 1,680 100
300 04 0216 / 5114 ON S MICHIGAN AVE FROM E 113TH ST TO E 115TH ST 28.0 05/01/06 11/01/06 6,056 05/17/06 06/22/06 6,056 100
300 09 / 33075 ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE 7.0 09/05/08 09/12/08 2,100 09/05/08 09/12/08 1,470 100
210 06 0166 / 4417 E 100TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/17/03 2,180 100
210 06 0166 / 4417 E 103RD ST AND S DR MARTIN LUTHER KING JR DR 04/22/03 05/10/03 3,000 04/22/03 05/16/03 2,180 100
210 06 0166 / 4417 E 107TH ST AND S DR MARTIN LUTHER KING JR DR 04/22/03 05/10/03 3,000 04/22/03 05/16/03 2,180 100
210 06 0166 / 4417 E 107TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/10/03 2,180 100
210 06 0166 / 4417 E 111TH ST AND S DR MARTIN LUTHER KING JR DR 04/22/03 05/10/03 3,000 04/22/03 05/10/03 2,180 100
210 06 0166 / 4417 E 111TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/09/03 2,180 100
210 06 0166 / 4417 E 113TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/05/03 2,180 100
210 06 0166 / 4417 E 115TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/07/03 2,180 100
210 06 0166 / 4417 E 119TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/06/03 2,180 100
210 06 0166 / 4417 E 127TH ST AND S MICHIGAN AVE 04/22/03 05/10/03 3,000 04/22/03 05/03/03 2,180 100
300 09 / 33074 10000-10300 S COTTAGE GROVE AVE 21.0 08/27/08 09/12/08 6,700 07/07/08 07/15/08 4,410 100
300 06 / 33764 10000-11600 S MICHIGAN AVE 236.0 12/01/08 04/30/09 52,050 12/01/08 12/19/08 44,610 100

Totals per Strt Light Pole Painting 372.0 120,906 96,301

Work Type: Strt Lighting Blocks


300 06 0204 / 5327 E 111TH ST AND S VERNON AVE 5.0 10/15/01 10/15/01 1,050 09/29/01 09/29/01 1,029 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 34 E 114TH PL 979.0 03/01/04 12/01/04 5,091 07/31/06 08/16/06 10,661 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 99

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2880 / 9066 698 E 100TH ST 28.0 06/03/94 06/03/94 0 06/03/94 06/03/94 21,000 100
805 06 2519 / 8705 694 E 103RD ST 34.0 01/24/96 01/24/96 0 01/24/96 01/24/96 25,500 100
805 06 2320 / 8506 598 E 105TH ST 28.0 06/03/94 06/03/94 0 06/03/94 06/03/94 21,000 100
805 06 2354 / 8540 590 E 107TH ST 34.0 03/19/96 03/19/96 0 03/19/96 03/19/96 25,500 100
805 06 2774 / 8960 598 E 109TH ST 28.0 06/03/94 06/03/94 0 06/03/94 06/03/94 21,000 100
805 06 2356 / 8542 530 E 111TH ST 32.0 04/01/96 04/01/96 0 04/01/96 04/01/96 24,000 100
300 06 0099 / 5260 34 E 112TH PL 284.0 08/28/03 09/02/03 15,962 08/26/03 08/27/03 12,851 100
805 06 2655 / 8841 498 E 113TH ST 24.0 06/06/94 06/06/94 0 06/06/94 06/06/94 18,000 100
805 06 2302 / 8488 101 E 116TH ST 14.0 12/03/93 12/03/93 0 12/03/93 12/03/93 10,500 100
805 06 2830 / 9016 198 E 130TH ST 26.0 05/15/94 05/15/94 0 05/15/94 05/15/94 19,500 100
805 06 2206 / 8392 815 E 95TH ST 44.0 06/19/97 06/19/97 0 06/19/97 06/19/97 33,000 100
805 06 2436 / 8622 432 E KENSINGTON AVE 34.0 10/27/95 10/27/95 0 10/27/95 10/27/95 25,500 100
805 06 2829 / 9015 11695 S INDIANA AVE 10.0 05/01/94 05/01/94 0 05/01/94 05/01/94 7,500 100
805 06 2177 / 8363 13001 S INDIANA AVE 18.0 04/11/97 04/11/97 0 04/11/97 04/11/97 13,500 100
805 06 2178 / 8364 13001 S INDIANA AVE 14.0 12/31/95 12/31/95 0 12/31/95 12/31/95 10,500 100
302 00 0070 / 5758 13140 S INDIANA AVE 0 04/04/97 04/11/97 16,636 100
805 06 2347 / 8533 11598 S MICHIGAN AVE 14.0 11/26/93 11/26/93 0 11/26/93 11/26/93 10,500 100
805 06 2556 / 8742 11701 S PRAIRIE AVE 10.0 06/14/95 06/14/95 0 06/14/95 06/14/95 7,500 100

Totals per Underpass Lighting 676.0 15,962 323,487

Totals per Lighting/Electrical 4,643,683 1,490,140


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 100

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0166 / 4417 E 100TH ST AND S MICHIGAN AVE 1.0 02/02/03 02/07/03 12,000 02/07/03 02/10/03 11,895 100
210 06 0166 / 4417 E 103RD ST AND S DR MARTIN LUTHER KING JR DR 1.0 02/02/03 02/07/03 12,000 02/11/03 05/16/03 11,895 100
210 06 0166 / 4417 E 107TH ST AND S DR MARTIN LUTHER KING JR DR 1.0 02/04/03 02/08/03 12,000 02/17/03 02/19/03 11,895 100
210 06 0166 / 4417 E 107TH ST AND S MICHIGAN AVE 1.0 02/04/03 02/08/03 12,000 02/19/03 02/21/03 11,895 100
210 06 0166 / 4417 E 111TH ST AND S DR MARTIN LUTHER KING JR DR 1.0 02/06/03 02/09/03 12,000 02/24/03 02/26/03 11,895 100
210 06 0166 / 4417 E 111TH ST AND S MICHIGAN AVE 1.0 02/06/03 02/09/03 12,000 02/26/03 02/28/03 11,895 100
210 06 0166 / 4417 E 113TH ST AND S MICHIGAN AVE 1.0 02/06/03 02/09/03 12,000 03/03/03 03/05/03 11,896 100
210 06 0166 / 4417 E 115TH ST AND S MICHIGAN AVE 1.0 02/10/03 02/12/03 12,000 03/05/03 03/06/03 11,896 100
210 06 0166 / 4417 E 119TH ST AND S MICHIGAN AVE 1.0 02/10/03 02/12/03 12,000 03/06/03 03/07/03 11,896 100
210 06 0166 / 4417 E 127TH ST AND S MICHIGAN AVE 1.0 02/10/03 02/12/03 12,000 03/07/03 03/10/03 11,896 100

Totals per LED Signal Head Install 10.0 120,000 118,954

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S MICHIGAN AVE AND E 127TH ST 1.0 4,000 04/30/01 05/03/01 1,885 100
300 06 0197 / 5322 S WALLACE ST AND W VERMONT ST 1.0 4,000 04/27/01 05/17/01 3,631 100

Totals per Removal Temp Wiring - Signals 2.0 8,000 5,516

Work Type: Signals Intersections


300 06 0096 / 5258 34 E 112TH PL 25.0 07/22/03 07/25/03 0 07/21/06 09/28/06 3,953 100

Work Type: TSM Install Locations


210 06 0074 / 4338 100 E 103RD ST 1.0 04/01/03 06/01/03 242,000 03/14/03 07/10/03 227,309 100
210 06 0069 / 4333 10000 S DR MARTIN LUTHER KING JR DR 1.0 06/01/99 12/01/99 167,500 07/30/99 01/20/00 112,132 100
814 06 0251 / 16463 11100 S DR MARTIN LUTHER KING JR DR 1.0 08/15/89 08/15/89 0 08/15/89 08/15/89 80,756 100
814 06 0066 / 16282 11100 S ELLIS AVE 1.0 03/26/91 03/26/91 0 03/26/91 03/26/91 212,115 100
814 06 0123 / 16337 13000 S ELLIS AVE 1.0 03/02/95 03/02/95 0 03/02/95 03/02/95 392,625 100
814 06 0250 / 16462 11100 S INDIANA AVE 1.0 09/26/89 09/26/89 0 09/26/89 09/26/89 80,756 100
814 06 0112 / 16327 13000 S INDIANA AVE 1.0 03/01/95 03/01/95 0 03/01/95 03/01/95 392,625 100
814 06 0252 / 16464 11100 S MICHIGAN AVE 1.0 08/10/89 08/10/89 0 08/10/89 08/10/89 80,756 100

Totals per TSM Install 8.0 409,500 1,579,074

Totals per Traffic 542,429 1,711,515


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 101

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 09 / 33075 ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE 7.0 09/05/08 09/12/08 2,600 09/05/08 09/12/08 2,324 100
300 09 / 33075 ON E 111TH ST FROM S COTTAGE GROVE AVE TO S INDIANA AVE 1.0 11/12/08 11/21/08 129 11/12/08 11/21/08 84 100
300 09 / 33075 ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE 5.0 09/02/08 09/10/08 2,200 09/02/08 09/05/08 1,610 100

Totals per Traffic Equipment Painting 13.0 4,929 4,018

Totals per Construction Phase 5,186,112 3,201,655

Totals for Ward 09 5,494,112 3,234,092


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 102

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0288 / 5395 TRUMBALL HOMES (CHA) .0 09/01/04 12/31/04 0 09/01/04 12/31/04 1,465 100
300 06 / 32277 ON S AVENUE H FROM E 98TH ST TO E 99TH ST 1.0 04/01/08 08/30/08 65,000 04/26/08 0 70
300 06 / 32277 ON S AVENUE J FROM E 98TH ST TO E 99TH ST 1.0 04/01/08 08/30/08 65,000 04/26/08 0 70
300 06 / 32277 ON S BRANDON AVE FROM E 93RD ST TO E 91ST ST 2.0 04/01/08 08/30/08 130,000 04/26/08 0 70
300 06 0308 / 5414 ON S MANISTEE AVE FROM E 97TH ST TO E 98TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,608 100
300 06 0308 / 5414 ON S MUSKEGON AVE FROM E 97TH ST TO E 98TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,608 100
281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0
300 06 / 32275 10700-10900 S HOXIE AVE .0 03/01/07 10/31/07 3,900 02/12/07 03/12/07 2,790 100

Totals per Design/Engineering 4.0 263,900 7,471


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 103

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON S EXCHANGE AVE FROM E 87TH ST TO E 91ST ST 19.0 08/12/02 08/12/02 3,857 08/09/02 08/09/02 3,990 100
300 06 0069 / 5233 3020 E 97TH ST 2.0 09/28/02 09/28/02 406 09/25/02 09/25/02 420 100

Totals per 250 Watt Changeout 21.0 4,263 4,410

Totals per Lighting/Electrical 1,694,939 1,751,040


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 104

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0096 / 5258 3522 E 106TH ST 2,164.0 03/01/03 09/01/03 56,523 03/01/06 09/01/06 65,383 0
302 00 0092 / 5774 3522 E 106TH ST 85.0 0 01/04/01 01/11/02 20,030 100
302 00 0092 / 5774 3456 E 112TH ST 1.0 0 03/27/01 03/27/01 236 100
302 00 0092 / 5774 3501 E 112TH ST 1.0 0 03/27/01 03/27/01 236 100
302 00 0092 / 5774 3524 E 112TH ST 1.0 0 03/27/01 03/27/01 236 100
302 00 0092 / 5774 3525 E 112TH ST 1.0 0 03/27/01 03/27/01 236 100
302 00 0092 / 5774 3556 E 112TH ST 1.0 0 03/27/01 03/27/01 236 100
302 00 0092 / 5774 3557 E 112TH ST 1.0 0 03/27/01 03/27/01 236 100
302 00 0092 / 5774 9800 S AVENUE H 1.0 0 12/11/01 12/11/01 236 100
805 06 0869 / 7055 9716 S AVENUE J 1.0 11/01/95 11/01/95 0 11/01/95 11/01/95 300 100
805 06 0849 / 7035 9640 S BALTIMORE AVE 1.0 10/18/96 10/18/96 0 10/18/96 10/18/96 300 100
805 06 1756 / 7942 9640 S BALTIMORE AVE 1.0 05/01/97 05/01/97 0 05/01/97 05/01/97 300 100
805 06 1777 / 7963 13016 S BURLEY AVE 1.0 04/17/97 04/17/97 0 04/17/97 04/17/97 300 100
805 06 1663 / 7849 13036 S BURLEY AVE 1.0 08/06/97 08/06/97 0 08/06/97 08/06/97 300 100
302 00 0092 / 5774 8740 S COMMERCIAL AVE 1.0 0 03/19/01 03/19/01 236 100
805 06 1538 / 7724 9558 S COMMERCIAL AVE 1.0 01/21/97 01/21/97 0 01/21/97 01/21/97 300 100
805 06 1519 / 7705 9610 S COMMERCIAL AVE 1.0 01/21/97 01/21/97 0 01/21/97 01/21/97 300 100
805 06 1530 / 7716 9656 S COMMERCIAL AVE 1.0 01/21/97 01/21/97 0 01/21/97 01/21/97 300 100
302 00 0092 / 5774 10199 S COMMERCIAL AVE 1.0 0 01/09/02 01/09/02 236 100
302 00 0092 / 5774 10241 S COMMERCIAL AVE 1.0 0 06/08/01 06/08/01 236 100
302 00 0092 / 5774 10253 S COMMERCIAL AVE 1.0 0 04/30/01 04/30/01 236 100
805 06 0678 / 6864 12643 S ESCANABA AVE 1.0 09/13/95 09/13/95 0 09/13/95 09/13/95 300 100
805 06 0587 / 6773 10912 S EWING AVE 1.0 01/06/95 01/06/95 0 01/06/95 01/06/95 300 100
805 06 1209 / 7395 8326 S HOUSTON AVE 1.0 01/30/97 01/30/97 0 01/30/97 01/30/97 300 100
805 06 1797 / 7983 13200 S MACKINAW AVE 1.0 04/10/97 04/10/97 0 04/10/97 04/10/97 300 100
805 06 0429 / 6615 10457 S TORRENCE AVE 1.0 05/31/95 05/31/95 0 05/31/95 05/31/95 300 100

Totals per Alley Lighting/Lamps 2,273.0 56,523 91,909

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 3522 E 106TH ST 1,944.0 06/01/07 12/31/07 57,231 01/31/08 02/11/08 55,501 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 105

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Strt Lighting/Lamps Installations
300 06 0053 / 5228 3522 E 106TH ST 2,768.0 0 09/13/02 09/25/02 50,400 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 TRUMBALL HOMES (CHA) 06/14/01 06/15/01 13,500 06/19/01 06/26/01 29,493 100
300 09 / 33076 2510 E 106TH ST 1.0 10/22/08 10/23/08 500 10/22/08 10/23/08 768 100
302 00 0092 / 5774 2949 E 126TH ST 1.0 0 04/27/01 04/27/01 471 100
302 00 0092 / 5774 2955 E 126TH ST 1.0 0 04/27/01 04/27/01 471 100
302 00 0092 / 5774 3001 E 126TH ST 1.0 0 04/27/01 04/27/01 471 100
302 00 0092 / 5774 3011 E 126TH ST 1.0 0 04/27/01 04/27/01 471 100
302 00 0092 / 5774 3015 E 126TH ST 1.0 0 04/27/01 04/27/01 471 100
300 09 / 33076 2610 E 136TH ST 2.0 10/22/08 10/23/08 1,000 10/22/08 10/23/08 1,537 100
300 06 0071 / 5234 9801 S AVENUE G 01/01/00 12/30/00 0 09/15/00 09/22/00 9,450 100
302 00 0092 / 5774 9050 S BRANDON AVE 1.0 0 07/10/01 07/10/01 471 100
302 00 0092 / 5774 9058 S BRANDON AVE 1.0 0 07/10/01 07/10/01 471 100
302 00 0092 / 5774 9546 S EWING AVE 1.0 0 11/09/01 11/09/01 404 100
300 09 / 33076 13600 S TORRENCE AVE 1.0 10/22/08 10/23/08 500 10/22/08 10/23/08 768 100

Totals per Flood Light Install 12.0 15,500 45,717

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0288 / 5395 TRUMBALL HOMES (CHA) 116.0 03/01/05 12/31/07 600,000 12/17/04 12/20/04 457,687 100
281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts 116.0 600,000 457,687

Work Type: Loop Lighting Blocks


281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental Lighting Blocks


281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 106

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: POD Camera Pole Poles
281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 3522 E 106TH ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32277 ON S AVENUE H FROM E 98TH ST TO E 99TH ST .0 05/04/08 12/31/08 0 0 0
300 06 / 32277 ON S AVENUE J FROM E 98TH ST TO E 99TH ST .0 05/04/08 12/31/08 0 0 0
300 06 / 32277 ON S BRANDON AVE FROM E 93RD ST TO E 91ST ST .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON S BUFFALO AVE FROM E 108TH ST TO E 109TH ST 1.0 06/01/05 07/15/05 0 06/10/05 08/12/05 59,430 100
300 06 0298 / 5405 ON S MACKINAW AVE FROM E 108TH ST TO E 109TH ST 1.0 06/01/05 07/01/05 0 06/10/05 08/19/05 59,430 100
300 06 0308 / 5414 ON S MANISTEE AVE FROM E 97TH ST TO E 98TH ST 1.0 05/04/06 07/21/06 105,100 05/04/06 07/21/06 73,363 100
300 06 0308 / 5414 ON S MUSKEGON AVE FROM E 97TH ST TO E 98TH ST 1.0 05/04/06 07/21/06 105,100 05/04/06 07/21/06 73,363 100

Project has been completed as of 07/21/2006 Note Last Updated on 25-AUG-06


300 06 / 32275 10700-10900 S HOXIE AVE 2.0 04/01/07 12/31/07 199,647 04/02/07 07/13/07 117,514 100

Totals per Residntl Staggered Lighting 6.0 409,847 383,100

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S ESCANABA AVE FROM E 85TH ST TO E 87TH ST 2.0 04/15/03 06/15/03 166,811 04/14/03 05/16/03 150,606 100
300 06 0267 / 5375 ON S EXCHANGE AVE FROM E 85TH ST TO E 87TH ST 2.0 09/20/04 11/20/04 177,934 10/06/04 11/05/04 136,319 100

Totals per Residntl Strt Lighting/Lamps 4.0 344,745 286,925

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 9059 S BURLEY AVE 1.0 0 06/13/01 06/13/01 378 100

Totals per Short Arm Installs - Residntl 1.0 0 378


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 107

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0117 / 5271 ON E 106TH ST FROM S AVENUE O TO S AVENUE H 14.0 04/14/00 05/01/00 5,000 04/14/00 0
300 07 0010 / 5433 ON E 91ST ST FROM S EXCHANGE AVE TO S HOUSTON AVE 11.0 04/18/06 11/18/06 2,750 09/09/06 09/15/06 3,682 100
300 07 0010 / 5433 ON E 92ND ST FROM S EXCHANGE AVE TO S HOUSTON AVE 14.0 04/18/06 11/18/06 3,500 09/09/06 09/15/06 4,687 100
300 07 0010 / 5433 ON S COMMERCIAL AVE FROM E 91ST ST TO S SOUTH CHICAGO AVE 15.0 04/18/06 11/18/06 3,750 09/09/06 09/15/06 5,021 100
300 06 0117 / 5271 ON S EWING AVE FROM E 104TH ST TO E 108TH ST 68.0 04/14/00 05/01/00 24,000 04/14/00 0
300 04 0216 / 5114 ON S EWING AVE FROM E 97TH ST TO E 99TH ST 28.0 05/01/06 11/01/06 6,056 05/17/06 05/30/06 6,056 100

Totals per Strt Light Pole Painting 150.0 45,056 19,446

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 10609 S AVENUE B .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Lighting Blocks


300 06 0135 / 5288 ON E 106TH ST FROM S AVENUE O TO S AVENUE H 3.0 09/01/01 11/01/01 43,200 10/25/00 11/08/00 37,574 100
300 06 0246 / 5356 ON E 131ST ST FROM S MARQUETTE AVE TO S EXCHANGE AVE 09/01/03 12/31/03 33,052 08/20/03 08/30/04 33,052 100
300 06 0135 / 5288 ON S EWING AVE FROM E 104TH ST TO E 108TH ST 4.0 57,600 10/25/00 11/08/00 0 100

Totals per Strt Lighting 7.0 133,852 70,626

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 3522 E 106TH ST 1,381.0 03/01/04 12/01/04 7,181 07/31/06 08/09/06 15,039 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 108

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0099 / 5260 3522 E 106TH ST 369.0 09/03/03 09/08/03 20,741 08/28/03 09/02/03 13,886 100
805 06 2611 / 8797 2695 E 95TH ST 10.0 03/03/95 03/03/95 0 03/03/95 03/03/95 7,500 100
805 06 2325 / 8511 3105 E 95TH ST 10.0 05/24/96 05/24/96 0 05/24/96 05/24/96 7,500 100
302 00 0070 / 5758 9950 S AVENUE L 0 06/12/97 06/19/97 22,706 100
805 06 2165 / 8351 9951 S AVENUE L 56.0 06/19/97 06/19/97 0 06/19/97 06/19/97 42,000 100
805 06 2478 / 8664 9895 S AVENUE M 38.0 10/10/95 10/10/95 0 10/10/95 10/10/95 28,500 100
805 06 2456 / 8642 9932 S AVENUE M 20.0 10/02/95 10/02/95 0 10/02/95 10/02/95 15,000 100
302 00 0071 / 5759 9940 S EWING AVE 0 02/09/99 02/15/99 7,759 100
302 00 0071 / 5759 9950 S EWING AVE 0 02/04/99 02/15/99 19,493 100
805 06 2453 / 8639 10001 S EWING AVE 20.0 03/05/91 03/05/91 0 03/05/91 03/05/91 15,000 100
805 06 2454 / 8640 10001 S EWING AVE 27.0 03/05/91 03/05/91 0 03/05/91 03/05/91 20,250 100
805 06 2455 / 8641 10004 S EWING AVE 8.0 03/05/91 03/05/91 0 03/05/91 03/05/91 6,000 100
805 06 2394 / 8580 9499 S MANISTEE AVE 70.0 12/08/95 12/08/95 0 12/08/95 12/08/95 52,500 100
302 00 0071 / 5759 12600 S MARQUETTE AVE 0 03/03/98 03/05/98 2,808 100
805 06 2828 / 9014 9499 S SOUTH CHICAGO AVE 12.0 04/07/94 04/07/94 0 04/07/94 04/07/94 9,000 100

Totals per Underpass Lighting 640.0 20,741 269,902


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 109

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S AVENUE O AND E 133RD ST 1.0 0 03/19/02 03/19/02 8,539 100
210 06 0130 / 4389 S AVENUE O AND E 134TH ST 1.0 0 03/05/02 03/05/02 8,539 100
210 06 0130 / 4389 S EWING AVE AND E 99TH ST 1.0 0 09/27/01 09/27/01 8,539 100
210 06 0130 / 4389 S SOUTH SHORE DR AND E 83RD ST .50 0 10/23/01 10/23/01 4,270 100
210 06 0130 / 4389 S TORRENCE AVE AND E 130TH ST 1.0 0 05/16/02 05/16/02 1,850 100

Totals per LED Signal Head Install 4.50 0 31,737

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 ON E 87TH ST FROM S BUFFALO AVE TO S BURLEY AVE 2.0 8,000 05/18/01 06/07/01 9,231 100
300 06 0197 / 5322 S COMMERCIAL AVE AND E 91ST ST 3.0 12,000 05/18/01 06/04/01 11,076 100
300 06 0197 / 5322 S COMMERCIAL AVE AND E 92ND ST 3.0 12,000 05/07/01 05/21/01 9,938 100
300 06 0197 / 5322 9360 S SOUTH CHICAGO AVE 3.0 2,800 05/11/01 05/21/01 2,800 100

Totals per Removal Temp Wiring - Signals 11.0 34,800 33,045

Work Type: Signals Intersections


300 06 0096 / 5258 3522 E 106TH ST 43.0 07/13/03 07/20/03 0 07/11/06 10/17/06 6,799 100

Work Type: TSM Install Locations


300 06 0195 / 5320 E 133RD ST AND S AVENUE O 1.0 12/01/01 11/15/02 200,000 12/11/01 10/16/02 146,517 100
300 06 0195 / 5320 E 134TH ST AND S AVENUE O 1.0 12/01/01 06/30/02 200,000 11/16/01 02/28/02 146,517 100
210 06 0075 / 4339 E 95TH ST AND S EWING AVE 04/01/04 06/01/04 249,000 03/18/04 06/18/04 234,815 100
814 06 0189 / 16401 2500 E 130TH ST 1.0 04/03/95 04/03/95 0 04/03/95 04/03/95 125,000 100
814 06 0071 / 16287 10000 S COMMERCIAL AVE 1.0 11/28/94 11/28/94 0 11/28/94 11/28/94 74,947 100
814 06 0234 / 16446 10599 S MUSKEGON AVE 1.0 01/01/89 01/01/89 0 01/01/89 01/01/89 90,000 100
814 06 0075 / 16291 12200 S TORRENCE AVE 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 126,636 100

Totals per TSM Install 6.0 649,000 944,432

Work Type: Traffic Equipment Painting Locations


300 07 0010 / 5433 ON E 91ST ST FROM S HOUSTON AVE TO S EXCHANGE AVE 13.0 04/18/06 11/18/06 6,600 09/09/06 09/15/06 4,352 100
300 07 0010 / 5433 ON E 92ND ST FROM S HOUSTON AVE TO S EXCHANGE AVE 13.0 04/18/06 11/18/06 6,680 09/09/06 09/15/06 4,352 100

Totals per Traffic Equipment Painting 26.0 13,280 8,704


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 110

1/1/2008 AND 12/31/2008

Ward 10 John Pope


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Totals per Traffic 697,080 1,024,717

Totals per Construction Phase 2,392,019 2,775,757

Totals for Ward 10 2,655,919 2,783,228


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 111

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON S LOWE AVE FROM W 37TH ST TO W PERSHING RD .0 04/01/08 08/30/08 0 0 0
300 06 / 32277 ON W 43RD PL FROM S WALLACE ST TO S CANAL ST .0 04/01/08 08/30/08 0 0 0
300 06 0292 / 5399 S DAMEN AVE AND W 33RD ST 1.0 5,000 01/20/05 04/08/05 1,454 100
300 06 0308 / 5414 W 46TH PL AND S WALLACE ST .0 02/01/06 07/31/06 75,861 02/01/06 07/31/06 1,296 100
300 06 0292 / 5399 3700 S NORMAL AVE 1.0 01/14/05 03/28/05 5,000 12/15/04 05/09/05 5,000 100
300 06 0282 / 5390 470 W 26TH ST 1.0 10/20/04 02/23/05 1,000 01/15/05 02/28/05 0 100
300 06 0292 / 5399 1548 W 33RD ST 1.0 2,000 06/16/05 09/08/05 840 100
281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Design/Engineering 4.0 88,861 8,590


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 112

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 09 / 33077 ON S LEAVITT ST FROM W 34TH ST TO W 35TH ST 4.0 08/25/08 08/25/08 1,600 08/25/08 08/25/08 1,158 100
300 06 0122 / 5275 ON W 47TH PL FROM S UNION AVE TO S HALSTED ST 3.0 07/01/03 07/02/03 1,305 06/17/03 06/18/03 676 100
300 06 0122 / 5275 ON W 48TH ST FROM S UNION AVE TO S HALSTED ST 4.0 07/01/03 07/02/03 1,740 06/17/03 06/18/03 901 100
300 06 0069 / 5233 3100 S BENSON ST 5.0 10/06/02 10/06/02 1,015 10/03/02 10/03/02 1,050 100
300 06 0122 / 5275 2900 S CANAL ST 7.0 05/10/03 05/12/03 2,825 05/01/03 05/01/03 1,195 100
300 06 0122 / 5275 3359 S HOYNE AVE 11/01/03 11/01/03 1,291 11/05/03 11/05/03 586 100
300 06 0069 / 5233 3733 S PAULINA ST 1.0 11/08/02 11/08/02 203 11/05/02 11/05/02 210 100
300 06 0069 / 5233 4400 S UNION AVE 3.0 05/12/02 05/12/02 609 05/09/02 05/09/02 630 100
300 06 0069 / 5233 4335 S WALLACE ST 1.0 01/26/03 01/26/03 203 01/23/03 01/23/03 210 100
300 06 0069 / 5233 1814 W 35TH ST 2.0 01/31/03 01/31/03 406 01/30/03 01/30/03 420 100
300 06 0069 / 5233 1644 W 37TH PL 1.0 11/08/02 11/08/02 203 11/05/02 11/05/02 210 100
300 06 0122 / 5275 1900 W 38TH ST 2.0 06/02/03 06/03/03 950 05/06/03 05/06/03 225 100
300 06 0122 / 5275 1936 W 38TH ST 1.0 05/04/03 05/04/03 375 05/01/03 05/01/03 119 100
300 06 0122 / 5275 1944 W 38TH ST 1.0 05/04/03 05/04/03 375 05/01/03 05/01/03 119 100

Totals per 250 Watt Changeout 35.0 13,100 7,709

Work Type: 400 Watt Changeout Fixtures


300 06 0225 / 5340 ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST 06/05/03 06/13/03 5,000 06/05/03 06/13/03 9,026 100
300 06 0225 / 5340 ON W 35TH ST FROM S STEWART AVE TO S WENTWORTH AVE 06/05/03 06/13/03 7,500 06/05/03 06/13/03 11,905 100

Totals per 400 Watt Changeout 12,500 20,931

Totals per Lighting/Electrical 3,852,550 4,201,250


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 113

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0727 / 6913 3217 S ARCHER AVE 1.0 03/28/96 03/28/96 0 03/28/96 03/28/96 300 100
805 06 0708 / 6894 3272 S ARCHER AVE 1.0 01/08/97 01/08/97 0 01/08/97 01/08/97 300 100
805 06 0743 / 6929 4325 S EMERALD AVE 1.0 09/17/96 09/17/96 0 09/17/96 09/17/96 300 100
805 06 0724 / 6910 4532 S EMERALD AVE 1.0 08/19/96 08/19/96 0 08/19/96 08/19/96 300 100
805 06 0735 / 6921 4640 S EMERALD AVE 1.0 08/11/95 08/11/95 0 08/11/95 08/11/95 300 100
805 06 1068 / 7254 3624 S HALSTED ST 1.0 03/22/96 03/22/96 0 03/22/96 03/22/96 300 100
300 06 0139 / 5289 3659 S HALSTED ST 1,527.0 03/01/06 09/01/06 33,308 02/15/06 03/01/06 46,137 100
302 00 0092 / 5774 3659 S HALSTED ST 41.0 0 01/29/01 01/25/02 9,662 100
805 06 0353 / 6539 3620 S LEAVITT ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 1832 / 8018 2707 S LOWE AVE 1.0 01/04/96 01/04/96 0 01/04/96 01/04/96 300 100
805 06 1850 / 8036 2820 S LOWE AVE 1.0 01/06/95 01/06/95 0 01/06/95 01/06/95 300 100
805 06 1871 / 8057 4534 S LOWE AVE 1.0 07/06/95 07/06/95 0 07/06/95 07/06/95 300 100
805 06 1958 / 8144 3601 S MORGAN ST 1.0 09/17/96 09/17/96 0 09/17/96 09/17/96 300 100
805 06 1959 / 8145 3611 S MORGAN ST 1.0 09/17/96 09/17/96 0 09/17/96 09/17/96 300 100
805 06 1960 / 8146 3619 S MORGAN ST 1.0 09/17/96 09/17/96 0 09/17/96 09/17/96 300 100
805 06 0609 / 6795 2914 S PARNELL AVE 1.0 02/03/97 02/03/97 0 02/03/97 02/03/97 300 100
805 06 1730 / 7916 2934 S PARNELL AVE 1.0 05/29/97 05/29/97 0 05/29/97 05/29/97 300 100
805 06 0610 / 6796 3045 S PARNELL AVE 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0611 / 6797 3839 S PARNELL AVE 1.0 07/17/96 07/17/96 0 07/17/96 07/17/96 300 100
805 06 1677 / 7863 2702 S PRINCETON AVE 1.0 07/28/97 07/28/97 0 07/28/97 07/28/97 300 100
805 06 0581 / 6767 3236 S PRINCETON AVE 1.0 06/19/95 06/19/95 0 06/19/95 06/19/95 300 100
805 06 0569 / 6755 2741 S QUINN ST 1.0 06/17/96 06/17/96 0 06/17/96 06/17/96 300 100
805 06 0672 / 6858 2640 S SHIELDS AVE 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
805 06 0650 / 6836 2743 S SHIELDS AVE 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1630 / 7816 2912 S SHIELDS AVE 1.0 09/18/97 09/18/97 0 09/18/97 09/18/97 300 100
805 06 1554 / 7740 3638 S UNION AVE 1.0 10/15/97 10/15/97 0 10/15/97 10/15/97 300 100
805 06 1764 / 7950 3817 S UNION AVE 1.0 05/13/97 05/13/97 0 05/13/97 05/13/97 300 100
805 06 1459 / 7645 4639 S WALLACE ST 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 0538 / 6724 2855 S WELLS ST 1.0 07/24/95 07/24/95 0 07/24/95 07/24/95 300 100
805 06 0539 / 6725 3023 S WENTWORTH AVE 1.0 12/13/96 12/13/96 0 12/13/96 12/13/96 300 100
805 06 0921 / 7107 333 W 25TH PL 1.0 12/13/95 12/13/95 0 12/13/95 12/13/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 114

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0937 / 7123 340 W 26TH ST 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
805 06 0912 / 7098 344 W 26TH ST 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
805 06 1741 / 7927 630 W 26TH ST 1.0 05/15/97 05/15/97 0 05/15/97 05/15/97 300 100
805 06 0913 / 7099 312 W 27TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
302 00 0092 / 5774 324 W 27TH ST 1.0 0 05/03/01 05/03/01 236 100
805 06 0914 / 7100 333 W 27TH ST 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
805 06 0915 / 7101 343 W 27TH ST 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
805 06 0886 / 7072 848 W 27TH ST 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 0888 / 7074 323 W 28TH PL 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 0872 / 7058 345 W 28TH PL 1.0 08/16/95 08/16/95 0 08/16/95 08/16/95 300 100
805 06 0890 / 7076 353 W 28TH PL 1.0 08/16/95 08/16/95 0 08/16/95 08/16/95 300 100
805 06 0911 / 7097 334 W 29TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1525 / 7711 1300 W 32ND PL 1.0 11/05/97 11/05/97 0 11/05/97 11/05/97 300 100
805 06 1769 / 7955 1240 W 32ND ST 1.0 05/15/97 05/15/97 0 05/15/97 05/15/97 300 100
805 06 0926 / 7112 525 W 45TH ST 1.0 02/07/97 02/07/97 0 02/07/97 02/07/97 300 100
805 06 0928 / 7114 527 W 46TH ST 1.0 04/18/95 04/18/95 0 04/18/95 04/18/95 300 100

Totals per Alley Lighting/Lamps 1,613.0 33,308 69,235

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 3659 S HALSTED ST 2,064.0 06/01/07 12/31/07 60,764 09/01/07 10/26/07 60,764 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 3659 S HALSTED ST 1,949.0 0 07/15/02 07/18/02 35,488 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 115

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0198 / 5323 BRIDGE PORT HOMES (CHA) 06/08/01 06/09/01 10,750 06/01/01 06/01/01 15,675 100
302 00 0092 / 5774 S BONFIELD ST AND W 31ST ST 1.0 0 05/14/01 05/14/01 471 100
300 06 0069 / 5233 3401 S CLAREMONT AVE 3.0 1,455 11/13/02 11/13/02 1,300 100
300 06 0167 / 5306 3706 S UNION AVE 1.0 0 01/17/99 01/17/99 351 100
302 00 0092 / 5774 3020 S WALLACE ST 1.0 0 05/08/01 05/08/01 471 100
302 00 0092 / 5774 3032 S WALLACE ST 1.0 0 05/08/01 05/08/01 471 100
302 00 0092 / 5774 244 W 33RD ST 2.0 0 09/10/01 09/10/01 689 100
300 06 0071 / 5234 2210 W PERSHING RD 01/01/00 12/30/00 0 09/13/00 09/14/00 5,400 100

Totals per Flood Light Install 9.0 12,205 24,828

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts .0 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 1548 W 33RD ST .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Operations project Note Last Updated on 01-NOV-07


281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts .0 0 0

Work Type: Lighting Imprvmnts Projects


300 06 0199 / 5324 ON S EMERALD AVE FROM W 35TH ST TO W 37TH ST 1.0 07/01/01 12/01/01 185,721 06/04/01 08/22/01 153,368 100

Work Type: Loop Lighting Blocks


281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Loop Lighting .0 0 0


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 116

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental Lighting Blocks
300 06 0156 / 5296 ON W 26TH ST FROM S NORMAL AVE TO S HALSTED ST 3.0 11/01/01 08/30/02 14,000 11/29/01 05/13/02 91,995 100
300 06 0156 / 5296 ON W 35TH ST FROM S NORMAL AVE TO S MORGAN ST 6.0 08/01/01 02/15/02 294,500 09/04/01 12/14/01 229,272 100
281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Ornamental Lighting 9.0 308,500 321,267

Work Type: POD Camera Pole Poles


281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per POD Camera Pole .0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 3659 S HALSTED ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 05 0011 / 5126 ON S ARCHER AVE FROM S LOOMIS ST TO S PITNEY CT 3.0 04/04/05 11/18/05 210,000 11/07/05 03/10/06 192,236 100
300 05 0011 / 5126 ON S CANAL ST FROM W 29TH ST TO W 31ST ST 2.0 04/04/05 11/18/05 170,000 10/10/05 11/30/05 105,431 100
300 05 0011 / 5126 ON S EMERALD AVE FROM W 45TH ST TO W 47TH ST 2.0 04/04/05 11/18/05 170,000 10/10/05 11/30/05 128,603 100
300 06 / 32277 ON S LOWE AVE FROM W 37TH ST TO W PERSHING RD .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON S SEELEY AVE FROM W 35TH ST TO W 37TH ST 2.0 06/20/05 07/30/05 0 07/06/05 08/19/05 115,086 100
300 07 0011 / 5434 ON S UNION AVE FROM W 31ST ST TO W 33RD ST 2.0 05/01/07 07/01/07 170,000 11/15/06 111,582 95
300 09 / 33077 ON S WALLACE ST FROM W 43RD ST TO W 44TH ST 1.0 65,000 04/01/08 12/01/08 0 0
300 06 / 32277 ON W 43RD PL FROM S WALLACE ST TO S CANAL ST .0 05/04/08 12/31/08 0 0 0
300 09 / 33077 ON W 43RD PL FROM S WALLACE ST TO S HALSTED ST 1.0 65,000 04/01/08 12/01/08 0 0
300 05 0011 / 5126 ON W 46TH ST FROM S STEWART AVE TO S UNION AVE 1.0 04/04/05 11/18/05 85,000 09/08/05 11/11/05 50,929 100
300 06 0308 / 5414 W 46TH PL AND S WALLACE ST 1.0 05/16/06 08/01/06 75,861 05/16/06 08/01/06 66,683 100

project has been completed as of 08/01/2006 Note Last Updated on 25-AUG-06


Totals per Residntl Staggered Lighting 15.0 1,010,861 770,550
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 117

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 03 0011 / 4882 ON S LOWE AVE FROM W 31ST ST TO W 35TH ST 4.0 12/01/04 02/01/05 250,000 12/01/04 03/01/05 198,962 100
300 06 0122 / 5275 ON S LOWE AVE FROM W 35TH ST TO W 37TH ST 2.0 12/15/03 03/01/04 150,000 12/01/03 04/19/04 220,920 100
300 06 0069 / 5233 ON S LOWE AVE FROM W 44TH ST TO W 46TH ST 2.0 09/15/02 11/15/02 165,000 09/13/02 01/15/03 131,500 100
300 06 0069 / 5233 ON S NORMAL BLVD FROM W 29TH ST TO W 31ST ST 2.0 03/01/03 05/15/03 180,000 02/18/03 03/31/03 143,865 100
300 06 0122 / 5275 ON S PARNELL AVE FROM W 29TH ST TO W 31ST ST 2.0 12/01/03 02/15/04 161,000 11/11/03 04/19/04 182,881 100
300 06 0235 / 5349 ON S UNION AVE FROM W 33RD ST TO W 35TH ST 2.0 05/01/03 07/01/03 159,067 05/08/03 07/11/03 133,390 100
300 06 0069 / 5233 ON S UNION AVE FROM W 35TH ST TO W 37TH ST 2.0 02/01/03 04/15/03 185,000 02/10/03 03/19/03 171,317 100
300 06 0122 / 5275 ON S WELLS ST FROM W 31ST ST TO W 33RD ST 2.0 12/15/03 03/01/04 150,000 11/17/03 04/05/04 160,286 100
300 03 0011 / 4882 ON W 34TH PL FROM S WOOD ST TO S DAMEN AVE 2.0 10/15/04 12/15/04 160,000 08/05/04 09/16/04 135,651 100
300 06 0069 / 5233 ON W 44TH ST FROM S CANAL ST TO S UNION AVE 2.0 08/19/02 10/01/02 195,000 08/19/02 01/08/03 152,620 100

Totals per Residntl Strt Lighting/Lamps 22.0 1,755,067 1,631,392

Work Type: Short Arm Installs - Arterial Locations


302 00 0092 / 5774 3001 S PARNELL AVE 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 3013 S PARNELL AVE 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 3026 S PARNELL AVE 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 3043 S PARNELL AVE 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 3059 S PARNELL AVE 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 4800 S UNION AVE 1.0 0 03/26/01 03/26/01 378 100
302 00 0092 / 5774 4808 S UNION AVE 1.0 0 03/26/01 03/26/01 378 100
281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 1643 W 38TH PL 1.0 0 04/20/01 04/20/01 378 100
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Arterial 8.0 0 3,024


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 118

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 3445 S HERMITAGE AVE 1.0 0 05/15/01 05/15/01 378 100
302 00 0092 / 5774 3449 S HERMITAGE AVE 1.0 0 05/15/01 05/15/01 378 100
302 00 0092 / 5774 3450 S HERMITAGE AVE 1.0 0 05/15/01 05/15/01 378 100
281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Residntl 3.0 0 1,134

Work Type: Strt Light Pole Painting Locations


302 00 0076 / 5764 ON S SHIELDS AVE FROM W 28TH PL TO W 31ST ST 13.0 04/09/98 04/09/98 0 04/09/98 04/09/98 221 100
300 06 0225 / 5340 ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST 05/30/03 06/17/03 3,625 05/30/03 06/17/03 5,285 100
300 06 0225 / 5340 ON W 35TH ST FROM S STEWART AVE TO S WENTWORTH AVE 05/30/03 06/17/03 5,250 05/30/03 06/17/03 3,780 100

Totals per Strt Light Pole Painting 13.0 8,875 9,286

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 911 W 37TH ST .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 1313 W FULLER ST .0 01/01/08 12/31/08 0 0 0

Totals per Strt Light Pole Replacmnt/Reloc .0 0 0

Work Type: Strt Lighting Blocks


300 06 0261 / 5369 ON W 35TH ST FROM S DAMEN AVE TO S WESTERN AVE 3.50 04/01/04 06/30/04 314,566 01/22/04 08/03/04 250,781 100
300 06 0246 / 5356 ON W 41ST ST FROM S HALSTED ST TO S WALLACE ST 08/01/03 11/30/03 23,274 07/18/03 10/14/03 23,274 100
300 06 0247 / 5357 700 W 46TH PL .25 06/16/03 06/30/03 32,500 06/12/03 08/05/03 32,201 100

Totals per Strt Lighting 3.75 370,340 306,256

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 3659 S HALSTED ST 2,806.0 03/01/04 12/01/04 14,591 07/31/06 09/19/06 30,557 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 119

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2609 / 8795 2495 S ARCHER AVE 24.0 10/09/91 10/09/91 0 10/09/91 10/09/91 18,000 100
805 06 2313 / 8499 3099 S ASHLAND AVE 26.0 01/01/91 01/01/91 0 01/01/91 01/01/91 19,500 100
805 06 2335 / 8521 3905 S ASHLAND AVE 18.0 12/31/91 12/31/91 0 12/31/91 12/31/91 13,500 100
805 06 2724 / 8910 2599 S CORBETT ST 20.0 01/14/91 01/14/91 0 01/14/91 01/14/91 15,000 100
805 06 2292 / 8478 3398 S DAMEN AVE 8.0 01/01/91 01/01/91 0 01/01/91 01/01/91 6,000 100
805 06 2688 / 8874 3399 S DAMEN AVE 14.0 08/16/91 08/16/91 0 08/16/91 08/16/91 10,500 100
805 06 2388 / 8574 3901 S EMERALD AVE 14.0 01/01/90 01/01/90 0 01/01/90 01/01/90 10,500 100
302 00 0071 / 5759 4000 S EMERALD AVE 0 09/07/98 09/14/98 12,802 100
300 06 0099 / 5260 3659 S HALSTED ST 1,187.0 09/09/03 09/24/03 66,718 09/03/03 09/15/03 49,190 100
805 06 2259 / 8445 3901 S HALSTED ST 34.0 12/13/96 12/13/96 0 12/13/96 12/13/96 25,500 100
805 06 2334 / 8520 3901 S HALSTED ST 12.0 01/01/91 01/01/91 0 01/01/91 01/01/91 9,000 100
805 06 2673 / 8859 3499 S HOYNE AVE 10.0 09/20/91 09/20/91 0 09/20/91 09/20/91 7,500 100
805 06 2768 / 8954 3595 S LEAVITT ST 10.0 10/02/91 10/02/91 0 10/02/91 10/02/91 7,500 100
805 06 2272 / 8458 3605 S LEAVITT ST 4.0 01/01/91 01/01/91 0 01/01/91 01/01/91 3,000 100
302 00 0071 / 5759 2820 S LOOMIS ST 0 02/20/99 02/25/99 7,115 100
805 06 2410 / 8596 3900 S NORMAL AVE 15.0 01/01/90 01/01/90 0 01/01/90 01/01/90 11,250 100
302 00 0071 / 5759 4000 S NORMAL AVE 0 02/24/99 03/05/99 16,487 100
805 06 2409 / 8595 3901 S UNION AVE 14.0 01/01/90 01/01/90 0 01/01/90 01/01/90 10,500 100
302 00 0071 / 5759 4000 S UNION AVE 0 02/26/99 03/05/99 14,813 100
805 06 2411 / 8597 3901 S WALLACE ST 10.0 01/01/90 01/01/90 0 01/01/90 01/01/90 7,500 100
302 00 0072 / 5760 4000 S WALLACE ST 1.0 0 02/21/00 02/25/00 9,600 100
805 06 2867 / 9053 3605 S WESTERN BLVD 7.0 01/01/91 01/01/91 0 01/01/91 01/01/91 5,250 100
302 00 0071 / 5759 400 W 25TH PL 0 06/12/98 06/23/98 20,920 100
805 06 2835 / 9021 135 W 26TH ST 8.0 10/13/93 10/13/93 0 10/13/93 10/13/93 6,000 100
302 00 0071 / 5759 400 W 26TH ST 0 05/25/98 06/07/98 41,745 100
805 06 2284 / 8470 401 W 26TH ST 34.0 03/20/94 03/20/94 0 03/20/94 03/20/94 25,500 100
805 06 2283 / 8469 401 W 28TH ST 86.0 06/14/96 06/14/96 0 06/14/96 06/14/96 64,500 100
805 06 2840 / 9026 138 W 29TH ST 8.0 10/07/93 10/07/93 0 10/07/93 10/07/93 6,000 100
805 06 2857 / 9043 405 W 29TH ST 34.0 11/19/93 11/19/93 0 11/19/93 11/19/93 25,500 100
805 06 2148 / 8334 1729 W 31ST PL 5.0 01/01/91 01/01/91 0 01/01/91 01/01/91 3,750 100
805 06 2692 / 8878 125 W 31ST ST 10.0 04/22/94 04/22/94 0 04/22/94 04/22/94 7,500 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 120

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2858 / 9044 401 W 32ND ST 54.0 05/01/91 05/01/91 0 05/01/91 05/01/91 40,500 100
805 06 2709 / 8895 1899 W 33RD ST 10.0 07/24/91 07/24/91 0 07/24/91 07/24/91 7,500 100
805 06 2818 / 9004 2001 W 34TH ST 10.0 08/23/91 08/23/91 0 08/23/91 08/23/91 7,500 100
302 00 0071 / 5759 400 W 35TH ST 0 02/24/98 03/12/98 40,902 100
805 06 2860 / 9046 401 W 35TH ST 56.0 06/12/92 06/12/92 0 06/12/92 06/12/92 42,000 100
805 06 2772 / 8958 2101 W 35TH ST 10.0 09/24/91 09/24/91 0 09/24/91 09/24/91 7,500 100
302 00 0071 / 5759 2140 W 35TH ST 0 09/03/98 09/08/98 11,638 100
805 06 2757 / 8943 2301 W 36TH ST 8.0 09/24/91 09/24/91 0 09/24/91 09/24/91 6,000 100
805 06 2861 / 9047 401 W 37TH ST 36.0 12/31/91 12/31/91 0 12/31/91 12/31/91 27,000 100
805 06 2862 / 9048 401 W 38TH ST 34.0 03/01/91 03/01/91 0 03/01/91 03/01/91 25,500 100
805 06 2836 / 9022 498 W 42ND PL 22.0 08/01/91 08/01/91 0 08/01/91 08/01/91 16,500 100
805 06 2739 / 8925 1331 W FULLER ST 18.0 03/01/91 03/01/91 0 03/01/91 03/01/91 13,500 100
805 06 2424 / 8610 405 W PERSHING RD 24.0 12/01/93 12/01/93 0 12/01/93 12/01/93 18,000 100

Totals per Underpass Lighting 1,895.0 66,718 755,462


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 121

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S ARCHER AVE AND S ASHLAND AVE 1.0 0 01/14/02 01/14/02 9,507 100
210 06 0219 / 4459 S ARCHER AVE AND S DAMEN AVE 1.0 04/11/05 04/11/05 10,563 0
210 06 0130 / 4389 S ARCHER AVE AND S HALSTED ST 1.0 0 01/15/02 01/18/02 13,974 100
210 06 0130 / 4389 S ARCHER AVE AND S THROOP ST 1.0 0 09/05/01 09/05/01 8,539 100
210 06 0130 / 4389 S ARCHER AVE AND S WOOD ST 1.0 0 01/17/02 01/17/02 8,539 100
210 06 0130 / 4389 S CANAL ST AND W 26TH ST 1.0 0 05/07/02 05/07/02 8,539 100
210 06 0130 / 4389 S LA SALLE ST AND W 31ST ST 1.0 0 04/10/02 04/10/02 7,078 100
210 06 0130 / 4389 S LOCK ST AND S ARCHER AVE 1.0 0 09/04/01 09/04/01 8,539 100
210 06 0130 / 4389 S UNION AVE AND W 26TH ST 1.0 0 05/08/02 05/08/02 6,867 100
210 06 0130 / 4389 S WALLACE ST AND W 26TH ST 1.0 0 05/15/02 05/15/02 8,539 100
210 06 0130 / 4389 S WALLACE ST AND W 31ST ST 1.0 0 01/31/02 01/31/02 15,228 100
210 06 0130 / 4389 S WENTWORTH AVE AND W 31ST ST 1.0 0 04/10/02 04/10/02 7,078 100

Totals per LED Signal Head Install 12.0 10,563 102,427

Work Type: Left Turn Arrow Locations


210 06 0127 / 4386 S HALSTED ST AND W PERSHING RD .0 10/01/07 12/31/07 85,000 101,236 50
210 06 0171 / 4420 W 35TH ST AND S DAMEN AVE .0 03/01/07 12/31/07 0 0 0

Totals per Left Turn Arrow .0 85,000 101,236

Work Type: New Signal Locations


300 06 0283 / 5391 S HALSTED ST AND W 31ST ST 1.0 09/02/04 09/30/04 11,341 09/09/04 09/09/04 11,341 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S DAMEN AVE AND W 37TH ST 2.0 8,000 06/05/01 06/06/01 3,590 100
300 06 0197 / 5322 S HALSTED ST AND W 43RD ST 1.0 03/20/01 04/20/01 4,000 03/22/01 04/06/01 6,489 100
300 06 0197 / 5322 S UNION AVE AND W ROOT ST 1.0 4,000 04/12/01 04/08/02 180 100
300 06 0197 / 5322 W 26TH ST AND S HALSTED ST 1.0 03/20/01 04/20/01 4,000 03/20/01 04/10/01 7,700 100
300 06 0197 / 5322 W 26TH ST AND S WENTWORTH AVE 1.0 04/20/01 04/26/01 4,000 04/20/01 04/26/01 2,672 100

Totals per Removal Temp Wiring - Signals 6.0 24,000 20,631

Totals per Traffic 446,404 926,059


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 122

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Signals Intersections
300 06 0096 / 5258 3659 S HALSTED ST 72.0 08/19/03 08/26/03 0 09/08/03 11/10/03 11,385 100

Work Type: TSM Install Locations


210 06 0025 / 4299 3600 S ARCHER AVE 1.0 08/01/98 10/01/98 150,000 11/11/98 02/03/99 131,974 100
814 06 0168 / 16380 3100 S EMERALD AVE 1.0 08/12/97 10/22/97 0 08/12/97 10/22/97 200,000 100
814 06 0089 / 16305 2500 S HALSTED ST 1.0 12/07/93 12/07/93 0 12/07/93 12/07/93 47,111 100
814 06 0058 / 16274 3000 S HALSTED ST 1.0 04/03/95 04/03/95 0 04/03/95 04/03/95 150,729 100
210 06 0057 / 4324 3400 S HALSTED ST 1.0 11/15/98 12/31/98 150,000 12/16/98 02/25/99 88,789 100
210 06 0074 / 4338 600 W 26TH ST 1.0 05/01/02 08/01/02 15,500 04/12/02 05/17/02 60,436 100

Totals per TSM Install 6.0 315,500 679,039

Totals per Construction Phase 4,298,954 5,127,309

Totals for Ward 11 4,387,815 5,135,899


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 123

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32456 LAWNDALE GARDENS .0 04/02/07 03/12/08 30,000 01/07/08 0 5

Additional lighting on California side due to wide parkway-sidewalk. It will be a continuation of lighting north of 25th Street Note Last Updated on 11-FEB-08
300 06 / 32146 ON S ARTESIAN AVE FROM W PERSHING RD TO W POPE JOHN PAUL II DR 1.0 05/01/07 10/31/07 16,000 08/17/07 09/26/07 5,200 100
300 09 / 33078 ON S MARSHALL BLVD FROM W 21ST ST TO W 24TH BLVD .0 01/01/08 05/30/08 0 04/01/08 12/01/08 0 0
300 06 0308 / 5414 ON S ROCKWELL ST FROM W POPE JOHN PAUL II DR TO W 45TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,315 100
300 06 / 32129 ON W 25TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE .0 11/27/06 02/14/07 3,700 11/27/06 02/14/07 2,414 100
300 06 / 32277 ON W 38TH ST FROM S HOMAN AVE TO S SACRAMENTO AVE .0 04/01/08 08/30/08 0 0 0
300 06 0292 / 5399 W 38TH ST AND S ARCHER AVE 1.0 1,000 05/12/05 05/13/05 0 100
300 09 / 33078 3819 S CAMPBELL AVE .0 01/01/08 05/30/08 0 04/01/08 12/01/08 0 0
300 06 0282 / 5390 3030 S KEDZIE AVE 1.0 09/03/04 10/22/04 1,000 10/01/04 10/22/04 1,488 100
300 06 0292 / 5399 4555 S WESTERN BLVD 1.0 3,500 05/26/05 08/10/05 3,361 100
300 06 0292 / 5399 2320 W 47TH ST 1.0 04/22/05 04/26/05 2,000 04/22/05 04/26/05 1,749 100

Totals per Design/Engineering 5.0 57,200 16,527

Work Type: Feasibility Study Projects


302 00 0079 / 5767 ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100

Totals per Lighting/Electrical 57,200 16,527


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 124

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 03 0012 / 4883 ON S ALBANY AVE FROM W 24TH ST TO W 25TH ST 10.0 10/01/04 10/10/04 3,905 10/08/04 10/19/04 2,236 100
300 06 0122 / 5275 ON S ALBANY AVE FROM W 36TH ST TO W PERSHING RD 9.20 08/01/04 08/15/04 3,634 06/14/04 06/22/04 2,505 100
300 06 0069 / 5233 ON S CALIFORNIA AVE FROM W 43RD ST TO W 47TH ST 60.0 10/04/02 10/22/02 24,000 10/01/02 10/18/02 12,463 100
300 06 0069 / 5233 ON S CAMPBELL AVE FROM W 40TH ST TO W 42ND ST 12.0 07/18/02 07/18/02 2,520 07/15/02 07/15/02 2,436 100
300 11 / 32201 ON S FAIRFIELD AVE FROM W 42ND ST TO W 44TH ST 13.0 11/01/07 11/20/07 5,200 10/11/07 10/11/07 2,500 100
300 06 0122 / 5275 ON S FAIRFIELD AVE FROM W 45TH ST TO W 47TH ST 03/13/03 03/13/03 2,940 03/10/03 03/10/03 2,940 100
300 06 0122 / 5275 ON S FRANCISCO AVE FROM W 36TH ST TO W PERSHING RD 3.0 08/01/04 08/15/04 1,125 06/15/04 06/21/04 919 100
300 06 0122 / 5275 ON S HOMAN AVE FROM W 37TH ST TO W PERSHING RD 9.0 08/01/04 08/15/04 3,375 06/15/04 06/21/04 2,502 100
300 06 0122 / 5275 ON S HOYNE AVE FROM W 47TH ST TO W 49TH ST 10.0 03/14/03 03/14/03 2,030 03/11/03 03/11/03 2,100 100
300 11 / 32201 ON S MAPLEWOOD AVE FROM W 40TH ST TO W 44TH ST 25.0 11/01/07 11/20/07 10,400 10/11/07 10/11/07 2,500 100
300 06 0069 / 5233 ON S MOZART ST FROM W 43RD ST TO W 47TH ST 30.0 10/04/02 10/22/02 12,000 10/01/02 10/18/02 6,232 100
300 06 0122 / 5275 ON S MOZART ST FROM W 45TH ST TO W 47TH ST 4.50 03/15/03 03/15/03 914 03/12/03 03/12/03 945 100
300 06 0122 / 5275 ON S ROCKWELL ST FROM W 45TH ST TO W 47TH ST 8.0 03/15/03 03/15/03 1,624 03/12/03 03/12/03 1,680 100
300 11 / 32201 ON S ROCKWELL ST FROM W 45TH ST TO W 47TH ST 29.0 11/01/07 11/15/07 12,000 10/04/07 10/12/07 12,000 100
300 03 0012 / 4883 ON S SACRAMENTO AVE FROM W 24TH ST TO W 25TH ST 10.0 10/01/04 10/10/04 3,910 10/08/04 10/19/04 2,237 100
300 06 0122 / 5275 ON S SPAULDING AVE FROM W 37TH PL TO W 38TH ST 3.0 06/21/04 06/25/04 1,125 06/15/04 06/21/04 1,172 100
300 11 / 32201 ON S TALMAN AVE FROM W 42ND ST TO W 44TH ST 12.0 11/01/07 11/15/07 4,800 10/11/07 10/11/07 2,500 100
300 06 0122 / 5275 ON S TALMAN AVE FROM W 45TH ST TO W 47TH ST 9.0 03/15/03 03/15/03 1,827 03/12/03 03/12/03 1,890 100
300 03 0012 / 4883 ON S TROY ST FROM W 24TH ST TO W 25TH ST 2.50 10/01/04 10/10/04 975 10/08/04 10/19/04 559 100
300 06 0122 / 5275 ON S WASHTENAW AVE FROM W 45TH ST TO W 47TH ST 9.0 03/15/03 03/15/03 1,827 03/12/03 03/12/03 1,890 100
300 03 0012 / 4883 ON S WHIPPLE ST FROM W 24TH ST TO W 25TH ST 5.0 10/01/04 10/10/04 1,950 10/08/04 10/19/04 1,118 100
300 03 0012 / 4883 ON W 24TH ST FROM S TROY ST TO S MARSHALL BLVD 5.0 10/01/04 10/10/04 1,950 10/08/04 10/19/04 1,117 100
300 03 0012 / 4883 ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE 4.15 10/01/04 10/10/04 1,619 10/08/04 10/19/04 928 100
300 06 0122 / 5275 ON W 36TH PL FROM S FRANCISCO AVE TO S ALBANY AVE 9.0 08/01/04 08/15/04 3,375 06/15/04 06/21/04 2,502 100
300 06 0122 / 5275 ON W 36TH ST FROM S FRANCISCO AVE TO S ALBANY AVE 15.0 08/01/04 08/15/04 6,025 06/15/04 06/21/04 3,832 100
300 06 0122 / 5275 ON W 38TH ST FROM S CALIFORNIA AVE TO S FRANCISCO AVE 9.0 08/01/04 08/15/04 3,375 06/15/04 06/21/04 2,502 100
300 06 0069 / 5233 3000 S ALBANY AVE 2.0 04/08/02 04/08/02 420 04/05/02 04/05/02 406 100
300 06 0122 / 5275 3301 S BELL AVE 2.0 11/01/03 11/01/03 862 11/05/03 11/05/03 400 100
300 06 0069 / 5233 4200-4259 S CAMPBELL AVE 5.0 0 07/15/02 07/15/02 1,875 100
300 06 0122 / 5275 3301 S CLAREMONT AVE 2.0 10/25/03 10/25/03 862 11/05/03 11/05/03 400 100
300 06 0122 / 5275 3301 S HAMILTON AVE 3.0 11/01/03 11/01/03 1,291 11/05/03 11/05/03 586 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 125

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 4501 S HERMITAGE AVE 2.0 0 02/23/01 02/23/01 413 100
300 06 0122 / 5275 3359 S LEAVITT ST 3.0 11/01/03 11/01/03 1,291 11/05/03 11/05/03 587 100
302 00 0092 / 5774 4401 S MARSHFIELD AVE 2.0 0 02/23/01 02/23/01 413 100
300 06 0122 / 5275 3300 S OAKLEY AVE 6.0 11/01/03 11/01/03 1,260 02/20/03 02/20/03 1,218 100
300 06 0122 / 5275 3359 S OAKLEY AVE 2.0 11/01/03 11/01/03 862 11/05/03 11/05/03 400 100
302 00 0092 / 5774 4124 S ROCKWELL ST 1.0 10/06/01 10/06/01 206 09/29/01 09/29/01 206 100
300 06 0122 / 5275 3301 S WESTERN AVE 3.0 11/01/03 11/01/03 1,291 11/05/03 11/05/03 400 100
300 06 0122 / 5275 2800 W 21ST PL 6.0 03/15/03 03/15/03 1,218 03/12/03 03/12/03 1,260 100
300 06 0122 / 5275 2800 W 25TH ST 2.0 03/28/03 03/28/03 406 03/25/03 03/25/03 420 100
300 06 0122 / 5275 2400 W 34TH PL 5.0 03/15/03 03/15/03 1,015 03/12/03 03/12/03 1,050 100
300 06 0122 / 5275 2400 W 34TH ST 6.0 03/14/03 03/14/03 1,260 03/11/03 03/11/03 1,218 100
300 06 0069 / 5233 3500 W 38TH PL 5.0 10/12/02 10/12/02 1,050 10/09/02 10/09/02 1,015 100
300 06 0122 / 5275 1700 W 45TH ST 3.0 02/23/03 02/23/03 630 03/20/03 03/20/03 609 100
302 00 0092 / 5774 2605-2639 W MONTGOMERY AVE 4.0 10/06/01 10/06/01 824 09/29/01 09/29/01 824 100

Totals per 250 Watt Changeout 379.35 133,172 89,904

Work Type: 400 Watt Changeout Fixtures


300 05 0012 / 5127 ON S CALIFORNIA AVE FROM W 24TH ST TO W 31ST ST 68.0 04/04/05 11/18/05 27,200 0
300 05 0012 / 5127 ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD 65.0 04/04/05 11/18/05 26,000 06/01/05 06/20/05 14,990 100
300 06 0122 / 5275 ON S KEDZIE AVE FROM W 36TH ST TO W PERSHING RD 36.0 06/21/04 06/25/04 14,400 06/15/04 06/21/04 7,472 100
300 07 0012 / 5435 ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST 54.0 11/15/06 11/29/06 21,600 10/20/06 11/09/06 10,908 100
300 03 0014 / 4885 ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE 47.52 05/10/04 06/10/04 19,008 05/01/04 05/11/04 18,321 100
302 00 0092 / 5774 ON W 47TH ST FROM S WESTERN AVE TO S ROCKWELL ST 14.0 03/14/02 03/14/02 5,600 03/11/02 03/11/02 5,250 100

Totals per 400 Watt Changeout 284.52 113,808 56,941

Totals per Lighting/Electrical 2,551,954 2,132,614


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 126

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0709 / 6895 3959 S ARCHER AVE 1.0 03/13/95 03/13/95 0 03/13/95 03/13/95 300 100
805 06 1549 / 7735 4136 S ARTESIAN AVE 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 0798 / 6984 4011 S BRIGHTON PL 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 0800 / 6986 3759 S CALIFORNIA AVE 1.0 05/24/96 05/24/96 0 05/24/96 05/24/96 300 100
805 06 0801 / 6987 3821 S CALIFORNIA AVE 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 0802 / 6988 4133 S CALIFORNIA AVE 1.0 04/16/96 04/16/96 0 04/16/96 04/16/96 300 100
805 06 1883 / 8069 3641 S MAPLEWOOD AVE 1.0 07/29/96 07/29/96 0 07/29/96 07/29/96 300 100
805 06 1953 / 8139 4053 S MONTGOMERY AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0669 / 6855 4014 S ROCKWELL ST 1.0 03/17/95 03/17/95 0 03/17/95 03/17/95 300 100
805 06 0699 / 6885 4030 S ROCKWELL ST 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0696 / 6882 4108 S ROCKWELL ST 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 0687 / 6873 4118 S ROCKWELL ST 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 1708 / 7894 3748 S SACRAMENTO AVE 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
805 06 0486 / 6672 3502 S WASHTENAW AVE 1.0 08/22/95 08/22/95 0 08/22/95 08/22/95 300 100
805 06 0504 / 6690 3734 S WASHTENAW AVE 1.0 10/17/95 10/17/95 0 10/17/95 10/17/95 300 100
805 06 0383 / 6569 3739 S WASHTENAW AVE 1.0 05/24/96 05/24/96 0 05/24/96 05/24/96 300 100
805 06 0525 / 6711 3801 S WASHTENAW AVE 1.0 05/24/96 05/24/96 0 05/24/96 05/24/96 300 100
805 06 0506 / 6692 3824 S WASHTENAW AVE 1.0 03/19/96 03/19/96 0 03/19/96 03/19/96 300 100
300 06 0139 / 5289 4650 S WESTERN AVE 933.0 03/01/06 09/01/06 23,522 02/15/06 03/01/06 28,190 100
805 06 0520 / 6706 4722 S WESTERN AVE 1.0 01/18/95 01/18/95 0 01/18/95 01/18/95 300 100
805 06 0966 / 7152 3126 W 26TH ST 1.0 11/03/95 11/03/95 0 11/03/95 11/03/95 300 100
805 06 1767 / 7953 2731 W 35TH PL 1.0 05/14/97 05/14/97 0 05/14/97 05/14/97 300 100
805 06 0892 / 7078 2642 W 36TH ST 1.0 10/17/95 10/17/95 0 10/17/95 10/17/95 300 100
805 06 0894 / 7080 2717 W 38TH PL 1.0 01/24/96 01/24/96 0 01/24/96 01/24/96 300 100
805 06 0895 / 7081 2745 W 38TH PL 1.0 01/24/96 01/24/96 0 01/24/96 01/24/96 300 100
805 06 0893 / 7079 2856 W 38TH PL 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
302 00 0092 / 5774 2456 W 38TH ST 38.0 0 02/20/01 12/13/01 8,955 100
805 06 0899 / 7085 2622 W 38TH ST 1.0 03/19/96 03/19/96 0 03/19/96 03/19/96 300 100
805 06 0900 / 7086 2825 W 38TH ST 1.0 01/24/96 01/24/96 0 01/24/96 01/24/96 300 100
805 06 1707 / 7893 3014 W 38TH ST 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
805 06 0871 / 7057 2631 W 39TH PL 1.0 03/17/95 03/17/95 0 03/17/95 03/17/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 127

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0891 / 7077 2705 W 39TH PL 1.0 03/17/95 03/17/95 0 03/17/95 03/17/95 300 100
805 06 0929 / 7115 2716 W 39TH PL 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 0889 / 7075 2640 W 42ND ST 1.0 09/14/95 09/14/95 0 09/14/95 09/14/95 300 100
805 06 0922 / 7108 2642 W 42ND ST 1.0 10/09/96 10/09/96 0 10/09/96 10/09/96 300 100

Totals per Alley Lighting/Lamps 1,004.0 23,522 47,045

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 2458 W 38TH ST 1,738.0 06/01/07 12/31/07 51,166 09/01/07 10/04/07 49,619 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2456 W 38TH ST 1,643.0 0 06/27/02 06/30/02 29,916 100

Work Type: Flood Light Install Fixtures


300 06 0069 / 5233 ON W 24TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE 3.75 1,406 06/24/02 06/24/02 1,406 100
300 06 0167 / 5306 ON W 45TH ST FROM S WESTERN AVE TO S ROCKWELL ST 17.0 0 05/19/99 05/19/99 3,008 100
302 00 0092 / 5774 S DAMEN AVE AND W 48TH ST .50 0 09/25/01 09/25/01 202 100
300 11 / 32201 3823 S CALIFORNIA AVE 1.0 11/01/07 11/10/07 500 10/10/07 10/10/07 507 100
300 06 0167 / 5306 3800 S SACRAMENTO AVE 1.0 0 12/08/99 12/08/99 351 100
300 06 0167 / 5306 3542 S WASHTENAW AVE 1.0 0 01/09/99 01/09/99 351 100
300 11 / 32201 3843 S WASHTENAW AVE 1.0 11/01/07 11/10/07 500 10/10/07 10/10/07 507 100
300 06 0167 / 5306 2700 W 38TH PL 1.0 0 12/08/99 12/08/99 351 100
300 11 / 32201 2809 W 38TH PL 1.0 11/10/07 11/11/07 500 10/10/07 10/10/07 507 100
300 11 / 32201 2813 W 38TH PL 1.0 11/10/07 11/11/07 500 10/10/07 10/10/07 507 100
300 11 / 32201 2814 W 38TH PL 1.0 11/10/07 11/11/07 500 10/10/07 10/10/07 507 100
300 06 0167 / 5306 3000 W 38TH PL 1.0 0 12/08/99 12/08/99 351 100

Totals per Flood Light Install 30.25 3,906 8,555


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 128

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0292 / 5399 4555 S WESTERN BLVD .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Not issued Note Last Updated on 01-NOV-07


300 06 0292 / 5399 2320 W 47TH ST .0 03/01/05 12/31/05 19,586 09/20/05 09/20/05 175,200 100

Totals per Lighting Imprvmnts .0 19,586 175,200

Work Type: Lighting Imprvmnts Projects


300 06 / 32456 LAWNDALE GARDENS .0 04/02/07 12/31/08 300,000 0 0
300 06 0282 / 5390 3030 S KEDZIE AVE .0 10/06/04 10/31/04 5,800 10/27/04 10/27/04 5,709 100

Totals per Lighting Imprvmnts .0 305,800 5,709

Work Type: Ornamental - Piggyback Lighting Fixtures


300 05 0012 / 5127 ON S CALIFORNIA AVE FROM W 24TH ST TO W 31ST ST 50.0 04/04/05 11/18/05 67,500 0
300 05 0012 / 5127 ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD 57.0 04/04/05 11/18/05 76,950 06/01/05 06/28/05 73,801 100
300 06 0069 / 5233 ON W 26TH ST FROM S PULASKI RD TO S KEDZIE AVE 29.0 12/20/02 01/09/03 36,250 12/28/02 02/28/03 35,049 100
300 07 0012 / 5435 ON W 26TH ST FROM S ROCKWELL ST TO S KEDZIE AVE 54.0 11/15/06 11/29/06 72,900 10/20/06 11/09/06 57,212 100

Totals per Ornamental - Piggyback Lighting 190.0 253,600 166,062

Work Type: Ornamental Lighting Blocks


300 09 / 33090 ON S MARSHALL BLVD FROM W 21ST ST TO W CERMAK RD .50 50,000 04/01/08 12/01/08 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2458 W 38TH ST .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 129

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 / 32146 ON S ARTESIAN AVE FROM W PERSHING RD TO W POPE JOHN PAUL II DR 4.0 12/05/07 06/26/08 336,375 0 25
300 07 0012 / 5435 ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 25TH ST 1.0 10/01/06 12/01/06 100,000 07/19/06 09/28/06 0 100
300 11 / 32201 ON S CAMPBELL AVE FROM W 42ND ST TO W POPE JOHN PAUL II DR 1.0 06/28/07 09/21/07 75,000 06/28/07 09/07/07 60,317 100
300 11 / 32201 ON S CAMPBELL AVE FROM W PERSHING RD TO W 40TH ST 1.0 06/28/07 09/21/07 75,000 06/28/07 09/07/07 60,317 100
300 11 / 32201 ON S MARSHALL BLVD FROM W CERMAK RD TO W 23RD ST 3.0 05/17/07 05/21/07 30,000 05/17/07 05/23/07 4,509 100
300 07 0014 / 5437 ON S MOZART ST FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MOZART ST FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 06 0308 / 5414 ON S ROCKWELL ST FROM W POPE JOHN PAUL II DR TO W 45TH ST 2.0 07/07/06 09/01/06 152,756 07/24/06 10/06/06 106,951 100
300 06 / 32129 ON W 25TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE 2.0 02/15/07 05/31/07 184,280 02/15/07 05/31/07 112,252 100
300 06 / 32277 ON W 38TH ST FROM S HOMAN AVE TO S SACRAMENTO AVE .0 05/04/08 12/31/08 0 0 0
300 11 / 32201 ON W 39TH PL FROM S CAMPBELL AVE TO S ROCKWELL ST 1.0 06/28/07 09/21/07 60,000 06/28/07 09/07/07 36,740 100
300 07 0011 / 5434 2415 W 46TH PL .0 03/01/06 12/31/06 0 0 0

Totals per Residntl Staggered Lighting 15.0 1,013,411 381,086

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S SEELEY AVE FROM W 47TH ST TO W 49TH ST 2.0 08/01/03 10/01/03 147,124 07/29/03 10/03/03 131,010 100

Work Type: Short Arm Installs - Arterial Locations


302 00 0092 / 5774 4330 S HERMITAGE AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4317 S MARSHFIELD AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4439 S MARSHFIELD AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4317 S PAULINA ST 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 2433 W 45TH PL 1.0 0 03/16/01 03/16/01 378 100
302 00 0092 / 5774 2461 W 45TH PL 1.0 0 03/16/01 03/16/01 378 100

Totals per Short Arm Installs - Arterial 6.0 0 2,268


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 130

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 05 0012 / 5127 ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD 57.0 04/04/05 11/18/05 14,250 10/20/05 10/20/05 12,001 100
300 03 0012 / 4883 ON S KEDZIE AVE FROM W 36TH ST TO W 39TH PL 39.56 07/01/04 07/20/04 10,406 07/10/04 08/01/04 8,991 100
300 04 0216 / 5114 ON S WESTERN AVE FROM W 47TH ST TO W 49TH ST 15.50 05/01/06 11/01/06 3,317 05/17/06 10/01/06 3,317 100
300 07 0012 / 5435 ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST 54.0 11/17/05 04/03/06 13,500 05/20/06 06/01/06 9,428 100
302 00 0077 / 5765 ON W 42ND ST FROM S TALMAN AVE TO S FAIRFIELD AVE 2.0 0 06/17/99 06/17/99 175 100
300 03 0014 / 4885 ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE 51.48 06/01/04 06/21/04 13,580 05/11/04 06/30/04 14,609 100
300 04 0216 / 5114 ON W CERMAK RD FROM S KEDZIE AVE TO S MARSHALL BLVD 16.0 05/01/06 11/01/06 3,461 05/17/06 08/30/06 3,461 100
302 00 0079 / 5767 ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE 39.06 09/01/02 09/03/02 4,898 09/09/02 10/23/02 4,898 100
302 00 0077 / 5765 4037 S ARCHER AVE 1.0 0 06/17/99 06/17/99 87 100
302 00 0076 / 5764 3700-6700 S CALIFORNIA AVE 237.0 09/01/00 12/31/00 0 4,029
302 00 0077 / 5765 2825 W 42ND ST 1.0 0 06/16/99 06/16/99 87 100
302 00 0077 / 5765 2700 W PERSHING RD 4.0 0 07/27/99 07/27/99 349 100

Totals per Strt Light Pole Painting 517.60 63,411 61,431

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 03 0012 / 4883 2400 S MARSHALL BLVD 11/01/04 11/10/04 5,000 03/17/05 03/17/05 0 100

Work Type: Strt Lighting Blocks


300 06 0261 / 5369 ON W 35TH ST FROM S DAMEN AVE TO S WESTERN AVE 3.50 04/01/04 06/30/04 314,566 01/22/04 08/03/04 250,781 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 4650 S WESTERN AVE 1,790.0 03/01/04 12/01/04 9,308 07/31/06 09/21/06 19,493 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 131

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0072 / 5760 4050 S ASHLAND AVE 1.0 0 02/25/00 03/15/00 14,456 100
805 06 2163 / 8349 3101 S CALIFORNIA AVE 16.0 06/18/93 06/18/93 0 06/18/93 06/18/93 12,000 100
805 06 2490 / 8676 3495 S CALIFORNIA AVE 6.0 12/19/95 12/19/95 0 12/19/95 12/19/95 4,500 100
805 06 2491 / 8677 3299 S KEDZIE AVE 4.0 10/20/95 10/20/95 0 10/20/95 10/20/95 3,000 100
805 06 2785 / 8971 1901 S MARSHALL BLVD 10.0 04/05/93 04/05/93 0 04/05/93 04/05/93 7,500 100
805 06 2518 / 8704 3631 S ROCKWELL ST 4.0 12/08/92 12/08/92 0 12/08/92 12/08/92 3,000 100
302 00 0071 / 5759 3700 S ROCKWELL ST 0 02/06/99 02/11/99 10,473 100
805 06 2813 / 8999 3631 S WASHTENAW AVE 10.0 04/25/94 04/25/94 0 04/25/94 04/25/94 7,500 100
302 00 0070 / 5758 3120 S WESTERN AVE 0 01/03/98 01/15/98 14,044 100
302 00 0070 / 5758 3140 S WESTERN AVE 0 01/03/98 01/15/98 12,751 100
805 06 2156 / 8342 3199 S WESTERN AVE 8.0 12/31/91 12/31/91 0 12/31/91 12/31/91 6,000 100
805 06 2145 / 8331 3200 S WESTERN AVE 8.0 12/31/91 12/31/91 0 12/31/91 12/31/91 6,000 100
805 06 2425 / 8611 3301 S WESTERN AVE 48.0 12/31/91 12/31/91 0 12/31/91 12/31/91 36,000 100
302 00 0072 / 5760 3650 S WESTERN AVE 1.0 0 02/29/00 03/08/00 10,000 100
302 00 0071 / 5759 3900 S WESTERN AVE 0 05/10/99 07/01/99 113,750 100
805 06 2190 / 8376 3901 S WESTERN AVE 14.0 12/31/95 12/31/95 0 12/31/95 12/31/95 10,500 100
805 06 2959 / 9145 3901 S WESTERN AVE 34.0 10/16/91 10/16/91 0 10/16/91 10/16/91 25,500 100
805 06 2960 / 9146 3901 S WESTERN AVE 14.0 10/16/91 10/16/91 0 10/16/91 10/16/91 10,500 100
805 06 2294 / 8480 4901 S WESTERN AVE 5.0 01/01/91 01/01/91 0 01/01/91 01/01/91 3,750 100
302 00 0070 / 5758 3130 S WESTERN BLVD 0 01/03/98 01/15/98 13,738 100
302 00 0072 / 5760 3640 S WESTERN BLVD 1.0 0 02/21/00 02/29/00 10,000 100
302 00 0071 / 5759 3900 S WESTERN BLVD 0 06/15/99 07/01/99 66,940 100
805 06 2953 / 9139 2505 W 26TH ST 14.0 03/20/94 03/20/94 0 03/20/94 03/20/94 10,500 100
805 06 2954 / 9140 2505 W 26TH ST 26.0 03/20/94 03/20/94 0 03/20/94 03/20/94 19,500 100
805 06 2181 / 8367 2400 W 31ST BLVD 4.0 04/02/93 04/02/93 0 04/02/93 04/02/93 3,000 100
805 06 2214 / 8400 2400 W 31ST BLVD 8.0 04/06/93 04/06/93 0 04/06/93 04/06/93 6,000 100
302 00 0070 / 5758 2500 W 31ST ST 0 01/28/98 02/05/98 16,290 100
302 00 0070 / 5758 2520 W 31ST ST 0 01/08/98 01/15/98 3,270 100
805 06 2517 / 8703 2431 W 36TH ST 12.0 01/01/91 01/01/91 0 01/01/91 01/01/91 9,000 100
300 06 0099 / 5260 2456 W 38TH ST 793.0 09/25/03 10/06/03 44,574 09/16/03 09/23/03 29,982 100
805 06 2447 / 8633 3505 W 38TH ST 12.0 05/14/93 05/14/93 0 05/14/93 05/14/93 9,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 132

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2458 / 8644 2399 W 43RD ST 13.0 11/14/95 11/14/95 0 11/14/95 11/14/95 9,750 100
805 06 2475 / 8661 2399 W 43RD ST 27.0 11/14/95 11/14/95 0 11/14/95 11/14/95 20,250 100
805 06 2588 / 8774 2295 W 47TH ST 26.0 05/12/95 05/12/95 0 05/12/95 05/12/95 19,500 100
805 06 2389 / 8575 1605 W PERSHING RD 48.0 11/02/95 11/02/95 0 11/02/95 11/02/95 36,000 100
805 06 2383 / 8569 2027 W PERSHING RD 25.0 08/15/95 08/15/95 0 08/15/95 08/15/95 18,750 100
805 06 2188 / 8374 2399 W PERSHING RD 22.0 12/31/95 12/31/95 0 12/31/95 12/31/95 16,500 100
805 06 2191 / 8377 2399 W PERSHING RD 10.0 12/31/95 12/31/95 0 12/31/95 12/31/95 7,500 100
302 00 0071 / 5759 2400 W PERSHING RD 0 06/17/99 07/01/99 20,900 100

Totals per Underpass Lighting 1,224.0 44,574 657,594


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 133

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 ON W 43RD ST FROM S WESTERN AVE TO S WESTERN BLVD 2.0 0 09/19/02 09/19/02 12,095 100
210 06 0130 / 4389 ON W 47TH ST FROM S WESTERN AVE TO S WESTERN BLVD 2.0 0 09/17/02 09/17/02 17,806 100
210 06 0130 / 4389 S CALIFORNIA AVE AND W 42ND ST .50 0 08/27/01 08/27/01 3,662 100
210 06 0219 / 4459 S WESTERN AVE AND S ARCHER AVE 1.0 05/09/05 05/10/05 10,563 03/17/05 03/17/05 8,008 100
210 06 0219 / 4459 S WESTERN AVE AND W 35TH ST 1.0 05/06/05 05/07/05 10,563 04/22/05 04/22/05 7,883 100
210 06 0219 / 4459 S WESTERN AVE AND W 44TH ST 1.0 04/13/05 04/13/05 10,563 04/08/05 04/08/05 8,937 100
210 06 0219 / 4459 S WESTERN AVE AND W 45TH ST 1.0 05/10/05 05/11/05 10,563 04/21/05 04/21/05 8,007 100

Totals per LED Signal Head Install 8.50 42,252 66,398

Work Type: New Signal Locations


210 06 0075 / 4339 W 31ST ST AND S SACRAMENTO AVE 10/01/04 12/01/04 185,500 07/19/04 09/08/04 140,683 100
210 06 0139 / 4397 3600 S CALIFORNIA AVE 1.0 07/01/03 08/25/03 200,000 06/02/03 08/21/03 188,311 100

Totals per New Signal 1.0 385,500 328,994

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 W 28TH ST AND S KEDZIE AVE .50 2,000 06/19/01 08/01/01 153 100

Work Type: Signals Intersections


300 06 0096 / 5258 2829 W CERMAK RD 44.0 09/01/03 09/07/03 0 09/02/03 09/09/03 6,957 100

Work Type: TSM Install Locations


814 06 0072 / 16288 2599 S ALBANY AVE 1.0 02/10/95 02/10/95 0 02/10/95 02/10/95 101,827 100
814 06 0164 / 16376 4300 S ASHLAND AVE 1.0 06/06/97 08/18/97 0 06/06/97 08/18/97 200,000 100
814 06 0392 / 16580 2500 S CALIFORNIA AVE 1.0 03/01/96 03/01/96 0 03/01/96 03/01/96 125,000 100
814 06 0393 / 16581 2500 S CALIFORNIA BLVD 1.0 03/01/96 03/01/96 0 03/01/96 03/01/96 125,000 100
814 06 0085 / 16301 4700 S HOYNE AVE 1.0 03/01/90 03/01/90 0 03/01/90 03/01/90 141,561 100
814 06 0191 / 16403 4700 S ROCKWELL ST 1.0 08/18/95 08/18/95 0 08/18/95 08/18/95 125,000 100
814 06 0188 / 16400 2600 W 31ST ST 1.0 03/22/95 03/22/95 0 03/22/95 03/22/95 125,000 100

Totals per TSM Install 7.0 0 943,388

Totals per Traffic 438,252 1,352,436


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 134

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 05 0012 / 5127 ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD 13.0 04/04/05 11/18/05 5,300 10/20/05 10/20/05 4,799 100
300 07 0012 / 5435 ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST 10.0 11/17/05 04/03/06 3,200 05/20/06 06/01/06 1,747 100

Totals per Traffic Equipment Painting 23.0 8,500 6,546

Totals per Construction Phase 2,990,206 3,485,050

Totals for Ward 12 3,047,406 3,501,577


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 135

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32969 ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST .0 10/17/07 11/30/07 0 0 0
300 06 / 32146 ON S KEELER AVE FROM W 59TH ST TO W 63RD ST 1.0 05/01/07 10/31/07 3,900 06/21/07 07/19/07 4,811 100
300 06 0308 / 5414 ON S KILDARE AVE FROM W 63RD ST TO W 65TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 958 100
300 06 / 32050 ON W 57TH ST FROM S HAMLIN AVE TO S KEELER AVE .0 04/15/06 04/15/06 6,000 04/15/06 04/15/06 4,519 100
300 06 / 32050 ON W 62ND PL FROM S LAWNDALE AVE TO S PULASKI RD .0 04/15/06 04/15/06 5,400 11/02/06 10/26/06 3,620 100
210 06 0127 / 4386 S KILDARE AVE AND W MARQUETTE RD .0 12/15/05 03/15/06 0 0 0
210 06 0127 / 4386 W 55TH ST AND S KILBOURN AVE .50 11/01/06 11/20/06 2,500 01/17/07 1,593 15
300 06 0296 / 5403 W 63RD PL AND S PULASKI RD 1.0 01/20/05 12/21/05 0 01/20/05 12/21/05 780 100
210 06 0187 / 4432 W 63RD ST AND S LATROBE AVE .50 11/15/03 02/15/04 0 11/15/03 02/15/04 2,063 100
300 06 0292 / 5399 6255 S AUSTIN AVE 1.0 1,000 12/10/04 02/22/05 603 100
300 06 / 32275 6300-6500 S KEELER AVE .0 03/01/07 10/31/07 3,900 01/30/07 02/27/07 2,520 100
300 06 / 32050 6500-6700 S KEELER AVE .0 04/15/06 10/31/06 0 04/15/06 10/31/06 1,999 100
300 06 / 32050 4000 W 70TH ST .0 04/15/06 10/31/06 0 04/15/06 07/07/06 1,807 100

Totals per Design/Engineering 4.0 22,700 25,273


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 136

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 6500 S PULASKI RD 2,081.0 07/01/02 10/31/02 694,780 07/01/02 10/11/02 554,387 100
302 00 0092 / 5774 3800-3899 W 63RD PL 4.0 0 09/25/01 09/25/01 823 100
302 00 0092 / 5774 3900-3999 W 63RD PL 5.0 0 09/25/01 09/25/01 1,029 100

Totals per 250 Watt Changeout 2,090.0 694,780 556,239

Work Type: 400 Watt Changeout Fixtures


300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 30.15 12/01/07 01/01/08 12,060 11/28/07 02/15/08 10,755 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST 3.75 05/27/08 06/05/08 1,500 09/22/08 10/24/08 1,500 100
300 06 0069 / 5233 ON S PULASKI RD FROM W 55TH ST TO W 83RD ST 245.0 98,000 08/02/02 08/23/02 49,240 100
300 06 0122 / 5275 ON W 59TH ST FROM S HAMLIN AVE TO S KENTON AVE 70.0 07/10/03 07/15/03 22,940 07/07/03 07/28/03 15,210 100
300 06 0069 / 5233 ON W 63RD ST FROM S LAWNDALE AVE TO S KARLOV AVE 88.0 10/01/02 33,000 08/02/02 08/23/02 16,685 100
300 06 / 33438 6200-6300 S CENTRAL AVE 11.0 06/30/08 07/25/08 4,400 08/25/08 08/26/08 4,400 100

Totals per 400 Watt Changeout 447.90 171,900 97,790

Totals per Lighting/Electrical 5,753,878 3,798,371


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 137

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1401 / 7587 6525 S KARLOV AVE 1.0 02/24/95 02/24/95 0 02/24/95 02/24/95 300 100
805 06 1283 / 7469 6699 S KEATING AVE 1.0 05/10/95 05/10/95 0 05/10/95 05/10/95 300 100
805 06 1264 / 7450 7842 S KEATING AVE 1.0 02/20/95 02/20/95 0 02/20/95 02/20/95 300 100
805 06 1141 / 7327 5543 S KEELER AVE 1.0 10/02/96 10/02/96 0 10/02/96 10/02/96 300 100
805 06 1143 / 7329 6424 S KEELER AVE 1.0 02/14/96 02/14/96 0 02/14/96 02/14/96 300 100
805 06 1144 / 7330 6557 S KEELER AVE 1.0 02/24/95 02/24/95 0 02/24/95 02/24/95 300 100
805 06 1145 / 7331 6619 S KEELER AVE 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 1157 / 7343 6141 S KENNETH AVE 1.0 08/02/95 08/02/95 0 08/02/95 08/02/95 300 100
805 06 1175 / 7361 6402 S KENNETH AVE 1.0 02/22/95 02/22/95 0 02/22/95 02/22/95 300 100
805 06 1195 / 7381 7721 S KENTON AVE 1.0 10/22/96 10/22/96 0 10/22/96 10/22/96 300 100
805 06 1177 / 7363 7747 S KENTON AVE 1.0 10/22/96 10/22/96 0 10/22/96 10/22/96 300 100
805 06 1178 / 7364 7822 S KENTON AVE 1.0 10/22/96 10/22/96 0 10/22/96 10/22/96 300 100
805 06 1179 / 7365 7831 S KENTON AVE 1.0 03/12/95 03/12/95 0 03/12/95 03/12/95 300 100
805 06 1181 / 7367 7843 S KENTON AVE 1.0 03/28/95 03/28/95 0 03/28/95 03/28/95 300 100
805 06 2027 / 8213 6300 S KILBOURN AVE 1.0 02/07/96 02/07/96 0 02/07/96 02/07/96 300 100
805 06 1528 / 7714 6837 S KILDARE AVE 1.0 11/07/97 11/07/97 0 11/07/97 11/07/97 300 100
805 06 2012 / 8198 7705 S KILPATRICK AVE 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 2013 / 8199 7820 S KILPATRICK AVE 1.0 10/04/96 10/04/96 0 10/04/96 10/04/96 300 100
805 06 1997 / 8183 6657 S KOLIN AVE 1.0 03/20/97 03/20/97 0 03/20/97 03/20/97 300 100
805 06 2020 / 8206 6035 S KOLMAR AVE 1.0 06/17/96 06/17/96 0 06/17/96 06/17/96 300 100
805 06 2023 / 8209 7759 S KOLMAR AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0310 / 6496 6315 S LAMON AVE 1.0 07/25/96 07/25/96 0 07/25/96 07/25/96 300 100
805 06 0317 / 6503 6345 S LATROBE AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0301 / 6487 6365 S LATROBE AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0349 / 6535 6338 S LECLAIRE AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0360 / 6546 6360 S LECLAIRE AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 1977 / 8163 6223 S MONITOR AVE 1.0 06/17/96 06/17/96 0 06/17/96 06/17/96 300 100
300 06 0139 / 5289 6500 S PULASKI RD 1,907.0 03/01/06 09/01/06 43,964 06/01/06 06/21/06 57,618 100
302 00 0092 / 5774 6500 S PULASKI RD 29.0 0 01/09/01 01/25/02 6,834 100
302 00 0092 / 5774 6719 S PULASKI RD 1.0 0 10/09/01 10/09/01 236 100
302 00 0092 / 5774 6735 S PULASKI RD 1.0 0 10/09/01 10/09/01 236 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 138

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0092 / 5774 6857 S PULASKI RD 1.0 0 10/15/01 10/15/01 236 100
805 06 1032 / 7218 4551 W 55TH ST 1.0 12/15/95 12/15/95 0 12/15/95 12/15/95 300 100
805 06 1033 / 7219 4551 W 55TH ST 1.0 10/05/95 10/05/95 0 10/05/95 10/05/95 300 100
805 06 1009 / 7195 3721 W 61ST PL 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1038 / 7224 3721 W 61ST ST 1.0 03/23/95 03/23/95 0 03/23/95 03/23/95 300 100
805 06 1058 / 7244 5133 W 63RD PL 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 1039 / 7225 5157 W 63RD PL 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 1040 / 7226 5201 W 63RD PL 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 1201 / 7387 3800 W 63RD ST 1.0 12/16/97 12/16/97 0 12/16/97 12/16/97 300 100
805 06 1761 / 7947 4610 W 63RD ST 1.0 05/09/97 05/09/97 0 05/09/97 05/09/97 300 100
805 06 1046 / 7232 5632 W 63RD ST 1.0 05/05/95 05/05/95 0 05/05/95 05/05/95 300 100
805 06 1003 / 7189 5124 W 64TH ST 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0984 / 7170 5160 W 64TH ST 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0985 / 7171 5200 W 64TH ST 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0986 / 7172 5220 W 64TH ST 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0990 / 7176 4548 W 66TH PL 1.0 04/28/95 04/28/95 0 04/28/95 04/28/95 300 100
805 06 0962 / 7148 3616 W 66TH ST 1.0 03/06/97 03/06/97 0 03/06/97 03/06/97 300 100
805 06 1545 / 7731 3801 W 68TH PL 1.0 10/29/97 10/29/97 0 10/29/97 10/29/97 300 100
805 06 1643 / 7829 4458 W 77TH PL 1.0 08/28/97 08/28/97 0 08/28/97 08/28/97 300 100
805 06 0996 / 7182 4548 W 77TH PL 1.0 10/22/96 10/22/96 0 10/22/96 10/22/96 300 100
805 06 1498 / 7684 4349 W 78TH ST 1.0 11/14/97 11/14/97 0 11/14/97 11/14/97 300 100
805 06 1499 / 7685 4357 W 78TH ST 1.0 11/14/97 11/14/97 0 11/14/97 11/14/97 300 100
805 06 0778 / 6964 4526 W 83RD ST 1.0 07/19/96 07/19/96 0 07/19/96 07/19/96 300 100

Totals per Alley Lighting/Lamps 1,988.0 43,964 79,860

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 6500 S PULASKI RD 1,661.0 06/01/07 12/31/07 48,899 12/18/07 12/29/07 47,421 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 6500 S PULASKI RD 1,566.0 0 07/18/02 07/21/02 28,514 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 139

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0167 / 5306 W 56TH PL AND S KARLOV AVE 4.0 0 12/08/99 12/08/99 1,404 100
300 06 0167 / 5306 W 63RD ST AND S LAWNDALE AVE 7.0 0 12/03/99 12/03/99 1,291 100
300 06 0167 / 5306 W 83RD ST AND S KOSTNER AVE 6.0 0 07/22/99 07/22/99 1,523 100
300 06 0167 / 5306 W 83RD ST AND S SCOTTSDALE AVE 3.0 0 12/02/99 12/02/99 470 100
300 06 0167 / 5306 6900-7000 S HAMLIN AVE 3.0 0 05/22/99 05/22/99 1,053 100
300 06 0167 / 5306 6425 S KILBOURN AVE 3.0 0 04/14/99 04/14/99 1,053 100
302 00 0092 / 5774 4130 W 61ST ST 1.0 0 07/23/01 07/23/01 471 100

Totals per Flood Light Install 27.0 0 7,265

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 6255 S AUSTIN AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 28.81 12/01/07 01/01/08 38,894 11/28/07 02/15/08 34,572 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST 3.75 07/28/08 08/08/08 5,063 09/22/08 10/24/08 3,930 100
300 09 / 33079 ON W 59TH ST FROM S PULASKI RD TO S KOLMAR AVE 45.0 07/28/08 08/15/08 61,350 09/22/08 10/24/08 47,157 100
300 05 0013 / 5128 ON W 63RD ST FROM S PARKSIDE AVE TO S AUSTIN AVE 20.0 12/20/06 12/21/06 2,800 12/20/06 12/21/06 0 100
300 09 / 33079 ON W MARQUETTE RD FROM S PULASKI RD TO S KOLMAR AVE 45.0 07/28/08 08/15/08 61,350 09/22/08 10/24/08 47,156 100
300 06 / 33438 6200-6300 S CENTRAL AVE 7.0 07/21/08 08/08/08 9,450 09/02/08 09/05/08 7,447 100
300 06 / 33439 6300-6500 S CICERO AVE 15.0 07/07/08 07/25/08 20,000 08/11/08 08/22/08 15,957 100
300 06 / 33440 5500-7000 S PULASKI RD 236.0 07/14/08 08/29/08 380,000 08/04/08 09/19/08 244,699 100

Totals per Ornamental - Piggyback Lighting 400.56 578,906 400,918

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 6500 S PULASKI RD .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 140

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0014 / 5437 ON S HAMLIN AVE FROM W 58TH ST TO W 58TH PL .0 03/01/06 12/31/06 0 0 0
300 09 / 33079 ON S KARLOV AVE FROM W 63RD ST TO W MARQUETTE RD 4.0 260,000 04/01/08 12/01/08 0 0
300 09 / 33079 ON S KEDVALE AVE FROM W 63RD ST TO W 65TH ST 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32202 ON S KEDVALE AVE FROM W 65TH ST TO W MARQUETTE RD 2.0 08/30/07 10/26/07 110,000 08/30/07 10/26/07 0 100
300 06 / 32146 ON S KEELER AVE FROM W 59TH ST TO W 63RD ST 4.0 12/05/07 06/23/08 319,274 0 75
300 06 0308 / 5414 ON S KILDARE AVE FROM W 63RD ST TO W 65TH ST 2.0 04/10/06 06/09/06 169,820 04/07/06 06/01/06 99,038 100
300 07 0013 / 5436 ON S KILDARE AVE FROM W 65TH ST TO W MARQUETTE RD 2.0 04/06/06 06/01/06 100,000 04/06/06 06/01/06 80,000 100
300 09 / 33079 ON S KOLIN AVE FROM W 63RD ST TO W MARQUETTE RD 4.0 260,000 04/01/08 12/01/08 0 0
300 09 / 33079 ON S KOMENSKY AVE FROM W 63RD ST TO W MARQUETTE RD 4.0 237,593 0 0
300 05 0013 / 5128 ON S KOSTNER AVE FROM W 55TH ST TO W 57TH ST 2.0 04/04/05 11/18/05 175,000 07/25/05 09/15/05 73,233 100
300 06 0298 / 5405 ON S KOSTNER AVE FROM W 57TH ST TO W 59TH ST 2.0 07/25/05 11/01/05 0 08/01/05 09/19/05 127,848 100
300 06 / 32275 6300-6500 S KEELER AVE 2.0 04/01/07 12/31/07 153,971 03/22/07 06/01/07 94,709 100

Totals per Residntl Staggered Lighting 30.0 1,915,658 474,828

Work Type: Residntl Strt Lighting/Lamps Blocks


300 03 0013 / 4884 ON S KOSTNER AVE FROM W 59TH ST TO W 65TH ST 6.0 06/01/04 11/30/04 465,000 06/16/04 12/14/04 442,237 100
300 06 0267 / 5375 ON S KOSTNER AVE FROM W 63RD ST TO W 65TH ST 2.0 06/01/04 09/01/04 150,000 06/16/04 12/14/04 76,780 100
300 06 / 32050 ON W 57TH ST FROM S HAMLIN AVE TO S KEELER AVE 4.0 06/15/06 04/01/06 200,000 06/15/06 09/15/06 199,615 100
300 06 / 32050 ON W 62ND PL FROM S LAWNDALE AVE TO S PULASKI RD 3.0 06/15/06 01/17/07 180,000 10/23/06 02/16/07 197,854 100
300 06 0122 / 5275 ON W 83RD ST FROM S KOLIN AVE TO S KOSTNER AVE 1.0 05/01/03 07/01/03 106,250 04/22/03 06/30/03 106,250 100
300 06 0235 / 5349 ON W 83RD ST FROM S KOSTNER AVE TO S CICERO AVE 2.0 05/01/03 08/01/03 75,243 03/14/03 06/06/03 69,065 100
300 06 0235 / 5349 ON W 83RD ST FROM S PULASKI RD TO S KOSTNER AVE 2.0 05/01/03 07/01/03 77,102 04/22/03 06/30/03 69,065 100
300 06 / 32050 6500-6700 S KEELER AVE 2.0 06/15/06 04/01/06 110,000 06/15/06 09/07/06 102,960 100
300 06 / 32050 4000 W 70TH ST 2.0 06/15/06 06/15/06 125,000 06/15/06 09/07/06 121,805 100

Totals per Residntl Strt Lighting/Lamps 24.0 1,488,595 1,385,631

Work Type: Residntl Strt Lighting/Lamps Locations


300 06 / 32969 ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST 1.0 12/03/07 02/29/08 60,000 01/11/08 03/28/08 34,407 100

JOINT PROJECT WITH CITY LIGHTS Note Last Updated on 04-MAR-09


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 141

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 30.15 08/07/07 08/18/07 6,633 08/07/07 08/18/07 6,633 100
300 07 0013 / 5436 ON S KARLOV AVE FROM W 79TH ST TO W 80TH PL 4.0 08/01/06 08/10/06 800 08/22/06 08/22/06 721 100
300 07 0013 / 5436 ON S KEDVALE AVE FROM W 79TH PL TO W 80TH PL 3.0 08/01/06 08/10/06 600 08/22/06 08/22/06 541 100
300 07 0013 / 5436 ON S KEELER AVE FROM W 79TH PL TO W 80TH PL 4.0 08/01/06 08/10/06 800 08/22/06 08/22/06 721 100
300 07 0013 / 5436 ON S KOMENSKY AVE FROM W 79TH ST TO W 80TH PL 2.0 08/01/06 08/10/06 400 08/22/06 08/22/06 360 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST 3.75 06/02/08 06/13/08 1,125 06/02/08 06/13/08 788 100
300 06 0058 / 5229 ON S PULASKI RD FROM W 55TH ST TO W 83RD ST 190.0 52,780 08/12/02 09/25/02 52,780 100
302 00 0076 / 5764 ON S PULASKI RD FROM W 59TH ST TO W 74TH ST 230.0 06/01/98 06/18/98 0 06/01/98 06/18/98 3,910 100
300 07 0013 / 5436 ON S TRIPP AVE FROM W 79TH ST TO W 81ST ST 3.0 08/01/06 08/10/06 600 08/22/06 08/22/06 540 100
300 04 0216 / 5114 ON W 55TH ST FROM S PULASKI RD TO S KEELER AVE 9.0 05/01/06 11/01/06 1,911 05/17/06 06/29/06 1,911 100
300 06 0108 / 5263 ON W 59TH ST FROM S HAMLIN AVE TO S KENTON AVE 61.0 06/20/03 06/29/03 15,550 05/30/03 06/06/03 15,330 100
300 06 0058 / 5229 ON W 63RD ST FROM S KARLOV AVE TO S LAWNDALE AVE 121.0 08/12/02 09/25/02 30,660 08/12/02 09/25/02 30,660 100
302 00 0076 / 5764 ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE 187.44 09/01/00 12/31/00 0 3,186
300 06 0108 / 5263 ON W 71ST ST FROM S CENTRAL PARK AVE TO S PULASKI RD 22.0 07/01/03 07/14/03 6,600 06/15/03 06/30/03 6,580 100
300 06 0108 / 5263 W 63RD ST AND S CICERO AVE 10.0 06/25/03 07/04/03 3,800 07/25/03 08/05/03 3,290 100
300 06 / 33438 6200-6300 S CENTRAL AVE 20.0 06/30/08 07/25/08 7,100 08/27/08 08/29/08 4,200 100

Totals per Strt Light Pole Painting 900.34 129,359 132,150

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 06 0296 / 5403 W 63RD PL AND S PULASKI RD 1.0 03/01/05 08/15/07 45,200 01/17/07 10/15/07 22,051 100

Work Type: Strt Lighting Blocks


300 06 0246 / 5356 ON S LATROBE AVE FROM W 63RD ST TO W 65TH ST 2.0 04/01/04 07/01/04 108,345 04/06/04 08/24/04 80,494 100
300 06 0246 / 5356 ON S LAWLER AVE FROM W 63RD ST TO W 64TH ST 1.0 04/01/04 07/01/04 108,345 04/06/04 08/24/04 80,494 100
300 06 0246 / 5356 ON S LECLAIRE AVE FROM W 63RD PL TO W 65TH ST 1.50 04/01/04 07/01/04 108,345 04/06/04 08/24/04 80,494 100
300 06 0247 / 5357 ON W 58TH ST FROM S KEELER AVE TO S KILDARE AVE 2.0 10/15/03 12/15/03 132,000 10/08/03 11/14/03 131,842 100
300 06 0246 / 5356 ON W 63RD PL FROM S LATROBE AVE TO S LAWLER AVE 2.0 04/01/04 07/01/04 108,345 04/06/04 08/24/04 80,494 100

Totals per Strt Lighting 8.50 565,380 453,818

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 6500 S PULASKI RD 1,015.0 03/01/04 12/01/04 5,278 07/31/06 08/28/06 11,053 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 142

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0099 / 5260 6500 S PULASKI RD 106.0 10/07/03 10/08/03 5,959 09/24/03 09/25/03 6,426 100
805 06 2449 / 8635 3601 W 59TH ST 12.0 04/13/93 04/13/93 0 04/13/93 04/13/93 9,000 100
805 06 2450 / 8636 3601 W 60TH ST 8.0 04/14/93 04/14/93 0 04/14/93 04/14/93 6,000 100
805 06 2821 / 9007 3630 W 61ST ST 8.0 03/28/94 03/28/94 0 03/28/94 03/28/94 6,000 100
805 06 2820 / 9006 3600 W 62ND ST 8.0 01/13/93 01/13/93 0 01/13/93 01/13/93 6,000 100
805 06 2815 / 9001 3600 W 63RD ST 10.0 05/02/93 05/02/93 0 05/02/93 05/02/93 7,500 100
805 06 2817 / 9003 3600 W 64TH ST 8.0 05/14/93 05/14/93 0 05/14/93 05/14/93 6,000 100
805 06 2819 / 9005 3600 W 65TH ST 8.0 05/17/93 05/17/93 0 05/17/93 05/17/93 6,000 100
805 06 2816 / 9002 3600 W 66TH ST 8.0 05/19/93 05/19/93 0 05/19/93 05/19/93 6,000 100
805 06 2814 / 9000 3605 W MARQUETTE RD 10.0 05/25/93 05/25/93 0 05/25/93 05/25/93 7,500 100

Totals per Underpass Lighting 186.0 5,959 66,426


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 143

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S AUSTIN AVE AND W 63RD ST .50 0 08/29/02 08/29/02 4,675 100
210 06 0130 / 4389 S CICERO AVE AND W 59TH ST .50 0 11/05/02 11/05/02 925 100
210 06 0130 / 4389 S MELVINA AVE AND W 63RD ST .50 0 08/28/02 08/28/02 4,675 100

Totals per LED Signal Head Install 1.50 0 10,274

Work Type: Left Turn Arrow Locations


210 06 0127 / 4386 S KILDARE AVE AND W MARQUETTE RD .0 06/01/05 12/01/05 0 0 0

Work Type: New Signal Locations


210 06 0127 / 4386 S KILDARE AVE AND W MARQUETTE RD .0 06/01/05 12/01/05 0 0 0
210 06 0127 / 4386 W 55TH ST AND S KILBOURN AVE .50 12/01/06 03/31/07 105,000 161,541 100
300 06 0283 / 5391 W 63RD ST AND S KEELER AVE 1.0 09/02/04 09/30/04 69 09/09/04 09/09/04 69 100

Totals per New Signal 1.50 105,069 161,610

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 W 63RD ST AND S LATROBE AVE .50 2,000 06/08/01 08/01/01 134 100

Work Type: Signals Intersections


300 06 0096 / 5258 6500 S PULASKI RD 30.0 09/01/03 09/07/03 0 08/23/03 09/02/03 4,744 100

Work Type: TSM Install Locations


210 06 0187 / 4432 W 63RD ST AND S LATROBE AVE .50 06/01/04 08/15/06 100,000 06/14/04 09/27/06 89,629 100
814 06 0262 / 16474 6000 S CENTRAL AVE 1.0 08/21/90 08/21/90 0 08/21/90 08/21/90 72,704 100
814 06 0192 / 16404 6300 S CENTRAL AVE 1.0 10/17/95 10/17/95 0 10/17/95 10/17/95 125,000 100
814 06 0370 / 16560 6300 S KEELER AVE 1.0 11/08/95 11/08/95 0 11/08/95 11/08/95 86,471 100
210 06 0090 / 4353 6300 S KILBOURN AVE 1.0 11/01/99 03/01/00 150,000 10/01/99 11/30/99 108,398 100
814 06 0146 / 16360 6700 S LAWNDALE AVE 1.0 08/27/91 08/27/91 0 08/27/91 08/27/91 94,990 100
814 06 0274 / 16486 7500 S PULASKI RD 1.0 04/27/89 04/27/89 0 04/27/89 04/27/89 97,888 100

Totals per TSM Install 6.50 250,000 675,080

Totals per Traffic 357,722 852,466


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 144

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 1.34 08/07/07 08/18/07 603 08/07/07 08/18/07 603 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST .25 06/02/08 06/13/08 50 06/02/08 06/13/08 21 100

Totals per Traffic Equipment Painting 1.59 653 624

Totals per Construction Phase 6,111,600 4,650,836

Totals for Ward 13 6,134,300 4,676,109


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 145

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0299 / 5406 BUREAU OF ELECTRICITY 1.0 10/01/01 10/03/03 300,000 01/01/02 12/31/04 76,558 100
300 06 0308 / 5414 ON S HARDING AVE FROM W 47TH ST TO W 49TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 7,303 100
300 06 / 32277 ON S KEELER AVE FROM W 43RD ST TO W 47TH ST 4.0 04/01/08 08/30/08 260,000 04/22/08 05/09/08 0 100
300 06 0292 / 5399 4720 S ST LOUIS AVE .0 01/20/05 12/21/05 0 01/20/05 03/01/05 0 100

Totals per Design/Engineering 5.0 560,000 83,861

Work Type: Feasibility Study Projects


302 00 0079 / 5767 ON S KEDZIE AVE FROM W 47TH ST TO W 55TH ST .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100
302 00 0079 / 5767 ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100

Totals per Feasibility Study .0 0 0

Totals per Lighting/Electrical 560,000 83,861


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 146

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0122 / 5275 ON S ALBANY AVE FROM W 36TH ST TO W PERSHING RD .80 08/01/04 08/15/04 316 06/14/04 06/22/04 218 100
300 06 0069 / 5233 ON S ALBANY AVE FROM W 43RD ST TO W 47TH ST 59.0 10/04/02 10/22/02 23,600 10/01/02 10/18/02 12,463 100
300 06 0122 / 5275 ON S FRANCISCO AVE FROM W 36TH ST TO W PERSHING RD 3.0 08/01/04 08/15/04 1,125 06/15/04 06/21/04 919 100
300 06 0069 / 5233 ON S FRANCISCO AVE FROM W 43RD ST TO W 47TH ST 60.0 10/04/02 10/22/02 24,000 10/01/02 10/18/02 12,463 100
300 06 0069 / 5233 ON S MOZART ST FROM W 43RD ST TO W 47TH ST 30.0 10/04/02 10/22/02 12,000 10/01/02 10/18/02 6,232 100
300 06 0122 / 5275 ON S MOZART ST FROM W 45TH ST TO W 47TH ST 4.50 03/15/03 03/15/03 914 03/12/03 03/12/03 945 100
300 06 0069 / 5233 ON S RICHMOND ST FROM W 43RD ST TO W 47TH ST 60.0 10/04/02 10/22/02 24,000 10/01/02 10/18/02 12,463 100
300 06 0069 / 5233 ON S SACRAMENTO AVE FROM W 43RD ST TO W 47TH ST 60.0 10/04/02 10/22/02 24,000 10/01/02 10/18/02 12,462 100
300 06 0069 / 5233 ON S WHIPPLE ST FROM W 43RD ST TO W 47TH ST 60.0 10/04/02 10/22/02 24,000 10/01/02 10/18/02 12,672 100
300 06 0069 / 5233 S ARCHER AVE AND S DRAKE AVE 19.0 05/10/02 05/10/02 3,990 05/07/02 05/07/02 3,857 100
302 00 0092 / 5774 4100-4199 S FRANCISCO AVE 5.0 11/01/01 11/01/01 1,029 09/29/01 09/29/01 1,029 100
302 00 0092 / 5774 4115 S FRANCISCO AVE 1.0 10/06/01 10/06/01 206 09/29/01 09/29/01 206 100
302 00 0092 / 5774 4201 S FRANCISCO AVE 1.0 0 11/24/01 11/24/01 206 100
302 00 0092 / 5774 4915-5000 S ROCKWELL ST 2.0 10/01/01 10/01/01 617 11/21/01 11/21/01 617 100
302 00 0092 / 5774 5100 S ROCKWELL ST 5.0 0 08/28/01 08/28/01 1,029 100
300 06 0069 / 5233 4100 S SACRAMENTO AVE 2.0 02/04/02 02/04/02 420 02/01/02 02/01/02 406 100
302 00 0092 / 5774 4500-4599 S SAWYER AVE 11.0 0 12/07/01 12/07/01 2,261 100
302 00 0092 / 5774 5631-5647 S SPAULDING AVE 2.0 10/07/01 10/07/01 412 09/29/01 09/29/01 412 100
300 06 0069 / 5233 3001 W 40TH PL 1.0 02/04/02 02/04/02 210 02/01/02 02/01/02 203 100
300 06 0069 / 5233 3001 W 40TH ST 1.0 02/04/02 02/04/02 210 02/01/02 02/01/02 203 100
300 06 0122 / 5275 2958 W 43RD ST 1.0 05/09/03 05/09/03 210 05/06/03 05/06/03 203 100
300 06 0069 / 5233 3055 W 43RD ST 1.0 01/11/02 01/11/02 210 01/18/02 01/18/02 203 100
302 00 0092 / 5774 3055 W 43RD ST 1.0 0 01/18/02 01/18/02 203 100
300 06 0122 / 5275 2650 W 51ST ST 1,078.0 09/10/03 10/10/03 420,850 07/28/03 08/20/03 258,291 100

Totals per 250 Watt Changeout 1,468.30 562,319 340,165

Totals per Lighting/Electrical 3,103,642 1,875,984


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 147

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 05 0014 / 5129 ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD 39.0 04/04/05 11/18/05 15,600 06/01/05 06/20/05 21,333 100
300 05 0014 / 5129 ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE 3.0 04/04/05 11/18/05 1,200 06/01/05 06/20/05 2,120 100
300 06 0122 / 5275 ON S PULASKI RD FROM W 40TH ST TO W 51ST ST 165.0 05/01/03 06/01/03 66,600 06/20/03 06/25/03 40,202 100
300 06 0069 / 5233 ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE 6.50 2,600 02/21/02 02/21/02 2,600 100
302 00 0092 / 5774 ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE 6.50 02/24/02 02/24/02 2,600 02/21/02 02/21/02 2,438 100
300 03 0014 / 4885 ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE 47.52 05/10/04 06/10/04 19,008 05/01/04 05/11/04 18,321 100
300 05 0014 / 5129 ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE 96.0 04/04/05 11/18/05 38,400 06/01/05 06/20/05 58,848 100
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 112.69 05/01/04 05/15/04 45,076 05/10/04 05/16/04 16,013 100
302 00 0092 / 5774 3300 W 55TH ST 5.0 03/03/02 03/03/02 2,000 02/28/02 02/28/02 1,875 100

Totals per 400 Watt Changeout 481.21 193,084 163,750


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 148

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0767 / 6953 3833 S ALBANY AVE 1.0 05/24/96 05/24/96 0 05/24/96 05/24/96 300 100
805 06 0710 / 6896 4393 S ARCHER AVE 1.0 06/19/96 06/19/96 0 06/19/96 06/19/96 300 100
805 06 0711 / 6897 4432 S ARCHER AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0712 / 6898 4452 S ARCHER AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0713 / 6899 4589 S ARCHER AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0744 / 6930 5315 S ARTESIAN AVE 1.0 01/11/95 01/11/95 0 01/11/95 01/11/95 300 100
805 06 0764 / 6950 5400 S ARTESIAN AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 1911 / 8097 4401 S CHRISTIANA AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 2029 / 8215 5530 S CHRISTIANA AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0496 / 6682 5558 S CHRISTIANA AVE 1.0 01/12/95 01/12/95 0 01/12/95 01/12/95 300 100
805 06 0507 / 6693 5609 S CHRISTIANA AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 0488 / 6674 5630 S CHRISTIANA AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0469 / 6655 5640 S CHRISTIANA AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0480 / 6666 5658 S CHRISTIANA AVE 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 0343 / 6529 5734 S CHRISTIANA AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 0442 / 6628 5758 S CHRISTIANA AVE 1.0 01/23/95 01/23/95 0 01/23/95 01/23/95 300 100
805 06 0643 / 6829 4643 S DRAKE AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 1770 / 7956 5022 S FAIRFIELD AVE 1.0 05/15/97 05/15/97 0 05/15/97 05/15/97 300 100
805 06 0842 / 7028 4323 S FRANCISCO AVE 1.0 01/27/95 01/27/95 0 01/27/95 01/27/95 300 100
805 06 0971 / 7157 4458 S FRANCISCO AVE 1.0 01/26/95 01/26/95 0 01/26/95 01/26/95 300 100
805 06 1082 / 7268 4600 S HOMAN AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 1103 / 7289 5500 S HOMAN AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 1084 / 7270 5501 S HOMAN AVE 1.0 04/13/95 04/13/95 0 04/13/95 04/13/95 300 100
805 06 1085 / 7271 5506 S HOMAN AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 1086 / 7272 5516 S HOMAN AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 1087 / 7273 5540 S HOMAN AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 1089 / 7275 5558 S HOMAN AVE 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 1090 / 7276 5620 S HOMAN AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 1091 / 7277 5630 S HOMAN AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 1092 / 7278 5656 S HOMAN AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 1093 / 7279 5740 S HOMAN AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 149

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1081 / 7267 5758 S HOMAN AVE 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 1420 / 7606 4359 S KARLOV AVE 1.0 08/06/96 08/06/96 0 08/06/96 08/06/96 300 100
805 06 1165 / 7351 4000 S KEDZIE AVE 1.0 03/14/96 03/14/96 0 03/14/96 03/14/96 300 100
805 06 1558 / 7744 4515 S KOMENSKY AVE 1.0 10/17/97 10/17/97 0 10/17/97 10/17/97 300 100
805 06 1559 / 7745 4539 S KOMENSKY AVE 1.0 10/17/97 10/17/97 0 10/17/97 10/17/97 300 100
805 06 1560 / 7746 4559 S KOMENSKY AVE 1.0 10/17/97 10/17/97 0 10/17/97 10/17/97 300 100
805 06 0328 / 6514 5002 S LAWNDALE AVE 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 1885 / 8071 5375 S MAPLEWOOD AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 0688 / 6874 4417 S RICHMOND ST 1.0 10/18/95 10/18/95 0 10/18/95 10/18/95 300 100
805 06 0691 / 6877 5019 S ROCKWELL ST 1.0 08/30/95 08/30/95 0 08/30/95 08/30/95 300 100
805 06 0701 / 6887 3834 S SACRAMENTO AVE 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0704 / 6890 4433 S SACRAMENTO AVE 1.0 01/27/95 01/27/95 0 01/27/95 01/27/95 300 100
805 06 0657 / 6843 4343 S SPAULDING AVE 1.0 06/05/95 06/05/95 0 06/05/95 06/05/95 300 100
805 06 0658 / 6844 4424 S SPAULDING AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0631 / 6817 5856 S SPAULDING AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 0435 / 6621 4748 S SPRINGFIELD AVE 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0417 / 6603 4425 S ST LOUIS AVE 1.0 08/28/95 08/28/95 0 08/28/95 08/28/95 300 100
805 06 0418 / 6604 4501 S ST LOUIS AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0419 / 6605 4621 S ST LOUIS AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0393 / 6579 5501 S ST LOUIS AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0348 / 6534 5620 S TROY ST 1.0 01/10/95 01/10/95 0 01/10/95 01/10/95 300 100
805 06 1672 / 7858 4342 S TRUMBULL AVE 1.0 07/22/97 07/22/97 0 07/22/97 07/22/97 300 100
805 06 0387 / 6573 5516 S TRUMBULL AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 0368 / 6554 5530 S TRUMBULL AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0369 / 6555 5618 S TRUMBULL AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 0371 / 6557 5630 S TRUMBULL AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0372 / 6558 5640 S TRUMBULL AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 0373 / 6559 5656 S TRUMBULL AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 0521 / 6707 5150 S WESTERN AVE 1.0 05/22/95 05/22/95 0 05/22/95 05/22/95 300 100
805 06 0451 / 6637 4349 S WHIPPLE ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0452 / 6638 5714 S WHIPPLE ST 1.0 04/13/95 04/13/95 0 04/13/95 04/13/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 150

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0896 / 7082 2923 W 38TH PL 1.0 06/05/95 06/05/95 0 06/05/95 06/05/95 300 100
805 06 0897 / 7083 2935 W 38TH PL 1.0 06/05/95 06/05/95 0 06/05/95 06/05/95 300 100
302 00 0092 / 5774 3108 W 39TH PL 1.0 0 12/24/01 12/24/01 236 100
805 06 0920 / 7106 2822 W 40TH ST 1.0 04/16/96 04/16/96 0 04/16/96 04/16/96 300 100
805 06 0923 / 7109 3100 W 44TH ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0924 / 7110 3118 W 44TH ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0910 / 7096 4200 W 46TH ST 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0919 / 7105 3528 W 47TH ST 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 0930 / 7116 4010 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0901 / 7087 4024 W 47TH ST 1.0 05/28/96 05/28/96 0 05/28/96 05/28/96 300 100
805 06 0902 / 7088 4034 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0903 / 7089 4058 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0904 / 7090 4100 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0905 / 7091 4124 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0907 / 7093 4134 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0908 / 7094 4158 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 0909 / 7095 4200 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 1050 / 7236 3712 W 50TH ST 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
302 00 0092 / 5774 2559 W 51ST ST 1.0 0 09/27/01 09/27/01 236 100
300 06 0139 / 5289 2650 W 51ST ST 1,371.0 03/01/06 09/01/06 33,005 04/01/06 04/21/06 41,423 100
302 00 0092 / 5774 2650 W 51ST ST 29.0 0 03/07/01 11/27/01 6,834 100
805 06 0955 / 7141 2654 W 51ST ST 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 1497 / 7683 3222 W 55TH ST 1.0 11/14/97 11/14/97 0 11/14/97 11/14/97 300 100
805 06 1030 / 7216 3337 W 55TH ST 1.0 01/26/95 01/26/95 0 01/26/95 01/26/95 300 100
805 06 1031 / 7217 3417 W 55TH ST 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 1034 / 7220 3434 W 56TH ST 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 1006 / 7192 3744 W 57TH ST 1.0 04/27/95 04/27/95 0 04/27/95 04/27/95 300 100
805 06 1381 / 7567 3741 W 58TH PL 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0555 / 6741 2956 W PERSHING RD 1.0 01/24/96 01/24/96 0 01/24/96 01/24/96 300 100
805 06 0526 / 6712 3016 W PERSHING RD 1.0 06/17/96 06/17/96 0 06/17/96 06/17/96 300 100
805 06 0527 / 6713 3038 W PERSHING RD 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 151

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
Totals per Alley Lighting/Lamps 1,491.0 33,005 75,429

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 5236 S WESTERN AVE 1,299.0 06/01/07 12/31/07 38,242 09/01/07 09/01/07 37,086 100
300 06 0215 / 5336 2650 W 51ST ST 1,627.0 06/01/07 12/31/07 47,898 09/01/07 10/01/07 46,450 100

Totals per Arterial Group Relamping 2,926.0 86,140 83,536

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2650 W 51ST ST 1,532.0 0 07/09/02 07/12/02 27,895 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 S ARCHER AVE AND S PULASKI RD 5.0 0 11/23/99 11/23/99 1,755 100
300 06 0167 / 5306 W 55TH ST AND S CALIFORNIA AVE 2.50 0 12/08/99 12/08/99 376 100
300 06 0167 / 5306 W 55TH ST AND S KEDZIE AVE 4.0 0 05/20/99 05/20/99 1,404 100
302 00 0092 / 5774 4101 S CICERO AVE 2.0 0 05/02/01 05/02/01 941 100
302 00 0092 / 5774 4107 S CICERO AVE 2.0 0 05/02/01 05/02/01 941 100
302 00 0092 / 5774 4111 S CICERO AVE 2.0 0 05/02/01 05/02/01 941 100
302 00 0092 / 5774 4115 S CICERO AVE 2.0 0 05/02/01 05/02/01 941 100
302 00 0092 / 5774 4121 S CICERO AVE 2.0 0 05/02/01 05/02/01 941 100
300 06 0167 / 5306 3800 S FRANCISCO AVE 1.0 0 12/08/99 12/08/99 351 100
300 09 / 33080 5317 S MOZART ST 1.0 500 0 0
300 09 / 33080 5401 S MOZART ST 1.0 500 0 0
300 09 / 33080 5440 S MOZART ST 1.0 350 0 0
300 06 0072 / 5235 5656 S ST LOUIS AVE 08/03/01 09/28/01 0 07/02/01 07/02/01 2,553
300 09 / 33080 2836 W 55TH ST 1.0 350 0 0

Totals per Flood Light Install 26.50 1,700 11,144

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 4720 S ST LOUIS AVE 1.0 03/11/05 01/23/06 6,000 03/11/05 01/23/06 1,229 100

Project has been completed. (100%) Note Last Updated on 01-SEP-06


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 152

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Projects
302 00 0092 / 5774 ON S KEDZIE AVE FROM W 51ST ST TO W 55TH ST 50.0 66,000 10/08/01 11/15/01 35,349 100

Work Type: Ornamental - Piggyback Lighting Fixtures


300 05 0014 / 5129 ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD 20.0 04/04/05 11/18/05 27,000 05/01/05 06/20/05 10,940 100
300 05 0014 / 5129 ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE 13.0 04/04/05 11/18/05 17,550 06/01/05 06/20/05 24,240 100
300 06 0122 / 5275 ON S KEDZIE AVE FROM W 55TH ST TO W 57TH ST 14.0 16,800 08/27/03 08/27/03 19,097 100
300 05 0014 / 5129 ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE 3.0 04/04/05 11/18/05 4,050 06/01/05 06/20/05 2,121 100
300 05 0014 / 5129 ON W 51ST ST FROM S WESTERN AVE TO S CALIFORNIA AVE 17.0 04/04/05 11/18/05 22,950 06/01/05 06/20/05 10,527 100
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 11.80 05/01/04 05/15/04 15,930 05/10/04 05/21/04 17,029 100

Totals per Ornamental - Piggyback Lighting 78.80 104,280 83,954

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2650 W 51ST ST .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 153

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0014 / 5437 ON S ALBANY AVE FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 11 / 32203 ON S AVERS AVE FROM W 45TH ST TO W 47TH ST 2.0 09/27/07 12/31/07 155,000 0 0
300 07 0014 / 5437 ON S AVERS AVE FROM W 47TH ST TO S ARCHER AVE 2.0 05/31/06 07/31/06 140,000 05/31/06 07/21/06 93,542 100
300 07 0014 / 5437 ON S CALIFORNIA AVE FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S CHRISTIANA AVE FROM W 56TH ST TO W 57TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S FRANCISCO AVE FROM S ARCHER AVE TO W 42ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S FRANCISCO AVE FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S FRANCISCO AVE FROM W 51ST ST TO W 52ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S FRANCISCO AVE FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 06 0298 / 5405 ON S HAMLIN AVE FROM W 47TH ST TO W 49TH ST 2.0 06/15/05 07/15/05 0 05/23/05 07/22/05 97,512 100
300 07 0014 / 5437 ON S HAMLIN AVE FROM W 58TH ST TO W 58TH PL .0 03/01/06 12/31/06 0 0 0
300 06 0308 / 5414 ON S HARDING AVE FROM W 47TH ST TO W 49TH ST 2.0 03/15/06 05/15/06 158,374 03/07/06 04/21/06 108,603 100
300 07 0014 / 5437 ON S HOMAN AVE FROM W 55TH ST TO W 56TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S HOMAN AVE FROM W 56TH ST TO W 57TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S HOMAN AVE FROM W 57TH ST TO W 58TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S HOMAN AVE FROM W 58TH ST TO W 59TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KARLOV AVE FROM W 43RD ST TO W 44TH ST .0 03/01/06 12/31/06 0 0 0
300 09 / 33080 ON S KARLOV AVE FROM W 43RD ST TO W 47TH ST 4.0 04/19/08 05/09/08 260,000 04/01/08 12/01/08 0 100
300 07 0014 / 5437 ON S KARLOV AVE FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KARLOV AVE FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KARLOV AVE FROM W 49TH ST TO W 50TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KARLOV AVE FROM W 50TH ST TO S ARCHER AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KEDVALE AVE FROM W 43RD ST TO W 44TH ST .0 03/01/06 12/31/06 0 0 0
300 09 / 33080 ON S KEDVALE AVE FROM W 43RD ST TO W 47TH ST 4.0 04/19/08 05/09/08 260,000 04/01/08 12/01/08 0 100
300 07 0014 / 5437 ON S KEDVALE AVE FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KEDVALE AVE FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KEDVALE AVE FROM W 46TH ST TO W 47TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KEELER AVE FROM W 43RD ST TO W 44TH ST .0 03/01/06 12/31/06 0 0 0
300 06 / 32277 ON S KEELER AVE FROM W 43RD ST TO W 47TH ST .0 05/04/08 12/31/08 0 0 0
300 07 0014 / 5437 ON S KEELER AVE FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 09 / 33080 ON S KOMENSKY AVE FROM W 43RD ST TO W 47TH ST 4.0 04/19/08 05/09/08 260,000 04/01/08 12/01/08 0 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 154

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0014 / 5437 ON S KOMENSKY AVE FROM W 46TH ST TO W 47TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S KOMENSKY AVE FROM W 49TH ST TO W 50TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MAPLEWOOD AVE FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MAPLEWOOD AVE FROM W 53RD ST TO W 54TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MAPLEWOOD AVE FROM W 54TH ST TO W 55TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MOZART ST FROM S ARCHER AVE TO W 42ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MOZART ST FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MOZART ST FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MOZART ST FROM W 51ST ST TO W 52ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S MOZART ST FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S RICHMOND ST FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S RICHMOND ST FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S RICHMOND ST FROM W 46TH ST TO W 47TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S RICHMOND ST FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 05 0014 / 5129 ON S RIDGEWAY AVE FROM W 47TH ST TO S ARCHER AVE 1.0 04/04/05 11/18/05 85,000 05/23/05 07/22/05 50,024 100
300 07 0014 / 5437 ON S ROCKWELL ST FROM W 53RD ST TO W 54TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SACRAMENTO AVE FROM S ARCHER AVE TO W POPE JOHN PAUL II .0 03/01/06 12/31/06 0 0 0
DR
300 07 0014 / 5437 ON S SACRAMENTO AVE FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SACRAMENTO AVE FROM W 46TH ST TO W 47TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SACRAMENTO AVE FROM W 51ST ST TO W 52ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SACRAMENTO AVE FROM W POPE JOHN PAUL II DR TO W 44TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SAWYER AVE FROM W 55TH ST TO W 56TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SAWYER AVE FROM W 56TH ST TO W 57TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SAWYER AVE FROM W 57TH ST TO W 58TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SAWYER AVE FROM W 58TH ST TO W 59TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SPAULDING AVE FROM W 56TH ST TO W 57TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S SPRINGFIELD AVE FROM W 47TH ST TO W 49TH ST 2.0 05/31/06 07/31/06 160,000 05/31/06 07/21/06 93,543 100
300 07 0014 / 5437 ON S TROY ST FROM W 45TH ST TO W 46TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S TROY ST FROM W 51ST ST TO W 52ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S TRUMBULL AVE FROM W 55TH ST TO W 56TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S TRUMBULL AVE FROM W 56TH ST TO W 57TH ST .0 03/01/06 12/31/06 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 155

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0014 / 5437 ON S TRUMBULL AVE FROM W 57TH ST TO W 58TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S TRUMBULL AVE FROM W 58TH ST TO W 59TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S WHIPPLE ST FROM W 44TH ST TO W 45TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S WHIPPLE ST FROM W 51ST ST TO W 52ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S WHIPPLE ST FROM W 52ND ST TO W 53RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON S WHIPPLE ST FROM W POPE JOHN PAUL II DR TO W 44TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 42ND ST FROM S MOZART ST TO S FRANCISCO AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 47TH ST FROM S AVERS AVE TO S SPRINGFIELD AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 47TH ST FROM S SPRINGFIELD AVE TO S PULASKI RD .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 53RD ST FROM S SACRAMENTO AVE TO S WHIPPLE ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 55TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 55TH ST FROM S SPAULDING AVE TO S CHRISTIANA AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 56TH PL FROM S CENTRAL PARK AVE TO S LAWNDALE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 56TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 57TH PL FROM S CENTRAL PARK AVE TO S LAWNDALE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 57TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 57TH ST FROM S CENTRAL PARK AVE TO S LAWNDALE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 57TH ST FROM S FRANCISCO AVE TO S RICHMOND ST .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 57TH ST FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 58TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 58TH ST FROM S CENTRAL PARK AVE TO S LAWNDALE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 ON W 58TH ST FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 4400-4500 S ALBANY AVE .0 03/01/06 12/31/06 0 0 0
300 07 0014 / 5437 5100-5200 S CALIFORNIA AVE .0 03/01/06 12/31/06 0 0 0

Totals per Residntl Staggered Lighting 23.0 1,478,374 443,224


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 156

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0267 / 5375 ON S LAWNDALE AVE FROM S ARCHER AVE TO W 49TH ST 1.0 08/01/04 10/01/04 75,000 08/17/04 09/17/04 70,604 100
300 06 0235 / 5349 ON S LAWNDALE AVE FROM W 50TH ST TO W 51ST ST 1.0 03/04/03 04/28/03 81,511 03/04/03 04/18/03 70,737 100
300 06 0267 / 5375 ON S RIDGEWAY AVE FROM S ARCHER AVE TO W 49TH ST 1.0 08/01/04 10/01/04 75,000 08/17/04 09/17/04 70,604 100
300 06 0235 / 5349 ON S RIDGEWAY AVE FROM W 50TH ST TO W 51ST ST 1.0 03/04/03 04/28/03 81,511 03/04/03 04/18/03 70,736 100

Totals per Residntl Strt Lighting/Lamps 4.0 313,022 282,681

Work Type: Short Arm Installs - Arterial Locations


302 00 0092 / 5774 4400 S ALBANY AVE 1.0 0 02/16/01 02/16/01 378 100
302 00 0092 / 5774 5301 S MOZART ST 1.0 0 03/07/01 03/07/01 378 100
302 00 0092 / 5774 5200 S RICHMOND ST 1.0 0 02/16/01 02/16/01 378 100
302 00 0092 / 5774 2915 W 38TH PL 1.0 0 04/13/01 04/13/01 378 100

Totals per Short Arm Installs - Arterial 4.0 0 1,512

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 5000 S MAPLEWOOD AVE 1.0 0 05/16/01 05/16/01 378 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 157

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0108 / 5263 ON S ARCHER AVE FROM S KOSTNER AVE TO S SACRAMENTO AVE 166.60 05/23/03 06/10/03 61,413 05/23/03 06/26/03 52,420 100
300 05 0014 / 5129 ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD 33.0 04/04/05 11/18/05 9,000 06/01/05 06/20/05 7,138 100
300 03 0012 / 4883 ON S KEDZIE AVE FROM W 36TH ST TO W 39TH PL 6.44 07/01/04 07/20/04 1,694 07/10/04 08/01/04 1,464 100
300 05 0014 / 5129 ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE 24.0 04/04/05 11/18/05 6,500 06/01/05 06/20/05 5,192 100
302 00 0079 / 5767 ON S KEDZIE AVE FROM W 47TH ST TO W 55TH ST 100.0 10/08/01 11/15/01 35,000 10/08/01 11/15/01 17,554 100
300 05 0014 / 5129 ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE 3.0 04/04/05 11/18/05 750 06/01/05 06/20/05 669 100
300 06 0108 / 5263 ON S PULASKI RD FROM W 40TH ST TO W 51ST ST 181.0 06/01/03 06/10/03 55,450 05/19/03 06/25/03 47,740 100
300 03 0014 / 4885 ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE 51.48 06/01/04 06/21/04 13,580 05/11/04 06/30/04 14,609 100
300 05 0014 / 5129 ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE 81.0 04/04/05 11/18/05 21,250 10/20/05 10/20/05 17,520 100
302 00 0076 / 5764 ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE 86.90 09/01/00 12/31/00 0 1,477
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 121.54 05/10/04 06/16/04 35,577 05/11/04 06/04/04 27,650 100
302 00 0079 / 5767 ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE 23.94 09/01/02 09/03/02 3,002 09/09/02 10/23/02 3,002 100
302 00 0076 / 5764 W 47TH ST AND S PULASKI RD 104.0 09/01/00 12/31/00 0 1,768
302 00 0077 / 5765 4068 S ARCHER AVE 1.0 0 06/15/99 06/15/99 87 100
302 00 0077 / 5765 4168 S ARCHER AVE 1.0 0 07/29/99 07/29/99 175 100
302 00 0077 / 5765 4100-4115 S CALIFORNIA AVE 2.0 0 07/29/99 07/29/99 175 100
302 00 0076 / 5764 5200-5300 S CALIFORNIA AVE 14.0 06/18/98 06/18/98 0 06/18/98 06/18/98 238 100
302 00 0076 / 5764 5400 S FAIRFIELD AVE 1.0 02/24/98 02/24/98 0 02/24/98 02/24/98 17 100
302 00 0077 / 5765 4125 S FRANCISCO AVE 1.0 0 06/17/99 06/17/99 87 100
302 00 0076 / 5764 5363 S ROCKWELL ST 1.0 02/28/98 02/28/98 0 02/24/98 02/24/98 17 100
302 00 0076 / 5764 5500 S ROCKWELL ST 1.0 02/24/98 02/24/98 0 02/24/98 02/24/98 17 100

Totals per Strt Light Pole Painting 1,004.90 243,215 199,016

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2650 W 51ST ST 2,190.0 03/01/04 12/01/04 11,388 07/31/06 09/01/06 23,849 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 158

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2361 / 8547 3828 N PULASKI RD 9.0 11/02/95 11/02/95 0 11/02/95 11/02/95 6,750 100
805 06 2451 / 8637 4700 S ARCHER AVE 23.0 05/20/93 05/20/93 0 05/20/93 05/20/93 17,250 100
805 06 2332 / 8518 4801 S CALIFORNIA AVE 20.0 01/01/91 01/01/91 0 01/01/91 01/01/91 15,000 100
805 06 2290 / 8476 4810 S CALIFORNIA AVE 16.0 01/01/91 01/01/91 0 01/01/91 01/01/91 12,000 100
302 00 0071 / 5759 4900 S CALIFORNIA AVE 0 01/18/99 01/25/99 10,863 100
805 06 2448 / 8634 4822 S KEDZIE AVE 26.0 10/31/95 10/31/95 0 10/31/95 10/31/95 19,500 100
805 06 2271 / 8457 4823 S KEDZIE AVE 16.0 01/01/91 01/01/91 0 01/01/91 01/01/91 12,000 100
300 06 0099 / 5260 2650 W 51ST ST 91.0 10/09/03 10/09/03 5,115 09/26/03 09/26/03 3,510 100
805 06 2445 / 8631 3550 W 58TH ST 8.0 04/08/93 04/08/93 0 04/08/93 04/08/93 6,000 100

Totals per Underpass Lighting 209.0 5,115 102,873


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 159

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S CALIFORNIA AVE AND W 42ND ST .50 0 08/27/01 08/27/01 3,662 100
210 06 0130 / 4389 S KOSTNER AVE AND W 47TH ST .50 0 10/18/01 10/18/01 4,270 100
210 06 0130 / 4389 S PULASKI RD AND W 44TH ST 1.0 0 02/08/02 02/08/02 8,539 100
210 06 0219 / 4459 S WESTERN AVE AND W 51ST ST .50 05/12/05 05/13/05 5,282 04/19/05 04/19/05 4,170 100
210 06 0219 / 4459 S WESTERN AVE AND W 54TH ST .50 05/13/05 05/14/05 5,282 04/18/05 04/18/05 3,879 100
210 06 0219 / 4459 W 55TH ST AND S WESTERN AVE .50 05/16/05 05/17/05 5,282 04/15/05 04/15/05 4,523 100

Totals per LED Signal Head Install 3.50 15,845 29,042

Work Type: Left Turn Arrow Locations


210 06 0110 / 4370 4100-4199 S PULASKI RD 1.0 11/01/00 04/30/01 20,000 11/03/00 04/12/01 15,286 100

Work Type: New Signal Locations


210 06 0133 / 4392 4200 S CALIFORNIA AVE 1.0 163,000 05/23/01 95,542 90
210 06 0073 / 4337 4400 S PULASKI RD 1.0 01/31/02 05/03/02 175,000 12/28/01 06/06/02 170,385 100

Totals per New Signal 2.0 338,000 265,927

Work Type: Signals Intersections


300 06 0096 / 5258 2650 W 51ST ST 42.0 09/21/03 09/28/03 0 08/27/03 09/04/03 6,641 100

Work Type: TSM Install Locations


814 06 0296 / 16508 4320 N PULASKI RD 1.0 09/11/91 09/11/91 0 09/11/91 09/11/91 106,875 100
814 06 0103 / 16318 4515 S HOMAN AVE 1.0 09/17/93 09/17/93 0 09/17/93 09/17/93 108,530 100
814 06 0217 / 16429 4699 S HOMAN AVE 1.0 01/27/95 01/27/95 0 01/27/95 01/27/95 125,000 100
814 06 0194 / 16406 3838 S PULASKI RD 1.0 11/13/95 11/13/95 0 11/13/95 11/13/95 125,000 100

Totals per TSM Install 4.0 0 465,405

Work Type: Traffic Equipment Painting Locations


300 05 0014 / 5129 ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD 6.0 04/04/05 11/18/05 1,500 06/01/05 06/20/05 1,875 100
300 05 0014 / 5129 ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE 9.0 04/04/05 11/18/05 2,400 06/01/05 06/20/05 2,451 100
300 05 0014 / 5129 ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE 26.0 04/04/05 11/18/05 7,900 10/20/05 10/20/05 8,364 100

Totals per Traffic Equipment Painting 41.0 11,800 12,690


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 160

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Reloc Locations
300 06 0286 / 5394 2420 W 54TH ST 2.0 05/01/05 06/01/05 43,000 05/09/05 06/01/05 30,498 100

Totals per Traffic 428,645 825,489

Totals per Construction Phase 3,532,286 2,701,473

Totals for Ward 14 4,092,286 2,785,334


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 161

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON S HERMITAGE AVE FROM W MARQUETTE RD TO W 65TH ST .0 04/01/08 08/30/08 0 0 0
300 06 0308 / 5414 ON S TALMAN AVE FROM W 61ST ST TO W 63RD ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,414 100
210 06 0243 / 4480 W 61ST ST AND S KEDZIE AVE .0 12/27/06 01/26/07 250 12/27/06 01/26/07 1,594 100
300 06 0292 / 5399 5840 S ASHLAND AVE 1.0 1,000 01/03/05 03/03/05 559 100
300 06 0292 / 5399 6312 S PAULINA ST 1.0 06/29/05 07/19/05 1,000 06/29/05 07/19/05 0 100
300 06 0292 / 5399 1634 W 59TH ST .0 01/20/05 12/21/05 0 01/20/05 12/21/05 0 0

Totals per Design/Engineering 2.0 2,250 4,567


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 162

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 05 0015 / 5130 ON S ARTESIAN AVE FROM W 60TH ST TO W MARQUETTE RD 26.0 04/04/05 11/18/05 10,800 06/15/05 06/28/05 5,980 100
300 05 0015 / 5130 ON S CAMPBELL AVE FROM W 60TH ST TO W MARQUETTE RD 25.0 04/04/05 11/18/05 10,400 06/15/05 06/28/05 5,750 100
300 05 0015 / 5130 ON S MAPLEWOOD AVE FROM W 60TH ST TO W MARQUETTE RD 26.0 04/04/05 11/18/05 10,800 06/15/05 06/28/05 5,980 100
300 05 0015 / 5130 ON S ROCKWELL ST FROM W 60TH ST TO W MARQUETTE RD 25.0 04/04/05 11/18/05 10,400 06/15/05 06/28/05 5,750 100
300 05 0015 / 5130 ON S TALMAN AVE FROM W 68TH ST TO W 60TH ST 26.0 04/04/05 11/18/05 10,800 06/15/05 06/28/05 5,980 100
300 03 0015 / 4886 ON S WOOD ST FROM W 55TH ST TO W 57TH ST 10.0 09/20/04 09/26/04 3,950 10/04/04 10/05/04 2,401 100
300 06 0069 / 5233 6400 S ARTESIAN AVE 5.0 0 07/15/02 07/15/02 1,875 100
302 00 0092 / 5774 6400 S CAMPBELL AVE 2.0 0 08/20/01 08/20/01 412 100
302 00 0092 / 5774 6400-6499 S CAMPBELL AVE 5.0 09/03/01 09/04/01 1,029 08/20/01 08/20/01 1,029 100
302 00 0092 / 5774 6500 S CAMPBELL AVE 5.0 10/03/01 10/03/01 1,029 11/12/01 11/12/01 1,029 100
302 00 0092 / 5774 6509 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6527 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6545 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6559 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6801 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6813 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6829 S CAMPBELL AVE 1.0 0 11/12/01 11/12/01 206 100
210 06 0022 / 4297 5500-5599 S HONORE ST 5.0 0 02/21/02 02/21/02 1,875 100
300 06 0069 / 5233 5500-5599 S HONORE ST 5.0 1,875 02/21/02 02/21/02 1,875 100
302 00 0092 / 5774 6300-6399 S MAPLEWOOD AVE 4.0 10/24/01 10/24/01 1,029 09/29/01 09/29/01 824 100
302 00 0092 / 5774 6100-6199 S RICHMOND ST 5.0 11/01/01 11/01/01 1,029 11/21/01 11/21/01 1,029 100
302 00 0092 / 5774 6443 S ROCKWELL ST 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 6459 S ROCKWELL ST 1.0 0 11/12/01 11/12/01 206 100
300 06 0069 / 5233 6201 S WOLCOTT AVE 1.0 06/20/02 06/20/02 210 06/17/02 06/17/02 203 100
300 06 0069 / 5233 3500 W 66TH PL 4.0 09/29/02 09/29/02 840 09/26/02 09/26/02 812 100

Totals per 250 Watt Changeout 188.0 64,191 44,658

Work Type: 400 Watt Changeout Fixtures


300 03 0015 / 4886 ON W 63RD ST FROM S CALIFORNIA AVE TO S WESTERN AVE 67.0 09/20/04 09/26/04 27,200 08/16/04 08/24/04 17,462 100

Totals per Lighting/Electrical 1,339,688 1,235,310


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 163

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0728 / 6914 6123 S ALBANY AVE 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0729 / 6915 6141 S ALBANY AVE 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0730 / 6916 6223 S ALBANY AVE 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0731 / 6917 6243 S ALBANY AVE 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0747 / 6933 6403 S ARTESIAN AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
302 00 0083 / 5768 6154 S ASHLAND AVE 0 10/30/97 10/30/97 267 100
805 06 1248 / 7434 6154 S ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0750 / 6936 6159 S ASHLAND AVE 1.0 06/22/95 06/22/95 0 06/22/95 06/22/95 300 100
302 00 0083 / 5768 6648 S ASHLAND AVE 0 10/30/97 10/30/97 267 100
805 06 1250 / 7436 6648 S ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1866 / 8052 6219 S CLAREMONT AVE 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
302 00 0083 / 5768 6700 S CLAREMONT AVE 0 10/30/97 10/30/97 266 100
805 06 1258 / 7444 6700 S CLAREMONT AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 6643 S DAMEN AVE 0 10/15/97 10/15/97 266 100
805 06 1249 / 7435 6643 S DAMEN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5916 S HERMITAGE AVE 0 10/15/97 10/15/97 266 100
805 06 1246 / 7432 5916 S HERMITAGE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5914 S HONORE ST 0 10/15/97 10/15/97 266 100
805 06 1272 / 7458 5914 S HONORE ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 6658 S HOYNE AVE 0 10/15/97 10/15/97 266 100
805 06 1253 / 7439 6658 S HOYNE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1467 / 7653 5500 S MARSHFIELD AVE 3.0 12/03/97 12/03/97 0 12/03/97 12/03/97 900 100
302 00 0083 / 5768 5527 S MARSHFIELD AVE 0 10/15/97 10/15/97 267 100
805 06 1267 / 7453 5527 S MARSHFIELD AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5915 S MARSHFIELD AVE 0 12/09/97 12/09/97 266 100
805 06 1274 / 7460 5915 S MARSHFIELD AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 6658 S OAKLEY AVE 0 12/09/97 12/09/97 266 100
805 06 1254 / 7440 6658 S OAKLEY AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5911 S PAULINA ST 0 12/09/97 12/09/97 266 100
805 06 1271 / 7457 5911 S PAULINA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 6045 S PAULINA ST 0 12/09/97 12/09/97 267 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 164

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1247 / 7433 6045 S PAULINA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 6656 S ROCKWELL ST 0 12/09/97 12/09/97 267 100
805 06 1252 / 7438 6656 S ROCKWELL ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0705 / 6891 6500 S SACRAMENTO AVE 1.0 08/16/96 08/16/96 0 08/16/96 08/16/96 300 100
302 00 0083 / 5768 6658 S SEELEY AVE 0 12/09/97 12/09/97 267 100
805 06 1255 / 7441 6658 S SEELEY AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0422 / 6608 6100 S TALMAN AVE 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100
302 00 0083 / 5768 6655 S WASHTENAW AVE 0 12/12/97 12/12/97 267 100
805 06 1251 / 7437 6655 S WASHTENAW AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5524 S WINCHESTER AVE 0 09/17/97 09/17/97 266 100
805 06 1263 / 7449 5524 S WINCHESTER AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5525 S WINCHESTER AVE 0 09/17/97 09/17/97 266 100
805 06 1265 / 7451 5525 S WINCHESTER AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5637 S WINCHESTER AVE 0 09/17/97 09/17/97 266 100
805 06 1269 / 7455 5637 S WINCHESTER AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5527 S WOLCOTT AVE 0 09/17/97 09/17/97 267 100
805 06 1268 / 7454 5527 S WOLCOTT AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5914 S WOLCOTT AVE 0 09/17/97 09/17/97 267 100
805 06 1273 / 7459 5914 S WOLCOTT AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5519 S WOOD ST 0 09/17/97 09/17/97 267 100
805 06 1262 / 7448 5519 S WOOD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5526 S WOOD ST 0 09/17/97 09/17/97 267 100
805 06 1266 / 7452 5526 S WOOD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0092 / 5774 5700 S WOOD ST 1.0 0 06/26/01 06/26/01 236 100
805 06 1783 / 7969 6019 S WOOD ST 1.0 04/30/97 04/30/97 0 04/30/97 04/30/97 300 100
302 00 0083 / 5768 6658 S WOOD ST 0 09/17/97 09/17/97 267 100
805 06 1257 / 7443 6658 S WOOD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1735 W 55TH ST 0 08/20/97 08/20/97 267 100
302 00 0083 / 5768 1935 W 55TH ST 0 08/20/97 08/20/97 267 100
302 00 0083 / 5768 1955 W 55TH ST 0 08/20/97 08/20/97 267 100
302 00 0083 / 5768 1955 W 59TH ST 0 08/20/97 08/20/97 266 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 165

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1435 / 7621 1955 W 59TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1027 / 7213 3432 W 62ND ST 1.0 06/23/95 06/23/95 0 06/23/95 06/23/95 300 100
805 06 1061 / 7247 3221 W 63RD PL 1.0 08/14/95 08/14/95 0 08/14/95 08/14/95 300 100
805 06 1063 / 7249 3239 W 63RD PL 1.0 08/14/95 08/14/95 0 08/14/95 08/14/95 300 100
805 06 1064 / 7250 3301 W 63RD PL 1.0 08/14/95 08/14/95 0 08/14/95 08/14/95 300 100
805 06 1065 / 7251 3324 W 63RD PL 1.0 01/10/95 01/10/95 0 01/10/95 01/10/95 300 100
805 06 1048 / 7234 3341 W 63RD PL 1.0 08/14/95 08/14/95 0 08/14/95 08/14/95 300 100
805 06 1037 / 7223 3403 W 63RD PL 1.0 08/17/95 08/17/95 0 08/17/95 08/17/95 300 100
805 06 1060 / 7246 3423 W 63RD PL 1.0 08/18/95 08/18/95 0 08/18/95 08/18/95 300 100
302 00 0083 / 5768 1955 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1436 / 7622 1955 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1957 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1437 / 7623 1957 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2006 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1440 / 7626 2006 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2032 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1411 / 7597 2032 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2100 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1413 / 7599 2100 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2300 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1416 / 7602 2300 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2332 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1418 / 7604 2332 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2355 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1422 / 7608 2355 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2434 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1425 / 7611 2434 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
300 06 0096 / 5258 2440 W 63RD ST 1,414.0 03/01/03 09/01/03 0 03/01/06 09/01/06 42,723 0
302 00 0092 / 5774 2440 W 63RD ST 35.0 0 02/02/01 01/29/02 8,248 100
302 00 0083 / 5768 2441 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1397 / 7583 2441 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 166

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0083 / 5768 2506 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1400 / 7586 2506 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2541 W 63RD ST 0 12/10/97 12/10/97 266 100
805 06 1404 / 7590 2541 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2606 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1405 / 7591 2606 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2754 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1407 / 7593 2754 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2755 W 63RD ST 0 12/10/97 12/10/97 267 100
805 06 1408 / 7594 2755 W 63RD ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1042 / 7228 2835 W 63RD ST 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 1044 / 7230 3217 W 63RD ST 1.0 01/06/95 01/06/95 0 01/06/95 01/06/95 300 100
805 06 1029 / 7215 3415 W 63RD ST 1.0 08/18/95 08/18/95 0 08/18/95 08/18/95 300 100
805 06 1045 / 7231 3433 W 63RD ST 1.0 08/18/95 08/18/95 0 08/18/95 08/18/95 300 100
805 06 1005 / 7191 3211 W 64TH PL 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 1004 / 7190 3415 W 64TH PL 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 0976 / 7162 3433 W 64TH PL 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 0980 / 7166 3227 W 64TH ST 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 0964 / 7150 3415 W 64TH ST 1.0 06/08/95 06/08/95 0 06/08/95 06/08/95 300 100
805 06 0982 / 7168 3435 W 64TH ST 1.0 06/08/95 06/08/95 0 06/08/95 06/08/95 300 100
805 06 0987 / 7173 3407 W 65TH PL 1.0 03/12/95 03/12/95 0 03/12/95 03/12/95 300 100
805 06 0988 / 7174 3209 W 65TH ST 1.0 06/08/95 06/08/95 0 06/08/95 06/08/95 300 100
805 06 0961 / 7147 3401 W 66TH ST 1.0 03/17/95 03/17/95 0 03/17/95 03/17/95 300 100
805 06 1458 / 7644 3518 W 66TH ST 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
302 00 0083 / 5768 2436 W 69TH ST 0 11/07/97 11/07/97 266 100
302 00 0083 / 5768 2502 W 69TH ST 0 11/07/97 11/07/97 266 100
805 06 1426 / 7612 1643 W GARFIELD BLVD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1429 / 7615 1735 W GARFIELD BLVD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1433 / 7619 1935 W GARFIELD BLVD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1434 / 7620 1955 W GARFIELD BLVD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1396 / 7582 2436 W LITHUANIAN PLAZA CT 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 167

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1399 / 7585 2502 W LITHUANIAN PLAZA CT 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1842 W MARQUETTE RD 0 09/02/97 09/02/97 266 100
805 06 1431 / 7617 1842 W MARQUETTE RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2506 W MARQUETTE RD 0 09/02/97 09/02/97 267 100
805 06 1402 / 7588 2506 W MARQUETTE RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1890 / 8076 3400 W MARQUETTE RD 1.0 03/17/95 03/17/95 0 03/17/95 03/17/95 300 100
805 06 1861 / 8047 3422 W MARQUETTE RD 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 300 100
805 06 1862 / 8048 3434 W MARQUETTE RD 1.0 03/20/95 03/20/95 0 03/20/95 03/20/95 300 100

Totals per Alley Lighting/Lamps 1,535.0 0 88,967

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2440 W 63RD ST 1,194.0 0 07/17/02 07/20/02 21,740 100

Work Type: Flood Light Install Fixtures


300 09 / 33081 ON S WASHTENAW AVE FROM W 68TH ST TO W LITHUANIAN PLAZA CT 4.0 10/22/08 10/23/08 2,000 10/22/08 10/23/08 2,556 100
300 06 0167 / 5306 S ARTESIAN AVE AND W 70TH ST .50 0 01/06/99 01/06/99 176 100
302 00 0092 / 5774 6001 S CALIFORNIA AVE 1.0 0 04/13/01 04/13/01 471 100
300 06 0167 / 5306 3255 W 65TH PL 1.0 0 04/07/99 04/07/99 351 100
300 06 0167 / 5306 3355 W 65TH PL 1.0 0 04/07/99 04/07/99 351 100
300 06 0167 / 5306 3357 W 65TH ST 1.0 0 04/07/99 04/07/99 351 100
300 06 0167 / 5306 3259 W 66TH ST 1.0 0 04/07/99 04/07/99 351 100
300 06 0167 / 5306 3357 W 66TH ST 1.0 0 04/07/99 04/07/99 351 100

Totals per Flood Light Install 10.50 2,000 4,958

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 6312 S PAULINA ST .0 03/01/05 12/31/05 6,209 08/19/05 08/25/05 3,074 100
300 06 0292 / 5399 1634 W 59TH ST 1.0 02/16/05 05/12/06 33,000 02/16/05 05/12/06 23,063 100

Totals per Lighting Imprvmnts 1.0 39,209 26,137

Work Type: Ornamental - Piggyback Lighting Fixtures


300 06 0069 / 5233 ON S FAIRFIELD AVE FROM W 64TH ST TO W 65TH ST 5.0 7,900 08/01/02 08/01/02 7,435 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 168

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residential Regrouping Lamps
300 06 0270 / 5378 3045 W 63RD ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32277 ON S HERMITAGE AVE FROM W MARQUETTE RD TO W 65TH ST .0 05/04/08 12/31/08 0 0 0
300 11 / 32204 ON S MARSHFIELD AVE FROM W 56TH ST TO W 58TH ST 2.50 12/12/07 03/26/08 150,000 01/07/08 05/09/08 135,215 100
300 11 / 32204 ON S MARSHFIELD AVE FROM W 64TH ST TO W MARQUETTE RD 3.0 12/26/07 03/26/08 175,000 01/07/08 0 75
300 05 0015 / 5130 ON S TALMAN AVE FROM W 60TH ST TO W 61ST ST .08 04/13/06 06/16/06 50,365 04/13/06 06/09/06 47,500 100
300 07 0015 / 5438 ON S TALMAN AVE FROM W 60TH ST TO W 61ST ST 1.0 04/13/06 06/16/06 14,635 04/13/06 06/09/06 48,140 100
300 06 0308 / 5414 ON S TALMAN AVE FROM W 61ST ST TO W 63RD ST 2.0 03/16/06 12/31/06 193,058 04/13/06 06/09/06 119,524 100
300 07 0017 / 5440 ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S WOOD ST TO S HONORE ST .0 03/01/06 12/31/06 0 0 0
300 05 0015 / 5130 5500-5600 S MARSHFIELD AVE .0 12/08/06 65,000 0 0

Totals per Residntl Staggered Lighting 8.58 648,058 350,379

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S HOYNE AVE FROM W 63RD ST TO W 65TH ST 2.0 08/01/03 10/01/03 157,731 07/09/03 10/27/03 145,862 100
300 06 0267 / 5375 ON S SEELEY AVE FROM W 63RD ST TO W 65TH ST 2.0 10/01/04 11/20/04 176,401 09/24/04 12/21/04 162,993 100

Totals per Residntl Strt Lighting/Lamps 4.0 334,132 308,855

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 6400 S WHIPPLE ST 1.0 0 05/16/01 05/16/01 378 100
302 00 0092 / 5774 6427 S WHIPPLE ST 1.0 0 05/16/01 05/16/01 378 100
302 00 0092 / 5774 6300 S WOOD ST 1.0 0 05/10/01 05/10/01 378 100

Totals per Short Arm Installs - Residntl 3.0 0 1,134


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 169

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 05 0015 / 5130 ON S ARTESIAN AVE FROM W 68TH ST TO W 60TH ST 31.0 04/04/05 11/18/05 10,500 06/15/05 06/21/05 4,470 100
300 05 0015 / 5130 ON S CAMPBELL AVE FROM W 60TH ST TO W MARQUETTE RD 31.0 04/04/05 11/18/05 8,800 06/15/05 06/21/05 4,470 100
300 04 0216 / 5114 ON S KEDZIE AVE FROM W 59TH ST TO W 63RD ST 22.50 05/01/06 11/01/06 4,867 05/17/06 10/10/06 4,867 100
300 05 0015 / 5130 ON S MAPLEWOOD AVE FROM W 68TH ST TO W 60TH ST 31.0 04/04/05 11/18/05 8,400 06/15/05 06/21/05 4,470 100
300 05 0015 / 5130 ON S ROCKWELL ST FROM W 60TH ST TO W MARQUETTE RD 30.0 04/04/05 11/18/05 10,500 06/15/05 06/21/05 4,326 100
300 05 0015 / 5130 ON S TALMAN AVE FROM W 68TH ST TO W 60TH ST 29.0 04/04/05 11/18/05 8,400 06/15/05 06/21/05 4,182 100
302 00 0076 / 5764 ON W 63RD ST FROM S CALIFORNIA AVE TO S ST LOUIS AVE 112.0 09/01/00 12/31/00 0 1,904
300 03 0015 / 4886 ON W 63RD ST FROM S CALIFORNIA AVE TO S WESTERN AVE 72.0 09/20/04 09/26/04 19,900 07/07/04 07/14/04 17,016 100
302 00 0076 / 5764 ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE 39.60 09/01/00 12/31/00 0 673
300 07 0017 / 5440 ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S WOOD ST TO S HONORE ST .0 03/01/06 12/31/06 0 0 0

Totals per Strt Light Pole Painting 398.10 71,367 46,378

Work Type: Strt Lighting Blocks


300 06 0247 / 5357 ON S HAMILTON AVE FROM W 63RD ST TO W 64TH ST 1.0 55,000 06/07/04 07/26/04 52,307 100
300 06 0266 / 5374 6315 S CLAREMONT AVE 01/10/04 03/25/04 51,000 01/10/04 03/25/04 39,325 100

Totals per Strt Lighting 1.0 106,000 91,632

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2440 W 63RD ST 951.0 03/01/04 12/01/04 4,945 07/31/06 09/05/06 10,356 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 170

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2894 / 9080 5899 S ASHLAND AVE 6.0 03/15/92 03/15/92 0 03/15/92 03/15/92 4,500 100
805 06 2533 / 8719 5801 S DAMEN AVE 6.0 03/01/92 03/01/92 0 03/01/92 03/01/92 4,500 100
805 06 2499 / 8685 5801 S HONORE ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
302 00 0071 / 5759 5830 S HONORE ST 0 11/05/98 11/11/98 6,985 100
805 06 2876 / 9062 5801 S JUSTINE ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
302 00 0072 / 5760 5800 S LAFLIN ST 1.0 0 03/09/00 03/16/00 10,313 100
805 06 2515 / 8701 5899 S PAULINA ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2482 / 8668 5899 S WINCHESTER AVE 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2530 / 8716 5899 S WOLCOTT AVE 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2544 / 8730 5899 S WOOD ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2489 / 8675 2135 W 63RD ST 17.0 12/08/95 12/08/95 0 12/08/95 12/08/95 12,750 100
805 06 2488 / 8674 2195 W 63RD ST 72.0 12/08/95 12/08/95 0 12/08/95 12/08/95 54,000 100
300 06 0099 / 5260 2440 W 63RD ST 85.0 10/10/03 10/13/03 4,755 09/26/03 10/02/03 10,174 100
300 06 0217 / 5337 2440 W 63RD ST 532.0 03/30/04 04/12/04 29,931 09/29/03 10/02/03 18,998
805 06 2340 / 8526 2218 W 65TH ST 88.0 04/04/96 04/04/96 0 04/04/96 04/04/96 66,000 100

Totals per Underpass Lighting 843.0 34,686 215,220


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 171

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 S ASHLAND AVE AND W 59TH ST 1.0 05/07/05 05/07/05 10,653 07/05/05 07/07/05 0
210 06 0219 / 4459 S ASHLAND AVE AND W MARQUETTE RD .50 05/06/05 05/06/05 5,327 07/01/05 07/05/05 0
210 06 0219 / 4459 S WESTERN AVE AND W 61ST ST .50 05/18/05 05/19/05 5,282 04/13/05 04/13/05 4,035 100
210 06 0219 / 4459 S WESTERN AVE AND W 62ND ST 1.0 05/19/05 05/20/05 10,563 04/12/05 04/12/05 6,925 100
210 06 0219 / 4459 S WESTERN AVE AND W 65TH ST 1.0 05/21/05 05/22/05 10,563 04/11/05 04/11/05 8,368 100
210 06 0219 / 4459 S WESTERN AVE AND W MARQUETTE RD .50 05/23/05 05/24/05 5,282 03/25/05 03/25/05 4,004 100
300 06 0225 / 5340 W 63RD ST AND S WESTERN AVE 1.0 06/01/05 07/01/05 6,105 06/01/04 06/10/04 6,105 100

Totals per LED Signal Head Install 5.50 53,774 29,437

Work Type: Left Turn Arrow Locations


210 06 0231 / 4470 S KEDZIE AVE AND W MARQUETTE RD .0 03/01/08 12/01/08 122,192 0 0

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W 61ST ST AND S KEDZIE AVE .0 03/15/06 05/08/07 6,000 02/22/07 03/20/07 2,491 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 W 63RD ST AND S ST LOUIS AVE 1.0 4,000 06/07/01 04/08/02 113 100

Work Type: Signals Intersections


300 06 0096 / 5258 2440 W 63RD ST 32.0 09/07/03 09/16/03 0 08/21/06 08/27/06 5,060 100

Work Type: TSM Install Locations


814 06 0259 / 16471 5700 S ASHLAND AVE 1.0 07/21/89 07/21/89 0 07/21/89 07/21/89 75,136 100
814 06 0258 / 16470 6100 S ASHLAND AVE 1.0 08/08/89 08/08/89 0 08/08/89 08/08/89 75,136 100
814 06 0277 / 16489 6699 S ST LOUIS AVE 1.0 03/22/89 03/22/89 0 03/22/89 03/22/89 65,000 100
210 06 0072 / 4336 6700 S WOOD ST 1.0 02/10/00 04/15/00 117,452 02/02/00 04/03/00 105,461 100

Totals per TSM Install 4.0 117,452 320,733

Work Type: Traffic Equipment Painting Locations


300 07 0017 / 5440 ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S WOOD ST TO S HONORE ST .0 03/01/06 12/31/06 0 0 0

Totals per Traffic Equipment Painting .0 0 0


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 172

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Totals per Traffic 303,418 357,834

Totals per Construction Phase 1,643,105 1,593,144

Totals for Ward 15 1,645,355 1,597,710


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 173

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0304 / 5410 ON S HALSTED ST FROM W ENGLEWOOD AVE TO W 63RD ST .0 08/01/05 10/15/05 0 05/07/05 06/29/05 0 100
300 06 0308 / 5414 ON W 60TH PL FROM S HALSTED ST TO S UNION AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 774 100
300 06 0308 / 5414 ON W 61ST ST FROM S HALSTED ST TO S UNION AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 774 100
210 06 0243 / 4480 W 61ST ST AND S KEDZIE AVE .0 12/27/06 01/26/07 250 12/27/06 01/26/07 1,594 100

Totals per Design/Engineering .0 250 3,142


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 174

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 11 / 32205 16TH WARD YARD 1,458.0 03/01/07 12/31/07 588,200 09/01/07 0 100
300 06 0069 / 5233 5954 S ALBANY AVE 1.0 04/22/02 04/22/02 210 04/19/02 04/19/02 203 100
302 00 0092 / 5774 5000-5099 S HERMITAGE AVE 6.0 10/20/01 10/20/01 1,029 10/03/01 10/03/01 1,236 100

Totals per 250 Watt Changeout 1,465.0 589,439 1,439

Work Type: 400 Watt Changeout Fixtures


300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 30.56 05/01/04 05/15/04 12,224 05/10/04 05/16/04 4,343 100

Totals per Lighting/Electrical 2,192,916 1,266,641


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 175

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0789 / 6975 6429 S ABERDEEN ST 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0779 / 6965 6439 S ABERDEEN ST 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0752 / 6938 5915 S ALBANY AVE 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0738 / 6924 5822 S ARTESIAN AVE 1.0 02/04/97 02/04/97 0 02/04/97 02/04/97 300 100
805 06 1656 / 7842 5942 S CAMPBELL AVE 1.0 07/30/97 07/30/97 0 07/30/97 07/30/97 300 100
805 06 1518 / 7704 5836 S CARPENTER ST 1.0 10/30/97 10/30/97 0 10/30/97 10/30/97 300 100
805 06 0797 / 6983 6432 S CARPENTER ST 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 1210 / 7396 4932 S HOYNE AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 1194 / 7380 4954 S HOYNE AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
805 06 1786 / 7972 6312 S MAY ST 1.0 10/07/96 10/07/96 0 10/07/96 10/07/96 300 100
805 06 1804 / 7990 6320 S MAY ST 1.0 10/07/96 10/07/96 0 10/07/96 10/07/96 300 100
805 06 1825 / 8011 6415 S MAY ST 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 1806 / 7992 6439 S MAY ST 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100
805 06 1927 / 8113 6401 S MORGAN ST 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100
805 06 1973 / 8159 6445 S MORGAN ST 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100
805 06 0649 / 6835 5024 S RACINE AVE 1.0 04/07/95 04/07/95 0 04/07/95 04/07/95 300 100
805 06 0681 / 6867 6345 S RACINE AVE 1.0 02/10/97 02/10/97 0 02/10/97 02/10/97 300 100
805 06 0615 / 6801 6419 S RACINE AVE 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 0366 / 6552 6005 S TROY ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
302 00 0092 / 5774 5143 S WESTERN BLVD 1.0 0 09/27/01 09/27/01 236 100
805 06 0453 / 6639 5939 S WHIPPLE ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
302 00 0092 / 5774 1420 W 50TH ST 1.0 0 06/18/01 06/18/01 236 100
805 06 1019 / 7205 2114 W 50TH ST 1.0 01/26/95 01/26/95 0 01/26/95 01/26/95 300 100
302 00 0083 / 5768 1634 W 55TH ST 0 08/20/97 08/20/97 267 100
302 00 0083 / 5768 2413 W 59TH ST 0 08/20/97 08/20/97 266 100
805 06 1423 / 7609 2413 W 59TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2537 W 59TH ST 0 08/20/97 08/20/97 266 100
805 06 1403 / 7589 2537 W 59TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2757 W 59TH ST 0 08/20/97 08/20/97 267 100
805 06 1409 / 7595 2757 W 59TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1036 / 7222 1405 W 62ND ST 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 176

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0139 / 5289 1249 W 63RD ST 1,339.0 03/01/06 09/01/06 32,312 04/01/06 04/16/06 40,457 100
302 00 0092 / 5774 1351 W 63RD ST 32.0 0 01/06/01 01/09/02 7,541 100

Totals per Alley Lighting/Lamps 1,398.0 32,312 57,036

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 1249 W 63RD ST 1,505.0 06/01/07 12/31/07 44,307 12/05/07 12/18/07 42,967 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 1351 W 63RD ST 1,410.0 0 07/12/02 07/15/02 25,673 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 W 55TH ST AND S CALIFORNIA AVE 2.50 0 12/08/99 12/08/99 376 100
302 00 0092 / 5774 5900 S ELIZABETH ST 2.0 0 04/06/01 04/06/01 941 100
300 06 0071 / 5234 1301 W 52ND ST 01/01/00 12/30/00 0 09/25/00 09/26/00 9,000 100

Totals per Flood Light Install 4.50 0 10,317

Work Type: Lighting Imprvmnts Installations


300 06 0304 / 5410 ON S HALSTED ST FROM W ENGLEWOOD AVE TO W 63RD ST 1.0 09/01/05 08/15/06 145,000 09/22/05 06/30/06 12,093 100

CONTRACTOR TOOK OVER JOB Note Last Updated on 04-MAR-09

Work Type: Ornamental - Piggyback Lighting Fixtures


300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 3.20 05/01/04 05/15/04 4,320 05/10/04 05/21/04 4,618 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5411 S ASHLAND AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 177

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 0298 / 5405 ON S LOOMIS BLVD FROM W 59TH ST TO W 61ST ST 2.0 0 09/08/05 12/19/05 116,079 100
300 09 / 33082 ON S SAWYER AVE FROM W 59TH ST TO W 61ST ST 2.0 130,000 0 0
300 09 / 33082 ON S SPAULDING AVE FROM W 59TH ST TO W 61ST ST 2.0 22,683 0 0
300 09 / 33082 ON S TROY ST FROM W 59TH ST TO W 61ST ST 2.0 130,000 0 0
300 06 0308 / 5414 ON W 60TH PL FROM S HALSTED ST TO S UNION AVE 1.0 03/16/06 12/31/06 64,482 10/17/06 35,638 80
300 06 0308 / 5414 ON W 61ST ST FROM S HALSTED ST TO S UNION AVE 1.0 03/16/06 12/31/06 64,482 10/17/06 35,638 80

Totals per Residntl Staggered Lighting 10.0 411,647 187,355

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S CALIFORNIA AVE FROM W 55TH ST TO W 57TH ST 2.0 06/01/03 08/01/03 148,623 05/30/03 07/31/03 136,196 100
300 06 0267 / 5375 ON S CALIFORNIA AVE FROM W 57TH ST TO W 59TH ST 2.0 05/29/04 08/29/04 147,831 06/01/04 08/13/04 135,820 100
300 06 0069 / 5233 ON S GREEN ST FROM W 64TH ST TO W 66TH ST 2.0 12/15/04 02/28/05 120,000 11/01/04 03/29/05 90,402 100
300 06 0069 / 5233 ON S PEORIA ST FROM W 64TH ST TO W 66TH ST 1.0 12/15/04 02/28/05 60,000 11/01/04 03/29/05 45,201 100
300 06 0166 / 5305 5500-5600 S MAY ST 1.0 09/12/00 09/26/00 65,600 09/12/00 09/26/00 53,770 100

Totals per Residntl Strt Lighting/Lamps 8.0 542,054 461,389

Work Type: Strt Light Pole Painting Locations


300 06 0058 / 5229 16TH WARD YARD .0 04/01/02 10/31/02 0 0 0
300 11 / 32205 16TH WARD YARD 1,458.0 03/01/07 12/31/07 291,600 08/17/07 11/05/07 0 100
300 04 0216 / 5114 ON S KEDZIE AVE FROM W 59TH ST TO W 63RD ST 22.50 05/01/06 11/01/06 4,867 05/17/06 10/10/06 4,867 100
300 04 0216 / 5114 ON S WESTERN AVE FROM W 47TH ST TO W 49TH ST 15.50 05/01/06 11/01/06 3,317 05/17/06 10/01/06 3,317 100
302 00 0076 / 5764 ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE 23.10 09/01/00 12/31/00 0 393
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 32.96 05/10/04 06/16/04 9,648 05/11/04 06/04/04 7,498 100
302 00 0076 / 5764 5700 S CALIFORNIA AVE 1.0 02/24/98 02/24/98 0 02/24/98 02/24/98 17 100
302 00 0076 / 5764 5514-5543 S TALMAN AVE 4.0 02/24/98 02/24/98 0 02/24/98 02/24/98 68 100

Totals per Strt Light Pole Painting 1,557.06 309,431 16,159

Work Type: Strt Lighting Blocks


300 06 0247 / 5357 ON W 58TH ST FROM S OAKLEY AVE TO S WESTERN AVE 2.0 07/01/04 08/01/04 80,000 07/06/04 08/26/04 79,383 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 178

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Traffic Signal Regrouping Lamps
300 06 0139 / 5289 1249 W 63RD ST 1,304.0 03/01/04 12/01/04 6,781 07/31/06 09/06/06 14,201 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 179

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2748 / 8934 1524 E 56TH ST 18.0 01/02/92 01/02/92 0 01/02/92 01/02/92 13,500 100
805 06 2966 / 9152 5801 S ABERDEEN ST 6.0 02/05/92 02/05/92 0 02/05/92 02/05/92 4,500 100
302 00 0072 / 5760 5830 S ABERDEEN ST 1.0 0 02/04/00 02/14/00 8,800 100
805 06 2892 / 9078 5801 S ADA ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
302 00 0072 / 5760 5830 S ADA ST 1.0 0 02/14/00 02/21/00 9,800 100
805 06 2895 / 9081 5801 S BISHOP ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2964 / 9150 5801 S CARPENTER ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
302 00 0072 / 5760 5830 S CARPENTER ST 1.0 0 02/22/00 02/29/00 10,000 100
805 06 2110 / 8296 4905 S DAMEN AVE 4.0 11/01/93 11/01/93 0 11/01/93 11/01/93 3,000 100
805 06 2896 / 9082 5801 S ELIZABETH ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2963 / 9149 5801 S GREEN ST 6.0 01/01/93 01/01/93 0 01/01/93 01/01/93 4,500 100
302 00 0072 / 5760 5830 S GREEN ST 1.0 0 02/25/00 03/08/00 9,500 100
302 00 0071 / 5759 5830 S HALSTED ST 0 02/12/99 02/16/99 6,206 100
805 06 2442 / 8628 4905 S HONORE ST 4.0 10/13/95 10/13/95 0 10/13/95 10/13/95 3,000 100
805 06 2117 / 8303 4905 S HOYNE AVE 6.0 05/25/93 05/25/93 0 05/25/93 05/25/93 4,500 100
805 06 2899 / 9085 5801 S LAFLIN ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
805 06 2897 / 9083 5801 S LOOMIS BLVD 10.0 01/02/92 01/02/92 0 01/02/92 01/02/92 7,500 100
302 00 0072 / 5760 5800 S LOOMIS ST 1.0 0 03/15/00 04/28/00 8,600 100
302 00 0072 / 5760 5800 S MAY ST 1.0 0 03/27/00 03/29/00 8,600 100
805 06 2891 / 9077 5801 S MAY ST 6.0 03/01/92 03/01/92 0 03/01/92 03/01/92 4,500 100
805 06 2279 / 8465 6352 S MAY ST 4.0 12/31/93 12/31/93 0 12/31/93 12/31/93 3,000 100
302 00 0072 / 5760 5830 S MORGAN ST 1.0 0 04/25/00 04/27/00 7,663 100
805 06 2843 / 9029 5899 S OAKLEY AVE 30.0 12/23/93 12/23/93 0 12/23/93 12/23/93 22,500 100
805 06 2796 / 8982 4905 S PAULINA ST 4.0 05/14/93 05/14/93 0 05/14/93 05/14/93 3,000 100
302 00 0072 / 5760 5830 S PEORIA ST 1.0 0 04/27/00 05/05/00 10,150 100
805 06 2900 / 9086 5801 S RACINE AVE 6.0 03/01/92 03/01/92 0 03/01/92 03/01/92 4,500 100
302 00 0072 / 5760 5830 S RACINE AVE 1.0 0 04/17/00 04/27/00 10,553 100
302 00 0072 / 5760 5800 S SANGAMON ST 1.0 0 03/17/00 03/24/00 8,446 100
805 06 2893 / 9079 5801 S THROOP ST 6.0 01/02/92 01/02/92 0 01/02/92 01/02/92 4,500 100
302 00 0072 / 5760 5830 S THROOP ST 1.0 0 04/19/00 04/26/00 10,553 100
805 06 2273 / 8459 4910 S WESTERN BLVD 5.0 01/01/91 01/01/91 0 01/01/91 01/01/91 3,750 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 180

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2384 / 8570 4905 S WOLCOTT AVE 4.0 11/18/95 11/18/95 0 11/18/95 11/18/95 3,000 100
805 06 2542 / 8728 4905 S WOOD ST 8.0 03/22/95 03/22/95 0 03/22/95 03/22/95 6,000 100
805 06 2459 / 8645 2399 W 49TH ST 22.0 12/01/91 12/01/91 0 12/01/91 12/01/91 16,500 100
805 06 2587 / 8773 2295 W 51ST ST 22.0 03/16/93 03/16/93 0 03/16/93 03/16/93 16,500 100
805 06 2155 / 8341 1600 W 53RD ST 37.0 11/01/97 11/01/97 0 11/01/97 11/01/97 27,750 100
805 06 2428 / 8614 2295 W 56TH ST 10.0 05/14/93 05/14/93 0 05/14/93 05/14/93 7,500 100
805 06 2452 / 8638 2295 W 56TH ST 22.0 05/14/93 05/14/93 0 05/14/93 05/14/93 16,500 100
300 06 0217 / 5337 1249 W 63RD ST 274.0 03/23/04 03/29/04 15,401 11/14/03 11/21/03 15,797 100
805 06 2099 / 8285 2098 W GARFIELD BLVD 12.0 04/06/93 04/06/93 0 04/06/93 04/06/93 9,000 100
805 06 2104 / 8290 2298 W GARFIELD BLVD 6.0 04/06/93 04/06/93 0 04/06/93 04/06/93 4,500 100
805 06 2109 / 8295 2298 W GARFIELD BLVD 3.0 04/06/93 04/06/93 0 04/06/93 04/06/93 2,250 100
805 06 2105 / 8291 2299 W GARFIELD BLVD 6.0 04/06/93 04/06/93 0 04/06/93 04/06/93 4,500 100
805 06 2107 / 8293 2299 W GARFIELD BLVD 3.0 04/06/93 04/06/93 0 04/06/93 04/06/93 2,250 100

Totals per Underpass Lighting 585.0 15,401 349,668


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 181

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S CALIFORNIA AVE AND W 57TH ST 1.0 0 11/07/02 11/07/02 7,324 100
210 06 0219 / 4459 S WESTERN AVE AND W 51ST ST .50 05/12/05 05/13/05 5,282 04/19/05 04/19/05 4,170 100
210 06 0219 / 4459 S WESTERN AVE AND W 54TH ST .50 05/13/05 05/14/05 5,282 04/18/05 04/18/05 3,879 100
210 06 0219 / 4459 S WESTERN AVE AND W 59TH ST 1.0 05/17/05 05/18/05 10,563 04/14/05 04/14/05 9,046 100
210 06 0219 / 4459 S WESTERN AVE AND W 61ST ST .50 05/18/05 05/19/05 5,282 04/13/05 04/13/05 4,035 100
210 06 0219 / 4459 W 55TH ST AND S WESTERN AVE .50 05/16/05 05/17/05 5,282 04/15/05 04/15/05 4,523 100

Totals per LED Signal Head Install 4.0 31,689 32,977

Work Type: Left Turn Arrow Locations


210 06 0073 / 4337 5900 S WESTERN AVE 1.0 05/01/02 06/01/02 50,000 07/02/02 08/01/02 61,544 100

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W 61ST ST AND S KEDZIE AVE .0 03/15/06 05/08/07 6,000 02/22/07 03/20/07 2,491 100

Work Type: Signals Intersections


300 06 0096 / 5258 1249 W 63RD ST 41.0 09/16/03 09/21/03 0 08/20/03 09/05/03 6,483 100

Work Type: TSM Install Locations


814 06 0227 / 16439 5000 S ASHLAND AVE 1.0 09/10/90 09/10/90 0 09/10/90 09/10/90 90,100 100
814 06 0292 / 16504 5300 S ASHLAND AVE 1.0 08/30/90 08/30/90 0 08/30/90 08/30/90 90,100 100
814 06 0338 / 16537 2000 W GARFIELD BLVD 1.0 01/01/96 01/01/96 0 01/01/96 03/11/98 175,000 100

Totals per TSM Install 3.0 0 355,200

Totals per Traffic 87,689 458,695

Totals per Construction Phase 2,280,605 1,725,335

Totals for Ward 16 2,280,855 1,728,477


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 182

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON S BISHOP ST FROM W 65TH ST TO W 69TH ST .0 04/01/08 08/30/08 0 0 0
300 06 0308 / 5414 ON S CARPENTER ST FROM W 79TH ST TO W 80TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,065 100
300 06 0308 / 5414 ON S MORGAN ST FROM W 79TH ST TO W 80TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,065 100
300 06 / 32021 7600-7900 S THROOP ST .0 09/12/06 09/18/06 0 09/12/06 09/18/06 0 0
300 06 0292 / 5399 1610 W 71ST ST .0 01/20/05 12/21/05 0 01/20/05 12/21/05 0 0

Totals per Design/Engineering .0 0 2,130


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 183

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 11 / 32206 ON S EMERALD AVE FROM W 73RD ST TO W 74TH ST 5.0 10/21/07 10/21/07 2,200 10/21/07 10/21/07 2,200 100
300 06 0069 / 5233 7000 S ELIZABETH ST 4.0 09/29/02 09/29/02 840 09/26/02 09/26/02 812 100

Totals per 250 Watt Changeout 9.0 3,040 3,012

Work Type: 400 Watt Changeout Fixtures


300 06 0069 / 5233 7600 S RACINE AVE 11.0 01/12/03 01/12/03 4,400 01/09/03 01/09/03 4,125 100
300 06 0069 / 5233 1200 W 76TH ST 11.0 01/12/03 01/12/03 4,400 01/09/03 01/09/03 4,125 100

Totals per 400 Watt Changeout 22.0 8,800 8,250

Totals per Lighting/Electrical 1,280,025 1,591,305


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 184

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0783 / 6969 6822 S ADA ST 1.0 02/07/96 02/07/96 0 02/07/96 02/07/96 300 100
805 06 1735 / 7921 6937 S ADA ST 1.0 06/10/97 06/10/97 0 06/10/97 06/10/97 300 100
805 06 0784 / 6970 7704 S ADA ST 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 1468 / 7654 7724 S ADA ST 2.0 12/03/97 12/03/97 0 12/03/97 12/03/97 600 100
805 06 1480 / 7666 7745 S ADA ST 1.0 11/28/97 11/28/97 0 11/28/97 11/28/97 300 100
805 06 0830 / 7016 6816 S CARPENTER ST 1.0 11/29/95 11/29/95 0 11/29/95 11/29/95 300 100
805 06 1460 / 7646 6840 S CLAREMONT AVE 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 2001 / 8187 7900 S LAFAYETTE AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 2003 / 8189 7702 S LAFLIN ST 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 1873 / 8059 6822 S LOOMIS BLVD 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 1852 / 8038 7200 S LOWE AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 1864 / 8050 7351 S MARSHFIELD AVE 1.0 06/15/95 06/15/95 0 06/15/95 06/15/95 300 100
805 06 1867 / 8053 7532 S MARSHFIELD AVE 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 1807 / 7993 7512 S MAY ST 1.0 07/30/96 07/30/96 0 07/30/96 07/30/96 300 100
805 06 1808 / 7994 7530 S MAY ST 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
805 06 1809 / 7995 7937 S MAY ST 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 1659 / 7845 6627 S MORGAN ST 1.0 08/01/97 08/01/97 0 08/01/97 08/01/97 300 100
805 06 1943 / 8129 7502 S MORGAN ST 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 1795 / 7981 7928 S MORGAN ST 1.0 04/08/97 04/08/97 0 04/08/97 04/08/97 300 100
805 06 1909 / 8095 7919 S NORMAL AVE 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100
805 06 0582 / 6768 7500 S PARNELL AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 0628 / 6814 7941 S PARNELL AVE 1.0 04/27/95 04/27/95 0 04/27/95 04/27/95 300 100
805 06 0553 / 6739 7634 S PEORIA ST 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100
805 06 0549 / 6735 7340 S PRINCETON AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 0583 / 6769 7430 S PRINCETON AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
300 06 0139 / 5289 7811 S RACINE AVE 1,775.0 03/01/06 09/01/06 41,106 06/27/06 07/14/06 53,630 100
302 00 0092 / 5774 7811 S RACINE AVE 39.0 0 01/03/01 12/31/01 9,190 100
805 06 0683 / 6869 7817 S RACINE AVE 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 0427 / 6613 7733 S THROOP ST 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 0347 / 6533 7652 S UNION AVE 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100
805 06 1203 / 7389 7320 S VINCENNES AVE 1.0 12/19/97 12/19/97 0 12/19/97 12/19/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 185

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0540 / 6726 8018 S WENTWORTH AVE 1.0 09/13/96 09/13/96 0 09/13/96 09/13/96 300 100
302 00 0083 / 5768 6705 S WESTERN AVE 0 12/12/97 12/12/97 267 100
805 06 1259 / 7445 6705 S WESTERN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1524 / 7710 7941 S YALE AVE 1.0 11/04/97 11/04/97 0 11/04/97 11/04/97 300 100
302 00 0083 / 5768 1632 W 69TH ST 0 09/09/97 09/09/97 266 100
805 06 1455 / 7641 1632 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1734 W 69TH ST 0 09/09/97 09/09/97 266 100
805 06 1428 / 7614 1734 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1830 W 69TH ST 0 09/09/97 09/09/97 266 100
805 06 1430 / 7616 1830 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1934 W 69TH ST 0 09/09/97 09/09/97 266 100
805 06 1432 / 7618 1934 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2135 W 69TH ST 0 11/07/97 11/07/97 267 100
805 06 1414 / 7600 2135 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2226 W 69TH ST 0 11/07/97 11/07/97 267 100
805 06 1415 / 7601 2226 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2336 W 69TH ST 0 11/07/97 11/07/97 267 100
805 06 1419 / 7605 2336 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2337 W 69TH ST 0 11/07/97 11/07/97 267 100
805 06 1421 / 7607 2337 W 69TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2057 W 71ST ST 0 12/12/97 12/12/97 267 100
805 06 1412 / 7598 2057 W 71ST ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1012 / 7198 1214 W 72ND ST 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 0981 / 7167 1252 W 72ND ST 1.0 08/29/95 08/29/95 0 08/29/95 08/29/95 300 100
805 06 1014 / 7200 1435 W 72ND ST 1.0 01/03/97 01/03/97 0 01/03/97 01/03/97 300 100
805 06 1015 / 7201 1460 W 72ND ST 1.0 01/03/97 01/03/97 0 01/03/97 01/03/97 300 100
805 06 1018 / 7204 1200 W 74TH PL 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 1020 / 7206 304 W 75TH ST 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 0998 / 7184 1515 W 77TH ST 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
805 06 0999 / 7185 1364 W 79TH ST 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1001 / 7187 450 W 80TH ST 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 186

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1047 / 7233 514 W 80TH ST 1.0 04/27/95 04/27/95 0 04/27/95 04/27/95 300 100
302 00 0083 / 5768 2431 W LITHUANIAN PLAZA CT 0 11/07/97 11/07/97 267 100
805 06 1424 / 7610 2431 W LITHUANIAN PLAZA CT 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1879 / 8065 958 W MARQUETTE RD 1.0 10/29/96 10/29/96 0 10/29/96 10/29/96 300 100

Totals per Alley Lighting/Lamps 1,868.0 41,106 81,953

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 7811 S RACINE AVE 3,029.0 06/01/07 12/31/07 89,173 12/05/07 12/12/07 86,477 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 7811 S RACINE AVE 2,934.0 0 08/07/02 08/26/02 53,423 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 S ARTESIAN AVE AND W 70TH ST .50 0 01/06/99 01/06/99 176 100

Work Type: Lighting Imprvmnts Blocks


281 00 / 32154 7600-7900 S THROOP ST .0 12/08/06 12/31/06 0 12/08/06 12/31/06 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0256 / 5366 ON W 75TH ST FROM S PRINCETON AVE TO S WENTWORTH AVE 6.0 02/15/04 08/01/04 9,400 07/06/04 05/16/05 12,237 100
300 06 0292 / 5399 1610 W 71ST ST 4.0 03/17/06 05/05/06 52,000 03/17/06 05/05/06 33,180 100

Project,100% Note Last Updated on 01-SEP-06


Totals per Lighting Imprvmnts 10.0 61,400 45,417

Work Type: Ornamental - Piggyback Lighting Fixtures


281 00 / 33664 6832-7100 S DAMEN AVE 32.0 08/25/08 09/26/08 0 0 0
281 00 / 33664 1400-2000 W 71ST ST 46.0 08/25/08 09/26/08 0 0 0

Totals per Ornamental - Piggyback Lighting 78.0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 7811 S RACINE AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 187

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 / 32277 ON S BISHOP ST FROM W 65TH ST TO W 69TH ST .0 05/04/08 12/31/08 0 0 0
300 06 0308 / 5414 ON S CARPENTER ST FROM W 79TH ST TO W 80TH ST 1.0 08/26/06 10/06/06 95,250 08/02/06 10/06/06 79,748 100
300 07 0017 / 5440 ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST .0 03/01/06 12/31/06 0 0 0
300 06 0298 / 5405 ON S MORGAN ST FROM W 69TH ST TO W 71ST ST 2.0 06/20/05 07/20/05 0 09/26/05 12/20/05 104,200 100
300 06 0308 / 5414 ON S MORGAN ST FROM W 79TH ST TO W 80TH ST 1.0 07/25/06 09/15/06 95,280 08/02/06 10/06/06 79,748 100
300 07 0017 / 5440 ON S PAULINA ST FROM W 77TH ST TO W 79TH ST 2.0 04/18/06 11/18/06 170,000 10/17/06 0 60
300 07 0017 / 5440 ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S WOOD ST TO S HONORE ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE .0 03/01/06 12/31/06 0 0 0

Totals per Residntl Staggered Lighting 6.0 360,530 263,696

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0232 / 5346 ON S MAY ST FROM W 69TH ST TO W 70TH ST 2.0 12/28/02 02/28/03 205,000 01/06/03 02/24/03 171,034 100
300 06 0235 / 5349 ON S MORGAN ST FROM W 75TH ST TO W 77TH ST 2.0 08/20/03 09/20/03 143,499 08/18/03 10/31/03 135,346 100
300 06 0267 / 5375 ON S MORGAN ST FROM W 77TH ST TO W 79TH ST 2.0 06/10/04 08/10/04 158,277 06/18/04 09/30/04 140,281 100
300 06 0069 / 5233 ON S PEORIA ST FROM W 64TH ST TO W 66TH ST 1.0 12/15/04 02/28/05 60,000 11/01/04 03/29/05 45,201 100

Totals per Residntl Strt Lighting/Lamps 7.0 566,776 491,862

Work Type: Residntl Strt Lighting/Lamps Installations


300 06 / 32021 7600-7900 S THROOP ST .0 09/18/06 09/29/06 0 09/18/06 09/29/06 0 0

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 7739 S EMERALD AVE 1.0 0 03/13/01 03/13/01 378 100
302 00 0092 / 5774 7740 S EMERALD AVE 1.0 0 03/13/01 03/13/01 378 100
302 00 0092 / 5774 7746 S EMERALD AVE 1.0 0 03/13/01 03/13/01 378 100
302 00 0092 / 5774 748 W 78TH ST 1.0 0 06/12/01 06/12/01 378 100

Totals per Short Arm Installs - Residntl 4.0 0 1,512


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 188

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 07 0017 / 5440 ON S DAMEN AVE FROM W 69TH PL TO W 71ST ST 32.0 04/18/06 11/18/06 8,000 0 0
300 11 / 32206 ON S DAMEN AVE FROM W 69TH PL TO W 71ST ST 32.0 05/01/07 05/15/07 8,000 05/01/07 05/15/07 8,000 100
300 07 0017 / 5440 ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST .0 03/01/06 12/31/06 0 0 0
300 04 0216 / 5114 ON S VINCENNES AVE FROM W 79TH ST TO W 81ST ST 14.0 05/01/06 11/01/06 3,028 05/17/06 07/01/06 3,028 100
300 07 0017 / 5440 ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S WOOD ST TO S HONORE ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 69TH ST FROM S ASHLAND AVE TO S CLAREMONT AVE 56.0 04/18/06 11/18/06 14,000 0 0
300 11 / 32206 ON W 69TH ST FROM S ASHLAND AVE TO S CLAREMONT AVE 56.0 05/01/07 05/15/07 14,000 05/01/07 05/15/07 14,000 100
302 00 0075 / 5763 ON W 69TH ST FROM S ASHLAND AVE TO S DAMEN AVE 55.0 04/01/97 10/01/97 4,620 04/01/98 08/01/99 4,620 100
302 00 0076 / 5764 ON W 69TH ST FROM S ASHLAND AVE TO S DAMEN AVE 78.0 02/19/98 02/24/98 0 02/19/98 02/24/98 1,326 100
302 00 0076 / 5764 ON W 69TH ST FROM S HALSTED ST TO S ASHLAND AVE 38.54 06/27/98 06/30/98 0 06/27/98 06/30/98 655 100
300 07 0017 / 5440 ON W 71ST ST FROM S LOOMIS BLVD TO S DAMEN AVE 46.0 04/18/06 11/18/06 11,500 04/13/07 05/15/07 0 100
300 11 / 32206 ON W 71ST ST FROM S LOOMIS BLVD TO S DAMEN AVE 46.0 05/01/07 05/15/07 11,500 05/01/07 05/15/07 11,500 100
300 07 0017 / 5440 ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE .0 03/01/06 12/31/06 0 0 0

Totals per Strt Light Pole Painting 453.54 74,648 43,129

Work Type: Strt Lighting Blocks


300 06 0117 / 5271 7600-7699 S YALE AVE 1.0 40,000 12/20/99 01/05/00 17,194 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 7811 S RACINE AVE 1,629.0 03/01/04 12/01/04 8,471 07/31/06 08/23/06 17,740 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 189

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2308 / 8494 7401 S ASHLAND AVE 22.0 05/20/96 05/20/96 0 05/20/96 05/20/96 16,500 100
805 06 2333 / 8519 7405 S DAMEN AVE 16.0 03/16/93 03/16/93 0 03/16/93 03/16/93 12,000 100
302 00 0072 / 5760 7500 S EMERALD AVE 1.0 0 04/21/00 04/24/00 2,800 100
302 00 0072 / 5760 7500 S HALSTED ST 1.0 0 04/19/00 05/08/00 13,000 100
805 06 2251 / 8437 7401 S LOOMIS BLVD 10.0 01/05/93 01/05/93 0 01/05/93 01/05/93 7,500 100
805 06 2606 / 8792 7401 S LOWE AVE 22.0 09/10/91 09/10/91 0 09/10/91 09/10/91 16,500 100
805 06 2555 / 8741 7495 S MORGAN ST 18.0 02/02/93 02/02/93 0 02/02/93 02/02/93 13,500 100
805 06 2554 / 8740 7505 S PEORIA ST 32.0 01/28/93 01/28/93 0 01/28/93 01/28/93 24,000 100
805 06 2250 / 8436 7501 S RACINE AVE 24.0 10/24/96 10/24/96 0 10/24/96 10/24/96 18,000 100
300 06 0217 / 5337 7811 S RACINE AVE 464.0 03/05/04 03/11/04 26,081 11/24/03 12/01/03 19,989 100
805 06 2552 / 8738 7405 S UNION AVE 18.0 07/22/93 07/22/93 0 07/22/93 07/22/93 13,500 100
805 06 2553 / 8739 7405 S UNION AVE 10.0 07/22/93 07/22/93 0 07/22/93 07/22/93 7,500 100
302 00 0071 / 5759 2150 W 68TH ST 0 10/10/98 10/20/98 24,830 100
805 06 2245 / 8431 2219 W 68TH ST 21.0 01/27/92 01/27/92 0 01/27/92 01/27/92 15,750 100
805 06 2386 / 8572 2219 W 69TH ST 78.0 02/14/96 02/14/96 0 02/14/96 02/14/96 58,500 100
805 06 2605 / 8791 599 W 72ND ST 22.0 05/31/95 05/31/95 0 05/31/95 05/31/95 16,500 100
805 06 2600 / 8786 435 W 74TH ST 14.0 01/01/91 01/01/91 0 01/01/91 01/01/91 10,500 100
805 06 2624 / 8810 501 W 75TH ST 16.0 02/02/94 02/02/94 0 02/02/94 02/02/94 12,000 100
302 00 0072 / 5760 500 W 76TH ST 1.0 0 01/18/00 02/04/00 11,350 100
805 06 2623 / 8809 501 W 76TH ST 14.0 09/27/91 09/27/91 0 09/27/91 09/27/91 10,500 100
302 00 0072 / 5760 600 W 76TH ST 1.0 0 02/02/00 02/21/00 19,995 100
805 06 2603 / 8789 631 W 76TH ST 26.0 12/01/91 12/01/91 0 12/01/91 12/01/91 19,500 100
805 06 2601 / 8787 555 W 78TH ST 32.0 01/12/94 01/12/94 0 01/12/94 01/12/94 24,000 100
805 06 2599 / 8785 551 W 79TH ST 22.0 10/19/93 10/19/93 0 10/19/93 10/19/93 16,500 100
805 06 2095 / 8281 536 W 80TH ST 15.0 02/21/94 02/21/94 0 02/21/94 02/21/94 11,250 100
805 06 2096 / 8282 536 W 80TH ST 25.0 02/25/94 02/25/94 0 02/25/94 02/25/94 18,750 100
805 06 2321 / 8507 426 W 81ST ST 10.0 05/13/96 05/13/96 0 05/13/96 05/13/96 7,500 100
805 06 2346 / 8532 426 W 81ST ST 17.0 05/13/96 05/13/96 0 05/13/96 05/13/96 12,750 100
805 06 2244 / 8430 2223 W MARQUETTE RD 30.0 10/02/96 10/02/96 0 10/02/96 10/02/96 22,500 100

Totals per Underpass Lighting 982.0 26,081 477,464


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 190

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 S ASHLAND AVE AND W 71ST ST 1.0 05/05/05 05/05/05 10,653 05/16/05 05/20/05 10,084 100
210 06 0219 / 4459 S ASHLAND AVE AND W MARQUETTE RD .50 05/06/05 05/06/05 5,327 07/01/05 07/05/05 0
210 06 0219 / 4459 S WESTERN AVE AND W 69TH ST 1.0 05/24/05 05/25/05 10,563 04/08/05 04/08/05 8,007 100
210 06 0219 / 4459 S WESTERN AVE AND W 71ST ST .50 05/25/05 05/26/05 5,282 04/07/05 04/07/05 5,403 100
210 06 0219 / 4459 S WESTERN AVE AND W MARQUETTE RD .50 05/23/05 05/24/05 5,282 03/25/05 03/25/05 4,004 100

Totals per LED Signal Head Install 3.50 37,106 27,498

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S VINCENNES AVE AND W 79TH ST 1.0 4,000 05/02/01 05/08/01 5,636 100

Work Type: Signals Intersections


300 06 0096 / 5258 7811 S RACINE AVE 33.0 08/08/03 08/12/03 0 08/07/03 08/13/03 5,218 100

Work Type: TSM Install Locations


814 06 0388 / 16576 7600 S HALSTED ST 1.0 12/15/95 12/15/95 0 12/15/95 12/15/95 137,995 100
210 06 0065 / 4330 7800 S HALSTED ST 1.0 02/15/99 04/30/99 0 02/15/99 04/15/99 126,808 100
271 00 0045 / 4794 7100 S WESTERN AVE 1.0 0 08/01/97 08/15/99 201,000

Totals per TSM Install 3.0 0 465,803

Work Type: Traffic Equipment Painting Locations


300 07 0017 / 5440 ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 68TH ST FROM S WOOD ST TO S HONORE ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE 2.0 04/18/06 11/18/06 5,800 0 0
300 11 / 32206 ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE 2.0 05/01/07 05/15/07 5,800 05/01/07 05/15/07 5,800 100
300 07 0017 / 5440 ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE .0 03/01/06 12/31/06 0 0 0

Totals per Traffic Equipment Painting 4.0 11,600 5,800

Totals per Traffic 52,706 509,955

Totals per Construction Phase 1,332,731 2,101,259


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 191

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt
Totals for Ward 17 1,332,731 2,103,389
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 192

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0274 / 5382 ON S CENTRAL PARK AVE FROM W 85TH ST TO W 87TH ST .0 07/01/04 12/31/04 0 03/22/05 10/05/05 3,796 100
300 06 0274 / 5382 ON S HOMAN AVE FROM W 76TH PL TO W 77TH ST .0 07/01/04 12/31/04 0 03/22/05 05/06/05 3,796 100
300 06 0274 / 5382 ON S HOYNE AVE FROM W 79TH ST TO W 80TH ST .0 07/01/04 12/31/04 0 03/22/05 05/06/05 3,796 100
300 06 0274 / 5382 ON W 77TH ST FROM S HOMAN AVE TO S KEDZIE AVE .0 07/01/04 12/31/04 0 03/22/05 10/05/05 3,796 100
300 06 0274 / 5382 ON W 78TH ST FROM S HOYNE AVE TO S HAMILTON AVE .0 07/01/04 12/31/04 0 03/22/05 10/05/05 3,796 100
300 06 0274 / 5382 ON W 81ST ST FROM S SACRAMENTO AVE TO S WHIPPLE ST .0 07/01/04 12/31/04 0 07/01/04 12/31/04 3,796 100
300 06 0274 / 5382 ON W 82ND ST FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE .0 07/01/04 12/31/04 0 03/22/05 05/06/05 3,796 100
300 06 / 32146 ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE .0 05/01/07 10/31/07 1,950 06/21/07 07/19/07 1,000 100
300 06 0292 / 5399 1630 W 87TH ST 1.0 05/27/05 06/14/05 2,000 05/27/05 06/14/05 1,667 100
300 06 0292 / 5399 3811 W COLUMBUS AVE 1.0 1,000 05/23/05 06/23/05 0 100

Totals per Design/Engineering 2.0 4,950 29,239


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 193

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0018 / 5441 ON S CLAREMONT AVE FROM W 74TH ST TO W 75TH ST 8.0 04/18/06 11/18/06 1,200 0 0
300 05 0018 / 5133 ON S HAMILTON AVE FROM W 83RD ST TO W 84TH ST 4.0 04/04/05 11/18/05 1,700 07/09/05 07/15/05 1,036 100
300 07 0018 / 5441 ON S HERMITAGE AVE FROM W 86TH ST TO W 87TH ST 5.0 01/19/07 01/31/07 2,000 0 0
300 07 0018 / 5441 ON S HONORE ST FROM W 79TH ST TO W 82ND ST 4.10 04/18/06 11/18/06 5,200 0 0
300 06 0069 / 5233 ON S HOYNE AVE FROM W 79TH PL TO W 80TH PL 7.0 11/16/02 11/16/02 1,470 11/13/02 11/13/02 1,421 100
300 05 0018 / 5133 ON S MAPLEWOOD AVE FROM W 71ST ST TO W 72ND ST 5.0 04/04/05 11/18/05 2,100 07/09/05 07/15/05 1,295 100
300 07 0018 / 5441 ON S MAPLEWOOD AVE FROM W 74TH ST TO W COLUMBUS AVE 3.0 04/18/06 11/18/06 1,200 0 0
300 06 0069 / 5233 ON S MARSHFIELD AVE FROM W 81ST ST TO W 83RD ST 4.0 1,500 05/06/02 05/06/02 1,500 100
300 03 0018 / 4889 ON S PAULINA ST FROM W 82ND ST TO W 83RD ST 4.0 10/01/04 10/01/04 1,700 10/20/04 10/20/04 1,547 100
300 07 0018 / 5441 ON S SACRAMENTO AVE FROM W 73RD ST TO W 74TH ST 4.0 01/19/07 01/31/07 1,600 0 0
300 07 0018 / 5441 ON S ST LOUIS AVE FROM W 84TH ST TO W 85TH ST 3.0 01/19/07 01/31/07 1,200 0 0
300 05 0018 / 5133 ON S TRUMBULL AVE FROM W 79TH ST TO W 80TH ST 4.0 04/04/05 11/18/05 1,700 07/09/05 07/15/05 1,036 100
300 03 0018 / 4889 ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE 5.0 12/01/04 12/31/04 2,075 0
300 07 0018 / 5441 ON W 78TH PL FROM S ST LOUIS AVE TO S CENTRAL PARK AVE 4.0 04/18/06 11/18/06 1,600 0 0
300 07 0018 / 5441 ON W 78TH ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE 4.0 04/18/06 11/18/06 1,600 0 0
300 06 0069 / 5233 ON W 80TH PL FROM S HOYNE AVE TO S DAMEN AVE 4.0 11/16/02 11/16/02 840 11/13/02 11/13/02 812 100
300 05 0018 / 5133 ON W 80TH PL FROM S OAKLEY AVE TO S WESTERN AVE 3.0 04/04/05 11/18/05 1,300 07/09/05 07/15/05 777 100
300 07 0018 / 5441 ON W 83RD PL FROM S SPAULDING AVE TO S HOMAN AVE 4.0 01/19/07 01/31/07 1,600 01/19/07 01/31/07 1,600 100
300 07 0018 / 5441 ON W 85TH ST FROM S WASHTENAW AVE TO S CALIFORNIA AVE 5.0 01/19/07 01/31/07 2,000 01/19/07 01/31/07 2,000 100
300 07 0018 / 5441 W 80TH ST AND S WESTERN AVE 8.0 04/18/06 11/18/06 3,200 0 0
300 07 0018 / 5441 W 84TH PL AND S ST LOUIS AVE 3.0 01/19/07 01/31/07 1,200 0 0
302 00 0092 / 5774 7103-7155 S ARTESIAN AVE 5.0 0 12/19/01 12/19/01 1,029 100
302 00 0092 / 5774 7221-7225 S ARTESIAN AVE 5.0 0 07/14/01 07/14/01 1,029 100
302 00 0092 / 5774 7101 S FAIRFIELD AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 7113 S FAIRFIELD AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 7129 S FAIRFIELD AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 7135 S FAIRFIELD AVE 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 7149 S FAIRFIELD AVE 1.0 0 11/12/01 11/12/01 206 100
300 06 0069 / 5233 8300 S FRANCISCO AVE 21.0 11/04/02 11/04/02 8,400 11/01/02 11/01/02 4,748 100
300 06 0069 / 5233 7359 S MAPLEWOOD AVE 1.0 11/15/02 11/15/02 210 11/12/02 11/12/02 203 100
300 06 0069 / 5233 7200 S OAKLEY AVE 5.0 03/25/02 03/25/02 1,050 03/22/02 03/22/02 1,015 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 194

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 7100-7199 S ROCKWELL ST 5.0 10/19/01 10/19/01 1,029 09/29/01 09/29/01 1,029 100
302 00 0092 / 5774 2300 W 72ND ST 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 2136 W 84TH ST 2.0 0 10/17/01 10/17/01 412 100

Totals per 250 Watt Changeout 145.10 48,674 23,725

Work Type: 400 Watt Changeout Fixtures


300 06 0069 / 5233 ON S PULASKI RD FROM W 55TH ST TO W 83RD ST 245.0 98,000 08/02/02 08/23/02 49,240 100
300 11 / 32207 ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE 44.0 01/01/08 01/21/08 17,600 11/30/07 02/19/08 8,500 100

Totals per 400 Watt Changeout 289.0 115,600 57,740

Totals per Lighting/Electrical 2,562,083 2,282,486


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 195

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0083 / 5768 7156 S ARTESIAN AVE 0 10/30/97 10/30/97 267 100
805 06 1233 / 7419 7156 S ARTESIAN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7351 S CALIFORNIA AVE 0 10/30/97 10/30/97 267 100
805 06 1238 / 7424 7351 S CALIFORNIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7156 S CAMPBELL AVE 0 10/30/97 10/30/97 266 100
805 06 1234 / 7420 7156 S CAMPBELL AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7422 S CAMPBELL AVE 0 10/30/97 10/30/97 266 100
805 06 1240 / 7426 7422 S CAMPBELL AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0092 / 5774 7701 S CHRISTIANA AVE 1.0 0 06/29/01 06/29/01 236 100
302 00 0083 / 5768 7133 S CLAREMONT AVE 0 10/30/97 10/30/97 266 100
805 06 1232 / 7418 7133 S CLAREMONT AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7056 S FAIRFIELD AVE 0 10/15/97 10/15/97 266 100
805 06 1231 / 7417 7056 S FAIRFIELD AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1660 / 7846 8116 S FAIRFIELD AVE 1.0 08/04/97 08/04/97 0 08/04/97 08/04/97 300 100
805 06 1685 / 7871 8224 S FAIRFIELD AVE 1.0 06/25/97 06/25/97 0 06/25/97 06/25/97 300 100
805 06 1174 / 7360 8130 S HOMAN AVE 1.0 04/04/95 04/04/95 0 04/04/95 04/04/95 300 100
302 00 0083 / 5768 7737 S KEDZIE AVE 0 10/15/97 10/15/97 267 100
805 06 1244 / 7430 7737 S KEDZIE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
300 06 0139 / 5289 8146 S KEDZIE AVE 2,075.0 03/01/06 09/01/06 47,602 02/01/06 03/16/06 62,694 100
302 00 0092 / 5774 8146 S KEDZIE AVE 27.0 0 01/31/01 01/25/02 6,363 100
805 06 1182 / 7368 8362 S KENTON AVE 1.0 03/12/95 03/12/95 0 03/12/95 03/12/95 300 100
805 06 2034 / 8220 8559 S KILDARE AVE 1.0 09/15/95 09/15/95 0 09/15/95 09/15/95 300 100
805 06 1993 / 8179 8521 S KNOX AVE 1.0 02/01/95 02/01/95 0 02/01/95 02/01/95 300 100
805 06 0676 / 6862 8021 S SACRAMENTO AVE 1.0 10/04/96 10/04/96 0 10/04/96 10/04/96 300 100
805 06 0674 / 6860 8039 S SACRAMENTO AVE 1.0 08/08/96 08/08/96 0 08/08/96 08/08/96 300 100
805 06 0720 / 6906 8102 S SACRAMENTO AVE 1.0 05/23/96 05/23/96 0 05/23/96 05/23/96 300 100
805 06 0407 / 6593 7656 S SPRINGFIELD AVE 1.0 09/23/96 09/23/96 0 09/23/96 09/23/96 300 100
302 00 0083 / 5768 7351 S TALMAN AVE 0 12/09/97 12/09/97 267 100
805 06 1239 / 7425 7351 S TALMAN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7714 S TROY ST 0 09/05/97 09/05/97 267 100
805 06 1241 / 7427 7714 S TROY ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 196

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0083 / 5768 7719 S TROY ST 0 09/05/97 09/05/97 267 100
805 06 1242 / 7428 7719 S TROY ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7727 S TROY ST 0 09/05/97 09/05/97 267 100
805 06 1243 / 7429 7727 S TROY ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0374 / 6560 7700 S TRUMBULL AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0375 / 6561 7818 S TRUMBULL AVE 1.0 05/08/95 05/08/95 0 05/08/95 05/08/95 300 100
302 00 0083 / 5768 7036 S WASHTENAW AVE 0 12/12/97 12/12/97 267 100
805 06 1260 / 7446 7036 S WASHTENAW AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0508 / 6694 7937 S WASHTENAW AVE 1.0 01/03/95 01/03/95 0 01/03/95 01/03/95 300 100
302 00 0083 / 5768 7209 S WESTERN AVE 0 12/12/97 12/12/97 266 100
805 06 1235 / 7421 7209 S WESTERN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 7247 S WESTERN AVE 0 12/12/97 12/12/97 266 100
805 06 1236 / 7422 7247 S WESTERN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0522 / 6708 8118 S WESTERN AVE 1.0 01/10/96 01/10/96 0 01/10/96 01/10/96 300 100
805 06 0437 / 6623 7712 S WOLCOTT AVE 1.0 09/26/96 09/26/96 0 09/26/96 09/26/96 300 100
805 06 0438 / 6624 7718 S WOLCOTT AVE 1.0 09/26/96 09/26/96 0 09/26/96 09/26/96 300 100
302 00 0083 / 5768 2634 W 71ST ST 0 12/12/97 12/12/97 267 100
805 06 1406 / 7592 2634 W 71ST ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 3201 W 71ST ST 0 12/12/97 12/12/97 267 100
805 06 1410 / 7596 3201 W 71ST ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2305 W 72ND ST 0 12/12/97 12/12/97 267 100
805 06 1417 / 7603 2305 W 72ND ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 2442 W 74TH ST 0 12/12/97 12/12/97 267 100
805 06 1398 / 7584 2442 W 74TH ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0992 / 7178 3401 W 76TH PL 1.0 02/22/95 02/22/95 0 02/22/95 02/22/95 300 100
805 06 0993 / 7179 3457 W 76TH PL 1.0 02/22/95 02/22/95 0 02/22/95 02/22/95 300 100
805 06 0994 / 7180 3501 W 76TH PL 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 300 100
805 06 0995 / 7181 3832 W 76TH PL 1.0 12/13/95 12/13/95 0 12/13/95 12/13/95 300 100
805 06 0774 / 6960 2153 W 82ND PL 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
805 06 0773 / 6959 3517 W 82ND PL 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 0775 / 6961 2037 W 82ND ST 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 197

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0776 / 6962 2604 W 83RD ST 1.0 04/23/96 04/23/96 0 04/23/96 04/23/96 300 100
805 06 0777 / 6963 3740 W 83RD ST 1.0 10/17/95 10/17/95 0 10/17/95 10/17/95 300 100
805 06 0763 / 6949 3626 W 85TH PL 1.0 11/23/96 11/23/96 0 11/23/96 11/23/96 300 100
805 06 0772 / 6958 3720 W 85TH ST 1.0 04/23/96 04/23/96 0 04/23/96 04/23/96 300 100
805 06 1646 / 7832 3821 W 86TH PL 1.0 09/08/97 09/08/97 0 09/08/97 09/08/97 300 100
805 06 0753 / 6939 4742 W 87TH ST 1.0 03/20/97 03/20/97 0 03/20/97 03/20/97 300 100
805 06 1556 / 7742 3235 W COLUMBUS AVE 1.0 04/19/95 04/19/95 0 04/19/95 04/19/95 300 100
805 06 1723 / 7909 2706 W SEIPP ST 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 1520 / 7706 2720 W SEIPP ST 1.0 10/31/97 10/31/97 0 10/31/97 10/31/97 300 100

Totals per Alley Lighting/Lamps 2,153.0 47,602 89,093

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 8146 S KEDZIE AVE 1,992.0 06/01/07 12/31/07 58,644 12/14/07 12/21/07 56,871 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 8146 S KEDZIE AVE 1,857.0 0 08/15/02 08/30/02 33,812 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 W 83RD ST AND S KOSTNER AVE 6.0 0 07/22/99 07/22/99 1,523 100
300 06 0167 / 5306 W 83RD ST AND S SCOTTSDALE AVE 3.0 0 12/02/99 12/02/99 470 100
300 06 0167 / 5306 W 84TH ST AND S KOLIN AVE 8.0 0 12/02/99 12/02/99 1,316 100
300 06 0167 / 5306 W 86TH ST AND S KEDVALE AVE 2.0 0 09/20/99 09/20/99 702 100
302 00 0092 / 5774 8300 S HAMILTON AVE 1.0 0 10/17/01 10/17/01 404 100
302 00 0092 / 5774 8338 S HAMILTON AVE 1.0 0 10/17/01 10/17/01 345 100
302 00 0092 / 5774 8358 S HAMILTON AVE 1.0 0 10/17/01 10/17/01 345 100
300 06 0071 / 5234 6734 S KEDZIE AVE 11/23/00 11/25/00 0 11/22/00 11/30/00 17,100 100
302 00 0092 / 5774 8401 S KOMENSKY AVE 1.0 0 04/05/01 04/05/01 471 100
302 00 0092 / 5774 7820 S OAKLEY AVE 1.0 0 04/05/01 04/05/01 471 100
302 00 0092 / 5774 2135 W 84TH ST 1.0 0 01/17/01 01/17/01 404 100

Totals per Flood Light Install 25.0 0 23,551


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 198

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Blocks
300 06 0150 / 5291 ON S KEDZIE AVE FROM W 76TH ST TO W 71ST ST 3.0 07/01/03 10/01/04 385,000 05/29/03 306,152 70

Work Type: Lighting Imprvmnts Installations


300 06 0302 / 5408 3330 W 71ST ST 1.0 06/01/05 09/30/05 25,337 07/01/05 08/02/05 10,208 100
300 06 0292 / 5399 1630 W 87TH ST .0 03/01/05 12/31/05 9,407 07/09/05 08/16/05 9,149 100
300 06 0292 / 5399 3811 W COLUMBUS AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Totals per Lighting Imprvmnts 1.0 34,744 19,357

Work Type: Ornamental - Piggyback Lighting Fixtures


300 11 / 32207 ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE 44.0 01/01/08 01/21/08 59,400 11/30/07 02/19/08 38,025 100
300 06 0122 / 5275 ON W COLUMBUS AVE FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE 8.0 11/01/03 11/07/03 9,600 10/30/03 10/30/03 10,787 100

Totals per Ornamental - Piggyback Lighting 52.0 69,000 48,812

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 8146 S KEDZIE AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 07 0017 / 5440 ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON S MOZART ST FROM W 82ND ST TO W 83RD ST .0 03/01/06 12/31/06 0 0 0
300 06 / 32146 ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE 2.0 12/05/07 04/29/08 158,512 0 50
300 06 0298 / 5405 ON W 83RD ST FROM S DAMEN AVE TO S LEAVITT ST 2.0 05/01/05 06/15/05 0 06/06/05 07/29/05 98,623 100

Totals per Residntl Staggered Lighting 4.0 158,512 98,623

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0122 / 5275 ON W 83RD ST FROM S KOLIN AVE TO S KOSTNER AVE 1.0 05/01/03 07/01/03 106,250 04/22/03 06/30/03 106,250 100
300 06 0235 / 5349 ON W 83RD ST FROM S KOSTNER AVE TO S CICERO AVE 2.0 05/01/03 08/01/03 75,243 03/14/03 06/06/03 69,065 100
300 06 0267 / 5375 ON W 83RD ST FROM S PULASKI RD TO S HAMLIN AVE 2.0 04/01/04 06/01/04 170,337 04/19/04 07/19/04 160,844 100
300 06 0235 / 5349 ON W 83RD ST FROM S PULASKI RD TO S KOSTNER AVE 2.0 05/01/03 07/01/03 77,102 04/22/03 06/30/03 69,065 100

Totals per Residntl Strt Lighting/Lamps 7.0 428,932 405,224


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 199

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 7200 S MOZART ST 1.0 0 03/07/01 03/07/01 378 100
302 00 0092 / 5774 7300 S MOZART ST 1.0 0 02/16/01 02/16/01 378 100
302 00 0092 / 5774 2300 W 72ND ST 1.0 0 06/15/01 06/15/01 378 100

Totals per Short Arm Installs - Residntl 3.0 0 1,134


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 200

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 07 0017 / 5440 ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST .0 03/01/06 12/31/06 0 0 0
300 03 0018 / 4889 ON S CALIFORNIA AVE FROM W 83RD ST TO W 87TH ST 35.0 05/01/05 05/31/05 7,643 0
300 07 0018 / 5441 ON S CLAREMONT AVE FROM W 74TH ST TO W 75TH ST 3.0 04/18/06 11/18/06 600 12/01/06 12/04/06 0 100
300 05 0018 / 5133 ON S FRANCISCO AVE FROM W SEIPP ST TO W 87TH ST 9.0 07/25/05 08/15/05 1,000 07/25/05 08/15/05 1,154 100
300 05 0018 / 5133 ON S KOLMAR AVE FROM W 85TH ST TO W 86TH ST 5.0 04/04/05 11/18/05 1,000 07/25/05 08/15/05 721 100
300 07 0017 / 5440 ON S MOZART ST FROM W 82ND ST TO W 83RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0018 / 5441 ON S OAKLEY AVE FROM W 74TH ST TO W 75TH ST 3.0 04/18/06 11/18/06 600 09/29/06 10/05/06 0 100
300 06 0058 / 5229 ON S PULASKI RD FROM W 55TH ST TO W 83RD ST 190.0 52,780 08/12/02 09/25/02 52,780 100
300 04 0216 / 5114 ON S PULASKI RD FROM W 83RD ST TO W 85TH ST 35.0 05/01/06 11/01/06 7,498 05/17/06 06/18/06 7,498 100
300 07 0018 / 5441 ON S TRIPP AVE FROM W 85TH ST TO W 86TH ST 3.0 04/18/06 11/18/06 600 09/29/06 10/05/06 508 100
300 03 0018 / 4889 ON S WESTERN AVE FROM W 77TH ST TO W 79TH ST 40.0 05/01/05 05/30/05 9,888 0
300 03 0018 / 4889 ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE 16.0 05/01/05 05/30/05 3,317 0
300 03 0018 / 4889 ON W 82ND PL FROM S DAMEN AVE TO S HOYNE AVE 9.0 10/01/04 10/15/04 1,800 10/01/04 10/20/04 1,298 100
300 07 0018 / 5441 ON W 83RD PL FROM W COLUMBUS AVE TO S ST LOUIS AVE 5.0 04/18/06 11/18/06 1,250 09/29/06 10/05/06 0 100
300 03 0018 / 4889 ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE 65.0 10/01/04 10/15/04 21,800 10/11/04 10/20/04 1,730 100
300 07 0018 / 5441 ON W 84TH ST FROM S CALIFORNIA AVE TO S FRANCISCO AVE 5.0 04/18/06 11/18/06 1,000 09/29/06 10/05/06 848 100
300 07 0018 / 5441 ON W 85TH ST FROM S WASHTENAW AVE TO S CALIFORNIA AVE 5.0 04/18/06 11/18/06 1,000 09/29/06 10/05/06 848 100
300 05 0018 / 5133 ON W 86TH PL FROM S FRANCISCO AVE TO S SACRAMENTO AVE 5.0 04/04/05 11/18/05 1,000 07/25/05 08/15/05 721 100
300 05 0018 / 5133 ON W 86TH ST FROM S FRANCISCO AVE TO S SACRAMENTO AVE 5.0 04/04/05 11/18/05 1,000 07/25/05 08/15/05 721 100
300 07 0018 / 5441 ON W 86TH ST FROM S TRIPP AVE TO S KILDARE AVE 1.0 04/18/06 11/18/06 250 09/29/06 10/05/06 0 100
300 05 0018 / 5133 ON W 87TH ST FROM S ROCKWELL ST TO S KEDZIE AVE 45.0 04/04/05 11/18/05 11,250 07/25/05 08/15/05 9,878 100
300 07 0018 / 5441 ON W COLUMBUS AVE FROM W 83RD ST TO W 87TH ST 53.0 04/18/06 11/18/06 13,250 10/05/06 10/16/06 10,479 100
300 07 0018 / 5441 W 80TH ST AND S WESTERN AVE 8.0 04/18/06 11/18/06 1,600 09/29/06 10/05/06 1,356 100
300 07 0018 / 5441 W 82ND PL AND S DAMEN AVE 9.0 04/18/06 11/18/06 1,800 09/29/06 10/05/06 1,526 100
302 00 0077 / 5765 8501-8537 S KOLIN AVE 3.0 0 06/15/99 06/15/99 262 100
300 03 0018 / 4889 2750 W COLUMBUS AVE 8.0 10/01/04 10/15/04 2,000 10/01/04 10/20/04 19,251 100

Totals per Strt Light Pole Painting 565.0 143,926 111,579


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 201

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Lighting Blocks
300 06 0274 / 5382 ON S CENTRAL PARK AVE FROM W 85TH ST TO W 87TH ST 2.0 06/24/05 03/24/06 150,000 06/24/05 03/24/06 80,000 100
300 06 0247 / 5357 ON S FRANCISCO AVE FROM W 83RD ST TO W 85TH ST 2.0 07/01/05 12/31/05 175,000 07/20/05 01/06/06 133,991 100
300 06 0274 / 5382 ON S HOMAN AVE FROM W 76TH PL TO W 77TH ST .50 06/24/05 03/24/06 40,000 06/24/05 03/24/06 80,000 100
300 06 0274 / 5382 ON S HOYNE AVE FROM W 79TH ST TO W 80TH ST 1.0 06/24/05 12/27/05 75,000 06/24/05 12/27/05 80,000 100
300 06 0247 / 5357 ON S WHIPPLE ST FROM W 83RD ST TO W 85TH ST 2.0 06/01/04 09/01/04 210,000 10/08/04 05/12/05 128,775 100
300 06 0247 / 5357 ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE 2.0 10/01/03 12/01/03 3,100 05/22/03 05/30/03 3,040 100
300 06 0274 / 5382 ON W 77TH ST FROM S HOMAN AVE TO S KEDZIE AVE 1.50 06/24/05 03/24/06 150,000 06/24/05 03/24/06 80,000 100
300 06 0274 / 5382 ON W 78TH ST FROM S HOYNE AVE TO S HAMILTON AVE .50 06/24/05 08/05/05 40,000 06/24/05 08/05/05 80,000 100
300 06 0274 / 5382 ON W 81ST ST FROM S SACRAMENTO AVE TO S WHIPPLE ST .50 06/24/05 08/05/05 40,000 06/24/05 08/05/05 80,000 100
300 06 0274 / 5382 ON W 82ND ST FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE 2.50 06/24/05 12/20/05 180,000 06/24/05 12/20/05 80,000 100

Totals per Strt Lighting 14.50 1,063,100 825,806

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 8146 S KEDZIE AVE 1,130.0 03/01/04 12/01/04 5,876 07/31/06 08/29/06 12,305 100

Work Type: Underpass Lighting Fixtures


805 06 2468 / 8654 2400 E 87TH ST 19.0 02/12/96 02/12/96 0 02/12/96 02/12/96 14,250 100
805 06 2469 / 8655 2400 E 87TH ST 19.0 02/12/96 02/12/96 0 02/12/96 02/12/96 14,250 100
302 00 0070 / 5758 7500 S DAMEN AVE 0 12/15/97 12/23/97 8,366 100
805 06 2138 / 8324 7500 S DAMEN AVE 22.0 12/23/97 12/23/97 0 12/23/97 12/23/97 16,500 100
805 06 2426 / 8612 7901 S KEDZIE AVE 22.0 09/29/95 09/29/95 0 09/29/95 09/29/95 16,500 100
300 06 0217 / 5337 8146 S KEDZIE AVE 44.0 03/02/04 03/04/04 2,473 12/02/03 12/02/03 3,230 100
302 00 0070 / 5758 7500 S WESTERN AVE 0 06/12/97 06/19/97 20,106 100
805 06 2189 / 8375 7500 S WESTERN AVE 34.0 06/19/97 06/19/97 0 06/19/97 06/19/97 25,500 100
805 06 2098 / 8284 8205 S WESTERN AVE 10.0 02/07/94 02/07/94 0 02/07/94 02/07/94 7,500 100
805 06 2385 / 8571 2299 W 79TH ST 16.0 03/12/93 03/12/93 0 03/12/93 03/12/93 12,000 100
302 00 0072 / 5760 3150 W 79TH ST 1.0 0 02/08/00 02/18/00 15,500 100
805 06 2961 / 9147 2135 W 83RD ST 12.0 10/20/93 10/20/93 0 10/20/93 10/20/93 9,000 100
805 06 2957 / 9143 2547 W 83RD ST 8.0 11/01/93 11/01/93 0 11/01/93 11/01/93 6,000 100

Totals per Underpass Lighting 207.0 2,473 168,702


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 202

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 ON S WESTERN AVE FROM W 74TH ST TO W COLUMBUS AVE 2.0 05/26/05 05/27/05 10,563 03/16/05 03/16/05 9,422 100
210 06 0219 / 4459 S ASHLAND AVE AND W 83RD ST .50 05/04/05 05/04/05 5,327 05/06/05 05/06/05 0 100
210 06 0219 / 4459 S WESTERN AVE AND W 71ST ST .50 05/25/05 05/26/05 5,282 04/07/05 04/07/05 5,403 100
210 06 0219 / 4459 S WESTERN AVE AND W 77TH ST 1.0 05/27/05 05/28/05 10,563 04/06/05 04/06/05 8,008 100
210 06 0130 / 4389 S WESTERN AVE AND W 79TH ST 1.0 0 07/31/02 07/31/02 1,850 100
210 06 0219 / 4459 S WESTERN AVE AND W 79TH ST 1.0 05/30/05 05/31/05 10,563 04/05/05 04/05/05 10,489 100
210 06 0219 / 4459 S WESTERN AVE AND W 83RD ST 1.0 06/01/05 06/02/05 10,563 04/04/05 04/04/05 8,008 100
210 06 0219 / 4459 S WESTERN AVE AND W 87TH ST .50 06/02/05 06/03/05 5,282 04/01/05 04/01/05 6,543 100

Totals per LED Signal Head Install 7.50 58,142 49,723

Work Type: Left Turn Arrow Locations


300 11 / 32207 W 83RD ST AND S WESTERN AVE 1.0 06/05/08 06/23/08 34,000 06/05/08 06/23/08 30,216 100

10720139 * Note Last Updated on 05-FEB-08


210 06 0070 / 4334 7900 S TALMAN AVE 1.0 06/01/99 12/01/99 30,000 04/27/99 07/22/99 30,279 100

Totals per Left Turn Arrow 2.0 64,000 60,495

Work Type: Signals Intersections


300 06 0096 / 5258 8146 S KEDZIE AVE 29.0 08/08/03 08/12/03 0 08/01/03 08/11/03 4,585 100

Work Type: TSM Install Locations


210 06 0108 / 4368 7700 S KEDZIE AVE 1.0 08/15/00 11/01/00 179,833 08/11/00 10/04/00 121,967 100
814 06 0097 / 16313 7700 S WESTERN AVE 1.0 11/19/92 11/19/92 0 11/19/92 11/19/92 77,020 100

Totals per TSM Install 2.0 179,833 198,987

Work Type: Traffic Equipment Painting Locations


300 07 0017 / 5440 ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON S MOZART ST FROM W 82ND ST TO W 83RD ST .0 03/01/06 12/31/06 0 0 0
300 07 0017 / 5440 ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE 2.0 04/18/06 11/18/06 5,800 0 0
300 11 / 32206 ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE 2.0 05/01/07 05/15/07 5,800 05/01/07 05/15/07 5,800 100
300 07 0018 / 5441 ON W COLUMBUS AVE FROM W 83RD ST TO W 87TH ST 15.0 04/18/06 11/18/06 6,000 10/05/06 10/16/06 2,976 100

Totals per Traffic Equipment Painting 19.0 17,600 8,776


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 203

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Totals per Traffic 319,575 322,566

Totals per Construction Phase 2,881,658 2,605,052

Totals for Ward 18 2,886,608 2,634,291


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 204

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON S CENTRAL PARK AVE FROM W 109TH ST TO W 111TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,957 100
210 06 0240 / 4477 W 103RD ST AND S MAPLEWOOD AVE .0 10/10/05 07/31/06 1,500 10/10/05 08/08/06 134 100
210 10 0025 / 4565 W 105TH ST AND S VINCENNES AVE .0 03/01/03 12/31/04 0 03/01/03 12/31/04 1,999 100
210 10 0025 / 4565 W 107TH ST AND S VINCENNES AVE .0 03/01/03 12/31/04 0 03/01/03 12/31/04 1,999 100
281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 10228 S WESTERN AVE 1.0 03/08/05 05/09/05 1,000 03/08/05 05/09/05 0 100

Totals per Design/Engineering 1.0 2,500 7,088

Work Type: Feasibility Study Projects


302 00 0079 / 5767 ON S LONGWOOD DR FROM W 91ST ST TO W 111TH ST .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100

Totals per Lighting/Electrical 2,500 7,088


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 205

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 09 / 33085 ON S VANDERPOEL AVE FROM W 93RD ST TO W 95TH ST 12.0 11/13/08 11/14/08 4,800 11/13/08 11/14/08 3,098 100
302 00 0092 / 5774 9100-9199 S BEVERLY AVE 5.0 11/01/01 11/01/01 1,029 09/29/01 09/29/01 1,029 100
300 06 0069 / 5233 11301 S CHURCH ST 1.0 09/08/02 09/08/02 210 09/05/02 09/05/02 203 100
302 00 0092 / 5774 1500 W 104TH ST 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 1511 W 104TH ST 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 1529 W 104TH ST 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 1537 W 104TH ST 1.0 0 11/12/01 11/12/01 206 100
302 00 0092 / 5774 1559 W 104TH ST 1.0 0 11/12/01 11/12/01 206 100

Totals per 250 Watt Changeout 23.0 6,039 5,360

Work Type: 400 Watt Changeout Fixtures


300 06 0122 / 5275 ON W 103RD ST FROM S LONGWOOD DR TO S WESTERN AVE 34.0 05/10/03 05/13/03 11,600 05/07/03 05/09/03 6,045 100
300 05 0019 / 5134 ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE 40.0 04/04/05 11/18/05 16,000 08/15/05 09/01/05 12,806 100

Totals per 400 Watt Changeout 74.0 27,600 18,851

Totals per Lighting/Electrical 1,236,035 1,356,982


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 206

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1638 / 7824 10916 S ALBANY AVE 1.0 08/21/97 08/21/97 0 08/21/97 08/21/97 300 100
805 06 1642 / 7828 11118 S ARTESIAN AVE 1.0 08/28/97 08/28/97 0 08/28/97 08/28/97 300 100
805 06 0843 / 7029 8956 S BELL AVE 1.0 10/28/96 10/28/96 0 10/28/96 10/28/96 300 100
805 06 0875 / 7061 9415 S BELL AVE 1.0 08/02/95 08/02/95 0 08/02/95 08/02/95 300 100
805 06 0876 / 7062 9425 S BELL AVE 1.0 10/17/95 10/17/95 0 10/17/95 10/17/95 300 100
805 06 1757 / 7943 9946 S BELL AVE 1.0 05/07/97 05/07/97 0 05/07/97 05/07/97 300 100
805 06 0855 / 7041 10222 S BELL AVE 1.0 07/25/95 07/25/95 0 07/25/95 07/25/95 300 100
805 06 0812 / 6998 10810 S CENTRAL PARK AVE 1.0 04/19/96 04/19/96 0 04/19/96 04/19/96 300 100
805 06 1995 / 8181 9807 S CHARLES ST 1.0 03/26/96 03/26/96 0 03/26/96 03/26/96 300 100
805 06 0533 / 6719 10430 S CHURCH ST 1.0 06/20/96 06/20/96 0 06/20/96 06/20/96 300 100
805 06 0434 / 6620 10442 S CHURCH ST 1.0 06/20/96 06/20/96 0 06/20/96 06/20/96 300 100
805 06 0579 / 6765 10615 S FAIRFIELD AVE 1.0 07/22/96 07/22/96 0 07/22/96 07/22/96 300 100
805 06 0560 / 6746 10629 S FAIRFIELD AVE 1.0 07/10/96 07/10/96 0 07/10/96 07/10/96 300 100
805 06 0541 / 6727 10828 S FAIRFIELD AVE 1.0 07/31/96 07/31/96 0 07/31/96 07/31/96 300 100
805 06 1126 / 7312 10717 S HALE AVE 1.0 06/12/95 06/12/95 0 06/12/95 06/12/95 300 100
805 06 1555 / 7741 9418 S HAMILTON AVE 1.0 10/16/97 10/16/97 0 10/16/97 10/16/97 300 100
805 06 1071 / 7257 10418 S HAMILTON AVE 1.0 05/26/95 05/26/95 0 05/26/95 05/26/95 300 100
805 06 1073 / 7259 11310 S HAMLIN AVE 1.0 05/31/95 05/31/95 0 05/31/95 05/31/95 300 100
805 06 1057 / 7243 11402 S HAMLIN AVE 1.0 10/04/95 10/04/95 0 10/04/95 10/04/95 300 100
805 06 1075 / 7261 11408 S HAMLIN AVE 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
302 00 0092 / 5774 10957 S HERMOSA AVE 1.0 0 07/17/01 07/17/01 236 100
805 06 1094 / 7280 10820 S HOMAN AVE 1.0 10/11/96 10/11/96 0 10/11/96 10/11/96 300 100
805 06 1661 / 7847 11151 S HOMAN AVE 1.0 08/05/97 08/05/97 0 08/05/97 08/05/97 300 100
805 06 1212 / 7398 9319 S HOYNE AVE 1.0 07/18/96 07/18/96 0 07/18/96 07/18/96 300 100
805 06 1872 / 8058 10206 S LONGWOOD DR 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0585 / 6771 10022 S PROSPECT AVE 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0556 / 6742 10035 S PROSPECT AVE 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0570 / 6756 10108 S PROSPECT AVE 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0558 / 6744 10159 S PROSPECT AVE 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0580 / 6766 10209 S PROSPECT AVE 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0561 / 6747 10433 S PROSPECT AVE 1.0 06/20/96 06/20/96 0 06/20/96 06/20/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 207

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0562 / 6748 10502 S PROSPECT AVE 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0563 / 6749 10631 S PULASKI RD 1.0 03/20/96 03/20/96 0 03/20/96 03/20/96 300 100
805 06 0622 / 6808 9515 S SEELEY AVE 1.0 06/10/96 06/10/96 0 06/10/96 06/10/96 300 100
805 06 1471 / 7657 11454 S ST LOUIS AVE 1.0 11/17/97 11/17/97 0 11/17/97 11/17/97 300 100
805 06 0424 / 6610 10642 S TALMAN AVE 1.0 08/05/96 08/05/96 0 08/05/96 08/05/96 300 100
805 06 1551 / 7737 10741 S TALMAN AVE 1.0 10/14/97 10/14/97 0 10/14/97 10/14/97 300 100
805 06 1711 / 7897 10949 S TALMAN AVE 1.0 06/18/97 06/18/97 0 06/18/97 06/18/97 300 100
805 06 0441 / 6627 11343 S TALMAN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0361 / 6547 11025 S TROY ST 1.0 08/30/96 08/30/96 0 08/30/96 08/30/96 300 100
805 06 0362 / 6548 11251 S TROY ST 1.0 02/10/95 02/10/95 0 02/10/95 02/10/95 300 100
805 06 0501 / 6687 10825 S WASHTENAW AVE 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 0502 / 6688 10859 S WASHTENAW AVE 1.0 03/15/95 03/15/95 0 03/15/95 03/15/95 300 100
805 06 1202 / 7388 10030 S WESTERN AVE 1.0 12/17/97 12/17/97 0 12/17/97 12/17/97 300 100
805 06 1734 / 7920 10117 S WESTERN AVE 1.0 06/09/97 06/09/97 0 06/09/97 06/09/97 300 100
805 06 0517 / 6703 10150 S WESTERN AVE 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0518 / 6704 10216 S WESTERN AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
805 06 0519 / 6705 10220 S WESTERN AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
300 06 0139 / 5289 10444 S WESTERN AVE 1,948.0 03/01/06 09/01/06 44,852 07/01/06 07/18/06 58,857 100
302 00 0092 / 5774 10444 S WESTERN AVE 46.0 0 02/06/01 01/24/02 10,840 100
805 06 1478 / 7664 10550 S WESTERN AVE 1.0 11/21/97 11/21/97 0 11/21/97 11/21/97 300 100
805 06 1763 / 7949 10734 S WHIPPLE ST 1.0 05/12/97 05/12/97 0 05/12/97 05/12/97 300 100
805 06 0459 / 6645 10935 S WOOD ST 1.0 11/02/95 11/02/95 0 11/02/95 11/02/95 300 100
805 06 1587 / 7773 1935 W 102ND ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1156 / 7342 2617 W 103RD PL 1.0 11/05/96 11/05/96 0 11/05/96 11/05/96 300 100
805 06 0958 / 7144 1901 W 103RD ST 1.0 04/03/96 04/03/96 0 04/03/96 04/03/96 300 100
805 06 0959 / 7145 1913 W 103RD ST 1.0 04/03/96 04/03/96 0 04/03/96 04/03/96 300 100
805 06 1645 / 7831 3951 W 104TH ST 1.0 09/03/97 09/03/97 0 09/03/97 09/03/97 300 100
805 06 0960 / 7146 1431 W 105TH ST 1.0 06/09/95 06/09/95 0 06/09/95 06/09/95 300 100
805 06 0931 / 7117 1527 W 107TH ST 1.0 03/30/95 03/30/95 0 03/30/95 03/30/95 300 100
805 06 0918 / 7104 3819 W 110TH PL 1.0 03/14/96 03/14/96 0 03/14/96 03/14/96 300 100
805 06 0934 / 7120 3838 W 110TH PL 1.0 03/14/96 03/14/96 0 03/14/96 03/14/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 208

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0936 / 7122 3849 W 110TH PL 1.0 03/14/96 03/14/96 0 03/14/96 03/14/96 300 100
805 06 1606 / 7792 3234 W 110TH ST 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
805 06 0938 / 7124 2545 W 111TH ST 1.0 07/10/96 07/10/96 0 07/10/96 07/10/96 300 100
805 06 0939 / 7125 3103 W 111TH ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 0941 / 7127 2160 W 112TH ST 1.0 07/07/95 07/07/95 0 07/07/95 07/07/95 300 100
805 06 1774 / 7960 2504 W 115TH ST 1.0 04/15/97 04/15/97 0 04/15/97 04/15/97 300 100
805 06 0916 / 7102 2534 W 117TH ST 1.0 11/11/96 11/11/96 0 11/11/96 11/11/96 300 100
805 06 1516 / 7702 1908 W MONTEREY AVE 1.0 10/30/97 10/30/97 0 10/30/97 10/30/97 300 100

Totals per Alley Lighting/Lamps 2,062.0 44,852 90,033

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 10444 S WESTERN AVE 1,715.0 06/01/07 12/31/07 50,489 12/28/07 01/04/08 48,963 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 10444 S WESTERN AVE 1,620.0 0 08/27/02 09/13/02 29,497 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 S ESMOND ST AND W MONTEREY AVE 1.0 0 11/13/99 11/13/99 351 100
302 00 0092 / 5774 10534 S MAPLEWOOD AVE 1.0 0 09/07/01 09/07/01 404 100
302 00 0092 / 5774 10536 S MAPLEWOOD AVE 1.0 0 09/07/01 09/07/01 404 100
302 00 0092 / 5774 10550 S MAPLEWOOD AVE 1.0 0 09/07/01 09/07/01 404 100
302 00 0092 / 5774 10304 S WOOD ST 1.0 0 07/23/01 07/23/01 471 100
302 00 0092 / 5774 10312 S WOOD ST 1.0 0 07/23/01 07/23/01 471 100
300 06 0167 / 5306 3820 W 103RD ST 1.0 0 01/06/99 01/06/99 351 100
300 06 0167 / 5306 4210 W 115TH ST 7.0 0 02/06/99 02/06/99 2,457 100

Totals per Flood Light Install 14.0 0 5,313

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 209

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 10228 S WESTERN AVE .0 03/01/05 12/31/05 7,262 06/17/05 06/22/05 6,276 100

Totals per Lighting Imprvmnts .0 7,262 6,276

Work Type: Lighting Imprvmnts Projects


300 06 0199 / 5324 ON W 91ST ST FROM S WESTERN AVE TO S CLAREMONT AVE 14,900 08/20/01 08/24/01 2,223 100

Work Type: Loop Lighting Blocks


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental Lighting Blocks


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0
300 06 0109 / 5264 2200-2299 W 95TH ST 1.0 11/01/98 12/01/98 80,000 11/10/98 12/01/98 76,427 100

Totals per Ornamental Lighting 1.0 80,000 76,427

Work Type: POD Camera Pole Poles


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0
300 11 / 32208 1900-1950 W 91ST ST 1.0 06/01/07 06/10/07 1,200 06/06/07 06/06/07 1,200 100

Totals per POD Camera Pole 1.0 1,200 1,200

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 10444 S WESTERN AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0298 / 5405 ON S CENTRAL PARK AVE FROM W 107TH ST TO W 109TH ST 2.0 04/07/05 05/07/05 0 04/07/05 06/02/05 118,215 100
300 06 0308 / 5414 ON S CENTRAL PARK AVE FROM W 109TH ST TO W 111TH ST 2.0 05/10/06 07/28/06 156,357 05/10/06 07/28/06 137,136 100

Project has been completed as of 7/28/2006 Note Last Updated on 25-AUG-06


Totals per Residntl Staggered Lighting 4.0 156,357 255,351
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 210

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0235 / 5349 ON S CENTRAL PARK AVE FROM W 103RD ST TO W 105TH ST 2.0 06/12/03 08/12/03 146,206 06/03/03 08/04/03 131,586 100
300 06 0267 / 5375 ON S CENTRAL PARK AVE FROM W 105TH ST TO W 107TH ST 2.0 03/22/04 05/22/04 144,219 03/26/04 05/04/04 142,139 100
300 06 0078 / 5241 8900-9000 S BEVERLY AVE 1.0 02/28/01 05/01/01 38,730 11/24/00 01/22/01 37,953 100

Totals per Residntl Strt Lighting/Lamps 5.0 329,155 311,678

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Light Pole Painting Locations


302 00 0079 / 5767 ON S LONGWOOD DR FROM W 91ST ST TO W 111TH ST 18.0 10/01/01 10/06/01 2,300 10/01/01 10/12/01 2,300 100
300 06 0108 / 5263 ON S PULASKI RD FROM W 99TH ST TO W 103RD ST 28.0 05/10/03 05/16/03 7,450 05/18/03 05/21/03 6,020 100
302 00 0077 / 5765 ON S WESTERN AVE FROM W 111TH ST TO W 119TH ST 96.0 0 04/18/99 04/30/99 8,388 100
300 06 0108 / 5263 ON W 103RD ST FROM S LONGWOOD DR TO S WESTERN AVE 29.0 04/28/03 05/02/03 13,900 05/05/03 05/16/03 10,710 100
300 05 0019 / 5134 ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE 60.0 04/04/05 11/18/05 15,000 08/15/05 09/01/05 12,329 100
302 00 0076 / 5764 ON W 95TH ST FROM S BEVERLY AVE TO S WESTERN AVE 114.68 04/14/98 04/21/98 0 04/14/98 04/21/98 1,950 100
300 04 0216 / 5114 ON W 95TH ST FROM S WESTERN AVE TO S HOYNE AVE 33.0 05/01/06 11/01/06 7,065 05/17/06 07/12/06 7,065 100

Totals per Strt Light Pole Painting 378.68 45,715 48,762

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 W 111TH ST AND S LAWNDALE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Lighting Blocks


300 06 0262 / 5370 ON S CALIFORNIA AVE FROM W 99TH ST TO W 103RD ST 5.0 11/01/02 03/15/03 180,000 10/22/02 02/28/03 163,979 100
300 06 0247 / 5357 ON W 112TH PL FROM S CENTRAL PARK AVE TO S ST LOUIS AVE 2.0 08/15/03 10/15/03 129,000 06/19/03 08/18/03 128,205 100
300 06 0247 / 5357 ON W 96TH ST FROM S LEAVITT ST TO S WESTERN AVE 2.0 11/01/04 12/15/04 155,000 11/01/04 12/23/04 147,135 100

Totals per Strt Lighting 9.0 464,000 439,319

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 10444 S WESTERN AVE 1,628.0 03/01/04 12/01/04 8,466 07/31/06 08/14/06 17,729 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 211

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S WESTERN AVE AND W 101ST ST 1.0 0 04/03/02 04/03/02 1,850 100
210 06 0130 / 4389 S WESTERN AVE AND W 103RD ST 1.0 0 10/22/02 10/22/02 11,608 100
210 06 0219 / 4459 S WESTERN AVE AND W 107TH ST 1.0 06/03/05 06/04/05 10,563 03/31/05 03/31/05 8,368 100
210 06 0219 / 4459 S WESTERN AVE AND W 109TH ST 1.0 06/04/05 06/05/05 10,563 03/31/05 03/31/05 8,368 100
210 06 0130 / 4389 S WESTERN AVE AND W 111TH ST 1.0 0 04/03/02 04/03/02 1,850 100
210 06 0219 / 4459 S WESTERN AVE AND W 111TH ST 1.0 06/07/05 06/08/05 10,563 05/01/05 05/01/05 10,084 100
210 06 0219 / 4459 S WESTERN AVE AND W 113TH PL 1.0 04/30/05 04/30/05 10,563 04/24/05 04/24/05 6,468 100
210 06 0219 / 4459 S WESTERN AVE AND W 115TH ST 1.0 06/09/05 06/10/05 10,563 04/29/05 04/29/05 8,008 100
210 06 0219 / 4459 S WESTERN AVE AND W 87TH ST .50 06/02/05 06/03/05 5,282 04/01/05 04/01/05 6,543 100

Totals per LED Signal Head Install 8.50 58,097 63,147

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0240 / 4477 W 103RD ST AND S MAPLEWOOD AVE 8.0 11/01/05 07/19/07 15,000 11/01/05 10/25/06 5,293 100

Constructed BY operations Note Last Updated on 30-MAY-07

Work Type: Signals Intersections


300 06 0096 / 5258 10444 S WESTERN AVE 34.0 08/04/03 08/12/03 0 08/01/03 08/10/03 5,376 100

Work Type: TSM Install Locations


814 06 0139 / 16353 11099 S HOMAN AVE 1.0 04/27/93 04/27/93 0 04/27/93 04/27/93 93,077 100
210 06 0105 / 4365 11100 S KEDZIE AVE 1.0 08/15/00 11/01/00 75,000 08/08/00 10/04/00 45,517 100
814 06 0352 / 16550 10299 S LONGWOOD DR 1.0 07/02/96 07/02/96 0 07/02/96 07/02/96 100,000 100
210 06 0008 / 4283 10300 S ST LOUIS AVE 1.0 08/01/98 12/01/98 150,000 07/29/98 07/15/99 113,551 100
814 06 0344 / 16542 11338 S WESTERN AVE 1.0 05/15/96 05/15/96 0 05/15/96 05/15/96 113,510 100
210 06 0058 / 4325 3700 W 111TH ST 1.0 06/01/99 12/31/99 153,000 06/01/99 09/15/99 88,318 100

Totals per TSM Install 6.0 378,000 553,973

Work Type: Traffic Equipment Painting Locations


300 05 0019 / 5134 ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE 17.0 04/04/05 11/18/05 5,300 08/15/05 09/01/05 8,796 100

Totals per Traffic 456,397 636,585

Totals per Construction Phase 1,692,432 1,993,566


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 212

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt
Totals for Ward 19 1,694,932 2,000,654
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 213

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0292 / 5399 5517 S MICHIGAN AVE 1.0 1,000 08/03/05 08/03/05 384 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 214

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON E 64TH ST FROM S WOODLAWN AVE TO S KIMBARK AVE 4.0 1,500 05/08/02 05/08/02 1,500 100
302 00 0092 / 5774 ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST 9.0 0 09/27/01 09/27/01 1,852 100
300 06 0069 / 5233 ON S SANGAMON ST FROM W 52ND ST TO W 53RD ST 4.0 05/24/02 05/24/02 840 05/21/02 05/21/02 904 100
302 00 0092 / 5774 ON S SANGAMON ST FROM W 52ND ST TO W 53RD ST 4.0 04/15/02 04/15/02 840 0
300 06 0069 / 5233 6327-6401 S INGLESIDE AVE 4.0 1,500 04/16/02 04/16/02 1,500 100
300 06 0069 / 5233 6300 S RHODES AVE 9.0 10/21/02 10/21/02 3,600 10/18/02 10/18/02 4,235 100
300 06 0122 / 5275 5859 S STATE ST 1,950.0 08/01/03 09/09/03 765,250 08/01/03 10/14/03 441,011 100
300 06 0069 / 5233 6217-6251 S UNIVERSITY AVE 3.0 1,125 05/08/02 05/08/02 1,125 100

Totals per 250 Watt Changeout 1,987.0 774,655 452,127

Work Type: Alley Lighting/Lamps Installations


300 06 0204 / 5327 ON S COTTAGE GROVE AVE FROM E 62ND ST TO E 63RD ST 3.0 08/13/01 08/13/01 960 09/29/01 09/29/01 960 100
300 06 0204 / 5327 ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST 10.0 08/14/01 08/14/01 3,200 09/29/01 09/29/01 2,060 100
300 06 0204 / 5327 800 E 63RD ST 2.0 08/09/01 08/09/01 640 09/29/01 09/29/01 640 100
805 06 0963 / 7149 367 E 68TH ST 1.0 03/27/96 03/27/96 0 03/27/96 03/27/96 300 100
805 06 1469 / 7655 360 E 69TH ST 2.0 12/04/97 12/04/97 0 12/04/97 12/04/97 600 100
805 06 1475 / 7661 370 E 69TH ST 1.0 11/19/97 11/19/97 0 11/19/97 11/19/97 300 100
805 06 1526 / 7712 6200 S DR MARTIN LUTHER KING JR DR 1.0 11/06/97 11/06/97 0 11/06/97 11/06/97 300 100
805 06 1887 / 8073 6812 S DR MARTIN LUTHER KING JR DR 1.0 10/21/96 10/21/96 0 10/21/96 10/21/96 300 100
805 06 2041 / 8227 6812 S DR MARTIN LUTHER KING JR DR 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
805 06 2054 / 8240 6838 S DR MARTIN LUTHER KING JR DR 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 2043 / 8229 6844 S DR MARTIN LUTHER KING JR DR 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 2064 / 8250 6846 S DR MARTIN LUTHER KING JR DR 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 0644 / 6830 6427 S EVANS AVE 1.0 06/07/95 06/07/95 0 06/07/95 06/07/95 300 100
302 00 0092 / 5774 6523 S HALSTED ST 1.0 0 12/31/01 12/31/01 236 100
805 06 1523 / 7709 5914 S LOWE AVE 1.0 11/04/97 11/04/97 0 11/04/97 11/04/97 300 100
302 00 0092 / 5774 4858 S MARSHFIELD AVE 1.0 0 10/23/01 10/23/01 236 100
805 06 0531 / 6717 6754 S PRAIRIE AVE 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
300 06 0139 / 5289 5859 S STATE ST 1,048.0 03/01/06 09/01/06 26,012 04/01/06 04/15/06 31,664 100
302 00 0092 / 5774 5859 S STATE ST 17.0 0 02/02/01 01/20/02 4,006 100

Totals per Alley Lighting/Lamps 1,095.0 30,812 43,702


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 215

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0215 / 5336 5859 S STATE ST 2,170.0 06/01/07 12/31/07 63,884 11/16/07 12/05/07 61,953 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5859 S STATE ST 2,075.0 0 07/24/02 07/27/02 37,782 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 RANDOLPH TOWERS (CHA) 02/24/01 06/07/01 17,762 06/04/01 06/06/01 14,691 100
302 00 0092 / 5774 S DAMEN AVE AND W 48TH ST .50 0 09/25/01 09/25/01 202 100
302 00 0092 / 5774 S WINCHESTER AVE AND W 48TH ST 1.0 0 09/25/01 09/25/01 404 100
300 06 0167 / 5306 6410 S DANTE AVE 6.0 0 10/27/99 10/27/99 2,105 100
300 06 0071 / 5234 5531 S DR MARTIN LUTHER KING JR DR 11/20/00 11/23/00 0 114 100

Totals per Flood Light Install 7.50 17,762 17,516

Work Type: Lighting Imprvmnts Installations


300 06 0256 / 5366 ON W 59TH ST FROM S PRINCETON AVE TO S WENTWORTH AVE 13.0 02/15/04 08/01/04 21,100 08/09/04 05/16/05 23,110 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 6357 S COTTAGE GROVE AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0298 / 5405 ON S RHODES AVE FROM E 63RD ST TO E 65TH ST 2.0 07/01/05 09/01/05 0 06/17/05 09/23/05 135,213 100

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON S RHODES AVE FROM E 61ST ST TO E 62ND ST 2.0 10/15/04 12/15/04 154,252 09/09/04 12/21/04 154,552 100
300 06 0235 / 5349 ON S WABASH AVE FROM E 55TH ST TO E 57TH ST 2.0 05/02/03 07/02/03 175,814 05/02/03 08/01/03 157,797 100

Totals per Residntl Strt Lighting/Lamps 4.0 330,066 312,349

Work Type: Short Arm Installs - Arterial Locations


302 00 0092 / 5774 4619 S HERMITAGE AVE 1.0 0 02/23/01 02/23/01 378 100
302 00 0092 / 5774 4645 S HERMITAGE AVE 1.0 0 02/23/01 02/23/01 378 100

Totals per Short Arm Installs - Arterial 2.0 0 756

Totals per Lighting/Electrical 1,523,070 1,899,429


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 216

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0108 / 5263 ON E 63RD ST FROM S STATE ST TO S STONY ISLAND AVE 70.0 05/11/03 05/31/03 17,000 07/01/03 07/28/03 16,870 100
300 06 0108 / 5263 ON S COTTAGE GROVE AVE FROM E 60TH ST TO E 68TH ST 79.0 05/20/03 06/03/03 18,500 07/01/03 07/28/03 18,480 100
300 06 0108 / 5263 ON S DR MARTIN LUTHER KING JR DR FROM E 55TH ST TO E 69TH ST 90.0 05/28/03 06/15/03 21,500 07/01/03 07/28/03 22,120 100

Totals per Strt Light Pole Painting 239.0 57,000 57,470

Work Type: Strt Lighting Blocks


300 06 0204 / 5327 ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST 9.0 10/13/01 10/13/01 1,890 09/27/01 09/27/01 1,890 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 5859 S STATE ST 1,795.0 03/01/04 12/01/04 9,334 07/31/06 09/07/06 19,548 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 217

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0122 / 5275 ON E 63RD ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE 200.0 10/15/03 10/30/03 190,000 10/01/03 11/03/03 164,675 100
GROVE AVE
300 06 0204 / 5327 E 63RD ST AND S COTTAGE GROVE AVE 8.0 08/10/01 08/10/01 2,960 12/04/01 12/05/01 2,960 100
805 06 2823 / 9009 1405 E 63RD ST 26.0 05/04/93 05/04/93 0 05/04/93 05/04/93 19,500 100
805 06 2965 / 9151 1405 E 64TH ST 26.0 02/24/94 02/24/94 0 02/24/94 02/24/94 19,500 100
805 06 2898 / 9084 1405 E 65TH ST 26.0 10/19/93 10/19/93 0 10/19/93 10/19/93 19,500 100
805 06 2370 / 8556 107 E GARFIELD BLVD 14.0 03/24/93 03/24/93 0 03/24/93 03/24/93 10,500 100
805 06 2393 / 8579 107 E GARFIELD BLVD 14.0 03/24/93 03/24/93 0 03/24/93 03/24/93 10,500 100
805 06 2797 / 8983 390 E MARQUETTE RD 33.0 06/21/94 06/21/94 0 06/21/94 06/21/94 24,750 100
805 06 2798 / 8984 390 E MARQUETTE RD 14.0 06/30/94 06/30/94 0 06/30/94 06/30/94 10,500 100
805 06 2466 / 8652 1398 E MARQUETTE RD 30.0 11/02/93 11/02/93 0 11/02/93 11/02/93 22,500 100
805 06 2832 / 9018 4995 S ABERDEEN ST 12.0 06/01/94 06/01/94 0 06/01/94 06/01/94 9,000 100
805 06 2137 / 8323 4905 S ASHLAND AVE 8.0 01/31/94 01/31/94 0 01/31/94 01/31/94 6,000 100
805 06 2618 / 8804 6720 S DR MARTIN LUTHER KING JR DR 16.0 10/27/94 10/27/94 0 10/27/94 10/27/94 12,000 100
805 06 2413 / 8599 6731 S DR MARTIN LUTHER KING JR DR 17.0 11/27/95 11/27/95 0 11/27/95 11/27/95 12,750 100
805 06 2414 / 8600 6731 S DR MARTIN LUTHER KING JR DR 21.0 11/27/95 11/27/95 0 11/27/95 11/27/95 15,750 100
805 06 2795 / 8981 4901 S HERMITAGE AVE 2.0 03/23/94 03/23/94 0 03/23/94 03/23/94 1,500 100
805 06 2573 / 8759 4905 S LAFLIN ST 4.0 03/15/95 03/15/95 0 03/15/95 03/15/95 3,000 100
805 06 2249 / 8435 4901 S LOOMIS BLVD 8.0 11/09/93 11/09/93 0 11/09/93 11/09/93 6,000 100
805 06 2557 / 8743 6105 S PRINCETON AVE 8.0 04/20/95 04/20/95 0 04/20/95 04/20/95 6,000 100
805 06 2234 / 8420 4901 S RACINE AVE 8.0 01/11/94 01/11/94 0 01/11/94 01/11/94 6,000 100
300 06 0217 / 5337 5859 S STATE ST 420.0 03/17/04 03/22/04 23,607 01/22/04 01/27/04 16,799 100
805 06 2809 / 8995 6305 S STATE ST 52.0 06/07/93 06/07/93 0 06/07/93 06/07/93 39,000 100
302 00 0071 / 5759 6440 S STATE ST 0 12/27/98 01/07/99 36,078 100
805 06 2514 / 8700 6505 S STATE ST 8.0 04/29/93 04/29/93 0 04/29/93 04/29/93 6,000 100
805 06 2516 / 8702 6505 S STATE ST 8.0 04/19/93 04/19/93 0 04/19/93 04/19/93 6,000 100
805 06 2810 / 8996 4901 S THROOP ST 8.0 06/01/94 06/01/94 0 06/01/94 06/01/94 6,000 100
805 06 2183 / 8369 6299 S WENTWORTH AVE 12.0 04/08/93 04/08/93 0 04/08/93 04/08/93 9,000 100
805 06 2185 / 8371 6299 S WENTWORTH AVE 14.0 03/28/97 03/28/97 0 03/28/97 03/28/97 10,500 100
805 06 2239 / 8425 6501 S WENTWORTH AVE 24.0 04/08/93 04/08/93 0 04/08/93 04/08/93 18,000 100
805 06 2827 / 9013 6200 S YALE AVE 11.0 04/28/94 04/28/94 0 04/28/94 04/28/94 8,250 100
805 06 2679 / 8865 101 W 57TH PL 12.0 07/22/94 07/22/94 0 07/22/94 07/22/94 9,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 218

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0072 / 5760 100 W 59TH ST 1.0 0 01/18/00 02/02/00 14,424 100
805 06 2749 / 8935 101 W 59TH ST 18.0 01/02/92 01/02/92 0 01/02/92 01/02/92 13,500 100
805 06 2680 / 8866 101 W 60TH ST 12.0 07/22/94 07/22/94 0 07/22/94 07/22/94 9,000 100
805 06 2845 / 9031 305 W 61ST PL 12.0 07/15/94 07/15/94 0 07/15/94 07/15/94 9,000 100
805 06 2682 / 8868 118 W 61ST ST 30.0 08/02/94 08/02/94 0 08/02/94 08/02/94 22,500 100
805 06 2825 / 9011 599 W 61ST ST 8.0 01/13/93 01/13/93 0 01/13/93 01/13/93 6,000 100
302 00 0071 / 5759 30 W 63RD ST 0 09/01/98 09/09/98 35,446 100
302 00 0071 / 5759 50 W 63RD ST 0 08/22/98 08/28/98 11,638 100
302 00 0071 / 5759 110 W 63RD ST 0 08/15/98 08/17/98 1,940 100
302 00 0071 / 5759 120 W 63RD ST 0 08/01/98 08/12/98 23,053 100
805 06 2808 / 8994 139 W 63RD ST 12.0 07/19/91 07/19/91 0 07/19/91 07/19/91 9,000 100
805 06 2831 / 9017 139 W 63RD ST 12.0 07/19/91 07/19/91 0 07/19/91 07/19/91 9,000 100
805 06 2834 / 9020 139 W 63RD ST 8.0 07/19/91 07/19/91 0 07/19/91 07/19/91 6,000 100
805 06 2269 / 8455 199 W 63RD ST 8.0 01/11/94 01/11/94 0 01/11/94 01/11/94 6,000 100
805 06 2286 / 8472 220 W 63RD ST 8.0 01/11/94 01/11/94 0 01/11/94 01/11/94 6,000 100
805 06 2848 / 9034 599 W ENGLEWOOD AVE 8.0 01/21/93 01/21/93 0 01/21/93 01/21/93 6,000 100

Totals per Underpass Lighting 1,201.0 216,567 736,013


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 219

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S INDIANA AVE AND E 69TH ST .50 0 05/21/02 05/21/02 3,662 100
210 06 0130 / 4389 S SOUTH CHICAGO AVE AND S KEEFE AVE .50 0 04/30/02 04/30/02 925 100

Totals per LED Signal Head Install 1.0 0 4,587

Work Type: New Signal Locations


210 06 0075 / 4339 E 57TH ST AND S MICHIGAN AVE 07/01/04 09/01/04 124,500 07/01/04 09/17/04 104,604 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S COTTAGE GROVE AVE AND E 63RD ST 3.0 03/20/01 04/20/01 12,000 03/14/01 04/07/01 7,563 100
300 06 0197 / 5322 S DR MARTIN LUTHER KING JR DR AND E 65TH ST 1.0 03/02/01 04/20/01 4,000 03/02/01 04/09/01 1,462 100
300 06 0197 / 5322 S ST LAWRENCE AVE AND E 63RD ST 3.0 03/20/01 04/20/01 12,000 03/08/01 03/21/01 9,066 100
300 06 0197 / 5322 S ST LAWRENCE AVE AND E 67TH ST 1.0 03/20/01 04/20/01 4,000 03/13/01 04/09/01 5,321 100

Totals per Removal Temp Wiring - Signals 8.0 32,000 23,412

Work Type: Signals Intersections


300 06 0096 / 5258 5859 S STATE ST 71.0 08/05/03 08/13/03 0 08/07/03 08/13/03 11,227 100

Totals per Traffic 156,500 143,830

Totals per Construction Phase 1,679,570 2,043,259

Totals for Ward 20 1,680,570 2,043,643


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 220

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON S ADA ST FROM W 81ST ST TO W 83RD ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,231 100
300 06 / 32146 ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE .0 05/01/07 10/31/07 1,950 06/21/07 07/19/07 1,000 100
300 06 0275 / 5383 ON W 88TH ST FROM S HARVARD AVE TO S HOLLAND RD .0 10/01/04 06/30/05 0 10/01/04 06/30/05 2,713 100
210 10 0025 / 4565 W 103RD ST AND S VINCENNES AVE .0 03/01/03 06/25/02 0 03/01/03 06/25/02 1,332 100
210 10 0025 / 4565 W 105TH ST AND S VINCENNES AVE .0 03/01/03 12/31/04 0 03/01/03 12/31/04 1,999 100
210 10 0025 / 4565 W 107TH ST AND S VINCENNES AVE .0 03/01/03 12/31/04 0 03/01/03 12/31/04 1,999 100
210 06 0243 / 4480 W 95TH ST AND S LAFAYETTE AVE .0 01/10/07 02/01/07 700 01/01/07 01/26/07 2,549 100
210 06 0243 / 4480 W 98TH PL AND S HALSTED ST .0 0 0 0
300 06 / 32275 8900-9100 S CARPENTER ST .0 03/01/07 10/31/07 3,900 02/21/07 03/21/07 2,277 100
300 06 / 32021 7600-7900 S THROOP ST .0 09/12/06 09/18/06 0 09/12/06 09/18/06 0 0
300 06 0315 / 5421 201 W 95TH ST .0 01/26/07 08/06/07 15,000 01/26/07 03/27/07 7,500 100

Project finished on 3/26/2007 Note Last Updated on 11-FEB-08


Electronic Files with proposed drives & work received on Jan 24th, 2007 Note Last Updated on 26-JAN-07
Totals per Design/Engineering .0 21,550 23,599
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 221

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON S GREEN ST FROM W 80TH ST TO W 83RD ST 13.0 01/10/03 01/10/03 5,200 01/07/03 01/07/03 2,758 100
300 06 0069 / 5233 ON S MARSHFIELD AVE FROM W 81ST ST TO W 83RD ST 4.0 1,500 05/06/02 05/06/02 1,500 100
300 06 0069 / 5233 ON S PEORIA ST FROM W 80TH ST TO W 83RD ST 13.0 01/10/03 01/10/03 5,200 01/07/03 01/07/03 2,757 100
300 06 0069 / 5233 ON S SANGAMON ST FROM W 80TH ST TO W 83RD ST 13.0 01/10/03 01/10/03 5,200 01/07/03 01/07/03 2,758 100
300 06 0069 / 5233 ON S WALLACE ST FROM W 90TH ST TO W 92ND ST 7.0 01/04/03 01/04/03 2,800 12/31/02 12/31/02 1,073 100
300 06 0069 / 5233 8300 S ABERDEEN ST 5.0 05/11/02 05/11/02 1,050 05/08/02 05/08/02 1,015 100
300 06 0069 / 5233 8400 S ABERDEEN ST 4.0 03/03/02 03/03/02 840 02/28/02 02/28/02 812 100
300 09 / 33087 8000-8100 S EMERALD AVE 4.0 06/09/08 06/10/08 1,600 06/09/08 06/10/08 1,141 100

MATERIALS ORDERED 07/01/08 Note Last Updated on 01-JUL-08


300 09 / 33087 9408 S HARVARD AVE 1.0 11/05/08 11/05/08 400 11/05/08 11/05/08 265 100
302 00 0092 / 5774 8801 S HONORE ST 1.0 0 08/20/01 08/20/01 206 100
302 00 0092 / 5774 8815 S HONORE ST 1.0 0 08/20/01 08/20/01 206 100
300 06 0069 / 5233 8800 S LOOMIS ST 4.0 01/10/03 01/10/03 1,600 01/07/03 01/07/03 1,500 100
300 06 0069 / 5233 8800 S LOWE AVE 4.0 01/10/03 01/10/03 1,600 01/07/03 01/07/03 1,500 100
302 00 0092 / 5774 8900-8999 S LOWE AVE 5.0 10/16/01 10/16/01 1,029 09/29/01 09/29/01 1,029 100
302 00 0092 / 5774 8101 S MARSHFIELD AVE 1.0 0 01/18/02 01/18/02 203 100
302 00 0092 / 5774 8201 S MARSHFIELD AVE 1.0 0 01/18/02 01/18/02 203 100
300 06 0069 / 5233 8400 S PEORIA ST 4.0 01/10/03 01/10/03 1,600 01/07/03 01/07/03 1,500 100
300 09 / 33087 8817 S PRINCETON AVE 1.0 11/05/08 11/05/08 400 11/05/08 11/05/08 261 100
300 09 / 33087 8833 S PRINCETON AVE 1.0 11/05/08 11/05/08 400 11/05/08 11/05/08 261 100
300 09 / 33087 9334 S STEWART AVE 1.0 11/05/08 11/05/08 400 11/05/08 11/05/08 265 100
300 09 / 33087 8100-8300 S THROOP ST 10.0 02/01/08 12/31/08 4,000 10/30/08 10/30/08 4,000 100
302 00 0092 / 5774 9337 S THROOP ST 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 8700-8799 S WALLACE ST 15.0 11/10/01 11/12/01 4,116 10/03/01 10/03/01 3,090 100
300 06 0069 / 5233 9000 S WALLACE ST 5.0 07/05/02 07/05/02 1,050 07/02/02 07/02/02 1,073 100
300 06 0069 / 5233 1300 W 88TH ST 4.0 01/10/03 01/10/03 1,600 01/07/03 01/07/03 1,343 100
300 06 0069 / 5233 1400 W 88TH ST 4.0 01/10/03 01/10/03 1,600 01/07/03 01/07/03 1,343 100
300 09 / 33087 245 W 91ST ST 1.0 11/05/08 11/05/08 400 11/05/08 11/05/08 265 100
300 09 / 33087 226 W 94TH ST 2.0 11/05/08 11/05/08 800 11/05/08 11/05/08 530 100

Totals per 250 Watt Changeout 130.0 44,621 33,093


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 222

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0204 / 5327 W 91ST ST AND S ABERDEEN ST 2.0 08/08/01 08/08/01 1,600 09/29/01 09/29/01 640 100
805 06 0856 / 7042 9863 S BEVERLY AVE 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 1636 / 7822 10246 S ELIZABETH ST 1.0 06/07/96 06/07/96 0 06/07/96 06/07/96 300 100
805 06 1644 / 7830 8241 S GREEN ST 1.0 08/29/97 08/29/97 0 08/29/97 08/29/97 300 100
302 00 0092 / 5774 8256 S HALSTED ST 1.0 0 12/10/01 12/10/01 236 100
300 06 0139 / 5289 9612 S HALSTED ST 2,279.0 03/01/06 09/01/06 52,018 04/01/06 04/16/06 68,858 100
805 06 1541 / 7727 9537 S LA SALLE ST 1.0 10/22/97 10/22/97 0 10/22/97 10/22/97 300 100
805 06 1810 / 7996 9211 S MAY ST 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100
805 06 0597 / 6783 9424 S PARNELL AVE 1.0 01/09/96 01/09/96 0 01/09/96 01/09/96 300 100
805 06 0546 / 6732 9119 S PAULINA ST 1.0 01/15/96 01/15/96 0 01/15/96 01/15/96 300 100
805 06 0428 / 6614 8440 S THROOP ST 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 0367 / 6553 8005 S UNION AVE 1.0 11/08/96 11/08/96 0 11/08/96 11/08/96 300 100
805 06 1796 / 7982 8019 S UNION AVE 1.0 04/09/97 04/09/97 0 04/09/97 04/09/97 300 100
302 00 0092 / 5774 1125 W 95TH ST 40.0 0 01/16/01 01/24/02 9,426 100

Totals per Alley Lighting/Lamps 2,332.0 53,618 82,160

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 9612 S HALSTED ST 2,069.0 06/01/07 12/31/07 60,911 11/15/07 01/11/08 59,069 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 1125 W 95TH ST 1,943.0 0 08/15/02 09/01/02 35,378 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 LOWDEN HOMES 06/16/01 06/27/01 50,891 06/06/01 06/18/01 50,891 100
300 06 0071 / 5234 8223 S PRINCETON AVE 07/13/98 09/15/98 11,600 07/13/98 09/15/98 4,918 100

Totals per Flood Light Install 62,491 55,809

Work Type: Lighting Imprvmnts Blocks


281 00 / 32154 7600-7900 S THROOP ST .0 12/08/06 12/31/06 0 12/08/06 12/31/06 0 0
300 06 0315 / 5421 201 W 95TH ST .0 04/02/07 04/30/08 255,600 04/19/07 05/08/07 226,958 100

Totals per Lighting Imprvmnts .0 255,600 226,958


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 223

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0122 / 5275 9450 S NORMAL AVE 1.0 05/12/03 05/14/03 3,900 05/01/03 05/02/03 2,601 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 9612 S HALSTED ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0308 / 5414 ON S ADA ST FROM W 81ST ST TO W 83RD ST 2.0 04/24/06 07/21/06 145,193 04/24/06 07/21/06 143,850 100
300 06 0298 / 5405 ON S LAFLIN ST FROM W 79TH ST TO W 81ST ST 2.0 09/01/05 10/15/05 0 08/02/05 12/19/05 124,705 100
300 06 / 32146 ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE 2.0 12/05/07 04/29/08 158,512 0 50
300 06 / 32275 8900-9100 S CARPENTER ST 2.0 04/01/07 12/31/07 162,645 04/05/07 07/02/07 96,306 100

Totals per Residntl Staggered Lighting 8.0 466,350 364,861

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0253 / 5363 SIMEON CPS 08/01/03 08/29/03 135,000 07/18/03 10/31/03 125,667 100
300 06 0232 / 5346 ON S HERMITAGE AVE FROM W 87TH ST TO W 88TH ST 2.0 11/20/02 02/14/03 146,400 12/02/02 02/07/03 130,267 100
300 06 0267 / 5375 ON S LOWE AVE FROM W 88TH ST TO W 90TH ST 2.0 10/15/04 12/15/04 181,968 10/18/04 12/14/04 127,930 100
300 06 0235 / 5349 ON S MAY ST FROM W 89TH ST TO W 91ST ST 2.0 03/19/03 05/14/03 166,598 03/19/03 05/16/03 149,337 100

Totals per Residntl Strt Lighting/Lamps 6.0 629,966 533,201

Work Type: Residntl Strt Lighting/Lamps Installations


300 06 / 32021 7600-7900 S THROOP ST .0 09/18/06 09/29/06 0 09/18/06 09/29/06 0 0

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 8100 S GREEN ST 1.0 0 05/24/01 05/24/01 378 100
302 00 0092 / 5774 8715 S WALLACE ST 1.0 0 06/15/01 06/15/01 378 100

Totals per Short Arm Installs - Residntl 2.0 0 756

Totals per Lighting/Electrical 2,312,612 2,295,956


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 224

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 04 0216 / 5114 ON S ASHLAND AVE FROM W 93RD ST TO W 95TH ST 31.0 05/01/06 11/01/06 6,705 05/17/06 09/01/06 6,705 100
300 04 0216 / 5114 ON S VINCENNES AVE FROM W 79TH ST TO W 81ST ST 14.0 05/01/06 11/01/06 3,028 05/17/06 07/01/06 3,028 100
302 00 0076 / 5764 ON W 95TH ST FROM S BEVERLY AVE TO S WESTERN AVE 7.32 04/14/98 04/21/98 0 04/14/98 04/21/98 124 100
300 06 0108 / 5263 8800 S ABERDEEN ST 4.0 11/25/03 11/25/03 800 11/15/03 11/16/03 560 100
302 00 0076 / 5764 8000-8100 S LAFLIN ST 18.0 05/17/98 05/18/98 0 05/17/98 05/18/98 306 100
300 06 0108 / 5263 9200 S LAFLIN ST 4.0 11/25/03 11/25/03 1,000 11/15/03 11/16/03 560 100

Totals per Strt Light Pole Painting 78.32 11,533 11,283

Work Type: Strt Lighting Blocks


300 06 0264 / 5372 CUFFE CPS 1.0 0 07/15/03 08/15/03 19,603 100
300 06 0246 / 5356 ON S GENOA AVE FROM W 95TH ST TO W 96TH ST 1.0 08/01/04 10/01/04 102,084 09/07/04 06/14/05 86,479 100
300 06 0246 / 5356 ON S RACINE AVE FROM W 97TH PL TO W 98TH ST .50 08/01/04 11/01/04 102,083 09/07/04 06/20/05 86,479 100
300 06 0246 / 5356 ON S SANGAMON ST FROM W 95TH ST TO W 94TH ST 1.0 08/01/04 11/01/04 102,083 09/07/04 12/04/04 86,479 100
300 06 0275 / 5383 ON W 88TH ST FROM S HARVARD AVE TO S HOLLAND RD .75 85,000 08/29/05 01/10/06 54,822 100
300 06 0246 / 5356 ON W 92ND ST FROM S SANGAMON ST TO S PEORIA ST .50 08/01/04 11/01/04 102,083 09/07/04 06/28/05 86,479 100
300 06 0246 / 5356 ON W 94TH ST FROM S SANGAMON ST TO S PEORIA ST .50 08/01/04 11/01/04 102,083 09/07/04 12/04/04 86,479 100
300 06 0246 / 5356 ON W 96TH ST FROM S VINCENNES AVE TO S HALSTED ST 3.50 08/01/04 11/01/04 102,084 09/07/04 06/28/05 86,479 100

Totals per Strt Lighting 8.75 697,500 593,299

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 9612 S HALSTED ST 1,705.0 03/01/04 12/01/04 8,866 07/31/06 08/16/06 18,567 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 225

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2258 / 8444 8501 S HALSTED ST 68.0 09/04/96 09/04/96 0 09/04/96 09/04/96 51,000 100
805 06 2945 / 9131 8699 S HOLLAND RD 20.0 12/28/93 12/28/93 0 12/28/93 12/28/93 15,000 100
805 06 2944 / 9130 8901 S MORGAN ST 4.0 12/21/93 12/21/93 0 12/21/93 12/21/93 3,000 100
805 06 2236 / 8422 9022 S STATE ST 16.0 05/09/96 05/09/96 0 05/09/96 05/09/96 12,000 100
805 06 2237 / 8423 9022 S STATE ST 8.0 05/09/96 05/09/96 0 05/09/96 05/09/96 6,000 100
805 06 2238 / 8424 9022 S STATE ST 11.0 05/09/96 05/09/96 0 05/09/96 05/09/96 8,250 100
805 06 2218 / 8404 8301 S VINCENNES AVE 78.0 12/18/96 12/18/96 0 12/18/96 12/18/96 58,500 100
302 00 0072 / 5760 8320 S VINCENNES AVE 1.0 0 05/01/00 05/03/00 8,748 100
805 06 2222 / 8408 8698 S VINCENNES AVE 34.0 12/09/96 12/09/96 0 12/09/96 12/09/96 25,500 100
805 06 2942 / 9128 8899 S VINCENNES AVE 18.0 03/20/94 03/20/94 0 03/20/94 03/20/94 13,500 100
805 06 2889 / 9075 625 W 80TH ST 18.0 03/04/94 03/04/94 0 03/04/94 03/04/94 13,500 100
805 06 2097 / 8283 695 W 81ST ST 16.0 02/17/93 02/17/93 0 02/17/93 02/17/93 12,000 100
805 06 2221 / 8407 285 W 87TH ST 24.0 04/27/93 04/27/93 0 04/27/93 04/27/93 18,000 100
805 06 2220 / 8406 335 W 87TH ST 20.0 04/22/93 04/22/93 0 04/22/93 04/22/93 15,000 100
805 06 2946 / 9132 335 W 88TH ST 8.0 12/21/93 12/21/93 0 12/21/93 12/21/93 6,000 100
300 06 0217 / 5337 1125 W 95TH ST 307.0 04/13/04 04/16/04 17,256 12/09/03 12/11/03 12,923 100

Totals per Underpass Lighting 651.0 17,256 278,921


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 226

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 S ASHLAND AVE AND W 83RD ST .50 05/04/05 05/04/05 5,327 05/06/05 05/06/05 0 100
210 06 0219 / 4459 S ASHLAND AVE AND W 87TH ST 1.0 05/03/05 05/03/05 10,653 05/05/04 05/04/05 0 100

Totals per LED Signal Head Install 1.50 15,980 0

Work Type: New Signal Locations


300 06 0283 / 5391 S HALSTED ST AND W 91ST ST 1.0 09/02/04 09/30/04 9,293 09/09/04 09/09/04 9,293 100

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W 95TH ST AND S LAFAYETTE AVE .0 03/27/06 12/27/08 12,000 0 0

Showing jcs funding for drafting dept. only. job not yet issued Note Last Updated on 29-JAN-08
210 06 0243 / 4480 W 98TH PL AND S HALSTED ST .0 04/01/06 04/01/07 0 0 0

Totals per Pedestrian Countdown Signal Install .0 12,000 0

Work Type: Signals Intersections


300 06 0096 / 5258 9245 S ASHLAND AVE 51.0 08/08/03 08/12/03 0 08/03/03 08/10/03 8,064 100

Work Type: TSM Install Locations


814 06 0063 / 16279 9100 S HALSTED ST 1.0 02/21/96 02/21/96 0 02/21/96 02/21/96 112,063 100
814 06 0375 / 16565 9099 S VINCENNES AVE 1.0 02/28/96 02/28/96 0 02/28/96 02/28/96 75,026 100
814 06 0166 / 16378 8700 S WALLACE ST 1.0 08/28/97 12/11/97 0 08/28/97 12/11/97 200,000 100
271 00 0039 / 4788 8700 S WOOD ST 1.0 0 07/20/98 09/30/98 15,000
814 06 0248 / 16460 140 W 87TH ST 1.0 12/29/89 12/29/89 0 12/29/89 12/29/89 84,322 100

Totals per TSM Install 5.0 0 486,411

Totals per Traffic 37,273 503,768

Totals per Construction Phase 2,349,885 2,799,724

Totals for Ward 21 2,371,435 2,823,323


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 227

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 3,137 100
210 06 0023 / 4298 W 26TH ST AND S KEELER AVE .0 02/06/02 04/02/02 0 02/06/02 04/02/02 0 0

Totals per Design/Engineering .0 0 3,137


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 228

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 03 0012 / 4883 ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE .30 10/01/04 10/10/04 117 10/08/04 10/19/04 67 100
300 03 0022 / 4893 2500 S ST LOUIS AVE 1,010.0 07/18/04 08/11/04 400,750 07/23/04 10/07/04 226,080 100

Totals per 250 Watt Changeout 1,010.30 400,867 226,147

Work Type: 400 Watt Changeout Fixtures


300 06 0225 / 5340 MCCORMICK SCHOOL CPS 31.0 08/16/04 08/27/04 12,707 08/16/04 08/27/04 9,193 100
300 06 0251 / 5361 MCCORMICK SCHOOL CPS 4.0 08/16/04 08/27/04 1,693 08/16/04 08/27/04 1,694 100
300 05 0022 / 5137 ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE 37.0 04/04/05 11/18/05 14,800 07/28/05 08/01/05 12,950 100

Totals per 400 Watt Changeout 72.0 29,200 23,837

Totals per Lighting/Electrical 1,715,181 1,493,305


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 229

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0826 / 7012 2520 S AVERS AVE 1.0 04/23/96 04/23/96 0 04/23/96 04/23/96 300 100
805 06 0844 / 7030 3133 S AVERS AVE 1.0 06/21/96 06/21/96 0 06/21/96 06/21/96 300 100
805 06 0814 / 7000 2444 S CENTRAL PARK AVE 1.0 06/21/96 06/21/96 0 06/21/96 06/21/96 300 100
805 06 1930 / 8116 2502 S CHRISTIANA AVE 1.0 03/29/96 03/29/96 0 03/29/96 03/29/96 300 100
805 06 1714 / 7900 2840 S CHRISTIANA AVE 1.0 06/18/97 06/18/97 0 06/18/97 06/18/97 300 100
805 06 0742 / 6928 2637 S DRAKE AVE 1.0 03/29/96 03/29/96 0 03/29/96 03/29/96 300 100
805 06 1080 / 7266 2522 S HAMLIN AVE 1.0 06/26/96 06/26/96 0 06/26/96 06/26/96 300 100
805 06 1053 / 7239 2536 S HAMLIN AVE 1.0 06/26/96 06/26/96 0 06/26/96 06/26/96 300 100
805 06 1163 / 7349 2430 S KEDZIE AVE 1.0 04/18/96 04/18/96 0 04/18/96 04/18/96 300 100
805 06 1170 / 7356 2818 S KEELER AVE 1.0 03/27/96 03/27/96 0 03/27/96 03/27/96 300 100
805 06 1565 / 7751 2652 S KOLIN AVE 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
805 06 1713 / 7899 2722 S LAWNDALE AVE 1.0 06/18/97 06/18/97 0 06/18/97 06/18/97 300 100
805 06 1548 / 7734 3221 S LAWNDALE AVE 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 0568 / 6754 3231 S PULASKI RD 1.0 01/24/96 01/24/96 0 01/24/96 01/24/96 300 100
805 06 1463 / 7649 3211 S SPRINGFIELD AVE 1.0 12/03/97 12/03/97 0 12/03/97 12/03/97 300 100
300 06 0139 / 5289 2500 S ST LOUIS AVE 1,162.0 03/01/06 09/01/06 25,405 04/01/06 04/15/06 35,109 100
302 00 0092 / 5774 2500 S ST LOUIS AVE 8.0 0 01/18/01 01/04/02 1,885 100
805 06 0954 / 7140 3924 W 24TH ST 1.0 03/22/95 03/22/95 0 03/22/95 03/22/95 300 100
302 00 0092 / 5774 3926 W 24TH ST 1.0 0 10/23/01 10/23/01 236 100
805 06 1733 / 7919 4008 W 26TH ST 1.0 06/05/97 06/05/97 0 06/05/97 06/05/97 300 100

Totals per Alley Lighting/Lamps 1,188.0 25,405 42,330

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 2512 S ST LOUIS AVE 1,231.0 06/01/07 12/31/07 36,240 09/01/07 10/01/07 35,145 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2500 S ST LOUIS AVE 1,096.0 0 06/04/02 06/07/02 19,956 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 2643 S CENTRAL PARK AVE 2.0 0 01/09/99 01/09/99 702 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 230

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Blocks
300 06 0078 / 5241 ON S PULASKI RD FROM W 25TH ST TO W 27TH ST 1.0 04/01/98 12/01/98 12,500 01/28/99 07/16/99 20,660 100

Work Type: Ornamental - Piggyback Lighting Fixtures


300 03 0022 / 4893 ON S KOLIN AVE FROM W 26TH ST TO W 27TH ST 10.0 05/06/04 05/06/04 13,500 05/06/04 05/11/04 1,443 100
300 06 0122 / 5275 ON W 26TH ST FROM S KOLIN AVE TO S PULASKI RD 44.0 12/10/03 12/25/03 52,800 12/08/03 12/12/03 51,509 100
300 06 0069 / 5233 ON W 26TH ST FROM S KOSTNER AVE TO S KOLIN AVE 58.0 12/20/02 01/09/03 72,500 12/28/02 02/28/03 70,097 100
300 06 0069 / 5233 ON W 26TH ST FROM S PULASKI RD TO S KEDZIE AVE 29.0 12/20/02 01/09/03 36,250 12/28/02 02/28/03 35,049 100
300 05 0022 / 5137 ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE 26.0 04/04/05 11/18/05 35,100 07/28/05 08/01/05 36,510 100

Totals per Ornamental - Piggyback Lighting 167.0 210,150 194,608

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2500 S ST LOUIS AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0308 / 5414 ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST 2.0 03/22/06 05/01/06 197,681 03/22/06 05/17/06 160,213 100
300 07 0022 / 5445 ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST 2.0 03/16/06 05/17/06 50,000 03/16/06 05/17/06 50,000 100
300 09 / 33088 ON S CENTRAL PARK AVE FROM W 26TH ST TO W CERMAK RD 4.0 30,000 04/01/08 12/01/08 0 0
300 06 0298 / 5405 ON S LAWNDALE AVE FROM W 24TH ST TO W 25TH ST 2.0 06/25/05 07/25/05 0 05/08/05 07/08/05 127,917 100

Totals per Residntl Staggered Lighting 10.0 277,681 338,130

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON S LAWNDALE AVE FROM W 26TH ST TO W 27TH ST 2.0 08/01/04 10/01/04 215,545 08/16/04 10/06/04 155,750 100
300 06 0235 / 5349 ON S LAWNDALE AVE FROM W 28TH ST TO W 30TH ST 2.0 08/15/03 10/15/03 163,727 07/23/03 10/01/03 139,874 100

Totals per Residntl Strt Lighting/Lamps 4.0 379,272 295,624

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 2735 S KOLIN AVE 1.0 0 03/01/01 03/01/01 378 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 231

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0225 / 5340 MCCORMICK SCHOOL CPS 35.0 08/16/04 08/27/04 8,750 08/16/04 08/27/04 7,776 100
300 06 0108 / 5263 ON W 26TH ST FROM S KOLIN AVE TO S PULASKI RD 42.0 12,500 10/10/03 10/30/03 10,360 100
300 05 0022 / 5137 ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE 97.0 04/04/05 11/18/05 24,250 07/25/05 08/08/05 19,251 100

Totals per Strt Light Pole Painting 174.0 45,500 37,387

Work Type: Strt Lighting Blocks


300 06 0246 / 5356 ON S KOSTNER AVE FROM W 31ST ST TO W 33RD ST 2.0 188,250 05/22/05 09/02/05 86,189 100
300 06 0247 / 5357 ON W 30TH ST FROM S KILBOURN AVE TO S KOSTNER AVE 2.0 04/28/03 06/30/03 100,000 04/22/03 07/07/03 99,166 100

Totals per Strt Lighting 4.0 288,250 185,355

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2500 S ST LOUIS AVE 951.0 03/01/04 12/01/04 4,945 07/31/06 09/21/06 10,356 100

Work Type: Underpass Lighting Fixtures


805 06 2198 / 8384 3100 S KEDZIE AVE 6.0 03/10/94 03/10/94 0 03/10/94 03/10/94 4,500 100
805 06 2621 / 8807 2399 S KEELER AVE 10.0 04/29/93 04/29/93 0 04/29/93 04/29/93 7,500 100
805 06 2422 / 8608 2495 S KOSTNER AVE 12.0 12/14/95 12/14/95 0 12/14/95 12/14/95 9,000 100
805 06 2620 / 8806 2395 S PULASKI RD 12.0 02/01/95 02/01/95 0 02/01/95 02/01/95 9,000 100
300 06 0217 / 5337 2600 S ST LOUIS AVE 92.0 03/12/04 03/16/04 5,171 12/12/03 12/12/03 4,190 100
805 06 2948 / 9134 4405 W 26TH ST 8.0 01/05/94 01/05/94 0 01/05/94 01/05/94 6,000 100
805 06 2348 / 8534 4501 W CERMAK RD 16.0 03/09/93 03/09/93 0 03/09/93 03/09/93 12,000 100
805 06 2955 / 9141 4400 W OGDEN AVE 14.0 12/12/95 12/12/95 0 12/12/95 12/12/95 10,500 100

Totals per Underpass Lighting 170.0 5,171 62,690


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 232

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Removal Temp Wiring - Signals Crossings
300 06 0197 / 5322 S CENTRAL PARK AVE AND W 25TH ST 3.0 12,000 06/26/01 04/08/02 209 100
300 06 0197 / 5322 W 28TH ST AND S KEDZIE AVE .50 2,000 06/19/01 08/01/01 153 100

Totals per Removal Temp Wiring - Signals 3.50 14,000 362

Work Type: Signals Intersections


300 06 0096 / 5258 2500 S ST LOUIS AVE 28.0 09/28/03 10/07/03 0 09/02/03 09/09/03 4,427 100

Work Type: TSM Install Locations


210 06 0020 / 4295 S HAMLIN AVE AND W 26TH ST 02/01/00 03/15/00 150,000 12/09/99 02/14/00 105,000 100
210 06 0022 / 4297 W 25TH ST AND S CENTRAL PARK AVE 1.0 11/07/02 04/15/03 178,000 11/01/02 01/31/03 110,835 100
210 06 0023 / 4298 W 26TH ST AND S KEELER AVE 1.0 08/25/03 11/15/03 170,700 08/22/03 10/10/03 132,551 100
814 06 0113 / 16328 3100 S HAMLIN AVE 1.0 04/29/93 04/29/93 0 04/29/93 04/29/93 83,958 100
271 00 0045 / 4794 2500 S PULASKI RD 1.0 125,660 08/01/97 08/15/99 125,660 100
814 06 0256 / 16468 2800 S PULASKI RD 1.0 08/17/89 08/17/89 0 08/17/89 08/17/89 74,970 100

Totals per TSM Install 5.0 624,360 632,974

Work Type: Traffic Equipment Painting Locations


300 05 0022 / 5137 ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE 14.0 04/04/05 11/18/05 5,650 07/25/05 08/08/05 5,191 100

Totals per Traffic 644,010 642,954

Totals per Construction Phase 2,359,191 2,136,259

Totals for Ward 22 2,359,191 2,139,396


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 233

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32969 ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST .0 10/17/07 11/30/07 0 0 0
300 06 0308 / 5414 ON S LATROBE AVE FROM W 54TH ST TO W 55TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,336 100
300 06 0308 / 5414 ON S LOCKWOOD AVE FROM W 54TH ST TO W 55TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,336 100
300 06 / 32277 ON S MAJOR AVE FROM W 51ST ST TO W 53RD ST .0 04/01/08 08/30/08 0 0 0
300 06 / 32277 ON W 53RD ST FROM S MASSASOIT AVE TO S PARKSIDE AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32146 ON W 63RD PL FROM S SAYRE AVE TO S OAK PARK AVE .0 05/01/07 10/31/07 3,900 06/21/07 07/19/07 3,756 100
300 06 / 32146 ON W 64TH ST FROM S SAYRE AVE TO S OAK PARK AVE .0 05/01/07 10/31/07 0 0 100
210 06 0127 / 4386 W 55TH ST AND S KILBOURN AVE .50 11/01/06 11/20/06 2,500 01/17/07 1,593 15
210 06 0187 / 4432 W 63RD ST AND S LATROBE AVE .50 11/15/03 02/15/04 0 11/15/03 02/15/04 2,063 100
300 06 0292 / 5399 5000 W 55TH ST 1.0 01/11/05 01/20/05 1,500 01/11/05 01/20/05 615 100

Totals per Design/Engineering 2.0 7,900 10,699


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 234

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON S LEAMINGTON AVE FROM W 46TH ST TO W 48TH ST 10.0 10/18/02 10/18/02 4,000 10/15/02 10/15/02 3,750 100
300 11 / 32212 ON S MCVICKER AVE FROM W 51ST ST TO W 52ND ST 5.0 01/11/08 01/04/08 2,200 01/04/08 01/04/08 1,545 100
300 03 0023 / 4894 ON S NASHVILLE AVE FROM W 51ST ST TO W 65TH ST 57.0 07/01/04 08/01/04 21,375 06/14/04 07/28/04 13,768 100
300 03 0023 / 4894 ON S NATCHEZ AVE FROM W 51ST ST TO W 65TH ST 56.0 07/01/04 08/01/04 21,000 06/14/04 07/28/04 13,526 100
300 03 0023 / 4894 ON S NEW ENGLAND AVE FROM W 51ST ST TO W 65TH ST 54.0 07/01/04 08/01/04 20,250 06/14/04 07/28/04 13,042 100
300 03 0023 / 4894 ON S NORMANDY AVE FROM W 51ST ST TO W 65TH ST 57.0 07/01/04 08/01/04 21,375 06/14/04 07/28/04 13,768 100
300 03 0023 / 4894 ON S SAYRE AVE FROM W 51ST ST TO W 65TH ST 34.0 07/01/04 08/01/04 12,750 06/14/04 07/28/04 8,212 100
300 03 0023 / 4894 ON W 53RD ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 6,375 06/14/04 07/28/04 4,107 100
300 03 0023 / 4894 ON W 54TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 18.0 07/01/04 08/01/04 6,750 06/14/04 07/28/04 4,347 100
300 03 0023 / 4894 ON W 56TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 6,375 06/14/04 07/28/04 4,107 100
300 03 0023 / 4894 ON W 57TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 6,375 06/14/04 07/28/04 4,107 100
300 03 0023 / 4894 ON W 58TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 6,375 06/14/04 07/28/04 4,107 100
300 03 0023 / 4894 ON W 59TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 15.0 07/01/04 08/01/04 5,625 06/14/04 07/28/04 3,623 100
300 03 0023 / 4894 ON W 60TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 16.0 07/01/04 08/01/04 6,000 06/14/04 07/28/04 3,865 100
300 03 0023 / 4894 ON W 61ST ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 13.0 07/01/04 08/01/04 4,875 06/14/04 07/28/04 3,141 100
300 03 0023 / 4894 ON W 62ND ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 23.0 07/01/04 08/01/04 8,625 06/14/04 07/28/04 5,659 100
300 03 0023 / 4894 ON W 64TH PL FROM S HARLEM AVE TO S NARRAGANSETT AVE 28.0 07/01/04 08/01/04 10,500 06/14/04 07/28/04 6,762 100
300 03 0023 / 4894 ON W 64TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 28.0 07/01/04 08/01/04 10,500 06/14/04 07/28/04 6,762 100
302 00 0092 / 5774 S MERRIMAC AVE AND W 62ND ST 1.0 10/04/01 10/05/01 205 10/05/01 10/09/01 205 100
300 06 0069 / 5233 5300 S KEATING AVE 5.0 1,875 09/25/02 09/25/02 1,875 100

Totals per 250 Watt Changeout 488.0 183,405 120,278

Work Type: 400 Watt Changeout Fixtures


300 09 / 33089 ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST 41.0 09/29/08 10/03/08 16,400 09/29/08 10/03/08 13,602 100
300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 14.85 12/01/07 01/01/08 5,940 11/28/07 02/15/08 5,297 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST 11.25 05/27/08 06/05/08 4,500 09/22/08 10/24/08 4,500 100
300 06 0069 / 5233 ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE 6.50 2,600 02/21/02 02/21/02 2,600 100
302 00 0092 / 5774 ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE 6.50 02/24/02 02/24/02 2,600 02/21/02 02/21/02 2,438 100
300 03 0014 / 4885 ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE 47.52 05/10/04 06/10/04 19,008 05/01/04 05/11/04 18,321 100
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 47.75 05/01/04 05/15/04 19,100 05/10/04 05/16/04 6,785 100

Totals per 400 Watt Changeout 175.37 70,148 53,543


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 235

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0714 / 6900 5102 S ARCHER AVE 1.0 12/11/96 12/11/96 0 12/11/96 12/11/96 300 100
805 06 0715 / 6901 5129 S ARCHER AVE 1.0 08/11/95 08/11/95 0 08/11/95 08/11/95 300 100
805 06 0717 / 6903 5151 S ARCHER AVE 1.0 08/11/95 08/11/95 0 08/11/95 08/11/95 300 100
805 06 0707 / 6893 5155 S ARCHER AVE 1.0 08/11/95 08/11/95 0 08/11/95 08/11/95 300 100
300 06 0139 / 5289 5838 S ARCHER AVE 2,400.0 03/01/06 09/01/06 54,637 06/26/06 07/14/06 72,514 100
302 00 0092 / 5774 5838 S ARCHER AVE 27.0 0 01/18/01 12/18/01 6,363 100
805 06 0865 / 7051 5433 S AUSTIN AVE 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 0770 / 6956 6054 S AUSTIN AVE 1.0 01/20/95 01/20/95 0 01/20/95 01/20/95 300 100
805 06 0864 / 7050 5426 S AVERS AVE 1.0 10/03/95 10/03/95 0 10/03/95 10/03/95 300 100
805 06 0378 / 6564 4620 S CICERO AVE 1.0 01/09/96 01/09/96 0 01/09/96 01/09/96 300 100
805 06 1355 / 7541 4906 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1446 / 7632 4922 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1347 / 7533 4936 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1328 / 7514 4958 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1310 / 7496 5022 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1291 / 7477 5040 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1302 / 7488 5050 S KEATING AVE 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 1200 / 7386 5129 S KENNETH AVE 1.0 07/20/95 07/20/95 0 07/20/95 07/20/95 300 100
805 06 1171 / 7357 5201 S KENNETH AVE 1.0 07/20/95 07/20/95 0 07/20/95 07/20/95 300 100
805 06 1172 / 7358 5221 S KENNETH AVE 1.0 07/20/95 07/20/95 0 07/20/95 07/20/95 300 100
805 06 1173 / 7359 5259 S KENNETH AVE 1.0 07/20/95 07/20/95 0 07/20/95 07/20/95 300 100
805 06 1021 / 7207 4901 S KILBOURN AVE 1.0 06/16/95 06/16/95 0 06/16/95 06/16/95 300 100
805 06 1479 / 7665 5420 S KILBOURN AVE 1.0 11/25/97 11/25/97 0 11/25/97 11/25/97 300 100
805 06 2032 / 8218 5141 S KILDARE AVE 1.0 07/25/95 07/25/95 0 07/25/95 07/25/95 300 100
805 06 2016 / 8202 5203 S KILDARE AVE 1.0 08/11/95 08/11/95 0 08/11/95 08/11/95 300 100
805 06 2055 / 8241 4822 S KILPATRICK AVE 1.0 09/21/95 09/21/95 0 09/21/95 09/21/95 300 100
805 06 2036 / 8222 4840 S KILPATRICK AVE 1.0 09/21/95 09/21/95 0 09/21/95 09/21/95 300 100
805 06 2037 / 8223 4858 S KILPATRICK AVE 1.0 09/21/95 09/21/95 0 09/21/95 09/21/95 300 100
805 06 2038 / 8224 4940 S KILPATRICK AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 2039 / 8225 5022 S KILPATRICK AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 2011 / 8197 5040 S KILPATRICK AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 236

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 2047 / 8233 4401 S KNOX AVE 1.0 04/26/95 04/26/95 0 04/26/95 04/26/95 300 100
805 06 2049 / 8235 4518 S KNOX AVE 1.0 06/13/95 06/13/95 0 06/13/95 06/13/95 300 100
805 06 2050 / 8236 4822 S KNOX AVE 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 2051 / 8237 4825 S KNOX AVE 1.0 01/11/96 01/11/96 0 01/11/96 01/11/96 300 100
805 06 2052 / 8238 4836 S KNOX AVE 1.0 08/22/95 08/22/95 0 08/22/95 08/22/95 300 100
805 06 1639 / 7825 4843 S KNOX AVE 1.0 08/26/97 08/26/97 0 08/26/97 08/26/97 300 100
805 06 1640 / 7826 4855 S KNOX AVE 1.0 08/26/97 08/26/97 0 08/26/97 08/26/97 300 100
805 06 2019 / 8205 4858 S KNOX AVE 1.0 08/22/95 08/22/95 0 08/22/95 08/22/95 300 100
805 06 2065 / 8251 4859 S KNOX AVE 1.0 01/11/96 01/11/96 0 01/11/96 01/11/96 300 100
805 06 2035 / 8221 4905 S KNOX AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 2010 / 8196 4921 S KNOX AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 1981 / 8167 4922 S KNOX AVE 1.0 08/22/95 08/22/95 0 08/22/95 08/22/95 300 100
805 06 1982 / 8168 4940 S KNOX AVE 1.0 09/07/95 09/07/95 0 09/07/95 09/07/95 300 100
805 06 1984 / 8170 4941 S KNOX AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 1985 / 8171 4958 S KNOX AVE 1.0 09/07/95 09/07/95 0 09/07/95 09/07/95 300 100
805 06 1986 / 8172 4959 S KNOX AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 1971 / 8157 5005 S KNOX AVE 1.0 09/12/95 09/12/95 0 09/12/95 09/12/95 300 100
805 06 1988 / 8174 5019 S KNOX AVE 1.0 09/07/95 09/07/95 0 09/07/95 09/07/95 300 100
805 06 2009 / 8195 5022 S KNOX AVE 1.0 09/07/95 09/07/95 0 09/07/95 09/07/95 300 100
805 06 1990 / 8176 5040 S KNOX AVE 1.0 09/07/95 09/07/95 0 09/07/95 09/07/95 300 100
805 06 1991 / 8177 5041 S KNOX AVE 1.0 09/06/95 09/06/95 0 09/06/95 09/06/95 300 100
805 06 1992 / 8178 5051 S KNOX AVE 1.0 09/06/95 09/06/95 0 09/06/95 09/06/95 300 100
805 06 2018 / 8204 5111 S KOLIN AVE 1.0 07/25/95 07/25/95 0 07/25/95 07/25/95 300 100
805 06 1966 / 8152 5119 S KOLIN AVE 1.0 07/21/95 07/21/95 0 07/21/95 07/21/95 300 100
805 06 1967 / 8153 5122 S KOLIN AVE 1.0 07/21/95 07/21/95 0 07/21/95 07/21/95 300 100
805 06 1968 / 8154 5142 S KOLIN AVE 1.0 07/21/95 07/21/95 0 07/21/95 07/21/95 300 100
805 06 1969 / 8155 5201 S KOLIN AVE 1.0 07/25/95 07/25/95 0 07/25/95 07/25/95 300 100
805 06 1970 / 8156 5225 S KOLIN AVE 1.0 07/25/95 07/25/95 0 07/25/95 07/25/95 300 100
805 06 1989 / 8175 5238 S KOLIN AVE 1.0 07/25/95 07/25/95 0 07/25/95 07/25/95 300 100
805 06 0352 / 6538 5119 S LEAMINGTON AVE 1.0 11/15/96 11/15/96 0 11/15/96 11/15/96 300 100
805 06 0355 / 6541 4517 S LECLAIRE AVE 1.0 06/21/96 06/21/96 0 06/21/96 06/21/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 237

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0339 / 6525 4537 S LECLAIRE AVE 1.0 01/12/96 01/12/96 0 01/12/96 01/12/96 300 100
805 06 1880 / 8066 5719 S MASON AVE 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 1851 / 8037 5742 S MASON AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
805 06 1826 / 8012 5758 S MASON AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
805 06 1811 / 7997 5720 S MAYFIELD AVE 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 1813 / 7999 5740 S MAYFIELD AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
805 06 1814 / 8000 5758 S MAYFIELD AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
805 06 1815 / 8001 5819 S MAYFIELD AVE 1.0 09/27/95 09/27/95 0 09/27/95 09/27/95 300 100
805 06 1805 / 7991 5841 S MAYFIELD AVE 1.0 09/27/95 09/27/95 0 09/27/95 09/27/95 300 100
805 06 1843 / 8029 5844 S MAYFIELD AVE 1.0 09/26/95 09/26/95 0 09/26/95 09/26/95 300 100
302 00 0092 / 5774 5318 S MC VICKER AVE 1.0 0 09/10/01 09/10/01 236 100
805 06 1785 / 7971 5425 S MC VICKER AVE 1.0 05/01/97 05/01/97 0 05/01/97 05/01/97 300 100
805 06 1833 / 8019 6004 S MC VICKER AVE 1.0 03/24/95 03/24/95 0 03/24/95 03/24/95 300 100
805 06 1844 / 8030 6018 S MC VICKER AVE 1.0 03/16/95 03/16/95 0 03/16/95 03/16/95 300 100
805 06 1845 / 8031 6040 S MC VICKER AVE 1.0 02/08/95 02/08/95 0 02/08/95 02/08/95 300 100
805 06 1649 / 7835 5532 S MELVINA AVE 1.0 09/10/97 09/10/97 0 09/10/97 09/10/97 300 100
805 06 1654 / 7840 5655 S MELVINA AVE 1.0 07/30/97 07/30/97 0 07/30/97 07/30/97 300 100
805 06 1513 / 7699 5658 S MELVINA AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
302 00 0092 / 5774 5240 S NAGLE AVE 1.0 0 10/01/01 10/01/01 0 100
805 06 1901 / 8087 5336 S NARRAGANSETT AVE 1.0 01/24/95 01/24/95 0 01/24/95 01/24/95 300 100
805 06 1902 / 8088 5540 S NARRAGANSETT AVE 1.0 08/31/95 08/31/95 0 08/31/95 08/31/95 300 100
805 06 1904 / 8090 5626 S NASHVILLE AVE 1.0 01/03/97 01/03/97 0 01/03/97 01/03/97 300 100
805 06 1905 / 8091 6222 S NASHVILLE AVE 1.0 07/19/95 07/19/95 0 07/19/95 07/19/95 300 100
805 06 1876 / 8062 6223 S NASHVILLE AVE 1.0 06/13/95 06/13/95 0 06/13/95 06/13/95 300 100
805 06 1474 / 7660 5736 S NATOMA AVE 1.0 11/17/97 11/17/97 0 11/17/97 11/17/97 300 100
805 06 1935 / 8121 5220 S NEENAH AVE 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 1926 / 8112 5827 S NEENAH AVE 1.0 01/19/95 01/19/95 0 01/19/95 01/19/95 300 100
805 06 1647 / 7833 5837 S NEVA AVE 1.0 09/08/97 09/08/97 0 09/08/97 09/08/97 300 100
805 06 1934 / 8120 5617 S NEWCASTLE AVE 1.0 01/11/96 01/11/96 0 01/11/96 01/11/96 300 100
805 06 1768 / 7954 5726 S NEWLAND AVE 1.0 05/14/97 05/14/97 0 05/14/97 05/14/97 300 100
805 06 1908 / 8094 5446 S NORDICA AVE 1.0 05/16/96 05/16/96 0 05/16/96 05/16/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 238

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1673 / 7859 6019 S NORMANDY AVE 1.0 07/24/97 07/24/97 0 07/24/97 07/24/97 300 100
805 06 0594 / 6780 5429 S NOTTINGHAM AVE 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 0578 / 6764 5607 S NOTTINGHAM AVE 1.0 07/18/96 07/18/96 0 07/18/96 07/18/96 300 100
805 06 0668 / 6854 5322 S RIDGEWAY AVE 1.0 01/23/95 01/23/95 0 01/23/95 01/23/95 300 100
805 06 0412 / 6598 5117 S TRIPP AVE 1.0 07/27/95 07/27/95 0 07/27/95 07/27/95 300 100
805 06 0388 / 6574 5229 S TRIPP AVE 1.0 07/27/95 07/27/95 0 07/27/95 07/27/95 300 100
805 06 0390 / 6576 5231 S TRIPP AVE 1.0 07/27/95 07/27/95 0 07/27/95 07/27/95 300 100
805 06 0927 / 7113 4700 W 47TH ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 1022 / 7208 4634 W 51ST ST 1.0 09/22/95 09/22/95 0 09/22/95 09/22/95 300 100
805 06 1023 / 7209 4658 W 51ST ST 1.0 09/22/95 09/22/95 0 09/22/95 09/22/95 300 100
805 06 1025 / 7211 4707 W 51ST ST 1.0 09/22/95 09/22/95 0 09/22/95 09/22/95 300 100
805 06 1026 / 7212 4724 W 51ST ST 1.0 09/22/95 09/22/95 0 09/22/95 09/22/95 300 100
805 06 1010 / 7196 4736 W 51ST ST 1.0 09/22/95 09/22/95 0 09/22/95 09/22/95 300 100
805 06 1028 / 7214 4742 W 51ST ST 1.0 09/22/95 09/22/95 0 09/22/95 09/22/95 300 100
302 00 0092 / 5774 5039 W 52ND ST 1.0 0 01/23/01 01/23/01 236 100
805 06 1624 / 7810 7151 W 54TH ST 1.0 09/12/97 09/12/97 0 09/12/97 09/12/97 300 100
805 06 1007 / 7193 5858 W 59TH ST 1.0 07/13/95 07/13/95 0 07/13/95 07/13/95 300 100
805 06 1008 / 7194 5900 W 59TH ST 1.0 09/26/95 09/26/95 0 09/26/95 09/26/95 300 100
805 06 1041 / 7227 6618 W 63RD PL 1.0 07/03/96 07/03/96 0 07/03/96 07/03/96 300 100
805 06 1013 / 7199 6301 W 63RD ST 1.0 04/13/95 04/13/95 0 04/13/95 04/13/95 300 100
805 06 1059 / 7245 6325 W 63RD ST 1.0 03/12/96 03/12/96 0 03/12/96 03/12/96 300 100
805 06 0977 / 7163 6541 W 64TH PL 1.0 01/17/96 01/17/96 0 01/17/96 01/17/96 300 100
805 06 0979 / 7165 6930 W 64TH PL 1.0 02/28/95 02/28/95 0 02/28/95 02/28/95 300 100
805 06 1782 / 7968 6415 W 64TH ST 1.0 04/29/97 04/29/97 0 04/29/97 04/29/97 300 100
805 06 1641 / 7827 6540 W 64TH ST 1.0 08/27/97 08/27/97 0 08/27/97 08/27/97 300 100

Totals per Alley Lighting/Lamps 2,543.0 54,637 113,249

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 6247 S ARCHER AVE 1,579.0 06/01/07 12/31/07 46,485 12/18/07 12/27/07 45,080 100

Totals per Lighting/Electrical 2,942,011 1,665,008


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 239

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Strt Lighting/Lamps Blocks
300 09 / 33089 4653 S LAWLER AVE 1.0 04/01/08 12/01/08 6,000 04/01/08 12/01/08 12,503 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5838 S ARCHER AVE 1,484.0 0 07/08/02 07/11/02 27,021 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 LE CLAIRE COURTS 05/24/01 06/05/01 77,530 05/14/01 05/26/01 79,082 100
300 09 / 33089 ON S MCVICKER AVE FROM W 52ND ST TO W 53RD ST 4.0 10/02/08 10/03/08 2,000 10/02/08 10/03/08 1,017 100
300 07 0023 / 5446 ON S NATOMA AVE FROM W 61ST ST TO W 62ND ST 7.0 04/18/06 11/18/06 3,500 0 0
300 11 / 32212 ON S NATOMA AVE FROM W 61ST ST TO W 62ND ST 7.0 02/12/07 02/12/07 3,500 02/12/07 02/12/07 3,500 100
300 09 / 33089 ON S NEVA AVE FROM W 52ND ST TO W 53RD ST 6.0 07/11/08 07/11/08 3,000 07/11/08 07/11/08 2,000 100
302 00 0092 / 5774 W 48TH ST AND S LARAMIE AVE 3.0 0 07/21/01 07/21/01 1,412 100
302 00 0092 / 5774 6200 S AUSTIN AVE 2.0 0 10/18/01 10/18/01 807 100
302 00 0092 / 5774 4800 S LEAMINGTON AVE 5.0 0 07/27/01 07/27/01 2,353 100
302 00 0092 / 5774 6200 S MERRIMAC AVE 1.0 0 10/05/01 10/05/01 345 100
302 00 0092 / 5774 5330 S NATOMA AVE 2.0 0 10/18/01 10/18/01 807 100
302 00 0092 / 5774 6400 S NEW ENGLAND AVE 2.0 0 10/11/01 10/11/01 807 100
302 00 0092 / 5774 5140 W 48TH ST 1.0 0 07/21/01 07/21/01 471 100
302 00 0092 / 5774 5140 W 49TH ST 2.0 0 07/27/01 07/27/01 941 100
300 09 / 33089 6939 W 59TH ST 2.0 07/11/08 07/11/08 1,000 07/11/08 07/11/08 850 100
302 00 0092 / 5774 6949 W 63RD PL 1.0 0 10/11/01 10/11/01 0 100

Totals per Flood Light Install 45.0 90,530 94,392

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33089 ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST 35.0 10/20/08 11/05/08 47,250 10/20/08 11/05/08 46,057 100
300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 14.19 12/01/07 01/01/08 19,157 11/28/07 02/15/08 17,028 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST 11.25 07/28/08 08/08/08 15,188 09/22/08 10/24/08 11,789 100
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 5.0 05/01/04 05/15/04 6,750 05/10/04 05/21/04 7,216 100

Totals per Ornamental - Piggyback Lighting 65.44 88,344 82,090

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 6247 S ARCHER AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 240

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32212 ON S AUSTIN AVE FROM W 51ST ST TO S ARCHER AVE 3.0 11/15/07 02/15/08 170,000 0 0

meade elec. Note Last Updated on 05-FEB-08


300 07 0023 / 5446 ON S KOSTNER AVE FROM W 47TH ST TO W 49TH ST 2.0 06/19/06 08/18/06 170,000 07/10/06 09/01/06 107,034 100
300 05 0023 / 5138 ON S KOSTNER AVE FROM W 55TH ST TO S ARCHER AVE 4.0 04/04/05 11/18/05 340,000 07/25/05 09/15/05 287,188 100
300 06 0308 / 5414 ON S LATROBE AVE FROM W 54TH ST TO W 55TH ST 1.0 04/17/06 06/19/06 90,310 04/17/06 06/19/06 63,196 100
300 06 0308 / 5414 ON S LOCKWOOD AVE FROM W 54TH ST TO W 55TH ST 1.0 04/17/06 06/19/06 90,310 04/17/06 06/19/06 63,196 100
300 06 / 32277 ON S MAJOR AVE FROM W 51ST ST TO W 53RD ST .0 05/04/08 12/31/08 0 0 0
300 05 0014 / 5129 ON W 51ST ST FROM S HARDING AVE TO S LAWNDALE AVE 2.0 04/04/05 11/18/05 170,000 07/11/05 08/19/05 103,647 100
300 06 / 32277 ON W 53RD ST FROM S MASSASOIT AVE TO S PARKSIDE AVE .0 05/04/08 12/31/08 0 0 0
300 07 0014 / 5437 ON W 55TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE .0 03/01/06 12/31/06 0 0 0
300 06 / 32146 ON W 63RD PL FROM S SAYRE AVE TO S OAK PARK AVE 2.0 12/05/07 04/29/08 461,234 0 95
300 06 / 32146 ON W 64TH ST FROM S SAYRE AVE TO S OAK PARK AVE 2.0 12/05/07 04/28/08 461,234 0 0

Totals per Residntl Staggered Lighting 17.0 1,953,088 624,261

Work Type: Residntl Strt Lighting/Lamps Blocks


300 03 0023 / 4894 ON S LEAMINGTON AVE FROM W 47TH ST TO W 49TH ST 2.0 07/01/04 08/01/04 57,000 06/14/04 09/09/04 57,000 100
300 06 0235 / 5349 ON S NASHVILLE AVE FROM W 53RD ST TO W ARCHER AVE 2.0 06/25/03 08/25/03 168,866 06/20/03 08/15/03 152,178 100

Totals per Residntl Strt Lighting/Lamps 4.0 225,866 209,178

Work Type: Residntl Strt Lighting/Lamps Locations


300 06 / 32969 ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST 1.0 12/03/07 02/29/08 60,000 01/11/08 03/28/08 34,407 100

JOINT PROJECT WITH CITY LIGHTS Note Last Updated on 04-MAR-09


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 241

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0108 / 5263 ON S ARCHER AVE FROM S KOSTNER AVE TO S SACRAMENTO AVE 29.40 05/23/03 06/10/03 10,838 05/23/03 06/26/03 9,251 100
300 09 / 33089 ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST 36.0 09/15/08 09/19/08 10,700 09/15/08 09/19/08 7,812 100
300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST 14.85 08/07/07 08/18/07 3,267 08/07/07 08/18/07 3,267 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST 11.25 06/02/08 06/13/08 3,375 06/02/08 06/13/08 2,363 100
300 03 0023 / 4894 ON S NASHVILLE AVE FROM W 51ST ST TO W 65TH ST 57.0 07/01/04 08/01/04 11,400 07/13/04 10/01/04 8,722 100
300 03 0023 / 4894 ON S NATCHEZ AVE FROM W 51ST ST TO W 65TH ST 56.0 07/01/04 08/01/04 11,200 07/13/04 10/01/04 8,569 100
300 03 0023 / 4894 ON S NEW ENGLAND AVE FROM W 51ST ST TO W 65TH ST 54.0 07/01/04 08/01/04 10,800 07/13/04 10/01/04 8,263 100
300 03 0023 / 4894 ON S NORMANDY AVE FROM W 51ST ST TO W 65TH ST 57.0 07/01/04 08/01/04 11,400 07/13/04 10/01/04 8,722 100
300 03 0023 / 4894 ON S SAYRE AVE FROM W 51ST ST TO W 65TH ST 34.0 07/01/04 08/01/04 6,800 07/13/04 10/01/04 5,203 100
300 03 0014 / 4885 ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE 51.48 06/01/04 06/21/04 13,580 05/11/04 06/30/04 14,609 100
300 03 0023 / 4894 ON W 53RD ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 3,400 07/13/04 10/01/04 2,602 100
300 03 0023 / 4894 ON W 54TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 18.0 07/01/04 08/01/04 3,600 07/13/04 10/01/04 2,755 100
300 04 0216 / 5114 ON W 55TH ST FROM S PULASKI RD TO S KEELER AVE 9.0 05/01/06 11/01/06 1,911 05/17/06 06/29/06 1,911 100
302 00 0076 / 5764 ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE .0 09/01/00 12/31/00 0 0
300 03 0014 / 4885 ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD 51.50 05/10/04 06/16/04 15,075 05/11/04 06/04/04 11,716 100
300 03 0023 / 4894 ON W 56TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 3,400 07/13/04 10/01/04 2,602 100
300 03 0023 / 4894 ON W 57TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 3,400 07/13/04 10/01/04 2,602 100
300 03 0023 / 4894 ON W 58TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 17.0 07/01/04 08/01/04 3,400 07/13/04 10/01/04 2,602 100
300 03 0023 / 4894 ON W 59TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 15.0 07/01/04 08/01/04 3,000 07/13/04 10/01/04 2,296 100
300 03 0023 / 4894 ON W 60TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 16.0 07/01/04 08/01/04 3,200 07/13/04 10/01/04 2,449 100
300 03 0023 / 4894 ON W 61ST ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 13.0 07/01/04 08/01/04 2,600 07/13/04 10/01/04 1,990 100
300 03 0023 / 4894 ON W 62ND ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 23.0 07/01/04 08/01/04 4,600 07/13/04 10/01/04 3,520 100
302 00 0077 / 5765 ON W 63RD PL FROM S NARRAGANSETT AVE TO S NATCHEZ AVE 5.0 0 05/14/99 05/14/99 437 100
302 00 0076 / 5764 ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE 36.96 09/01/00 12/31/00 0 628
300 03 0023 / 4894 ON W 64TH PL FROM S HARLEM AVE TO S NARRAGANSETT AVE 28.0 07/01/04 08/01/04 5,600 07/13/04 10/01/04 4,285 100
300 03 0023 / 4894 ON W 64TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE 28.0 07/01/04 08/01/04 5,600 07/13/04 10/01/04 4,285 100
300 06 0108 / 5263 W 63RD ST AND S CICERO AVE 10.0 06/25/03 07/04/03 3,800 07/25/03 08/05/03 3,290 100

Totals per Strt Light Pole Painting 722.44 155,945 126,750

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 5838 S ARCHER AVE 1,195.0 03/01/04 12/01/04 6,214 07/31/06 08/30/06 13,014 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 242

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0070 / 5758 5600 N CICERO AVE 0 10/14/97 10/27/97 18,940 100
805 06 2131 / 8317 5600 N CICERO AVE 12.0 10/24/97 10/24/97 0 10/24/97 10/24/97 9,000 100
805 06 2132 / 8318 5600 N CICERO AVE 13.0 11/03/97 11/03/97 0 11/03/97 11/03/97 9,750 100
805 06 2133 / 8319 5600 N CICERO AVE 12.0 10/23/97 10/23/97 0 10/23/97 10/23/97 9,000 100
805 06 2134 / 8320 5600 N CICERO AVE 12.0 10/27/97 10/27/97 0 10/27/97 10/27/97 9,000 100
300 06 0217 / 5337 5838 S ARCHER AVE 24.0 08/17/04 08/19/04 1,349 08/16/04 08/23/04 7,052 100
805 06 2281 / 8467 4150 S CICERO AVE 6.0 12/09/96 12/09/96 0 12/09/96 12/09/96 4,500 100
805 06 2307 / 8493 4150 S CICERO AVE 18.0 12/09/96 12/09/96 0 12/09/96 12/09/96 13,500 100
805 06 2461 / 8647 5399 S CICERO AVE 22.0 07/19/93 07/19/93 0 07/19/93 07/19/93 16,500 100
805 06 2575 / 8761 4625 W 47TH ST 16.0 04/01/95 04/01/95 0 04/01/95 04/01/95 12,000 100

Totals per Underpass Lighting 135.0 1,349 109,242


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 243

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S AUSTIN AVE AND W 63RD ST .50 0 08/29/02 08/29/02 4,675 100
210 06 0130 / 4389 S CICERO AVE AND W 59TH ST .50 0 11/05/02 11/05/02 925 100
210 06 0130 / 4389 S KOSTNER AVE AND W 47TH ST .50 0 10/18/01 10/18/01 4,270 100
210 06 0130 / 4389 S MELVINA AVE AND W 63RD ST .50 0 08/28/02 08/28/02 4,675 100
210 06 0130 / 4389 S NARRAGANSETT AVE AND W 63RD ST 1.0 0 08/22/02 08/22/02 9,349 100
210 06 0130 / 4389 S OAK PARK AVE AND W 63RD ST 1.0 0 08/20/02 08/20/02 8,944 100

Totals per LED Signal Head Install 4.0 0 32,837

Work Type: Left Turn Arrow Locations


300 05 0023 / 5138 S ARCHER AVE AND S KEELER AVE 1.0 04/04/05 11/18/05 75,000 04/18/06 05/30/06 36,584 100
300 05 0023 / 5138 W 63RD ST AND S NARRAGANSETT AVE 1.0 04/04/05 11/18/05 75,000 05/15/06 95,430 80

Totals per Left Turn Arrow 2.0 150,000 132,014

Work Type: New Signal Locations


210 06 0127 / 4386 W 55TH ST AND S KILBOURN AVE .50 12/01/06 03/31/07 105,000 161,541 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 W 63RD ST AND S LATROBE AVE .50 2,000 06/08/01 08/01/01 134 100
300 06 0197 / 5322 W 63RD ST AND S NARRAGANSETT AVE 1.0 4,000 06/08/01 07/11/01 4,039 100

Totals per Removal Temp Wiring - Signals 1.50 6,000 4,173

Work Type: Signals Intersections


300 06 0096 / 5258 5838 S ARCHER AVE 38.0 09/01/03 09/07/03 0 08/15/03 08/20/03 6,009 100

Totals per Traffic 563,447 2,024,337


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 244

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0187 / 4432 W 63RD ST AND S LATROBE AVE .50 06/01/04 08/15/06 100,000 06/14/04 09/27/06 89,629 100
210 06 0217 / 4457 W ARCHER AVE AND S SAYRE AVE 1.0 10/01/05 12/01/05 200,000 09/02/05 11/22/05 192,731 100
814 06 0282 / 16494 5048 N CICERO AVE 1.0 10/08/91 10/08/91 0 10/08/91 10/08/91 134,857 100
814 06 0150 / 16364 6201 N NAGLE AVE 1.0 08/29/90 08/29/90 0 08/29/90 08/29/90 103,851 100
814 06 0096 / 16312 5500 S CENTRAL AVE 1.0 02/09/95 02/09/95 0 02/09/95 02/09/95 239,189 100
814 06 0348 / 16546 4700 S CICERO AVE 1.0 03/16/89 03/16/89 0 03/16/89 03/16/89 418,644 100
814 06 0349 / 16547 5200 S CICERO AVE 1.0 07/10/90 07/10/90 0 07/10/90 07/10/90 418,644 100
814 06 0080 / 16296 5000 W 55TH ST 1.0 11/18/94 11/18/94 0 11/18/94 11/18/94 88,242 100

Totals per TSM Install 7.50 300,000 1,685,787

Work Type: Traffic Equipment Painting Locations


300 11 / 32202 ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST .66 08/07/07 08/18/07 297 08/07/07 08/18/07 297 100
300 09 / 33079 ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST .75 06/02/08 06/13/08 150 06/02/08 06/13/08 63 100
300 09 / 33089 W 55TH ST AND S AUSTIN AVE 1.0 09/22/08 09/23/08 2,000 09/22/08 09/23/08 1,617 100

Totals per Traffic Equipment Painting 2.41 2,447 1,977

Totals per Construction Phase 3,505,458 3,689,345

Totals for Ward 23 3,513,358 3,700,044


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 245

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON S HARDING AVE FROM W ROOSEVELT RD TO W 16TH ST 4.0 04/01/08 08/30/08 260,000 03/29/08 05/19/08 0 100
300 09 / 33078 ON S MARSHALL BLVD FROM W 21ST ST TO W 24TH BLVD .0 01/01/08 05/30/08 0 04/01/08 12/01/08 0 0
210 06 0127 / 4386 S KEDZIE AVE AND W ROOSEVELT RD 1.0 12/15/05 03/15/06 0 12/15/05 02/09/06 939 100
210 06 0243 / 4480 W HARRISON ST AND S LARAMIE AVE .0 12/26/06 01/26/07 250 12/26/06 01/26/07 638 100

Totals per Design/Engineering 5.0 260,250 1,577


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 246

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 05 0024 / 5139 ON S CHRISTIANA AVE FROM W DOUGLAS BLVD TO W 16TH ST 6.0 04/04/05 11/18/05 3,300 07/15/05 08/10/05 1,314 100
300 05 0024 / 5139 ON S KILBOURN AVE FROM W LEXINGTON ST TO W FIFTH AVE 6.0 04/04/05 11/18/05 3,300 07/15/05 08/10/05 1,314 100
300 05 0024 / 5139 ON S LAWNDALE AVE FROM W 18TH ST TO W OGDEN AVE 6.0 04/04/05 11/18/05 3,300 07/15/05 08/10/05 1,314 100
300 05 0024 / 5139 ON S SPRINGFIELD AVE FROM W 18TH ST TO W 19TH ST 3.0 04/04/05 11/18/05 2,100 07/15/05 08/10/05 657 100
300 03 0012 / 4883 ON S TROY ST FROM W 24TH ST TO W 25TH ST 2.50 10/01/04 10/10/04 975 10/08/04 10/19/04 559 100
300 05 0024 / 5139 ON W 21ST ST FROM S KEELER AVE TO S KILDARE AVE 5.0 04/04/05 11/18/05 2,200 07/15/05 08/10/05 4,502 100
300 03 0012 / 4883 ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE .55 10/01/04 10/10/04 215 10/08/04 10/19/04 123 100
300 05 0024 / 5139 ON W CONGRESS PKWY FROM S KILPATRICK AVE TO S CICERO AVE 6.0 04/04/05 11/18/05 3,300 07/15/05 08/10/05 1,314 100
300 06 0122 / 5275 ON W CULLERTON ST FROM S KARLOV AVE TO S KEELER AVE 5.0 11/20/03 11/20/03 2,075 11/18/03 11/19/03 1,151 100
300 05 0024 / 5139 ON W FLOURNOY ST FROM S HOMAN AVE TO S ST LOUIS AVE 3.0 04/04/05 11/18/05 2,100 07/15/05 08/10/05 657 100
300 05 0024 / 5139 ON W GLADYS AVE FROM S KARLOV AVE TO S KEELER AVE 1.50 04/04/05 11/18/05 1,050 07/15/05 08/10/05 329 100
300 05 0024 / 5139 ON W VAN BUREN ST FROM S KILPATRICK AVE TO S CICERO AVE 6.0 04/04/05 11/18/05 3,300 07/15/05 08/10/05 1,314 100
302 00 0092 / 5774 S KILPATRICK AVE AND W CONGRESS PKWY 1.0 02/02/02 02/02/02 203 01/30/02 01/30/02 210 100
300 06 0069 / 5233 2100 S KARLOV AVE 1.0 09/08/02 09/08/02 210 09/05/02 09/05/02 203 100
300 06 0122 / 5275 1600 S KOMENSKY AVE 4.0 08/01/04 08/02/04 1,700 08/01/04 08/01/04 1,850 100
300 06 0122 / 5275 2300 S TROY ST 4.0 08/01/04 08/02/04 1,700 04/30/04 04/30/04 1,114 100
302 00 0092 / 5774 3400-3499 W 12TH PL 5.0 10/18/01 10/18/01 1,029 09/29/01 09/29/01 1,029 100
300 06 0069 / 5233 3800 W FILLMORE ST 5.0 06/19/02 06/19/02 1,050 06/16/02 06/16/02 1,015 100

Totals per 250 Watt Changeout 70.55 33,107 19,968

Work Type: 400 Watt Changeout Fixtures


300 05 0024 / 5139 ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD 68.0 04/04/05 11/18/05 27,200 07/15/05 08/10/05 23,800 100
300 07 0024 / 5447 ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE 38.0 04/18/06 11/18/06 15,600 11/01/06 11/13/06 0 100
300 07 0024 / 5447 ON W ROOSEVELT RD FROM S KEDZIE AVE TO S ALBANY AVE 23.0 04/18/06 11/18/06 9,200 11/01/06 11/13/06 0 100

Totals per 400 Watt Changeout 129.0 52,000 23,800

Totals per Lighting/Electrical 2,411,019 1,973,703


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 247

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0792 / 6978 2114 S ALBANY AVE 1.0 10/31/95 10/31/95 0 10/31/95 10/31/95 300 100
805 06 0793 / 6979 2144 S ALBANY AVE 1.0 10/31/95 10/31/95 0 10/31/95 10/31/95 300 100
805 06 1160 / 7346 621 S KEDVALE AVE 1.0 05/09/96 05/09/96 0 05/09/96 05/09/96 300 100
805 06 2022 / 8208 620 S KOLMAR AVE 1.0 10/05/95 10/05/95 0 10/05/95 10/05/95 300 100
805 06 0935 / 7121 4014 W 16TH ST 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100
805 06 0748 / 6934 3137 W ARTHINGTON ST 1.0 07/19/95 07/19/95 0 07/19/95 07/19/95 300 100
805 06 1104 / 7290 4525 W HARRISON ST 1.0 10/10/95 10/10/95 0 10/10/95 10/10/95 300 100
805 06 1762 / 7948 4736 W POLK ST 1.0 05/09/97 05/09/97 0 05/09/97 05/09/97 300 100
300 06 0139 / 5289 4325 W ROOSEVELT RD 1,099.0 03/01/06 09/01/06 27,116 05/10/06 06/10/06 33,205 100
302 00 0092 / 5774 4325 W ROOSEVELT RD 8.0 0 02/19/01 09/25/01 1,885 100

Totals per Alley Lighting/Lamps 1,115.0 27,116 37,490

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 4325 W ROOSEVELT RD 1,953.0 06/01/07 12/31/07 57,496 06/05/07 07/31/07 57,496 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 4325 W ROOSEVELT RD 1,758.0 0 06/12/02 06/15/02 32,010 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 W ARTHINGTON ST AND S KEDZIE AVE 4.0 0 05/06/99 05/06/99 1,404 100
300 06 0071 / 5234 1401 S SACRAMENTO AVE 02/15/99 04/15/00 81,000 02/17/99 04/20/00 31,745 100
302 00 0092 / 5774 1522 S SAWYER AVE 1.0 0 10/04/01 10/04/01 404 100
302 00 0092 / 5774 4941 W VAN BUREN ST 1.0 0 05/07/01 05/07/01 471 100

Totals per Flood Light Install 6.0 81,000 34,024

Work Type: Ornamental - Piggyback Lighting Fixtures


300 05 0024 / 5139 ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD 80.0 04/04/05 11/18/05 108,000 07/15/05 08/10/05 79,544 100
300 07 0024 / 5447 ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE 30.0 04/18/06 11/18/06 40,500 12/10/06 12/22/06 0 100
300 07 0024 / 5447 ON W ROOSEVELT RD FROM S KEDZIE AVE TO S ALBANY AVE 12.0 04/18/06 11/18/06 16,200 12/10/06 12/22/06 0 100

Totals per Ornamental - Piggyback Lighting 122.0 164,700 79,544


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 248

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental Lighting Blocks
300 09 / 33090 ON S MARSHALL BLVD FROM W 21ST ST TO W CERMAK RD .50 50,000 04/01/08 12/01/08 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 1630 S CENTRAL PARK AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 249

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32213 ON S ALBANY AVE FROM W CERMAK RD TO W 23RD ST 1.0 01/18/08 04/09/08 55,000 01/18/08 04/09/08 52,104 100
300 09 / 33090 ON S AVERS AVE FROM W ROOSEVELT RD TO W 14TH ST 2.0 04/05/08 05/19/08 130,000 04/01/08 12/01/08 0 100
300 11 / 32213 ON S DRAKE AVE FROM W 16TH ST TO W 18TH ST 1.0 01/18/08 03/28/08 55,000 01/18/08 04/09/08 51,743 100
300 09 / 33090 ON S DRAKE AVE FROM W 18TH ST TO W OGDEN AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 06 / 32277 ON S HARDING AVE FROM W ROOSEVELT RD TO W 16TH ST .0 05/04/08 12/31/08 0 0 0
300 09 / 33090 ON S KARLOV AVE FROM W 14TH ST TO W 16TH ST 2.0 04/02/08 04/15/08 130,000 04/01/08 12/01/08 0 100
300 11 / 32213 ON S LAWNDALE AVE FROM W ROOSEVELT RD TO W 13TH ST 1.0 01/18/08 03/28/08 55,000 01/18/08 04/09/08 51,830 100
300 11 / 32213 ON S RIDGEWAY AVE FROM W 15TH ST TO W 16TH ST 1.0 01/18/08 03/28/08 55,000 01/18/08 04/09/08 51,953 100
300 11 / 32213 ON S SAWYER AVE FROM W 19TH ST TO W 21ST ST 1.0 11/27/07 01/25/08 55,000 11/27/07 01/25/08 60,348 100
300 11 / 32213 ON S SPAULDING AVE FROM W 15TH ST TO W 16TH ST 1.0 11/27/07 01/25/08 55,000 11/27/07 01/25/08 60,881 100
300 11 / 32213 ON S SPAULDING AVE FROM W 19TH ST TO W 21ST ST 1.0 01/18/08 03/28/08 55,000 01/18/08 04/25/08 51,408 100
300 09 / 33090 ON S ST LOUIS AVE FROM W 16TH ST TO W OGDEN AVE 2.0 03/22/08 03/27/08 0 04/01/08 12/01/08 130,000 100
300 06 0298 / 5405 ON S ST LOUIS AVE FROM W OGDEN AVE TO W CERMAK RD 2.0 0 10/11/05 12/02/05 107,801 100
300 11 / 32213 ON S TROY ST FROM W FILLMORE ST TO W ROOSEVELT RD 1.0 10/15/07 01/11/08 55,000 10/15/07 01/11/08 49,451 100
300 09 / 33090 ON S TROY ST FROM W ROOSEVELT RD TO W DOUGLAS BLVD 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32213 ON W CONGRESS PKWY FROM S KILPATRICK AVE TO S CICERO AVE 1.0 10/15/07 01/11/08 55,000 10/15/07 01/11/08 49,051 100
300 11 / 32213 ON W FLOURNOY ST FROM S SPAULDING AVE TO S HOMAN AVE 1.0 10/15/07 01/11/08 55,000 10/15/07 01/11/08 49,551 100
300 11 / 32213 ON W FLOURNOY ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE 1.0 10/15/07 01/11/08 55,000 10/15/07 01/11/08 49,668 100
300 11 / 32213 ON W GLADYS AVE FROM S CICERO AVE TO S KILPATRICK AVE 1.0 01/18/08 03/28/08 55,000 01/18/08 04/25/08 51,563 100
300 11 / 32213 ON W GLADYS AVE FROM S CICERO AVE TO S LAVERGNE AVE 2.0 11/27/07 01/25/08 110,000 11/27/07 01/25/08 120,500 100
300 09 / 33090 ON W GLADYS AVE FROM S KOSTNER AVE TO S KOLMAR AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32213 ON W LEXINGTON ST FROM S ALBANY AVE TO S KEDZIE AVE 1.0 10/15/07 01/11/08 55,000 10/15/07 01/11/08 49,382 100
300 09 / 33090 ON W LEXINGTON ST FROM S SPAULDING AVE TO S ST LOUIS AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32213 ON W LEXINGTON ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE 1.0 01/04/08 03/28/08 55,000 11/28/07 01/11/08 49,081 100
300 11 / 32213 ON W LEXINGTON ST FROM S ST LOUIS AVE TO S LAWNDALE AVE 1.0 10/15/07 01/11/08 55,000 10/15/07 01/11/08 49,081 100
300 09 / 33090 ON W VAN BUREN ST FROM S KOSTNER AVE TO S KOLMAR AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 11 / 32213 ON W VAN BUREN ST FROM S SPRINGFIELD AVE TO S PULASKI RD 1.0 11/27/07 01/25/08 55,000 11/27/07 01/25/08 60,881 100

Totals per Residntl Staggered Lighting 32.0 1,640,000 1,196,277


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 250

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 03 0024 / 4895 ON S TROY ST FROM W OGDEN AVE TO W 21ST ST 10/01/04 11/15/04 8,752 10/08/04 12/14/04 2,113 100
300 06 0122 / 5275 ON S TROY ST FROM W OGDEN AVE TO W 21ST ST 10/02/04 11/30/04 17,887 10/08/04 12/14/04 17,887 100
300 06 0267 / 5375 ON S TROY ST FROM W OGDEN AVE TO W 21ST ST 2.0 10/01/04 12/01/04 150,000 10/08/04 12/14/04 141,901 100
300 03 0024 / 4895 ON W 19TH ST FROM S KEDZIE AVE TO S ALBANY AVE 10/01/04 11/15/04 8,752 10/08/04 12/14/04 2,113 100
300 06 0122 / 5275 ON W 19TH ST FROM S KEDZIE AVE TO S ALBANY AVE 10/02/04 11/30/04 17,887 10/08/04 12/14/04 17,887 100
300 03 0024 / 4895 ON W 21ST ST FROM S KEDZIE AVE TO S ALBANY AVE 10/01/04 11/15/04 8,752 10/08/04 12/14/04 2,113 100
300 06 0122 / 5275 ON W 21ST ST FROM S KEDZIE AVE TO S ALBANY AVE 10/02/04 11/30/04 17,887 10/08/04 12/14/04 17,887 100

Totals per Residntl Strt Lighting/Lamps 2.0 229,917 201,901

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 1303 S LAWNDALE AVE 2.0 0 02/20/01 02/20/01 756 100
302 00 0092 / 5774 1325 S LAWNDALE AVE 1.0 0 02/20/01 02/20/01 378 100
302 00 0092 / 5774 1400 S ST LOUIS AVE 1.0 0 03/01/01 03/01/01 378 100
302 00 0092 / 5774 4935 W VAN BUREN ST 1.0 0 05/07/01 05/07/01 378 100
302 00 0092 / 5774 4949 W VAN BUREN ST 1.0 0 05/07/01 05/07/01 378 100

Totals per Short Arm Installs - Residntl 6.0 0 2,268

Work Type: Strt Light Pole Painting Locations


300 05 0024 / 5139 ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD 76.0 04/04/05 11/18/05 24,500 08/01/05 09/08/05 16,439 100
300 04 0216 / 5114 ON W CERMAK RD FROM S KEDZIE AVE TO S MARSHALL BLVD 16.0 05/01/06 11/01/06 3,461 05/17/06 08/30/06 3,461 100
300 07 0024 / 5447 ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE 30.0 04/18/06 11/18/06 7,500 07/16/06 07/24/06 6,360 100
300 07 0024 / 5447 ON W ROOSEVELT RD FROM S ALBANY AVE TO S KEDZIE AVE 12.0 04/18/06 11/18/06 3,000 07/16/06 07/24/06 2,544 100
300 06 0081 / 5244 4600 W ROOSEVELT RD 7.0 0 05/22/98 05/22/98 444 100

Totals per Strt Light Pole Painting 141.0 38,461 29,248

Work Type: Traffic Signal Regrouping Lamps


300 06 0238 / 5352 4325 W ROOSEVELT RD 3,162.0 06/01/06 12/31/06 18,000 09/20/06 09/27/06 16,442 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 251

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2585 / 8771 1000 S ALBANY AVE 18.0 05/09/95 05/09/95 0 05/09/95 05/09/95 13,500 100
805 06 2799 / 8985 2201 S CENTRAL PARK AVE 6.0 05/18/94 05/18/94 0 05/18/94 05/18/94 4,500 100
805 06 2806 / 8992 1001 S CICERO AVE 10.0 12/31/93 12/31/93 0 12/31/93 12/31/93 7,500 100
805 06 2592 / 8778 1095 S HOMAN AVE 22.0 03/20/95 03/20/95 0 03/20/95 03/20/95 16,500 100
805 06 2589 / 8775 1005 S INDEPENDENCE BLVD 14.0 05/12/93 05/12/93 0 05/12/93 05/12/93 10,500 100
805 06 2591 / 8777 1005 S INDEPENDENCE BLVD 12.0 05/12/93 05/12/93 0 05/12/93 05/12/93 9,000 100
805 06 2805 / 8991 1000 S KARLOV AVE 14.0 04/20/94 04/20/94 0 04/20/94 04/20/94 10,500 100
805 06 2586 / 8772 1001 S KEDZIE AVE 14.0 08/27/91 08/27/91 0 08/27/91 08/27/91 10,500 100
302 00 0071 / 5759 1020 S KEDZIE AVE 0 10/20/98 10/30/98 12,305 100
805 06 2949 / 9135 2105 S KEDZIE AVE 8.0 02/23/94 02/23/94 0 02/23/94 02/23/94 6,000 100
805 06 2595 / 8781 1005 S KEELER AVE 10.0 05/04/95 05/04/95 0 05/04/95 05/04/95 7,500 100
805 06 2243 / 8429 600 S KOLMAR AVE 10.0 04/19/93 04/19/93 0 04/19/93 04/19/93 7,500 100
805 06 2807 / 8993 820 S KOSTNER AVE 10.0 04/14/94 04/14/94 0 04/14/94 04/14/94 7,500 100
805 06 2804 / 8990 1095 S PULASKI RD 10.0 04/26/94 04/26/94 0 04/26/94 04/26/94 7,500 100
805 06 2801 / 8987 1095 S SPAULDING AVE 24.0 04/20/94 04/20/94 0 04/20/94 04/20/94 18,000 100
805 06 2473 / 8659 1005 S SPRINGFIELD AVE 6.0 08/17/95 08/17/95 0 08/17/95 08/17/95 4,500 100
805 06 2366 / 8552 4595 W FIFTH AVE 12.0 06/14/93 06/14/93 0 06/14/93 06/14/93 9,000 100
805 06 2931 / 9117 4535 W HARRISON ST 10.0 04/19/93 04/19/93 0 04/19/93 04/19/93 7,500 100
302 00 0070 / 5758 4600 W HARRISON ST 0 01/15/98 01/23/98 15,405 100
805 06 2915 / 9101 4535 W JACKSON BLVD 11.0 03/01/94 03/01/94 0 03/01/94 03/01/94 8,250 100
805 06 2242 / 8428 4533 W LEXINGTON ST 4.0 09/04/96 09/04/96 0 09/04/96 09/04/96 3,000 100
805 06 2368 / 8554 4535 W POLK ST 10.0 04/02/93 04/02/93 0 04/02/93 04/02/93 7,500 100
300 06 0217 / 5337 4325 W ROOSEVELT RD 342.0 12/22/03 12/29/03 19,223 12/15/03 12/19/03 18,275 100
805 06 2369 / 8555 4547 W ROOSEVELT RD 18.0 10/23/95 10/23/95 0 10/23/95 10/23/95 13,500 100
805 06 2153 / 8339 4535 W VAN BUREN ST 10.0 06/24/93 06/24/93 0 06/24/93 06/24/93 7,500 100

Totals per Underpass Lighting 605.0 19,223 243,235


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 252

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S PULASKI RD AND W 15TH ST 1.0 0 07/12/02 07/12/02 7,324 100
210 06 0130 / 4389 S SPAULDING AVE AND W ROOSEVELT RD 1.0 0 08/16/02 08/16/02 8,539 100

Totals per LED Signal Head Install 2.0 0 15,863

Work Type: Left Turn Arrow Locations


210 06 0127 / 4386 S KEDZIE AVE AND W ROOSEVELT RD 1.0 09/30/06 10/30/06 95,000 05/03/06 09/01/06 85,537 100

Work Type: New Signal Locations


210 06 0138 / 4396 3300 W ROOSEVELT RD 1.0 10/01/02 01/01/03 222,600 06/14/02 08/16/02 190,585 100

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W HARRISON ST AND S LARAMIE AVE .0 03/15/06 05/08/07 6,000 12/26/06 02/13/07 2,959 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S KEELER AVE AND W 16TH ST 3.0 12,000 07/11/01 08/01/01 3,278 100
300 06 0197 / 5322 W 19TH ST AND S PULASKI RD 2.0 8,000 06/14/01 06/27/01 6,348 100

Totals per Removal Temp Wiring - Signals 5.0 20,000 9,626

Work Type: Signals Intersections


300 06 0096 / 5258 4325 W ROOSEVELT RD 55.0 11/10/03 11/12/03 0 11/01/03 11/10/03 8,697 100

Work Type: TSM Install Locations


210 06 0022 / 4297 S PULASKI RD AND W 15TH ST 1.0 06/01/02 10/01/02 186,800 04/18/02 07/12/02 108,292 100
814 06 0218 / 16430 348 N CICERO AVE 1.0 08/07/92 08/07/92 0 08/07/92 08/07/92 40,173 100
814 06 0219 / 16431 600 S CICERO AVE 1.0 02/13/92 02/13/92 0 02/13/92 02/13/92 40,173 100
814 06 0224 / 16436 700 S CICERO AVE 1.0 03/12/92 03/12/92 0 03/12/92 03/12/92 40,173 100
814 06 0221 / 16433 728 S CICERO AVE 1.0 03/12/92 03/12/92 0 03/12/92 03/12/92 40,173 100
210 06 0138 / 4396 1132 S HOMAN AVE 1.0 12/01/02 03/01/03 200,000 11/07/02 01/29/03 152,161 100
210 06 0034 / 4305 2300 S KEDZIE AVE 1.0 07/01/98 09/30/98 160,000 12/01/98 05/14/99 145,518 100

Totals per TSM Install 7.0 546,800 566,663

Totals per Traffic 900,050 891,075


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 253

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 05 0024 / 5139 ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD 32.0 04/04/05 11/18/05 6,900 08/01/05 09/08/05 9,661 100
300 07 0024 / 5447 ON W ROOSEVELT RD FROM S ALBANY AVE TO S KEDZIE AVE 7.0 04/18/06 11/18/06 2,750 07/16/06 07/24/06 1,484 100

Totals per Traffic Equipment Painting 39.0 9,650 11,145

Totals per Construction Phase 3,311,069 2,864,778

Totals for Ward 24 3,571,319 2,866,354


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 254

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON S CLAREMONT AVE FROM W GRENSHAW ST TO W TAYLOR ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 995 100
300 06 0282 / 5390 ON S MORGAN ST FROM W 14TH PL TO W 15TH ST 1.0 11/16/04 02/15/05 15,000 11/01/04 02/15/05 13,417 100

S. Morgan from 14PL. to W. 15th PL/Work to be constructed by Private contractor. BOE to be notified by inspectional sevices when completed and approved. Note Last Updated on 22-FEB-07
300 06 0292 / 5399 ON W 15TH ST FROM S HALSTED ST TO S UNION AVE 2.0 04/20/05 04/29/05 6,500 04/06/05 11/15/05 2,873 100
300 06 0308 / 5414 ON W GRENSHAW ST FROM S WESTERN AVE TO S OAKLEY BLVD .0 02/01/06 07/31/06 0 02/01/06 07/31/06 995 100
300 06 0282 / 5390 1650 S BLUE ISLAND AVE 1.0 08/27/04 12/01/04 4,000 09/01/04 09/08/04 1,728 100
300 06 0292 / 5399 2432 S BLUE ISLAND AVE 1.0 08/02/05 09/01/05 1,000 08/02/05 09/01/05 448 100
300 06 0292 / 5399 2437 S DAMEN AVE 1.0 05/20/05 05/24/05 2,000 05/20/05 05/24/05 0 100
300 06 0292 / 5399 837 S WESTERN AVE 1.0 1,500 02/22/05 03/01/05 0 100

Totals per Design/Engineering 7.0 30,000 20,456


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 255

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0122 / 5275 ON S PAULINA ST FROM W CERMAK RD TO W 16TH ST 21.0 05/12/03 05/12/03 8,275 05/12/03 05/16/03 3,658 100
300 09 / 33091 ON S WOLCOTT AVE FROM S BLUE ISLAND AVE TO W CERMAK RD 9.0 08/14/08 08/15/08 3,600 08/14/08 08/15/08 1,945 100
300 06 0122 / 5275 ON S WOLCOTT AVE FROM W CERMAK RD TO W 16TH ST 13.0 05/12/03 05/12/03 5,275 05/12/03 05/15/03 2,271 100
300 06 0122 / 5275 ON S WOOD ST FROM W CERMAK RD TO W 16TH ST 16.0 05/15/03 05/15/03 6,400 05/15/03 05/16/03 2,789 100
300 06 0122 / 5275 ON W 19TH ST FROM S ASHLAND AVE TO S DAMEN AVE 18.0 05/15/03 05/15/03 7,150 05/15/03 05/16/03 3,145 100
300 09 / 33091 ON W 22ND PL FROM S DAMEN AVE TO S WOLCOTT AVE 4.0 08/14/08 08/15/08 1,600 08/14/08 08/15/08 973 100
300 06 0122 / 5275 ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE 2.0 10/20/03 10/21/03 850 11/05/03 11/05/03 850 100
300 09 / 33091 ON W 23RD ST FROM S DAMEN AVE TO S WOLCOTT AVE 4.0 08/14/08 08/15/08 1,600 08/14/08 08/15/08 973 100
300 06 0122 / 5275 ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE 2.0 11/01/03 11/01/03 850 11/05/03 11/05/03 850 100
300 06 0122 / 5275 ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE 2.0 11/01/03 11/01/03 850 11/05/03 11/05/03 850 100
300 06 0122 / 5275 ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE 2.0 11/01/03 11/01/03 850 11/05/03 11/05/03 850 100
300 06 0122 / 5275 ON W CULLERTON ST FROM S ASHLAND AVE TO S DAMEN AVE 20.0 05/14/03 05/14/03 7,900 05/14/03 05/16/03 3,490 100
300 06 0069 / 5233 ON W CULLERTON ST FROM S HALSTED ST TO S RACINE AVE 14.0 08/10/02 08/10/02 2,940 08/07/02 08/07/02 2,842 100
300 09 / 33091 ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST 10.0 02/01/08 12/31/08 4,000 08/25/08 08/26/08 2,430 100
300 06 0122 / 5275 800 S ABERDEEN ST 5.0 02/22/03 02/22/03 1,050 02/19/03 02/19/03 1,015 100
300 06 0122 / 5275 2200 S BELL AVE 5.0 05/08/03 05/08/03 1,050 05/05/03 05/05/03 1,015 100
302 00 0092 / 5774 2400 S BELL AVE 4.0 02/08/02 02/08/02 840 02/05/02 02/05/02 840 100
300 06 0122 / 5275 800 S CARPENTER ST 5.0 02/22/03 02/22/03 1,050 02/19/03 02/19/03 1,015 100
300 06 0069 / 5233 800 S CLAREMONT AVE 5.0 10/11/02 10/11/02 1,050 10/08/02 10/08/02 1,015 100
302 00 0092 / 5774 2300-2399 S HOYNE AVE 5.0 0 10/02/01 10/02/01 1,029 100
302 00 0092 / 5774 2200 S LEAVITT ST 4.0 02/08/02 02/08/02 840 02/05/02 02/05/02 840 100
302 00 0092 / 5774 2300 S LEAVITT ST 6.0 02/08/02 02/08/02 1,260 02/05/02 02/05/02 1,218 100
302 00 0092 / 5774 800 S MAY ST 3.0 0 08/20/01 08/20/01 617 100
300 06 0069 / 5233 700 W 17TH PL 5.0 08/10/02 08/10/02 1,050 08/07/02 08/07/02 1,015 100
300 06 0069 / 5233 2200 W 19TH ST 5.0 11/07/02 11/07/02 1,050 11/04/02 11/04/02 1,015 100
300 06 0122 / 5275 2300 W 22ND PL 4.0 06/01/03 06/03/03 1,900 05/06/03 05/06/03 911 100
300 06 0069 / 5233 300 W 23RD PL 5.0 10/11/02 10/11/02 1,050 10/08/02 10/08/02 1,015 100
302 00 0092 / 5774 2100-2199 W 23RD ST 5.0 10/02/01 10/02/01 1,029 10/02/01 10/02/01 1,029 100
300 06 0069 / 5233 400 W 24TH ST 5.0 07/19/02 07/19/02 1,050 07/16/02 07/16/02 1,015 100
302 00 0092 / 5774 2000-2099 W COULTER ST 5.0 0 10/02/01 10/02/01 1,029 100
302 00 0092 / 5774 2100-2199 W COULTER ST 5.0 0 10/02/01 10/02/01 1,029 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 256

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 2200 W COULTER ST 4.0 02/02/02 02/02/02 840 01/30/02 01/30/02 812 100
300 06 0122 / 5275 1400 W FLOURNOY ST 20.0 7,500 01/15/03 01/19/03 5,410 100
302 00 0092 / 5774 1200-1399 W LEXINGTON ST 5.0 10/20/01 10/20/01 1,029 09/28/01 09/28/01 1,029 100
300 06 0122 / 5275 1400 W LEXINGTON ST 21.0 08/01/04 08/05/04 7,875 01/15/03 01/19/03 5,680 100

Totals per 250 Watt Changeout 268.0 83,653 57,509

Work Type: 400 Watt Changeout Fixtures


300 09 / 33091 ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST 3.0 11/05/08 11/13/08 1,200 11/05/08 11/06/08 996 100
300 11 / 32214 ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST 22.0 10/25/07 10/25/07 9,200 10/25/07 10/25/07 5,899 100
300 06 0122 / 5275 ON W 18TH ST FROM S WESTERN AVE TO S HALSTED ST 103.0 11/20/03 12/10/03 45,000 11/05/03 11/10/03 26,781 100
300 09 / 33091 ON W 21ST ST FROM S DAMEN AVE TO S OAKLEY AVE 15.0 10/21/08 10/30/08 6,000 10/21/08 10/30/08 4,875 100
300 09 / 33091 ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST 11.0 02/01/08 12/31/08 4,400 09/24/08 09/26/08 3,740 100
300 11 / 32214 ON W CULLERTON ST FROM S OAKLEY AVE TO S WESTERN AVE 5.0 10/25/07 10/25/07 2,200 10/25/07 10/25/07 1,468 100
300 09 / 33068 ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE 2.0 10/13/08 10/17/08 800 10/06/08 10/08/08 800 100
300 09 / 33091 ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST 12.0 02/01/08 12/31/08 4,800 09/08/08 09/09/08 3,984 100
302 00 0092 / 5774 W 24TH ST AND S LEAVITT ST 1.0 03/08/02 03/08/02 400 03/05/02 03/05/02 375 100

Totals per 400 Watt Changeout 174.0 74,000 48,918

Totals per Lighting/Electrical 1,761,370 3,540,922


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 257

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0883 / 7069 820 S BELL AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 0881 / 7067 821 S BELL AVE 1.0 11/21/96 11/21/96 0 11/21/96 11/21/96 300 100
805 06 1679 / 7865 1618 S BLUE ISLAND AVE 1.0 07/29/97 07/29/97 0 07/29/97 07/29/97 300 100
805 06 0824 / 7010 1830 S BLUE ISLAND AVE 1.0 11/01/96 11/01/96 0 11/01/96 11/01/96 300 100
805 06 1509 / 7695 2550 S BLUE ISLAND AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1752 / 7938 1602 S CARPENTER ST 1.0 05/23/97 05/23/97 0 05/23/97 05/23/97 300 100
805 06 1508 / 7694 2504 S CLAREMONT AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1687 / 7873 2515 S CLAREMONT AVE 1.0 06/26/97 06/26/97 0 06/26/97 06/26/97 300 100
805 06 1115 / 7301 1940 S DESPLAINES ST 1.0 02/06/97 02/06/97 0 02/06/97 02/06/97 300 100
805 06 1199 / 7385 1948 S DESPLAINES ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 0989 / 7175 2002 S DESPLAINES ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1107 / 7293 2010 S DESPLAINES ST 1.0 02/06/97 02/06/97 0 02/06/97 02/06/97 300 100
805 06 1597 / 7783 1112 S HALSTED ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 2004 / 8190 1820 S LAFLIN ST 1.0 01/03/97 01/03/97 0 01/03/97 01/03/97 600 100
805 06 0354 / 6540 803 S LEAVITT ST 1.0 08/05/96 08/05/96 0 08/05/96 08/05/96 300 100
805 06 1680 / 7866 1621 S LOOMIS ST 1.0 07/29/97 07/29/97 0 07/29/97 07/29/97 300 100
300 06 0139 / 5289 2439 S OAKLEY AVE 1,131.0 03/01/06 09/01/06 24,734 02/15/06 03/15/06 34,172 100
302 00 0092 / 5774 2439 S OAKLEY AVE 53.0 0 02/01/01 01/11/02 12,489 100
805 06 1667 / 7853 2452 S OAKLEY AVE 1.0 07/14/97 07/14/97 0 07/14/97 07/14/97 300 100
805 06 0542 / 6728 1800 S PEORIA ST 1.0 01/03/95 01/03/95 0 01/03/95 01/03/95 300 100
805 06 1686 / 7872 2317 S SEELEY AVE 1.0 06/26/97 06/26/97 0 06/26/97 06/26/97 300 100
805 06 1507 / 7693 2425 S WESTERN AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1504 / 7690 2323 S WOLCOTT AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 0464 / 6650 2326 S WOLCOTT AVE 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1505 / 7691 2326 S WOLCOTT AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 0967 / 7153 639 W 18TH ST 1.0 02/06/97 02/06/97 0 02/06/97 02/06/97 300 100
805 06 0968 / 7154 1689 W 18TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 0969 / 7155 1701 W 18TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1204 / 7390 1701 W 18TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1789 / 7975 1701 W 18TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 0972 / 7158 2000 W 18TH ST 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 258

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0973 / 7159 1700 W 19TH ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 0956 / 7142 1702 W 19TH ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 0975 / 7161 1714 W 19TH ST 1.0 12/01/95 12/01/95 0 12/01/95 12/01/95 300 100
805 06 0965 / 7151 1758 W 19TH ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 0949 / 7135 1800 W 21ST PL 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 0947 / 7133 1756 W 21ST ST 1.0 02/06/97 02/06/97 0 02/06/97 02/06/97 300 100
805 06 0948 / 7134 1902 W 21ST ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1501 / 7687 1808 W 22ND PL 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1502 / 7688 1820 W 22ND PL 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
300 06 0122 / 5275 2308 W 22ND PL 16.0 05/06/03 05/09/03 5,600 05/06/03 05/06/03 2,735 100
805 06 0950 / 7136 1900 W 23RD ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 0951 / 7137 2326 W 23RD ST 1.0 04/29/96 04/29/96 0 04/29/96 04/29/96 300 100
805 06 1503 / 7689 2314 W 25TH ST 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1568 / 7754 2327 W 25TH ST 1.0 10/01/97 10/01/97 0 10/01/97 10/01/97 300 100
805 06 1506 / 7692 2336 W 25TH ST 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1205 / 7391 200 W CERMAK RD 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1791 / 7977 200 W CERMAK RD 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 2067 / 8253 200 W CERMAK RD 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 2056 / 8242 1630 W CERMAK RD 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 2048 / 8234 1922 W CERMAK RD 1.0 10/26/95 10/26/95 0 10/26/95 10/26/95 300 100
805 06 1892 / 8078 2000 W CERMAK RD 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 2040 / 8226 2004 W CERMAK RD 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1766 / 7952 1700 W CULLERTON ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1747 / 7933 1703 W CULLERTON ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1728 / 7914 1800 W CULLERTON ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1739 / 7925 1801 W CULLERTON ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1720 / 7906 2003 W CULLERTON ST 1.0 01/14/97 01/14/97 0 01/14/97 01/14/97 300 100
805 06 1598 / 7784 1210 W LEXINGTON ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 0530 / 6716 1057 W POLK ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100

Totals per Alley Lighting/Lamps 1,257.0 30,334 66,796


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 259

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0215 / 5336 2439 S OAKLEY AVE 2,584.0 06/01/07 12/31/07 76,072 09/01/07 09/15/07 73,773 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2439 S OAKLEY AVE 2,489.0 0 06/09/02 06/12/02 45,320 100

Work Type: Flood Light Install Fixtures


300 09 / 33091 ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST 8.0 02/01/08 12/31/08 4,000 08/25/08 08/26/08 3,280 100
302 00 0092 / 5774 2700 S WESTERN AVE 1.0 0 05/14/01 05/14/01 471 100
300 09 / 33091 1845 W 22ND PL 1.0 10/01/08 10/01/08 500 10/01/08 10/01/08 0 100
300 06 0122 / 5275 2308 W 22ND PL 3.0 05/09/03 05/09/03 2,425 05/06/03 05/06/03 965 100
300 09 / 33091 200 W CERMAK RD 1.0 10/01/08 10/01/08 500 10/01/08 10/01/08 0 100
300 06 0122 / 5275 1400 W FLOURNOY ST 3.0 01/15/03 01/22/03 1,455 01/15/03 01/19/03 970 100
300 06 0167 / 5306 2200 W OGDEN AVE 9.0 0 11/11/99 11/11/99 1,504 100

Totals per Flood Light Install 26.0 8,880 7,190

Work Type: Lighting Imprvmnts Blocks


302 00 0094 / 5776 ON W TAYLOR ST FROM S MORGAN ST TO S ASHLAND AVE 3.0 0 03/08/98 08/01/99 565,355 100

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 2432 S BLUE ISLAND AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 99

open til further notice Note Last Updated on 01-NOV-07


300 06 0292 / 5399 2437 S DAMEN AVE .0 09/30/05 10/30/05 14,306 09/29/05 11/29/05 10,993 100
300 06 0292 / 5399 837 S WESTERN AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Totals per Lighting Imprvmnts .0 14,306 10,993

Work Type: Lighting Imprvmnts Projects


300 06 0199 / 5324 2451 S ASHLAND AVE 1.0 72,350 72,318 100
300 06 0282 / 5390 1650 S BLUE ISLAND AVE .0 10/06/04 10/31/04 4,000 09/14/04 12/15/04 0 100

Totals per Lighting Imprvmnts 1.0 76,350 72,318


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 260

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 09 / 33091 ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST 6.0 11/05/08 11/13/08 8,100 11/05/08 11/07/08 6,930 100
300 09 / 33091 ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST 22.0 09/22/08 10/17/08 29,700 10/06/08 10/16/08 25,410 100
300 03 0025 / 4896 ON W 18TH ST FROM S DAMEN AVE TO S MORGAN ST 110.0 08/01/04 08/18/04 148,500 08/13/04 09/13/04 124,826 100
300 09 / 33091 ON W 18TH ST FROM S DAMEN AVE TO S OAKLEY AVE 43.0 01/12/09 01/30/09 58,050 01/12/09 01/30/09 49,605 100
300 09 / 33091 ON W 21ST ST FROM S DAMEN AVE TO S OAKLEY AVE 15.0 10/21/08 10/30/08 20,250 10/21/08 10/30/08 17,325 100
300 06 0122 / 5275 ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE 4.0 10/25/03 10/25/03 4,800 11/05/03 11/05/03 4,944 100
300 06 0122 / 5275 ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE 5.0 10/25/03 10/25/03 6,000 11/05/03 11/05/03 6,179 100
300 06 0122 / 5275 ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE 4.0 10/25/03 10/25/03 4,800 11/05/03 11/05/03 4,944 100
300 06 0122 / 5275 ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE 4.0 10/25/03 10/25/03 4,800 11/05/03 11/05/03 4,944 100
300 09 / 33091 ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST 11.0 02/01/08 12/31/08 14,850 10/01/08 10/06/08 12,705 100
300 09 / 33068 ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE 2.0 10/20/08 10/24/08 2,700 10/09/08 10/16/08 2,864 100
300 09 / 33091 ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST 12.0 02/01/08 12/31/08 16,200 10/06/08 10/16/08 13,860 100

Totals per Ornamental - Piggyback Lighting 238.0 318,750 274,536

Work Type: Ornamental Lighting Blocks


300 09 / 33091 ON S SANGAMON ST FROM W 18TH ST TO W CULLERTON ST 2.0 240,000 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2439 S OAKLEY AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0308 / 5414 ON S CLAREMONT AVE FROM W GRENSHAW ST TO W TAYLOR ST 1.0 06/09/06 08/07/06 53,753 06/09/06 08/07/06 40,195 100
300 06 0298 / 5405 ON S LEAVITT ST FROM W POLK ST TO W TAYLOR ST 2.0 07/15/05 09/01/05 0 07/15/05 09/07/05 94,230 100
300 06 0308 / 5414 ON W GRENSHAW ST FROM S WESTERN AVE TO S OAKLEY BLVD 1.0 06/09/06 08/07/06 53,753 06/09/06 08/07/06 40,195 100

Totals per Residntl Staggered Lighting 4.0 107,506 174,620

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S CLAREMONT AVE FROM W POLK ST TO W TAYLOR ST 2.0 05/30/03 07/30/03 95,892 05/22/03 07/14/03 92,774 100
300 06 0122 / 5275 ON S OAKLEY AVE FROM W POLK ST TO W TAYLOR ST 2.0 02/15/03 02/28/03 6,300 02/10/03 02/21/03 6,300 100
300 06 0267 / 5375 ON W 18TH PL FROM S LEAVITT ST TO S WESTERN AVE 2.0 10/15/04 12/15/04 150,000 10/06/04 01/21/05 170,704 100

Totals per Residntl Strt Lighting/Lamps 6.0 252,192 269,778


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 261

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 2259 W 23RD PL 1.0 0 03/23/01 03/23/01 378 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 262

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 05 0025 / 5140 ON S CARPENTER ST FROM W 21ST ST TO W CULLERTON ST 4.0 04/04/05 11/18/05 800 11/10/05 11/20/05 829 100
302 00 0077 / 5765 ON S CLARK ST FROM W 17TH ST TO W 18TH ST 9.50 0 11/11/99 11/12/99 830 100
300 05 0025 / 5140 ON S DAMEN AVE FROM W 19TH ST TO W 18TH ST 6.0 04/04/05 11/18/05 1,200 11/10/05 11/20/05 1,244 100
300 09 / 33068 ON S DAMEN AVE FROM W JACKSON BLVD TO W OGDEN AVE 2.80 06/02/08 06/20/08 560 06/02/08 06/13/08 588 100
300 09 / 33091 ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST 6.0 10/22/08 10/23/08 1,800 10/22/08 10/23/08 1,260 100
300 09 / 33068 ON S LAFLIN ST FROM W POLK ST TO W FILLMORE ST 2.59 06/02/08 06/13/08 777 06/02/08 06/13/08 544 100
300 05 0025 / 5140 ON S MAY ST FROM W CULLERTON ST TO W CERMAK RD 8.0 04/04/05 11/18/05 1,600 11/10/05 11/20/05 1,659 100
300 11 / 32214 ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST 22.0 11/01/07 11/07/07 4,840 10/25/07 10/25/07 4,400 100
300 05 0025 / 5140 ON S PRINCETON AVE FROM W 24TH ST TO W CERMAK RD 13.0 04/04/05 11/18/05 3,250 11/10/05 11/20/05 2,697 100
300 05 0025 / 5140 ON S STEWART AVE FROM W 23RD PL TO W 24TH PL 4.0 04/04/05 11/18/05 800 11/10/05 11/20/05 830 100
300 05 0025 / 5140 ON S WENTWORTH AVE FROM W 24TH ST TO W 24TH PL 2.0 04/04/05 11/18/05 400 11/10/05 11/20/05 415 100
300 09 / 33068 ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST 3.60 06/02/08 06/20/08 720 06/05/08 07/09/08 756 100
300 05 0025 / 5140 ON S WOOD ST FROM W 18TH ST TO W 19TH ST 6.0 04/04/05 11/18/05 1,200 11/10/05 11/20/05 1,245 100
300 03 0025 / 4896 ON W 18TH ST FROM S WESTERN AVE TO S HALSTED ST 172.0 05/01/04 05/10/04 40,320 05/01/04 06/01/04 40,376 100
300 05 0025 / 5140 ON W 19TH ST FROM S WOOD ST TO S DAMEN AVE 11.0 04/04/05 11/18/05 2,200 11/10/05 11/20/05 2,282 100
300 09 / 33091 ON W 21ST PL FROM S DAMEN AVE TO S OAKLEY AVE 15.0 09/22/08 09/26/08 4,500 09/22/08 09/26/08 3,150 100
300 05 0025 / 5140 ON W 22ND PL FROM S WENTWORTH AVE TO S PRINCETON AVE 6.0 04/04/05 11/18/05 1,200 11/10/05 11/20/05 830 100
300 06 0108 / 5263 ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE 4.0 09/10/03 09/20/03 1,000 09/05/03 09/07/03 560 100
300 05 0025 / 5140 ON W 23RD PL FROM S WENTWORTH AVE TO S PRINCETON AVE 5.0 04/04/05 11/18/05 1,000 11/10/05 11/20/05 1,037 100
300 06 0108 / 5263 ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE 5.0 09/10/03 09/20/03 1,250 09/05/03 09/07/03 560 100
300 05 0025 / 5140 ON W 23RD ST FROM S WENTWORTH AVE TO S PRINCETON AVE 5.0 04/04/05 11/18/05 1,000 11/10/05 11/20/05 1,037 100
300 06 0108 / 5263 ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE 4.0 09/10/03 09/20/03 1,000 09/05/03 09/07/03 560 100
300 05 0025 / 5140 ON W 24TH PL FROM S WENTWORTH AVE TO S PRINCETON AVE 6.0 04/04/05 11/18/05 1,200 11/10/05 11/20/05 1,245 100
300 06 0108 / 5263 ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE 4.0 09/10/03 09/20/03 1,000 09/05/03 09/07/03 560 100
300 05 0025 / 5140 ON W 24TH ST FROM S WENTWORTH AVE TO S PRINCETON AVE 5.0 04/04/05 11/18/05 1,000 11/10/05 11/20/05 1,037 100
300 05 0025 / 5140 ON W ALEXANDER ST FROM S WENTWORTH AVE TO S PRINCETON AVE 6.0 04/04/05 11/18/05 1,200 11/10/05 11/20/05 1,244 100
300 04 0216 / 5114 ON W CERMAK RD FROM S OAKLEY AVE TO S HOYNE AVE 33.0 05/01/06 11/01/06 7,066 05/17/06 07/12/06 7,066 100
300 09 / 33091 ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST 11.0 02/01/08 12/31/08 3,300 09/22/08 09/24/08 2,350 100
300 05 0025 / 5140 ON W CULLERTON ST FROM S CARPENTER ST TO S MAY ST 4.0 04/04/05 11/18/05 800 11/10/05 11/20/05 830 100
300 09 / 33091 ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST 10.0 02/01/08 12/31/08 1,600 08/25/08 08/26/08 1,008 100
300 11 / 32191 ON W HARRISON ST FROM S RACINE AVE TO S MORGAN ST 17.0 11/14/08 12/15/08 3,400 11/14/08 12/15/08 3,400 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 263

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 09 / 33068 S LAFLIN ST AND W TAYLOR ST 1.0 06/02/08 06/13/08 300 06/05/08 06/10/08 210 100
302 00 0077 / 5765 2100 W OGDEN AVE 6.0 0 08/25/99 08/25/99 524 100

Totals per Strt Light Pole Painting 419.49 92,283 87,163

Work Type: Strt Lighting Blocks


300 03 0025 / 4896 ON W 18TH PL FROM S LEAVITT ST TO S WESTERN AVE 10/01/04 11/01/04 65,000 10/06/04 01/21/05 27,803 100
300 06 0084 / 5246 2000-2100 S CLARK ST 09/01/98 01/31/99 221,000 10/01/98 02/28/99 233,215 100
303 00 0006 / 5783 2400 W 21ST ST 08/01/97 12/01/97 60,000 08/01/97 04/30/98 76,549 100

Totals per Strt Lighting 346,000 337,567

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2439 S OAKLEY AVE 1,775.0 03/01/04 12/01/04 9,230 09/22/06 09/26/06 19,330 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 264

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2444 / 8630 1820 N HOYNE AVE 10.0 09/11/95 09/11/95 0 09/11/95 09/11/95 7,500 100
805 06 2667 / 8853 1819 N LEAVITT ST 10.0 11/25/94 11/25/94 0 11/25/94 11/25/94 7,500 100
805 06 2329 / 8515 2290 S ARCHER AVE 31.0 05/15/96 05/15/96 0 05/15/96 05/15/96 23,250 100
805 06 2159 / 8345 1583 S BLUE ISLAND AVE 20.0 05/21/97 05/21/97 0 05/21/97 05/21/97 15,000 100
805 06 2186 / 8372 1583 S BLUE ISLAND AVE 50.0 05/21/97 05/21/97 0 05/21/97 05/21/97 37,500 100
302 00 0071 / 5759 2200 S CANAL ST 0 10/08/98 10/14/98 12,802 100
805 06 2658 / 8844 2205 S CANAL ST 14.0 10/01/91 10/01/91 0 10/01/91 10/01/91 10,500 100
805 06 2838 / 9024 1602 S CLARK ST 3.0 12/09/93 12/09/93 0 12/09/93 12/09/93 2,250 100
805 06 2559 / 8745 1695 S DAMEN AVE 200.0 11/13/94 11/13/94 0 11/13/94 11/13/94 150,000 100
805 06 2564 / 8750 1695 S DAMEN AVE 200.0 11/13/94 11/13/94 0 11/13/94 11/13/94 150,000 100
805 06 2584 / 8770 1698 S DAMEN AVE 200.0 11/13/94 11/13/94 0 11/13/94 11/13/94 150,000 100
805 06 2560 / 8746 1699 S DAMEN AVE 200.0 11/13/94 11/13/94 0 11/13/94 11/13/94 150,000 100
805 06 2685 / 8871 1501 S HALSTED ST 18.0 03/11/91 03/11/91 0 03/11/91 03/11/91 13,500 100
805 06 2951 / 9137 1465 S MORGAN ST 44.0 04/04/94 04/04/94 0 04/04/94 04/04/94 33,000 100
805 06 2967 / 9153 1580 S MORGAN ST 20.0 04/04/94 04/04/94 0 04/04/94 04/04/94 15,000 100
805 06 2691 / 8877 1599 S NEWBERRY AVE 38.0 06/06/94 06/06/94 0 06/06/94 06/06/94 28,500 100
805 06 2787 / 8973 2341 S NORMAL AVE 6.0 10/30/91 10/30/91 0 10/30/91 10/30/91 4,500 100
805 06 2846 / 9032 2345 S NORMAL AVE 18.0 10/01/91 10/01/91 0 10/01/91 10/01/91 13,500 100
300 06 0217 / 5337 2439 S OAKLEY AVE 566.0 12/26/03 01/03/04 31,814 12/22/03 12/29/03 20,331 100
805 06 2379 / 8565 1501 S PEORIA ST 18.0 01/10/96 01/10/96 0 01/10/96 01/10/96 13,500 100
805 06 2380 / 8566 1597 S PEORIA ST 50.0 03/01/96 03/01/96 0 03/01/96 03/01/96 37,500 100
805 06 2920 / 9106 1505 S RACINE AVE 20.0 03/18/94 03/18/94 0 03/18/94 03/18/94 15,000 100
805 06 2935 / 9121 1590 S RACINE AVE 42.0 03/18/94 03/18/94 0 03/18/94 03/18/94 31,500 100
805 06 2540 / 8726 1501 S SANGAMON ST 22.0 06/06/95 06/06/95 0 06/06/95 06/06/95 16,500 100
805 06 2539 / 8725 1590 S SANGAMON ST 42.0 06/06/95 06/06/95 0 06/06/95 06/06/95 31,500 100
805 06 2179 / 8365 1505 S UNION AVE 40.0 04/15/97 04/15/97 0 04/15/97 04/15/97 30,000 100
302 00 0070 / 5758 1520 S UNION AVE 0 04/04/97 04/15/97 14,507 100
302 00 0070 / 5758 1540 S UNION AVE 0 06/03/97 06/19/97 16,179 100
805 06 2158 / 8344 1562 S UNION AVE 46.0 06/19/97 06/19/97 0 06/19/97 06/19/97 34,500 100
805 06 2784 / 8970 1305 S WESTERN AVE 18.0 07/11/94 07/11/94 0 07/11/94 07/11/94 13,500 100
805 06 2783 / 8969 2400 S WESTERN AVE 30.0 05/23/94 05/23/94 0 05/23/94 05/23/94 22,500 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 265

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2782 / 8968 2405 S WESTERN AVE 34.0 06/06/94 06/06/94 0 06/06/94 06/06/94 25,500 100
805 06 2905 / 9091 999 W 16TH ST 10.0 12/19/93 12/19/93 0 12/19/93 12/19/93 7,500 100
805 06 2496 / 8682 410 W 23RD ST 51.0 09/25/95 09/25/95 0 09/25/95 09/25/95 38,250 100
805 06 2717 / 8903 2405 W 23RD ST 38.0 05/10/94 05/10/94 0 05/10/94 05/10/94 28,500 100
805 06 2338 / 8524 401 W 24TH ST 82.0 05/24/96 05/24/96 0 05/24/96 05/24/96 61,500 100
805 06 2952 / 9138 2440 W 26TH ST 12.0 03/20/94 03/20/94 0 03/20/94 03/20/94 9,000 100
805 06 2824 / 9010 121 W CERMAK RD 18.0 03/13/91 03/13/91 0 03/13/91 03/13/91 13,500 100
805 06 2328 / 8514 301 W CERMAK RD 22.0 01/01/91 01/01/91 0 01/01/91 01/01/91 16,500 100
302 00 0070 / 5758 400 W CERMAK RD 0 11/21/97 11/28/97 18,298 100
805 06 2129 / 8315 400 W CERMAK RD 34.0 11/28/97 11/28/97 0 11/28/97 11/28/97 25,500 100
302 00 0070 / 5758 430 W CERMAK RD 0 12/10/97 12/17/97 4,012 100
805 06 2130 / 8316 430 W CERMAK RD 26.0 12/17/97 12/17/97 0 12/17/97 12/17/97 19,500 100
805 06 2693 / 8879 499 W CERMAK RD 26.0 01/01/91 01/01/91 0 01/01/91 01/01/91 19,500 100
805 06 2718 / 8904 2405 W CERMAK RD 28.0 08/03/91 08/03/91 0 08/03/91 08/03/91 21,000 100

Totals per Underpass Lighting 2,357.0 31,814 1,429,379


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 266

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 S CLARK ST AND S ARCHER AVE .50 0 09/10/01 09/10/01 4,472 100
210 06 0130 / 4389 S HALSTED ST AND S CANALPORT AVE 1.0 0 07/18/02 07/18/02 1,850 100
210 06 0130 / 4389 S HALSTED ST AND W 16TH ST 1.0 0 01/18/02 01/18/02 1,850 100
210 06 0219 / 4459 S WESTERN AVE AND S BLUE ISLAND AVE 1.0 05/05/05 05/06/05 10,563 03/18/05 03/18/05 9,406 100
210 06 0219 / 4459 S WESTERN AVE AND W 16TH ST .50 03/10/05 03/11/05 5,282 04/28/05 04/28/05 4,004 100
210 06 0219 / 4459 S WESTERN AVE AND W 21ST ST 1.0 03/08/05 03/09/05 10,563 04/26/05 04/26/05 8,008 100
210 06 0219 / 4459 S WESTERN AVE AND W CERMAK RD 1.0 04/27/05 04/27/05 10,563 04/22/05 04/22/05 8,527 100
210 06 0219 / 4459 S WESTERN AVE AND W ROOSEVELT RD .50 03/14/05 03/15/05 5,282 03/28/05 03/28/05 4,783 100
210 06 0130 / 4389 S WOLCOTT AVE AND S BLUE ISLAND AVE 1.0 0 09/16/02 09/16/02 9,306 100
210 06 0219 / 4459 W 23RD PL AND S WESTERN AVE 1.0 05/04/05 05/05/05 10,563 04/25/05 04/25/05 6,468 100

Totals per LED Signal Head Install 8.50 52,815 58,673

Work Type: Left Turn Arrow Locations


300 06 0225 / 5340 S LOOMIS ST AND W CERMAK RD 1.0 03/15/04 04/01/04 8,300 11/17/03 11/17/03 6,281 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 W 14TH ST AND S BLUE ISLAND AVE .50 2,000 09/11/01 09/12/01 1,328 100
300 06 0197 / 5322 W 21ST ST AND S WESTERN AVE 3.0 12,000 06/19/01 06/27/01 9,977 100
300 06 0197 / 5322 W CERMAK RD AND S LEAVITT ST 3.0 12,000 06/26/01 07/02/01 2,991 100
300 06 0197 / 5322 2190 W TAYLOR ST 1.0 8,000 11/13/01 11/13/01 10,685 100

Totals per Removal Temp Wiring - Signals 7.50 34,000 24,981

Work Type: Signals Intersections


300 06 0096 / 5258 2439 S OAKLEY AVE 50.0 07/10/03 07/15/03 0 07/08/03 07/08/03 7,906 100

Totals per Traffic 182,269 610,080


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 267

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0020 / 4295 S BLUE ISLAND AVE AND W 16TH ST 05/18/00 07/15/00 82,500 05/18/00 09/25/00 95,886 100
814 06 0181 / 16393 339 E CERMAK RD 1.0 10/24/95 10/24/95 0 10/24/95 10/24/95 125,000 100
814 06 0327 / 16531 1726 N LA SALLE ST 1.0 01/01/96 01/01/96 0 01/01/96 04/15/97 5,500 100
814 06 0238 / 16450 2800 N WESTERN AVE 1.0 01/01/91 01/01/91 0 01/01/91 01/01/91 100,000 100
814 06 0233 / 16445 2451 S ASHLAND AVE 1.0 07/23/92 07/23/92 0 07/23/92 07/23/92 105,000 100
814 06 0347 / 16545 950 W ROOSEVELT RD 1.0 09/22/96 09/22/96 0 09/22/96 09/22/96 77,534 100

Totals per TSM Install 5.0 82,500 508,920

Work Type: Traffic Equipment Painting Locations


300 09 / 33091 ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST 1.0 10/22/08 10/23/08 200 10/22/08 10/23/08 84 100
300 09 / 33068 ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST .95 06/02/08 06/20/08 264 04/01/08 12/01/08 0 100
300 11 / 32191 W HARRISON ST AND S MORGAN ST 1.0 11/14/08 12/16/08 1,250 11/14/08 12/16/08 910 100
300 11 / 32191 W HARRISON ST AND S RACINE AVE 1.0 11/14/08 12/16/08 2,940 11/14/08 12/16/08 2,325 100

Totals per Traffic Equipment Painting 3.95 4,654 3,319

Totals per Construction Phase 1,943,639 4,151,002

Totals for Ward 25 1,973,639 4,171,458


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 268

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32146 ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 1.0 11/01/07 11/30/07 0 0 0
300 06 / 32146 ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD 1.0 10/01/07 10/31/07 0 0 100
300 06 0308 / 5414 ON N RICHMOND ST FROM W GRAND AVE TO W AUGUSTA BLVD .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,082 100
300 06 0292 / 5399 1154 N CAMPBELL AVE 1.0 2,000 02/22/05 03/02/05 0 100
300 06 0292 / 5399 3227 W NORTH AVE 1.0 03/15/05 03/31/05 1,000 03/15/05 03/31/05 0 100

Totals per Design/Engineering 4.0 3,000 2,082


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 269

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON N CHRISTIANA AVE FROM W GRAND AVE TO W DIVISION ST 8.0 01/25/03 01/25/03 3,200 01/22/03 01/22/03 1,832 100
300 11 / 32215 ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD .0 03/01/07 12/31/07 0 0 0
300 07 0026 / 5449 ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 7.0 01/10/07 01/31/07 2,900 01/04/07 01/04/07 2,900 100
300 06 0069 / 5233 ON N HOMAN AVE FROM W GRAND AVE TO W DIVISION ST 8.0 01/25/03 01/25/03 3,200 01/22/03 01/22/03 2,748 100
300 06 0069 / 5233 ON N LAWNDALE AVE FROM W DIVISION ST TO W POTOMAC AVE 4.50 01/31/03 01/31/03 1,688 01/30/03 01/30/03 1,262 100
300 07 0026 / 5449 ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD 7.0 01/10/07 01/31/07 2,900 01/04/07 01/04/07 2,900 100
300 07 0026 / 5449 ON N RIDGEWAY AVE FROM W CORTLAND ST TO W ARMITAGE AVE 4.0 01/10/07 01/31/07 1,600 01/04/07 01/04/07 1,600 100
300 06 0069 / 5233 ON N SPAULDING AVE FROM W GRAND AVE TO W DIVISION ST 8.0 01/25/03 01/25/03 2,800 01/22/03 01/22/03 2,625 100
300 06 0069 / 5233 ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE 2.64 10/01/03 10/16/03 0 02/04/02 02/04/02 990 100
300 09 / 33067 ON W HADDON AVE FROM N ROCKWELL ST TO N CALIFORNIA AVE 3.50 06/16/08 06/20/08 1,400 06/16/08 06/20/08 879 100

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08
300 11 / 32215 ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE .0 03/01/07 12/31/07 0 0 0
300 06 0069 / 5233 1500 N KEDZIE AVE 1.0 01/19/03 01/19/03 210 01/16/03 01/16/03 203 100
302 00 0092 / 5774 1500 N ROCKWELL AVE 2.0 01/18/02 01/18/02 425 01/16/02 01/16/02 406 100
302 00 0092 / 5774 1500 N ROCKWELL AVE 1.0 0 01/16/02 01/16/02 203 100
300 06 0069 / 5233 1257 N ROCKWELL ST 1.0 10/24/02 10/24/02 210 10/21/02 10/21/02 203 100
302 00 0092 / 5774 2100 N SPAULDING AVE 1.0 10/02/01 10/02/01 205 10/04/01 10/04/01 205 100
300 11 / 32215 3300 W BLOOMINGDALE AVE 5.0 08/01/07 08/10/07 2,200 08/18/07 08/18/07 2,200 100
300 11 / 32215 3236 W DIVISION ST .0 03/01/07 12/31/07 0 0 0
302 00 0092 / 5774 3400 W PALMER ST 3.0 02/07/02 02/07/02 630 02/04/02 02/04/02 609 100
300 06 0069 / 5233 3400-3499 W PALMER ST 3.0 0 02/04/02 02/04/02 1,125 100
300 06 0069 / 5233 2601 W POTOMAC AVE 1.0 10/24/02 10/24/02 210 10/21/02 10/21/02 203 100
300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Totals per 250 Watt Changeout 70.64 23,778 23,092

Totals per Lighting/Electrical 2,076,617 1,004,711


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 270

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0794 / 6980 2300 N ALBANY AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0795 / 6981 2324 N ALBANY AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0882 / 7068 2525 N BERNARD ST 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 0804 / 6990 817 N CALIFORNIA AVE 1.0 10/04/96 10/04/96 0 10/04/96 10/04/96 300 100
302 00 0092 / 5774 1223 N CALIFORNIA AVE 1.0 0 11/05/01 11/05/01 236 100
302 00 0092 / 5774 1247 N CALIFORNIA AVE 1.0 0 11/05/01 11/05/01 236 100
302 00 0092 / 5774 1457 N CALIFORNIA AVE 1.0 0 11/06/01 11/06/01 236 100
302 00 0092 / 5774 1400 N CAMPBELL AVE 1.0 0 07/19/01 07/19/01 236 100
805 06 0813 / 6999 2415 N CENTRAL PARK AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0816 / 7002 2445 N CENTRAL PARK AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0817 / 7003 2517 N CENTRAL PARK AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0769 / 6955 2525 N CENTRAL PARK AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 1000 / 7186 2545 N CENTRAL PARK AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0514 / 6700 2433 N DRAKE AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 1096 / 7282 2436 N DRAKE AVE 1.0 04/17/96 04/17/96 0 04/17/96 04/17/96 300 100
805 06 1069 / 7255 2457 N DRAKE AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0970 / 7156 2525 N DRAKE AVE 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100
805 06 0841 / 7027 2542 N DRAKE AVE 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100
805 06 1095 / 7281 2041 N HAMLIN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1218 / 7404 1600 N HUMBOLDT BLVD 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 1715 / 7901 1618 N KEDZIE AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 1716 / 7902 1623 N KEDZIE AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 1724 / 7910 1729 N KIMBALL AVE 1.0 06/20/97 06/20/97 0 06/20/97 06/20/97 300 100
805 06 1718 / 7904 1733 N KIMBALL AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 2014 / 8200 2116 N KIMBALL AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 2015 / 8201 2156 N KIMBALL AVE 1.0 07/12/96 07/12/96 0 07/12/96 07/12/96 300 100
302 00 0092 / 5774 1505 N MAPLEWOOD AVE 1.0 0 11/05/01 11/05/01 236 100
302 00 0092 / 5774 1516 N ROCKWELL AVE 1.0 0 11/05/01 11/05/01 236 100
805 06 1695 / 7881 1500 N ROCKWELL ST 1.0 07/07/97 07/07/97 0 07/07/97 07/07/97 300 100
302 00 0092 / 5774 854 N SACRAMENTO AVE 1.0 0 07/24/01 07/24/01 236 100
302 00 0092 / 5774 933 N SACRAMENTO AVE 1.0 0 12/10/01 12/10/01 236 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 271

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0690 / 6876 854 N SACRAMENTO BLVD 1.0 04/20/96 04/20/96 0 04/20/96 04/20/96 300 100
805 06 1719 / 7905 1830 N SAWYER AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 1721 / 7907 1837 N SAWYER AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 1722 / 7908 1850 N SAWYER AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 0408 / 6594 1940 N ST LOUIS AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0409 / 6595 2403 N ST LOUIS AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0394 / 6580 2435 N ST LOUIS AVE 1.0 07/17/96 07/17/96 0 07/17/96 07/17/96 300 100
805 06 0411 / 6597 2457 N ST LOUIS AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0432 / 6618 2523 N ST LOUIS AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 0413 / 6599 2541 N ST LOUIS AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 0414 / 6600 2559 N ST LOUIS AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
302 00 0092 / 5774 2735 W AUGUSTA BLVD 1.0 0 10/19/01 10/19/01 236 100
805 06 1051 / 7237 3401 W DICKENS AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 1062 / 7248 3402 W DICKENS AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 1043 / 7229 3433 W DICKENS AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 1024 / 7210 3533 W DICKENS AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
300 06 0139 / 5289 3236 W DIVISION ST 1,179.0 03/01/06 09/01/06 25,774 06/15/06 06/30/06 35,622 100
302 00 0092 / 5774 3236 W DIVISION ST 19.0 0 01/19/01 01/16/02 4,477 100
805 06 1678 / 7864 3115 W FULLERTON AVE 1.0 07/28/97 07/28/97 0 07/28/97 07/28/97 300 100
805 06 1751 / 7937 3153 W FULLERTON AVE 1.0 05/22/97 05/22/97 0 05/22/97 05/22/97 300 100
302 00 0092 / 5774 2519 W HADDON AVE 1.0 0 07/12/01 07/12/01 236 100
805 06 1154 / 7340 2602 W HADDON AVE 1.0 08/01/96 08/01/96 0 08/01/96 08/01/96 300 100
805 06 1691 / 7877 3710 W LE MOYNE ST 1.0 07/02/97 07/02/97 0 07/02/97 07/02/97 300 100
805 06 1692 / 7878 3722 W LE MOYNE ST 1.0 07/02/97 07/02/97 0 07/02/97 07/02/97 300 100
805 06 1694 / 7880 3741 W LE MOYNE ST 1.0 07/02/97 07/02/97 0 07/02/97 07/02/97 300 100
805 06 1837 / 8023 3503 W MC LEAN AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 1912 / 8098 2617 W NORTH AVE 1.0 10/18/95 10/18/95 0 10/18/95 10/18/95 300 100
805 06 1913 / 8099 2619 W NORTH AVE 1.0 10/18/95 10/18/95 0 10/18/95 10/18/95 300 100
302 00 0092 / 5774 1507 W OHIO ST 1.0 0 10/19/01 10/19/01 236 100
805 06 1712 / 7898 2101 W OHIO ST 1.0 06/18/97 06/18/97 0 06/18/97 06/18/97 300 100
805 06 0605 / 6791 3325 W PALMER ST 1.0 03/30/95 03/30/95 0 03/30/95 03/30/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 272

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0627 / 6813 3640 W PALMER ST 1.0 04/08/96 04/08/96 0 04/08/96 04/08/96 300 100
805 06 0624 / 6810 3435 W SHAKESPEARE AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 0645 / 6831 3533 W SHAKESPEARE AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 0399 / 6585 3248 W WABANSIA AVE 1.0 07/17/96 07/17/96 0 07/17/96 07/17/96 300 100
805 06 0466 / 6652 3503 W WRIGHTWOOD AVE 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100
805 06 0487 / 6673 3525 W WRIGHTWOOD AVE 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100

Totals per Alley Lighting/Lamps 1,264.0 25,774 59,195

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 3236 W DIVISION ST 1,342.0 06/01/07 12/31/07 39,508 07/10/07 01/05/08 39,508 100

Work Type: Arterial Strt Lighting/Lamps Blocks


300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 3236 W DIVISION ST 1,247.0 0 05/18/02 05/21/02 22,706 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 824 N FAIRFIELD AVE 2.0 0 12/09/99 12/09/99 188 100

Work Type: Lighting Imprvmnts Blocks


300 06 0078 / 5241 3200 W PALMER ST 1.0 04/01/98 12/01/98 26,500 04/15/98 03/20/01 1,415 100

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 3227 W NORTH AVE .0 03/01/05 12/31/05 0 05/06/05 07/06/05 0 100

Work Type: Ornamental Lighting Blocks


300 11 / 32215 3236 W DIVISION ST 1.0 03/01/07 12/31/07 33,000 0 0
300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Totals per Ornamental Lighting 1.0 33,000 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 3236 W DIVISION ST .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 273

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 09 / 33092 ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32215 ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 2.0 03/01/07 12/31/07 110,000 0 0
300 06 / 32146 ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 2.0 03/28/08 06/30/08 305,644 0 0

Mozart from Augusta to Chicago is also under the same estimate Note Last Updated on 04-MAR-08
300 11 / 32219 ON N HAMLIN AVE FROM W GRAND AVE TO W NORTH AVE 1.0 04/16/07 08/15/07 62,500 04/09/07 09/07/07 50,000 100
300 06 0298 / 5405 ON N MAPLEWOOD AVE FROM W DIVISION ST TO W HIRSCH ST 2.0 10/15/05 11/25/05 0 10/03/05 11/30/05 109,552 100
300 07 0026 / 5449 ON N MONTICELLO AVE FROM W HIRSCH ST TO W NORTH AVE 2.0 04/18/06 11/18/06 170,000 01/03/07 05/04/07 133,415 100
300 06 / 32146 ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 12/05/07 06/23/08 305,644 0 0

Same project as Francisco Ave Note Last Updated on 04-MAR-08


300 06 0308 / 5414 ON N RICHMOND ST FROM W GRAND AVE TO W AUGUSTA BLVD 2.0 03/16/06 12/31/06 160,406 09/20/06 04/20/07 37,328 100
300 09 / 33092 ON N ROCKWELL ST FROM W CHICAGO AVE TO W GRAND AVE 4.0 40,000 0 0
300 09 / 33092 ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32215 ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE 2.0 03/01/07 12/31/07 110,000 0 0
300 11 / 32215 3236 W DIVISION ST .0 03/01/07 12/31/07 0 0 0
300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Totals per Residntl Staggered Lighting 25.0 1,524,194 330,295

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0232 / 5346 ON N MONTICELLO AVE FROM W NORTH AVE TO W WABANSIA AVE 2.0 11/04/02 01/03/03 132,000 11/06/02 12/27/02 116,966 100
300 06 0235 / 5349 ON W CRYSTAL ST FROM N KEDZIE AVE TO N HOMAN AVE 2.0 07/01/03 09/01/03 137,451 06/12/03 08/22/03 131,162 100
300 06 0267 / 5375 ON W SUPERIOR ST FROM N WESTERN AVE TO N ROCKWELL AVE 1.0 07/20/04 09/20/04 80,185 07/12/04 10/15/04 90,227 100

Totals per Residntl Strt Lighting/Lamps 5.0 349,636 338,355


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 274

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 11 / 32215 ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD .0 03/01/07 12/31/07 0 0 0
300 07 0026 / 5449 ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 7.0 04/18/06 11/18/06 1,400 12/01/06 12/11/06 0 100
300 04 0216 / 5114 ON N KEDZIE AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE 15.50 05/01/06 11/01/06 2,920 05/17/06 10/30/06 2,920 100
300 07 0026 / 5449 ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD 7.0 04/18/06 11/18/06 1,400 12/01/06 12/11/06 0 100
300 07 0026 / 5449 ON N RIDGEWAY AVE FROM W CORTLAND ST TO W ARMITAGE AVE 4.0 04/18/06 11/18/06 800 12/01/06 12/11/06 0 100
302 00 0076 / 5764 ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE 50.0 09/01/00 12/31/00 0 850
300 04 0216 / 5114 ON W GRAND AVE FROM N ASHLAND AVE TO N NOBLE ST 10.50 05/01/06 11/01/06 2,235 05/17/06 07/12/06 2,235 100
300 11 / 32215 ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE .0 03/01/07 12/31/07 0 0 0
302 00 0076 / 5764 ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE 5.67 09/01/00 12/31/00 0 96
300 11 / 32215 3236 W DIVISION ST .0 03/01/07 12/31/07 0 0 0
300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Totals per Strt Light Pole Painting 99.67 8,755 6,101

Work Type: Strt Lighting Blocks


300 06 0078 / 5241 1132 N ROCKWELL ST 1.0 04/01/98 12/01/98 6,300 04/13/98 04/23/98 4,685 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0238 / 5352 3236 W DIVISION ST 1,716.0 06/01/06 12/31/06 10,000 10/19/06 10/23/06 8,923 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 275

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0071 / 5759 1800 N ALBANY AVE 0 10/15/98 10/19/98 5,819 100
805 06 2770 / 8956 1805 N ALBANY AVE 5.0 05/01/92 05/01/92 0 05/01/92 05/01/92 3,750 100
805 06 2305 / 8491 1800 N CENTRAL PARK AVE 10.0 07/15/96 07/15/96 0 07/15/96 07/15/96 7,500 100
805 06 2750 / 8936 1801 N DRAKE AVE 6.0 06/21/94 06/21/94 0 06/21/94 06/21/94 4,500 100
302 00 0072 / 5760 1800 N KIMBALL AVE 1.0 0 03/15/00 04/27/00 23,466 100
805 06 2746 / 8932 1852 N KIMBALL AVE 24.0 01/01/91 01/01/91 0 01/01/91 01/01/91 18,000 100
805 06 2751 / 8937 1898 N MONTICELLO AVE 10.0 06/23/94 06/23/94 0 06/23/94 06/23/94 7,500 100
805 06 2771 / 8957 1801 N SAWYER AVE 6.0 01/01/90 01/01/90 0 01/01/90 01/01/90 4,500 100
805 06 2747 / 8933 1805 N SPAULDING AVE 10.0 06/16/94 06/16/94 0 06/16/94 06/16/94 7,500 100
805 06 2745 / 8931 1798 N ST LOUIS AVE 10.0 06/16/94 06/16/94 0 06/16/94 06/16/94 7,500 100
302 00 0070 / 5758 1800 N WHIPPLE ST 0 09/10/97 09/15/97 4,233 100
805 06 2101 / 8287 1800 N WHIPPLE ST 10.0 09/15/97 09/15/97 0 09/15/97 09/15/97 7,500 100
805 06 2769 / 8955 3000 W BLOOMINGDALE AVE 12.0 08/11/94 08/11/94 0 08/11/94 08/11/94 9,000 100
805 06 2773 / 8959 3200 W BLOOMINGDALE AVE 6.0 06/29/94 06/29/94 0 06/29/94 06/29/94 4,500 100
805 06 2922 / 9108 3405 W DIVISION ST 12.0 02/28/94 02/28/94 0 02/28/94 02/28/94 9,000 100
300 06 0217 / 5337 2009 W GRAND AVE 519.0 01/07/04 01/19/04 29,172 01/05/04 01/15/04 29,480 100
805 06 2653 / 8839 3685 W NORTH AVE 10.0 06/04/93 06/04/93 0 06/04/93 06/04/93 7,500 100
805 06 2652 / 8838 3570 W POTOMAC AVE 12.0 12/02/94 12/02/94 0 12/02/94 12/02/94 9,000 100

Totals per Underpass Lighting 663.0 29,172 170,248


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 276

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N HAMLIN AVE AND W ARMITAGE AVE 1.0 0 09/23/02 09/23/02 1,850 100
210 06 0130 / 4389 N HUMBOLDT BLVD AND W DIVISION ST 1.0 0 12/07/01 12/07/01 8,539 100
210 06 0130 / 4389 N KEDZIE AVE AND W DIVISION ST 1.0 0 12/04/01 12/04/01 8,539 100
210 06 0219 / 4459 N WESTERN AVE AND W DIVISION ST .50 03/28/05 03/29/05 5,282 03/16/05 03/16/05 5,042 100
210 06 0219 / 4459 N WESTERN AVE AND W POTOMAC AVE .50 03/29/05 03/30/05 5,282 03/08/05 03/08/05 3,824 100

Totals per LED Signal Head Install 4.0 10,563 27,794

Work Type: Left Turn Arrow Locations


210 06 0029 / 4303 2400 N KIMBALL AVE 1.0 03/01/00 05/31/00 86,000 03/01/00 05/30/00 124,383 100

Work Type: New Signal Locations


300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N CALIFORNIA AVE AND W HIRSCH ST 1.0 4,000 01/03/02 01/04/02 3,671 100
300 06 0197 / 5322 N KIMBALL AVE AND W ARMITAGE AVE .50 2,000 10/02/01 10/02/01 178 100

Totals per Removal Temp Wiring - Signals 1.50 6,000 3,849

Work Type: Signals Intersections


300 06 0096 / 5258 3236 W DIVISION ST 34.0 11/15/03 11/21/03 0 11/12/03 11/19/03 5,376 100

Work Type: TSM Install Locations


300 06 0199 / 5324 N WESTERN AVE AND W POTOMAC AVE .50 9,573 02/26/01 04/27/01 79,240 100
210 06 0028 / 4302 2400 N ALBANY AVE 1.0 07/15/98 09/30/98 175,000 12/15/98 02/15/99 127,277 100
814 06 0155 / 16369 1000 N CALIFORNIA AVE 1.0 02/05/93 02/05/93 0 02/05/93 02/05/93 76,127 100
814 06 0365 / 16556 1015 N HUMBOLDT DR 1.0 01/01/96 01/01/96 0 01/01/96 02/10/98 14,689 100
814 06 0366 / 16557 999 N SACRAMENTO BLVD 1.0 01/01/96 01/01/96 0 01/01/96 02/10/98 200,613 100

Totals per TSM Install 4.50 184,573 497,946

Work Type: Traffic Equipment Painting Locations


300 11 / 32190 2601 W POTOMAC AVE .0 03/01/07 12/31/07 0 0 0

Totals per Traffic 287,136 659,347


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 277

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Totals per Construction Phase 2,363,752 1,664,058

Totals for Ward 26 2,366,752 1,666,140


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 278

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0290 / 5397 CABRINI GREEN EXTENSION .0 02/01/05 06/01/05 28,000 02/01/05 10/18/06 8,100 100
300 06 / 32453 FRANCIS CABRINI HOMES .0 04/02/07 12/31/07 51,000 12/01/07 2,200 10
300 06 0211 / 5334 HENRY HORNER HOMES .0 11/07/01 08/20/02 0 11/07/01 08/20/02 6,670 100
300 06 / 32277 ON N AVERS AVE FROM W DIVISION ST TO W GRAND AVE 1.0 04/01/08 08/30/08 65,000 05/06/08 0 20
300 06 / 32146 ON N DRAKE AVE FROM W OHIO ST TO W CHICAGO AVE 1.0 11/01/07 11/30/07 0 0 100
300 06 / 32277 ON N HARDING AVE FROM W DIVISION ST TO W GRAND AVE 1.50 04/01/08 08/30/08 97,000 05/06/08 0 20
300 06 / 32277 ON N SPRINGFIELD AVE FROM W DIVISION ST TO W GRAND AVE 1.50 04/01/08 08/30/08 97,000 05/06/08 0 20
300 06 / 32146 ON N ST LOUIS AVE FROM W OHIO ST TO W CHICAGO AVE 1.0 05/01/07 10/31/07 0 0 100
300 06 0308 / 5414 ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 274 100
210 06 0243 / 4480 N ASHLAND AVE AND W CHICAGO AVE .0 12/27/06 01/26/07 250 12/27/06 01/26/07 638 100
210 06 0240 / 4477 W NORTH AVE AND N SEDGWICK ST .0 10/10/05 07/31/06 600 10/10/05 08/08/06 125 100
300 11 / 32232 W NORTH AVE AND N WELLS ST 1.0 06/01/07 12/31/07 0 1,506 100
300 06 0292 / 5399 327 N ADA ST 1.0 02/22/05 03/04/05 6,000 10/07/04 03/14/05 742 100
300 06 0314 / 5420 200-300 N WOLCOTT AVE .0 04/01/06 12/31/06 0 0 0
300 06 0282 / 5390 650 W MADISON ST 1.0 09/29/04 10/21/04 1,000 05/01/04 10/21/04 832 100
300 06 0292 / 5399 536 W SCOTT ST 1.0 02/10/05 05/26/05 2,000 02/10/05 05/26/05 607 100
300 06 0314 / 5420 1800-1900 W WASHINGTON BLVD .0 04/01/06 12/31/06 0 0 0

Totals per Design/Engineering 10.0 347,850 21,693


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 279

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON N HAMLIN AVE FROM W CHICAGO AVE TO W DIVISION ST 16.0 05/02/02 05/02/02 3,360 04/30/02 04/30/02 3,248 100
300 06 0069 / 5233 ON N HARDING AVE FROM W CHICAGO AVE TO W DIVISION ST 16.0 05/02/02 05/02/02 3,360 04/30/02 04/30/02 3,248 100
302 00 0092 / 5774 ON N LAWNDALE AVE FROM W CHICAGO AVE TO W IOWA ST 5.0 09/13/01 09/13/01 1,029 09/28/01 09/28/01 1,029 100
300 06 0069 / 5233 ON N LAWNDALE AVE FROM W DIVISION ST TO W POTOMAC AVE 4.50 01/31/03 01/31/03 1,688 01/30/03 01/30/03 1,262 100
300 06 0069 / 5233 ON N SPRINGFIELD AVE FROM W CHICAGO AVE TO W DIVISION ST 16.0 05/02/02 05/02/02 3,360 04/30/02 04/30/02 3,248 100
300 06 0069 / 5233 1200 N AVERS AVE 5.0 0 06/04/02 06/04/02 1,875 100
300 06 / 32496 500 N DRAKE AVE 5.0 08/01/07 08/10/07 3,200 08/18/07 08/18/07 170 100

Totals per 250 Watt Changeout 67.50 15,997 14,080

Work Type: 400 Watt Changeout Fixtures


300 07 0042 / 5465 ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST 6.50 01/10/07 01/31/07 2,600 2,600 100
300 06 0225 / 5340 1901 W MADISON ST 124.0 11/15/03 11/30/03 49,600 11/13/03 12/08/03 27,325 100

Totals per 400 Watt Changeout 130.50 52,200 29,925

Totals per Lighting/Electrical 3,914,688 2,696,656


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 280

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1500 / 7686 405 N ABERDEEN ST 1.0 11/15/97 11/15/97 0 11/15/97 11/15/97 300 100
805 06 1493 / 7679 431 N ABERDEEN ST 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
805 06 1495 / 7681 439 N ABERDEEN ST 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
302 00 0092 / 5774 614 N ADA ST 1.0 0 10/19/01 10/19/01 236 100
805 06 1491 / 7677 405 N CARPENTER ST 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
805 06 1494 / 7680 431 N CARPENTER ST 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
805 06 1496 / 7682 439 N CARPENTER ST 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
302 00 0092 / 5774 346 N JUSTINE ST 1.0 0 06/11/01 06/11/01 236 100
302 00 0092 / 5774 614 N MAY ST 1.0 0 09/28/01 09/28/01 236 100
805 06 0662 / 6848 1126 N RIDGEWAY AVE 1.0 05/17/96 05/17/96 0 05/17/96 05/17/96 300 100
302 00 0092 / 5774 1538 W AUGUSTA BLVD 1.0 0 05/13/01 05/13/01 236 100
805 06 0831 / 7017 3030 W CARROLL AVE 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 0832 / 7018 3052 W CARROLL AVE 1.0 10/11/96 10/11/96 0 10/11/96 10/11/96 300 100
300 06 0139 / 5289 1463 W CHICAGO AVE 1,392.0 03/01/06 09/01/06 30,385 06/12/06 06/27/06 42,058 100
302 00 0092 / 5774 1463 W CHICAGO AVE 21.0 0 02/05/01 01/17/02 4,949 100
805 06 1599 / 7785 1401 W CORTEZ ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1600 / 7786 1417 W CORTEZ ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1601 / 7787 1440 W CORTEZ ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1534 / 7720 1455 W CORTEZ ST 1.0 10/22/97 10/22/97 0 10/22/97 10/22/97 300 100
805 06 1102 / 7288 1801 W FULTON ST 1.0 09/10/96 09/10/96 0 09/10/96 09/10/96 300 100
302 00 0092 / 5774 1354 W GRAND AVE 1.0 0 10/19/01 10/19/01 236 100
805 06 1237 / 7423 2119 W HUBBARD ST 1.0 04/03/96 04/03/96 0 04/03/96 04/03/96 300 100
302 00 0092 / 5774 1243 W OHIO ST 1.0 0 10/19/01 10/19/01 236 100
805 06 1470 / 7656 4028 W POTOMAC AVE 1.0 12/04/97 12/04/97 0 12/04/97 12/04/97 300 100
805 06 0499 / 6685 1716 W WASHINGTON BLVD 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100

Totals per Alley Lighting/Lamps 1,436.0 30,385 53,523

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 1463 W CHICAGO AVE 3,228.0 06/01/07 12/31/07 95,032 07/10/07 09/01/07 95,032 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 281

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Strt Lighting/Lamps Installations
300 06 0053 / 5228 1463 W CHICAGO AVE 3,133.0 0 06/20/02 06/23/02 57,046 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 CABRINI GREEN EXTENSION 03/02/01 04/17/01 72,500 04/05/01 04/13/01 51,244 100
300 06 0198 / 5323 HENRY HORNER HOMES 01/16/01 03/14/01 60,625 03/09/01 03/14/01 49,839 100
300 06 0198 / 5323 WILLIAM GREEN HOMES 03/02/01 04/24/01 42,500 04/05/01 04/14/01 12,814 100
300 11 / 32216 ON N SAWYER AVE FROM W OHIO ST TO W HURON ST 2.0 10/05/07 10/05/07 1,200 10/05/07 10/05/07 586 100
300 06 0167 / 5306 ON N SPRINGFIELD AVE FROM W POTOMAC AVE TO W LE MOYNE ST 1.60 0 09/23/99 09/23/99 263 100
300 06 0167 / 5306 825 N CARPENTER ST 1.0 0 01/07/99 01/07/99 351 100
300 06 0167 / 5306 1000 N NOBLE ST 2.0 0 01/09/99 01/09/99 702 100
300 06 0069 / 5233 1400 N ORLEANS ST 4.0 11/20/02 11/20/02 1,940 11/18/02 11/18/02 1,918 100
300 11 / 32216 600-700 N SAWYER AVE 2.0 10/05/07 10/15/07 1,000 10/10/07 10/10/07 586 100
302 00 0092 / 5774 100 S RACINE AVE 1.0 0 10/17/01 10/17/01 404 100
300 11 / 32216 1463 W CHICAGO AVE 1.0 09/01/07 09/10/07 1,250 07/10/07 07/10/07 293 100
300 06 0071 / 5234 618 W SCOTT ST 01/01/00 07/01/00 400,000 03/30/00 06/15/00 91,430 100

Totals per Flood Light Install 14.60 581,015 210,430

Work Type: Lighting Imprvmnts Installations


300 06 0290 / 5397 CABRINI GREEN EXTENSION .0 07/01/05 07/31/07 286,000 10/26/06 10/26/07 0 100

no funding found in jcs. Note Last Updated on 29-JAN-08


300 06 0211 / 5334 HENRY HORNER HOMES 34.0 11/15/02 05/31/04 351,574 10/07/02 01/20/05 360,632 100
300 06 0292 / 5399 327 N ADA ST .0 03/18/05 12/31/05 6,000 01/22/06 12/31/05 7,592 100
300 06 0282 / 5390 650 W MADISON ST 1.0 70,000 10/08/04 11/08/04 74,690 100
300 06 0292 / 5399 536 W SCOTT ST .0 03/01/05 12/31/05 0 07/28/05 08/05/05 0 100

Totals per Lighting Imprvmnts 35.0 713,574 442,914

Work Type: Lighting Imprvmnts Projects


300 06 / 32453 FRANCIS CABRINI HOMES .0 04/02/07 12/21/08 510,000 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 282

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 09 / 33093 ON N HARDING AVE FROM W AUGUSTA BLVD TO W CHICAGO AVE 2.0 65,646 04/01/08 12/01/08 0 0
300 06 0225 / 5340 1901 W MADISON ST 17.0 01/01/04 01/10/04 20,400 12/30/03 01/02/04 19,657 100

Totals per Ornamental - Piggyback Lighting 19.0 86,046 19,657

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 1463 W CHICAGO AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32277 ON N AVERS AVE FROM W DIVISION ST TO W GRAND AVE .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON N DRAKE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 2.0 11/01/05 12/15/05 0 08/22/05 11/11/05 110,151 100
300 06 / 32146 ON N DRAKE AVE FROM W OHIO ST TO W CHICAGO AVE 4.0 12/07/07 05/29/08 381,586 01/02/08 0 50
300 09 / 33093 ON N HARDING AVE FROM W AUGUSTA BLVD TO W CHICAGO AVE 2.0 64,353 04/01/08 12/01/08 0 0
300 06 / 32277 ON N HARDING AVE FROM W DIVISION ST TO W GRAND AVE .0 05/04/08 12/31/08 0 0 0
300 11 / 32216 ON N KEYSTONE AVE FROM W THOMAS ST TO W DIVISION ST 1.0 02/15/08 04/04/08 60,000 02/18/08 04/25/08 48,598 100
300 06 / 32277 ON N SPRINGFIELD AVE FROM W DIVISION ST TO W GRAND AVE .0 05/04/08 12/31/08 0 0 0
300 09 / 33093 ON N ST LOUIS AVE FROM W AUGUSTA BLVD TO W THOMAS ST 1.0 65,000 04/01/08 12/01/08 0 0
300 06 / 32146 ON N ST LOUIS AVE FROM W OHIO ST TO W CHICAGO AVE 2.0 12/06/07 06/23/08 381,586 0 50
300 09 / 33093 ON W HURON ST FROM N HARDING AVE TO N HAMLIN AVE 2.0 97,500 04/01/08 12/01/08 0 0
300 06 0308 / 5414 ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE 1.0 07/31/06 09/22/06 70,814 07/25/06 03/23/07 40,204 100

Totals per Residntl Staggered Lighting 15.0 1,120,839 198,953

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON W ERIE ST FROM N PULASKI RD TO N HARDING AVE 1.0 10/01/04 11/15/04 48,436 10/05/04 11/05/04 37,593 100
302 00 0092 / 5774 ON W GOETHE ST FROM N WELLS ST TO N SEDGWICK ST 08/13/01 41,000 08/13/01 09/07/01 40,581 100
300 06 0235 / 5349 ON W HURON ST FROM N NOBLE ST TO N ASHLAND AVE 2.0 10/01/03 11/15/03 168,587 10/02/03 11/07/03 153,357 100
300 06 0267 / 5375 ON W HURON ST FROM N PULASKI RD TO N HARDING AVE 1.0 09/20/04 11/20/04 48,436 10/05/04 11/05/04 37,594 100
300 06 0314 / 5420 200-300 N WOLCOTT AVE .0 10/15/06 09/30/08 89,000 07/19/07 08/12/08 88,176 100
300 06 0314 / 5420 1800-1900 W WASHINGTON BLVD .0 10/15/06 09/30/08 89,000 07/19/07 08/12/07 88,176 100

Totals per Residntl Strt Lighting/Lamps 4.0 484,459 445,477


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 283

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 1413 N WIELAND ST 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1425 N WIELAND ST 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1449 N WIELAND ST 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1505 N WIELAND ST 1.0 0 03/23/01 03/23/01 378 100
302 00 0092 / 5774 1507 N WIELAND ST 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1515 N WIELAND ST 1.0 0 01/31/01 01/31/01 378 100
302 00 0092 / 5774 1529 N WIELAND ST 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 3800 W FERDINAND ST 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 3807 W FERDINAND ST 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 3817 W FERDINAND ST 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 3832 W FERDINAND ST 1.0 0 02/13/01 02/13/01 378 100

Totals per Short Arm Installs - Residntl 11.0 0 4,158

Work Type: Strt Light Pole Painting Locations


300 11 / 32191 ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST 3.57 11/14/08 12/15/08 893 11/14/08 12/15/08 714 100
300 09 / 33109 ON N CLEVELAND AVE FROM N CLYBOURN AVE TO W NORTH AVE 4.20 05/19/08 06/20/08 840 04/01/08 12/01/08 504 100
300 04 0216 / 5114 ON N PULASKI RD FROM W DIVISION ST TO W GRAND AVE 24.0 05/01/06 11/01/06 5,119 05/17/06 07/24/06 5,119 100
300 11 / 32191 ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST 1.56 11/14/08 12/16/08 390 11/14/08 12/16/08 312 100
300 04 0216 / 5114 ON W GRAND AVE FROM N ASHLAND AVE TO N NOBLE ST 10.50 05/01/06 11/01/06 2,235 05/17/06 07/12/06 2,235 100
300 07 0042 / 5465 ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST 6.50 04/18/06 11/18/06 1,625 08/14/06 09/01/06 1,283 100
302 00 0076 / 5764 ON W GRAND AVE FROM W DIVISION ST TO N LOREL AVE 61.50 09/01/00 12/31/00 0 1,046
300 06 0225 / 5340 1901 W MADISON ST 130.0 10/15/03 11/06/03 43,050 10/13/03 11/10/03 43,000 100

Totals per Strt Light Pole Painting 241.83 54,152 54,213

Work Type: Strt Lighting Blocks


303 00 0006 / 5783 200 N ASHLAND AVE 08/01/97 12/01/97 60,000 08/01/97 04/30/98 76,547 100
300 06 0078 / 5241 800 N SPRINGFIELD AVE 1.0 10/01/00 02/01/01 6,300 05/15/98 05/26/98 0 100
300 06 0076 / 5239 300 W CHICAGO AVE 03/19/01 05/19/01 58,500 03/02/01 03/20/01 0 100

Totals per Strt Lighting 1.0 124,800 76,547


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 284

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Traffic Signal Regrouping Lamps
300 06 0139 / 5289 1463 W CHICAGO AVE 1,981.0 03/01/04 12/01/04 21,190 10/02/06 10/12/06 21,573 100
300 06 0238 / 5352 1463 W CHICAGO AVE 2,103.0 06/01/06 12/31/06 25,000 10/02/06 10/12/06 22,902 100

Totals per Traffic Signal Regrouping 4,084.0 46,190 44,475


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 285

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2690 / 8876 200 N ABERDEEN ST 2.0 12/31/93 12/31/93 0 12/31/93 12/31/93 1,500 100
805 06 2956 / 9142 425 N ABERDEEN ST 12.0 02/15/94 02/15/94 0 02/15/94 02/15/94 9,000 100
805 06 2716 / 8902 198 N ADA ST 2.0 12/31/93 12/31/93 0 12/31/93 12/31/93 1,500 100
805 06 2351 / 8537 428 N ADA ST 14.0 08/26/94 08/26/94 0 08/26/94 08/26/94 10,500 100
805 06 2714 / 8900 205 N ARTESIAN AVE 2.0 12/31/93 12/31/93 0 12/31/93 12/31/93 1,500 100
805 06 2713 / 8899 198 N ASHLAND AVE 2.0 12/31/93 12/31/93 0 12/31/93 12/31/93 1,500 100
805 06 2197 / 8383 385 N ASHLAND AVE 26.0 01/05/94 01/05/94 0 01/05/94 01/05/94 19,500 100
805 06 2753 / 8939 435 N CARPENTER ST 14.0 02/10/94 02/10/94 0 02/10/94 02/10/94 10,500 100
805 06 2760 / 8946 385 N DAMEN AVE 26.0 08/04/93 08/04/93 0 08/04/93 08/04/93 19,500 100
805 06 2907 / 9093 430 N DESPLAINES ST 14.0 12/01/93 12/01/93 0 12/01/93 12/01/93 10,500 100
302 00 0070 / 5758 420 N ELIZABETH ST 0 02/07/97 02/14/97 6,482 100
805 06 2289 / 8475 900 N ELSTON AVE 26.0 08/28/96 08/28/96 0 08/28/96 08/28/96 19,500 100
805 06 2926 / 9112 640 N GREEN ST 18.0 11/24/93 11/24/93 0 11/24/93 11/24/93 13,500 100
805 06 2565 / 8751 430 N HALSTED ST 30.0 02/05/91 02/05/91 0 02/05/91 02/05/91 22,500 100
805 06 2761 / 8947 498 N HAMLIN AVE 12.0 05/06/94 05/06/94 0 05/06/94 05/06/94 9,000 100
805 06 2756 / 8942 339 N HOYNE AVE 34.0 05/14/93 05/14/93 0 05/14/93 05/14/93 25,500 100
805 06 2758 / 8944 339 N LEAVITT ST 22.0 05/03/93 05/03/93 0 05/03/93 05/03/93 16,500 100
805 06 2390 / 8576 808 N LESSING ST 15.0 01/24/96 01/24/96 0 01/24/96 01/24/96 11,250 100
805 06 2213 / 8399 430 N MAY ST 14.0 01/02/92 01/02/92 0 01/02/92 01/02/92 10,500 100
805 06 2174 / 8360 450 N MILWAUKEE AVE 17.0 12/31/95 12/31/95 0 12/31/95 12/31/95 12,750 100
805 06 2176 / 8362 450 N MILWAUKEE AVE 32.0 04/20/97 04/20/97 0 04/20/97 04/20/97 24,000 100
805 06 2200 / 8386 450 N MILWAUKEE AVE 17.0 12/31/95 12/31/95 0 12/31/95 12/31/95 12,750 100
805 06 2175 / 8361 455 N MILWAUKEE AVE 17.0 12/31/94 12/31/94 0 12/31/94 12/31/94 12,750 100
805 06 2173 / 8359 460 N MILWAUKEE AVE 17.0 12/31/94 12/31/94 0 12/31/94 12/31/94 12,750 100
302 00 0070 / 5758 700 N MILWAUKEE AVE 0 04/13/97 04/20/97 22,746 100
805 06 2400 / 8586 420 N MORGAN ST 14.0 02/22/94 02/22/94 0 02/22/94 02/22/94 10,500 100
805 06 2759 / 8945 389 N OAKLEY BLVD 22.0 06/03/94 06/03/94 0 06/03/94 06/03/94 16,500 100
805 06 2353 / 8539 398 N OGDEN AVE 34.0 07/19/93 07/19/93 0 07/19/93 07/19/93 25,500 100
805 06 2350 / 8536 430 N OGDEN AVE 16.0 07/19/93 07/19/93 0 07/19/93 07/19/93 12,000 100
805 06 2522 / 8708 389 N PAULINA ST 14.0 05/14/93 05/14/93 0 05/14/93 05/14/93 10,500 100
805 06 2562 / 8748 429 N PEORIA ST 16.0 04/19/95 04/19/95 0 04/19/95 04/19/95 12,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 286

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2534 / 8720 405 N PULASKI RD 12.0 04/07/95 04/07/95 0 04/07/95 04/07/95 9,000 100
805 06 2535 / 8721 405 N PULASKI RD 4.0 04/07/95 04/07/95 0 04/07/95 04/07/95 3,000 100
805 06 2536 / 8722 405 N PULASKI RD 8.0 04/07/95 04/07/95 0 04/07/95 04/07/95 6,000 100
805 06 2558 / 8744 405 N PULASKI RD 8.0 04/07/95 04/07/95 0 04/07/95 04/07/95 6,000 100
302 00 0071 / 5759 420 N RACINE AVE 0 01/27/99 02/05/99 15,129 100
805 06 2187 / 8373 430 N RACINE AVE 10.0 01/23/92 01/23/92 0 01/23/92 01/23/92 7,500 100
805 06 2252 / 8438 948 N RACINE AVE 14.0 10/16/96 10/16/96 0 10/16/96 10/16/96 10,500 100
805 06 2777 / 8963 345 N SACRAMENTO BLVD 22.0 04/21/94 04/21/94 0 04/21/94 04/21/94 16,500 100
805 06 2224 / 8410 798 N SACRAMENTO BLVD 14.0 12/30/96 12/30/96 0 12/30/96 12/30/96 10,500 100
805 06 2230 / 8416 798 N SACRAMENTO BLVD 11.0 12/30/96 12/30/96 0 12/30/96 12/30/96 8,250 100
805 06 2231 / 8417 798 N SACRAMENTO BLVD 8.0 12/30/96 12/30/96 0 12/30/96 12/30/96 6,000 100
805 06 2265 / 8451 799 N SACRAMENTO BLVD 6.0 12/30/96 12/30/96 0 12/30/96 12/30/96 4,500 100
805 06 2529 / 8715 430 N SANGAMON ST 14.0 01/02/92 01/02/92 0 01/02/92 01/02/92 10,500 100
805 06 2537 / 8723 850 N SANGAMON ST 30.0 05/31/95 05/31/95 0 05/31/95 05/31/95 22,500 100
805 06 2532 / 8718 890 N SANGAMON ST 24.0 06/04/95 06/04/95 0 06/04/95 06/04/95 18,000 100
805 06 2778 / 8964 998 N SPAULDING AVE 16.0 06/01/94 06/01/94 0 06/01/94 06/01/94 12,000 100
805 06 2215 / 8401 501 N UNION AVE 18.0 12/09/96 12/09/96 0 12/09/96 12/09/96 13,500 100
805 06 2355 / 8541 388 N WESTERN AVE 28.0 08/04/93 08/04/93 0 08/04/93 08/04/93 21,000 100
805 06 2541 / 8727 370 N WOLCOTT AVE 34.0 05/25/95 05/25/95 0 05/25/95 05/25/95 25,500 100
805 06 2523 / 8709 388 N WOOD ST 22.0 05/01/95 05/01/95 0 05/01/95 05/01/95 16,500 100
805 06 2590 / 8776 1029 S CENTRAL PARK AVE 20.0 08/01/93 08/01/93 0 08/01/93 08/01/93 15,000 100
805 06 2731 / 8917 819 W ANCONA ST 4.0 06/01/94 06/01/94 0 06/01/94 06/01/94 3,000 100
805 06 2216 / 8402 1212 W AUGUSTA BLVD 30.0 12/09/96 12/09/96 0 12/09/96 12/09/96 22,500 100
805 06 2315 / 8501 3301 W AUGUSTA BLVD 24.0 05/23/96 05/23/96 0 05/23/96 05/23/96 18,000 100
805 06 2317 / 8503 3301 W AUGUSTA BLVD 24.0 05/23/96 05/23/96 0 05/23/96 05/23/96 18,000 100
805 06 2406 / 8592 3305 W AUGUSTA BLVD 24.0 05/23/96 05/23/96 0 05/23/96 05/23/96 18,000 100
805 06 2405 / 8591 3310 W AUGUSTA BLVD 24.0 05/23/96 05/23/96 0 05/23/96 05/23/96 18,000 100
805 06 2381 / 8567 950 W CHICAGO AVE 17.0 01/24/96 01/24/96 0 01/24/96 01/24/96 12,750 100
805 06 2225 / 8411 3100 W CHICAGO AVE 24.0 06/16/94 06/16/94 0 06/16/94 06/16/94 18,000 100
805 06 2937 / 9123 2535 W FULTON ST 12.0 06/29/93 06/29/93 0 06/29/93 06/29/93 9,000 100
805 06 2938 / 9124 2625 W FULTON ST 12.0 07/01/93 07/01/93 0 07/01/93 07/01/93 9,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 287

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2211 / 8397 663 W GRAND AVE 4.0 02/10/97 02/10/97 0 02/10/97 02/10/97 3,000 100
805 06 2212 / 8398 663 W GRAND AVE 4.0 12/31/95 12/31/95 0 12/31/95 12/31/95 3,000 100
805 06 2205 / 8391 664 W GRAND AVE 18.0 02/10/97 02/10/97 0 02/10/97 02/10/97 13,500 100
302 00 0070 / 5758 700 W GRAND AVE 0 02/01/97 02/10/97 15,559 100
805 06 2210 / 8396 3359 W GRAND AVE 10.0 12/31/95 12/31/95 0 12/31/95 12/31/95 7,500 100
302 00 0070 / 5758 3400 W GRAND AVE 0 12/01/97 12/08/97 15,811 100
805 06 2143 / 8329 3400 W GRAND AVE 16.0 12/08/97 12/08/97 0 12/08/97 12/08/97 12,000 100
805 06 2613 / 8799 1029 W HUBBARD ST 3.0 11/30/94 11/30/94 0 11/30/94 11/30/94 2,250 100
805 06 2301 / 8487 870 W HURON ST 14.0 11/16/93 11/16/93 0 11/16/93 11/16/93 10,500 100
805 06 2106 / 8292 1401 W KINZIE ST 8.0 12/12/95 12/12/95 0 12/12/95 12/12/95 6,000 100
805 06 2408 / 8594 2623 W LAKE ST 12.0 01/05/96 01/05/96 0 01/05/96 01/05/96 9,000 100
805 06 2314 / 8500 2630 W LAKE ST 12.0 01/05/96 01/05/96 0 01/05/96 01/05/96 9,000 100
805 06 2318 / 8504 2633 W LAKE ST 12.0 01/05/96 01/05/96 0 01/05/96 01/05/96 9,000 100
805 06 2407 / 8593 2633 W LAKE ST 12.0 01/05/96 01/05/96 0 01/05/96 01/05/96 9,000 100
805 06 2581 / 8767 701 W OHIO ST 8.0 03/08/95 03/08/95 0 03/08/95 03/08/95 6,000 100
805 06 2730 / 8916 833 W SUPERIOR ST 14.0 08/08/94 08/08/94 0 08/08/94 08/08/94 10,500 100

Totals per Underpass Lighting 1,166.0 0 950,227


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 288

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Flashing Yellow Warning Lights Locations
210 06 0022 / 4297 1444 W AUGUSTA BLVD 1.0 01/15/02 01/25/02 23,000 01/09/02 01/11/02 16,907 100

Work Type: LED Signal Head Install Locations


210 06 0130 / 4389 N HAMLIN AVE AND W DIVISION ST 1.0 0 12/04/01 12/04/01 8,539 100
210 06 0130 / 4389 N HOMAN AVE AND W FRANKLIN BLVD .50 0 05/02/02 05/02/02 4,270 100
210 06 0130 / 4389 N ORLEANS ST AND W CHICAGO AVE .50 0 04/12/02 04/12/02 3,953 100
210 06 0130 / 4389 N WELLS ST AND W CHICAGO AVE .50 0 04/10/02 04/10/02 4,270 100
210 06 0219 / 4459 N WESTERN AVE AND W LAKE ST .50 03/24/05 03/25/05 5,282 03/01/05 03/01/05 4,365 100
300 06 0251 / 5361 W CHICAGO AVE AND N HALSTED ST 1.0 06/01/06 07/01/06 30,500 07/01/06 07/26/06 10,484 100

Totals per LED Signal Head Install 4.0 35,782 35,880

Work Type: Left Turn Arrow Locations


210 06 0231 / 4470 W GRAND AVE AND N HALSTED ST .0 03/01/08 12/01/08 0 0 0
210 06 0231 / 4470 W GRAND AVE AND N MILWAUKEE AVE .0 03/01/08 12/01/08 0 0 0

Totals per Left Turn Arrow .0 0 0

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 N ASHLAND AVE AND W CHICAGO AVE .0 03/15/06 05/08/07 6,000 01/26/07 02/09/07 2,994 100

10713013 Note Last Updated on 03-APR-08


210 06 0240 / 4477 W NORTH AVE AND N SEDGWICK ST 4.0 11/01/05 09/30/06 5,000 11/01/05 10/16/06 2,979 100
300 11 / 32232 W NORTH AVE AND N WELLS ST 1.0 07/25/07 10/31/07 12,000 08/01/07 08/02/07 5,776 100

Totals per Pedestrian Countdown Signal Install 5.0 23,000 11,749

Work Type: Pedestrian Countdown Signal Installation Installations


300 11 / 32600 W NORTH AVE AND N WELLS ST 1.0 09/08/07 01/04/08 11,520 08/01/07 08/02/07 0 100

Totals per Traffic 272,097 1,249,534


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 289

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Removal Temp Wiring - Signals Crossings
300 06 0197 / 5322 N CALIFORNIA AVE AND W LAKE ST .50 2,000 07/18/01 04/08/02 1,285 100
300 06 0197 / 5322 N HAMLIN AVE AND W DIVISION ST 3.0 12,000 04/08/02 04/08/02 0 100
300 06 0197 / 5322 N LARRABEE ST AND W DIVISION ST 1.0 4,000 07/26/01 07/31/01 11,590 100
300 06 0197 / 5322 N MILWAUKEE AVE AND W ERIE ST 1.0 4,000 07/25/01 04/08/02 175 100

Totals per Removal Temp Wiring - Signals 5.50 22,000 13,050

Work Type: Signal Removal Locations


300 06 0225 / 5340 N DESPLAINES ST AND W RANDOLPH ST .50 11/01/02 11/30/02 2,500 09/25/02 11/14/02 1,906 100

Work Type: Signals Intersections


300 06 0096 / 5258 1463 W CHICAGO AVE 161.0 11/01/03 11/07/03 0 11/20/03 11/28/03 25,457 100

Work Type: TSM Install Locations


814 06 0160 / 16373 150 N DESPLAINES ST 1.0 02/13/92 02/13/92 0 02/13/92 02/13/92 106,743 100
814 06 0185 / 16397 300 N DESPLAINES ST 1.0 03/04/92 03/04/92 0 03/04/92 03/04/92 106,743 100
814 06 0187 / 16399 453 N MILWAUKEE AVE 1.0 03/20/92 03/20/92 0 03/20/92 03/20/92 106,743 100
814 06 0270 / 16482 1000 N MILWAUKEE AVE 1.0 12/04/90 12/04/90 0 12/04/90 12/04/90 94,307 100
814 06 0053 / 16270 100 N MORGAN ST 1.0 08/02/96 08/02/96 0 08/02/96 08/02/96 123,933 100
814 06 0266 / 16478 1482 N OGDEN AVE 1.0 03/12/92 03/12/92 0 03/12/92 03/12/92 108,062 100
814 06 0264 / 16476 800 N ORLEANS ST 1.0 03/13/92 03/13/92 0 03/13/92 03/13/92 108,062 100
814 06 0052 / 16269 100 N SANGAMON ST 1.0 08/05/96 08/05/96 0 08/05/96 08/05/96 158,482 100
814 06 0083 / 16299 1327 W DIVISION ST 1.0 10/05/93 10/05/93 0 10/05/93 10/05/93 26,873 100
814 06 0326 / 16530 1600 W MADISON ST 1.0 01/01/96 01/01/96 0 01/01/96 04/10/97 100,000 100
210 06 0006 / 4281 1800 W MADISON ST 1.0 03/01/00 05/31/00 150,000 03/16/00 04/24/00 102,142

Totals per TSM Install 11.0 150,000 1,142,090

Work Type: Traffic Equipment Painting Locations


300 11 / 32191 ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST 2.94 11/14/08 12/15/08 1,006 11/14/08 12/15/08 947 100
300 11 / 32191 ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST 4.81 11/14/08 12/16/08 1,820 11/14/08 12/16/08 1,549 100
300 06 0108 / 5263 N WELLS ST AND W NORTH AVE 04/01/05 04/10/05 1,470 0

Totals per Traffic Equipment Painting 7.75 4,296 2,496


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 290

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr.


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Totals per Construction Phase 4,186,785 3,946,190

Totals for Ward 27 4,534,635 3,967,883


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 291

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,352 100
300 06 0308 / 5414 ON W WILCOX ST FROM S PULASKI RD TO S KEELER AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,566 100
300 06 0292 / 5399 9 N LARAMIE AVE .0 02/18/05 2,000 02/18/05 842 0
300 06 0282 / 5390 2750 W ROOSEVELT RD 1.0 10/26/04 11/16/04 2,500 11/01/04 11/16/04 2,175 100

Totals per Design/Engineering 1.0 4,500 5,935


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 292

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 09 / 33094 ON N LEAMINGTON AVE FROM W KINZIE ST TO W OHIO ST 5.0 2,000 0 0
302 00 0092 / 5774 ON N PINE AVE FROM W LAKE ST TO W FERDINAND ST 3.0 0 02/01/02 02/06/02 618 100
300 05 0024 / 5139 ON W GLADYS AVE FROM S KARLOV AVE TO S KEELER AVE 1.50 04/04/05 11/18/05 1,050 07/15/05 08/10/05 329 100
300 11 / 32217 ON W MAYPOLE AVE FROM N KOSTNER AVE TO N KENTON AVE 12.0 08/01/07 08/10/07 5,000 08/16/07 08/16/07 5,000 100
300 06 0069 / 5233 400 N PINE AVE 2.0 04/20/02 04/20/02 420 04/17/02 04/17/02 406 100
302 00 0092 / 5774 5000-5099 W GLADYS AVE 7.0 0 12/17/01 12/17/01 1,421 100
302 00 0092 / 5774 3000-3099 W LEXINGTON ST 5.0 10/23/01 10/23/01 1,029 09/28/01 09/28/01 1,029 100

Totals per 250 Watt Changeout 35.50 9,499 8,803

Work Type: 400 Watt Changeout Fixtures


300 06 0122 / 5275 ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST 6.0 08/01/04 08/15/04 2,500 06/10/04 06/10/04 1,506 100
300 09 / 33068 ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD 4.50 06/09/08 06/13/08 1,800 06/09/08 06/13/08 1,449 100

Totals per 400 Watt Changeout 10.50 4,300 2,955

Totals per Lighting/Electrical 1,958,443 2,145,237


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 293

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1077 / 7263 208 N HAMLIN BLVD 1.0 10/23/96 10/23/96 0 10/23/96 10/23/96 300 100
805 06 1169 / 7355 262 N KEELER AVE 1.0 05/31/95 05/31/95 0 05/31/95 05/31/95 300 100
805 06 0344 / 6530 548 N LARAMIE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0092 / 5774 118 N PULASKI RD 5.0 0 07/19/01 12/13/01 1,178 100
300 06 0139 / 5289 259 N PULASKI RD 1,747.0 03/01/06 09/01/06 40,500 07/01/06 07/15/06 52,784 100
805 06 0925 / 7111 1000 S FRANCISCO AVE 1.0 11/15/96 11/15/96 0 11/15/96 11/15/96 300 100
805 06 1919 / 8105 1100 S MOZART ST 1.0 11/18/96 11/18/96 0 11/18/96 11/18/96 300 100
805 06 0685 / 6871 1100 S RICHMOND ST 1.0 11/18/96 11/18/96 0 11/18/96 11/18/96 300 100
805 06 0363 / 6549 210 S TROY ST 1.0 06/14/96 06/14/96 0 06/14/96 06/14/96 300 100
805 06 0974 / 7160 2620 W 15TH PL 1.0 07/06/95 07/06/95 0 07/06/95 07/06/95 300 100
805 06 0953 / 7139 2722 W 23RD ST 1.0 10/26/95 10/26/95 0 10/26/95 10/26/95 300 100
805 06 0785 / 6971 3540 W ADAMS ST 1.0 07/24/96 07/24/96 0 07/24/96 07/24/96 300 100
805 06 0716 / 6902 4818 W ERIE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1726 / 7912 4917 W FERDINAND ST 1.0 05/23/97 05/23/97 0 05/23/97 05/23/97 300 100
805 06 0898 / 7084 2800 W FILLMORE ST 1.0 11/18/96 11/18/96 0 11/18/96 11/18/96 300 100
805 06 0689 / 6875 2926 W FILLMORE ST 1.0 10/10/95 10/10/95 0 10/10/95 10/10/95 300 100
805 06 1214 / 7400 4903 W HUBBARD ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1336 / 7522 3526 W JACKSON BLVD 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 2005 / 8191 5323 W LAKE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1849 / 8035 4605 W MADISON ST 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 1834 / 8020 4202 W MAYPOLE AVE 1.0 06/21/95 06/21/95 0 06/21/95 06/21/95 300 100
805 06 1754 / 7940 4702 W OHIO ST 1.0 05/23/97 05/23/97 0 05/23/97 05/23/97 300 100
805 06 1755 / 7941 4716 W OHIO ST 1.0 05/23/97 05/23/97 0 05/23/97 05/23/97 300 100
302 00 0092 / 5774 5147 W WASHINGTON ST 1.0 0 12/10/01 12/10/01 236 100
805 06 0524 / 6710 4719 W WEST END AVE 1.0 08/14/95 08/14/95 0 08/14/95 08/14/95 300 100
805 06 0512 / 6698 4732 W WEST END AVE 1.0 08/14/95 08/14/95 0 08/14/95 08/14/95 300 100

Totals per Alley Lighting/Lamps 1,776.0 40,500 61,098

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 259 N PULASKI RD 2,592.0 06/01/07 12/31/07 76,308 06/08/07 07/11/07 76,308 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 294

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Strt Lighting/Lamps Installations
300 06 0053 / 5228 118 N PULASKI RD 2,497.0 0 06/08/02 06/11/02 45,466 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 OGDEN COURTS 05/18/01 05/19/01 8,375 05/30/01 05/31/01 4,887 100
300 06 0069 / 5233 ON W 24TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE 1.25 469 06/24/02 06/24/02 469 100
300 06 0167 / 5306 W JACKSON BLVD AND S FRANCISCO AVE 1.50 0 12/08/99 12/08/99 527 100
300 06 0167 / 5306 W MONROE ST AND S CENTRAL PARK AVE 6.0 0 03/24/99 03/24/99 1,429 100
300 06 0071 / 5234 100 N CENTRAL PARK AVE 02/01/99 01/31/01 0 02/01/99 01/12/01 427,832 100
300 06 0167 / 5306 119 S CENTRAL PARK AVE 1.0 0 12/08/99 12/08/99 351 100
302 00 0092 / 5774 2424 W 18TH ST 1.0 0 10/15/01 10/15/01 404 100

Totals per Flood Light Install 10.75 8,844 435,898

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 9 N LARAMIE AVE 1.0 07/17/06 12/31/06 5,497 07/26/06 12/31/06 5,924 25

Work Type: Lighting Imprvmnts Projects


300 06 0201 / 5325 190 N CENTRAL PARK DR 1.0 06/01/01 12/01/01 90,216 06/14/01 06/29/01 84,143 100
300 06 0201 / 5325 200 N PULASKI RD 1.0 10/01/01 12/31/01 100,820 10/04/01 11/28/01 108,257 100
300 06 0118 / 5272 5200 W LAKE ST 1.0 10/30/00 06/29/01 31,888 04/12/01 05/31/01 22,855 100

Totals per Lighting Imprvmnts 3.0 222,924 215,255

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33068 ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD 4.50 07/28/08 08/08/08 9,000 07/28/08 08/08/08 5,153 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 259 N PULASKI RD .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 295

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 09 / 33094 ON N LOCKWOOD AVE FROM W CHICAGO AVE TO W OHIO ST 1.0 65,000 0 0
300 05 0028 / 5143 ON N PINE AVE FROM W LAKE ST TO W RACE AVE 1.0 09/15/05 11/18/05 60,000 08/18/05 10/14/05 44,514 100
300 07 0002 / 5425 ON S FRANCISCO AVE FROM W WILCOX ST TO W VAN BUREN ST 1.0 04/18/06 11/18/06 80,000 09/01/06 10/27/06 51,733 100
300 09 / 33094 ON W ADAMS ST FROM S CICERO AVE TO S LARAMIE AVE 4.0 260,000 0 0
300 11 / 32217 ON W ADAMS ST FROM S HOMAN AVE TO S CENTRAL PARK BLVD 2.0 140,000 0 0
300 11 / 32217 ON W ADAMS ST FROM S KENTON AVE TO S CICERO AVE 2.0 140,000 0 0
300 07 0029 / 5452 ON W GLADYS AVE FROM S LAVERGNE AVE TO S LEAMINGTON AVE 1.0 07/12/06 09/27/06 65,000 07/20/06 09/27/06 59,636 100
300 07 0028 / 5451 ON W MONROE ST FROM S CICERO AVE TO S LAVERGNE AVE 2.0 04/01/07 06/01/07 100,000 10/05/06 11/17/06 80,345 100
300 06 0308 / 5414 ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE 1.0 04/24/06 06/16/06 91,485 04/19/06 06/19/06 63,076 100
300 06 0308 / 5414 ON W WILCOX ST FROM S PULASKI RD TO S KEELER AVE 2.0 09/01/06 11/22/06 165,823 08/04/06 10/24/06 117,933 100

Totals per Residntl Staggered Lighting 17.0 1,167,308 417,236

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N LATROBE AVE FROM W OHIO ST TO W CHICAGO AVE 2.0 06/21/03 08/21/03 165,298 07/07/03 10/06/03 158,431 100
300 06 0267 / 5375 ON W MONROE ST FROM S LAVERGNE AVE TO S LARAMIE AVE 2.0 10/01/04 12/01/04 194,928 10/12/04 12/03/04 142,679 100

Totals per Residntl Strt Lighting/Lamps 4.0 360,226 301,110

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 2101 S FAIRFIELD AVE 1.0 0 06/14/01 06/14/01 378 100
302 00 0092 / 5774 3000 W HARRISON ST 1.0 0 05/16/01 05/16/01 378 100
302 00 0092 / 5774 3020 W HARRISON ST 1.0 0 05/16/01 05/16/01 378 100
302 00 0092 / 5774 3030 W HARRISON ST 1.0 0 05/16/01 05/16/01 378 100
302 00 0092 / 5774 3040 W HARRISON ST 1.0 0 05/16/01 05/16/01 378 100

Totals per Short Arm Installs - Residntl 5.0 0 1,890


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 296

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 11 / 32191 ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST 5.60 11/14/08 12/16/08 1,400 11/14/08 12/16/08 1,120 100
300 04 0216 / 5114 ON S PULASKI RD FROM W JACKSON BLVD TO W MADISON ST 22.0 05/01/06 11/01/06 4,687 05/17/06 06/22/06 4,687 100
300 06 0108 / 5263 ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST 6.0 08/10/04 08/11/04 1,500 07/23/04 07/28/04 1,476 100
300 11 / 32191 ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST 22.80 11/14/08 12/16/08 5,700 11/14/08 12/16/08 4,560 100
300 09 / 33068 ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD 5.76 06/02/08 06/20/08 1,728 06/02/08 06/26/08 1,210 100
300 09 / 33068 ON W CONGRESS PKWY FROM S FRANCISCO AVE TO S MAPLEWOOD 15.25 10/07/08 10/22/08 4,575 10/07/08 10/22/08 3,203 100
AVE
300 09 / 33068 ON W HARRISON ST FROM S MAPLEWOOD AVE TO S SACRAMENTO BLVD 16.80 08/13/08 09/09/08 5,040 08/13/08 09/09/08 3,528 100
300 11 / 32191 ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE 9.36 11/14/08 12/15/08 2,340 11/14/08 12/15/08 1,872 100
300 11 / 32191 ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE 10.08 11/14/08 12/16/08 2,520 11/14/08 12/16/08 2,016 100

Totals per Strt Light Pole Painting 113.65 29,490 23,671

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 259 N PULASKI RD 3,175.0 03/01/04 12/01/04 16,510 10/05/06 10/13/06 34,576 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 297

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2549 / 8735 401 N CENTRAL AVE 16.0 09/11/91 09/11/91 0 09/11/91 09/11/91 12,000 100
805 06 2457 / 8643 340 N CENTRAL PARK AVE 10.0 09/18/95 09/18/95 0 09/18/95 09/18/95 7,500 100
302 00 0070 / 5758 400 N CICERO AVE 0 02/01/97 02/07/97 4,554 100
805 06 2697 / 8883 334 N KEDZIE AVE 18.0 10/07/94 10/07/94 0 10/07/94 10/07/94 13,500 100
805 06 2930 / 9116 395 N LARAMIE AVE 14.0 08/16/91 08/16/91 0 08/16/91 08/16/91 10,500 100
805 06 2929 / 9115 395 N LAVERGNE AVE 14.0 03/04/94 03/04/94 0 03/04/94 03/04/94 10,500 100
805 06 2766 / 8952 398 N LOCKWOOD AVE 14.0 04/29/94 04/29/94 0 04/29/94 04/29/94 10,500 100
805 06 2767 / 8953 399 N LONG AVE 16.0 06/25/93 06/25/93 0 06/25/93 06/25/93 12,000 100
805 06 2547 / 8733 401 N PINE AVE 14.0 04/27/95 04/27/95 0 04/27/95 04/27/95 10,500 100
300 06 0217 / 5337 118 N PULASKI RD 143.0 05/12/04 05/14/04 8,038 01/16/04 01/21/04 11,740 100
805 06 2781 / 8967 343 N ST LOUIS AVE 6.0 12/23/94 12/23/94 0 12/23/94 12/23/94 4,500 100
805 06 2168 / 8354 1001 S CALIFORNIA AVE 14.0 12/31/95 12/31/95 0 12/31/95 12/31/95 10,500 100
805 06 2786 / 8972 1901 S CALIFORNIA AVE 6.0 05/20/94 05/20/94 0 05/20/94 05/20/94 4,500 100
805 06 2940 / 9126 1005 S FAIRFIELD AVE 8.0 03/14/94 03/14/94 0 03/14/94 03/14/94 6,000 100
805 06 2780 / 8966 1001 S FRANCISCO AVE 14.0 06/07/94 06/07/94 0 06/07/94 06/07/94 10,500 100
805 06 2800 / 8986 1000 S SACRAMENTO BLVD 8.0 04/07/94 04/07/94 0 04/07/94 04/07/94 6,000 100
805 06 2779 / 8965 1001 S WASHTENAW AVE 10.0 04/26/94 04/26/94 0 04/26/94 04/26/94 7,500 100
805 06 2360 / 8546 2401 W 15TH ST 56.0 04/02/96 04/02/96 0 04/02/96 04/02/96 42,000 100
805 06 2494 / 8680 2405 W 16TH ST 21.0 09/14/95 09/14/95 0 09/14/95 09/14/95 15,750 100
805 06 2495 / 8681 2405 W 16TH ST 20.0 09/14/95 09/14/95 0 09/14/95 09/14/95 15,000 100
805 06 2203 / 8389 2400 W 18TH ST 24.0 08/16/92 08/16/92 0 08/16/92 08/16/92 18,000 100
302 00 0072 / 5760 2500 W 21ST ST 1.0 0 10/21/99 01/05/00 35,750 100
805 06 2762 / 8948 4599 W ADAMS ST 4.0 05/01/94 05/01/94 0 05/01/94 05/01/94 3,000 100
805 06 2932 / 9118 2505 W ARTHINGTON ST 8.0 02/01/94 02/01/94 0 02/01/94 02/01/94 6,000 100
805 06 2306 / 8492 4599 W CHICAGO AVE 38.0 08/13/96 08/13/96 0 08/13/96 08/13/96 28,500 100
805 06 2764 / 8950 4605 W FULTON ST 4.0 05/24/94 05/24/94 0 05/24/94 05/24/94 3,000 100
805 06 2574 / 8760 4601 W LAKE ST 8.0 03/27/95 03/27/95 0 03/27/95 03/27/95 6,000 100
805 06 2392 / 8578 4600 W MADISON ST 5.0 12/31/95 12/31/95 0 12/31/95 12/31/95 3,750 100
805 06 2763 / 8949 4601 W MAYPOLE AVE 8.0 05/20/94 05/20/94 0 05/20/94 05/20/94 6,000 100
805 06 2733 / 8919 4597 W MONROE ST 4.0 07/06/94 07/06/94 0 07/06/94 07/06/94 3,000 100
302 00 0072 / 5760 4650 W MONROE ST 1.0 0 04/26/00 05/15/00 25,851 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 298

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2509 / 8695 2440 W OGDEN AVE 8.0 07/07/95 07/07/95 0 07/07/95 07/07/95 6,000 100
805 06 2512 / 8698 2440 W OGDEN AVE 8.0 06/16/95 06/16/95 0 06/16/95 06/16/95 6,000 100
805 06 2507 / 8693 2457 W OGDEN AVE 9.0 06/29/95 06/29/95 0 06/29/95 06/29/95 6,750 100
805 06 2526 / 8712 2457 W OGDEN AVE 3.0 06/21/95 06/21/95 0 06/21/95 06/21/95 2,250 100
805 06 2550 / 8736 2457 W OGDEN AVE 10.0 06/22/95 06/22/95 0 06/22/95 06/22/95 7,500 100
805 06 2594 / 8780 2457 W OGDEN AVE 15.0 06/16/95 06/16/95 0 06/16/95 06/16/95 11,250 100
805 06 2580 / 8766 2460 W OGDEN AVE 3.0 06/29/95 06/29/95 0 06/29/95 06/29/95 2,250 100
805 06 2510 / 8696 2500 W OGDEN AVE 16.0 07/07/95 07/07/95 0 07/07/95 07/07/95 12,000 100
805 06 2513 / 8699 2500 W OGDEN AVE 21.0 06/16/95 06/16/95 0 06/16/95 06/16/95 15,750 100
805 06 2508 / 8694 2520 W OGDEN AVE 8.0 06/29/95 06/29/95 0 06/29/95 06/29/95 6,000 100
805 06 2511 / 8697 2520 W OGDEN AVE 12.0 07/07/95 07/07/95 0 07/07/95 07/07/95 9,000 100
805 06 2572 / 8758 2520 W OGDEN AVE 8.0 07/06/95 07/06/95 0 07/06/95 07/06/95 6,000 100
805 06 2228 / 8414 2519 W ROOSEVELT RD 14.0 10/29/96 10/29/96 0 10/29/96 10/29/96 10,500 100
805 06 2253 / 8439 2519 W ROOSEVELT RD 37.0 10/29/96 10/29/96 0 10/29/96 10/29/96 27,750 100
805 06 2705 / 8891 2505 W TAYLOR ST 14.0 07/27/94 07/27/94 0 07/27/94 07/27/94 10,500 100
805 06 2916 / 9102 4605 W WASHINGTON BLVD 8.0 03/21/94 03/21/94 0 03/21/94 03/21/94 6,000 100

Totals per Underpass Lighting 721.0 8,038 509,895


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 299

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N HOMAN AVE AND W FRANKLIN BLVD .50 0 05/02/02 05/02/02 4,270 100
210 06 0130 / 4389 N KEELER AVE AND W WASHINGTON ST 1.0 0 03/26/02 03/26/02 5,651 100
210 06 0219 / 4459 S WESTERN AVE AND W 16TH ST .50 03/10/05 03/11/05 5,282 04/28/05 04/28/05 4,004 100
210 06 0219 / 4459 S WESTERN AVE AND W ROOSEVELT RD .50 03/14/05 03/15/05 5,282 03/28/05 03/28/05 4,783 100

Totals per LED Signal Head Install 2.50 10,563 18,707

Work Type: Left Turn Arrow Locations


300 03 0028 / 4899 N CICERO AVE AND W MADISON ST 1.0 03/01/05 08/15/05 96,500 04/07/05 29,678 40

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N LONG AVE AND W WASHINGTON BLVD 2.0 8,000 10/04/01 10/10/01 9,370 100
300 06 0197 / 5322 S SACRAMENTO AVE AND W ARTHINGTON ST 2.0 8,000 07/17/01 07/27/01 10,535 100
300 06 0197 / 5322 S SACRAMENTO AVE AND W FIFTH AVE .50 2,000 07/18/01 07/19/01 1,948 100
300 06 0197 / 5322 W CERMAK RD AND S WASHTENAW AVE 1.0 4,000 06/25/01 07/11/01 2,097 100

Totals per Removal Temp Wiring - Signals 5.50 22,000 23,950

Work Type: Signals Intersections


300 06 0096 / 5258 118 N PULASKI RD 71.0 11/01/03 11/07/03 0 11/11/03 11/17/03 11,227 100

Work Type: TSM Install Locations


814 06 0245 / 16457 100 N CICERO AVE 1.0 02/06/92 02/06/92 0 02/06/92 02/06/92 40,173 100
814 06 0247 / 16459 199 N CICERO AVE 1.0 01/01/92 01/01/92 0 01/01/92 01/01/92 40,173 100
814 06 0116 / 16331 500 N CICERO AVE 1.0 07/02/92 07/02/92 0 07/02/92 07/02/92 103,965 100
814 06 0231 / 16443 600 N CICERO AVE 1.0 09/07/90 09/07/90 0 09/07/90 09/07/90 92,500 100
814 06 0220 / 16432 1 S CICERO AVE 1.0 02/13/92 02/13/92 0 02/13/92 02/13/92 40,173 100
814 06 0223 / 16435 300 S CICERO AVE 1.0 02/13/92 02/13/92 0 02/13/92 02/13/92 40,173 100
814 06 0391 / 16579 4000 W JACKSON BLVD 1.0 02/06/96 02/06/96 0 02/06/96 02/06/96 152,719 100

Totals per TSM Install 7.0 0 509,876

Totals per Traffic 144,150 599,688


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 300

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 11 / 32191 ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST 3.36 11/14/08 12/16/08 1,149 11/14/08 12/16/08 1,082 100
300 11 / 32191 ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST 13.68 4,899 0 0
300 09 / 33068 ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD 1.92 06/02/08 06/20/08 534 04/01/08 12/01/08 0 100
300 07 0024 / 5447 ON W FIFTH AVE FROM S ALBANY AVE TO S KEDZIE AVE 16.0 04/18/06 11/18/06 6,500 07/15/06 07/24/06 3,392 100
300 11 / 32191 ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE 3.84 11/14/08 12/15/08 1,416 11/14/08 12/15/08 1,236 100
300 11 / 32191 ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE 1.68 11/14/08 12/16/08 588 11/14/08 12/16/08 541 100

Totals per Traffic Equipment Painting 40.48 15,087 6,251

Totals per Construction Phase 2,102,593 2,744,926

Totals for Ward 28 2,107,093 2,750,860


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 301

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32275 ON N MELVINA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE .0 03/01/07 10/31/07 3,900 01/24/07 02/21/07 2,216 100
300 06 / 32277 ON W IOWA ST FROM N AUSTIN BLVD TO N MENARD AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32277 ON W RICE ST FROM N AUSTIN BLVD TO N MENARD AVE .0 04/01/08 08/30/08 0 0 0
300 06 0308 / 5414 ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,352 100
300 06 0308 / 5414 ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 334 100
210 06 / 32040 N AUSTIN BLVD AND W LAKE ST .0 11/01/06 12/31/07 5,000 10/03/06 10/20/06 3,505 100
210 06 0243 / 4480 W HARRISON ST AND S LARAMIE AVE .0 12/26/06 01/26/07 250 12/26/06 01/26/07 638 100
281 00 / 33662 1200-1600 N MASON AVE .0 10/05/07 11/20/07 0 0 0

Totals per Design/Engineering .0 9,150 8,044


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 302

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 03 0029 / 4900 ON N MARMORA AVE FROM W FULLERTON AVE TO W ALTGELD ST 5.0 04/26/04 05/02/04 2,013 05/01/04 05/01/04 917 100
300 03 0029 / 4900 ON N MASON AVE FROM W FULLERTON AVE TO W ALTGELD ST 10.0 04/26/04 05/02/04 4,025 05/01/04 05/01/04 1,833 100
300 06 0122 / 5275 ON N MASON AVE FROM W THOMAS ST TO W DIVISION ST 5.0 07/17/03 07/18/03 2,075 06/17/03 06/17/03 1,823 100
300 07 0029 / 5452 ON N MASON AVE FROM W WEST END AVE TO W CORCORAN PL 8.0 04/18/06 11/18/06 3,200 0 0
302 00 0092 / 5774 ON N MASSASOIT AVE FROM W CHICAGO AVE TO W IOWA ST 4.0 0 07/10/01 07/11/01 824 100
302 00 0092 / 5774 ON N MASSASOIT AVE FROM W IOWA ST TO W AUGUSTA BLVD 4.0 0 07/10/01 07/11/01 824 100
302 00 0092 / 5774 ON N MENARD AVE FROM W CHICAGO AVE TO W IOWA ST 5.0 0 07/16/01 07/18/01 1,030 100
302 00 0092 / 5774 ON N MENARD AVE FROM W IOWA ST TO W AUGUSTA BLVD 5.0 0 07/16/01 07/18/01 1,030 100
300 06 0069 / 5233 ON N MENARD AVE FROM W MADISON ST TO W WASHINGTON BLVD 5.0 0 05/08/02 05/08/02 1,875 100
300 06 0069 / 5233 ON N MENARD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 5.0 05/13/02 05/13/02 1,050 05/10/02 05/10/02 1,015 100
300 03 0029 / 4900 ON N MENARD AVE FROM W NORTH AVE TO W WABANSIA AVE 10.0 04/26/04 05/02/04 4,025 05/01/04 05/01/04 1,834 100
302 00 0092 / 5774 ON N MENARD AVE FROM W WASHINGTON BLVD TO W WEST END AVE 6.0 0 12/17/01 12/17/01 1,218 100
300 03 0029 / 4900 ON N PARKSIDE AVE FROM W AUGUSTA BLVD TO W THOMAS ST 9.0 06/01/04 06/02/04 3,775 05/25/04 05/25/04 1,824 100
302 00 0092 / 5774 ON N PARKSIDE AVE FROM W AUGUSTA BLVD TO W THOMAS ST 3.0 0 07/10/01 07/11/01 618 100
302 00 0092 / 5774 ON N PARKSIDE AVE FROM W CHICAGO AVE TO W IOWA ST 4.0 0 07/10/01 07/11/01 824 100
302 00 0092 / 5774 ON N PARKSIDE AVE FROM W IOWA ST TO W AUGUSTA BLVD 4.0 0 07/10/01 07/11/01 824 100
300 07 0029 / 5452 ON N WALLER AVE FROM W AUGUSTA BLVD TO W DIVISION ST 9.0 04/18/06 11/18/06 3,800 0 0
302 00 0092 / 5774 ON N WALLER AVE FROM W CHICAGO AVE TO W IOWA ST 4.0 0 07/10/01 07/11/01 824 100
302 00 0092 / 5774 ON N WALLER AVE FROM W IOWA ST TO W AUGUSTA BLVD 5.0 0 07/10/01 07/11/01 1,030 100
302 00 0092 / 5774 ON N WALLER AVE FROM W MADISON ST TO W WASHINGTON BLVD 5.0 0 12/12/01 12/12/01 1,029 100
302 00 0092 / 5774 ON S MAYFIELD AVE FROM W FILLMORE ST TO W ROOSEVELT RD 5.0 0 12/18/01 12/18/01 1,029 100
302 00 0092 / 5774 ON W CONGRESS PKWY FROM S LARAMIE AVE TO S CENTRAL AVE 20.0 0 07/21/01 07/25/01 4,116 100
302 00 0092 / 5774 ON W GLADYS AVE FROM S LARAMIE AVE TO S CENTRAL AVE 20.0 0 07/21/01 07/25/01 4,116 100
300 06 0069 / 5233 ON W HURON ST FROM N CENTRAL AVE TO N MENARD AVE 8.0 07/06/02 07/06/02 1,680 07/03/02 07/03/02 1,624 100
300 07 0029 / 5452 ON W IOWA ST FROM N MENARD AVE TO N AUSTIN BLVD 8.0 04/18/06 11/18/06 3,200 0 0
302 00 0092 / 5774 ON W JACKSON BLVD FROM S LARAMIE AVE TO S CENTRAL AVE 20.0 0 07/24/01 07/24/01 7,086 100
302 00 0092 / 5774 ON W MONROE ST FROM S LARAMIE AVE TO S CENTRAL AVE 20.0 0 07/21/01 07/25/01 4,116 100
302 00 0092 / 5774 ON W QUINCY ST FROM S LARAMIE AVE TO S CENTRAL AVE 20.0 0 07/21/01 07/25/01 4,116 100
300 07 0029 / 5452 ON W RICE ST FROM N MAYFIELD AVE TO N AUSTIN BLVD 5.0 04/18/06 11/18/06 2,200 01/05/07 01/05/07 0 100
300 07 0029 / 5452 ON W SUPERIOR ST FROM N MENARD AVE TO N AUSTIN BLVD 10.0 04/18/06 11/18/06 4,000 0 0
302 00 0092 / 5774 ON W VAN BUREN ST FROM S LARAMIE AVE TO S CENTRAL AVE 20.0 0 07/21/01 07/25/01 4,116 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 303

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 03 0029 / 4900 1100 N MAYFIELD AVE 6.0 06/01/04 06/02/04 2,450 05/25/04 05/25/04 1,422 100
302 00 0092 / 5774 1400 N MAYFIELD AVE 4.0 07/06/02 07/06/02 840 07/06/02 07/06/02 812 100
300 06 0069 / 5233 1700 N MAYFIELD AVE 5.0 04/28/03 04/28/03 1,875 05/01/03 05/01/03 987 100
210 06 0022 / 4297 2100-2199 N MEADE AVE 6.0 0 02/22/02 02/22/02 2,250 100
300 06 0069 / 5233 2100-2199 N MEADE AVE 6.0 2,250 02/22/02 02/22/02 2,250 100
302 00 0092 / 5774 600 N WALLER AVE 8.0 12/14/02 12/14/02 1,680 12/14/02 12/14/02 1,624 100
302 00 0092 / 5774 5000-5099 W CONGRESS PKWY 7.0 0 07/21/01 07/25/01 1,441 100
302 00 0092 / 5774 5900-5999 W ERIE ST 6.0 0 07/16/01 07/18/01 1,236 100
302 00 0092 / 5774 5510 W GLADYS AVE 5.0 02/02/02 02/02/02 1,015 01/30/02 01/30/02 1,050 100
302 00 0092 / 5774 5900 W HURON ST 6.0 0 07/16/01 07/18/01 1,236 100
302 00 0092 / 5774 5600-5699 W IOWA ST 3.0 0 07/10/01 07/11/01 618 100
302 00 0092 / 5774 5700-5799 W IOWA ST 2.0 0 07/10/01 07/11/01 412 100
302 00 0092 / 5774 5200-5299 W LEXINGTON ST 6.0 0 07/18/01 07/18/01 2,126 100
302 00 0092 / 5774 5900-5999 W OHIO ST 6.0 0 07/16/01 07/18/01 1,236 100
302 00 0092 / 5774 5000-5099 W VAN BUREN ST 7.0 0 12/17/01 12/17/01 1,421 100

Totals per 250 Watt Changeout 354.0 45,153 71,636

Work Type: 400 Watt Changeout Fixtures


300 07 0029 / 5452 ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD 35.0 10/23/06 01/04/07 14,000 10/23/06 01/04/07 0 100

Totals per Lighting/Electrical 3,663,768 2,074,586


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 304

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0725 / 6911 1642 N AUSTIN AVE 1.0 04/30/96 04/30/96 0 04/30/96 04/30/96 300 100
805 06 0741 / 6927 1718 N AUSTIN AVE 1.0 04/22/96 04/22/96 0 04/22/96 04/22/96 300 100
805 06 1749 / 7935 1719 N AUSTIN AVE 1.0 05/22/97 05/22/97 0 05/22/97 05/22/97 300 100
805 06 0835 / 7021 1738 N AUSTIN AVE 1.0 06/13/96 06/13/96 0 06/13/96 06/13/96 300 100
805 06 1827 / 8013 1016 N MASSASOIT AVE 1.0 06/16/96 06/16/96 0 06/16/96 06/16/96 300 100
805 06 1838 / 8024 1720 N MC VICKER AVE 1.0 01/30/97 01/30/97 0 01/30/97 01/30/97 300 100
805 06 1840 / 8026 1756 N MC VICKER AVE 1.0 04/30/96 04/30/96 0 04/30/96 04/30/96 300 100
805 06 1816 / 8002 1632 N MEADE AVE 1.0 04/30/96 04/30/96 0 04/30/96 04/30/96 300 100
805 06 1819 / 8005 1638 N MELVINA AVE 1.0 06/13/96 06/13/96 0 06/13/96 06/13/96 300 100
805 06 1821 / 8007 1716 N MELVINA AVE 1.0 01/31/97 01/31/97 0 01/31/97 01/31/97 300 100
805 06 1666 / 7852 2100 N MERRIMAC AVE 1.0 07/09/97 07/09/97 0 07/09/97 07/09/97 300 100
805 06 1948 / 8134 1615 N MOBILE AVE 1.0 05/01/96 05/01/96 0 05/01/96 05/01/96 300 100
805 06 1950 / 8136 2351 N MOBILE AVE 1.0 03/20/97 03/20/97 0 03/20/97 03/20/97 300 100
805 06 1878 / 8064 1838 N MULLIGAN AVE 1.0 01/31/97 01/31/97 0 01/31/97 01/31/97 300 100
805 06 1899 / 8085 1823 N NARRAGANSETT AVE 1.0 01/30/97 01/30/97 0 01/30/97 01/30/97 300 100
805 06 0403 / 6589 1538 N WALLER AVE 1.0 08/22/96 08/22/96 0 08/22/96 08/22/96 300 100
302 00 0092 / 5774 1021 S AUSTIN AVE 1.0 0 05/21/01 05/21/01 236 100
302 00 0092 / 5774 1041 S AUSTIN AVE 1.0 0 05/21/01 05/21/01 236 100
805 06 1974 / 8160 1041 S MONITOR AVE 1.0 10/10/96 10/10/96 0 10/10/96 10/10/96 300 100
805 06 1847 / 8033 5958 W CORTLAND ST 1.0 08/28/96 08/28/96 0 08/28/96 08/28/96 300 100
805 06 1114 / 7300 6301 W FULLERTON AVE 1.0 02/15/95 02/15/95 0 02/15/95 02/15/95 300 100
805 06 1122 / 7308 5959 W GRAND AVE 1.0 06/13/95 06/13/95 0 06/13/95 06/13/95 300 100
805 06 2006 / 8192 5944 W LAKE ST 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100
300 06 0139 / 5289 5937 W MADISON ST 1,133.0 03/01/06 09/01/06 27,852 05/12/06 06/07/06 34,232 100
302 00 0092 / 5774 5937 W MADISON ST 24.0 0 03/15/01 09/24/01 5,656 100
805 06 1841 / 8027 5920 W MIDWAY PARK 1.0 11/15/95 11/15/95 0 11/15/95 11/15/95 300 100
805 06 0589 / 6775 5960 W NORTH AVE 1.0 05/15/96 05/15/96 0 05/15/96 05/15/96 300 100
805 06 2092 / 8278 6046 W NORTH AVE 1.0 10/11/96 10/11/96 0 10/11/96 10/11/96 300 100
805 06 0591 / 6777 6150 W NORTH AVE 1.0 10/02/96 10/02/96 0 10/02/96 10/02/96 300 100
805 06 0430 / 6616 5941 W WALTON ST 1.0 03/23/95 03/23/95 0 03/23/95 03/23/95 300 100

Totals per Alley Lighting/Lamps 1,185.0 27,852 48,160


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 305

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0215 / 5336 5937 W MADISON ST 1,347.0 06/01/07 12/31/07 39,655 06/05/07 07/10/07 39,655 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5937 W MADISON ST 1,252.0 0 06/16/02 06/19/02 22,797 100

Work Type: Flood Light Install Fixtures


300 06 0071 / 5234 500 S CENTRAL AVE 01/01/00 12/30/00 0 09/27/00 10/06/00 9,450 100
300 06 0167 / 5306 5900-6000 W ADAMS ST 7.0 0 08/31/99 08/31/99 1,128 100
300 06 0071 / 5234 6100 W FULLERTON AVE 12/01/00 12/30/00 0 485 100

Totals per Flood Light Install 7.0 0 11,063

Work Type: Ornamental - Piggyback Lighting Fixtures


300 07 0029 / 5452 ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD 30.0 10/23/06 01/04/07 40,500 10/23/06 01/04/07 0 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5253 W MADISON ST .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 306

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32218 ON N MASON AVE FROM W NORTH AVE TO W CORTLAND ST 3.0 10/16/07 12/31/07 170,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 09 / 33095 ON N MASSASOIT AVE FROM W CHICAGO AVE TO W IOWA ST 1.0 65,000 04/01/08 12/01/08 0 0
300 09 / 33095 ON N MASSASOIT AVE FROM W DIVISION ST TO W HIRSCH ST 2.0 130,000 0 0
300 09 / 33095 ON N MAYFIELD AVE FROM W NORTH AVE TO W CORTLAND ST 3.0 162,500 0 0
300 06 / 32275 ON N MELVINA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 2.0 04/01/07 12/31/07 168,100 03/15/07 06/14/07 95,935 100
300 11 / 32218 ON N MENARD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 2.0 10/19/07 12/31/07 120,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 11 / 32218 ON N MONITOR AVE FROM W AUGUSTA BLVD TO W DIVISION ST 2.0 10/24/07 12/31/07 140,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 07 0029 / 5452 ON N MOODY AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 2.0 07/05/06 08/31/06 150,000 10/16/06 05/04/07 99,422 100
300 09 / 33095 ON N PARKSIDE AVE FROM W CHICAGO AVE TO W DIVISION ST 4.0 260,000 0 0
300 11 / 32218 ON N WALLER AVE FROM W DIVISION ST TO W HIRSCH ST 2.0 10/26/07 12/31/07 130,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 11 / 32218 ON W CONGRESS PKWY FROM S LAVERGNE AVE TO S LARAMIE AVE 2.0 170,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 11 / 32218 ON W CORTLAND ST FROM N MONITOR AVE TO N AUSTIN AVE 2.0 11/07/07 01/18/08 65,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 06 0298 / 5405 ON W ERIE ST FROM N AUSTIN BLVD TO N MENARD AVE 2.0 06/01/05 06/15/05 0 05/17/05 06/16/05 161,857 100
300 07 0029 / 5452 ON W GLADYS AVE FROM S LAVERGNE AVE TO S LEAMINGTON AVE 1.0 07/12/06 09/27/06 65,000 07/20/06 09/27/06 59,636 100
300 07 0029 / 5452 ON W HURON ST FROM N MENARD AVE TO N AUSTIN BLVD 2.0 07/26/06 09/29/06 170,000 11/01/06 05/07/07 111,705 100
300 11 / 32218 ON W HURON ST FROM N MENARD AVE TO N WALLER AVE 1.0 11/12/07 01/25/08 40,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 06 / 32277 ON W IOWA ST FROM N AUSTIN BLVD TO N MENARD AVE .0 05/04/08 12/31/08 0 0 0
300 05 0029 / 5144 ON W MONROE ST FROM S LOCKWOOD AVE TO S LOTUS AVE 2.0 04/04/05 11/18/05 170,000 07/22/05 09/16/05 115,797 100
300 11 / 32218 ON W MONROE ST FROM S LOTUS AVE TO S CENTRAL AVE 1.0 11/14/07 01/25/08 60,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 05 0029 / 5144 ON W QUINCY ST FROM S LARAMIE AVE TO S LOCKWOOD AVE 1.0 04/04/05 11/18/05 85,000 07/20/05 09/16/05 49,882 100
300 06 / 32277 ON W RICE ST FROM N AUSTIN BLVD TO N MENARD AVE .0 05/04/08 12/31/08 0 0 0
300 11 / 32218 ON W SUPERIOR ST FROM N WALLER AVE TO N AUSTIN BLVD 3.0 11/16/07 01/31/08 190,000 0 0

meade ele. Note Last Updated on 05-FEB-08


300 06 0308 / 5414 ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE 1.0 04/24/06 06/16/06 91,485 04/19/06 06/19/06 63,076 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 307

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 0308 / 5414 ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE .26 03/16/06 12/31/06 18,588 06/07/06 08/01/06 11,291 100
300 07 0030 / 5453 ON W WRIGHTWOOD AVE FROM N MENARD AVE TO N AUSTIN AVE 1.0 06/12/06 08/18/06 75,000 06/07/06 08/15/06 51,456 100

Project has been completed Note Last Updated on 25-AUG-06


281 00 / 33662 1200-1600 N MASON AVE 4.0 12/07/07 03/19/08 0 12/07/07 03/21/08 218,545 100

Totals per Residntl Staggered Lighting 46.26 2,695,673 1,038,601

Work Type: Residntl Strt Lighting/Lamps Blocks


300 03 0029 / 4900 ON W OHIO ST FROM N AUSTIN BLVD TO N WALLER AVE 3.0 07/15/04 10/01/04 240,000 08/12/04 10/13/04 140,190 100
300 06 0267 / 5375 ON W QUINCY ST FROM S LOCKWOOD AVE TO S CENTRAL AVE 2.0 09/01/04 11/01/04 202,151 09/01/04 10/12/04 137,577 100
300 06 0122 / 5275 ON W RACE AVE FROM N MAYFIELD AVE TO N AUSTIN AVE 1.0 07/15/03 09/15/03 110,000 06/07/03 09/15/03 110,000 100
300 06 0235 / 5349 ON W RACE AVE FROM N WALLER AVE TO N AUSTIN AVE 3.0 07/15/03 10/01/03 155,000 06/07/03 09/15/03 126,300 100

Totals per Residntl Strt Lighting/Lamps 9.0 707,151 514,067


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 308

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 10 N MASON AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 44 N MASON AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 20 N MAYFIELD AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 44 N MAYFIELD AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 1300 N PARKSIDE AVE 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1314 N PARKSIDE AVE 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1324 N PARKSIDE AVE 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1338 N PARKSIDE AVE 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1352 N PARKSIDE AVE 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1007 S AUSTIN AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 1021 S AUSTIN AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 1041 S AUSTIN AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 140 S MASON AVE 1.0 0 01/18/01 01/18/01 378 100
302 00 0092 / 5774 1000 S MASON AVE 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 930 S MENARD AVE 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 1000 S MENARD AVE 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 1030 S MENARD AVE 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 1050 S MENARD AVE 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 1036 S MONITOR AVE 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 1049 S MONITOR AVE 1.0 0 01/17/01 01/17/01 378 100

Totals per Short Arm Installs - Residntl 20.0 0 7,560

Work Type: Strt Light Pole Painting Locations


300 04 0216 / 5114 ON N AUSTIN AVE FROM W NORTH AVE TO W CORTLAND ST 22.0 05/01/06 11/01/06 4,758 05/17/06 06/12/06 4,758 100
300 04 0216 / 5114 ON N NARRAGANSETT AVE FROM W FULLERTON AVE TO W DIVERSEY 15.50 05/01/06 11/01/06 3,353 05/17/06 11/01/06 3,353 100
AVE
300 07 0029 / 5452 ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD 65.0 10/23/06 01/04/07 14,500 10/23/06 01/04/07 0 100
302 00 0077 / 5765 5626 W LAKE ST 9.0 0 07/26/99 07/27/99 786 100

Totals per Strt Light Pole Painting 111.50 22,611 8,897


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 309

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Lighting Blocks
300 06 0268 / 5376 DE PRIEST CPS 50,000 02/10/04 08/10/04 113,047 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0238 / 5352 5937 W MADISON ST 1,949.0 06/01/06 12/31/06 11,000 10/12/06 10/17/06 10,134 100

Work Type: Underpass Lighting Fixtures


805 06 2349 / 8535 2010 N AUSTIN AVE 118.0 08/04/95 08/04/95 0 08/04/95 08/04/95 88,500 100
805 06 2571 / 8757 430 N MAYFIELD AVE 14.0 11/01/93 11/01/93 0 11/01/93 11/01/93 10,500 100
805 06 2570 / 8756 430 N MENARD AVE 14.0 11/01/93 11/01/93 0 11/01/93 11/01/93 10,500 100
805 06 2569 / 8755 425 N PARKSIDE AVE 16.0 11/04/93 11/04/93 0 11/04/93 11/04/93 12,000 100
805 06 2568 / 8754 420 N WALLER AVE 14.0 10/05/93 10/05/93 0 10/05/93 10/05/93 10,500 100
805 06 2374 / 8560 995 S CENTRAL AVE 24.0 06/11/93 06/11/93 0 06/11/93 06/11/93 18,000 100
805 06 2375 / 8561 995 S CENTRAL AVE 6.0 06/11/93 06/11/93 0 06/11/93 06/11/93 4,500 100
805 06 2398 / 8584 995 S CENTRAL AVE 6.0 06/11/93 06/11/93 0 06/11/93 06/11/93 4,500 100
805 06 2715 / 8901 995 S CENTRAL AVE 24.0 06/11/93 06/11/93 0 06/11/93 06/11/93 18,000 100
300 06 0217 / 5337 5837 W MADISON ST 181.0 12/12/03 12/15/03 10,174 12/03/03 12/08/03 11,970 100

Totals per Underpass Lighting 417.0 10,174 188,970


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 310

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Left Turn Arrow Locations
210 06 / 32040 N AUSTIN BLVD AND W LAKE ST 1.0 11/01/06 12/31/07 85,000 11/01/06 03/06/07 0 100

Work Type: New Signal Locations


300 06 0283 / 5391 N CENTRAL AVE AND W DIVISION ST .50 09/02/04 09/30/04 8,159 09/09/04 09/09/04 8,159 100

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W HARRISON ST AND S LARAMIE AVE .0 03/15/06 05/08/07 6,000 12/26/06 02/13/07 2,959 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N MELVINA AVE AND W GRAND AVE 1.0 4,000 08/01/01 08/07/01 12,864 100

Work Type: Signals Intersections


300 06 0096 / 5258 5937 W MADISON ST 47.0 11/01/03 11/08/03 0 11/01/03 11/07/03 7,432 100

Work Type: TSM Install Locations


814 06 0070 / 16286 300 N CENTRAL AVE 1.0 02/21/95 02/21/95 0 02/21/95 02/21/95 107,398 100
814 06 0384 / 16572 400 N CENTRAL AVE 1.0 03/11/96 03/11/96 0 03/11/96 03/11/96 250,000 100
814 06 0387 / 16575 1200 N CENTRAL AVE 1.0 04/10/96 04/10/96 0 04/10/96 04/10/96 125,000 100

Totals per TSM Install 3.0 0 482,398

Work Type: Traffic Equipment Painting Locations


300 07 0029 / 5452 ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD 8.0 10/23/06 01/04/07 2,800 10/23/06 01/04/07 0 100

Totals per Traffic 105,959 513,812

Totals per Construction Phase 3,769,726 2,588,398

Totals for Ward 29 3,778,876 2,596,442


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 311

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32275 ON N AVERS AVE FROM W HIRSCH ST TO W NORTH AVE .0 03/01/07 10/31/07 48,000 01/26/07 02/23/07 7,389 100
300 06 0274 / 5382 ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE .0 07/01/04 12/31/04 0 03/22/05 10/05/05 1,784 100
300 06 0308 / 5414 ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,237 100
210 06 0208 / 4451 W ADDISON ST AND N LAWNDALE AVE .0 07/01/04 10/01/04 0 0 0
210 06 0243 / 4480 W BELMONT AVE AND N MILWAUKEE AVE .0 01/08/07 01/26/07 250 01/08/07 01/26/07 638 100

Totals per Design/Engineering .0 48,250 12,047


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 312

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 ON N AVERS AVE FROM W ALTGELD ST TO W DIVERSEY AVE 4.0 11/05/01 11/05/01 1,029 10/04/01 10/04/01 824 100
300 03 0030 / 4901 ON N AVERS AVE FROM W GRAND AVE TO W LE MOYNE ST 8.0 11/01/04 11/10/04 3,000 10/18/04 10/20/04 1,833 100
300 07 0030 / 5453 ON N AVERS AVE FROM W NORTH AVE TO W WABANSIA AVE 5.0 04/18/06 11/18/06 2,200 09/19/06 09/29/06 2,200 100
300 09 / 33096 ON N KEATING AVE FROM W BELMONT AVE TO W SCHOOL ST 4.0 10/13/08 10/14/08 1,600 10/13/08 10/14/08 1,245 100
300 11 / 32219 ON N KEELER AVE FROM W ARMITAGE AVE TO W PALMER ST 54.0 12/12/07 12/18/07 27,246 12/12/07 12/18/07 34,841 100
300 09 / 33096 ON N KENTON AVE FROM W ROSCOE ST TO W ADDISON ST 8.0 10/15/08 10/17/08 3,200 10/15/08 10/17/08 2,460 100
300 03 0030 / 4901 ON N KEYSTONE AVE FROM W CORTLAND ST TO W ARMITAGE AVE 5.0 07/20/04 07/20/04 2,075 07/23/04 07/23/04 1,125 100
300 03 0030 / 4901 ON N KEYSTONE AVE FROM W GRAND AVE TO W NORTH AVE 8.0 11/01/04 11/10/04 3,000 10/18/04 10/20/04 1,833 100
300 09 / 33096 ON N KOLMAR AVE FROM W SCHOOL ST TO W ADDISON ST 12.0 10/13/08 10/14/08 4,800 10/13/08 10/14/08 3,840 100
300 11 / 32219 ON N KOSTNER AVE FROM W ARMITAGE AVE TO W PALMER ST 10.0 12/12/07 12/18/07 1,677 12/12/07 12/18/07 1,677 100
300 03 0030 / 4901 ON N LOWELL AVE FROM W ROSCOE ST TO W ADDISON ST 9.0 11/01/04 11/10/04 3,375 10/18/04 10/20/04 2,062 100
300 07 0030 / 5453 ON N MANGO AVE FROM W DIVERSEY AVE TO W GEORGE ST 4.0 04/18/06 11/18/06 1,600 0 0
300 03 0029 / 4900 ON N MARMORA AVE FROM W FULLERTON AVE TO W ALTGELD ST 5.0 04/26/04 05/02/04 2,013 05/01/04 05/01/04 917 100
300 07 0030 / 5453 ON N MARMORA AVE FROM W GEORGE ST TO W BELMONT AVE 14.0 04/18/06 11/18/06 5,700 0 0
300 07 0030 / 5453 ON N MENARD AVE FROM W DIVERSEY AVE TO W BELMONT AVE 18.0 04/18/06 11/18/06 7,400 0 0
300 07 0030 / 5453 ON N MONITOR AVE FROM W BELDEN AVE TO W BELMONT AVE 16.0 04/18/06 11/18/06 6,600 0 0
300 07 0030 / 5453 ON N SPRINGFIELD AVE FROM W DICKENS AVE TO W FULLERTON AVE 15.0 04/18/06 11/18/06 6,200 09/14/06 09/29/06 0 100
300 06 0069 / 5233 ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE 2.64 10/01/03 10/16/03 0 02/04/02 02/04/02 990 100
300 03 0030 / 4901 ON W DRUMMOND PL FROM N LONG AVE TO N CENTRAL AVE 8.0 11/01/04 11/10/04 3,000 10/18/04 10/20/04 1,833 100
300 07 0030 / 5453 ON W MELROSE ST FROM N CICERO AVE TO N LAVERGNE AVE 8.0 04/18/06 11/18/06 3,400 01/10/07 01/10/07 1,513 100
300 03 0030 / 4901 ON W PARKER AVE FROM N LONG AVE TO N CENTRAL AVE 7.0 11/01/04 11/10/04 2,825 10/18/04 10/20/04 1,604 100
300 03 0030 / 4901 ON W SCHUBERT AVE FROM N LONG AVE TO N CENTRAL AVE 8.0 11/01/04 11/10/04 3,200 10/18/04 10/20/04 1,833 100
300 06 0069 / 5233 ON W WABANSIA AVE FROM N PULASKI RD TO N LOWELL AVE 6.0 2,250 01/14/03 01/14/03 2,250 100
300 06 0122 / 5275 N AVERS AVE AND W WELLINGTON AVE 4.0 12/04/03 12/04/03 1,700 12/08/03 12/08/03 975 100
300 06 0122 / 5275 N HAMLIN AVE AND W GEORGE ST 5.0 12/04/03 12/04/03 1,875 12/08/03 12/08/03 975 100
300 03 0030 / 4901 2700 N AVERS AVE 5.0 11/01/04 11/10/04 1,875 10/18/04 10/20/04 1,146 100
300 06 0069 / 5233 2928 N AVERS AVE 1.0 06/09/02 06/09/02 210 06/06/02 06/06/02 203 100
300 06 0069 / 5233 2948 N AVERS AVE 1.0 06/09/02 06/09/02 210 06/06/02 06/06/02 203 100
300 06 0069 / 5233 2852 N HAMLIN AVE 1.0 07/15/02 07/15/02 210 07/12/02 07/12/02 203 100
300 06 0069 / 5233 2900 N HAMLIN AVE 1.0 07/15/02 07/15/02 210 07/12/02 07/12/02 203 100
300 03 0030 / 4901 2700 N HARDING AVE 5.0 11/01/04 11/10/04 1,875 10/18/04 10/20/04 1,145 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 313

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 2932 N HARDING AVE 1.0 10/24/02 10/24/02 210 10/21/02 10/21/02 203 100
300 07 0030 / 5453 1800-1900 N KEYSTONE AVE .0 03/01/06 12/31/06 0 0 0
300 03 0030 / 4901 3300 N KILBOURN AVE 4.0 11/01/04 11/10/04 1,500 10/18/04 10/20/04 917 100
300 03 0030 / 4901 3100 N MAJOR AVE 5.0 11/01/04 11/10/04 1,875 10/18/04 10/20/04 1,146 100
300 03 0030 / 4901 3100 N PARKSIDE AVE 5.0 11/01/04 11/10/04 1,875 10/18/04 10/20/04 1,145 100
300 03 0030 / 4901 1400 N SPRINGFIELD AVE 4.0 11/01/04 11/10/04 1,500 10/18/04 10/20/04 917 100
302 00 0092 / 5774 2500-2599 N SPRINGFIELD AVE 4.0 11/02/01 11/02/01 1,029 10/04/01 10/04/01 824 100
300 06 0069 / 5233 3850 W HIRSCH ST 1.0 11/04/02 11/04/02 210 11/01/02 11/01/02 203 100
300 09 / 33096 4233 W SCHOOL ST 1.0 10/20/08 10/20/08 400 10/20/08 10/20/08 278 100
300 09 / 33096 4245 W SCHOOL ST 1.0 10/20/08 10/20/08 400 10/20/08 10/20/08 278 100

Totals per 250 Watt Changeout 287.64 114,554 75,844

Work Type: 400 Watt Changeout Fixtures


300 09 / 33096 ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 12.0 10/27/08 10/31/08 4,800 10/27/08 10/31/08 3,984 100
300 09 / 33096 ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE 11.0 10/27/08 10/31/08 4,400 10/27/08 10/31/08 3,652 100
300 09 / 33096 ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE 17.40 10/27/08 11/01/07 6,960 10/27/08 11/01/07 6,647 100
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 63.0 04/04/05 11/18/05 25,200 07/10/05 08/01/05 22,050 100
300 11 / 32219 ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD 13.0 11/01/07 12/01/07 5,400 09/26/07 10/31/07 3,919 100
300 07 0030 / 5453 1800-1900 N KEYSTONE AVE .0 03/01/06 12/31/06 0 0 0
300 06 0122 / 5275 4200 W NORTH AVE 3.0 06/01/03 06/02/03 4,800 05/13/03 05/13/03 3,647 100

Totals per 400 Watt Changeout 119.40 51,560 43,899

Totals per Lighting/Electrical 1,678,639 1,911,405


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 314

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0092 / 5774 3402 N HAMLIN AVE 1.0 0 03/29/01 03/29/01 236 100
805 06 1055 / 7241 2422 N HARDING AVE 1.0 02/03/95 02/03/95 0 02/03/95 02/03/95 300 100
805 06 1056 / 7242 2726 N HARDING AVE 1.0 01/27/95 01/27/95 0 01/27/95 01/27/95 300 100
805 06 1076 / 7262 3629 N HARDING AVE 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 1717 / 7903 1701 N KARLOV AVE 1.0 06/19/97 06/19/97 0 06/19/97 06/19/97 300 100
805 06 1393 / 7579 3213 N KEATING AVE 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 1256 / 7442 3521 N KEATING AVE 1.0 05/20/96 05/20/96 0 05/20/96 05/20/96 300 100
805 06 1197 / 7383 1509 N KEDVALE AVE 1.0 11/27/96 11/27/96 0 11/27/96 11/27/96 300 100
805 06 1427 / 7613 1523 N KEDVALE AVE 1.0 11/27/96 11/27/96 0 11/27/96 11/27/96 300 100
805 06 1213 / 7399 1555 N KEDVALE AVE 1.0 11/27/96 11/27/96 0 11/27/96 11/27/96 300 100
805 06 1158 / 7344 1634 N KEELER AVE 1.0 04/04/95 04/04/95 0 04/04/95 04/04/95 300 100
805 06 1184 / 7370 3823 N KEYSTONE AVE 1.0 08/28/96 08/28/96 0 08/28/96 08/28/96 300 100
805 06 2024 / 8210 2125 N KOSTNER AVE 1.0 08/08/95 08/08/95 0 08/08/95 08/08/95 300 100
805 06 0564 / 6750 1518 N PULASKI RD 1.0 07/11/95 07/11/95 0 07/11/95 07/11/95 300 100
805 06 0565 / 6751 1916 N PULASKI RD 1.0 04/12/95 04/12/95 0 04/12/95 04/12/95 300 100
805 06 0566 / 6752 1936 N PULASKI RD 1.0 04/12/95 04/12/95 0 04/12/95 04/12/95 300 100
805 06 0567 / 6753 1956 N PULASKI RD 1.0 04/12/95 04/12/95 0 04/12/95 04/12/95 300 100
300 06 0139 / 5289 3616 N PULASKI RD 1,505.0 03/01/06 09/01/06 32,831 05/05/06 05/19/06 45,472 100
302 00 0092 / 5774 3618 N PULASKI RD 39.0 0 01/25/01 01/23/02 6,834 100
805 06 1778 / 7964 2170 N SPRINGFIELD AVE 1.0 04/17/97 04/17/97 0 04/17/97 04/17/97 300 100
805 06 0677 / 6863 2441 N SPRINGFIELD AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0443 / 6629 1621 N TRIPP AVE 1.0 06/10/96 06/10/96 0 06/10/96 06/10/96 300 100
805 06 0786 / 6972 3732 W ADDISON ST 1.0 09/19/95 09/19/95 0 09/19/95 09/19/95 300 100
805 06 0787 / 6973 4008 W ADDISON ST 1.0 02/17/95 02/17/95 0 02/17/95 02/17/95 300 100
805 06 0771 / 6957 4129 W ADDISON ST 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 0790 / 6976 4599 W ADDISON ST 1.0 08/28/96 08/28/96 0 08/28/96 08/28/96 300 100
302 00 0092 / 5774 3840 W ALTGELD ST 1.0 0 04/24/01 04/24/01 236 100
805 06 1740 / 7926 5625 W DIVERSEY AVE 1.0 06/12/97 06/12/97 0 06/12/97 06/12/97 300 100
805 06 0807 / 6993 3915 W FULLERTON AVE 1.0 10/18/96 10/18/96 0 10/18/96 10/18/96 300 100
805 06 0788 / 6974 3925 W FULLERTON AVE 1.0 10/18/96 10/18/96 0 10/18/96 10/18/96 300 100
805 06 1229 / 7415 3955 W FULLERTON AVE 1.0 10/18/96 10/18/96 0 10/18/96 10/18/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 315

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1180 / 7366 3975 W FULLERTON AVE 1.0 10/18/96 10/18/96 0 10/18/96 10/18/96 300 100
300 06 0139 / 5289 5402 W FULLERTON AVE 1,410.0 03/01/06 09/01/06 30,775 04/17/06 05/01/06 42,602 100
805 06 1604 / 7790 4124 W NORTH AVE 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1788 / 7974 4200 W NORTH AVE 1.0 11/12/91 11/12/91 0 11/12/91 11/12/91 300 100
805 06 1510 / 7696 4212 W NORTH AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1512 / 7698 4220 W NORTH AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 1800 / 7986 3917 W PALMER ST 1.0 04/14/97 04/14/97 0 04/14/97 04/14/97 300 100
805 06 1771 / 7957 3921 W PALMER ST 1.0 04/14/97 04/14/97 0 04/14/97 04/14/97 300 100
805 06 1772 / 7958 3925 W PALMER ST 1.0 04/14/97 04/14/97 0 04/14/97 04/14/97 300 100
805 06 1780 / 7966 3927 W PALMER ST 1.0 04/17/97 04/17/97 0 04/17/97 04/17/97 300 100
805 06 0642 / 6828 4235 W SCHOOL ST 1.0 10/12/95 10/12/95 0 10/12/95 10/12/95 300 100
805 06 1779 / 7965 3902 W SHAKESPEARE AVE 1.0 04/17/97 04/17/97 0 04/17/97 04/17/97 300 100
805 06 0652 / 6838 4346 W SHAKESPEARE AVE 1.0 08/08/95 08/08/95 0 08/08/95 08/08/95 300 100

Totals per Alley Lighting/Lamps 2,995.0 63,606 107,080

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 5402 W FULLERTON AVE 1,200.0 06/01/07 12/31/07 35,238 07/10/07 09/15/07 35,238 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 3618 N PULASKI RD 709.0 0 04/30/02 05/03/02 12,910 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 ON N SPRINGFIELD AVE FROM W POTOMAC AVE TO W LE MOYNE ST 6.40 0 09/23/99 09/23/99 1,053 100
302 00 0092 / 5774 N SPRINGFIELD AVE AND W SHAKESPEARE AVE 1.0 0 04/10/01 04/10/01 471 100
300 06 0167 / 5306 W DIVERSEY AVE AND N AVERS AVE 3.50 0 06/10/99 06/10/99 1,229 100
300 06 0069 / 5233 1435 N KARLOV AVE 2.0 970 07/11/02 07/11/02 1,432 100
300 06 0167 / 5306 1901 N KEELER AVE 1.0 0 12/01/99 12/01/99 351 100

Totals per Flood Light Install 13.90 970 4,535

Work Type: Lighting Imprvmnts Installations


300 06 0122 / 5275 3811 W SCHOOL ST 1.0 10/15/03 10/16/03 4,600 10/17/03 10/17/03 1,764 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 316

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 09 / 33096 ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 21.0 12/19/08 12/31/08 28,350 12/19/08 12/31/08 28,400 100
300 09 / 33096 ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE 20.0 12/19/08 12/31/08 27,000 12/19/08 12/31/08 21,249 100
300 09 / 33096 ON W ARMITAGE AVE FROM N PULASKI RD TO N SPRINGFIELD AVE 5.0 11/20/08 11/26/08 6,750 11/20/08 11/26/08 6,800 100
300 09 / 33096 ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE 33.93 12/22/08 01/16/09 45,806 12/22/08 01/16/09 46,145 100
300 07 0030 / 5453 ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE 14.0 04/18/06 11/18/06 19,300 0 0
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 67.0 04/04/05 11/18/05 90,450 07/10/05 08/01/05 78,882 100
300 11 / 32219 ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD 13.0 11/01/07 12/01/07 17,550 09/26/07 10/31/07 11,757 100
300 07 0030 / 5453 1800-1900 N KEYSTONE AVE .0 03/01/06 12/31/06 0 0 0

Totals per Ornamental - Piggyback Lighting 173.93 235,206 193,232

Work Type: Ornamental Lighting Blocks


300 05 0030 / 5145 KOSCIUSZKO (THADEUZ) .0 04/01/05 0 04/01/05 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 3348 N MILWAUKEE AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 05 0030 / 5145 KOSCIUSZKO (THADEUZ) .0 04/01/05 0 04/01/05 0 0
300 06 / 32275 ON N AVERS AVE FROM W HIRSCH ST TO W NORTH AVE 2.0 04/01/07 12/31/07 217,243 03/23/07 08/17/07 90,478 100
300 11 / 32219 ON N HAMLIN AVE FROM W GRAND AVE TO W NORTH AVE 1.0 04/16/07 08/15/07 62,500 04/09/07 09/07/07 50,000 100
300 05 0030 / 5145 ON W SCHUBERT AVE FROM N CENTRAL AVE TO N MENARD AVE 2.0 08/10/05 11/18/05 170,000 08/15/05 10/21/05 123,228 100
300 06 0298 / 5405 ON W SCHUBERT AVE FROM N MENARD AVE TO N AUSTIN AVE 2.0 06/25/05 08/01/05 0 08/08/05 10/21/05 73,406 100
300 06 0308 / 5414 ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE 1.74 03/16/06 12/31/06 124,400 06/07/06 08/01/06 75,560 100
300 07 0030 / 5453 ON W WRIGHTWOOD AVE FROM N MENARD AVE TO N AUSTIN AVE 1.0 06/12/06 08/18/06 75,000 06/07/06 08/15/06 51,456 100

Project has been completed Note Last Updated on 25-AUG-06


300 07 0030 / 5453 1800-1900 N KEYSTONE AVE .0 03/01/06 12/31/06 0 0 0

Totals per Residntl Staggered Lighting 9.74 649,143 464,128


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 317

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0235 / 5349 ON N KILBOURN AVE FROM W ROSCOE ST TO W ADDISON ST 2.0 08/28/03 10/28/03 154,477 08/28/03 10/17/03 137,993 100
300 06 0267 / 5375 ON N LOTUS AVE FROM W FULLERTON AVE TO W ALTGELD ST 2.0 05/20/04 07/20/04 146,035 06/02/04 09/16/04 127,621 100

Totals per Residntl Strt Lighting/Lamps 4.0 300,512 265,614

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 1900 N TRIPP AVE 1.0 0 04/20/01 04/20/01 378 100
302 00 0092 / 5774 1910 N TRIPP AVE 1.0 0 04/20/01 04/20/01 378 100
302 00 0092 / 5774 1922 N TRIPP AVE 1.0 0 04/20/01 04/20/01 378 100
302 00 0092 / 5774 1940 N TRIPP AVE 1.0 0 04/20/01 04/20/01 378 100
302 00 0092 / 5774 1948 N TRIPP AVE 1.0 0 04/20/01 04/20/01 378 100
302 00 0092 / 5774 5733 W DIVERSEY AVE 1.0 0 02/01/01 02/01/01 378 100
302 00 0092 / 5774 5734 W DIVERSEY AVE 1.0 0 02/01/01 02/01/01 378 100
302 00 0092 / 5774 5737 W DIVERSEY AVE 1.0 0 04/20/01 04/20/01 378 100
302 00 0092 / 5774 4300 W SHAKESPEARE AVE 1.0 0 04/10/01 04/10/01 378 100
302 00 0092 / 5774 4324 W SHAKESPEARE AVE 1.0 0 04/10/01 04/10/01 378 100
302 00 0092 / 5774 4336 W SHAKESPEARE AVE 1.0 0 04/10/01 04/10/01 378 100
302 00 0092 / 5774 4352 W SHAKESPEARE AVE 1.0 0 04/10/01 04/10/01 378 100

Totals per Short Arm Installs - Residntl 12.0 0 4,536


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 318

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 09 / 33096 ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 21.0 10/23/08 10/28/08 6,300 10/23/08 10/28/08 4,410 100
300 09 / 33096 ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE 20.0 10/20/08 10/23/08 6,000 10/20/08 10/23/08 4,200 100
302 00 0076 / 5764 ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE 31.16 09/01/00 12/31/00 0 530
300 09 / 33096 ON N MONITOR AVE FROM W BELDEN AVE TO W ALTGELD ST 3.50 700 0 0
300 09 / 33096 ON W BELMONT AVE FROM N LONG AVE TO N LAVERGNE AVE 30.45 10/27/08 10/31/08 9,135 10/27/08 10/31/08 7,856 100
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 96.50 04/04/05 11/18/05 24,125 06/27/05 07/15/05 15,000 100
302 00 0076 / 5764 ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE 50.0 09/01/00 12/31/00 0 850
300 11 / 32219 ON W NORTH AVE FROM N HAMLIN AVE TO N LOWELL AVE 50.0 06/10/07 07/10/07 11,000 06/10/07 07/10/07 11,000 100
302 00 0076 / 5764 ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE 69.66 09/01/00 12/31/00 0 1,184
300 11 / 32219 ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD 13.0 07/10/07 08/01/07 3,250 07/10/07 08/01/07 3,250 100
300 07 0030 / 5453 1800-1900 N KEYSTONE AVE .0 03/01/06 12/31/06 0 0 0
300 06 0108 / 5263 4200 W NORTH AVE 3.0 05/21/03 05/21/03 750 07/01/03 07/03/03 630 100

Totals per Strt Light Pole Painting 388.27 61,260 48,910

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 06 0098 / 5259 1800-2300 N PULASKI RD 5.0 04/01/01 01/15/03 0 04/16/01 06/15/02 515,969 100

Work Type: Strt Lighting Blocks


300 06 0274 / 5382 ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE 1.0 06/20/06 08/31/06 75,000 06/20/06 08/31/06 30,628 100

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 3616 N PULASKI RD 774.0 03/01/04 12/01/04 4,024 10/18/06 10/19/06 8,429 100

NEW WARD ADDRESS IS 3348 N. MILWAUKEE Note Last Updated on 30-OCT-06


300 06 0238 / 5352 5402 W FULLERTON AVE 1,522.0 06/01/06 12/31/06 8,500 10/19/06 10/23/06 7,914 100

Totals per Traffic Signal Regrouping 2,296.0 12,524 16,343


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 319

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2639 / 8825 1895 N KARLOV AVE 8.0 10/25/94 10/25/94 0 10/25/94 10/25/94 6,000 100
805 06 2917 / 9103 1893 N KEELER AVE 12.0 03/16/94 03/16/94 0 03/16/94 03/16/94 9,000 100
805 06 2638 / 8824 1895 N KILDARE AVE 8.0 12/20/94 12/20/94 0 12/20/94 12/20/94 6,000 100
300 06 0117 / 5271 2300 N PULASKI RD 12.0 52,265 2,235
302 00 0072 / 5760 2300 N PULASKI RD 1.0 0 03/09/00 03/15/00 7,626 100
300 06 0217 / 5337 3616 N PULASKI RD 395.0 12/16/03 12/19/03 22,202 01/28/04 02/06/04 23,423 100
805 06 2752 / 8938 1898 N SPRINGFIELD AVE 10.0 06/29/94 06/29/94 0 06/29/94 06/29/94 7,500 100
805 06 2358 / 8544 1890 N TRIPP AVE 8.0 06/04/96 06/04/96 0 06/04/96 06/04/96 6,000 100
302 00 0071 / 5759 3850 W ARMITAGE AVE 0 10/17/98 10/22/98 3,492 100
805 06 2654 / 8840 3899 W ARMITAGE AVE 4.0 05/08/92 05/08/92 0 05/08/92 05/08/92 3,000 100
805 06 2633 / 8819 3925 W DICKENS AVE 8.0 12/14/94 12/14/94 0 12/14/94 12/14/94 6,000 100
805 06 2659 / 8845 4565 W ROSCOE ST 4.0 04/19/93 04/19/93 0 04/19/93 04/19/93 3,000 100
805 06 2207 / 8393 4001 W WRIGHTWOOD AVE 10.0 12/31/95 12/31/95 0 12/31/95 12/31/95 7,500 100

Totals per Underpass Lighting 480.0 74,467 90,776


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 320

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Flashing Yellow Warning Lights Locations
300 06 0166 / 5305 4100 W GRAND AVE 1.0 03/15/01 04/15/01 15,000 06/13/01 06/15/01 11,165 100

Work Type: LED Signal Head Install Locations


210 06 0130 / 4389 N KEELER AVE AND W ARMITAGE AVE 1.0 0 02/26/02 02/26/02 7,324 90
210 06 0130 / 4389 N PULASKI RD AND W ARMITAGE AVE 1.0 0 02/26/02 02/26/02 10,074 100

Totals per LED Signal Head Install 2.0 0 17,398

Work Type: Left Turn Arrow Locations


210 06 / 32040 N CENTRAL AVE AND W DIVERSEY AVE .0 11/01/06 12/31/07 42,500 0 0
210 06 0257 / 4493 N CENTRAL AVE AND W FULLERTON AVE .50 09/15/06 08/20/07 58,700 01/17/07 04/17/07 0 100

No true cost avail. Pending jcs adjustment Note Last Updated on 04-OCT-07
Awaiting ADA work. Note Last Updated on 21-JUN-07
210 06 0256 / 4492 W BELMONT AVE AND N CENTRAL AVE .50 09/01/05 06/30/07 61,036 01/02/07 10/19/07 0 100

Awaiting ADA work. Note Last Updated on 21-JUN-07


210 06 0073 / 4337 1600 N PULASKI RD 1.0 06/13/02 09/01/02 50,000 06/13/02 02/07/03 60,838 100

Totals per Left Turn Arrow 2.0 212,236 60,838

Work Type: New Signal Locations


210 06 0208 / 4451 W ADDISON ST AND N LAWNDALE AVE .50 12/01/05 06/30/06 112,500 0
210 06 0131 / 4390 W FULLERTON AVE AND N AVERS AVE .50 07/01/01 12/01/01 85,000 05/31/01 08/02/01 47,668 100

Totals per New Signal 1.0 197,500 47,668

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W BELMONT AVE AND N MILWAUKEE AVE .0 03/15/06 05/08/07 6,000 01/12/07 02/13/07 4,070 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N KOSTNER AVE AND W PALMER BLVD .50 2,000 07/20/01 04/08/02 527 100

Work Type: Signals Intersections


300 06 0096 / 5258 3616 N PULASKI RD 49.0 11/15/03 11/21/03 0 11/04/03 11/10/03 7,748 100

Totals per Traffic 590,586 692,094


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 321

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
814 06 0341 / 16539 2800 N HAMLIN AVE 1.0 04/15/97 04/15/97 0 04/15/97 12/15/97 129,900 100
210 06 0072 / 4336 3200 N KILPATRICK AVE 1.0 06/06/00 10/10/00 150,000 06/06/00 10/10/00 95,170 100
814 06 0383 / 16571 3600 N PULASKI RD 1.0 09/19/96 09/19/96 0 09/19/96 09/19/96 123,824 100
814 06 0312 / 16524 3850 N PULASKI RD 1.0 11/21/91 11/21/91 0 11/21/91 11/21/91 106,875 100
814 06 0125 / 16339 3869 N PULASKI RD 1.0 10/29/93 10/29/93 0 10/29/93 10/29/93 79,020 100

Totals per TSM Install 5.0 150,000 534,789

Work Type: Traffic Equipment Painting Locations


300 07 0030 / 5453 ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE 1.50 04/18/06 11/18/06 300 0 0
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 20.50 04/04/05 11/18/05 7,550 06/27/05 07/15/05 7,892 100
300 07 0030 / 5453 1800-1900 N KEYSTONE AVE .0 03/01/06 12/31/06 0 0 0

Totals per Traffic Equipment Painting 22.0 7,850 7,892

Totals per Construction Phase 2,269,224 2,603,499

Totals for Ward 30 2,317,474 2,615,546


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 322

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON N KILPATRICK AVE FROM W PALMER ST TO W FULLERTON AVE 2.0 04/01/08 08/30/08 130,000 05/19/08 0 20
300 06 0308 / 5414 ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 354 100
300 06 / 32277 ON N LOWELL AVE FROM W PALMER ST TO W FULLERTON AVE 2.0 04/01/08 08/30/08 130,000 05/19/08 0 20
300 06 0274 / 5382 ON W GEORGE ST FROM N LONG AVE TO N CENTRAL AVE .0 07/01/04 12/31/04 0 03/22/05 05/06/05 818 100
210 06 0243 / 4480 W BELMONT AVE AND N MILWAUKEE AVE .0 01/08/07 01/26/07 250 01/08/07 01/26/07 638 100
300 06 0292 / 5399 1833 N CICERO AVE 1.0 2,500 03/30/05 05/01/05 0 100
210 06 0127 / 4386 4640 W DIVERSEY AVE .0 12/15/05 03/15/06 0 12/15/05 02/16/06 1,275 100
300 06 0292 / 5399 4821 W FULLERTON AVE 1.0 02/23/05 03/04/05 1,000 01/20/05 05/19/05 1,000 100

Totals per Design/Engineering 6.0 263,750 4,085


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 323

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 11 / 32219 ON N KOSTNER AVE FROM W ARMITAGE AVE TO W PALMER ST 10.0 12/12/07 12/18/07 1,677 12/12/07 12/18/07 1,677 100
300 06 0069 / 5233 ON W SHAKESPEARE AVE FROM N LAMON AVE TO N CICERO AVE 5.0 03/17/03 03/17/03 2,000 03/14/03 03/14/03 1,875 100
300 06 0069 / 5233 ON W WABANSIA AVE FROM N PULASKI RD TO N LOWELL AVE 6.0 2,250 01/14/03 01/14/03 2,250 100
300 06 0069 / 5233 2200 N KENNETH AVE 5.0 04/29/02 04/29/02 1,050 04/25/02 04/25/02 1,015 100
302 00 0092 / 5774 3100-3199 N KENOSHA AVE 8.0 0 09/28/01 09/28/01 1,646 100
300 06 0069 / 5233 2600 N KILBOURN AVE 8.0 06/07/02 06/07/02 1,680 06/04/02 06/04/02 1,624 100
300 06 0069 / 5233 2000 N LAWLER AVE 5.0 01/10/02 01/10/02 1,050 01/07/02 01/07/02 1,015 100
300 06 0069 / 5233 2458 N LOWELL AVE 1.0 11/04/02 11/04/02 210 11/01/02 11/01/02 203 100
300 06 0069 / 5233 4353 W ALTGELD ST 1.0 11/04/02 11/04/02 210 11/01/02 11/01/02 203 100
300 06 0069 / 5233 4502 W FULLERTON AVE 894.0 350,000 04/18/03 06/30/03 197,004 100
300 06 0122 / 5275 4502 W FULLERTON AVE 604.0 07/01/03 08/01/03 238,250 05/10/03 06/30/03 130,493 100
300 06 0069 / 5233 4800 W WOLFRAM ST 5.0 04/29/02 04/29/02 1,050 04/25/02 04/25/02 1,015 100

Totals per 250 Watt Changeout 1,552.0 599,427 340,020

Work Type: 400 Watt Changeout Fixtures


300 06 0122 / 5275 ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE 171.0 06/11/04 06/16/04 68,400 05/25/04 06/21/04 68,400 100
300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 38.50 04/04/05 11/18/05 15,400 07/10/05 08/01/05 13,475 100
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 63.0 04/04/05 11/18/05 25,200 07/10/05 08/01/05 22,050 100
300 03 0031 / 4902 ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD 91.50 05/18/04 05/25/04 36,600 05/15/04 06/01/04 34,037 100

Totals per 400 Watt Changeout 364.0 145,600 137,962

Totals per Lighting/Electrical 2,156,355 1,679,392


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 324

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0840 / 7026 2811 N CENTRAL AVE 1.0 03/10/95 03/10/95 0 03/10/95 03/10/95 300 100
805 06 1758 / 7944 2940 N CICERO AVE 1.0 05/09/97 05/09/97 0 05/09/97 05/09/97 300 100
805 06 1759 / 7945 2958 N CICERO AVE 1.0 05/09/97 05/09/97 0 05/09/97 05/09/97 300 100
805 06 1738 / 7924 3002 N CICERO AVE 1.0 06/12/97 06/12/97 0 06/12/97 06/12/97 300 100
805 06 0416 / 6602 3032 N CICERO AVE 1.0 08/05/96 08/05/96 0 08/05/96 08/05/96 300 100
805 06 1760 / 7946 3056 N CICERO AVE 1.0 05/09/97 05/09/97 0 05/09/97 05/09/97 300 100
805 06 0332 / 6518 3134 N DAVLIN CT 1.0 05/04/95 05/04/95 0 05/04/95 05/04/95 300 100
805 06 1382 / 7568 2332 N KEATING AVE 1.0 08/12/96 08/12/96 0 08/12/96 08/12/96 300 100
805 06 1196 / 7382 2034 N KENNETH AVE 1.0 04/01/96 04/01/96 0 04/01/96 04/01/96 300 100
805 06 1166 / 7352 2054 N KENNETH AVE 1.0 06/19/96 06/19/96 0 06/19/96 06/19/96 300 100
302 00 0092 / 5774 3157 N KENOSHA AVE 1.0 0 09/29/01 09/29/01 236 100
805 06 2028 / 8214 2635 N KILDARE AVE 1.0 04/05/95 04/05/95 0 04/05/95 04/05/95 300 100
805 06 2008 / 8194 2233 N KOSTNER AVE 1.0 09/29/95 09/29/95 0 09/29/95 09/29/95 300 100
805 06 1996 / 8182 3015 N KOSTNER AVE 1.0 10/22/96 10/22/96 0 10/22/96 10/22/96 300 100
805 06 2017 / 8203 3215 N KOSTNER AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 1998 / 8184 3257 N KOSTNER AVE 1.0 06/02/95 06/02/95 0 06/02/95 06/02/95 300 100
805 06 1961 / 8147 2937 N LONG AVE 1.0 04/03/96 04/03/96 0 04/03/96 04/03/96 300 100
805 06 1859 / 8045 2839 N LUNA AVE 1.0 04/03/96 04/03/96 0 04/03/96 04/03/96 300 100
805 06 1860 / 8046 2858 N LUNA AVE 1.0 01/25/96 01/25/96 0 01/25/96 01/25/96 300 100
805 06 1743 / 7929 4521 W ARMITAGE AVE 1.0 05/21/97 05/21/97 0 05/21/97 05/21/97 300 100
805 06 1744 / 7930 4531 W ARMITAGE AVE 1.0 05/21/97 05/21/97 0 05/21/97 05/21/97 300 100
805 06 1745 / 7931 4551 W ARMITAGE AVE 1.0 05/21/97 05/21/97 0 05/21/97 05/21/97 300 100
302 00 0092 / 5774 4502 W FULLERTON AVE 30.0 0 01/25/01 10/31/01 7,070 100
805 06 1112 / 7298 4616 W FULLERTON AVE 1.0 08/10/95 08/10/95 0 08/10/95 08/10/95 300 100
805 06 1651 / 7837 4821 W MEDILL AVE 1.0 07/29/97 07/29/97 0 07/29/97 07/29/97 300 100
805 06 1929 / 8115 5038 W NELSON ST 1.0 09/06/96 09/06/96 0 09/06/96 09/06/96 300 100
805 06 0634 / 6820 4344 W SCHOOL ST 1.0 08/07/95 08/07/95 0 08/07/95 08/07/95 300 100
805 06 0618 / 6804 5021 W SCHUBERT AVE 1.0 03/14/96 03/14/96 0 03/14/96 03/14/96 300 100
805 06 0619 / 6805 5301 W SCHUBERT AVE 1.0 12/03/96 12/03/96 0 12/03/96 12/03/96 300 100
805 06 0537 / 6723 4819 W WELLINGTON AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 300 100
805 06 0471 / 6657 4635 W WRIGHTWOOD AVE 1.0 02/02/95 02/02/95 0 02/02/95 02/02/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 325

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
Totals per Alley Lighting/Lamps 60.0 0 16,006

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 4502 W FULLERTON AVE 1,016.0 06/01/07 12/31/07 29,911 08/18/07 01/15/08 29,911 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 4502 W FULLERTON AVE 921.0 0 05/24/02 05/27/02 16,770 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 ON N KEATING AVE FROM W DIVERSEY AVE TO W BELMONT AVE 14.0 0 09/24/99 09/24/99 2,444 100
300 06 0167 / 5306 ON N KILPATRICK AVE FROM W DIVERSEY AVE TO W BARRY AVE 9.0 0 09/24/99 09/24/99 1,504 100
302 00 0092 / 5774 W BELDEN AVE AND N LA CROSSE AVE 1.0 0 04/04/01 04/04/01 471 100
300 06 0167 / 5306 2800 N KEATING AVE 1.0 0 09/24/99 09/24/99 351 100
300 06 0167 / 5306 2900 N KEATING AVE 1.0 0 09/04/99 09/24/99 351 100
300 06 0167 / 5306 3000 N KEATING AVE 1.0 0 09/24/99 09/24/99 351 100
300 06 0167 / 5306 2800 N KILPATRICK AVE 1.0 0 09/27/99 09/27/99 351 100
300 06 0167 / 5306 2900 N KILPATRICK AVE 1.0 0 09/27/99 09/27/99 351 100
300 06 0167 / 5306 3000 N KILPATRICK AVE 1.0 0 09/27/99 09/27/99 351 100
300 06 0167 / 5306 3222 N KOSTNER AVE 1.0 0 09/03/99 09/03/99 351 100
302 00 0092 / 5774 2248 N LAMON AVE 1.0 0 05/09/01 05/09/01 471 100
300 06 0167 / 5306 4220 W BARRY AVE 1.0 0 04/17/99 04/17/99 351 100
302 00 0092 / 5774 4816 W BARRY AVE 1.0 0 02/06/01 02/06/01 471 100
302 00 0092 / 5774 4802 W MONTANA ST 1.0 0 02/14/01 02/14/01 471 100
302 00 0092 / 5774 4010 W NELSON ST 1.0 0 02/08/01 02/08/01 471 100
302 00 0092 / 5774 4340 W WELLINGTON AVE 1.0 0 05/01/01 05/01/01 471 100
302 00 0092 / 5774 4352 W WELLINGTON AVE 1.0 0 05/01/01 05/01/01 471 100
302 00 0092 / 5774 4802 W WOLFRAM ST 1.0 0 02/01/01 02/01/01 471 100

Totals per Flood Light Install 39.0 0 10,524


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 326

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0292 / 5399 1833 N CICERO AVE .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0
300 06 0292 / 5399 4821 W FULLERTON AVE .0 03/01/05 12/31/05 0 06/27/05 06/27/05 0 100

Totals per Lighting Imprvmnts .0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 06 0122 / 5275 ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE 135.0 06/16/04 06/30/04 182,250 06/11/04 07/07/04 113,051 100
300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 31.0 04/04/05 11/18/05 41,850 07/10/05 07/15/05 26,500 100
300 09 / 33097 ON W ARMITAGE AVE FROM N KOSTNER AVE TO W GRAND AVE 46.0 07/07/08 08/01/08 62,700 06/27/08 07/07/08 47,358 100
300 07 0030 / 5453 ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE 14.0 04/18/06 11/18/06 19,300 0 0
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 67.0 04/04/05 11/18/05 90,450 07/10/05 08/01/05 78,882 100
300 03 0031 / 4902 ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD 77.0 05/26/04 06/10/04 103,950 05/25/04 07/07/04 81,642 100

Totals per Ornamental - Piggyback Lighting 370.0 500,500 347,433

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 4502 W FULLERTON AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32277 ON N KILPATRICK AVE FROM W PALMER ST TO W FULLERTON AVE .0 05/04/08 12/31/08 0 0 0
300 06 0308 / 5414 ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE 1.0 08/25/06 10/25/06 84,842 09/05/06 04/27/07 20,179 100
300 06 / 32277 ON N LOWELL AVE FROM W PALMER ST TO W FULLERTON AVE .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON W GEORGE ST FROM N LAMON AVE TO N LAVERGNE AVE 1.0 06/30/05 08/01/05 0 08/08/05 10/07/05 58,082 100
300 06 0298 / 5405 ON W WOLFRAM ST FROM N LAMON AVE TO N LAVERGNE AVE 1.0 06/30/05 08/01/05 0 08/08/05 10/07/05 58,082 100
300 09 / 33097 ON W WOLFRAM ST FROM N LAVERGNE AVE TO N LARAMIE AVE 1.0 130,000 04/01/08 12/01/08 0 0

Totals per Residntl Staggered Lighting 4.0 214,842 136,343

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON W DRUMMOND PL FROM N CICERO AVE TO N LAVERGNE AVE 2.0 08/01/03 10/01/03 159,534 07/31/03 10/17/03 144,080 100
300 06 0267 / 5375 ON W GEORGE ST FROM N CICERO AVE TO N LAMON AVE 1.0 09/27/04 11/27/04 97,526 10/04/04 11/17/04 63,482 100
300 06 0267 / 5375 ON W WOLFRAM ST FROM N CICERO AVE TO N LAMON AVE 1.0 09/15/04 11/15/04 97,526 10/04/04 11/17/04 63,483 100

Totals per Residntl Strt Lighting/Lamps 4.0 354,586 271,045


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 327

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 W BELDEN AVE AND N LAMON AVE 1.0 0 06/01/01 06/01/01 378 100
302 00 0092 / 5774 3000 N KARLOV AVE 1.0 0 04/10/01 04/10/01 378 100
302 00 0092 / 5774 3001 N KARLOV AVE 1.0 0 02/08/01 02/08/01 378 100
302 00 0092 / 5774 3101 N KARLOV AVE 1.0 0 02/08/01 02/08/01 378 100
302 00 0092 / 5774 2300 N KILPATRICK AVE 1.0 0 02/16/01 02/16/01 378 100
302 00 0092 / 5774 2210 N LA CROSSE AVE 1.0 0 04/03/01 04/03/01 378 100
302 00 0092 / 5774 2226 N LA CROSSE AVE 1.0 0 04/03/01 04/03/01 378 100
302 00 0092 / 5774 2242 N LA CROSSE AVE 1.0 0 04/03/01 04/03/01 378 100
302 00 0092 / 5774 2250 N LAMON AVE 1.0 0 06/01/01 06/01/01 378 100
302 00 0092 / 5774 4816 W BARRY AVE 1.0 0 02/01/01 02/01/01 378 100
302 00 0092 / 5774 4900 W DEMING PL 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 5100 W DEMING PL 1.0 0 03/14/01 03/14/01 378 100
302 00 0092 / 5774 4002 W NELSON ST 1.0 0 02/08/01 02/08/01 378 100
302 00 0092 / 5774 4030 W NELSON ST 1.0 0 04/10/01 04/10/01 378 100
302 00 0092 / 5774 4100 W NELSON ST 1.0 0 02/08/01 02/08/01 378 100
302 00 0092 / 5774 5055 W WRIGHTWOOD AVE 1.0 0 03/01/01 03/01/01 378 100

Totals per Short Arm Installs - Residntl 16.0 0 6,048

Work Type: Strt Light Pole Painting Locations


300 03 0031 / 4902 ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE 6.0 06/04/04 06/28/04 1,425 05/25/04 06/20/04 0 100
300 06 0108 / 5263 ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE 194.0 06/04/04 06/28/04 55,325 05/25/04 06/30/04 44,136 100
302 00 0077 / 5765 ON N CICERO AVE FROM W BARRY AVE TO W GRAND AVE 160.0 0 07/06/99 07/23/99 13,979 100
300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 31.0 04/04/05 11/18/05 7,750 06/27/05 07/15/05 6,324 100
302 00 0076 / 5764 ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE 6.84 09/01/00 12/31/00 0 116
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 96.50 04/04/05 11/18/05 24,125 06/27/05 07/15/05 15,000 100
302 00 0076 / 5764 ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE 50.0 09/01/00 12/31/00 0 850
300 03 0031 / 4902 ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD 101.0 05/10/04 06/04/04 27,425 05/10/04 06/04/04 24,084 100
302 00 0076 / 5764 ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE 1.62 09/01/00 12/31/00 0 28

Totals per Strt Light Pole Painting 646.96 116,050 104,517


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 328

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Lighting Blocks
300 06 0297 / 5404 KELVYN PARK CPS 1.0 12/01/03 12/31/04 28,973 06/23/03 06/25/04 28,973 100
300 06 0274 / 5382 ON W GEORGE ST FROM N LONG AVE TO N CENTRAL AVE 2.0 150,000 10/13/04 12/01/04 119,418 100
300 06 0204 / 5327 3100 N KENOSHA AVE 4.0 10/17/01 10/17/01 840 09/29/01 09/29/01 1,029 100

Totals per Strt Lighting 7.0 179,813 149,420

Work Type: Underpass Lighting Fixtures


805 06 2111 / 8297 1805 N KOSTNER AVE 8.0 03/16/94 03/16/94 0 03/16/94 03/16/94 6,000 100
805 06 2921 / 9107 4695 W ARMITAGE AVE 4.0 03/02/94 03/02/94 0 03/02/94 03/02/94 3,000 100
805 06 2908 / 9094 4300 W BELMONT AVE 4.0 12/09/93 12/09/93 0 12/09/93 12/09/93 3,000 100
805 06 2660 / 8846 4625 W BELMONT AVE 4.0 04/19/93 04/19/93 0 04/19/93 04/19/93 3,000 100
805 06 2661 / 8847 4699 W DIVERSEY AVE 4.0 04/19/93 04/19/93 0 04/19/93 04/19/93 3,000 100
805 06 2632 / 8818 4001 W FULLERTON AVE 6.0 05/02/92 05/02/92 0 05/02/92 05/02/92 4,500 100
302 00 0071 / 5759 4030 W FULLERTON AVE 0 10/24/98 10/29/98 8,146 100
300 06 0217 / 5337 4502 W FULLERTON AVE 278.0 08/20/04 08/31/04 15,626 04/12/04 04/16/04 14,972 100
805 06 2919 / 9105 4569 W FULLERTON AVE 4.0 05/07/92 05/07/92 0 05/07/92 05/07/92 3,000 100
302 00 0071 / 5759 4600 W FULLERTON AVE 0 10/28/98 11/05/98 8,146 100
805 06 2257 / 8443 4698 W GRAND AVE 26.0 09/02/96 09/02/96 0 09/02/96 09/02/96 19,500 100
805 06 2918 / 9104 4860 W GRAND AVE 10.0 03/20/94 03/20/94 0 03/20/94 03/20/94 7,500 100
302 00 0070 / 5758 4100 W WRIGHTWOOD AVE 0 10/31/97 11/07/97 10,130 100
805 06 2103 / 8289 4100 W WRIGHTWOOD AVE 16.0 11/07/97 11/07/97 0 11/07/97 11/07/97 12,000 100
805 06 2656 / 8842 4598 W WRIGHTWOOD AVE 10.0 12/14/94 12/14/94 0 12/14/94 12/14/94 7,500 100

Totals per Underpass Lighting 374.0 15,626 113,394


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 329

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Flashing Yellow Warning Lights Locations
300 06 0166 / 5305 4800 W DICKENS AVE 1.0 10/27/00 10/30/00 15,000 10/27/00 10/30/00 17,592 100

Work Type: Left Turn Arrow Locations


210 06 / 32040 N CENTRAL AVE AND W DIVERSEY AVE .0 11/01/06 12/31/07 42,500 0 0
210 06 0222 / 4462 W ARMITAGE AVE AND N CICERO AVE 1.0 10/01/05 11/01/05 68,000 06/27/05 11/16/05 93,454 100
210 06 0073 / 4337 2800 N CICERO AVE 1.0 04/15/03 05/13/03 77,316 04/14/03 79,824 95
210 06 0127 / 4386 4640 W DIVERSEY AVE 1.0 11/01/06 12/01/06 75,000 01/16/07 26,078 75

Totals per Left Turn Arrow 3.0 262,816 199,356

Work Type: New Signal Locations


210 06 0073 / 4337 2400 N PULASKI RD 1.0 11/15/02 01/15/03 150,000 09/12/02 01/30/03 204,580 100

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 W BELMONT AVE AND N MILWAUKEE AVE .0 03/15/06 05/08/07 6,000 01/12/07 02/13/07 4,070 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N KOSTNER AVE AND W PALMER BLVD .50 2,000 07/20/01 04/08/02 527 100

Work Type: Signals Intersections


300 06 0096 / 5258 4502 W FULLERTON AVE 28.0 11/15/03 11/21/03 0 11/05/03 11/12/03 4,427 100

Work Type: TSM Install Locations


300 06 0078 / 5241 N LAMON AVE AND W FULLERTON AVE 1.0 11/01/02 01/31/03 25,000 11/02/02 12/03/02 25,000 100
210 06 0010 / 4285 2800 N KILBOURN AVE 1.0 08/01/98 12/01/98 150,000 08/03/98 10/19/99 108,833 100
814 06 0360 / 16554 2200 N PULASKI RD 1.0 08/01/96 08/01/96 0 08/01/96 03/26/97 126,851 100
814 06 0076 / 16292 4640 W DIVERSEY AVE 1.0 12/19/90 12/19/90 0 12/19/90 12/19/90 113,617 100

Totals per TSM Install 4.0 175,000 374,301

Work Type: Traffic Equipment Painting Locations


300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 13.0 04/04/05 11/18/05 4,850 06/27/05 07/15/05 2,652 100
300 07 0030 / 5453 ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE 1.50 04/18/06 11/18/06 300 0 0
300 05 0031 / 5146 ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE 20.50 04/04/05 11/18/05 7,550 06/27/05 07/15/05 7,892 100

Totals per Traffic Equipment Painting 35.0 12,700 10,544


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 330

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Totals per Traffic 623,516 815,396

Totals per Construction Phase 2,779,871 2,494,788

Totals for Ward 31 3,043,621 2,498,872


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 331

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE .0 04/01/08 08/30/08 0 0 0
300 06 0308 / 5414 ON W BARRY AVE FROM N HOYNE AVE TO N DAMEN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,171 100
300 05 0047 / 5162 ON W CORNELIA AVE FROM N RAVENSWOOD AVE TO N WOLCOTT AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 / 32277 ON W FLETCHER ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32275 ON W MELROSE ST FROM N LINCOLN AVE TO N RAVENSWOOD AVE .0 03/01/07 10/31/07 3,900 02/14/07 03/14/07 3,194 100
300 06 / 32275 ON W SCHOOL ST FROM N LINCOLN AVE TO N PAULINA ST .0 03/01/07 10/31/07 3,900 02/14/07 03/14/07 3,194 100
300 06 0308 / 5414 ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,086 100
300 05 0047 / 5162 ON W WINNEMAC AVE FROM N WINCHESTER AVE TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 0292 / 5399 W FULLERTON AVE AND N LAKEWOOD AVE 1.0 02/01/05 03/01/05 5,000 03/01/05 04/01/05 2,745 100
300 06 0292 / 5399 2800 N ASHLAND AVE 1.0 03/31/05 04/20/05 2,000 03/30/05 04/27/05 2,000 100
281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 2942 N LINCOLN AVE 1.0 1,000 07/12/05 07/20/05 0 100
300 06 0292 / 5399 1100 N NORTH BRANCH ST 1.0 01/06/05 03/11/05 10,000 12/10/04 04/14/05 4,397 100

Totals per Design/Engineering 4.0 25,800 18,787

Work Type: Feasibility Study Projects


302 00 0079 / 5767 ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100

Totals per Lighting/Electrical 25,800 18,787


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 332

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0032 / 5455 ON N AVONDALE AVE FROM N SEELEY AVE TO N WINCHESTER AVE 3.0 04/18/06 11/18/06 1,200 09/22/06 10/10/06 606 100
300 07 0032 / 5455 ON N CLIFTON AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON N CLYBOURN AVE FROM W WEBSTER AVE TO N MAGNOLIA AVE 1.0 04/18/06 11/18/06 400 09/22/06 10/10/06 202 100
300 06 0122 / 5275 ON N FREMONT ST FROM W NORTH AVE TO W BLACKHAWK ST 6.0 11/01/03 11/07/03 2,250 10/30/03 10/30/03 1,461 100
300 07 0032 / 5455 ON N HAMILTON AVE FROM W WEBSTER AVE TO N AVONDALE AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON N HOYNE AVE FROM W CHICAGO AVE TO W HADDON AVE 10.0 04/18/06 11/18/06 4,000 09/22/06 10/10/06 2,020 100
300 07 0032 / 5455 ON N HOYNE AVE FROM W WEBSTER AVE TO N AVONDALE AVE 10.0 04/18/06 11/18/06 4,000 09/22/06 10/10/06 2,020 100
300 07 0032 / 5455 ON N KENMORE AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON N LAKEWOOD AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 09 / 33098 ON N LEAVITT ST FROM W HOMER ST TO W CORTLAND ST 4.0 08/26/08 08/27/08 1,600 08/26/08 08/27/08 0 100
300 07 0032 / 5455 ON N LEAVITT ST FROM W SUPERIOR ST TO W DIVISION ST 8.0 04/18/06 11/18/06 3,200 09/22/06 10/10/06 1,616 100
300 07 0032 / 5455 ON N MAGNOLIA AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 07 0032 / 5455 ON N SEELEY AVE FROM W WEBSTER AVE TO N AVONDALE AVE 2.0 04/18/06 11/18/06 800 09/22/06 10/10/06 404 100
300 07 0032 / 5455 ON N SEMINARY AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE 2.50 04/18/06 11/18/06 1,000 09/22/06 10/10/06 505 100
300 07 0032 / 5455 ON N WAYNE AVE FROM N CLYBOURN AVE TO W WEBSTER AVE 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 404 100
300 07 0001 / 5424 ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0032 / 5455 ON N WINCHESTER AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 07 0032 / 5455 ON N WOLCOTT AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 07 0032 / 5455 ON W BARRY AVE FROM N LINCOLN AVE TO N ASHLAND AVE 2.0 04/18/06 11/18/06 800 09/22/06 10/10/06 404 100
300 07 0032 / 5455 ON W BARRY AVE FROM N RACINE AVE TO N LINCOLN AVE 13.0 04/18/06 11/18/06 5,200 09/22/06 10/10/06 2,626 100
300 07 0032 / 5455 ON W CATON ST FROM N MILWAUKEE AVE TO N LEAVITT ST 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 11 / 32221 ON W CATON ST FROM N MILWAUKEE AVE TO N LEAVITT ST 5.0 08/10/07 09/10/07 2,200 09/10/07 03/07/08 2,200 100
300 06 0122 / 5275 ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE 13.44 12/01/03 12/01/03 5,376 11/15/03 11/20/03 5,460 100
300 11 / 32221 ON W CONCORD PL FROM N HOYNE AVE TO N LEAVITT ST 4.0 10/10/07 10/10/07 1,600 10/10/07 10/10/07 1,600 100
300 07 0032 / 5455 ON W CONCORD PL FROM N MILWAUKEE AVE TO N LEAVITT ST 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 11 / 32221 ON W CONCORD PL FROM N THROOP ST TO N ADA ST 4.0 08/10/07 09/10/07 1,600 09/10/07 09/07/08 1,600 100
300 07 0032 / 5455 ON W CORTEZ ST FROM N DAMEN AVE TO N WESTERN AVE 7.50 04/18/06 11/18/06 3,000 09/22/06 10/10/06 1,515 100
300 07 0032 / 5455 ON W CORTLAND ST FROM N DAMEN AVE TO N HERMITAGE AVE 15.0 04/18/06 11/18/06 6,000 09/22/06 10/10/06 3,030 100
300 07 0032 / 5455 ON W FLETCHER ST FROM N RACINE AVE TO N GREENVIEW AVE 12.0 04/18/06 11/18/06 4,800 09/22/06 10/10/06 2,424 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 333

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0032 / 5455 ON W GEORGE ST FROM N LINCOLN AVE TO N ASHLAND AVE 12.0 04/18/06 11/18/06 4,800 09/22/06 10/10/06 2,424 100
300 07 0032 / 5455 ON W GEORGE ST FROM N RACINE AVE TO N LINCOLN AVE 7.0 04/18/06 11/18/06 2,800 09/22/06 10/10/06 1,414 100
300 07 0032 / 5455 ON W HADDON AVE FROM N DAMEN AVE TO N LEAVITT ST 8.0 04/18/06 11/18/06 3,200 09/22/06 10/10/06 1,616 100
300 07 0032 / 5455 ON W HADDON AVE FROM N OAKLEY BLVD TO N LEAVITT ST 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON W IOWA ST FROM N DAMEN AVE TO N HONORE ST 3.50 04/18/06 11/18/06 1,400 09/22/06 10/10/06 707 100
300 07 0032 / 5455 ON W IOWA ST FROM N DAMEN AVE TO N WESTERN AVE 20.0 04/18/06 11/18/06 8,000 09/22/06 10/10/06 4,040 100
300 07 0032 / 5455 ON W LE MOYNE ST FROM N HOYNE AVE TO N LEAVITT ST 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE 2.50 04/18/06 11/18/06 1,000 09/22/06 10/10/06 0 100
300 07 0032 / 5455 ON W LYNDALE ST FROM N AVONDALE AVE TO N LEAVITT ST 2.0 04/18/06 11/18/06 800 09/22/06 10/10/06 404 100
300 09 / 33098 ON W MOFFAT ST FROM N HOYNE AVE TO N LEAVITT ST 5.0 08/26/08 08/27/08 2,000 08/26/08 08/27/08 0 100
300 07 0032 / 5455 ON W NELSON ST FROM N GREENVIEW AVE TO N ASHLAND AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON W NELSON ST FROM N RACINE AVE TO N SOUTHPORT AVE 8.0 04/18/06 11/18/06 3,200 09/22/06 10/10/06 1,616 100
300 07 0032 / 5455 ON W OAKDALE AVE FROM N RACINE AVE TO N LAKEWOOD AVE 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 07 0032 / 5455 ON W OAKDALE AVE FROM N SOUTHPORT AVE TO N ASHLAND AVE 4.0 04/18/06 11/18/06 1,600 09/22/06 10/10/06 808 100
300 07 0032 / 5455 ON W POTOMAC AVE FROM N HOYNE AVE TO N LEAVITT ST 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON W RICE ST FROM N DAMEN AVE TO N WESTERN AVE 15.0 04/18/06 11/18/06 6,000 09/22/06 10/10/06 3,030 100
300 11 / 32221 ON W SCHOOL ST FROM N PAULINA ST TO N RAVENSWOOD AVE 5.0 08/10/07 09/10/07 2,200 09/10/07 03/07/08 2,200 100
300 07 0032 / 5455 ON W THOMAS ST FROM N DAMEN AVE TO N OAKLEY BLVD 12.0 04/18/06 11/18/06 4,800 09/22/06 10/10/06 2,424 100
300 07 0032 / 5455 ON W WALTON ST FROM N DAMEN AVE TO N WESTERN AVE 16.0 04/18/06 11/18/06 6,400 09/22/06 10/10/06 3,232 100
300 07 0032 / 5455 ON W WEBSTER AVE FROM N CLYBOURN AVE TO N SOUTHPORT AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100
300 07 0032 / 5455 ON W WELLINGTON AVE FROM N RACINE AVE TO N ASHLAND AVE 16.0 04/18/06 11/18/06 6,400 09/22/06 10/10/06 3,232 100
300 07 0032 / 5455 ON W WRIGHTWOOD AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE 5.0 04/18/06 11/18/06 2,000 0 0
302 00 0092 / 5774 3212 N PAULINA ST 1.0 0 09/21/01 09/21/01 206 100
302 00 0092 / 5774 3224 N PAULINA ST 1.0 0 09/21/01 09/21/01 206 100
302 00 0092 / 5774 3240 N PAULINA ST 1.0 0 09/21/01 09/21/01 206 100
300 06 0069 / 5233 1900 N WILMOT AVE 4.0 1,500 01/10/03 01/10/03 1,500 100
302 00 0092 / 5774 2109 W DICKENS AVE 1.0 0 01/16/02 01/16/02 203 100
300 06 0069 / 5233 1756 W NEWPORT AVE 1.0 01/13/03 01/13/03 210 01/10/03 01/10/03 203 100

Totals per 250 Watt Changeout 357.44 141,336 76,130

Totals per Lighting/Electrical 1,764,767 1,912,147


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 334

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 07 0032 / 5455 ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE 4.50 04/18/06 11/18/06 1,800 09/07/06 10/10/06 909 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W AUGUSTA BLVD TO W CORTEZ ST 9.0 04/18/06 11/18/06 3,600 09/07/06 10/10/06 1,818 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W CHICAGO AVE TO W AUGUSTA BLVD 9.0 04/18/06 11/18/06 3,600 09/07/06 10/10/06 1,818 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST 4.50 04/18/06 11/18/06 1,800 09/07/06 10/10/06 909 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W SUPERIOR ST TO W CHICAGO AVE 9.0 04/18/06 11/18/06 3,600 09/07/06 10/10/06 1,818 100
300 09 / 33109 ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE 1.0 02/01/08 12/31/08 400 08/07/08 08/11/08 339 100
300 09 / 33109 ON N RACINE AVE FROM W DICKENS AVE TO N MAUD AVE 1.0 06/23/08 06/27/08 400 04/01/08 12/01/08 0 0
300 07 0032 / 5455 ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 2,000 09/07/06 10/10/06 2,020 100
300 07 0032 / 5455 ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE 4.0 04/18/06 11/18/06 1,600 09/07/06 10/10/06 808 100
300 06 0122 / 5275 ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST 27.50 11/01/03 11/21/03 11,200 10/05/03 10/06/03 7,718 100
300 07 0032 / 5455 ON N WESTERN AVE FROM W AUGUSTA BLVD TO W CORTEZ ST 8.0 04/18/06 11/18/06 3,200 09/07/06 10/10/06 1,616 100
300 07 0032 / 5455 ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 1,600 09/07/06 10/10/06 808 100
300 07 0032 / 5455 ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST 4.50 04/18/06 11/18/06 1,800 09/07/06 10/10/06 909 100
300 07 0032 / 5455 ON W AUGUSTA BLVD FROM N WESTERN AVE TO N DAMEN AVE 24.0 04/18/06 11/18/06 9,600 09/07/06 10/10/06 4,848 100
300 07 0032 / 5455 ON W CORTLAND ST FROM N HERMITAGE AVE TO N ASHLAND AVE 9.0 04/18/06 11/18/06 3,600 09/07/06 10/10/06 1,818 100
300 03 0043 / 4914 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 9.50 07/10/04 07/13/04 3,800 07/05/04 07/12/04 2,430 100
300 03 0044 / 4915 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 41.0 07/10/04 07/13/04 16,400 07/12/04 08/10/04 10,486 100
300 06 0069 / 5233 ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE 32.0 10/04/02 10/04/02 16,800 10/01/02 10/01/02 12,000 100
300 03 0032 / 4903 ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE 20.0 08/16/04 08/19/04 8,000 07/01/04 07/14/04 9,661 100
300 07 0032 / 5455 ON W WEBSTER AVE FROM N SOUTHPORT AVE TO N CLYBOURN AVE 5.0 04/18/06 11/18/06 2,000 09/22/06 10/10/06 1,010 100

Totals per 400 Watt Changeout 231.50 96,800 63,742


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 335

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1583 / 7769 2126 N CLIFTON AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
300 06 0139 / 5289 2148 N DAMEN AVE 1,483.0 03/01/04 12/01/04 0 06/01/06 06/10/06 44,807 100
302 00 0092 / 5774 2150 N DAMEN AVE 15.0 0 03/07/01 01/17/02 3,535 100
805 06 1537 / 7723 1921 N ELSTON AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1438 / 7624 1939 N ELSTON AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1207 / 7393 1728 N HONORE ST 1.0 08/09/95 08/09/95 0 08/09/95 08/09/95 300 100
805 06 1208 / 7394 2036 N HONORE ST 1.0 04/17/95 04/17/95 0 04/17/95 04/17/95 300 100
805 06 1147 / 7333 2715 N KENMORE AVE 1.0 12/26/96 12/26/96 0 12/26/96 12/26/96 300 100
805 06 1828 / 8014 1860 N MAUD AVE 1.0 06/21/96 06/21/96 0 06/21/96 06/21/96 300 100
805 06 1829 / 8015 1921 N MAUD AVE 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 1830 / 8016 1924 N MAUD AVE 1.0 06/21/96 06/21/96 0 06/21/96 06/21/96 300 100
805 06 1790 / 7976 1944 N MAUD AVE 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1793 / 7979 1944 N MAUD AVE 1.0 01/31/97 01/31/97 0 01/31/97 01/31/97 300 100
805 06 1802 / 7988 1944 N MAUD AVE 1.0 01/13/97 01/13/97 0 01/13/97 01/13/97 300 100
805 06 1482 / 7668 1618 N PAULINA ST 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 1490 / 7676 1874 N SHEFFIELD AVE 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
805 06 0653 / 6839 2218 N SOUTHPORT AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0654 / 6840 2258 N SOUTHPORT AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0481 / 6667 2218 N WAYNE AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 0510 / 6696 2218 N WAYNE AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 0482 / 6668 2237 N WAYNE AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 0483 / 6669 2252 N WAYNE AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0484 / 6670 2257 N WAYNE AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 0534 / 6720 959 N WESTERN AVE 1.0 10/26/95 10/26/95 0 10/26/95 10/26/95 300 100
805 06 0516 / 6702 1001 N WESTERN AVE 1.0 04/15/96 04/15/96 0 04/15/96 04/15/96 300 100
805 06 0440 / 6626 1920 N WINCHESTER AVE 1.0 05/18/95 05/18/95 0 05/18/95 05/18/95 300 100
805 06 0722 / 6908 2316 W AUGUSTA BLVD 1.0 04/10/96 04/10/96 0 04/10/96 04/10/96 300 100
805 06 0723 / 6909 2334 W AUGUSTA BLVD 1.0 09/18/95 09/18/95 0 09/18/95 09/18/95 300 100
805 06 0454 / 6640 1804 W BLOOMINGDALE AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0455 / 6641 1812 W BLOOMINGDALE AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0838 / 7024 2110 W CATON ST 1.0 03/08/96 03/08/96 0 03/08/96 03/08/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 336

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0839 / 7025 2120 W CATON ST 1.0 03/08/96 03/08/96 0 03/08/96 03/08/96 300 100
805 06 0799 / 6985 2138 W CATON ST 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 1976 / 8162 2221 W CHARLESTON ST 1.0 12/12/96 12/12/96 0 12/12/96 12/12/96 300 100
805 06 1602 / 7788 2213 W CORTLAND ST 1.0 01/11/96 01/11/96 0 01/11/96 01/11/96 300 100
805 06 1884 / 8070 2213 W CORTLAND ST 1.0 11/01/95 11/01/95 0 11/01/95 11/01/95 300 100
805 06 0815 / 7001 1155 W FULLERTON AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0796 / 6982 1357 W FULLERTON AVE 1.0 11/15/96 11/15/96 0 11/15/96 11/15/96 300 100
805 06 1535 / 7721 2338 W MC LEAN AVE 1.0 10/22/97 10/22/97 0 10/22/97 10/22/97 300 100
805 06 1818 / 8004 2023 W MELROSE ST 1.0 10/26/95 10/26/95 0 10/26/95 10/26/95 300 100
805 06 0684 / 6870 2316 W RICE ST 1.0 11/17/95 11/17/95 0 11/17/95 11/17/95 300 100
805 06 0495 / 6681 2350 W WALTON ST 1.0 02/15/96 02/15/96 0 02/15/96 02/15/96 300 100
805 06 0485 / 6671 1332 W WEBSTER AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 1489 / 7675 1478 W WEBSTER AVE 1.0 11/13/97 11/13/97 0 11/13/97 11/13/97 300 100
805 06 0536 / 6722 1856 W WELLINGTON AVE 1.0 07/19/96 07/19/96 0 07/19/96 07/19/96 300 100
805 06 0489 / 6675 1150 W WRIGHTWOOD AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100

Totals per Alley Lighting/Lamps 1,542.0 0 61,542

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 1824 W WEBSTER AVE 2,361.0 06/01/07 12/31/07 69,507 07/21/07 08/18/07 69,507 100

Work Type: Arterial Strt Lighting/Lamps Blocks


300 07 0001 / 5424 ON N LEAVITT ST FROM N MILWAUKEE AVE TO W WABANSIA AVE .50 04/18/06 11/18/06 3,500 11/21/06 11/21/06 0 100
300 07 0001 / 5424 ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 07 0032 / 5455 1234 W GEORGE ST 1.0 04/18/06 11/18/06 3,000 0 0

Totals per Arterial Strt Lighting/Lamps 1.50 6,500 0

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2150 N DAMEN AVE 2,166.0 0 04/24/02 04/27/02 39,439 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 337

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
302 00 0092 / 5774 2944 N SOUTHPORT AVE 1.0 0 08/30/01 08/30/01 404 100
302 00 0092 / 5774 2954 N SOUTHPORT AVE 1.0 0 08/30/01 08/30/01 404 100
302 00 0092 / 5774 2315 W AUGUSTA BLVD 1.0 0 08/22/01 08/22/01 404 100
302 00 0092 / 5774 2323 W AUGUSTA BLVD 1.0 0 08/22/01 08/22/01 404 100

Totals per Flood Light Install 4.0 0 1,616

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 2800 N ASHLAND AVE .0 06/29/05 12/31/05 29,778 08/15/05 12/31/05 22,567 100
281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 1100 N NORTH BRANCH ST 1.0 10/19/06 64,000 10/19/06 86 70

Totals per Lighting Imprvmnts 1.0 93,778 22,653

Work Type: Loop Lighting Blocks


281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 338

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 07 0032 / 5455 ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE 4.50 04/18/06 11/18/06 6,075 09/22/06 10/10/06 3,853 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W AUGUSTA BLVD TO W CORTEZ ST 9.0 04/18/06 11/18/06 12,150 09/22/06 10/10/06 7,706 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W CHICAGO AVE TO W AUGUSTA BLVD 9.0 04/18/06 11/18/06 12,150 09/22/06 10/10/06 7,706 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST 4.50 04/18/06 11/18/06 6,075 09/22/06 10/10/06 3,853 100
300 07 0032 / 5455 ON N OAKLEY BLVD FROM W SUPERIOR ST TO W CHICAGO AVE 9.0 04/18/06 11/18/06 12,150 09/22/06 10/10/06 7,706 100
300 09 / 33109 ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE 1.0 08/25/08 09/12/08 1,350 08/25/08 09/12/08 1,147 100
300 07 0032 / 5455 ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE 8.0 04/18/06 11/18/06 10,800 09/22/06 10/10/06 6,850 100
300 07 0032 / 5455 ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE 4.0 04/18/06 11/18/06 5,400 09/22/06 10/10/06 3,425 100
300 06 0122 / 5275 ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST 21.50 11/01/03 11/21/03 25,800 10/14/03 10/20/03 37,364 100
300 07 0032 / 5455 ON N WESTERN AVE FROM W AUGUSTA BLVD TO W CORTEZ ST 8.0 04/18/06 11/18/06 10,800 09/22/06 10/10/06 6,850 100
300 07 0032 / 5455 ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 4.0 04/18/06 11/18/06 5,400 09/22/06 10/10/06 3,425 100
300 07 0032 / 5455 ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST 4.50 04/18/06 11/18/06 6,075 09/22/06 10/10/06 3,853 100
300 07 0032 / 5455 ON W AUGUSTA BLVD FROM N WESTERN AVE TO N DAMEN AVE 24.0 04/18/06 11/18/06 32,400 09/22/06 10/10/06 20,550 100
300 06 0122 / 5275 ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE 13.44 12/01/03 12/06/03 18,144 11/28/03 12/04/03 18,721 100
300 07 0032 / 5455 ON W CORTLAND ST FROM N HERMITAGE AVE TO N ASHLAND AVE 9.0 04/18/06 11/18/06 12,150 09/22/06 10/10/06 7,706 100
300 06 0069 / 5233 ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE 32.0 10/01/02 10/31/02 38,400 10/01/02 10/21/02 46,764 100
300 07 0032 / 5455 ON W WEBSTER AVE FROM N CLYBOURN AVE TO N SOUTHPORT AVE 4.0 04/18/06 11/18/06 5,400 09/22/06 10/10/06 3,425 100
300 03 0032 / 4903 ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE 20.0 08/16/04 08/19/04 27,000 09/01/04 10/01/04 0 100

Totals per Ornamental - Piggyback Lighting 189.44 247,719 190,903

Work Type: Ornamental Lighting Blocks


281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0

Work Type: POD Camera Pole Poles


281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2657 N CLYBOURN AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 339

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 / 32277 ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE .0 05/04/08 12/31/08 0 0 0
300 06 0308 / 5414 ON W BARRY AVE FROM N HOYNE AVE TO N DAMEN AVE 1.0 03/01/06 05/01/06 98,328 03/09/06 04/28/06 63,684 100
300 06 / 32277 ON W FLETCHER ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE .0 05/04/08 12/31/08 0 0 0
300 06 / 32275 ON W MELROSE ST FROM N LINCOLN AVE TO N RAVENSWOOD AVE 1.0 04/01/07 12/31/07 108,392 03/27/07 06/29/07 69,752 100
300 06 / 32275 ON W SCHOOL ST FROM N LINCOLN AVE TO N PAULINA ST 1.0 04/01/07 12/31/07 108,392 03/27/07 06/29/07 69,752 100
300 06 0308 / 5414 ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE .50 03/09/06 05/09/06 49,164 03/09/06 04/28/06 31,842 100

Totals per Residntl Staggered Lighting 3.50 364,276 235,030

Work Type: Residntl Strt Lighting/Lamps Blocks


300 03 0032 / 4903 ON N HOYNE AVE FROM W WABANSIA AVE TO W CHURCHILL ST 2.0 09/15/04 11/30/04 60,000 09/20/04 01/21/05 0 100
300 06 0235 / 5349 ON W LYNDALE ST FROM N LEAVITT ST TO N WESTERN AVE 2.0 06/01/03 08/01/03 145,471 05/28/03 07/30/03 133,463 100
300 03 0032 / 4903 ON W WABANSIA AVE FROM N ASHLAND AVE TO N WOOD ST 1.50 10/01/04 12/15/04 92,500 10/08/04 01/21/05 42,715 100
300 06 0267 / 5375 ON W WABANSIA AVE FROM N WOOD ST TO N MILWAUKEE AVE 2.0 08/15/04 10/15/04 150,000 09/20/04 01/21/05 162,403 100

Totals per Residntl Strt Lighting/Lamps 7.50 447,971 338,581

Work Type: Residntl Strt Lighting/Lamps Locations


300 03 0032 / 4903 ON W WABANSIA AVE FROM N WOOD ST TO N MILWAUKEE AVE 1.0 09/15/04 11/30/04 50,944 09/20/04 01/21/05 50,000 100

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 340

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 3204 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3230 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3252 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3310 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3336 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3350 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3410 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3430 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3448 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 3456 N RAVENSWOOD AVE 1.0 0 05/18/01 05/18/01 378 100
302 00 0092 / 5774 2942 N SOUTHPORT AVE 1.0 0 08/30/01 08/30/01 335 100
302 00 0092 / 5774 2952 N SOUTHPORT AVE 1.0 0 08/30/01 08/30/01 335 100

Totals per Short Arm Installs - Residntl 12.0 0 4,450

Work Type: Strt Light Pole Painting Locations


300 09 / 33109 ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE 1.0 06/16/08 06/20/08 300 06/16/08 06/20/08 200 100
300 09 / 33109 ON N SHEFFIELD AVE FROM W ARMITAGE AVE TO W WEBSTER AVE 2.25 05/19/08 06/20/08 450 04/01/08 12/01/08 450 100
300 06 0108 / 5263 ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST 21.50 10/01/03 10/22/03 9,520 09/20/03 09/26/03 9,520 100
300 07 0001 / 5424 ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE .0 03/01/06 12/31/06 0 0 0
300 03 0043 / 4914 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 14.50 07/26/04 08/09/04 4,725 07/01/04 08/10/04 2,961 100
300 03 0044 / 4915 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 72.0 07/26/04 08/09/04 15,950 08/01/04 08/10/04 14,703 100
302 00 0079 / 5767 ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE 25.40 12/01/01 12/22/01 3,200 04/20/01 05/03/01 3,175 100
300 07 0032 / 5455 ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE 2.50 04/18/06 11/18/06 500 01/05/07 01/05/07 0 100
300 06 0058 / 5229 ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE 36.0 9,940 09/09/02 09/27/02 9,940 100
300 03 0032 / 4903 ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE 52.0 08/11/04 08/19/04 14,150 08/16/04 08/27/04 9,661 100
300 05 0043 / 5158 ON W WILLOW ST FROM N HALSTED ST TO N SHEFFIELD AVE 2.50 04/04/05 11/18/05 500 06/27/05 07/23/05 401 100
300 07 0032 / 5455 ON W WRIGHTWOOD AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE 5.0 04/18/06 11/18/06 1,000 01/05/07 01/05/07 0 100
300 06 0108 / 5263 1234 N HALSTED ST 5.0 10/01/03 10/01/03 1,250 10/05/03 10/06/03 1,050 100
300 07 0032 / 5455 1824 W WEBSTER AVE 502.0 04/18/06 11/18/06 107,050 03/01/06 12/31/06 75,250 100

Totals per Strt Light Pole Painting 741.65 168,535 127,311


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 341

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Replacmnt/Reloc Blocks
281 00 / 33670 2401-2409 N CLYBOURN AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2148 N DAMEN AVE 3,989.0 03/01/04 12/01/04 20,743 10/25/06 10/31/06 43,440 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 342

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2285 / 8471 1830 N ASHLAND AVE 2.0 06/04/96 06/04/96 0 06/04/96 06/04/96 1,500 100
805 06 2311 / 8497 1895 N ASHLAND AVE 7.0 07/01/96 07/01/96 0 07/01/96 07/01/96 5,250 100
805 06 2309 / 8495 1900 N ASHLAND AVE 27.0 07/10/96 07/10/96 0 07/10/96 07/10/96 20,250 100
805 06 2310 / 8496 1900 N ASHLAND AVE 43.0 07/10/96 07/10/96 0 07/10/96 07/10/96 32,250 100
302 00 0070 / 5758 2520 N CLYBOURN AVE 0 04/02/97 04/09/97 15,267 100
805 06 2192 / 8378 2538 N CLYBOURN AVE 12.0 12/31/95 12/31/95 0 12/31/95 12/31/95 9,000 100
805 06 2193 / 8379 2538 N CLYBOURN AVE 18.0 04/09/97 04/09/97 0 04/09/97 04/09/97 13,500 100
805 06 2443 / 8629 1794 N DAMEN AVE 13.0 06/16/93 06/16/93 0 06/16/93 06/16/93 9,750 100
300 06 0217 / 5337 2148 N DAMEN AVE 1,008.0 04/12/04 04/26/04 56,658 04/19/04 05/10/04 76,818 100
805 06 2282 / 8468 2230 N DAMEN AVE 44.0 07/30/96 07/30/96 0 07/30/96 07/30/96 33,000 100
805 06 2440 / 8626 2270 N DAMEN AVE 8.0 09/26/95 09/26/95 0 09/26/95 09/26/95 6,000 100
805 06 2169 / 8355 2000 N ELSTON AVE 7.0 12/31/95 12/31/95 0 12/31/95 12/31/95 5,250 100
302 00 0070 / 5758 2050 N ELSTON AVE 0 12/20/97 12/31/97 18,723 100
805 06 2141 / 8327 2050 N ELSTON AVE 18.0 12/31/97 12/31/97 0 12/31/97 12/31/97 13,500 100
805 06 2543 / 8729 1701 N HERMITAGE AVE 7.0 08/31/92 08/31/92 0 08/31/92 08/31/92 5,250 100
805 06 2732 / 8918 1805 N HONORE ST 6.0 05/27/94 05/27/94 0 05/27/94 05/27/94 4,500 100
805 06 2884 / 9070 1060 N HOOKER ST 6.0 12/03/93 12/03/93 0 12/03/93 12/03/93 4,500 100
805 06 2712 / 8898 1701 N LEAVITT ST 6.0 01/01/95 01/01/95 0 01/01/95 01/01/95 4,500 100
805 06 2668 / 8854 1805 N MARSHFIELD AVE 6.0 11/25/94 11/25/94 0 11/25/94 11/25/94 4,500 100
805 06 2545 / 8731 1798 N PAULINA ST 6.0 09/01/92 09/01/92 0 09/01/92 09/01/92 4,500 100
805 06 2669 / 8855 1805 N WINCHESTER AVE 6.0 12/14/94 12/14/94 0 12/14/94 12/14/94 4,500 100
805 06 2670 / 8856 1805 N WOLCOTT AVE 10.0 10/17/94 10/17/94 0 10/17/94 10/17/94 7,500 100
805 06 2521 / 8707 1805 N WOOD ST 10.0 01/27/95 01/27/95 0 01/27/95 01/27/95 7,500 100
805 06 2291 / 8477 2925 S ASHLAND AVE 14.0 01/01/91 01/01/91 0 01/01/91 01/01/91 10,500 100
805 06 2474 / 8660 1605 W ARMITAGE AVE 12.0 12/14/95 12/14/95 0 12/14/95 12/14/95 9,000 100
805 06 2420 / 8606 1670 W ARMITAGE AVE 8.0 12/11/95 12/11/95 0 12/11/95 12/11/95 6,000 100
805 06 2755 / 8941 1805 W BARRY AVE 4.0 06/21/94 06/21/94 0 06/21/94 06/21/94 3,000 100
805 06 2219 / 8405 1800 W BELMONT AVE 6.0 05/04/94 05/04/94 0 05/04/94 05/04/94 4,500 100
805 06 2879 / 9065 1779 W CORNELIA AVE 6.0 12/21/93 12/21/93 0 12/21/93 12/21/93 4,500 100
805 06 2201 / 8387 1599 W CORTLAND ST 4.0 07/10/96 07/10/96 0 07/10/96 07/10/96 3,000 100
805 06 2227 / 8413 1599 W CORTLAND ST 4.0 07/10/96 07/10/96 0 07/10/96 07/10/96 3,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 343

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2642 / 8828 1800 W DIVERSEY PKWY 6.0 05/05/94 05/05/94 0 05/05/94 05/05/94 4,500 100
805 06 2666 / 8852 1326 W DIVISION ST 24.0 06/22/93 06/22/93 0 06/22/93 06/22/93 18,000 100
805 06 2647 / 8833 1635 W FULLERTON AVE 8.0 06/02/93 06/02/93 0 06/02/93 06/02/93 6,000 100
805 06 2195 / 8381 2036 W FULLERTON AVE 12.0 06/19/97 06/19/97 0 06/19/97 06/19/97 9,000 100
805 06 2196 / 8382 2036 W FULLERTON AVE 8.0 06/04/93 06/04/93 0 06/04/93 06/04/93 6,000 100
805 06 2144 / 8330 2295 W FULLERTON AVE 32.0 12/31/95 12/31/95 0 12/31/95 12/31/95 24,000 100
805 06 2923 / 9109 1799 W MELROSE ST 6.0 10/13/93 10/13/93 0 10/13/93 10/13/93 4,500 100
302 00 0072 / 5760 1430 W NORTH AVE 1.0 0 10/12/99 10/22/99 19,862 100
302 00 0072 / 5760 1450 W NORTH AVE 1.0 0 10/05/99 10/08/99 12,433 100
805 06 2925 / 9111 1763 W ROSCOE ST 6.0 12/01/93 12/01/93 0 12/01/93 12/01/93 4,500 100
805 06 2924 / 9110 1779 W SCHOOL ST 6.0 10/15/93 10/15/93 0 10/15/93 10/15/93 4,500 100
805 06 2650 / 8836 1601 W WEBSTER AVE 14.0 05/20/92 05/20/92 0 05/20/92 05/20/92 10,500 100
302 00 0070 / 5758 1650 W WEBSTER AVE 0 12/15/97 12/26/97 9,809 100
805 06 2127 / 8313 1650 W WEBSTER AVE 17.0 12/26/97 12/26/97 0 12/26/97 12/26/97 12,750 100
302 00 0070 / 5758 1900 W WEBSTER AVE 0 12/10/97 12/20/97 9,488 100
805 06 2100 / 8286 1900 W WEBSTER AVE 9.0 12/20/97 12/20/97 0 12/20/97 12/20/97 6,750 100
302 00 0072 / 5760 1930 W WEBSTER AVE 1.0 0 10/20/99 11/10/99 30,903 100
805 06 2439 / 8625 1999 W WEBSTER AVE 8.0 05/01/92 05/01/92 0 05/01/92 05/01/92 6,000 100
805 06 2619 / 8805 1999 W WEBSTER AVE 40.0 01/23/95 01/23/95 0 01/23/95 01/23/95 30,000 100
805 06 2641 / 8827 1805 W WELLINGTON AVE 6.0 12/14/94 12/14/94 0 12/14/94 12/14/94 4,500 100
805 06 2645 / 8831 1898 W WRIGHTWOOD AVE 4.0 12/14/94 12/14/94 0 12/14/94 12/14/94 3,000 100

Totals per Underpass Lighting 1,537.0 56,658 587,803


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 344

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N ELSTON AVE AND N LEAVITT ST .50 0 10/24/02 10/24/02 5,037 100
210 06 0130 / 4389 N ELSTON AVE AND W NORTH AVE 1.0 0 10/16/02 10/16/02 1,850 100
210 06 0130 / 4389 N SHEFFIELD AVE AND W NORTH AVE 1.0 0 10/16/02 10/16/02 1,850 100
210 06 0219 / 4459 N WESTERN AVE AND W ARMITAGE AVE .50 04/01/05 04/02/05 5,282 04/07/05 04/07/05 4,523 100
210 06 0219 / 4459 N WESTERN AVE AND W CHICAGO AVE .50 04/15/05 04/15/05 5,282 04/10/05 04/10/05 4,004 100
210 06 0219 / 4459 N WESTERN AVE AND W FULLERTON AVE .50 04/04/05 04/05/05 5,282 03/25/05 03/25/05 4,523 100
300 06 0225 / 5340 1800-1775 N LEAVITT ST 4.0 09/02/02 10/31/02 9,850 07/25/02 08/09/02 7,739 100

Totals per LED Signal Head Install 8.0 25,695 29,526

Work Type: Left Turn Arrow Locations


210 06 0231 / 4470 W DIVISION ST AND N HALSTED ST .0 03/01/08 12/01/08 0 0 0
300 06 0078 / 5241 2400 N ASHLAND AVE 1.0 04/01/98 12/01/98 5,615 03/20/98 04/20/00 4,794 100

Totals per Left Turn Arrow 1.0 5,615 4,794

Work Type: New Signal Locations


210 06 0171 / 4420 N LINCOLN AVE AND W SCHOOL ST .50 08/02/07 09/20/07 57,120 04/19/07 91,967 85

Work Type: Pedestrian Countdown Signal Installation Installations


210 06 / 32276 W ADDISON ST AND N PAULINA ST 4.0 11/21/07 11/26/07 5,760 12/10/07 12/14/07 3,425 100
210 06 / 32276 W DIVERSEY PKWY AND N SHEFFIELD AVE .0 04/01/07 02/28/08 5,760 0 0

Totals per Pedestrian Countdown Signal Installation 4.0 11,520 3,425

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N OAKLEY AVE AND W AUGUSTA BLVD 1.0 4,000 07/17/01 07/18/01 6,359 100
300 06 0197 / 5322 N OAKLEY AVE AND W DIVISION ST .50 2,000 07/11/01 07/12/01 131 100

Totals per Removal Temp Wiring - Signals 1.50 6,000 6,490

Work Type: Signals Intersections


300 06 0096 / 5258 2148 N DAMEN AVE 71.0 11/19/03 11/23/03 0 12/08/06 12/15/06 11,227 100

Totals per Traffic 541,505 2,224,762


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 345

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0022 / 4297 W GEORGE ST AND N LINCOLN AVE 1.0 12/03/01 03/31/02 216,500 11/19/01 03/01/02 160,969 100
814 06 0288 / 16500 2000 N ASHLAND AVE 1.0 01/03/92 01/03/92 0 01/03/92 01/03/92 126,620 100
814 06 0289 / 16501 2037 N ASHLAND AVE 1.0 01/03/92 01/03/92 0 01/03/92 01/03/92 126,620 100
814 06 0244 / 16456 2340 N CLYBOURN AVE 1.0 01/01/95 01/01/95 0 01/01/95 01/01/95 125,000 100
210 06 0027 / 4301 2700 N CLYBOURN AVE 06/01/02 01/15/03 192,605 04/24/02 12/13/02 190,881 100
814 06 0106 / 16321 2269 N DAMEN AVE 1.0 09/24/94 09/24/94 0 09/24/94 09/24/94 33,115 100
814 06 0291 / 16503 2000 N ELSTON AVE 1.0 01/02/92 01/02/92 0 01/02/92 01/02/92 126,620 100
814 06 0290 / 16502 2200 N ELSTON AVE 1.0 11/14/91 11/14/91 0 11/14/91 11/14/91 126,620 100
814 06 0067 / 16283 1200 N NORTH BRANCH ST 1.0 03/22/94 03/22/94 0 03/22/94 03/22/94 132,866 100
814 06 0162 / 16374 1952 N SOUTHPORT AVE 1.0 07/07/97 07/07/97 0 07/07/97 07/18/97 200,000 100
814 06 0265 / 16477 2132 N SOUTHPORT AVE 1.0 03/09/92 03/09/92 0 03/09/92 03/09/92 108,062 100
814 06 0377 / 16567 1599 N THROOP ST 1.0 04/30/96 04/30/96 0 04/30/96 04/30/96 142,921 100
814 06 0275 / 16487 2399 N WOOD ST 1.0 01/26/89 01/26/89 0 01/26/89 01/26/89 123,765 100
814 06 0105 / 16320 1670 W ARMITAGE AVE 1.0 10/20/94 10/20/94 0 10/20/94 10/20/94 59,079 100
814 06 0118 / 16333 1732 W ARMITAGE AVE 1.0 09/28/93 09/28/93 0 09/28/93 09/28/93 110,321 100
210 06 0018 / 4293 1835 W FULLERTON AVE 1.0 02/01/98 04/01/98 20,000 01/21/98 06/18/98 27,729 100
814 06 0298 / 16510 2130 W FULLERTON AVE 1.0 01/01/97 01/01/97 0 01/01/97 92,412 100
814 06 0107 / 16322 1438 W NORTH AVE 1.0 10/27/94 10/27/94 0 10/27/94 10/27/94 57,284 100

Totals per TSM Install 17.0 429,105 2,070,884

Work Type: Traffic Equipment Painting Locations


300 07 0032 / 5455 1824 W WEBSTER AVE 24.0 04/18/06 11/18/06 6,450 03/01/06 12/31/06 6,450 100

Totals per Construction Phase 2,306,272 4,136,909

Totals for Ward 32 2,332,072 4,155,695


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 346

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32146 ON N SAWYER AVE FROM W LELAND AVE TO W LAWRENCE AVE 1.0 05/01/07 10/31/07 3,900 05/29/07 06/28/07 2,344 100
300 06 / 32146 ON N SPAULDING AVE FROM W LELAND AVE TO W EASTWOOD AVE 1.0 05/01/07 10/31/07 3,900 05/29/07 06/28/07 2,349 100
300 06 / 32146 ON N SPAULDING AVE FROM W LELAND AVE TO W LAWRENCE AVE .0 05/01/07 10/31/07 3,900 05/29/07 06/27/07 2,349 100
300 06 0308 / 5414 ON W BARRY AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,215 100
300 06 0308 / 5414 ON W FLETCHER ST FROM N FRANCISCO AVE TO N CALIFORNIA AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,215 100
300 06 / 32146 ON W LELAND AVE FROM N KEDZIE AVE TO N SPAULDING AVE .0 05/01/07 10/31/07 0 0 100
300 06 / 32277 ON W ROSCOE ST FROM N KEDZIE AVE TO N CALIFORNIA AVE .0 04/01/08 08/30/08 0 0 0
210 06 / 32040 N CALIFORNIA AVE AND W IRVING PARK RD .0 11/01/06 12/31/07 5,000 0 0
210 06 0158 / 5058 W LAWRENCE AVE AND N KIMBALL AVE .0 08/15/05 12/31/05 0 08/15/05 12/31/05 235 100

Totals per Design/Engineering 2.0 16,700 9,707


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 347

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0122 / 5275 ON N KEDZIE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE 174.0 08/01/03 09/01/03 68,437 07/01/03 07/28/03 39,219 100
300 06 0122 / 5275 ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 14.50 08/01/03 09/01/03 5,688 07/01/03 07/28/03 3,119 100
300 06 0122 / 5275 ON N LAWNDALE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE 87.50 08/01/03 09/01/03 34,219 07/01/03 07/28/03 19,610 100
300 09 / 33101 ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE 1.58 09/02/08 09/03/08 632 09/02/08 09/03/08 378 100
300 06 0122 / 5275 ON W IRVING PARK RD FROM N KEDZIE AVE TO N CHRISTIANA AVE 57.0 11/10/03 11/30/03 24,000 10/30/03 11/28/03 13,496 100
300 06 0122 / 5275 ON W LAWRENCE AVE FROM N KIMBALL AVE TO N KEDZIE AVE 323.0 11/10/03 11/30/03 127,500 10/30/03 11/28/03 77,597 100

Totals per 250 Watt Changeout 657.58 260,476 153,418

Work Type: 400 Watt Changeout Fixtures


300 03 0033 / 4904 ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE 83.70 03/10/05 03/20/05 33,480 0
300 03 0033 / 4904 ON N KIMBALL AVE FROM W IRVING PARK RD TO W LAWRENCE AVE 150.0 03/01/05 03/01/05 60,000 0
300 03 0040 / 4911 ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE 5.50 08/20/04 09/20/04 2,200 07/14/04 08/10/04 1,438 100
300 06 0122 / 5275 ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE 5.10 07/01/04 07/16/04 2,040 06/22/04 06/30/04 2,040 100

Totals per 400 Watt Changeout 244.30 97,720 3,478

Totals per Lighting/Electrical 2,668,971 1,311,427


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 348

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0768 / 6954 4903 N ALBANY AVE 1.0 05/26/95 05/26/95 0 05/26/95 05/26/95 300 100
805 06 0736 / 6922 4923 N ALBANY AVE 1.0 05/26/95 05/26/95 0 05/26/95 05/26/95 300 100
805 06 0782 / 6968 4941 N ALBANY AVE 1.0 05/20/96 05/20/96 0 05/20/96 05/20/96 300 100
805 06 0887 / 7073 3940 N FRANCISCO AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0780 / 6966 4232 N FRANCISCO AVE 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 0879 / 7065 4325 N FRANCISCO AVE 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
300 06 0096 / 5258 3649 N KEDZIE AVE 905.0 03/01/03 09/01/03 0 03/01/06 09/01/06 27,344 0
302 00 0092 / 5774 3649 N KEDZIE AVE 15.0 0 03/12/01 12/12/01 3,535 100
805 06 1164 / 7350 3649 N KEDZIE AVE 1.0 03/15/96 03/15/96 0 03/15/96 03/15/96 300 100
805 06 1149 / 7335 4601 N KEDZIE AVE 1.0 03/23/95 03/23/95 0 03/23/95 03/23/95 300 100
805 06 1167 / 7353 4725 N KEDZIE AVE 1.0 06/21/95 06/21/95 0 06/21/95 06/21/95 300 100
805 06 1893 / 8079 3924 N MOZART ST 1.0 10/11/96 10/11/96 0 10/11/96 10/11/96 300 100
805 06 1894 / 8080 3940 N MOZART ST 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0686 / 6872 3822 N RICHMOND ST 1.0 10/11/96 10/11/96 0 10/11/96 10/11/96 300 100
805 06 0671 / 6857 3841 N RICHMOND ST 1.0 10/04/96 10/04/96 0 10/04/96 10/04/96 300 100
805 06 0700 / 6886 3630 N SACRAMENTO AVE 1.0 01/25/95 01/25/95 0 01/25/95 01/25/95 300 100
805 06 0702 / 6888 4220 N SACRAMENTO AVE 1.0 05/25/95 05/25/95 0 05/25/95 05/25/95 300 100
805 06 0703 / 6889 4242 N SACRAMENTO AVE 1.0 05/25/95 05/25/95 0 05/25/95 05/25/95 300 100
805 06 0656 / 6842 3700 N SPAULDING AVE 1.0 09/06/95 09/06/95 0 09/06/95 09/06/95 300 100
805 06 0364 / 6550 4937 N TROY ST 1.0 05/26/95 05/26/95 0 05/26/95 05/26/95 300 100
302 00 0092 / 5774 3406 W IRVING PARK RD 1.0 0 04/06/01 04/06/01 236 100
805 06 1895 / 8081 2855 W NELSON ST 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 1928 / 8114 2941 W NELSON ST 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100

Totals per Alley Lighting/Lamps 941.0 0 37,115

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 3649 N KEDZIE AVE 738.0 06/01/07 12/31/07 21,726 07/31/07 08/18/07 21,726 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 3649 N KEDZIE AVE 643.0 0 05/18/02 05/21/02 11,708 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 349

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 11 / 32222 ON N ST LOUIS AVE FROM W WILSON AVE TO W LELAND AVE 4.0 11/01/07 11/10/07 2,200 10/11/07 10/11/07 2,200 100
300 06 0072 / 5235 3843 N CALIFORNIA AVE 08/03/01 09/28/01 0 07/02/01 07/03/01 2,379
302 00 0092 / 5774 3041 N FRANCISCO AVE 6.0 0 09/27/01 09/27/01 2,421 100
300 06 0167 / 5306 3731 N MOZART ST 1.0 0 12/07/99 12/07/99 351 100
300 06 0071 / 5234 2800 W IRVING PARK RD 0 10/19/00 10/19/00 1,350 100
302 00 0092 / 5774 2677 W MONTROSE AVE 1.0 0 08/21/01 08/21/01 404 100
300 06 0071 / 5234 2741 W MONTROSE AVE 01/01/00 12/30/00 0 10/19/00 10/19/00 3,600 100
302 00 0092 / 5774 2850 W NELSON ST 1.0 0 10/10/01 10/10/01 345 100
300 06 0069 / 5233 3253 W WILSON AVE 2.0 11/20/02 11/20/02 970 11/18/02 11/18/02 1,183 100

Totals per Flood Light Install 15.0 3,170 14,233

Work Type: Ornamental - Piggyback Lighting Fixtures


300 11 / 32222 ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST 11.55 11/01/07 12/01/07 15,725 03/13/08 04/04/08 13,060 100
300 11 / 32222 ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST 13.86 11/01/07 12/01/07 18,843 03/13/08 04/04/08 17,538 100
300 11 / 32222 ON W MONTROSE AVE FROM N KEDZIE AVE TO N MANOR AVE 70.0 11/01/07 12/01/07 95,100 03/26/08 04/04/08 58,855 100

Totals per Ornamental - Piggyback Lighting 95.41 129,668 89,452

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 3649 N KEDZIE AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 350

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32222 ON N RICHMOND ST FROM W NELSON ST TO W FLETCHER ST 2.0 11/07/07 04/04/08 120,000 11/07/07 04/04/08 78,800 100
300 06 / 32146 ON N SAWYER AVE FROM W LELAND AVE TO W LAWRENCE AVE 2.0 12/05/07 03/28/07 227,000 0 95
300 06 / 32146 ON N SPAULDING AVE FROM W LELAND AVE TO W EASTWOOD AVE 1.0 12/05/07 04/09/08 227,000 0 95
300 06 / 32146 ON N SPAULDING AVE FROM W LELAND AVE TO W LAWRENCE AVE 1.0 12/05/07 05/29/08 227,000 0 95
300 06 0308 / 5414 ON W BARRY AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE 1.0 03/16/06 12/31/06 103,808 09/26/06 12/22/06 69,825 100
300 11 / 32222 ON W FLETCHER ST FROM N FRANCISCO AVE TO N ALBANY AVE 2.0 11/07/07 04/04/08 120,000 11/07/07 04/04/08 78,800 100
300 06 0308 / 5414 ON W FLETCHER ST FROM N FRANCISCO AVE TO N CALIFORNIA AVE 1.0 03/16/06 12/31/06 103,808 09/26/06 12/22/06 69,825 100
300 06 / 32146 ON W LELAND AVE FROM N KEDZIE AVE TO N SPAULDING AVE 2.0 11/05/07 01/29/08 227,000 01/30/08 0 100
300 11 / 32222 ON W NELSON ST FROM N CALIFORNIA AVE TO N SACRAMENTO AVE 2.0 11/07/07 04/04/08 120,000 11/07/07 04/04/08 78,800 100
300 06 / 32277 ON W ROSCOE ST FROM N KEDZIE AVE TO N CALIFORNIA AVE .0 05/04/08 12/31/08 0 0 0
300 11 / 32222 ON W WELLINGTON AVE FROM N CALIFORNIA AVE TO N FRANCISCO AVE 1.0 11/08/07 04/04/08 55,000 11/08/07 04/04/08 39,400 100

Totals per Residntl Staggered Lighting 15.0 1,530,616 415,450

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N ALBANY AVE FROM W ARGYLE ST TO W CARMEN AVE 1.0 05/15/03 07/15/03 67,162 05/15/03 07/18/03 66,425 100
300 06 0267 / 5375 ON N ALBANY AVE FROM W ARGYLE ST TO W LAWRENCE AVE 2.0 04/10/04 06/10/04 140,910 04/06/04 05/10/04 131,091 100
300 06 0235 / 5349 ON W ARGYLE ST FROM N WHIPPLE ST TO N ALBANY AVE 1.0 05/15/03 07/15/03 67,162 05/15/03 07/18/03 66,424 100

Totals per Residntl Strt Lighting/Lamps 4.0 275,234 263,940

Work Type: Strt Light Pole Painting Locations


300 03 0033 / 4904 ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE 99.51 03/01/05 03/20/05 26,412 0
300 09 / 33105 ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 13.0 09/10/08 09/24/08 3,900 09/10/08 09/24/08 2,730 100
300 03 0033 / 4904 ON N KIMBALL AVE FROM W IRVING PARK RD TO W LAWRENCE AVE 162.0 03/01/05 03/20/05 53,000 0
302 00 0076 / 5764 ON N SACRAMENTO AVE FROM W WILSON AVE TO W LAWRENCE AVE 09/01/00 12/31/00 0 0
300 11 / 32190 ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE 4.95 05/15/07 06/01/07 1,089 05/15/07 06/01/07 1,089 100
300 03 0040 / 4911 ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE 5.35 05/10/04 09/10/04 1,610 05/10/04 08/01/04 1,445 100
300 06 0108 / 5263 ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE 143.65 08/01/04 08/15/04 41,948 06/21/04 07/28/04 31,743 100
300 04 0216 / 5114 ON W IRVING PARK RD FROM N ROCKWELL ST TO N CALIFORNIA AVE 12.0 05/01/06 11/01/06 2,596 05/17/06 07/25/06 2,596 100

Totals per Strt Light Pole Painting 440.46 130,554 39,602


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 351

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Replacmnt/Reloc Blocks
300 06 0199 / 5324 ON W EDDY ST FROM N ALBANY AVE TO N TROY ST 10/12/01 10/26/01 26,450 08/12/01 08/22/01 30,493 100

Work Type: Strt Lighting Blocks


300 06 0247 / 5357 ON W BERTEAU AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE 2.0 05/12/03 07/03/03 80,000 05/07/03 07/16/03 77,780 100
300 06 0247 / 5357 ON W WAVELAND AVE FROM N CALIFORNIA AVE TO N FRANCISCO AVE 2.0 05/23/03 07/21/03 80,000 05/20/03 07/16/03 76,132 100

Totals per Strt Lighting 4.0 160,000 153,912

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 3649 N KEDZIE AVE 1,486.0 03/01/04 12/01/04 7,727 10/24/06 11/02/06 16,183 100

Work Type: Underpass Lighting Fixtures


805 06 2299 / 8485 3201 N KEDZIE AVE 10.0 11/17/92 11/17/92 0 11/17/92 11/17/92 7,500 100
300 06 0217 / 5337 3649 N KEDZIE AVE 456.0 04/27/04 05/03/04 25,631 05/11/04 05/14/04 17,217 100
805 06 2295 / 8481 3725 S ALBANY AVE 26.0 11/19/93 11/19/93 0 11/19/93 11/19/93 19,500 100
805 06 2812 / 8998 3630 S CALIFORNIA AVE 22.0 03/05/93 03/05/93 0 03/05/93 03/05/93 16,500 100

Totals per Underpass Lighting 514.0 25,631 60,717


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 352

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N CENTRAL PARK AVE AND W IRVING PARK RD 1.0 0 04/03/02 04/03/02 8,539 100
210 06 0130 / 4389 N KEDZIE AVE AND W ARGYLE ST .50 0 08/26/02 08/26/02 925 100

Totals per LED Signal Head Install 1.50 0 9,464

Work Type: Left Turn Arrow Locations


210 06 / 32040 N CALIFORNIA AVE AND W IRVING PARK RD 1.0 11/01/06 12/31/08 85,000 02/08/07 08/24/07 120,822 100
210 06 0231 / 4470 N ELSTON AVE AND W IRVING PARK RD .0 03/01/08 12/01/08 121,474 0 0
210 06 / 32157 N KEDZIE AVE AND W LAWRENCE AVE .0 11/01/08 02/28/09 51,000 0 0

Awaiting for a responce from obm Note Last Updated on 04-OCT-07


210 06 0158 / 5058 W LAWRENCE AVE AND N KIMBALL AVE .50 06/22/06 12/31/07 30,000 06/22/06 22,347 95

NEEDS CONCRETE RESTORATION WORK. Note Last Updated on 12-MAR-07


Totals per Left Turn Arrow 1.50 287,474 143,169

Work Type: Signals Intersections


300 06 0096 / 5258 3649 N KEDZIE AVE 39.0 10/01/03 10/08/03 0 09/30/06 10/07/06 6,167 100

Work Type: TSM Install Locations


814 06 0087 / 16303 2890 N CALIFORNIA AVE 1.0 10/04/94 10/04/94 0 10/04/94 10/04/94 62,421 100
814 06 0287 / 16499 3930 N CENTRAL PARK AVE 1.0 11/26/91 11/26/91 0 11/26/91 11/26/91 123,207 100
814 06 0385 / 16573 3200 N SACRAMENTO AVE 1.0 04/18/91 04/18/91 0 04/18/91 04/18/91 96,382 100
814 06 0193 / 16405 4000 N SACRAMENTO AVE 1.0 10/20/95 10/20/95 0 10/20/95 10/20/95 125,000 100
814 06 0199 / 16411 4800 N SACRAMENTO AVE 1.0 08/14/96 08/14/96 0 08/14/96 08/14/96 150,000 100
814 06 0084 / 16300 3176 W BELMONT AVE 1.0 05/19/95 05/19/95 0 05/19/95 05/19/95 161,287 100

Totals per TSM Install 6.0 0 718,297

Work Type: Traffic Equipment Painting Locations


300 11 / 32190 ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE 1.65 05/15/07 06/01/07 512 05/15/07 06/01/07 512 100

Totals per Traffic 287,986 877,608

Totals per Construction Phase 2,956,957 2,189,035

Totals for Ward 33 2,973,657 2,198,741


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 353

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 11 / 32223 ON S ABERDEEN ST FROM W 114TH PL TO W 115TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S ASHLAND AVE FROM W 116TH ST TO W 117TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S ASHLAND AVE FROM W 118TH ST TO W 119TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S ASHLAND AVE FROM W 122ND ST TO W 123RD ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S CARPENTER ST FROM W 116TH ST TO W 117TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S ELIZABETH ST FROM W 117TH ST TO W 118TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S EMERALD AVE FROM W 108TH ST TO W 109TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S EMERALD AVE FROM W 110TH ST TO W 111TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S EMERALD AVE FROM W 112TH ST TO W 113TH ST .0 03/14/07 04/18/07 0 0 0
300 11 / 32223 ON S GREEN ST FROM W 103RD ST TO W 104TH ST .0 03/14/07 04/18/07 0 0 0
300 06 0274 / 5382 ON S GREEN ST FROM W 107TH ST TO W 110TH ST .0 07/01/04 12/31/04 0 03/22/05 10/05/05 6,183 100
300 11 / 32223 ON S LAFLIN ST FROM W 121ST ST TO W 122ND ST .0 10/26/07 11/02/07 0 0 0
300 06 / 32277 ON S PEORIA ST FROM W 103RD ST TO W 104TH ST .0 04/01/08 08/30/08 0 0 0
300 06 0274 / 5382 ON S PEORIA ST FROM W 107TH ST TO W 110TH ST .0 07/01/04 12/31/04 0 03/22/05 11/10/06 6,183 100
300 06 0308 / 5414 ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 0 0
300 06 0274 / 5382 ON W 108TH ST FROM S HALSTED ST TO S SANGAMON ST .0 07/01/04 12/31/04 0 03/22/05 11/10/06 6,183 100
300 06 0274 / 5382 ON W 109TH ST FROM S SANGAMON ST TO S HALSTED ST .0 07/01/04 12/31/04 0 03/22/05 11/10/06 6,183 100
300 11 / 32223 ON W 111TH ST FROM S STATE ST TO S PERRY AVE .0 03/14/07 04/18/07 7,500 03/14/07 04/18/07 0 100
300 06 / 32277 ON W 113TH PL FROM S STATE ST TO S PERRY AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32277 ON W 113TH ST FROM S STATE ST TO S PERRY AVE .0 04/01/08 08/30/08 0 0 0
210 06 0243 / 4480 W 119TH ST AND S HALSTED ST .0 0 0 0
210 06 0243 / 4480 W 99TH ST AND S HALSTED ST .0 0 0 0
300 06 / 32275 11900-12100 S YALE AVE .0 03/01/07 10/31/07 3,900 03/01/07 03/22/07 2,495 100
300 06 0292 / 5399 849 W 115TH ST 1.0 05/27/05 07/25/05 1,000 05/27/05 07/25/05 475 100

Totals per Design/Engineering 1.0 12,400 27,702


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 354

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 ON S EMERALD AVE FROM W 119TH ST TO W 122ND ST 8.0 10/25/01 10/27/01 1,414 09/29/01 09/29/01 1,624 100
300 09 / 33100 ON W 104TH PL FROM S MORGAN ST TO S RACINE AVE 7.0 02/01/08 12/31/08 2,800 09/02/08 09/05/08 1,925 100
300 06 0069 / 5233 800-1014 E 104TH ST 7.0 2,625 05/08/02 05/08/02 2,625 100
302 00 0092 / 5774 11839 S BISHOP ST 1.0 09/25/01 09/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 11629 S GREEN ST 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 206 100
302 00 0092 / 5774 11914-11945 S LOWE AVE 4.0 10/25/01 10/27/01 1,178 09/29/01 09/29/01 824 100
302 00 0092 / 5774 10232 S MORGAN ST 1.0 10/20/01 10/21/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 11832 S STEWART AVE 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 12039 S UNION AVE 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 12051 S UNION AVE 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 12017 S WALLACE ST 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 11731 S YALE AVE 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 215-341 W 111TH PL 8.0 10/20/01 10/21/01 1,885 09/29/01 09/29/01 1,885 100
302 00 0092 / 5774 307 W 118TH ST 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100
302 00 0092 / 5774 751 W 118TH ST 1.0 10/25/01 10/27/01 236 09/29/01 09/29/01 236 100

Totals per 250 Watt Changeout 44.0 12,262 11,213

Work Type: 400 Watt Changeout Fixtures


300 07 0034 / 5457 ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST 25.0 09/05/06 09/15/06 10,000 09/28/06 10/12/06 13,152 100
300 09 / 33075 ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE 7.0 12/15/08 01/09/09 2,800 12/15/08 01/09/09 2,366 100

Totals per 400 Watt Changeout 32.0 12,800 15,518

Totals per Lighting/Electrical 2,139,061 2,015,857


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 355

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0069 / 5233 ON W 112TH PL FROM S MAY ST TO S LAFLIN ST 14.0 0 07/17/02 07/17/02 4,900 100
300 06 0069 / 5233 ON W 112TH ST FROM S ABERDEEN ST TO S THROOP ST 5.0 0 07/16/02 07/16/02 1,750 100
300 06 0069 / 5233 ON W 112TH ST FROM S RACINE AVE TO S LAFLIN ST 14.0 0 07/17/02 07/17/02 4,900 100
300 06 0069 / 5233 ON W 115TH ST FROM S MAY ST TO S JUSTINE ST 3.0 0 07/23/02 07/23/02 1,050 100
300 06 0069 / 5233 9956 S ABERDEEN ST 1.0 0 07/12/02 07/12/02 350 100
300 06 0069 / 5233 10054 S ABERDEEN ST 1.0 0 07/19/02 07/19/02 350 100
300 06 0069 / 5233 10114-10142 S ABERDEEN ST 3.0 0 07/12/02 07/12/02 1,050 100
300 06 0204 / 5327 10241 S ABERDEEN ST 1.0 08/08/01 08/08/01 320 09/29/01 09/29/01 320 100
805 06 1552 / 7738 12221 S ABERDEEN ST 1.0 10/14/97 10/14/97 0 10/14/97 10/14/97 300 100
805 06 1574 / 7760 12257 S ABERDEEN ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1553 / 7739 12258 S ABERDEEN ST 1.0 10/14/97 10/14/97 0 10/14/97 10/14/97 300 100
300 06 0069 / 5233 11313 S BISHOP ST 1.0 01/15/03 01/15/03 350 01/13/03 01/13/03 301 100
302 00 0092 / 5774 11518 S BISHOP ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11554 S BISHOP ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11626 S BISHOP ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11636 S BISHOP ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11736 S BISHOP ST 1.0 0 10/04/01 10/09/01 236 100
805 06 1697 / 7883 11759 S BISHOP ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
300 06 0069 / 5233 9954 S CARPENTER ST 1.0 0 07/12/02 07/12/02 350 100
302 00 0092 / 5774 11559 S CARPENTER ST 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 11658 S CARPENTER ST 1.0 0 07/15/02 07/15/02 350 100
805 06 1571 / 7757 12208 S CARPENTER ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1563 / 7749 12257 S CARPENTER ST 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
302 00 0092 / 5774 12258 S EMERALD AVE 1.0 0 01/17/02 01/17/02 236 100
300 06 0069 / 5233 10701-10758 S GLENROY AVE 5.0 0 07/15/02 07/15/02 1,750 100
805 06 1569 / 7755 12150 S GREEN ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1570 / 7756 12156 S GREEN ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1585 / 7771 12257 S GREEN ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1097 / 7283 12803 S GREEN ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 1098 / 7284 12815 S GREEN ST 1.0 08/22/95 08/22/95 0 08/22/95 08/22/95 300 100
805 06 1127 / 7313 10958 S HALSTED ST 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 356

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1683 / 7869 11112 S HALSTED ST 1.0 06/25/97 06/25/97 0 06/25/97 06/25/97 300 100
302 00 0092 / 5774 11710 S HALSTED ST 1.0 0 01/23/02 01/23/02 236 100
302 00 0092 / 5774 11736 S HALSTED ST 1.0 0 01/23/02 01/23/02 236 100
302 00 0092 / 5774 11759 S HALSTED ST 1.0 0 01/23/02 01/23/02 236 100
302 00 0092 / 5774 11800 S HALSTED ST 1.0 0 01/18/02 01/18/02 236 100
805 06 1608 / 7794 11511 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1609 / 7795 11514 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1611 / 7797 11533 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1612 / 7798 11538 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1613 / 7799 11600 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1614 / 7800 11617 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1615 / 7801 11636 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1725 / 7911 11658 S JUSTINE ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 1616 / 7802 11740 S JUSTINE ST 1.0 09/22/97 09/22/97 0 09/22/97 09/22/97 300 100
805 06 1729 / 7915 11758 S JUSTINE ST 1.0 05/29/97 05/29/97 0 05/29/97 05/29/97 300 100
302 00 0092 / 5774 10730 S LA SALLE ST 1.0 0 12/27/01 12/27/01 236 100
300 06 0069 / 5233 11806-11816 S LA SALLE ST 2.0 0 07/15/02 07/15/02 700 100
805 06 1592 / 7778 10522 S LAFAYETTE AVE 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1593 / 7779 10554 S LAFAYETTE AVE 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1595 / 7781 10610 S LAFAYETTE AVE 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1588 / 7774 11536 S LAFLIN ST 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
805 06 1696 / 7882 11659 S LAFLIN ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 1589 / 7775 11754 S LAFLIN ST 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
300 06 0069 / 5233 11253-11258 S LOOMIS ST 2.0 0 07/16/02 07/16/02 700 100
302 00 0092 / 5774 11719 S LOOMIS ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11737 S LOOMIS ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11757 S LOOMIS ST 1.0 0 10/04/01 10/09/01 236 100
805 06 1698 / 7884 11836 S LOOMIS ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 1665 / 7851 11012 S LOWE AVE 1.0 08/18/97 08/18/97 0 08/18/97 08/18/97 300 100
805 06 1846 / 8032 12218 S LOWE AVE 1.0 03/13/96 03/13/96 0 03/13/96 03/13/96 300 100
805 06 1848 / 8034 12223 S LOWE AVE 1.0 03/13/96 03/13/96 0 03/13/96 03/13/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 357

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0069 / 5233 9957-10048 S MAY ST 3.0 0 07/19/02 07/19/02 1,050 100
300 06 0069 / 5233 11250 S MAY ST 1.0 0 07/16/02 07/16/02 350 100
302 00 0092 / 5774 11559 S MAY ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11601 S MAY ST 1.0 0 10/04/01 10/09/01 236 100
805 06 1561 / 7747 12204 S MAY ST 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
805 06 1577 / 7763 12204 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1562 / 7748 12209 S MAY ST 1.0 09/29/97 09/29/97 0 09/29/97 09/29/97 300 100
805 06 1578 / 7764 12209 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1579 / 7765 12215 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1580 / 7766 12218 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1582 / 7768 12241 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1584 / 7770 12244 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1586 / 7772 12258 S MAY ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
302 00 0092 / 5774 11514 S MORGAN ST 1.0 0 10/04/01 10/09/01 236 100
805 06 1573 / 7759 12243 S MORGAN ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1955 / 8141 12717 S MORGAN ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 1956 / 8142 12901 S MORGAN ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 0608 / 6794 11506 S PARNELL AVE 1.0 04/03/95 04/03/95 0 04/03/95 04/03/95 300 100
300 06 0069 / 5233 10118-10156 S PEORIA ST 3.0 0 07/23/02 07/23/02 1,050 100
805 06 1566 / 7752 12217 S PEORIA ST 1.0 09/30/97 09/30/97 0 09/30/97 09/30/97 300 100
805 06 1557 / 7743 12228 S PEORIA ST 1.0 10/17/97 10/17/97 0 10/17/97 10/17/97 300 100
805 06 1567 / 7753 12228 S PEORIA ST 1.0 09/30/97 09/30/97 0 09/30/97 09/30/97 300 100
805 06 1581 / 7767 12237 S PEORIA ST 1.0 09/26/97 09/26/97 0 09/26/97 09/26/97 300 100
805 06 1572 / 7758 12238 S PEORIA ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1546 / 7732 12257 S PEORIA ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1547 / 7733 12258 S PEORIA ST 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 0548 / 6734 12806 S PEORIA ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 0532 / 6718 12814 S PEORIA ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 0550 / 6736 12841 S PEORIA ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
302 00 0092 / 5774 11654 S PRINCETON AVE 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 10123-10143 S RACINE AVE 2.0 0 07/19/02 07/19/02 700 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 358

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0069 / 5233 11401-11421 S RACINE AVE 2.0 0 07/16/02 07/16/02 700 100
300 06 0069 / 5233 11424-11432 S RACINE AVE 2.0 0 07/23/02 07/23/02 700 100
302 00 0092 / 5774 11557 S RACINE AVE 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 11558 S RACINE AVE 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 11701 S RACINE AVE 1.0 0 07/15/02 07/15/02 350 100
805 06 1705 / 7891 12125 S RACINE AVE 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
300 06 0069 / 5233 10056-10154 S SANGAMON ST 4.0 0 07/12/02 07/12/02 1,400 100
805 06 1787 / 7973 12201 S SANGAMON ST 1.0 10/09/87 10/09/87 0 10/09/87 10/09/87 300 100
805 06 0635 / 6821 12805 S SANGAMON ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 0636 / 6822 12806 S SANGAMON ST 1.0 08/23/95 08/23/95 0 08/23/95 08/23/95 300 100
805 06 1617 / 7803 10432 S STATE ST 1.0 09/24/97 09/24/97 0 09/24/97 09/24/97 300 100
805 06 1594 / 7780 10558 S STATE ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 0448 / 6634 12245 S STEWART AVE 1.0 09/21/95 09/21/95 0 09/21/95 09/21/95 300 100
300 06 0069 / 5233 11443 S THROOP ST 1.0 0 07/23/02 07/23/02 350 100
805 06 0346 / 6532 12209 S UNION AVE 1.0 03/13/96 03/13/96 0 03/13/96 03/13/96 300 100
805 06 0384 / 6570 10857 S WALLACE ST 1.0 04/16/96 04/16/96 0 04/16/96 04/16/96 300 100
805 06 0385 / 6571 11000 S WALLACE ST 1.0 07/31/96 07/31/96 0 07/31/96 07/31/96 300 100
805 06 1650 / 7836 10334 S WENTWORTH AVE 1.0 09/11/97 09/11/97 0 09/11/97 09/11/97 300 100
805 06 1620 / 7806 10454 S WENTWORTH AVE 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1596 / 7782 10650 S WENTWORTH AVE 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1626 / 7812 10900 S WENTWORTH AVE 1.0 09/17/97 09/17/97 0 09/17/97 09/17/97 300 100
300 06 0069 / 5233 1101-1155 W 101ST ST 2.0 0 07/19/02 07/19/02 700 100
300 06 0069 / 5233 1125-1133 W 101ST ST 2.0 0 07/12/02 07/12/02 700 100
300 06 0069 / 5233 1156 W 102ND ST 1.0 0 07/19/02 07/19/02 350 100
300 06 0204 / 5327 1058 W 103RD ST 1.0 08/08/01 08/08/01 320 09/29/01 09/29/01 320 100
805 06 1618 / 7804 23 W 104TH PL 1.0 09/24/97 09/24/97 0 09/24/97 09/24/97 300 100
805 06 1607 / 7793 63 W 104TH PL 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
805 06 1631 / 7817 143 W 104TH PL 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
805 06 1632 / 7818 215 W 104TH PL 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
805 06 1633 / 7819 225 W 104TH PL 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
805 06 1635 / 7821 311 W 104TH PL 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 359

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1627 / 7813 118 W 105TH ST 1.0 09/17/97 09/17/97 0 09/17/97 09/17/97 300 100
805 06 1634 / 7820 246 W 105TH ST 1.0 09/19/97 09/19/97 0 09/19/97 09/19/97 300 100
302 00 0092 / 5774 264 W 107TH PL 1.0 0 01/18/02 01/18/02 236 100
805 06 0932 / 7118 338 W 109TH ST 1.0 09/21/95 09/21/95 0 09/21/95 09/21/95 300 100
805 06 0957 / 7143 433 W 110TH PL 1.0 07/02/96 07/02/96 0 07/02/96 07/02/96 300 100
805 06 1709 / 7895 443 W 111TH ST 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
805 06 1710 / 7896 500 W 111TH ST 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
300 06 0139 / 5289 507 W 111TH ST 2,100.0 03/01/06 09/01/06 51,217 07/01/06 07/18/06 63,449 100
302 00 0092 / 5774 507 W 111TH ST 65.0 0 01/30/01 01/24/02 15,317 100
805 06 1605 / 7791 524 W 111TH ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 1576 / 7762 534 W 111TH ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
805 06 0940 / 7126 319 W 112TH PL 1.0 11/08/95 11/08/95 0 11/08/95 11/08/95 300 100
300 06 0069 / 5233 1101-1157 W 112TH PL 3.0 0 07/16/02 07/16/02 1,050 100
805 06 1628 / 7814 43 W 112TH ST 1.0 09/17/97 09/17/97 0 09/17/97 09/17/97 300 100
300 06 0069 / 5233 1427 W 112TH ST 1.0 01/15/03 01/15/03 350 01/13/03 01/13/03 301 100
805 06 0942 / 7128 350 W 113TH ST 1.0 09/01/95 09/01/95 0 09/01/95 09/01/95 300 100
805 06 0943 / 7129 12 W 115TH ST 1.0 11/13/96 11/13/96 0 11/13/96 11/13/96 300 100
805 06 0945 / 7131 13 W 115TH ST 1.0 08/05/96 08/05/96 0 08/05/96 08/05/96 300 100
302 00 0092 / 5774 956 W 115TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 1035 W 115TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 1150 W 115TH ST 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 1218 W 115TH ST 1.0 0 07/15/02 07/15/02 350 100
302 00 0092 / 5774 1218 W 115TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 1223 W 115TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 1227 W 115TH ST 1.0 0 10/04/01 10/09/01 236 100
805 06 1603 / 7789 1525 W 115TH ST 1.0 09/25/97 09/25/97 0 09/25/97 09/25/97 300 100
302 00 0092 / 5774 307 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 321 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 322 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 354 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 422 W 116TH ST 1.0 0 07/15/02 07/15/02 350 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 360

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0092 / 5774 422 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 503 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 522 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 951 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 959 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 1003 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 1025 W 116TH ST 1.0 0 07/15/02 07/15/02 350 100
302 00 0092 / 5774 1105 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
302 00 0092 / 5774 1219 W 116TH ST 1.0 0 10/04/01 10/09/01 236 100
300 06 0069 / 5233 105-123 W 118TH ST 2.0 0 07/15/02 07/15/02 700 100
805 06 1699 / 7885 1400 W 119TH ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 1700 / 7886 1420 W 119TH ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 1702 / 7888 1434 W 119TH ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 1706 / 7892 1456 W 119TH ST 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
805 06 1703 / 7889 1500 W 119TH ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
805 06 0946 / 7132 535 W 123RD ST 1.0 03/28/96 03/28/96 0 03/28/96 03/28/96 300 100

Totals per Alley Lighting/Lamps 2,389.0 52,557 147,648

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 507 W 111TH ST 1,622.0 06/01/07 12/31/07 47,751 01/10/08 01/28/08 46,308 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 507 W 111TH ST 1,517.0 0 08/21/02 09/03/02 27,622 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 361

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 07 0034 / 5457 ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST 8.0 09/05/06 09/15/06 4,000 09/01/06 09/11/06 4,208 100
302 00 0092 / 5774 330 W 104TH ST 1.0 0 08/22/01 08/22/01 345 100
302 00 0092 / 5774 111 W 108TH PL 1.0 0 06/20/01 06/20/01 471 100
302 00 0092 / 5774 127 W 108TH PL 1.0 0 06/20/01 06/20/01 471 100
302 00 0092 / 5774 141 W 108TH PL 1.0 0 06/20/01 06/20/01 471 100
302 00 0092 / 5774 153 W 108TH PL 1.0 0 06/20/01 06/20/01 471 100
300 06 0167 / 5306 314 W 108TH ST 3.0 0 04/08/99 04/08/99 1,053 100

Totals per Flood Light Install 16.0 4,000 7,490

Work Type: Lighting Imprvmnts Projects


300 06 0292 / 5399 849 W 115TH ST .0 03/01/05 12/31/05 0 08/11/05 08/11/05 0 100

Work Type: Ornamental - Piggyback Lighting Fixtures


300 07 0034 / 5457 ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST 25.0 09/05/06 09/15/06 33,750 09/28/06 10/12/06 21,406 100
300 09 / 33075 ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE 7.0 12/15/08 01/09/09 9,450 12/15/08 01/09/09 8,022 100

Totals per Ornamental - Piggyback Lighting 32.0 43,200 29,428

Work Type: Ornamental Lighting Blocks


300 11 / 32223 ON W 111TH ST FROM S STATE ST TO S PERRY AVE 1.0 06/01/07 09/15/07 350,000 06/01/07 01/18/08 329,000 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 507 W 111TH ST .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 362

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 0298 / 5405 ON S JUSTINE ST FROM W 120TH ST TO W 121ST ST 1.0 06/25/05 07/25/05 0 06/13/05 08/12/05 59,100 100
300 06 0298 / 5405 ON S LAFLIN ST FROM W 120TH ST TO W 121ST ST 1.0 07/01/05 09/01/05 0 06/13/05 08/12/05 59,100 100
300 11 / 32223 ON S LAFLIN ST FROM W 121ST ST TO W 122ND ST .0 11/07/07 12/07/07 0 0 0
300 06 / 32277 ON S PEORIA ST FROM W 103RD ST TO W 104TH ST .0 05/04/08 12/31/08 0 0 0
300 06 0308 / 5414 ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST 2.0 06/13/06 09/20/06 148,758 06/13/06 09/20/06 146,295 100
300 07 0034 / 5457 ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST 2.0 06/12/06 08/18/06 50,000 06/13/06 09/20/06 50,000 100
300 06 / 32277 ON W 113TH PL FROM S STATE ST TO S PERRY AVE .0 05/04/08 12/31/08 0 0 0
300 06 / 32277 ON W 113TH ST FROM S STATE ST TO S PERRY AVE .0 05/04/08 12/31/08 0 0 0
300 06 / 32275 11900-12100 S YALE AVE 2.0 04/01/07 12/31/07 153,104 04/06/07 07/06/07 90,006 100

Totals per Residntl Staggered Lighting 8.0 351,862 404,501

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON S JUSTINE ST FROM W 121ST ST TO W 123RD ST 1.0 10/01/03 12/01/03 109,352 08/25/03 10/27/03 81,113 100
300 06 0267 / 5375 ON W 107TH PL FROM S MORGAN ST TO S ABERDEEN ST 2.0 09/20/04 11/20/04 148,413 08/31/04 12/10/04 142,617 100
300 06 0235 / 5349 ON W 109TH ST FROM S MORGAN ST TO S BEVERLY AVE 1.0 03/03/03 05/14/03 93,962 04/17/03 07/18/03 87,636 100

Totals per Residntl Strt Lighting/Lamps 4.0 351,727 311,366

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 11500 S RACINE AVE 2.0 0 02/16/01 02/16/01 756 100
302 00 0092 / 5774 11613 S RACINE AVE 1.0 0 02/16/01 02/16/01 378 100
302 00 0092 / 5774 11651 S RACINE AVE 1.0 0 02/16/01 02/16/01 378 100
302 00 0092 / 5774 11700 S RACINE AVE 1.0 0 02/16/01 02/16/01 378 100

Totals per Short Arm Installs - Residntl 5.0 0 1,890


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 363

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 07 0034 / 5457 ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST 25.0 11/17/05 04/03/06 6,250 05/20/06 06/01/06 7,000 100
302 00 0076 / 5764 ON S HALSTED ST FROM W 103RD ST TO W 119TH ST 300.0 03/20/98 04/16/98 0 03/20/98 04/16/98 5,100 100
300 09 / 33075 ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE 7.0 09/05/08 09/12/08 2,100 09/05/08 09/12/08 1,470 100
300 07 0034 / 5457 ON W 111TH ST FROM S HALSTED ST TO S PERRY AVE .0 04/18/06 11/18/06 2,700 0 100
300 07 0034 / 5457 ON W 111TH ST FROM S PERRY AVE TO S HALSTED ST 60.0 04/18/06 11/18/06 15,452 06/06/07 07/01/07 0 100
300 09 / 33100 11200-11300 S GREEN ST 4.0 07/01/08 07/07/08 800 07/01/08 07/07/08 504 100

Totals per Strt Light Pole Painting 396.0 27,302 14,074

Work Type: Strt Lighting Blocks


300 06 0247 / 5357 ON S ABERDEEN ST FROM W 122ND ST TO W 123RD ST 1.0 09/01/03 10/01/03 115,000 09/30/04 06/17/05 100,162 100
300 06 0247 / 5357 ON S DAVOL ST FROM W EDMAIRE ST TO W MONTEREY AVE 2.0 08/01/03 10/01/03 118,000 08/01/03 09/23/03 117,028 100
300 06 0274 / 5382 ON S GREEN ST FROM W 107TH ST TO W 110TH ST 3.0 11/04/05 12/18/06 225,000 11/04/05 12/18/06 103,028 100
300 06 0274 / 5382 ON S PEORIA ST FROM W 107TH ST TO W 110TH ST 3.50 11/04/05 12/18/06 265,000 11/04/05 12/18/06 103,028 100
300 06 0274 / 5382 ON W 108TH ST FROM S HALSTED ST TO S SANGAMON ST .50 04/27/06 12/18/06 40,000 04/27/06 12/18/06 103,028 100
300 06 0274 / 5382 ON W 109TH ST FROM S SANGAMON ST TO S HALSTED ST 1.50 04/27/06 12/18/06 115,000 04/27/06 12/18/06 103,028 100
300 06 0204 / 5327 10200-10299 S ABERDEEN ST 4.0 10/08/01 10/08/01 840 09/29/01 09/29/01 840 100

Totals per Strt Lighting 15.50 878,840 630,142

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 507 W 111TH ST 1,300.0 03/01/04 12/01/04 6,760 07/31/06 08/14/06 14,157 100

Work Type: Underpass Lighting Fixtures


805 06 2357 / 8543 500 E 115TH ST 34.0 03/26/96 03/26/96 0 03/26/96 03/26/96 25,500 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 364

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Pedestrian Countdown Signal Install Locations
210 06 0243 / 4480 W 119TH ST AND S HALSTED ST .0 04/01/06 04/01/07 0 0 0
210 06 0243 / 4480 W 99TH ST AND S HALSTED ST .0 04/01/06 04/01/07 0 0 0

Totals per Pedestrian Countdown Signal Install .0 0 0

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 S HALSTED ST AND W VERMONT ST 1.0 4,000 04/27/01 05/08/01 4,603 100

Work Type: Signals Intersections


300 06 0096 / 5258 507 W 111TH ST 24.0 08/11/03 08/22/03 0 08/08/03 08/18/03 3,795 100

Work Type: TSM Install Locations


814 06 0236 / 16448 10700 S HALSTED ST 1.0 01/01/90 01/01/90 0 01/01/90 01/01/90 8,000 100
210 06 0107 / 4367 11900 S HALSTED ST 1.0 06/01/01 12/01/01 150,000 05/31/01 01/01/02 182,777 100
814 06 0129 / 16343 11100 S HAMLET AVE 1.0 06/29/94 06/29/94 0 06/29/94 06/29/94 85,414 100
814 06 0128 / 16342 11100 S MARSHFIELD AVE 1.0 06/29/94 06/29/94 0 06/29/94 06/29/94 52,414 100
814 06 0249 / 16461 10300 S WENTWORTH AVE 1.0 08/04/89 08/04/89 0 08/04/89 08/04/89 96,863 100

Totals per TSM Install 5.0 150,000 425,468

Work Type: Traffic Equipment Painting Locations


300 07 0034 / 5457 ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST 1.0 11/17/05 04/03/06 200 05/20/06 06/01/06 282 100

Totals per Traffic 154,200 434,148

Totals per Construction Phase 2,293,261 2,450,005

Totals for Ward 34 2,305,661 2,477,707


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 365

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32146 ON N ALLEN AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE .50 05/01/07 10/31/07 0 0 100
300 06 / 32146 ON N DAWSON AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE .50 05/01/07 10/31/07 0 0 100
300 06 0308 / 5414 ON N RICHMOND ST FROM W NORTH AVE TO W BLOOMINGDALE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 3,127 100
300 06 / 32146 ON N WISNER AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE .0 05/01/07 10/31/07 5,000 2,500 100
300 06 / 32277 ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO N HUMBOLDT .0 04/01/08 08/30/08 0 0 0
BLVD
210 06 0208 / 4451 W ADDISON ST AND N LAWNDALE AVE .0 07/01/04 10/01/04 0 0 0
300 06 0282 / 5390 3326 W FULLERTON AVE 1.0 09/15/04 09/15/04 1,700 09/01/04 09/15/04 1,627 100

Totals per Design/Engineering 2.0 6,700 7,254


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 366

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 ON N AVERS AVE FROM W ALTGELD ST TO W DIVERSEY AVE 4.0 11/05/01 11/05/01 1,029 10/04/01 10/04/01 824 100
300 09 / 33101 ON N CHRISTIANA AVE FROM W WELLINGTON AVE TO W BARRY AVE 3.0 09/02/08 09/05/08 1,200 09/02/08 09/05/08 717 100
302 00 0092 / 5774 ON N HAMLIN AVE FROM W ALTGELD ST TO W DIVERSEY AVE 18.0 11/10/01 11/10/01 2,058 10/09/01 10/09/01 3,708 100
300 09 / 33101 ON N HAMLIN AVE FROM W ALTGELD ST TO W PALMER ST 9.0 09/11/08 09/15/08 3,800 09/11/08 09/15/08 2,151 100
300 06 0069 / 5233 ON N HAMLIN AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 9.0 10/01/02 10/01/02 3,789 09/25/02 09/25/02 1,877 100
302 00 0092 / 5774 ON N LAWNDALE AVE FROM W ALTGELD ST TO W DIVERSEY AVE 10.0 11/10/01 11/10/01 2,058 10/09/01 10/09/01 1,648 100
300 06 0069 / 5233 ON N LAWNDALE AVE FROM W BELDEN AVE TO W DIVERSEY AVE 15.0 0 02/04/02 02/04/02 5,625 100
300 09 / 33101 ON N LAWNDALE AVE FROM W BELDEN AVE TO W FULLERTON AVE 1.0 09/02/08 09/05/08 400 09/02/08 09/05/08 239 100
302 00 0092 / 5774 ON N MONTICELLO AVE FROM W ALTGELD ST TO W DIVERSEY AVE 5.0 11/05/01 11/05/01 2,058 10/09/01 10/09/01 1,029 100
300 09 / 33101 ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE .08 09/02/08 09/03/08 32 09/02/08 09/03/08 19 100
302 00 0092 / 5774 ON N RIDGEWAY AVE FROM W ALTGELD ST TO W DIVERSEY AVE 9.0 11/01/01 11/01/01 2,058 10/04/01 10/04/01 1,854 100
300 06 0069 / 5233 ON N RIDGEWAY AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 10.0 10/01/02 10/01/02 4,211 09/25/02 09/25/02 2,086 100
300 09 / 33101 ON N SAWYER AVE FROM W BARRY AVE TO W BELMONT AVE 5.0 09/02/08 09/05/08 2,200 09/02/08 09/05/08 1,175 100
300 09 / 33101 ON N SPAULDING AVE FROM N MILWAUKEE AVE TO W WRIGHTWOOD 5.0 09/03/08 09/08/08 2,200 09/03/08 09/08/08 1,175 100
AVE
300 09 / 33101 ON N SPAULDING AVE FROM W BARRY AVE TO W WELLINGTON AVE 4.0 09/03/08 09/05/08 1,800 09/03/08 09/05/08 956 100
300 09 / 33101 ON N ST LOUIS AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE 8.0 09/05/08 09/09/08 3,400 09/05/08 09/09/08 1,912 100
300 09 / 33101 ON N TROY ST FROM W WELLINGTON AVE TO W BARRY AVE 3.0 09/02/08 09/04/08 1,200 09/02/08 09/04/08 717 100
300 06 0069 / 5233 ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE 2.64 10/01/03 10/16/03 0 02/04/02 02/04/02 990 100
300 09 / 33101 ON W GRACE ST FROM N CENTRAL PARK AVE TO N MONTICELLO AVE 2.0 09/02/08 09/05/08 800 09/02/08 09/05/08 478 100
300 09 / 33101 ON W LYNDALE ST FROM N CALIFORNIA AVE TO N SACRAMENTO AVE 8.0 09/15/08 09/16/08 3,400 09/15/08 09/16/08 1,912 100
300 09 / 33101 ON W SCHUBERT AVE FROM N FRANCISCO AVE TO N KEDZIE AVE 6.0 09/02/08 09/05/08 2,600 09/02/08 09/05/08 1,434 100
300 09 / 33101 ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO W PALMER BLVD 9.0 09/16/08 09/19/08 3,800 09/16/08 09/19/08 2,151 100
302 00 0092 / 5774 2500 N MAPLEWOOD AVE 1.0 02/09/03 02/09/03 225 02/07/03 02/07/03 203 100
302 00 0092 / 5774 2542 N MONTICELLO AVE 1.0 01/12/02 01/12/02 210 01/09/02 01/09/02 203 100
302 00 0092 / 5774 2552 N MONTICELLO AVE 1.0 01/12/02 01/12/02 210 01/09/02 01/09/02 203 100
302 00 0092 / 5774 2610 N MONTICELLO AVE 1.0 01/12/02 01/12/02 210 01/09/02 01/09/02 203 100
302 00 0092 / 5774 2620 N MONTICELLO AVE 1.0 01/12/02 01/12/02 210 01/09/02 01/09/02 203 100
302 00 0092 / 5774 2143 N RICHMOND ST 1.0 0 01/16/02 01/16/02 203 100
300 06 0069 / 5233 1900 N SAWYER AVE 5.0 01/10/03 01/10/03 2,000 01/07/03 01/07/03 1,890 100
300 06 0069 / 5233 1900 N SPAULDING AVE 5.0 01/10/03 01/10/03 2,000 01/07/03 01/07/03 1,890 100
302 00 0092 / 5774 2700 N SPAULDING AVE 4.0 01/19/03 01/19/03 840 01/16/03 01/16/03 812 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 367

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 2852-2854 N SPAULDING AVE 1.0 10/03/01 10/04/01 205 10/05/01 10/05/01 205 100
300 06 0069 / 5233 2600-2699 N WHIPPLE ST 4.0 0 02/04/02 02/04/02 1,500 100
302 00 0092 / 5774 2868 W DICKENS AVE 1.0 0 01/16/02 01/16/02 203 100
302 00 0092 / 5774 3600-3640 W GEORGE ST 5.0 10/01/01 10/01/01 1,029 09/29/01 09/29/01 1,029 100
302 00 0092 / 5774 3000-3099 W LYNDALE ST 4.0 01/31/02 02/16/02 1,616 02/15/01 02/15/01 942 100
302 00 0092 / 5774 2868 W MC LEAN AVE 1.0 0 01/16/02 01/16/02 203 100
300 03 0030 / 4901 3800 W SCHUBERT AVE 4.0 11/01/04 11/10/04 1,500 10/18/04 10/20/04 917 100
300 06 0069 / 5233 3300-3399 W WRIGHTWOOD AVE 4.0 0 02/04/02 02/04/02 1,500 100

Totals per 250 Watt Changeout 189.72 54,348 46,986

Work Type: 400 Watt Changeout Fixtures


300 09 / 33101 ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD 6.0 08/25/08 09/10/08 2,600 09/09/08 09/10/08 1,992 100
300 06 0122 / 5275 ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE .90 07/01/04 07/16/04 360 06/22/04 06/30/04 360 100
300 09 / 33101 ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N HAMLIN AVE 3.0 09/08/08 09/09/08 1,200 09/08/08 09/09/08 996 100
300 06 0122 / 5275 ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE 18.0 10/10/03 10/15/03 9,000 10/20/03 10/30/03 7,830 100

Totals per 400 Watt Changeout 27.90 13,160 11,178

Totals per Lighting/Electrical 2,654,346 1,896,672


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 368

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0766 / 6952 2959 N ALBANY AVE 1.0 09/18/96 09/18/96 0 09/18/96 09/18/96 300 100
805 06 1275 / 7461 2522 N CENTRAL PARK AVE 1.0 05/17/96 05/17/96 0 05/17/96 05/17/96 300 100
805 06 1732 / 7918 2618 N CENTRAL PARK AVE 1.0 06/02/97 06/02/97 0 06/02/97 06/02/97 300 100
302 00 0092 / 5774 3440 N CENTRAL PARK AVE 1.0 0 05/09/01 05/09/01 236 100
805 06 1161 / 7347 2937 N DAWSON AVE 1.0 03/23/95 03/23/95 0 03/23/95 03/23/95 300 100
805 06 0906 / 7092 2614 N FRANCISCO AVE 1.0 03/30/95 03/30/95 0 03/30/95 03/30/95 300 100
805 06 1456 / 7642 2953 N GRESHAM AVE 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 1078 / 7264 2415 N HAMLIN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1079 / 7265 2511 N HAMLIN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1052 / 7238 2525 N HAMLIN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1162 / 7348 2036 N KEDZIE AVE 1.0 03/23/95 03/23/95 0 03/23/95 03/23/95 300 100
302 00 0092 / 5774 2535 N KEDZIE AVE 27.0 0 01/25/01 01/07/02 6,363 100
805 06 2044 / 8230 2423 N KIMBALL AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0322 / 6508 2544 N LAWNDALE AVE 1.0 06/18/96 06/18/96 0 06/18/96 06/18/96 300 100
805 06 0323 / 6509 2552 N LAWNDALE AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0325 / 6511 2602 N LAWNDALE AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0326 / 6512 2702 N LAWNDALE AVE 1.0 03/12/97 03/12/97 0 03/12/97 03/12/97 300 100
805 06 0327 / 6513 2730 N LAWNDALE AVE 1.0 03/12/97 03/12/97 0 03/12/97 03/12/97 300 100
805 06 1882 / 8068 2520 N MAPLEWOOD AVE 1.0 11/21/96 11/21/96 0 11/21/96 11/21/96 300 100
805 06 1869 / 8055 2601 N MILWAUKEE AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1936 / 8122 2613 N MILWAUKEE AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1937 / 8123 2625 N MILWAUKEE AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1939 / 8125 2635 N MILWAUKEE AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1940 / 8126 2641 N MILWAUKEE AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1891 / 8077 2057 N MOZART ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0663 / 6849 2540 N RIDGEWAY AVE 1.0 03/12/97 03/12/97 0 03/12/97 03/12/97 300 100
805 06 0664 / 6850 2551 N RIDGEWAY AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0665 / 6851 2552 N RIDGEWAY AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0666 / 6852 2600 N RIDGEWAY AVE 1.0 06/13/96 06/13/96 0 06/13/96 06/13/96 300 100
805 06 0667 / 6853 2601 N RIDGEWAY AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 1675 / 7861 2610 N RIDGEWAY AVE 1.0 07/28/97 07/28/97 0 07/28/97 07/28/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 369

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1676 / 7862 2620 N RIDGEWAY AVE 1.0 07/28/97 07/28/97 0 07/28/97 07/28/97 300 100
805 06 0679 / 6865 2521 N SACRAMENTO AVE 1.0 10/08/96 10/08/96 0 10/08/96 10/08/96 300 100
805 06 0698 / 6884 2533 N SACRAMENTO AVE 1.0 04/17/96 04/17/96 0 04/17/96 04/17/96 300 100
805 06 0719 / 6905 2533 N SACRAMENTO AVE 1.0 10/08/96 10/08/96 0 10/08/96 10/08/96 300 100
300 06 0139 / 5289 2710 N SAWYER AVE 1,096.0 03/01/06 09/01/06 27,051 06/01/06 06/20/06 33,114 100
805 06 0638 / 6824 2715 N SAWYER AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 300 100
805 06 0639 / 6825 2747 N SAWYER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0640 / 6826 3022 N SAWYER AVE 1.0 02/10/95 02/10/95 0 02/10/95 02/10/95 300 100
805 06 1485 / 7671 2834 N SPAULDING AVE 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 0490 / 6676 1926 N WHIPPLE ST 1.0 03/30/95 03/30/95 0 03/30/95 03/30/95 300 100
805 06 0535 / 6721 1943 N WHIPPLE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0505 / 6691 1944 N WHIPPLE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1536 / 7722 2719 N WHIPPLE ST 1.0 10/22/97 10/22/97 0 10/22/97 10/22/97 300 100
805 06 1483 / 7669 2832 N WOODARD ST 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 0745 / 6931 3067 W ARMITAGE AVE 1.0 06/13/96 06/13/96 0 06/13/96 06/13/96 300 100
805 06 0734 / 6920 3501 W ARMITAGE AVE 1.0 04/30/96 04/30/96 0 04/30/96 04/30/96 300 100
805 06 0765 / 6951 3501 W ARMITAGE AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 300 100
805 06 0851 / 7037 3048 W BELDEN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1457 / 7643 3415 W DIVERSEY AVE 1.0 12/02/97 12/02/97 0 12/02/97 12/02/97 300 100
805 06 1035 / 7221 3535 W DIVERSEY AVE 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100
805 06 1016 / 7202 3557 W DIVERSEY AVE 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100
805 06 0457 / 6643 2604 W LOGAN BLVD 1.0 12/09/95 12/09/95 0 12/09/95 12/09/95 300 100
805 06 0491 / 6677 2612 W LOGAN BLVD 1.0 12/09/95 12/09/95 0 12/09/95 12/09/95 300 100
805 06 0492 / 6678 2624 W LOGAN BLVD 1.0 12/09/95 12/09/95 0 12/09/95 12/09/95 300 100
805 06 0493 / 6679 2632 W LOGAN BLVD 1.0 12/09/95 12/09/95 0 12/09/95 12/09/95 300 100
805 06 0494 / 6680 2640 W LOGAN BLVD 1.0 12/09/95 12/09/95 0 12/09/95 12/09/95 300 100
805 06 0478 / 6664 2652 W LOGAN BLVD 1.0 12/09/95 12/09/95 0 12/09/95 12/09/95 300 100
805 06 1803 / 7989 3214 W MC LEAN AVE 1.0 03/30/95 03/30/95 0 03/30/95 03/30/95 300 100
805 06 1836 / 8022 3219 W MC LEAN AVE 1.0 06/25/96 06/25/96 0 06/25/96 06/25/96 300 100
805 06 0616 / 6802 2713 W SCHUBERT AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0617 / 6803 2749 W SCHUBERT AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 370

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0439 / 6625 3541 W WOLFRAM ST 1.0 01/12/95 01/12/95 0 01/12/95 01/12/95 300 100
805 06 0468 / 6654 3760 W WRIGHTWOOD AVE 1.0 09/18/96 09/18/96 0 09/18/96 09/18/96 300 100
805 06 1657 / 7843 3767 W WRIGHTWOOD AVE 1.0 07/31/97 07/31/97 0 07/31/97 07/31/97 300 100

Totals per Alley Lighting/Lamps 1,186.0 27,051 58,313

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 2710 N SAWYER AVE 1,401.0 06/01/07 12/31/07 41,245 07/20/07 09/01/07 41,245 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 2535 N KEDZIE AVE 1,306.0 0 05/07/02 05/10/02 23,780 100

Work Type: Flood Light Install Fixtures


300 06 0198 / 5323 LAWNDALE GARDENS 03/08/01 05/22/01 20,563 05/29/01 05/30/01 12,106 100
300 06 0167 / 5306 N FRANCISCO AVE AND W WABANSIA AVE 2.50 0 06/01/99 06/01/99 539 100
300 06 0167 / 5306 W DIVERSEY AVE AND N AVERS AVE 3.50 0 06/10/99 06/10/99 1,229 100
302 00 0092 / 5774 2500 N LINDEN PL 1.0 0 08/13/01 08/13/01 345 100
302 00 0092 / 5774 2517 W LOGAN BLVD 1.0 0 02/14/01 02/14/01 471 100
302 00 0092 / 5774 2519 W LOGAN BLVD 1.0 0 02/14/01 02/14/01 471 100

Totals per Flood Light Install 9.0 20,563 15,161

Work Type: Lighting Imprvmnts Installations


300 06 0282 / 5390 3326 W FULLERTON AVE 1.0 2,800 09/20/04 09/23/04 2,349 100

Work Type: Lighting Imprvmnts Projects


300 06 0118 / 5272 2400 N CALIFORNIA AVE 1.0 10/30/00 06/29/01 77,376 09/11/00 06/05/01 77,431 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 371

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 09 / 33101 ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD 6.0 09/15/08 10/03/08 8,100 09/12/08 09/16/08 6,810 100
300 11 / 32222 ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST 11.55 11/01/07 12/01/07 15,725 03/13/08 04/04/08 13,060 100
300 11 / 32222 ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST 13.86 11/01/07 12/01/07 18,843 03/13/08 04/04/08 17,538 100
300 09 / 33101 ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N HAMLIN AVE 3.0 09/10/08 09/19/08 4,050 09/10/08 09/19/08 3,375 100
300 06 0122 / 5275 ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE 18.0 10/15/03 10/18/03 24,000 10/20/03 10/30/03 18,269 100

Totals per Ornamental - Piggyback Lighting 52.41 70,718 59,051

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 2710 N SAWYER AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32146 ON N ALLEN AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE 4.0 12/05/07 06/27/08 247,733 12/14/07 0 50
300 06 / 32146 ON N DAWSON AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE 4.0 12/05/07 05/29/08 247,733 12/20/07 0 50
300 07 0035 / 5458 ON N DRAKE AVE FROM W SCHOOL ST TO N AVONDALE AVE 2.0 07/17/06 09/29/06 110,000 11/01/06 04/20/07 71,567 100
300 07 0035 / 5458 ON N MONTICELLO AVE FROM W SCHOOL ST TO W BELMONT AVE 3.0 08/07/06 10/06/06 255,000 09/11/06 11/17/06 162,122 100
300 07 0035 / 5458 ON N RICHMOND ST FROM W ARMITAGE AVE TO W BLOOMINGDALE AVE 2.0 05/11/06 07/17/06 140,000 05/11/06 07/24/06 127,515 100

Project has been completed. Note Last Updated on 25-AUG-06


300 06 0308 / 5414 ON N RICHMOND ST FROM W NORTH AVE TO W BLOOMINGDALE AVE 2.0 03/16/06 12/31/06 147,540 05/11/06 07/24/06 127,565 100
300 07 0035 / 5458 ON N RIDGEWAY AVE FROM W BELDEN AVE TO W FULLERTON AVE 1.0 08/01/06 09/22/06 85,000 10/16/06 04/20/07 43,621 100
300 06 / 32146 ON N WISNER AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE 1.0 12/05/07 05/29/08 247,733 0 75
300 07 0035 / 5458 ON W BELDEN AVE FROM N HAMLIN AVE TO N LAWNDALE AVE 1.0 08/01/06 09/22/06 85,000 10/16/06 04/20/07 43,755 100
300 07 0035 / 5458 ON W CORNELIA AVE FROM N AVONDALE AVE TO N MONTICELLO AVE .0 03/01/06 12/31/06 0 0 0
300 07 0035 / 5458 ON W MELROSE ST FROM N KIMBALL AVE TO N DRAKE AVE 2.0 07/17/06 09/29/06 110,000 11/01/06 04/20/07 71,567 100
300 06 / 32277 ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO N HUMBOLDT .0 05/04/08 12/31/08 0 0 0
BLVD
Totals per Residntl Staggered Lighting 22.0 1,675,739 647,712
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 372

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0267 / 5375 ON N FRANCISCO AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE 2.0 05/19/04 07/19/04 150,000 05/24/04 08/06/04 132,136 100
AVE
300 03 0001 / 4872 ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE .50 06/01/04 09/01/04 40,000 05/29/04 07/09/04 40,000 100
300 03 0035 / 4906 ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE 06/01/04 09/01/04 40,000 05/24/04 07/09/04 40,000 100
300 06 0232 / 5346 ON N LAWNDALE AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 2.0 10/28/02 12/28/02 150,000 10/28/02 12/20/02 128,918 100
300 06 0235 / 5349 ON N RIDGEWAY AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 2.0 03/03/03 04/28/03 167,240 03/02/03 04/04/03 151,454 100

Totals per Residntl Strt Lighting/Lamps 6.50 547,240 492,508

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 2406 N LAWNDALE AVE 1.0 0 03/20/01 03/20/01 378 100
302 00 0092 / 5774 2412 N LAWNDALE AVE 1.0 0 03/20/01 03/20/01 378 100
302 00 0092 / 5774 2600 N MONTICELLO AVE 1.0 0 01/02/01 01/02/01 378 100
302 00 0092 / 5774 2436 N RIDGEWAY AVE 1.0 0 06/14/01 06/14/01 378 100
302 00 0092 / 5774 2448 N RIDGEWAY AVE 1.0 0 06/14/01 06/14/01 378 100
302 00 0092 / 5774 2454 N RIDGEWAY AVE 1.0 0 06/14/01 06/14/01 378 100
302 00 0092 / 5774 3608 W GEORGE ST 1.0 0 02/09/01 02/09/01 378 100
302 00 0092 / 5774 3616 W GEORGE ST 1.0 0 02/09/01 02/09/01 378 100
302 00 0092 / 5774 3626 W GEORGE ST 1.0 0 02/09/01 02/09/01 378 100
302 00 0092 / 5774 3636 W GEORGE ST 1.0 0 02/09/01 02/09/01 378 100
302 00 0092 / 5774 3640 W GEORGE ST 1.0 0 02/09/01 02/09/01 378 100
302 00 0092 / 5774 3654 W GEORGE ST 1.0 0 03/28/01 03/28/01 378 100
302 00 0092 / 5774 2837 W MC LEAN AVE 1.0 0 03/20/01 03/20/01 378 100
302 00 0092 / 5774 2869 W MC LEAN AVE 1.0 0 03/20/01 03/20/01 378 100
302 00 0092 / 5774 3609 W WOLFRAM ST 1.0 0 02/09/01 02/09/01 378 100
302 00 0092 / 5774 3621 W WOLFRAM ST 1.0 0 02/09/01 02/09/01 378 100

Totals per Short Arm Installs - Residntl 16.0 0 6,048


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 373

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 04 0216 / 5114 ON N KEDZIE AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE 15.50 05/01/06 11/01/06 2,920 05/17/06 10/30/06 2,920 100
300 09 / 33101 ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD 6.0 08/25/08 08/29/08 1,800 09/12/08 09/15/08 1,260 100
300 07 0035 / 5458 ON W BELMONT AVE FROM N SPAULDING AVE TO N KIMBALL AVE 3.0 04/18/06 11/18/06 845 10/02/06 10/20/06 0 100
300 07 0035 / 5458 ON W CORNELIA AVE FROM N AVONDALE AVE TO N MONTICELLO AVE .0 03/01/06 12/31/06 0 0 0
302 00 0076 / 5764 ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE 50.0 09/01/00 12/31/00 0 850
300 06 0108 / 5263 ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE 25.35 08/01/04 08/15/04 7,403 06/21/04 07/28/04 5,602 100
300 09 / 33101 ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N AVERS AVE 3.0 09/12/08 09/15/08 900 09/12/08 09/15/08 630 100
300 06 0108 / 5263 ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE 18.0 09/10/03 09/18/03 7,000 08/28/03 08/29/03 3,780 100

Totals per Strt Light Pole Painting 120.85 20,868 15,042

Work Type: Strt Lighting Blocks


300 06 0111 / 5266 ON N CALIFORNIA AVE FROM W FULLERTON AVE TO W DIVERSEY AVE 3.48 08/01/00 09/30/00 0 11/01/98 12/15/98 36,834 100
303 00 0006 / 5783 2400 N MILWAUKEE AVE 08/01/97 12/01/97 60,000 08/01/97 04/30/98 76,547 100

Totals per Strt Lighting 3.48 60,000 113,381

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 2710 N SAWYER AVE 2,273.0 03/01/04 12/01/04 11,819 10/19/06 10/27/06 24,753 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 374

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0072 / 5760 2830 N CALIFORNIA AVE 1.0 0 08/31/99 09/28/99 39,560 100
805 06 2793 / 8979 1799 N FRANCISCO AVE 6.0 04/13/94 04/13/94 0 04/13/94 04/13/94 4,500 100
805 06 2429 / 8615 3198 N KEDZIE AVE 12.0 01/02/96 01/02/96 0 01/02/96 01/02/96 9,000 100
302 00 0072 / 5760 3200 N KEDZIE AVE 1.0 0 09/27/99 10/22/99 24,706 100
300 06 0217 / 5337 2535 N KEDZIE BLVD 559.0 05/04/04 05/10/04 31,420 05/17/04 05/21/04 21,780 100
302 00 0072 / 5760 3200 N KIMBALL AVE 1.0 0 08/31/99 09/15/99 24,773 100
805 06 2437 / 8623 3338 N KIMBALL AVE 12.0 12/19/95 12/19/95 0 12/19/95 12/19/95 9,000 100
805 06 2399 / 8585 1798 N MOZART ST 10.0 10/16/95 10/16/95 0 10/16/95 10/16/95 7,500 100
805 06 2229 / 8415 3001 N SACRAMENTO AVE 8.0 10/29/96 10/29/96 0 10/29/96 10/29/96 6,000 100
302 00 0071 / 5759 2530 N WESTERN AVE 0 02/07/98 02/17/98 32,008 100
805 06 2683 / 8869 3653 W ADDISON ST 8.0 04/16/92 04/16/92 0 04/16/92 04/16/92 6,000 100
302 00 0072 / 5760 3210 W BELMONT AVE 1.0 0 09/16/99 09/24/99 14,025 100
302 00 0072 / 5760 3220 W BELMONT AVE 1.0 0 09/16/99 10/16/99 12,670 100
805 06 2794 / 8980 2929 W BLOOMINGDALE AVE 5.0 06/01/94 06/01/94 0 06/01/94 06/01/94 3,750 100
302 00 0072 / 5760 2800 W DIVERSEY AVE 1.0 0 08/02/99 09/03/99 46,462 100

Totals per Underpass Lighting 626.0 31,420 261,734


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 375

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Left Turn Arrow Locations
210 06 0073 / 4337 3400 W DIVERSEY AVE 1.0 06/01/03 07/01/03 50,000 0

Work Type: New Signal Locations


300 06 0283 / 5391 ON W DICKENS AVE FROM N CALIFORNIA AVE TO N MOZART ST 1.0 09/01/04 09/30/04 11,807 09/09/04 09/09/04 11,807 100
210 06 0208 / 4451 W ADDISON ST AND N LAWNDALE AVE .50 12/01/05 06/30/06 112,500 0
210 06 0131 / 4390 W FULLERTON AVE AND N AVERS AVE .50 07/01/01 12/01/01 85,000 05/31/01 08/02/01 47,668 100

Totals per New Signal 2.0 209,307 59,475

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N KIMBALL AVE AND W ARMITAGE AVE .50 2,000 10/02/01 10/02/01 178 100

Work Type: Signals Intersections


300 06 0096 / 5258 2724 N KEDZIE BLVD 32.0 11/01/03 11/01/03 0 11/01/03 11/07/03 5,060 100

Work Type: TSM Install Locations


210 06 0074 / 4338 N ROCKWELL ST AND W LOGAN BLVD 1.0 10/01/03 12/01/03 328,600 10/15/03 02/04/04 117,249 100
814 06 0273 / 16485 2800 N CALIFORNIA AVE 1.0 03/17/92 03/17/92 0 03/17/92 03/17/92 80,424 100
814 06 0120 / 16335 2812 N CALIFORNIA AVE 1.0 10/13/93 10/13/93 0 10/13/93 10/13/93 78,827 100
814 06 0108 / 16323 3600 N CENTRAL PARK AVE 1.0 10/26/94 10/26/94 0 10/26/94 10/26/94 83,419 100
814 06 0396 / 16583 3000 N KEDZIE AVE 1.0 04/19/91 04/19/91 0 04/19/91 04/19/91 96,382 100
814 06 0119 / 16334 3125 N KEDZIE AVE 1.0 10/27/92 10/27/92 0 10/27/92 10/27/92 78,827 100
814 06 0303 / 16515 3600 N KIMBALL AVE 1.0 02/20/90 02/20/90 0 02/20/90 02/20/90 44,226 100
814 06 0286 / 16498 3736 N KIMBALL AVE 1.0 11/20/91 11/20/91 0 11/20/91 11/20/91 123,207 100
814 06 0057 / 16273 2800 N SACRAMENTO AVE 1.0 04/16/91 04/16/91 0 04/16/91 04/16/91 96,382 100
814 06 0269 / 16481 3000 N SACRAMENTO AVE 1.0 12/23/91 12/23/91 0 12/23/91 12/23/91 35,000 100
814 06 0102 / 16317 3600 N ST LOUIS AVE 1.0 08/01/94 08/01/94 0 08/01/94 08/01/94 163,461 100
814 06 0124 / 16338 3648 W ADDISON ST 1.0 10/26/94 10/26/94 0 10/26/94 10/26/94 79,020 100

Totals per TSM Install 12.0 328,600 1,076,424

Totals per Traffic 589,907 1,141,137

Totals per Construction Phase 3,244,253 3,037,808

Totals for Ward 35 3,250,953 3,045,062


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 376

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32146 ON N OTTAWA AVE FROM W ADDISON ST TO W FOREST PRESERVE AVE 1.0 05/01/07 10/31/07 3,900 05/29/07 06/28/07 5,465 100
300 06 0308 / 5414 ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W GRAND AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,419 100
300 06 0282 / 5390 1713 N HARLEM AVE 1.0 08/19/04 08/26/04 1,000 08/19/04 08/26/04 1,000 100
300 06 0292 / 5399 6450 W BELMONT AVE 1.0 02/08/05 03/01/05 800 01/03/05 04/15/05 747 100

Totals per Design/Engineering 3.0 5,700 9,631


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 377

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 09 / 33102 ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE 14.0 06/09/08 06/13/08 5,600 06/09/08 06/13/08 3,025 100

Work Type: Alley Lighting/Lamps Installations


805 06 1701 / 7887 3657 N CUMBERLAND AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1083 / 7269 1921 N HARLEM AVE 1.0 09/12/96 09/12/96 0 09/12/96 09/12/96 300 100
805 06 1877 / 8063 2838 N NATCHEZ AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1931 / 8117 3600 N NEVA AVE 1.0 12/12/96 12/12/96 0 12/12/96 12/12/96 300 100
805 06 1932 / 8118 3620 N NEVA AVE 1.0 12/12/96 12/12/96 0 12/12/96 12/12/96 300 100
805 06 1907 / 8093 3356 N NEWLAND AVE 1.0 08/12/96 08/12/96 0 08/12/96 08/12/96 300 100
805 06 1910 / 8096 2436 N NORMANDY AVE 1.0 09/27/96 09/27/96 0 09/27/96 09/27/96 300 100
805 06 0600 / 6786 3918 N OCTAVIA AVE 1.0 07/16/96 07/16/96 0 07/16/96 07/16/96 300 100
805 06 0576 / 6762 3617 N OLEANDER AVE 1.0 11/13/96 11/13/96 0 11/13/96 11/13/96 300 100
805 06 1727 / 7913 3433 N PANAMA AVE 1.0 05/28/97 05/28/97 0 05/28/97 05/28/97 300 100
300 06 0139 / 5289 6839 W BELMONT AVE 1,977.0 03/01/06 09/01/06 45,478 05/17/06 06/02/06 59,733 100
302 00 0092 / 5774 6839 W BELMONT AVE 2.0 0 07/12/01 10/03/01 471 100
805 06 0978 / 7164 6939 W DIVERSEY AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0944 / 7130 7451 W FOREST PRESERVE AVE 1.0 06/28/96 06/28/96 0 06/28/96 06/28/96 300 100
805 06 1123 / 7309 7151 W GRAND AVE 1.0 12/20/96 12/20/96 0 12/20/96 12/20/96 300 100
805 06 1124 / 7310 7159 W GRAND AVE 1.0 12/20/96 12/20/96 0 12/20/96 12/20/96 300 100
805 06 1108 / 7294 7019 W HENDERSON ST 1.0 05/03/96 05/03/96 0 05/03/96 05/03/96 300 100

Totals per Alley Lighting/Lamps 1,994.0 45,478 64,704

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 6839 W BELMONT AVE 1,783.0 06/01/07 12/31/07 52,491 08/20/07 09/15/07 52,491 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 6839 W BELMONT AVE 1,713.0 0 05/08/02 05/11/02 31,190 100

Work Type: Flood Light Install Fixtures


302 00 0092 / 5774 2524 N SAYRE AVE 1.0 0 03/20/01 03/20/01 471 100
302 00 0092 / 5774 2558 N SAYRE AVE 1.0 0 03/20/01 03/20/01 471 100

Totals per Flood Light Install 2.0 0 942


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 378

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0292 / 5399 6450 W BELMONT AVE .0 03/01/05 12/31/05 6,097 09/27/05 10/04/05 4,593 100

Operations project Note Last Updated on 01-NOV-07

Work Type: Lighting Imprvmnts Projects


300 06 0282 / 5390 1713 N HARLEM AVE .0 10/06/04 10/31/04 0 09/14/04 09/21/04 13,453 100

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33102 ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE 9.0 08/04/08 08/15/08 12,150 08/04/08 08/15/08 10,242 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 6839 W BELMONT AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32146 ON N OTTAWA AVE FROM W ADDISON ST TO W FOREST PRESERVE AVE 4.0 07/15/07 03/15/08 263,000 0 95
300 06 0298 / 5405 ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE 2.0 05/15/05 06/30/05 0 05/02/05 06/10/05 119,717 100
300 06 0308 / 5414 ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W GRAND AVE 2.0 04/18/06 06/02/06 179,830 05/30/06 07/28/06 121,255 100

Totals per Residntl Staggered Lighting 8.0 442,830 240,972

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0122 / 5275 ON N NATCHEZ AVE FROM W BELDEN AVE TO W GRAND AVE 1.50 07/01/03 09/01/03 110,000 06/30/03 10/07/03 110,000 100

Work Type: Strt Light Pole Painting Locations


300 04 0216 / 5114 ON N NARRAGANSETT AVE FROM W FULLERTON AVE TO W DIVERSEY 15.50 05/01/06 11/01/06 3,353 05/17/06 11/01/06 3,353 100
AVE
300 09 / 33102 ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE 9.0 06/09/08 06/13/08 2,700 06/09/08 06/13/08 1,800 100
302 00 0076 / 5764 ON W NORTH AVE FROM N NAGLE AVE TO N NASHVILLE AVE 11.0 04/27/98 04/27/98 0 04/27/98 04/27/98 187 100

Totals per Strt Light Pole Painting 35.50 6,053 5,340

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 6839 W BELMONT AVE 1,139.0 03/01/04 12/01/04 5,922 10/17/06 10/19/06 12,404 100

Totals per Lighting/Electrical 686,621 549,356


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 379

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
300 06 0225 / 5340 1800 N NARRAGANSETT AVE 1.0 10/01/03 11/01/03 3,153 08/05/03 01/08/04 4,601 100
300 06 0225 / 5340 6400 W BLOOMINGDALE AVE 1.0 10/01/03 11/01/03 3,154 08/05/03 01/08/04 4,602 100

Totals per LED Signal Head Install 2.0 6,307 9,203

Work Type: Left Turn Arrow Locations


300 05 0036 / 5151 W ADDISON ST AND N HARLEM AVE 1.0 115,200 04/07/06 103,282 100
300 05 0036 / 5151 W ADDISON ST AND N OAK PARK AVE .50 40,250 04/06/06 33,535 100
300 05 0036 / 5151 W BELMONT AVE AND N HARLEM AVE 1.0 98,300 02/20/06 106,761 100

Totals per Left Turn Arrow 2.50 253,750 243,578

Work Type: Signals Intersections


300 06 0096 / 5258 6839 W BELMONT AVE 31.0 10/27/03 11/04/03 0 10/08/03 10/17/03 4,902 100

Work Type: TSM Install Locations


814 06 0059 / 16275 2100 N NARRAGANSETT AVE 1.0 07/12/95 07/12/95 0 07/12/95 07/12/95 127,326 100
300 11 / 32225 6650 W DIVERSEY AVE 1.0 7,000 0 0
814 06 0069 / 16285 6700 W GRAND AVE 1.0 09/16/94 09/16/94 0 09/16/94 09/16/94 101,159 100

Totals per TSM Install 3.0 7,000 228,485

Work Type: Traffic Equipment Painting Locations


300 09 / 33102 ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE 2.0 06/09/08 06/13/08 2,900 06/09/08 06/13/08 1,230 100

Totals per Traffic 269,957 487,398

Totals per Construction Phase 956,578 1,036,754

Totals for Ward 36 962,278 1,046,385


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 380

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0303 / 5409 ON N KOSTNER AVE FROM W HIRSCH ST TO W NORTH AVE .0 09/01/05 11/01/05 0 06/21/05 04/20/06 1,120 100
300 06 0308 / 5414 ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 354 100
300 06 / 32277 ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N LARAMIE AVE 4.0 04/01/08 08/30/08 260,000 04/29/08 0 70
210 06 0127 / 4386 N CICERO AVE AND W DIVISION ST 1.0 12/15/05 03/15/06 0 12/15/05 02/14/06 470 100
210 06 / 32040 W DIVISION ST AND N LARAMIE AVE .0 11/01/06 12/31/07 5,000 3,186 0
300 06 0292 / 5399 W NORTH AVE AND N KOSTNER AVE 1.0 04/01/05 04/25/05 5,000 02/03/05 02/15/05 5,000 100
300 06 0292 / 5399 4300 W DIVISION ST 1.0 01/22/05 02/04/05 1,000 01/03/05 02/10/05 742 100

Totals per Design/Engineering 7.0 271,000 10,872


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 381

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON N KARLOV AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 8.0 06/16/02 06/16/02 1,680 06/13/02 06/13/02 1,680 100
300 06 0069 / 5233 ON N KEYSTONE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 16.0 05/02/02 05/02/02 3,600 04/30/02 04/30/02 2,734 100
300 09 / 33103 ON N LATROBE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 7.0 11/20/08 11/20/08 2,800 11/20/08 11/20/08 1,280 100
300 03 0037 / 4908 ON N LATROBE AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 12.0 10/15/04 10/21/04 4,600 10/06/04 10/09/04 2,676 100
302 00 0092 / 5774 ON N LAVERGNE AVE FROM W CHICAGO AVE TO W IOWA ST 3.0 0 02/01/02 02/06/02 618 100
300 07 0037 / 5460 ON N LAVERGNE AVE FROM W IOWA ST TO W AUGUSTA BLVD 5.0 01/10/07 01/31/07 2,200 01/10/07 01/31/07 2,200 100

10620105 was found that work was don previously under work order at an earlier date. iris is being updated Note Last Updated on 25-FEB-08
302 00 0092 / 5774 ON N LAVERGNE AVE FROM W IOWA ST TO W AUGUSTA BLVD 3.0 0 02/01/02 02/06/02 618 100
302 00 0092 / 5774 ON N LECLAIRE AVE FROM W CHICAGO AVE TO W IOWA ST 3.0 0 02/01/02 02/06/02 618 100
300 07 0037 / 5460 ON N LECLAIRE AVE FROM W HIRSCH ST TO W LE MOYNE ST 5.0 04/18/06 11/18/06 2,200 04/18/06 11/18/06 2,200 100
302 00 0092 / 5774 ON N LECLAIRE AVE FROM W IOWA ST TO W AUGUSTA BLVD 3.0 0 02/01/02 02/06/02 618 100
300 06 0069 / 5233 ON N LECLAIRE AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 10.0 04/20/02 04/20/02 2,100 04/17/02 04/17/02 2,030 100
300 03 0037 / 4908 ON N LINDER AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 12.0 10/15/04 10/21/04 4,600 10/06/04 10/09/04 2,676 100
300 07 0037 / 5460 ON N LINDER AVE FROM W WABANSIA AVE TO W BLOOMINGDALE AVE 5.0 01/10/07 01/31/07 2,200 08/07/06 08/07/06 2,000 100
300 09 / 33103 ON N LOCKWOOD AVE FROM W GRAND AVE TO W FULLERTON AVE 11.0 10/22/08 10/22/08 4,400 10/22/08 10/22/08 2,869 100
300 03 0037 / 4908 ON N LOCKWOOD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 12.0 10/15/04 10/21/04 4,600 10/06/04 10/09/04 2,676 100
300 06 0122 / 5275 ON N LONG AVE FROM W DIVISION ST TO W POTOMAC AVE 5.0 11/20/03 11/21/03 2,075 11/05/03 11/05/03 1,575 100
300 03 0037 / 4908 ON N LONG AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 10.0 10/15/04 10/21/04 3,850 10/06/04 10/09/04 2,230 100
300 03 0037 / 4908 ON N LOREL AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 10.0 10/15/04 10/21/04 3,850 10/06/04 10/09/04 2,230 100
300 06 0122 / 5275 ON N LOTUS AVE FROM W HURON ST TO W CHICAGO AVE 10.0 07/20/03 07/21/03 4,150 06/17/03 06/17/03 2,599 100
300 03 0037 / 4908 ON N LOTUS AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 10.0 10/15/04 10/21/04 3,850 10/06/04 10/09/04 2,230 100
300 03 0037 / 4908 ON N LUNA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 7.0 10/15/04 10/21/04 2,625 10/06/04 10/09/04 1,561 100
300 07 0030 / 5453 ON N MONITOR AVE FROM W BELDEN AVE TO W BELMONT AVE 16.0 04/18/06 11/18/06 6,600 0 0
300 06 0069 / 5233 ON N PINE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 3.0 0 04/25/02 04/25/02 1,125 100
300 06 0069 / 5233 ON W AUGUSTA BLVD FROM N LONG AVE TO N CENTRAL AVE 10.0 0 04/25/02 04/25/02 3,750 100
300 06 0069 / 5233 ON W BLOOMINGDALE AVE FROM N CICERO AVE TO N LECLAIRE AVE 17.0 5,825 04/15/02 04/17/02 6,375 100
300 07 0037 / 5460 ON W CORTEZ ST FROM N LONG AVE TO N PINE AVE 5.0 01/10/07 01/31/07 2,100 01/10/07 01/31/07 2,100 100
300 07 0037 / 5460 ON W CRYSTAL ST FROM N PINE AVE TO N CENTRAL AVE 4.0 01/10/07 01/31/07 1,700 01/10/07 01/31/07 1,700 100
300 09 / 33103 ON W IOWA ST FROM N KOSTNER AVE TO N KILBOURN AVE 5.0 08/25/08 08/25/08 2,000 08/25/08 08/25/08 1,250 100
300 06 0122 / 5275 ON W KAMERLING AVE FROM N LONG AVE TO N PINE AVE 5.0 10/15/03 10/16/03 2,075 11/05/03 11/05/03 1,575 100
300 11 / 32226 ON W ST PAUL AVE FROM N CICERO AVE TO N LAMON AVE 5.0 08/01/07 08/10/07 2,200 08/18/07 08/18/07 1,226 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 382

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0069 / 5233 ON W ST PAUL AVE FROM N CICERO AVE TO N LECLAIRE AVE 17.0 5,825 04/15/02 04/17/02 6,375 100
300 06 0069 / 5233 ON W WABANSIA AVE FROM N CICERO AVE TO N LECLAIRE AVE 17.0 5,825 04/15/02 04/17/02 6,375 100
300 06 0069 / 5233 ON W WALTON ST FROM N LONG AVE TO N CENTRAL AVE 3.0 0 04/25/02 04/25/02 1,125 100
300 07 0037 / 5460 1100 N LATROBE AVE 5.0 04/18/06 11/18/06 2,200 01/05/07 01/05/07 0 100
300 06 0122 / 5275 1500 N LATROBE AVE 4.0 11/01/03 11/02/03 1,700 11/05/03 11/05/03 1,242 100
300 06 0069 / 5233 819 N LEAMINGTON AVE 3.0 12/15/03 12/15/03 1,125 02/10/04 02/10/04 581 100
300 06 0122 / 5275 1400 N LEAMINGTON AVE 11.0 05/10/03 05/12/03 4,900 05/01/03 05/01/03 3,122 100
300 11 / 32226 1600 N LINDER AVE 4.0 10/10/07 10/10/07 1,800 10/10/07 10/10/07 1,800 100
300 11 / 32226 1600-1700 N LINDER AVE 5.0 10/10/07 10/10/07 2,200 10/10/07 10/10/07 2,200 100
300 06 0069 / 5233 1800 N LINDER AVE 5.0 05/01/03 05/01/03 2,000 09/25/02 09/25/02 1,342 100
300 06 0069 / 5233 1800 N LONG AVE 5.0 09/28/02 09/28/02 2,000 09/25/02 09/25/02 1,342 100
302 00 0092 / 5774 2200 N LONG AVE 5.0 10/02/01 10/02/01 1,029 10/02/01 10/02/01 1,029 100
300 06 0069 / 5233 2340 N LOREL AVE 1.0 06/09/02 06/09/02 210 06/06/02 06/06/02 203 100
300 06 0069 / 5233 2350 N LOREL AVE 1.0 06/09/02 06/09/02 210 06/06/02 06/06/02 203 100
300 06 0069 / 5233 1800 N LOTUS AVE 5.0 09/28/02 09/28/02 2,000 09/25/02 09/25/02 1,342 100
302 00 0092 / 5774 4800-4899 W AUGUSTA BLVD 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4900-4999 W AUGUSTA BLVD 4.0 0 02/01/02 02/06/02 824 100
300 03 0037 / 4908 4300 W CORTEZ ST 5.0 05/20/04 05/21/04 2,075 05/14/04 05/14/04 1,167 100
302 00 0092 / 5774 4800-4899 W CORTEZ ST 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4900-4999 W CORTEZ ST 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4800-4899 W IOWA ST 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4900-4999 W IOWA ST 4.0 0 02/01/02 02/06/02 824 100
300 06 0069 / 5233 5500-5599 W IOWA ST 1.0 0 04/25/02 04/25/02 375 100
302 00 0092 / 5774 4800-4899 W RICE ST 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4900-4999 W RICE ST 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4800-4899 W THOMAS ST 3.0 0 02/01/02 02/06/02 618 100
302 00 0092 / 5774 4900-4999 W THOMAS ST 3.0 0 02/01/02 02/06/02 618 100
302 00 0092 / 5774 4800-4899 W WALTON ST 4.0 0 02/01/02 02/06/02 824 100
302 00 0092 / 5774 4900-4999 W WALTON ST 4.0 0 02/01/02 02/06/02 824 100

Totals per 250 Watt Changeout 380.0 112,979 98,318


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 383

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 38.50 04/04/05 11/18/05 15,400 07/10/05 08/01/05 13,475 100
300 03 0031 / 4902 ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD 91.50 05/18/04 05/25/04 36,600 05/15/04 06/01/04 34,037 100
300 07 0037 / 5460 ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE 97.0 04/18/06 11/18/06 38,800 12/04/06 01/22/07 38,800 100

Totals per 400 Watt Changeout 227.0 90,800 86,312

Work Type: Alley Lighting/Lamps Installations


300 06 0122 / 5275 ON N LOTUS AVE FROM W HURON ST TO W CHICAGO AVE 7.0 07/20/03 07/21/03 2,450 06/17/03 06/17/03 2,598 100
805 06 1146 / 7332 835 N KEELER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0345 / 6531 1141 N LARAMIE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2053 / 8239 2310 N LARAMIE AVE 1.0 01/11/96 01/11/96 0 01/11/96 01/11/96 300 100
805 06 0319 / 6505 1000 N LAWLER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0340 / 6526 1034 N LAWLER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0321 / 6507 1437 N LAWLER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0356 / 6542 1810 N LECLAIRE AVE 1.0 07/30/86 07/30/86 0 07/30/86 07/30/86 300 100
805 06 1753 / 7939 1746 N LINDER AVE 1.0 05/23/97 05/23/97 0 05/23/97 05/23/97 300 100
805 06 0338 / 6524 1534 N LONG AVE 1.0 06/19/96 06/19/96 0 06/19/96 06/19/96 300 100
805 06 1874 / 8060 1400 N LOREL AVE 1.0 05/30/96 05/30/96 0 05/30/96 05/30/96 300 100
805 06 1875 / 8061 1418 N LOREL AVE 1.0 05/06/96 05/06/96 0 05/06/96 05/06/96 300 100
805 06 1938 / 8124 4030 W CHICAGO AVE 1.0 03/14/97 03/14/97 0 03/14/97 03/14/97 300 100
805 06 1668 / 7854 4040 W CHICAGO AVE 1.0 07/17/97 07/17/97 0 07/17/97 07/17/97 300 100
805 06 1949 / 8135 4042 W CHICAGO AVE 1.0 01/31/97 01/31/97 0 01/31/97 01/31/97 300 100
805 06 0342 / 6528 4557 W NORTH AVE 1.0 10/06/95 10/06/95 0 10/06/95 10/06/95 300 100
300 06 0139 / 5289 5344 W NORTH AVE 1,233.0 03/01/06 09/01/06 30,017 06/01/06 06/19/06 37,254 100
302 00 0092 / 5774 5344 W NORTH AVE 28.0 0 01/09/01 01/13/02 6,598 100
805 06 0682 / 6868 5513 W NORTH AVE 1.0 03/28/95 03/28/95 0 03/28/95 03/28/95 300 100
805 06 1652 / 7838 5321 W POTOMAC AVE 1.0 07/29/97 07/29/97 0 07/29/97 07/29/97 300 100
805 06 1653 / 7839 5345 W POTOMAC AVE 1.0 07/29/97 07/29/97 0 07/29/97 07/29/97 300 100
805 06 0497 / 6683 4300 W WALTON ST 1.0 05/30/96 05/30/96 0 05/30/96 05/30/96 300 100

Totals per Alley Lighting/Lamps 1,287.0 32,467 52,150

Totals per Lighting/Electrical 3,373,630 2,698,872


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 384

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0215 / 5336 5344 W NORTH AVE 1,378.0 06/01/07 12/31/07 40,568 06/05/07 09/10/07 40,568 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5344 W NORTH AVE 1,233.0 0 06/15/02 06/18/02 22,451 100

Work Type: Flood Light Install Fixtures


302 00 0092 / 5774 5443 W HURON ST 1.0 0 03/28/01 03/28/01 471 100

Work Type: Lighting Imprvmnts Installations


300 06 0303 / 5409 ON N KOSTNER AVE FROM W HIRSCH ST TO W NORTH AVE 1.0 10/01/05 09/26/06 147,000 08/12/05 10/29/05 22,425 100
300 06 0292 / 5399 4300 W DIVISION ST .0 03/01/05 12/31/05 0 03/01/05 12/31/05 0 0

Operations project Note Last Updated on 01-NOV-07


Totals per Lighting Imprvmnts 1.0 147,000 22,425

Work Type: Ornamental - Piggyback Lighting Fixtures


300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 31.0 04/04/05 11/18/05 41,850 07/10/05 07/15/05 26,500 100
300 03 0031 / 4902 ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD 77.0 05/26/04 06/10/04 103,950 05/25/04 07/07/04 81,642 100

Totals per Ornamental - Piggyback Lighting 108.0 145,800 108,142

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5344 W NORTH AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 385

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0037 / 5460 ON N KEYSTONE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 2.0 04/18/06 11/18/06 170,000 03/19/07 05/31/07 96,542 100
300 05 0037 / 5152 ON N LATROBE AVE FROM W HIRSCH ST TO W NORTH AVE 2.0 04/04/05 11/18/05 170,000 09/07/05 11/18/05 126,305 100
300 09 / 33103 ON N LAVERGNE AVE FROM W HIRSCH ST TO W NORTH AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 06 0308 / 5414 ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE 1.0 08/25/06 10/25/06 84,842 09/05/06 04/27/07 20,179 100
300 11 / 32226 ON N LECLAIRE AVE FROM W HIRSCH ST TO W NORTH AVE 2.0 11/30/07 03/14/08 120,000 11/28/07 05/02/08 107,104 100
300 05 0037 / 5152 ON N LINDER AVE FROM W HIRSCH ST TO W NORTH AVE 2.0 04/04/05 11/18/05 170,000 09/01/05 11/18/05 111,574 100
300 09 / 33094 ON N LOCKWOOD AVE FROM W CHICAGO AVE TO W OHIO ST 1.0 65,000 0 0
300 03 0037 / 4908 ON N LOCKWOOD AVE FROM W HIRSCH ST TO W LE MOYNE ST 2.0 03/15/05 05/15/05 165,000 03/14/05 06/10/05 118,337 100
300 09 / 33103 ON N LONG AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 2.0 130,000 04/01/08 12/01/08 0 0
300 11 / 32226 ON N LOREL AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE 2.0 11/30/07 03/14/08 120,000 11/28/07 05/02/08 107,104 100
300 06 0298 / 5405 ON N PINE AVE FROM W OHIO ST TO W CHICAGO AVE 2.0 07/15/05 09/15/05 0 08/15/05 10/14/05 128,727 100
300 05 0037 / 5152 ON N PINE AVE FROM W OHIO ST TO W RACE AVE 2.0 04/04/05 11/18/05 85,000 08/15/05 10/14/05 91,671 100
300 06 / 32277 ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N LARAMIE AVE .0 05/04/08 12/31/08 0 0 0
300 05 0037 / 5152 ON W CRYSTAL ST FROM N LONG AVE TO N CENTRAL AVE 2.0 04/04/05 11/18/05 170,000 09/19/05 11/11/05 124,547 100
300 11 / 32226 ON W ST PAUL AVE FROM N CICERO AVE TO N LECLAIRE AVE 2.0 11/30/07 03/14/08 120,000 11/28/07 05/02/08 107,104 100

Totals per Residntl Staggered Lighting 26.0 1,699,842 1,139,194

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0252 / 5362 MC NAIR ACADEMIC CPS 2.0 08/01/03 08/29/03 79,580 07/10/03 09/02/03 87,933 100
300 06 0122 / 5275 ON N LAVERGNE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD 3.0 07/11/03 09/11/03 186,500 07/11/03 10/01/03 182,566 100
300 06 0232 / 5346 ON W CORTEZ ST FROM N CICERO AVE TO N LAVERGNE AVE 2.0 12/16/02 02/16/03 174,000 12/12/02 02/14/03 116,740 100
300 06 0267 / 5375 ON W IOWA ST FROM N CICERO AVE TO N LAMON AVE 2.0 05/18/04 07/18/04 147,333 05/03/04 09/16/04 148,699 100
300 03 0037 / 4908 ON W POTOMAC AVE FROM N CICERO AVE TO N LAVERGNE AVE 2.0 09/15/04 11/15/04 150,000 08/02/04 09/09/04 108,138 100
300 03 0037 / 4908 ON W POTOMAC AVE FROM N LONG AVE TO N CENTRAL AVE 2.0 10/15/04 12/15/04 150,000 11/18/04 03/18/05 101,249 100
300 06 0235 / 5349 ON W RICE ST FROM N CICERO AVE TO N LAVERGNE AVE 2.0 07/15/03 09/15/03 144,029 06/06/03 09/18/03 176,128 100

Totals per Residntl Strt Lighting/Lamps 15.0 1,031,442 921,453


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 386

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 1600 N LOCKWOOD AVE 1.0 0 04/12/01 04/12/01 378 100
302 00 0092 / 5774 800 N PINE AVE 1.0 0 04/12/01 04/12/01 378 100
302 00 0092 / 5774 5514 W CORTLAND ST 1.0 0 01/17/01 01/17/01 378 100
302 00 0092 / 5774 5547 W CORTLAND ST 1.0 0 01/17/01 01/17/01 378 100

Totals per Short Arm Installs - Residntl 4.0 0 1,512

Work Type: Strt Light Pole Painting Locations


302 00 0076 / 5764 ON N LARAMIE AVE FROM W HIRSCH ST TO W LE MOYNE ST 14.0 09/01/00 12/31/00 0 238
300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 31.0 04/04/05 11/18/05 7,750 06/27/05 07/15/05 6,324 100
302 00 0076 / 5764 ON N LAVERGNE AVE FROM W HIRSCH ST TO W LE MOYNE ST 9.0 09/01/00 12/31/00 0 153
302 00 0076 / 5764 ON N LAWLER AVE FROM W HIRSCH ST TO W LE MOYNE ST 9.0 09/01/00 12/31/00 0 153
302 00 0076 / 5764 ON N LEAMINGTON AVE FROM W HIRSCH ST TO W LE MOYNE ST 9.0 09/01/00 12/31/00 0 153
302 00 0076 / 5764 ON N LECLAIRE AVE FROM W HIRSCH ST TO W LE MOYNE ST 9.0 09/01/00 12/31/00 0 153
300 09 / 33096 ON N MONITOR AVE FROM W BELDEN AVE TO W ALTGELD ST 3.50 700 0 0
302 00 0076 / 5764 ON N PINE AVE FROM W DIVISION ST TO W POTOMAC AVE 5.0 07/20/98 07/20/98 0 07/20/98 07/20/98 85 100
300 03 0031 / 4902 ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD 101.0 05/10/04 06/04/04 27,425 05/10/04 06/04/04 24,084 100
302 00 0076 / 5764 ON W GRAND AVE FROM W DIVISION ST TO N LOREL AVE 61.50 09/01/00 12/31/00 0 1,046
300 07 0037 / 5460 ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE 87.0 04/18/06 11/18/06 21,750 12/22/06 01/22/07 22,011 100
302 00 0076 / 5764 ON W NORTH AVE FROM N CICERO AVE TO N CENTRAL AVE 96.0 09/01/00 12/31/00 0 1,632
300 04 0216 / 5114 ON W NORTH AVE FROM N KILPATRICK AVE TO N CICERO AVE 22.0 05/01/06 11/01/06 4,758 05/17/06 07/24/06 4,758 100
302 00 0076 / 5764 ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE 4.05 09/01/00 12/31/00 0 69
302 00 0077 / 5765 737 N CENTRAL AVE 9.0 0 06/22/99 06/22/99 786 100
302 00 0076 / 5764 5300-5400 W CRYSTAL ST 11.0 07/20/98 07/20/98 0 07/20/98 07/20/98 187 100
302 00 0076 / 5764 5300-5400 W DIVISION ST 17.0 09/01/00 12/31/00 0 289
302 00 0076 / 5764 5100 W HIRSCH ST 9.0 09/01/00 12/31/00 0 153
302 00 0076 / 5764 5000-5100 W LE MOYNE ST 9.0 09/01/00 12/31/00 0 153
302 00 0076 / 5764 5000-5100 W NORTH AVE 24.0 09/01/00 12/31/00 0 408
302 00 0076 / 5764 5300-5400 W POTOMAC AVE 10.0 09/01/00 12/31/00 0 170

Totals per Strt Light Pole Painting 550.05 62,383 63,004


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 387

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Traffic Signal Regrouping Lamps
300 06 0238 / 5352 5344 W NORTH AVE 1,647.0 06/01/06 12/31/06 9,000 10/13/06 10/19/06 8,564 100

Work Type: Underpass Lighting Fixtures


805 06 2112 / 8298 1813 N CICERO AVE 10.0 08/01/94 08/01/94 0 08/01/94 08/01/94 7,500 100
805 06 2463 / 8649 1930 N LARAMIE AVE 24.0 08/21/95 08/21/95 0 08/21/95 08/21/95 18,000 100
805 06 2663 / 8849 1895 N LECLAIRE AVE 10.0 12/14/94 12/14/94 0 12/14/94 12/14/94 7,500 100
805 06 2438 / 8624 1035 S KILDARE AVE 14.0 08/01/95 08/01/95 0 08/01/95 08/01/95 10,500 100
805 06 2319 / 8505 4601 W AUGUSTA BLVD 22.0 05/30/96 05/30/96 0 05/30/96 05/30/96 16,500 100
805 06 2287 / 8473 4533 W DIVISION ST 30.0 08/16/96 08/16/96 0 08/16/96 08/16/96 22,500 100
805 06 2288 / 8474 4533 W DIVISION ST 16.0 08/16/96 08/16/96 0 08/16/96 08/16/96 12,000 100
805 06 2256 / 8442 4601 W GRAND AVE 14.0 10/23/96 10/23/96 0 10/23/96 10/23/96 10,500 100
805 06 2822 / 9008 5600 W GRAND AVE 13.0 06/01/93 06/01/93 0 06/01/93 06/01/93 9,750 100
805 06 2376 / 8562 4575 W NORTH AVE 11.0 11/14/95 11/14/95 0 11/14/95 11/14/95 8,250 100
805 06 2377 / 8563 4575 W NORTH AVE 12.0 11/20/95 11/20/95 0 11/20/95 11/20/95 9,000 100
300 06 0217 / 5337 5344 W NORTH AVE 24.0 05/11/04 05/14/04 1,349 06/02/04 06/02/04 2,308 100

Totals per Underpass Lighting 200.0 1,349 134,308


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 388

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N KEELER AVE AND W DIVISION ST 1.0 0 12/04/01 12/04/01 7,324 100

Work Type: Left Turn Arrow Locations


210 06 0257 / 4493 N CENTRAL AVE AND W FULLERTON AVE .50 09/15/06 08/20/07 58,700 01/17/07 04/17/07 0 100

No true cost avail. Pending jcs adjustment Note Last Updated on 04-OCT-07
Awaiting ADA work. Note Last Updated on 21-JUN-07
210 06 0127 / 4386 N CICERO AVE AND W DIVISION ST 1.0 10/15/06 11/15/06 110,000 05/09/06 08/17/06 97,222 100
210 06 0171 / 4420 N CICERO AVE AND W NORTH AVE .0 03/01/07 12/31/07 0 0 0
210 06 / 32040 W DIVISION ST AND N LARAMIE AVE 1.0 11/01/06 12/31/07 85,000 08/08/07 75,422 99

waiting for cut over Note Last Updated on 17-JUN-08


210 06 0073 / 4337 800 N CICERO AVE 1.0 11/30/02 12/30/02 57,718 11/18/02 01/15/03 53,170 100

Totals per Left Turn Arrow 3.50 311,418 225,814

Work Type: New Signal Locations


300 06 0283 / 5391 N CENTRAL AVE AND W DIVISION ST .50 09/02/04 09/30/04 8,159 09/09/04 09/09/04 8,159 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N KOLMAR AVE AND W AUGUSTA BLVD 3.0 12,000 10/02/01 10/05/01 3,607 100

Work Type: Signals Intersections


300 06 0096 / 5258 5344 W NORTH AVE 41.0 11/12/03 11/20/03 0 10/31/03 11/06/03 6,483 100

Work Type: TSM Install Locations


814 06 0232 / 16444 800 N CICERO AVE 1.0 09/07/90 09/07/90 0 09/07/90 09/07/90 92,500 100
814 06 0203 / 16415 1000 N CICERO AVE 1.0 09/07/90 09/07/90 0 09/07/90 09/07/90 92,500 100
814 06 0204 / 16416 1200 N CICERO AVE 1.0 09/07/90 09/07/90 0 09/07/90 09/07/90 92,500 100
814 06 0260 / 16472 1400 N CICERO AVE 1.0 08/17/89 08/17/89 0 08/17/89 08/17/89 140,000 100
814 06 0177 / 16389 1813 N CICERO AVE 1.0 09/21/94 09/21/94 0 09/21/94 09/21/94 120,000 100
814 06 0138 / 16352 800 N LAVERGNE AVE 1.0 09/07/93 09/07/93 0 09/07/93 09/07/93 89,812 100

Totals per TSM Install 6.0 0 627,312

Totals per Traffic 346,377 889,200


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 389

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 05 0031 / 5146 ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE 13.0 04/04/05 11/18/05 4,850 06/27/05 07/15/05 2,652 100
300 07 0037 / 5460 ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE 31.0 04/18/06 11/18/06 9,950 12/22/06 01/22/07 7,849 100

Totals per Traffic Equipment Painting 44.0 14,800 10,501

Totals per Construction Phase 3,720,006 3,588,071

Totals for Ward 37 3,991,006 3,598,943


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 390

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32146 ON N MELVINA AVE FROM W IRVING PARK RD TO W MONTROSE AVE 1.0 05/01/07 10/31/07 3,900 08/23/07 09/20/07 197 100
300 06 0274 / 5382 ON N MENARD AVE FROM W EASTWOOD AVE TO W WILSON AVE .0 07/01/04 12/31/04 0 03/22/05 10/05/05 3,567 100
300 06 0274 / 5382 ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE .0 07/01/04 12/31/04 0 03/22/05 10/05/05 1,784 100
300 06 0274 / 5382 ON W CULLOM AVE FROM N MENARD AVE TO N MAJOR AVE .0 07/01/04 12/31/04 0 03/22/05 05/06/05 3,567 100
300 06 0308 / 5414 ON W PATTERSON AVE FROM N CICERO AVE TO N LAVERGNE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,716 100
210 06 0208 / 4451 N AUSTIN AVE AND W GRACE ST .0 07/01/04 10/01/04 0 03/09/04 05/13/05 6,457 100
210 06 0243 / 4480 W IRVING PARK RD AND N LONG AVE .0 12/26/06 01/26/07 500 12/26/06 01/26/07 1,275 100
281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Design/Engineering 1.0 4,400 19,563


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 391

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 11 / 32227 N CICERO AVE AND W PATTERSON AVE 10.0 4,200 0 0
300 06 0069 / 5233 4500 W PATTERSON AVE 4.0 06/07/02 06/07/02 840 06/04/02 06/04/02 812 100
300 06 0069 / 5233 4500 W WAVELAND AVE 4.0 06/07/02 06/07/02 840 06/04/02 06/04/02 812 100

Totals per 250 Watt Changeout 18.0 5,880 1,624

Work Type: 400 Watt Changeout Fixtures


300 11 / 32227 ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE 34.0 10/01/07 12/15/07 14,200 09/12/07 09/24/07 12,940 100
300 11 / 32227 ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD 40.0 10/01/07 12/15/07 16,400 09/15/07 09/24/07 12,392 100
300 11 / 32227 ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE 80.0 10/01/07 12/15/07 32,600 09/21/07 09/25/07 23,908 100
300 09 / 33096 ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE 2.60 10/27/08 11/01/07 1,040 10/27/08 11/01/07 993 100
300 11 / 32227 ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE 25.0 10/01/07 12/01/07 10,600 09/15/07 09/25/07 8,478 100

Totals per 400 Watt Changeout 181.60 74,840 58,711

Work Type: Alley Lighting/Lamps Installations


805 06 1664 / 7850 3514 N CICERO AVE 1.0 08/15/97 08/15/97 0 08/15/97 08/15/97 300 100
805 06 2030 / 8216 4200 N KILDARE AVE 1.0 09/13/95 09/13/95 0 09/13/95 09/13/95 300 100
805 06 1853 / 8039 3705 N LOWELL AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0092 / 5774 4422 N MC VICKER AVE 1.0 0 12/04/01 12/04/01 236 100
805 06 1817 / 8003 4518 N MEADE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1921 / 8107 3920 N MOBILE AVE 1.0 06/06/96 06/06/96 0 06/06/96 06/06/96 300 100
805 06 1922 / 8108 3940 N MOBILE AVE 1.0 06/06/96 06/06/96 0 06/06/96 06/06/96 300 100
805 06 1975 / 8161 4419 N MONITOR AVE 1.0 08/02/96 08/02/96 0 08/02/96 08/02/96 300 100
805 06 1900 / 8086 4237 N NARRAGANSETT AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1792 / 7978 5741 W CORNELIA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1309 / 7495 6428 W DAKIN ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1111 / 7297 4648 W GRACE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1152 / 7338 6031 W GUNNISON ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
300 06 0139 / 5289 5817 W IRVING PARK RD 1,719.0 03/01/06 09/01/06 39,894 04/10/06 04/28/06 51,938 100
302 00 0092 / 5774 5817 W IRVING PARK RD 14.0 0 03/15/01 01/17/02 3,299 100
805 06 0543 / 6729 6235 W PATTERSON AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 300 100

Totals per Alley Lighting/Lamps 1,747.0 39,894 59,373


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 392

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0215 / 5336 5817 W IRVING PARK RD 1,450.0 06/01/07 12/31/07 42,688 09/01/07 09/15/07 42,688 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5817 W IRVING PARK RD 1,355.0 0 04/18/02 04/21/02 24,672 100

Work Type: Flood Light Install Fixtures


300 06 0071 / 5234 4100 N LONG AVE 02/01/98 06/30/98 117,500 03/01/98 06/17/98 38,457 100
302 00 0092 / 5774 4250 N MELVINA AVE 2.0 0 02/16/01 02/16/01 941 100
302 00 0092 / 5774 5700 W BERTEAU AVE 2.0 0 09/21/01 09/21/01 689 100
302 00 0092 / 5774 5815 W IRVING PARK RD 1.0 0 09/21/01 09/21/01 404 100

Totals per Flood Light Install 5.0 117,500 40,491

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts .0 0 0

Work Type: Lighting Imprvmnts Installations


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts .0 0 0

Work Type: Loop Lighting Blocks


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Loop Lighting .0 0 0

Totals per Lighting/Electrical 1,520,392 2,708,841


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 393

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 11 / 32227 ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE 30.0 10/01/07 12/15/07 40,500 10/10/07 10/10/07 34,200 100
300 11 / 32227 ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD 32.0 10/01/07 12/15/07 43,200 10/10/07 10/10/07 36,640 100
300 11 / 32227 ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE 53.0 10/01/07 12/15/07 71,550 10/10/07 10/10/07 60,685 100
300 09 / 33096 ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE 5.07 12/22/08 01/16/09 6,845 12/22/08 01/16/09 6,895 100
300 11 / 32227 ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE 42.0 10/01/07 12/01/07 56,700 10/10/07 10/10/07 48,090 100

Totals per Ornamental - Piggyback Lighting 162.07 218,795 186,510

Work Type: Ornamental Lighting Blocks


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Ornamental Lighting .0 0 0

Work Type: POD Camera Pole Poles


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per POD Camera Pole .0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5817 W IRVING PARK RD .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 / 32146 ON N MELVINA AVE FROM W IRVING PARK RD TO W MONTROSE AVE 4.0 12/05/07 03/02/08 295,049 12/28/07 0 50
300 06 0298 / 5405 ON N NEW ENGLAND AVE FROM W BYRON ST TO W GRACE ST 1.0 09/01/05 10/15/05 0 08/15/05 10/03/05 66,215 100
300 06 0298 / 5405 ON N NEWLAND AVE FROM W BYRON ST TO W GRACE ST 1.0 09/01/05 10/15/05 0 08/15/05 10/03/05 66,215 100
300 06 0308 / 5414 ON W PATTERSON AVE FROM N CICERO AVE TO N LAVERGNE AVE 2.0 04/01/06 06/01/06 235,932 03/27/06 05/24/06 155,625 100

Totals per Residntl Staggered Lighting 8.0 530,981 288,055

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON N KOSTNER AVE FROM W IRVING PARK RD TO W BERTEAU AVE 2.0 06/28/04 08/12/04 129,596 06/18/04 08/04/04 137,213 100
300 06 0235 / 5349 ON N MENARD AVE FROM W GRACE ST TO W IRVING PARK RD 2.0 06/01/03 08/01/03 122,608 05/21/03 07/31/03 117,302 100

Totals per Residntl Strt Lighting/Lamps 4.0 252,204 254,515


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 394

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Arterial Locations
281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Arterial .0 0 0

Work Type: Short Arm Installs - Residntl Locations


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Short Arm Installs - Residntl .0 0 0

Work Type: Strt Light Pole Painting Locations


300 11 / 32227 ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE 30.0 06/15/07 07/10/07 6,600 06/15/07 07/10/07 6,600 100
302 00 0076 / 5764 ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE 38.0 09/01/00 12/31/00 0 646
300 11 / 32227 ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD 32.0 06/15/07 07/08/07 7,040 06/15/07 07/08/07 7,040 100
300 11 / 32227 ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE 53.0 06/15/07 07/10/07 11,660 06/15/07 07/10/07 11,660 100
300 04 0216 / 5114 ON W ADDISON ST FROM N LARAMIE AVE TO N CICERO AVE 32.0 05/01/06 11/01/06 6,705 05/17/06 07/09/06 6,705 100
300 09 / 33096 ON W BELMONT AVE FROM N LONG AVE TO N LAVERGNE AVE 4.55 10/27/08 10/31/08 1,365 10/27/08 10/31/08 1,174 100
300 11 / 32227 ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE 42.0 07/10/07 08/01/07 9,240 07/10/07 08/01/07 9,240 100

Totals per Strt Light Pole Painting 231.55 42,610 43,065

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 3927 N CENTRAL AVE .0 01/01/08 12/31/08 0 0 0
300 06 0098 / 5259 3900-5100 N PULASKI RD 12.0 04/01/01 02/28/03 0 04/18/01 02/11/03 1,238,325 100
281 00 / 33670 6008 W GIDDINGS ST .0 01/01/08 12/31/08 0 0 0

Totals per Strt Light Pole Replacmnt/Reloc 12.0 0 1,238,325

Work Type: Strt Lighting Blocks


300 06 0274 / 5382 ON N MENARD AVE FROM W EASTWOOD AVE TO W WILSON AVE .50 11/01/05 05/15/06 35,000 11/01/05 05/15/06 61,256 100
300 06 0274 / 5382 ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE 1.0 06/20/06 08/31/06 75,000 06/20/06 08/31/06 30,628 100
300 06 0274 / 5382 ON W CULLOM AVE FROM N MENARD AVE TO N MAJOR AVE 1.0 11/01/05 05/15/06 75,000 11/01/05 05/15/06 61,256 100

Totals per Strt Lighting 2.50 185,000 153,140


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 395

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Traffic Signal Regrouping Lamps
300 06 0238 / 5352 5817 W IRVING PARK RD 1,847.0 06/01/06 12/31/06 10,000 11/16/06 11/21/06 9,604 100

Work Type: Underpass Lighting Fixtures


302 00 0072 / 5760 4000 N KEELER AVE 1.0 0 07/16/99 11/04/99 49,326 100
805 06 2263 / 8449 4010 N KEELER AVE 8.0 08/14/96 08/14/96 0 08/14/96 08/14/96 6,000 100
805 06 2423 / 8609 4212 N KOSTNER AVE 8.0 09/06/95 09/06/95 0 09/06/95 09/06/95 6,000 100
302 00 0072 / 5760 4220 N KOSTNER AVE 1.0 0 07/02/99 08/03/99 37,841 100
805 06 2910 / 9096 3750 N MILWAUKEE AVE 10.0 07/29/94 07/29/94 0 07/29/94 07/29/94 7,500 100
805 06 2911 / 9097 3820 N MILWAUKEE AVE 6.0 07/29/94 07/29/94 0 07/29/94 07/29/94 4,500 100
302 00 0072 / 5760 3900 N PULASKI RD 1.0 0 07/01/99 08/20/99 45,260 100
302 00 0071 / 5759 4440 W ADDISON ST 0 10/13/98 10/19/98 9,795 100
805 06 2662 / 8848 4560 W ADDISON ST 4.0 04/16/92 04/16/92 0 04/16/92 04/16/92 3,000 100
302 00 0071 / 5759 4600 W ADDISON ST 0 09/25/98 10/02/98 9,096 100
805 06 2261 / 8447 4198 W IRVING PARK RD 14.0 12/09/96 12/09/96 0 12/09/96 12/09/96 10,500 100
805 06 2912 / 9098 4533 W IRVING PARK RD 13.0 07/09/93 07/09/93 0 07/09/93 07/09/93 9,750 100
805 06 2260 / 8446 4540 W IRVING PARK RD 146.0 12/13/96 12/13/96 0 12/13/96 12/13/96 109,500 100

Totals per Underpass Lighting 212.0 0 308,068


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 396

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N LAVERGNE AVE AND W ADDISON ST 1.0 0 11/22/02 11/22/02 7,324 100
210 06 0130 / 4389 N LONG AVE AND W ADDISON ST 1.0 0 10/24/01 10/24/01 8,539 100
210 06 0130 / 4389 N MELVINA AVE AND W IRVING PARK RD 1.0 0 01/29/02 01/29/02 7,324 100
210 06 0130 / 4389 N MENARD AVE AND W IRVING PARK RD 1.0 0 01/30/02 01/30/02 7,324 100

Totals per LED Signal Head Install 4.0 0 30,511

Work Type: Left Turn Arrow Locations


210 06 0231 / 4470 W ADDISON ST AND N CENTRAL AVE .0 03/01/08 12/01/08 125,682 0 0
300 05 0036 / 5151 W ADDISON ST AND N OAK PARK AVE .50 40,250 04/06/06 33,535 100
210 06 0256 / 4492 W BELMONT AVE AND N CENTRAL AVE .50 09/01/05 06/30/07 61,036 01/02/07 10/19/07 0 100

Awaiting ADA work. Note Last Updated on 21-JUN-07


300 11 / 32227 W IRVING PARK RD AND N KEELER AVE 1.0 02/11/08 06/15/08 44,000 02/21/08 03/21/08 46,182 100
210 06 / 32040 W IRVING PARK RD AND N OAK PARK AVE 1.0 11/01/06 12/31/07 85,000 01/16/08 06/04/08 124,243 100
300 06 0199 / 5324 W MONTROSE AVE AND N LARAMIE AVE .50 11/01/01 11/28/01 3,078 11/07/01 11/08/01 4,980 100

Totals per Left Turn Arrow 3.50 359,045 208,940

Work Type: New Signal Locations


210 06 0208 / 4451 N AUSTIN AVE AND W GRACE ST 1.0 07/15/04 09/15/04 200,000 07/06/04 09/02/04 155,090 100
210 06 0075 / 4339 W MONTROSE AVE AND N KNOX AVE 09/01/04 11/01/04 90,500 07/26/04 07/07/05 114,304 100

Totals per New Signal 1.0 290,500 269,394

Work Type: Pedestrian Countdown Signal Install Locations


210 06 / 32280 N AUSTIN AVE AND W IRVING PARK RD .0 05/04/08 12/31/08 10,500 0 0
210 06 0243 / 4480 W IRVING PARK RD AND N LONG AVE .0 03/15/06 05/08/07 12,000 12/29/06 02/09/07 8,248 100

Totals per Pedestrian Countdown Signal Install .0 22,500 8,248

Work Type: Pedestrian Crosswalk Signals Locations


210 06 0240 / 4477 W BERTEAU AVE AND N NARRAGANSETT AVE .0 11/01/05 08/30/07 27,760 11/01/05 23,122 100

Actual division doing this job wo#1061320 is construction. This is not an Operations job. Note Last Updated on 29-JAN-08
Target Construction Completion Date set for 6/15/07. Note Last Updated on 30-MAY-07
Totals per Traffic 1,256,055 2,177,739
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 397

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Signal Realignment Intersections
300 06 0199 / 5324 W IRVING PARK RD AND N NEENAH AVE 1.0 05/01/01 12/01/01 11,400 03/23/01 03/30/01 13,641 100

Work Type: Signals Intersections


300 06 0096 / 5258 5817 W IRVING PARK RD 30.0 11/01/03 11/07/03 0 10/10/03 10/17/03 4,744 100

Work Type: TSM Install Locations


210 06 0072 / 4336 W GRACE ST AND N LARAMIE AVE .50 02/12/01 04/12/01 75,000 02/01/01 04/02/01 72,768 100
814 06 0317 / 16525 3800 N CENTRAL AVE 1.0 09/01/97 09/01/97 0 09/01/97 12/23/97 200,000 100
210 06 0074 / 4338 4500 N CENTRAL AVE 1.0 02/01/03 04/01/03 141,000 12/24/02 02/10/03 155,005 100
814 06 0073 / 16289 3300 N CICERO AVE 1.0 02/14/96 02/14/96 0 02/14/96 02/14/96 107,451 100
814 06 0230 / 16442 3400 N CICERO AVE 1.0 08/21/90 08/21/90 0 08/21/90 08/21/90 37,173 100
814 06 0229 / 16441 3600 N CICERO AVE 1.0 09/07/90 09/07/90 0 09/07/90 09/07/90 37,173 100
814 06 0268 / 16480 4000 N KEELER AVE 1.0 03/11/92 03/11/92 0 03/11/92 03/11/92 80,424 100
814 06 0117 / 16332 4023 N KEELER AVE 1.0 11/03/93 11/03/93 0 11/03/93 11/03/93 95,365 100
814 06 0082 / 16298 4100 N KEELER AVE 1.0 10/25/94 10/25/94 0 10/25/94 10/25/94 50,417 100
814 06 0350 / 16548 4400 N KEELER AVE 1.0 08/27/91 08/27/91 0 08/27/91 08/27/91 73,893 100
814 06 0358 / 16553 4000 N KILDARE AVE 1.0 11/25/91 11/25/91 0 11/25/91 11/25/91 73,893 100
210 06 0072 / 4336 3600 N MELVINA AVE 1.0 03/01/01 05/01/01 150,000 03/13/01 04/16/01 118,009 100
210 06 0072 / 4336 3800 N MILWAUKEE AVE 1.0 12/31/01 04/15/02 150,000 3,528 100
814 06 0054 / 16271 4000 N NARRAGANSETT AVE 1.0 11/15/95 11/15/95 0 11/15/95 11/15/95 8,586 100
814 06 0098 / 16314 4000 N NARRAGANSETT AVE 1.0 03/25/93 03/25/93 0 03/25/93 03/25/93 44,179 100
814 06 0180 / 16392 4199 N NARRAGANSETT AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 200,000 100
814 06 0261 / 16473 3999 N NATCHEZ AVE 1.0 08/08/90 08/08/90 0 08/08/90 08/08/90 110,172 100
814 06 0216 / 16428 4141 W IRVING PARK RD 1.0 12/22/95 12/22/95 0 12/22/95 12/22/95 125,000 100
300 06 0078 / 5241 6532 W IRVING PARK RD 1.0 04/01/98 12/01/98 5,000 05/18/98 05/19/98 2,254 100

Totals per TSM Install 18.50 521,000 1,595,290


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 398

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 11 / 32227 ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE 13.0 06/15/07 07/10/07 4,450 06/15/07 07/10/07 4,450 100
300 11 / 32227 ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD 16.0 06/15/07 07/08/07 5,700 06/15/07 07/08/07 5,700 100
300 11 / 32227 ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE 26.0 06/15/07 07/16/07 9,600 06/15/07 07/16/07 9,600 100
300 11 / 32227 ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE 12.0 07/10/07 08/01/07 4,100 07/10/07 08/01/07 4,100 100

Totals per Traffic Equipment Painting 67.0 23,850 23,850

Totals per Construction Phase 2,776,447 4,886,580

Totals for Ward 38 2,780,847 4,906,143


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 399

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON N KEELER AVE FROM W LAWRENCE AVE TO W FOSTER AVE 4.0 04/01/08 08/30/08 260,000 04/14/08 05/09/08 0 100
300 06 / 32275 ON N KEYSTONE AVE FROM W LAWRENCE AVE TO W ARGYLE ST .0 03/01/07 10/31/07 3,900 01/30/07 02/27/07 2,366 100
300 06 0308 / 5414 ON N TRIPP AVE FROM W FOSTER AVE TO W ARGYLE ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,562 100
210 06 0127 / 4386 N CICERO AVE AND W LAWRENCE AVE .0 12/15/05 03/15/06 0 0 0
210 06 0158 / 5058 W IRVING PARK RD AND N PULASKI RD .0 10/01/07 12/31/07 0 0 0

Needs Requirements Note Last Updated on 16-MAR-07


210 06 0158 / 5058 W LAWRENCE AVE AND N KIMBALL AVE .0 08/15/05 12/31/05 0 08/15/05 12/31/05 235 100
210 06 0209 / 4452 W LAWRENCE AVE AND N PULASKI RD 1.0 07/01/04 12/31/04 0 07/01/04 12/31/04 4,044 100
210 06 0158 / 5058 W PETERSON AVE AND N KIMBALL AVE .0 08/15/05 12/31/05 0 08/15/05 12/31/05 235 100

Totals per Design/Engineering 5.0 263,900 9,441


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 400

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0122 / 5275 ON N HAMLIN AVE FROM W GRACE ST TO W BYRON ST 5.0 11/01/03 11/02/03 2,200 03/01/05 03/02/05 1,232 100
300 06 0122 / 5275 ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 14.50 08/01/03 09/01/03 5,688 07/01/03 07/28/03 3,119 100
300 06 0122 / 5275 ON N KOLMAR AVE FROM N ELSTON AVE TO W CARMEN AVE 9.0 12/21/04 12/22/04 3,800 03/01/05 03/02/05 2,214 100
300 06 0122 / 5275 ON N LAWNDALE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE 87.50 08/01/03 09/01/03 34,219 07/01/03 07/28/03 19,610 100
300 06 0122 / 5275 ON W AINSLIE ST FROM N PULASKI RD TO N KIMBALL AVE 16.0 12/21/04 12/22/04 6,600 03/01/05 03/02/05 3,937 100
300 06 0122 / 5275 ON W LAWRENCE AVE FROM N KIMBALL AVE TO N KEDZIE AVE 323.0 11/10/03 11/30/03 127,500 10/30/03 11/28/03 77,597 100
300 05 0039 / 5154 3800 N HAMLIN AVE .0 2,956 0 0
300 06 0069 / 5233 4632 N KARLOV AVE 1.0 06/30/02 06/30/02 210 06/27/02 06/27/02 203 100
300 06 0069 / 5233 4843 N ST LOUIS AVE 1.0 06/17/02 06/17/02 210 06/14/02 06/14/02 203 100
300 05 0039 / 5154 3400-4000 W AINSLIE ST .0 2,956 0 0
302 00 0092 / 5774 3722 W WINDSOR AVE 1.0 0 11/14/01 11/14/01 206 100
302 00 0092 / 5774 3734 W WINDSOR AVE 1.0 0 11/14/01 11/14/01 206 100
302 00 0092 / 5774 3748 W WINDSOR AVE 1.0 0 11/14/01 11/14/01 206 100

Totals per 250 Watt Changeout 460.0 186,339 108,732

Work Type: 400 Watt Changeout Fixtures


300 03 0040 / 4911 ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE 7.50 07/30/04 08/30/04 3,000 07/14/04 08/10/04 1,961 100
300 03 0040 / 4911 ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE 5.07 08/20/04 09/20/04 2,028 07/14/04 08/10/04 1,325 100
300 03 0040 / 4911 ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 2.50 08/20/04 09/20/04 1,000 07/14/04 08/10/04 654 100
300 03 0039 / 4910 ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE 7.0 10/01/04 10/05/04 3,075 10/01/04 10/01/04 1,036 100
300 03 0050 / 4921 ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE 20.16 10/01/04 10/20/04 8,064 08/27/04 09/06/04 5,615 100

Totals per 400 Watt Changeout 42.23 17,167 10,590

Totals per Lighting/Electrical 2,400,297 2,307,186


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 401

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1539 / 7725 4339 N AVERS AVE 1.0 10/22/97 10/22/97 0 10/22/97 10/22/97 300 100
805 06 0873 / 7059 4832 N BERNARD ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2087 / 8273 4825 N CENTRAL PARK AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2074 / 8260 4832 N CENTRAL PARK AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0423 / 6609 4833 N CHRISTIANA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0461 / 6647 4901 N CHRISTIANA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0389 / 6575 6215 N CICERO AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0370 / 6556 6224 N CICERO AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0351 / 6537 6323 N CICERO AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1187 / 7373 4834 N DRAKE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0952 / 7138 4137 N ELSTON AVE 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
805 06 1206 / 7392 4409 N ELSTON AVE 1.0 08/28/96 08/28/96 0 08/28/96 08/28/96 300 100
805 06 1669 / 7855 4920 N HAMLIN AVE 1.0 07/17/97 07/17/97 0 07/17/97 07/17/97 300 100
805 06 1211 / 7397 5745 N JERSEY AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 1439 / 7625 5749 N JERSEY AVE 1.0 10/25/96 10/25/96 0 10/25/96 10/25/96 300 100
805 06 1670 / 7856 4136 N KEDVALE AVE 1.0 07/18/97 07/18/97 0 07/18/97 07/18/97 300 100
805 06 1477 / 7663 5138 N KEELER AVE 1.0 11/20/97 11/20/97 0 11/20/97 11/20/97 300 100
805 06 1185 / 7371 4035 N KEYSTONE AVE 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 0590 / 6776 4240 N KEYSTONE AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 0305 / 6491 4250 N KEYSTONE AVE 1.0 03/27/95 03/27/95 0 03/27/95 03/27/95 300 100
805 06 2026 / 8212 5145 N KILBOURN AVE 1.0 05/07/96 05/07/96 0 05/07/96 05/07/96 300 100
805 06 2042 / 8228 4831 N KIMBALL AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2033 / 8219 4905 N KIMBALL AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1987 / 8173 5807 N KOLMAR AVE 1.0 10/08/96 10/08/96 0 10/08/96 10/08/96 300 100
805 06 1999 / 8185 5901 N KOSTNER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2000 / 8186 4856 N KRUGER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1540 / 7726 6128 N PULASKI RD 1.0 10/22/97 10/22/97 0 10/22/97 10/22/97 300 100
805 06 0637 / 6823 6063 N SAUGANASH AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
805 06 0626 / 6812 4837 N SAWYER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0659 / 6845 4818 N SPAULDING AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1681 / 7867 5235 N SPAULDING AVE 1.0 06/24/97 06/24/97 0 06/24/97 06/24/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 402

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0523 / 6709 4120 N SPRINGFIELD AVE 1.0 05/24/95 05/24/95 0 05/24/95 05/24/95 300 100
805 06 0433 / 6619 4318 N SPRINGFIELD AVE 1.0 07/17/96 07/17/96 0 07/17/96 07/17/96 300 100
805 06 0406 / 6592 4927 N SPRINGFIELD AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0420 / 6606 4945 N ST LOUIS AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0391 / 6577 4952 N ST LOUIS AVE 1.0 06/25/96 06/25/96 0 06/25/96 06/25/96 300 100
805 06 0392 / 6578 5202 N ST LOUIS AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0421 / 6607 5722 N ST LOUIS AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0359 / 6545 3212 W LAWRENCE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
300 06 0139 / 5289 4404 W LAWRENCE AVE 1,686.0 03/01/06 09/01/06 39,180 04/17/06 05/01/06 50,941 100
805 06 0357 / 6543 4630 W LAWRENCE AVE 1.0 03/21/97 03/21/97 0 03/21/97 03/21/97 300 100
805 06 1688 / 7874 3717 W WILSON AVE 1.0 07/01/97 07/01/97 0 07/01/97 07/01/97 300 100

Totals per Alley Lighting/Lamps 1,727.0 39,180 63,241

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 4404 W LAWRENCE AVE 1,428.0 06/01/07 12/31/07 42,040 09/01/07 09/15/07 42,040 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 4404 W LAWRENCE AVE 1,333.0 0 04/07/02 04/10/02 24,271 100

Work Type: Lighting Imprvmnts Blocks


300 06 0228 / 5343 ON W FOSTER AVE FROM N KEDZIE AVE TO N KIMBALL AVE 2.0 07/01/02 08/30/02 45,000 04/16/02 04/29/02 44,952 100

Work Type: Lighting Imprvmnts Projects


300 06 0199 / 5324 W PETERSON AVE AND N KOSTNER AVE 1.0 18,400 11/26/01 01/24/02 16,247 100

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 4404 W LAWRENCE AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 403

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 07 0039 / 5462 ON N KEDVALE AVE FROM W ARGYLE ST TO W CARMEN AVE 1.0 07/10/06 08/25/06 65,000 09/05/06 11/27/06 64,578 100
300 06 0298 / 5405 ON N KEDVALE AVE FROM W LAWRENCE AVE TO W ARGYLE ST 2.0 07/01/05 08/10/05 0 07/01/05 08/19/05 95,592 100
300 06 / 32277 ON N KEELER AVE FROM W LAWRENCE AVE TO W FOSTER AVE .0 05/04/08 12/31/08 0 0 0
300 07 0039 / 5462 ON N KENNETH AVE FROM W LAWRENCE AVE TO W FOSTER AVE 4.0 06/30/06 09/29/06 300,000 07/20/06 11/10/06 229,668 100
300 06 / 32275 ON N KEYSTONE AVE FROM W LAWRENCE AVE TO W ARGYLE ST 2.0 04/01/07 12/31/07 210,094 03/28/07 07/13/07 122,730 100
300 05 0039 / 5154 ON N KILBOURN AVE FROM N ELSTON AVE TO W FOSTER AVE .0 139,606 0 0
300 09 / 33105 ON N KILDARE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 4.0 200,000 04/01/08 12/01/08 0 0
300 05 0039 / 5154 ON N KILPATRICK AVE FROM N ELSTON AVE TO W LAWRENCE AVE .0 09/15/06 11/14/06 51,661 0 0
300 07 0039 / 5462 ON N KILPATRICK AVE FROM W LAWRENCE AVE TO N ELSTON AVE 1.0 04/18/06 11/18/06 33,339 12/12/06 05/18/07 0 100
300 05 0039 / 5154 ON N KOLMAR AVE FROM W CARMEN AVE TO N ELSTON AVE .0 20,347 0 0
300 07 0039 / 5462 ON N KOSTNER AVE FROM W LAWRENCE AVE TO W FOSTER AVE 4.0 06/30/06 09/29/06 300,000 07/20/06 11/10/06 229,668 100
300 07 0039 / 5462 ON N TRIPP AVE FROM W ARGYLE ST TO W LAWRENCE AVE 2.0 06/15/06 08/18/06 140,000 07/06/06 09/06/06 109,105 100
300 06 0308 / 5414 ON N TRIPP AVE FROM W FOSTER AVE TO W ARGYLE ST 2.0 03/16/06 12/31/06 118,306 07/06/06 09/06/06 118,197 100

Totals per Residntl Staggered Lighting 22.0 1,578,353 969,538

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N BERNARD ST FROM W FOSTER AVE TO W BERWYN AVE 2.0 05/15/03 07/15/03 150,943 05/05/03 06/06/03 133,764 100
300 06 0267 / 5375 ON N KOLMAR AVE FROM W CARMEN AVE TO W FOSTER AVE 1.0 07/15/04 09/15/04 69,244 06/23/04 08/16/04 62,432 100

Totals per Residntl Strt Lighting/Lamps 3.0 220,187 196,196

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 4246 N LAWNDALE AVE 1.0 0 03/01/01 03/01/01 378 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 404

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 09 / 33105 ON N CHRISTIANA AVE FROM W LAWRENCE AVE TO W ARGYLE ST 7.0 09/03/08 09/19/08 1,400 09/03/08 09/19/08 840 100
300 03 0040 / 4911 ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE 7.50 05/10/04 09/10/04 1,875 05/10/04 08/01/04 2,025 100
300 03 0040 / 4911 ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE 7.54 05/10/04 09/10/04 2,262 05/10/04 08/01/04 2,036 100
300 09 / 33105 ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 13.0 09/10/08 09/24/08 3,900 09/10/08 09/24/08 2,730 100
300 03 0040 / 4911 ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 4.0 05/10/04 09/10/04 1,450 05/10/04 08/01/04 1,080 100
300 09 / 33105 ON N SAWYER AVE FROM W LAWRENCE AVE TO W CARMEN AVE 13.0 09/03/08 09/19/08 2,600 09/03/08 09/19/08 1,560 100
300 09 / 33105 ON N SPAULDING AVE FROM W LAWRENCE AVE TO W CARMEN AVE 16.0 09/03/08 09/19/08 3,200 09/03/08 09/19/08 1,920 100
300 09 / 33105 ON W AINSLIE ST FROM N CENTRAL PARK AVE TO N KEDZIE AVE 3.0 12/03/08 12/04/08 390 12/03/08 12/04/08 378 100
300 09 / 33105 ON W ARGYLE ST FROM N CENTRAL PARK AVE TO N KEDZIE AVE 5.0 12/03/08 12/04/08 650 12/03/08 12/04/08 630 100
300 03 0039 / 4910 ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE 7.0 08/27/04 09/03/04 1,750 07/01/04 07/10/04 1,731 100
300 09 / 33105 ON W CARMEN AVE FROM N KEDZIE AVE TO N SPAULDING AVE 2.0 12/03/08 12/04/08 260 12/03/08 12/04/08 252 100
302 00 0076 / 5764 ON W PETERSON AVE FROM N KIMBALL AVE TO N PULASKI RD 70.50 04/11/98 04/17/98 0 04/11/98 04/17/98 1,199 100
300 04 0216 / 5114 ON W PETERSON AVE FROM N KOSTNER AVE TO N PULASKI RD 49.0 05/01/06 11/01/06 10,526 05/17/06 08/15/06 10,526 100
300 03 0050 / 4921 ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE 21.63 10/01/04 10/20/04 6,122 07/10/04 08/27/04 6,041 100
300 06 0058 / 5229 ON W THORNDALE AVE FROM N ROGERS AVE TO N KILBOURN AVE 8.0 10/20/02 10/23/02 1,120 10/29/02 10/30/02 1,120 100
302 00 0076 / 5764 4000-4800 W LAWRENCE AVE 25.0 09/01/00 12/31/00 0 425

Totals per Strt Light Pole Painting 259.17 37,505 34,492

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 06 0098 / 5259 ON N PULASKI RD FROM W FOSTER AVE TO W BRYN MAWR AVE 04/01/01 02/28/03 0 05/11/01 02/11/03 85,928 100
300 06 0098 / 5259 ON N PULASKI RD FROM W PETERSON AVE TO W BRYN MAWR AVE 4.0 04/01/01 02/28/03 0 05/11/01 02/11/03 412,775 100

Totals per Strt Light Pole Replacmnt/Reloc 4.0 0 498,703

Work Type: Traffic Signal Regrouping Lamps


300 06 0238 / 5352 4404 W LAWRENCE AVE 1,364.0 06/01/06 12/31/06 10,000 11/14/06 11/21/06 9,093 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 405

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0230 / 5344 N OB KENNEDY EXPY AND W IRVING PARK RD 86.0 45,000 10/29/02 02/21/03 53,456 100
300 06 0231 / 5345 W IRVING PARK RD AND N PULASKI RD 93.0 55,000 10/07/02 01/07/03 84,822 100
805 06 2734 / 8920 4989 N ELSTON AVE 14.0 07/20/94 07/20/94 0 07/20/94 07/20/94 10,500 100
805 06 2364 / 8550 5805 N ROGERS AVE 12.0 09/27/95 09/27/95 0 09/27/95 09/27/95 9,000 100
805 06 2735 / 8921 4600 W FOSTER AVE 14.0 05/04/94 05/04/94 0 05/04/94 05/04/94 10,500 100
300 06 0217 / 5337 4404 W LAWRENCE AVE 109.0 05/17/04 05/21/04 6,127 06/03/04 06/07/04 7,926 100
805 06 2681 / 8867 4031 W PETERSON AVE 10.0 04/23/92 04/23/92 0 04/23/92 04/23/92 7,500 100
302 00 0072 / 5760 4120 W PETERSON AVE 1.0 0 02/07/00 02/16/00 10,631 100
302 00 0072 / 5760 4320 W PETERSON AVE 1.0 0 02/17/00 02/28/00 12,200 100
805 06 2365 / 8551 4399 W PETERSON AVE 8.0 04/27/92 04/27/92 0 04/27/92 04/27/92 6,000 100

Totals per Underpass Lighting 348.0 106,127 212,535

Work Type: Underpass Lighting Locations


300 06 0230 / 5344 N OB KENNEDY EXPY AND W IRVING PARK RD 1.0 10/07/02 10/31/02 45,000 09/24/02 12/04/02 38,089 100
300 06 0231 / 5345 W IRVING PARK RD AND N PULASKI RD 1.0 10/01/02 10/31/02 55,000 09/24/02 10/23/02 38,089 100

Totals per Underpass Lighting 2.0 100,000 76,178


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 406

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N KEDZIE AVE AND W ARGYLE ST .50 0 08/26/02 08/26/02 925 100
210 06 0130 / 4389 N PULASKI RD AND N ELSTON AVE 1.0 0 11/26/02 11/26/02 8,539 100
210 06 0130 / 4389 N PULASKI RD AND W BERTEAU AVE 1.0 0 11/26/02 11/26/02 7,324 100
210 06 0130 / 4389 N PULASKI RD AND W BRYN MAWR AVE 1.0 0 12/09/02 12/09/02 10,884 100
210 06 0130 / 4389 N PULASKI RD AND W FOSTER AVE 1.0 0 12/09/02 12/09/02 5,298 100
210 06 0130 / 4389 N PULASKI RD AND W IRVING PARK RD 1.0 0 11/26/02 11/26/02 10,841 100
210 06 0130 / 4389 N PULASKI RD AND W LAWRENCE AVE 1.0 0 12/06/02 12/06/02 8,539 100
210 06 0130 / 4389 N PULASKI RD AND W MONTROSE AVE 1.0 0 11/26/02 11/26/02 8,539 100
210 06 0130 / 4389 N PULASKI RD AND W PETERSON AVE 1.0 0 12/09/02 12/09/02 12,418 100
210 06 0130 / 4389 W DAKIN ST AND N PULASKI RD 1.0 0 11/26/02 11/26/02 6,108 100

Totals per LED Signal Head Install 9.50 0 79,415

Work Type: Left Turn Arrow Locations


210 06 0127 / 4386 N CICERO AVE AND W LAWRENCE AVE .50 47,500 0 0
210 06 / 32157 N KEDZIE AVE AND W LAWRENCE AVE .0 11/01/08 02/28/09 51,000 0 0

Awaiting for a responce from obm Note Last Updated on 04-OCT-07


210 06 0158 / 5058 W IRVING PARK RD AND N PULASKI RD 1.0 02/18/07 12/31/07 60,000 85 0
210 06 0158 / 5058 W LAWRENCE AVE AND N KIMBALL AVE .50 06/22/06 12/31/07 30,000 06/22/06 22,347 95

NEEDS CONCRETE RESTORATION WORK. Note Last Updated on 12-MAR-07


210 06 / 32157 W LAWRENCE AVE AND N PULASKI RD 1.0 05/01/07 01/05/07 28,000 05/01/07 08/28/07 29,285 100
210 06 0209 / 4452 W LAWRENCE AVE AND N PULASKI RD 1.0 10/01/05 08/15/06 66,900 08/23/05 08/15/06 37,250 60
210 06 0231 / 4470 W MONTROSE AVE AND N PULASKI RD .0 03/01/08 12/01/08 103,482 0 0
210 06 0158 / 5058 W PETERSON AVE AND N KIMBALL AVE .50 06/02/06 02/19/07 30,000 06/22/06 03/02/07 33,249 100

Totals per Left Turn Arrow 4.50 416,882 122,216

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N KOSTNER AVE AND W FOSTER AVE 2.0 8,000 01/16/02 04/08/02 18,374 100

Work Type: Signal Realignment Intersections


300 06 0225 / 5340 N ELSTON AVE AND N PULASKI RD 1.0 09/13/04 09/20/04 6,000 08/15/04 10/13/04 4,055 100

Totals per Traffic 650,982 1,695,686


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 407

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Signals Intersections
300 06 0096 / 5258 4404 W LAWRENCE AVE 23.0 11/09/03 11/16/03 0 10/08/03 10/15/03 3,637 100

Work Type: TSM Install Locations


210 06 0074 / 4338 N KEELER AVE AND W LAWRENCE AVE 1.0 05/01/03 07/01/03 138,000 09/17/02 03/07/03 114,877 100
300 06 0199 / 5324 W PETERSON AVE AND N PULASKI RD 1.0 09/01/01 10/01/02 82,100 09/17/01 08/19/02 89,597 100
814 06 0114 / 16329 4800 N CENTRAL PARK AVE 1.0 01/28/92 01/28/92 0 01/28/92 01/28/92 103,623 100
814 06 0307 / 16519 4140 N ELSTON AVE 1.0 03/04/92 03/04/92 0 03/04/92 03/04/92 134,857 100
814 06 0331 / 16534 4400 N ELSTON AVE 1.0 09/13/91 09/13/91 0 09/13/91 09/13/91 106,875 100
814 06 0279 / 16491 4665 N ELSTON AVE 1.0 01/22/92 01/22/92 0 01/22/92 01/22/92 134,857 100
814 06 0278 / 16490 4801 N ELSTON AVE 1.0 02/25/92 02/25/92 0 02/25/92 02/25/92 134,857 100
814 06 0081 / 16297 4000 N PULASKI RD 1.0 11/02/94 11/02/94 0 11/02/94 11/02/94 135,031 100
814 06 0376 / 16566 4000 N PULASKI RD 1.0 03/13/92 03/13/92 0 03/13/92 03/13/92 73,893 100
814 06 0297 / 16509 4200 N PULASKI RD 1.0 11/21/91 11/21/91 0 11/21/91 11/21/91 106,875 100
814 06 0293 / 16505 4400 N PULASKI RD 1.0 09/12/91 09/12/91 0 09/12/91 09/12/91 106,875 100
814 06 0237 / 16449 3600 W FOSTER AVE 1.0 01/01/90 01/01/90 0 01/01/90 01/01/90 6,200 100
814 06 0200 / 16412 4030 W FOSTER AVE 1.0 11/04/96 11/04/96 0 11/04/96 11/04/96 150,000 100
814 06 0110 / 16325 4100 W IRVING PARK RD 1.0 10/28/94 10/28/94 0 10/28/94 10/28/94 61,572 100
814 06 0239 / 16451 4000 W PETERSON AVE 1.0 01/01/91 01/01/91 0 01/01/91 01/01/91 8,000 100

Totals per TSM Install 15.0 220,100 1,467,989

Totals per Construction Phase 3,051,279 4,002,872

Totals for Ward 39 3,315,179 4,012,313


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 408

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON N RICHMOND ST FROM W HOLLYWOOD AVE TO W PETERSON AVE .0 04/01/08 08/30/08 0 0 0
300 05 0047 / 5162 ON N ROCKWELL ST FROM W LAWRENCE AVE TO W GUNNISON ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 / 32277 ON N SACRAMENTO AVE FROM W HOLLYWOOD AVE TO W PETERSON .0 04/01/08 08/30/08 0 0 0
AVE
300 06 / 32146 ON W CATALPA AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 1.0 05/01/07 10/31/07 15,000 05/31/07 06/28/07 0 100
300 06 / 32146 ON W GREGORY ST FROM N CALIFORNIA AVE TO N VIRGINIA AVE .0 05/01/07 10/31/07 3,900 06/15/07 08/01/07 2,000 100
300 06 0308 / 5414 ON W ROSEHILL DR FROM N RAVENSWOOD AVE TO N ASHLAND AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 3,930 100
300 05 0047 / 5162 ON W WINNEMAC AVE FROM N WESTERN AVE TO N LINCOLN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
210 06 0240 / 4477 N LINCOLN AVE AND W CATALPA AVE .0 10/10/05 07/31/06 1,500 10/10/05 11/14/06 1,262 100
300 06 0282 / 5390 W PETERSON AVE AND N RICHMOND ST .50 500 09/17/04 10/06/04 500 100
281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0
300 06 0282 / 5390 3019 W PETERSON AVE 1.0 11/02/04 11/22/04 2,500 11/01/04 11/17/04 2,330 100

Totals per Design/Engineering 2.50 23,400 10,022


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 409

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0307 / 5413 ON N ARTESIAN AVE FROM W PETERSON AVE TO W GLENLAKE AVE 5.0 02/15/06 05/31/06 2,000 01/16/06 02/10/06 1,242 100
300 06 0307 / 5413 ON N BELL AVE FROM N BOWMANVILLE AVE TO W BERWYN AVE 1.0 02/23/06 05/31/06 400 01/16/05 02/10/06 248 100
300 06 0307 / 5413 ON N CHRISTIANA AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 9.0 03/02/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N DAMEN AVE FROM W PETERSON AVE TO W GRANVILLE AVE 9.0 02/10/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N GLENWOOD AVE FROM W GRANVILLE AVE TO W DEVON AVE 7.0 02/01/06 05/31/06 2,800 01/16/05 02/10/06 1,739 100
300 06 0307 / 5413 ON N GREENVIEW AVE FROM W HOOD AVE TO W DEVON AVE 2.0 02/01/06 05/31/06 800 01/16/05 02/10/06 497 100
300 06 0307 / 5413 ON N HAMILTON AVE FROM W NORWOOD ST TO W GRANVILLE AVE 6.0 02/10/06 05/31/06 2,400 01/16/05 02/10/06 1,491 100
300 06 0307 / 5413 ON N HERMITAGE AVE FROM W BRYN MAWR AVE TO W ROSEHILL DR 7.0 02/13/06 05/31/06 2,800 01/16/05 02/10/06 1,739 100
300 06 0307 / 5413 ON N HERMITAGE AVE FROM W DEVON AVE TO W GRANVILLE AVE 10.0 02/03/06 05/31/06 4,000 01/16/05 02/10/06 2,484 100
300 06 0307 / 5413 ON N HERMITAGE AVE FROM W GRANVILLE AVE TO N RIDGE AVE 9.0 02/07/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N HONORE ST FROM W FOSTER AVE TO W FARRAGUT AVE 2.0 02/21/06 05/31/06 800 01/16/05 02/10/06 487 100
300 06 0307 / 5413 ON N HOYNE AVE FROM W FOSTER AVE TO W RASCHER AVE 6.0 02/20/06 05/31/06 2,400 01/16/05 02/10/06 1,491 100
300 06 0307 / 5413 ON N HOYNE AVE FROM W NORWOOD ST TO W GRANVILLE AVE 5.0 02/10/06 05/31/06 2,000 01/16/05 02/10/06 1,242 100
300 06 0307 / 5413 ON N LAKEWOOD AVE FROM W ROSEMONT AVE TO W DEVON AVE 4.0 02/01/06 05/31/06 1,600 01/16/05 02/10/06 994 100
300 06 0307 / 5413 ON N LEAVITT ST FROM N BOWMANVILLE AVE TO W FOSTER AVE 4.0 02/23/06 05/31/06 1,600 01/16/05 02/10/06 995 100
300 06 0307 / 5413 ON N MAGNOLIA AVE FROM W ROSEMONT AVE TO W DEVON AVE 4.0 02/01/06 05/31/06 1,600 01/16/05 02/10/06 994 100
300 06 0307 / 5413 ON N MAPLEWOOD AVE FROM N LINCOLN AVE TO W BRYN MAWR AVE 3.0 02/28/06 05/31/06 1,200 01/16/05 02/10/06 745 100
300 06 0307 / 5413 ON N OAKLEY AVE FROM N BOWMANVILLE AVE TO W FOSTER AVE 3.0 02/23/06 05/31/06 1,200 01/16/05 02/10/06 746 100
300 06 0307 / 5413 ON N OAKLEY AVE FROM W PETERSON AVE TO W GLENLAKE AVE 4.0 02/14/06 05/31/06 1,600 01/16/05 02/10/06 994 100
300 06 0307 / 5413 ON N PAULINA ST FROM W FOSTER AVE TO W GREGORY ST 14.0 02/20/06 05/31/06 5,600 01/16/05 02/10/06 3,478 100
300 06 0307 / 5413 ON N PAULINA ST FROM W GRANVILLE AVE TO W DEVON AVE 9.0 02/03/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N PAULINA ST FROM W PETERSON AVE TO W GRANVILLE AVE 9.0 02/07/06 05/31/06 3,600 01/16/05 02/10/06 2,237 100
300 06 0069 / 5233 ON N RAVENSWOOD AVE FROM W FOSTER AVE TO W BERWYN AVE 5.0 06/30/02 06/30/02 1,050 06/27/02 06/27/02 1,015 100
300 06 0307 / 5413 ON N RAVENSWOOD AVE FROM W ROSEHILL DR TO W BRYN MAWR AVE 7.0 02/13/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 09 / 33101 ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE .34 09/02/08 09/03/08 136 09/02/08 09/03/08 81 100
300 06 0307 / 5413 ON N RIDGE AVE FROM N RAVENSWOOD AVE TO W PETERSON AVE 10.0 02/08/06 05/31/06 4,000 01/16/05 02/10/06 2,485 100
300 06 0307 / 5413 ON N SAWYER AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 8.0 03/01/06 05/31/06 3,200 01/16/05 02/10/06 1,989 100
300 06 0307 / 5413 ON N SEELEY AVE FROM W NORWOOD ST TO W HOOD AVE 4.0 02/10/06 05/31/06 1,600 01/16/05 02/10/06 995 100
300 06 0307 / 5413 ON N SPAULDING AVE FROM W BRYN MAWR AVE TO W BALMORAL AVE 9.0 03/01/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N WAYNE AVE FROM W ROSEMONT AVE TO W DEVON AVE 3.0 02/01/06 05/31/06 1,200 01/16/05 02/10/06 745 100
300 06 0307 / 5413 ON N WINCHESTER AVE FROM W FOSTER AVE TO W BALMORAL AVE 4.0 02/20/06 05/31/06 1,600 01/16/05 02/10/06 994 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 410

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0307 / 5413 ON N WINCHESTER AVE FROM W PETERSON AVE TO W GRANVILLE AVE 9.0 02/09/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N WOLCOTT AVE FROM W PETERSON AVE TO W GRANVILLE AVE 9.0 02/09/06 05/31/06 3,600 01/16/05 02/10/06 2,236 100
300 06 0307 / 5413 ON N WOLCOTT AVE FROM W WINONA ST TO W BRYN MAWR AVE 8.50 02/21/06 05/31/06 3,400 01/16/05 02/10/06 2,113 100
300 06 0307 / 5413 ON W BALMORAL AVE FROM N LINCOLN AVE TO N WESTERN AVE 5.0 02/28/06 05/31/06 2,000 01/16/05 02/10/06 1,242 100
300 06 0307 / 5413 ON W BALMORAL AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE 7.0 02/17/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 06 0307 / 5413 ON W BERWYN AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE 7.0 02/17/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 06 0307 / 5413 ON W BERWYN AVE FROM N RAVENSWOOD AVE TO N WESTERN AVE 24.0 02/25/06 05/31/06 9,600 01/16/05 02/10/06 5,963 100
300 06 0307 / 5413 ON W BERWYN AVE FROM N WESTERN AVE TO N LINCOLN AVE 6.0 02/26/06 05/31/06 2,400 01/16/05 02/10/06 1,491 100
300 06 0307 / 5413 ON W CATALPA AVE FROM N KIMBALL AVE TO N KEDZIE AVE 6.0 02/28/06 05/31/06 2,400 01/16/05 02/10/06 1,491 100
300 06 0307 / 5413 ON W CATALPA AVE FROM N LINCOLN AVE TO N ROCKWELL ST 3.0 03/02/06 05/31/06 1,200 01/16/05 02/10/06 745 100
300 06 0307 / 5413 ON W CATALPA AVE FROM N RAVENSWOOD AVE TO N CLARK ST 7.0 02/16/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 06 0307 / 5413 ON W CATALPA AVE FROM N WESTERN AVE TO N LINCOLN AVE 4.0 02/28/06 05/31/06 1,600 01/16/05 02/10/06 995 100
300 06 0307 / 5413 ON W EDGEWATER AVE FROM N HERMITAGE AVE TO N CLARK ST 5.0 02/15/06 05/31/06 2,000 01/16/05 02/10/06 1,242 100
300 06 0307 / 5413 ON W FARRAGUT AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE 8.0 02/20/06 05/31/06 3,200 01/16/05 02/10/06 1,989 100
300 06 0307 / 5413 ON W FARRAGUT AVE FROM N RAVENSWOOD AVE TO N WESTERN AVE 17.0 02/26/06 05/31/06 6,800 01/16/05 02/10/06 4,225 100
300 06 0307 / 5413 ON W GLENLAKE AVE FROM N HERMITAGE AVE TO N CLARK ST 5.0 02/08/06 05/31/06 2,000 01/16/05 02/10/06 1,242 100
300 06 0307 / 5413 ON W GRANVILLE AVE FROM N GREENVIEW AVE TO N CLARK ST 6.0 02/02/06 05/31/06 2,400 01/16/05 02/10/06 1,491 100
300 06 0307 / 5413 ON W GRANVILLE AVE FROM N RAVENSWOOD AVE TO N OAKLEY AVE 16.50 02/07/06 05/31/06 6,600 01/16/05 02/10/06 4,100 100
300 06 0307 / 5413 ON W GREGORY ST FROM N RAVENSWOOD AVE TO N ASHLAND AVE 7.0 02/16/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 06 0307 / 5413 ON W HIGHLAND AVE FROM N CLARK ST TO N RAVENSWOOD AVE 9.0 02/06/06 05/31/06 3,600 01/16/05 02/10/06 2,237 100
300 06 0307 / 5413 ON W HIGHLAND AVE FROM N GLENWOOD AVE TO N CLARK ST 4.0 02/02/06 05/31/06 1,600 01/16/05 02/10/06 995 100
300 06 0307 / 5413 ON W HOLLYWOOD AVE FROM N HERMITAGE AVE TO N CLARK ST 5.0 02/14/06 05/31/06 2,000 01/16/05 02/10/06 1,243 100
300 06 0307 / 5413 ON W HOLLYWOOD AVE FROM N JERSEY AVE TO N SPAULDING AVE 3.0 03/01/06 05/31/06 1,200 01/16/05 02/10/06 746 100
300 06 0307 / 5413 ON W HOOD AVE FROM N DAMEN AVE TO N RAVENSWOOD AVE 7.0 02/14/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 06 0307 / 5413 ON W HOOD AVE FROM N HAMILTON AVE TO N SEELEY AVE 2.0 02/08/06 05/31/06 800 01/16/05 02/10/06 497 100
300 06 0307 / 5413 ON W NORWOOD ST FROM N RAVENSWOOD AVE TO N HAMILTON AVE 11.0 02/08/06 05/31/06 4,400 01/16/05 02/10/06 2,733 100
300 06 0307 / 5413 ON W OLIVE AVE FROM N JERSEY AVE TO N SPAULDING AVE 3.0 02/28/06 05/31/06 1,200 01/16/05 02/10/06 745 100
300 06 0307 / 5413 ON W OLIVE AVE FROM N RAVENSWOOD AVE TO N CLARK ST 10.0 02/13/06 05/31/06 4,000 01/16/05 02/10/06 2,485 100
300 06 0307 / 5413 ON W RASCHER AVE FROM N DAMEN AVE TO N HOYNE AVE 4.0 02/24/06 05/31/06 1,600 01/16/05 02/10/06 995 100
300 06 0307 / 5413 ON W RASCHER AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE 7.0 02/16/06 05/31/06 2,800 01/16/05 02/10/06 1,729 100
300 06 0307 / 5413 ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N BROADWAY 1.50 02/02/06 05/31/06 600 01/16/05 02/10/06 373 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 411

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0307 / 5413 ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N CLARK ST 8.0 02/02/06 05/31/06 3,200 01/16/05 02/10/06 1,988 100
300 06 0307 / 5413 ON W SUMMERDALE AVE FROM N RAVENSWOOD AVE TO N ASHLAND 7.0 02/17/06 05/31/06 2,800 01/16/05 02/10/06 1,728 100
AVE
300 06 0307 / 5413 ON W SUMMERDALE AVE FROM N RAVENSWOOD AVE TO N LEAVITT ST 16.0 02/25/06 05/31/06 6,400 01/16/05 02/10/06 3,975 100
300 06 0307 / 5413 ON W THOME AVE FROM N GLENWOOD AVE TO N CLARK ST 8.0 02/02/06 05/31/06 3,200 01/16/05 02/10/06 1,989 100
300 06 0307 / 5413 ON W THOME AVE FROM N RAVENSWOOD AVE TO N CLARK ST 8.0 02/06/06 05/31/06 3,200 01/16/05 02/10/06 1,988 100
300 06 0307 / 5413 ON W VICTORIA ST FROM N JERSEY AVE TO N SPAULDING AVE 3.0 03/01/06 05/31/06 1,200 01/16/05 02/10/06 826 100
300 06 0069 / 5233 6444 N BOSWORTH AVE 1.0 03/24/02 03/24/02 210 03/21/02 03/21/02 203 100
300 03 0040 / 4911 5850 N LINCOLN AVE 229.0 10/01/04 10/31/04 85,875 10/18/04 10/29/04 50,465 100
300 06 0069 / 5233 1515 W ARTHUR AVE 1.0 03/24/02 03/24/02 210 03/21/02 03/21/02 203 100
300 06 0069 / 5233 1509 W SCHREIBER AVE 1.0 03/24/02 03/24/02 210 03/21/02 03/21/02 203 100

Totals per 250 Watt Changeout 690.84 269,091 164,847

Totals per Lighting/Electrical 3,870,472 1,864,526


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 412

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 03 0040 / 4911 ON N ASHLAND AVE FROM W FOSTER AVE TO W ROSEHILL DR 110.0 08/20/04 09/20/04 44,000 07/14/04 08/10/04 28,755 100
300 03 0040 / 4911 ON N BROADWAY FROM W DEVON AVE TO W ROSEMONT AVE 8.0 08/20/04 09/20/04 3,200 07/14/04 08/10/04 2,092 100
300 03 0040 / 4911 ON N CALIFORNIA AVE FROM W LAWRENCE AVE TO W PETERSON AVE 119.0 10/01/04 10/31/04 47,600 08/09/04 09/03/04 31,108 100
300 06 0307 / 5413 ON N DAMEN AVE FROM W BALMORAL AVE TO N BOWMANVILLE AVE 7.0 02/20/06 05/31/06 2,800 01/16/05 02/10/06 1,739 100
300 03 0040 / 4911 ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE 20.0 08/20/04 09/20/04 8,000 07/14/04 08/10/04 5,228 100
300 03 0040 / 4911 ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE 7.50 07/30/04 08/30/04 3,000 07/14/04 08/10/04 1,961 100
300 03 0040 / 4911 ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE 33.93 08/20/04 09/20/04 13,572 07/14/04 08/10/04 8,870 100
300 03 0040 / 4911 ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 2.50 08/20/04 09/20/04 1,000 07/14/04 08/10/04 654 100
300 03 0040 / 4911 ON N LINCOLN AVE FROM W WINNEMAC AVE TO W PETERSON AVE 163.0 08/20/04 09/20/04 65,200 07/14/04 08/10/04 42,610 100
300 03 0047 / 4918 ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE 5.0 11/01/04 11/20/04 2,000 10/01/04 10/15/04 2,087 100
300 03 0040 / 4911 ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE 162.75 08/20/04 09/20/04 65,100 07/14/04 08/10/04 42,544 100
300 03 0040 / 4911 ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE 55.0 08/20/04 09/20/04 22,000 07/14/04 08/10/04 14,378 100
300 03 0039 / 4910 ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE 21.0 10/01/04 10/05/04 9,225 10/01/04 10/01/04 3,108 100
300 03 0040 / 4911 ON W BRYN MAWR AVE FROM N WESTERN AVE TO N KIMBALL AVE 54.0 08/20/04 09/20/04 21,600 07/14/04 08/10/04 14,116 100
300 03 0040 / 4911 ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE 78.10 08/20/04 09/20/04 31,240 07/14/04 08/10/04 20,416 100
300 03 0047 / 4918 ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE 18.0 11/01/04 11/20/04 7,200 10/01/04 10/15/04 5,167 100
300 06 0122 / 5275 ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE 1.89 12/15/03 12/21/03 756 12/09/03 12/14/03 549 100
300 06 0307 / 5413 ON W GRANVILLE AVE FROM N GLENWOOD AVE TO N GREENVIEW AVE .50 02/02/06 05/31/06 200 01/16/05 02/10/06 124 100
300 03 0040 / 4911 ON W LAWRENCE AVE FROM N CALIFORNIA AVE TO N ROCKWELL AVE 10.08 08/20/04 09/20/04 4,032 07/14/04 08/10/04 2,635 100
300 03 0040 / 4911 ON W PETERSON AVE FROM N CLARK ST TO N LINCOLN AVE 127.98 08/20/04 09/20/04 51,192 08/01/04 08/20/04 33,455 100
300 03 0050 / 4921 ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE 29.76 10/01/04 10/20/04 11,904 08/27/04 09/06/04 8,288 100

Totals per 400 Watt Changeout 1,034.99 414,821 269,881


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 413

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0746 / 6932 5638 N ARTESIAN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0803 / 6989 4862 N CALIFORNIA AVE 1.0 06/10/96 06/10/96 0 06/10/96 06/10/96 300 100
302 00 0083 / 5768 5716 N CLARK ST 0 11/18/97 11/18/97 267 100
805 06 1270 / 7456 5716 N CLARK ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1550 / 7736 6327 N LAKEWOOD AVE 1.0 10/09/97 10/09/97 0 10/09/97 10/09/97 300 100
805 06 1658 / 7844 6333 N LAKEWOOD AVE 1.0 08/01/97 08/01/97 0 08/01/97 08/01/97 300 100
805 06 2025 / 8211 6417 N LAKEWOOD AVE 1.0 05/13/96 05/13/96 0 05/13/96 05/13/96 300 100
805 06 0320 / 6506 5214 N LINCOLN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2073 / 8259 5252 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2075 / 8261 5311 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2076 / 8262 5331 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2077 / 8263 5336 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2078 / 8264 5405 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2063 / 8249 5411 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2080 / 8266 5427 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2071 / 8257 5430 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2082 / 8268 5438 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2083 / 8269 5441 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2084 / 8270 5455 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2057 / 8243 5566 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2058 / 8244 5570 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2072 / 8258 5617 N LINCOLN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2059 / 8245 5651 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2060 / 8246 5659 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2061 / 8247 5660 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2062 / 8248 5672 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2081 / 8267 5694 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0312 / 6498 5710 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0303 / 6489 5724 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2079 / 8265 5740 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0306 / 6492 5750 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 414

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0307 / 6493 5758 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0308 / 6494 5800 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0309 / 6495 5808 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2094 / 8280 5811 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0311 / 6497 5816 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
300 06 0139 / 5289 5850 N LINCOLN AVE 1,001.0 03/01/06 09/01/06 24,994 05/20/06 06/01/06 30,244 100
302 00 0092 / 5774 5850 N LINCOLN AVE 8.0 0 03/16/01 12/19/01 1,885 100
805 06 0302 / 6488 5854 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0313 / 6499 5915 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0314 / 6500 5921 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0315 / 6501 5930 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2088 / 8274 5938 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2089 / 8275 5944 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 2090 / 8276 5951 N LINCOLN AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 1886 / 8072 5523 N MAPLEWOOD AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 1870 / 8056 5541 N MAPLEWOOD AVE 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 1925 / 8111 6443 N NEWGARD AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1906 / 8092 6516 N NEWGARD AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0692 / 6878 5543 N ROCKWELL ST 1.0 08/13/96 08/13/96 0 08/13/96 08/13/96 300 100
805 06 0498 / 6684 5523 N SPAULDING AVE 1.0 01/26/96 01/26/96 0 01/26/96 01/26/96 300 100
805 06 0885 / 7071 2859 W BERWYN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0837 / 7023 2544 W CARMEN AVE 1.0 06/21/96 06/21/96 0 06/21/96 06/21/96 300 100
805 06 0828 / 7014 2608 W CARMEN AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1109 / 7295 1420 W HIGHLAND AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1110 / 7296 3243 W HOLLYWOOD AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0577 / 6763 3229 W OLIVE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0431 / 6617 1921 W SUMMERDALE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1750 / 7936 2610 W WINONA ST 1.0 05/22/97 05/22/97 0 05/22/97 05/22/97 300 100

Totals per Alley Lighting/Lamps 1,065.0 24,994 49,196


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 415

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0238 / 5352 5850 N LINCOLN AVE 1,400.0 06/01/07 12/31/07 41,216 07/21/07 01/01/08 41,216 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5850 N LINCOLN AVE 1,305.0 0 04/17/02 04/20/02 23,762 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 N CLARK ST AND W SCHREIBER AVE 3.0 0 11/30/99 11/30/99 1,053 100
300 06 0167 / 5306 N PAULINA ST AND W GREGORY ST 3.0 0 11/30/99 11/30/99 1,053 100
302 00 0092 / 5774 4911 N FRANCISCO AVE 1.0 0 02/05/01 02/05/01 471 100
302 00 0092 / 5774 6559 N GLENWOOD AVE 2.0 0 10/10/01 10/10/01 689 100
302 00 0092 / 5774 1339 W LOYOLA AVE 1.0 0 10/10/01 10/10/01 345 100

Totals per Flood Light Install 10.0 0 3,611

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Projects


300 06 0282 / 5390 W PETERSON AVE AND N RICHMOND ST .0 10/06/04 10/31/04 0 0 0

Work Type: Loop Lighting Blocks


281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 03 0040 / 4911 ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE 16.0 08/20/04 09/20/04 21,600 08/10/04 08/10/04 19,200 100
300 03 0040 / 4911 ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE 14.0 10/01/04 10/10/04 18,900 10/01/04 10/10/04 17,500 100
300 06 0307 / 5413 ON W CATALPA AVE FROM N LINCOLN AVE TO N ROCKWELL ST 3.0 03/02/06 05/31/06 6,000 01/16/05 02/10/06 4,500 100

Totals per Ornamental - Piggyback Lighting 33.0 46,500 41,200

Work Type: Ornamental Lighting Blocks


281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 416

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: POD Camera Pole Poles
281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5850 N LINCOLN AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 07 0040 / 5463 ON N CALIFORNIA AVE FROM W BALMORAL AVE TO W FOSTER AVE 2.0 04/18/06 11/18/06 150,000 10/23/06 04/20/07 110,259 100
300 07 0040 / 5463 ON N CALIFORNIA AVE FROM W BRYN MAWR AVE TO W BALMORAL AVE 2.0 04/18/06 11/18/06 150,000 10/23/06 04/20/07 110,565 100
300 09 / 33106 ON N LAKEWOOD AVE FROM W DEVON AVE TO W ARTHUR AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 09 / 33106 ON N MAGNOLIA AVE FROM W DEVON AVE TO W ARTHUR AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 09 / 33106 ON N PAULINA ST FROM W PETERSON AVE TO W GRANVILLE AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 09 / 33106 ON N RICHMOND ST FROM W BRYN MAWR AVE TO N LINCOLN AVE 3.0 162,500 04/01/08 12/01/08 0 0
300 06 / 32277 ON N RICHMOND ST FROM W HOLLYWOOD AVE TO W PETERSON AVE .0 05/04/08 12/31/08 0 0 0
300 06 / 32277 ON N SACRAMENTO AVE FROM W HOLLYWOOD AVE TO W PETERSON .0 05/04/08 12/31/08 0 0 0
AVE
300 05 0040 / 5155 ON N VIRGINIA AVE FROM W BALMORAL AVE TO W BERWYN AVE 1.0 04/04/05 11/18/05 85,000 09/07/05 11/18/05 65,615 100
300 06 0298 / 5405 ON N VIRGINIA AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 2.0 09/07/05 11/07/05 0 09/07/05 11/17/05 62,821 100
300 09 / 33106 ON N WAYNE AVE FROM W DEVON AVE TO W ARTHUR AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 07 0040 / 5463 ON N WHIPPLE ST FROM N LINCOLN AVE TO W HOOD AVE .50 07/17/06 09/08/06 42,500 08/14/06 10/13/06 38,578 100
300 09 / 33106 ON W ARTHUR AVE FROM N GLENWOOD AVE TO N LAKEWOOD AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 11 / 32229 ON W BALMORAL AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 08/13/07 12/21/07 120,000 08/13/07 0 10
300 11 / 32229 ON W BERWYN AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 108,000 08/13/07 0 10
300 06 / 32146 ON W CATALPA AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 08/06/07 01/31/08 330,125 08/16/07 12/04/07 0 100
300 11 / 32229 ON W FARRAGUT AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 108,000 08/16/07 0 5
300 06 / 32146 ON W GREGORY ST FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 08/10/07 01/31/08 330,125 02/04/08 0 100
300 11 / 32229 ON W RASCHER AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 08/16/07 12/21/07 120,000 08/16/07 0 5
300 06 0308 / 5414 ON W ROSEHILL DR FROM N RAVENSWOOD AVE TO N ASHLAND AVE 2.0 06/20/06 09/08/06 191,486 06/20/06 09/08/06 129,120 100
300 11 / 32229 ON W SUMMERDALE AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.0 108,000 08/20/07 0 5

Totals per Residntl Staggered Lighting 32.50 2,395,736 516,958


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 417

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0267 / 5375 ON N VIRGINIA AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE 2.0 03/22/04 05/22/04 147,308 03/22/04 05/07/04 145,067 100
300 06 0305 / 5411 ON W BRYN MAWR AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE 2.50 11/01/05 01/31/06 200,000 11/08/05 03/17/06 174,554 100

Totals per Residntl Strt Lighting/Lamps 4.50 347,308 319,621

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 4811 N FRANCISCO AVE 1.0 0 02/05/01 02/05/01 378 100
302 00 0092 / 5774 4812 N FRANCISCO AVE 1.0 0 03/27/01 03/27/01 378 100
302 00 0092 / 5774 4833 N FRANCISCO AVE 1.0 0 02/05/01 02/05/01 378 100
302 00 0092 / 5774 4851 N FRANCISCO AVE 1.0 0 02/05/01 02/05/01 378 100
302 00 0092 / 5774 1455 W ARTHUR AVE 1.0 0 03/14/01 03/14/01 378 100
281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 2902 W LAWRENCE AVE 2.0 0 03/27/01 03/27/01 756 100

Totals per Short Arm Installs - Residntl 7.0 0 2,646


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 418

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 03 0040 / 4911 ON N ASHLAND AVE FROM W ROSEHILL DR TO W FOSTER AVE 114.0 05/10/04 09/10/04 34,000 05/10/04 08/01/04 30,780 100
300 03 0040 / 4911 ON N BROADWAY FROM W ROSEMONT AVE TO W DEVON AVE 8.0 05/10/04 09/10/04 2,200 05/10/04 08/01/04 2,160 100
300 03 0040 / 4911 ON N CALIFORNIA AVE FROM W LAWRENCE AVE TO W PETERSON AVE 128.0 10/01/04 10/31/04 39,100 08/01/04 09/01/04 34,560 100
300 03 0040 / 4911 ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE 22.0 05/10/04 09/10/04 6,400 05/10/04 08/01/04 5,940 100
300 03 0040 / 4911 ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE 7.50 05/10/04 09/10/04 1,875 05/10/04 08/01/04 2,025 100
300 03 0040 / 4911 ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE 50.46 05/10/04 09/10/04 15,138 05/10/04 08/01/04 13,624 100
300 03 0040 / 4911 ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE 4.0 05/10/04 09/10/04 1,450 05/10/04 08/01/04 1,080 100
300 03 0040 / 4911 ON N LINCOLN AVE FROM W WINNEMAC AVE TO W PETERSON AVE 174.0 05/10/04 09/10/04 50,650 05/10/04 08/01/04 46,980 100
300 03 0047 / 4918 ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE 5.50 11/01/04 11/20/04 1,750 10/01/04 10/20/04 1,298 100
300 03 0040 / 4911 ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE 150.66 05/10/04 09/10/04 41,339 05/10/04 08/01/04 40,678 100
300 03 0040 / 4911 ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE 58.0 05/10/04 09/10/04 14,125 05/10/04 08/01/04 15,660 100
300 03 0039 / 4910 ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE 21.0 08/27/04 09/03/04 5,250 07/01/04 07/10/04 5,192 100
300 03 0040 / 4911 ON W BRYN MAWR AVE FROM N WESTERN AVE TO N KIMBALL AVE 58.0 05/10/04 09/10/04 14,125 05/10/04 08/01/04 15,660 100
300 03 0040 / 4911 ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE 75.97 05/10/04 09/10/04 22,862 05/10/04 08/01/04 20,512 100
300 03 0047 / 4918 ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE 21.50 11/01/04 11/20/04 6,500 10/01/04 10/20/04 5,101 100
300 06 0108 / 5263 ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE 2.43 03/01/04 03/10/04 717 04/12/04 05/07/04 594 100
300 03 0040 / 4911 ON W LAWRENCE AVE FROM N ROCKWELL AVE TO N CALIFORNIA AVE 10.71 05/10/04 09/10/04 3,276 05/10/04 08/01/04 2,892 100
300 03 0050 / 4921 ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE 31.93 10/01/04 10/20/04 9,037 07/10/04 08/27/04 8,918 100
300 03 0040 / 4911 ON W PETERSON AVE FROM N LINCOLN AVE TO N CLARK ST 157.95 05/10/04 09/10/04 38,799 05/10/04 08/01/04 42,647 100

Totals per Strt Light Pole Painting 1,101.61 308,592 296,300

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 06 0078 / 5241 ON W BERWYN AVE FROM N WESTERN AVE TO N BOWMANVILLE AVE 1.0 11/18/02 11/29/02 8,200 11/30/02 11/30/02 566 100
281 00 / 33670 2800 W LAWRENCE AVE .0 01/01/08 12/31/08 0 0 0

Totals per Strt Light Pole Replacmnt/Reloc 1.0 8,200 566

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 5850 N LINCOLN AVE 2,068.0 03/01/04 12/01/04 10,754 11/09/06 11/30/06 22,520 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 419

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0217 / 5337 5850 N LINCOLN AVE 58.0 05/25/04 06/01/04 3,260 06/08/04 06/10/04 3,469 100
302 00 0072 / 5760 6400 N RAVENSWOOD AVE 1.0 0 02/29/00 03/09/00 11,800 100
805 06 2531 / 8717 6088 N RIDGE AVE 14.0 03/09/95 03/09/95 0 03/09/95 03/09/95 10,500 100
805 06 2327 / 8513 1270 W ALBION AVE 18.0 05/13/96 05/13/96 0 05/13/96 05/13/96 13,500 100
805 06 2842 / 9028 1805 W BALMORAL AVE 6.0 12/29/93 12/29/93 0 12/29/93 12/29/93 4,500 100
805 06 2736 / 8922 1800 W BRYN MAWR AVE 10.0 11/03/94 11/03/94 0 11/03/94 11/03/94 7,500 100
805 06 2913 / 9099 1800 W FOSTER AVE 6.0 12/16/93 12/16/93 0 12/16/93 12/16/93 4,500 100
805 06 2676 / 8862 1790 W GRANVILLE AVE 10.0 12/01/94 12/01/94 0 12/01/94 12/01/94 7,500 100
805 06 2150 / 8336 1305 W NORTH SHORE AVE 13.0 12/31/94 12/31/94 0 12/31/94 12/31/94 9,750 100
302 00 0071 / 5759 1330 W NORTH SHORE AVE 0 04/04/99 04/12/99 16,682 100
805 06 2528 / 8714 1800 W PETERSON AVE 16.0 05/04/94 05/04/94 0 05/04/94 05/04/94 12,000 100
805 06 2671 / 8857 1795 W ROSEHILL DR 4.0 11/01/94 11/01/94 0 11/01/94 11/01/94 3,000 100
805 06 2811 / 8997 1785 W THOME AVE 10.0 07/28/94 07/28/94 0 07/28/94 07/28/94 7,500 100

Totals per Underpass Lighting 166.0 3,260 112,201


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 420

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N LINCOLN AVE AND W CATALPA AVE 1.0 0 10/24/02 10/24/02 1,850 100
210 06 0130 / 4389 N WESTERN AVE AND W BERWYN AVE 1.0 0 04/25/02 04/25/02 7,324 100
210 06 0130 / 4389 N WESTERN AVE AND W BRYN MAWR AVE 1.0 0 04/24/02 04/24/02 8,539 100
210 06 0130 / 4389 N WESTERN AVE AND W FOSTER AVE .50 0 05/14/02 05/14/02 925 100
210 06 0219 / 4459 N WESTERN AVE AND W FOSTER AVE .50 04/22/05 04/23/05 5,282 04/13/05 04/13/05 4,985 100
210 06 0219 / 4459 N WESTERN AVE AND W PETERSON AVE 1.0 04/24/05 04/25/05 10,563 03/07/05 03/07/05 10,489 100
210 06 0130 / 4389 N WESTERN AVE AND W WINNEMAC AVE .50 0 04/25/02 04/25/02 3,662 100
300 06 0225 / 5340 5800 N RICHMOND ST 4.0 09/02/02 10/31/02 8,350 07/12/02 07/25/02 14,430 100

Totals per LED Signal Head Install 9.50 24,195 52,204

Work Type: Left Turn Arrow Locations


210 06 0128 / 4387 W FOSTER AVE AND N LEAVITT ST .50 12/31/01 01/31/02 7,500 0
210 06 0231 / 4470 W PETERSON AVE AND N WESTERN AVE .0 03/01/08 12/01/08 4,000 0 0

TOTAL PROJECT IS $8,000 WITH $4,000 COMING FROM THE 40TH WARD MENU UNDER 2005,2006,2007. AUTHORIZED PER OBM TO PROCEED ON 11/20/08 PER THE DIRECTOR. Note
Last Updated on 21-NOV-08
Totals per Left Turn Arrow .50 11,500 0

Work Type: New Signal Locations


300 06 0283 / 5391 ON N LINCOLN AVE FROM W BERWYN AVE TO W CATALPA AVE 1.0 09/01/04 09/30/04 92 09/09/04 09/09/04 92 100

Work Type: Pedestrian Countdown Signal Install Locations


300 09 / 33106 N CLARK ST AND W GRANVILLE AVE 1.0 09/23/08 09/23/08 12,000 09/23/08 09/23/08 6,795 100

SR#08-01886806 GJ#3885 COMP.09/23/08 Note Last Updated on 30-DEC-08

Work Type: Pedestrian Crosswalk Signals Locations


210 06 0240 / 4477 N LINCOLN AVE AND W CATALPA AVE 1.0 09/12/06 09/12/06 12,500 09/12/06 09/12/06 8,960 100

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 5740 N CALIFORNIA AVE 1.0 4,000 01/07/02 04/08/02 15,345 100

Work Type: Signals Intersections


300 06 0096 / 5258 5850 N LINCOLN AVE 39.0 10/15/03 10/21/03 0 09/17/03 09/22/03 6,167 100

Totals per Traffic 89,387 846,031


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 421

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
300 06 0166 / 5305 W HOLLYWOOD AVE AND N ASHLAND AVE 03/01/01 07/01/01 25,100 01/22/01 04/02/01 31,175 100
814 06 0196 / 16408 4800 N CALIFORNIA AVE 1.0 09/10/96 09/10/96 0 09/10/96 09/10/96 150,000 100
814 06 0088 / 16304 5200 N FRANCISCO AVE 1.0 12/02/93 12/02/93 0 12/02/93 12/02/93 84,096 100
814 06 0136 / 16350 5200 N LINCOLN AVE 1.0 04/27/93 04/27/93 0 04/27/93 04/27/93 119,631 100
814 06 0368 / 16558 5300 N LINCOLN AVE 1.0 04/10/95 04/10/95 0 04/10/95 04/10/95 110,783 100
814 06 0397 / 16584 5500 N LINCOLN AVE 1.0 04/28/95 04/28/95 0 04/28/95 04/28/95 110,783 100
814 06 0198 / 16410 4800 N ROCKWELL ST 1.0 09/10/96 09/10/96 0 09/10/96 09/10/96 150,000 100

Totals per TSM Install 6.0 25,100 756,468

Totals per Construction Phase 3,959,859 2,710,557

Totals for Ward 40 3,983,259 2,720,579


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 422

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32277 ON N OSCEOLA AVE FROM W TOUHY AVE TO W PRATT AVE 4.0 04/01/08 08/30/08 260,000 05/10/08 0 90
300 06 0308 / 5414 ON W COYLE AVE FROM N ODELL AVE TO N HARLEM AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,870 100
300 06 / 32275 ON W IBSEN ST FROM N HARLEM AVE TO N ODELL AVE .0 03/01/07 10/31/07 3,900 02/09/07 03/09/07 2,605 100
210 06 0240 / 4477 N HARLEM AVE AND W HIGGINS AVE .0 10/10/05 07/31/06 1,200 10/10/05 02/15/06 134 100
210 06 0240 / 4477 W BRYN MAWR AVE AND N HARLEM AVE .0 10/10/05 07/31/06 1,200 10/10/05 08/08/06 135 100

Totals per Design/Engineering 4.0 266,300 4,744


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 423

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 11 / 32230 ON N SAYRE AVE FROM W DEVON AVE TO W HAYES AVE 6.0 2,600 0 0

Work Type: Alley Lighting/Lamps Installations


805 06 0335 / 6521 6324 N LEONA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1896 / 8082 5610 N NAGLE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1917 / 8103 5634 N NAGLE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1898 / 8084 6158 N NAGLE AVE 1.0 05/30/96 05/30/96 0 05/30/96 05/30/96 300 100
805 06 1897 / 8083 5526 N NATOMA AVE 1.0 11/04/96 11/04/96 0 11/04/96 11/04/96 300 100
805 06 1916 / 8102 5916 N NEWARK AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 300 100
805 06 1514 / 7700 5826 N NINA AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 0592 / 6778 6509 N NORTHWEST HWY 1.0 12/20/96 12/20/96 0 12/20/96 12/20/96 300 100
805 06 0593 / 6779 6517 N NORTHWEST HWY 1.0 12/20/96 12/20/96 0 12/20/96 12/20/96 300 100
300 06 0139 / 5289 6550 N NORTHWEST HWY 1,775.0 03/01/06 09/01/06 41,106 06/01/06 07/01/06 53,630 100
302 00 0092 / 5774 6650 N NORTHWEST HWY 20.0 0 02/20/01 11/07/01 4,713 100
805 06 0574 / 6760 6623 N OKETO AVE 1.0 03/11/96 03/11/96 0 03/11/96 03/11/96 300 100
805 06 0575 / 6761 6837 N OLCOTT AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1472 / 7658 5121 N RUTHERFORD AVE 1.0 11/17/97 11/17/97 0 11/17/97 11/17/97 300 100
805 06 0833 / 7019 7459 W CATALPA AVE 1.0 01/02/96 01/02/96 0 01/02/96 01/02/96 300 100
805 06 0818 / 7004 8502 W CATALPA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0836 / 7022 8522 W CATALPA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0827 / 7013 8538 W CATALPA AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0933 / 7119 7307 W FITCH AVE 1.0 10/22/96 10/22/96 0 10/22/96 10/22/96 300 100
805 06 1119 / 7305 7629 W GREGORY ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0557 / 6743 7305 W RASCHER AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 0398 / 6584 7311 W TOUHY AVE 1.0 03/13/97 03/13/97 0 03/13/97 03/13/97 300 100

Totals per Alley Lighting/Lamps 1,815.0 41,106 64,343

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 6650 N NORTHWEST HWY 1,752.0 06/01/07 12/31/07 51,578 09/01/07 09/21/07 51,578 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 6650 N NORTHWEST HWY 1,657.0 0 04/09/02 04/12/02 30,171 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 424

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0167 / 5306 6220 N OLCOTT AVE 2.0 0 01/18/99 01/18/99 702 100

Work Type: Irrigation System - Power Supply Locations


300 06 0166 / 5305 6308 N AVONDALE AVE 1.0 04/18/00 05/09/00 11,838 04/18/00 05/09/00 13,235 100

Work Type: Ornamental Lighting Blocks


300 06 0117 / 5271 ON N NORTHWEST HWY FROM N NETTLETON AVE TO N SAYRE AVE 1.50 35,000 0
300 07 0041 / 5464 ON N NORTHWEST HWY FROM N NEWARK AVE TO N SAYRE AVE 3.0 04/18/06 11/18/06 450,000 08/14/06 0 15
300 06 0064 / 5231 ON N NORTHWEST HWY FROM N OGALLAH AVE TO N OVERHILL AVE 2.0 11/28/97 03/31/98 16,850 05/13/98 11/06/98 17,909 100
300 06 0064 / 5231 6700-6734 N OLMSTED AVE .50 11/28/97 03/31/98 16,850 05/13/98 11/06/98 17,909 100
302 00 0098 / 5778 5600 W DEVON AVE 4.0 09/01/02 06/23/03 645,345 08/26/02 06/18/03 644,104 100

Totals per Ornamental Lighting 11.0 1,164,045 679,922

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 6650 N NORTHWEST HWY .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 11 / 32230 ON N OLIPHANT AVE FROM N AVONDALE AVE TO W PRATT AVE 2.0 09/20/07 11/30/07 127,500 0 0

not issued Note Last Updated on 04-MAR-09


300 06 / 32277 ON N OSCEOLA AVE FROM W TOUHY AVE TO W PRATT AVE .0 05/04/08 12/31/08 0 0 0
300 06 0308 / 5414 ON W COYLE AVE FROM N ODELL AVE TO N HARLEM AVE 2.0 04/06/06 06/16/06 151,613 04/07/06 06/09/06 119,178 100
300 06 / 32275 ON W IBSEN ST FROM N HARLEM AVE TO N ODELL AVE 2.0 04/01/07 12/31/07 151,400 03/27/07 07/20/07 150,817 100
300 06 0298 / 5405 ON W LUNT AVE FROM N HARLEM AVE TO N ODELL AVE 2.0 06/01/05 07/01/05 0 05/13/05 07/15/05 112,118 100

Totals per Residntl Staggered Lighting 8.0 430,513 382,113

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON W FITCH AVE FROM N HARLEM AVE TO N ODELL AVE 2.0 09/01/03 11/01/03 145,441 08/18/03 10/29/03 131,302 100
300 06 0267 / 5375 ON W GREENLEAF AVE FROM N HARLEM AVE TO N ODELL AVE 2.0 04/19/04 06/19/04 165,110 04/23/04 06/01/04 157,132 100

Totals per Residntl Strt Lighting/Lamps 4.0 310,551 288,434

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 06 0194 / 5319 ON W BRYN MAWR AVE FROM N ORIOLE AVE TO N OZARK AVE 1.50 03/01/01 04/01/01 16,650 2,255 1
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 425

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Lighting Blocks
300 06 0246 / 5356 ON N ALGONQUIN AVE FROM N IONIA AVE TO N DOWAGIAC AVE .50 09/01/04 11/01/04 141,000 07/26/04 02/10/05 55,009 100
300 06 0246 / 5356 ON N DOWAGIAC AVE FROM N WAUKESHA AVE TO N CENTRAL AVE 1.50 09/01/04 11/01/04 141,000 07/26/04 02/10/05 55,009 100
300 06 0246 / 5356 ON N HIAWATHA AVE FROM N MENDOTA AVE TO N MANKATO AVE 2.0 09/01/04 08/01/05 150,000 05/23/05 09/23/05 64,644 100
300 06 0246 / 5356 ON N IONIA AVE FROM N CHICORA AVE TO N CENTRAL AVE 3.0 08/01/04 03/31/05 141,000 07/26/04 02/10/05 55,009 100
300 06 0246 / 5356 ON N MANKATO AVE FROM N HIAWATHA AVE TO N IONIA AVE 1.50 09/01/04 08/01/05 115,000 05/23/05 09/23/05 64,644 100
300 06 0246 / 5356 ON N MOSELLE AVE FROM N HIAWATHA AVE TO N LEOTI AVE .50 40,000 05/23/05 09/23/05 64,644 100
300 06 0246 / 5356 ON N MOSELLE AVE FROM N SIOUX AVE TO N IONIA AVE 1.0 75,000 05/23/05 09/23/05 64,644 100
300 06 0246 / 5356 ON N SIOUX AVE FROM N MOSELLE AVE TO N MANKATO AVE 1.50 09/01/04 08/01/05 115,000 05/23/05 10/03/05 64,644 100
300 06 0246 / 5356 ON N WAUKESHA AVE FROM N IONIA AVE TO N DOWAGIAC AVE .50 09/01/04 11/01/04 141,000 07/26/04 02/10/05 55,009 100

Totals per Strt Lighting 12.0 1,059,000 543,256

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 6550 N NORTHWEST HWY 2,195.0 03/01/04 12/01/04 11,414 11/20/06 12/27/06 23,904 100

Work Type: Underpass Lighting Fixtures


300 06 0217 / 5337 6650 N NORTHWEST HWY 13.0 06/02/04 06/05/04 731 06/10/04 06/11/04 2,088 100

Totals per Lighting/Electrical 3,100,026 2,082,001


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 426

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Flashing Yellow Warning Lights Locations
300 06 0166 / 5305 7200 N OSCEOLA AVE 1.0 03/15/01 04/15/01 15,000 05/03/01 05/04/01 6,451 100

Work Type: LED Signal Head Install Locations


210 06 0130 / 4389 N ORIOLE AVE AND W DEVON AVE 1.0 0 02/19/02 02/19/02 8,539 100
210 06 0130 / 4389 6725 N OLIPHANT AVE 1.0 0 09/25/01 09/25/01 8,539 100

Totals per LED Signal Head Install 2.0 0 17,078

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0240 / 4477 N HARLEM AVE AND W HIGGINS AVE 8.0 11/01/05 06/18/07 12,500 11/01/05 07/27/07 4,086 100
210 06 0240 / 4477 W BRYN MAWR AVE AND N HARLEM AVE 6.0 11/01/05 08/22/07 12,500 07/26/07 07/30/07 5,354 100

can not give true field for actual cost to date. No information found altho project is 100% Note Last Updated on 28-JAN-08
Totals per Pedestrian Countdown Signal Install 14.0 25,000 9,440

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N HARLEM AVE AND W PRATT BLVD 1.0 4,000 04/08/02 04/08/02 0 100

Work Type: Signals Intersections


300 06 0096 / 5258 6650 N NORTHWEST HWY 28.0 11/14/03 11/20/03 0 09/27/03 10/05/03 4,427 100

Work Type: TSM Install Locations


814 06 0322 / 16529 6324 N CALDWELL AVE 1.0 10/22/89 10/22/89 0 10/22/89 10/22/89 212,397 100
814 06 0321 / 16528 6348 N CALDWELL AVE 1.0 10/22/89 10/22/89 0 10/22/89 10/22/89 212,397 100
814 06 0295 / 16507 6400 N CALDWELL AVE 1.0 10/22/89 10/22/89 0 10/22/89 10/22/89 212,397 100
814 06 0294 / 16506 6220 N CENTRAL AVE 1.0 10/22/89 10/22/89 0 10/22/89 10/22/89 212,397 100
814 06 0320 / 16527 6400 N CENTRAL AVE 1.0 06/22/89 06/22/89 0 06/22/89 06/22/89 212,397 100
814 06 0068 / 16284 5400 N CUMBERLAND AVE 1.0 08/12/94 08/12/94 0 08/12/94 08/12/94 140,000 100
814 06 0319 / 16526 6400 N LEHIGH AVE 1.0 10/22/89 10/22/89 0 10/22/89 10/22/89 212,397 100
814 06 0169 / 16381 5800 N NAGLE AVE 1.0 09/28/90 09/28/90 0 09/28/90 09/28/90 103,851 100
210 06 0072 / 4336 5200 N RUTHERFORD AVE 1.0 03/01/01 05/01/01 150,000 04/11/01 08/01/01 150,853 100
814 06 0378 / 16568 6400 W FOSTER AVE 1.0 03/01/97 03/01/97 0 03/01/97 03/27/97 133,900 100

Totals per TSM Install 10.0 150,000 1,802,986

Totals per Traffic 194,000 1,840,382


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 427

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Totals per Construction Phase 3,294,026 3,922,383

Totals for Ward 41 3,560,326 3,927,127


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 428

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N DEARBORN ST FROM W OAK ST TO W DIVISION ST .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,446 100
300 06 0292 / 5399 ON N WABASH AVE FROM E PEARSON ST TO E CHESTNUT ST 1.0 11/19/04 05/18/05 1,000 11/19/04 05/18/05 0 100
210 06 0023 / 4298 N CLARK ST AND W ERIE ST .0 02/06/02 04/02/02 0 02/06/02 04/02/02 0 0
210 06 0023 / 4298 N CLARK ST AND W SUPERIOR ST .0 02/06/02 04/02/02 0 02/06/02 04/02/02 0 0
210 06 0207 / 4450 N COLUMBUS DR AND E ILLINOIS ST .0 07/01/04 12/30/04 0 07/01/04 12/30/04 39 100
210 06 0207 / 4450 N FAIRBANKS CT AND E GRAND AVE .0 07/01/04 12/30/04 0 07/01/04 12/30/04 39 100
210 06 0240 / 4477 N LA SALLE ST AND W LAKE ST .0 10/10/05 07/31/06 1,200 10/10/05 08/08/06 235 100
210 06 0240 / 4477 N LA SALLE ST AND W RANDOLPH ST .0 10/10/05 07/31/06 1,200 10/10/05 02/13/06 235 100
210 06 0240 / 4477 N LA SALLE ST AND W WASHINGTON ST .0 10/10/05 07/31/06 1,500 10/10/05 02/13/06 235 100
210 06 0207 / 4450 N LOWER MICHIGAN AVE AND E GRAND AVE .0 07/01/04 12/30/04 0 07/01/04 12/30/04 39 100
210 06 0207 / 4450 N MICHIGAN AVE AND E GRAND AVE .0 07/01/04 12/30/04 0 07/01/04 12/30/04 39 100
210 06 0207 / 4450 N MICHIGAN AVE AND E OAK ST .0 07/01/04 12/30/04 0 03/08/05 05/31/05 940 100
210 06 0207 / 4450 N MICHIGAN AVE AND E RANDOLPH ST .0 07/01/04 12/30/04 0 09/02/04 09/10/04 920 100
210 06 0207 / 4450 N MICHIGAN AVE AND E WASHINGTON ST .0 07/01/04 12/30/04 0 09/02/04 09/10/04 721 100
210 06 0207 / 4450 N PESHTIGO CT AND E GRAND AVE .0 07/01/04 12/30/04 0 07/01/04 12/30/04 39 100
210 06 0207 / 4450 N PESHTIGO CT AND E ILLINOIS ST .0 07/01/04 12/30/04 0 04/26/05 11/18/05 39 100
210 06 0023 / 4298 N RUSH ST AND E WALTON ST .0 02/06/02 04/02/02 0 02/06/02 04/02/02 0 0
210 06 0207 / 4450 N ST CLAIR ST AND E GRAND AVE .0 07/01/04 12/30/04 0 04/26/05 11/18/05 39 100
210 06 0207 / 4450 N STREETER DR AND E ILLINOIS ST .0 07/01/04 12/30/04 0 04/26/05 11/18/05 39 100
210 06 0243 / 4480 N WABASH AVE AND E WASHINGTON ST .0 12/27/06 01/26/07 500 12/27/06 01/26/07 1,912 100
210 06 0023 / 4298 N WELLS ST AND W HURON ST .0 02/06/02 04/02/02 0 02/06/02 04/02/02 0 0
210 06 0207 / 4450 S MICHIGAN AVE AND E ADAMS ST .0 07/01/04 12/30/04 500 09/02/04 09/10/04 137 100
210 06 0207 / 4450 S MICHIGAN AVE AND E JACKSON BLVD .0 07/01/04 12/30/04 750 09/02/04 09/10/04 460 100
210 06 0207 / 4450 S MICHIGAN AVE AND E MONROE ST .0 07/01/04 12/30/04 500 09/02/04 09/10/04 137 100
210 06 0243 / 4480 W ILLINOIS ST AND N LA SALLE DR .0 07/07/07 07/16/07 1,135 07/14/07 07/15/07 0 0
300 06 0282 / 5390 345 E OHIO ST 1.0 12/15/04 01/10/05 2,000 12/01/04 01/03/05 1,805 100
300 06 0292 / 5399 26 E PEARSON ST 1.0 1,000 04/08/05 0 85
281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 300 N CANAL ST 1.0 03/30/05 05/11/05 5,000 03/30/05 05/11/05 1,092 100
300 06 0291 / 5398 401 N WABASH AVE .0 10/01/04 12/31/04 54,192 10/01/04 11/04/04 0 100
300 06 0282 / 5390 747 N WABASH AVE 1.0 4,000 06/23/04 02/07/05 364 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 429

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0292 / 5399 330 W GRAND AVE .0 01/20/05 12/21/05 0 01/20/05 08/05/05 0 100
300 06 0292 / 5399 156 W SUPERIOR ST 1.0 02/10/05 05/26/05 3,000 02/10/05 05/26/05 0 100

Totals per Design/Engineering 6.0 77,477 11,951


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 430

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0042 / 5465 ON E BELLEVUE PL FROM N STATE ST TO N LAKE SHORE DR WEST 8.0 04/18/06 11/18/06 3,200 3,200 100
300 07 0042 / 5465 ON E CEDAR ST FROM N STATE ST TO N LAKE SHORE DR WEST 8.0 01/10/07 01/31/07 3,200 3,200 100
300 07 0042 / 5465 ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST 7.0 01/10/07 01/19/07 2,800 2,800 100
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W LAKE ST FROM N MILWAUKEE AVE TO N WEST WATER ST 4.0 01/10/07 01/31/07 6,000 6,000 100
300 07 0042 / 5465 ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR 2.0 01/10/07 01/31/07 800 800 100
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0

Totals per 250 Watt Changeout 29.0 16,000 16,000

Totals per Lighting/Electrical 3,524,651 4,193,749


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 431

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 07 0042 / 5465 ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST 7.0 01/10/07 01/19/07 2,800 2,800 100
300 07 0042 / 5465 ON N COLUMBUS DR FROM E WACKER DR TO E NORTH WATER ST 6.0 01/10/07 01/31/07 2,400 2,400 100
300 07 0042 / 5465 ON N DEARBORN ST FROM W ERIE ST TO W ONTARIO ST 11.0 01/10/07 01/31/07 4,400 4,400 100
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N LAKE SHORE DR WEST FROM E ERIE ST TO E ONTARIO ST 7.0 01/10/07 01/31/07 2,800 2,800 100
300 07 0042 / 5465 ON N MIES VAN DER ROHE WAY FROM E CHICAGO AVE TO E WALTON ST 5.0 01/10/07 01/31/07 1,200 1,200 100
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N DEARBORN ST TO N CLARK ST 4.0 01/10/07 01/31/07 1,600 1,600 100
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST 6.50 01/10/07 01/31/07 2,600 2,600 100
300 07 0042 / 5465 ON W HUBBARD ST FROM N FRANKLIN ST TO N ORLEANS ST 7.0 01/10/07 01/31/07 2,900 2,900 100
300 07 0042 / 5465 ON W KINZIE ST FROM N ORLEANS ST TO N FRANKLIN ST 6.0 01/10/07 01/31/07 2,500 2,500 100
300 07 0042 / 5465 ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR 6.0 01/10/07 01/31/07 2,400 2,400 100
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 333 W HUBBARD ST 13.0 04/18/06 11/18/06 5,400 5,400 100
300 06 0069 / 5233 150 W OAK ST 3.0 01/27/03 01/27/03 1,200 01/24/03 01/24/03 1,125 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 432

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
Totals per 400 Watt Changeout 81.50 33,000 32,925
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 433

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0095 / 5777 ON N MICHIGAN AVE FROM E RANDOLPH ST TO E LAKE ST 2.0 500 05/31/00 05/31/00 947 100
302 00 0095 / 5777 ON W WACKER DR FROM N FRANKLIN ST TO N WELLS ST 9.0 2,000 05/29/01 05/30/01 4,154 100
302 00 0095 / 5777 70 E ADAMS ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 70 E JACKSON BLVD 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 6 E LAKE ST 1.0 750 0
302 00 0095 / 5777 30 E LAKE ST 9.0 6,750 08/01/97 08/30/97 7,732 100
302 00 0095 / 5777 67 E MADISON ST 6.0 4,500 03/31/03 04/02/03 6,640 100
302 00 0095 / 5777 71 E MADISON ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 18 N CLARK ST 3.0 2,250 10/23/02 10/29/02 1,200 100
805 06 0515 / 6701 36 N CLARK ST 1.0 12/20/96 12/20/96 0 12/20/96 12/20/96 300 100
302 00 0095 / 5777 220 N CLARK ST 4.0 3,000 10/23/02 10/29/02 1,500 100
302 00 0095 / 5777 1 N DEARBORN ST 25.0 18,750 02/24/03 02/27/03 13,892 100
805 06 1476 / 7662 1301 N DEARBORN ST 1.0 11/20/97 11/20/97 0 11/20/97 11/20/97 300 100
302 00 0095 / 5777 17 N FRANKLIN ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 18 N FRANKLIN ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 40 N FRANKLIN ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 150 N FRANKLIN ST 3.0 2,250 10/23/02 10/29/02 1,200 100
805 06 0834 / 7020 700 N FRANKLIN ST 1.0 05/24/96 05/24/96 0 05/24/96 05/24/96 300 100
805 06 0853 / 7039 720 N FRANKLIN ST 1.0 05/29/96 05/29/96 0 05/29/96 05/29/96 300 100
302 00 0095 / 5777 18 N LA SALLE ST 1.0 750 10/23/02 10/29/02 400 100
302 00 0095 / 5777 33 N LA SALLE ST 4.0 3,000 01/16/03 01/22/03 3,532 100
302 00 0095 / 5777 120 N LA SALLE ST 18.0 13,500 10/15/01 10/15/01 9,737 100
300 06 0096 / 5258 121 N LA SALLE ST 300.0 03/01/03 09/01/03 0 03/01/06 09/01/06 9,064 0
302 00 0092 / 5774 121 N LA SALLE ST 33.0 0 02/13/01 01/21/02 7,776 100
302 00 0095 / 5777 18 N MICHIGAN AVE 3.0 2,250 10/23/02 10/29/02 1,200 100
302 00 0095 / 5777 40 N MICHIGAN AVE 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 150 N MICHIGAN AVE 3.0 2,250 10/23/02 10/29/02 1,200 100
302 00 0095 / 5777 360 N MICHIGAN AVE 2.0 1,500 10/11/00 10/11/00 947 100
805 06 0449 / 6635 1300 N STATE ST 1.0 11/15/96 11/15/96 0 11/15/96 11/15/96 300 100
302 00 0095 / 5777 151 N WABASH AVE 2.0 1,500 10/23/02 10/29/02 800 100
302 00 0095 / 5777 221 N WABASH AVE 2.0 1,500 10/23/02 10/29/02 1,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 434

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0095 / 5777 18 N WELLS ST 3.0 2,250 10/23/02 10/29/02 1,200 100
302 00 0095 / 5777 40 N WELLS ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 150 N WELLS ST 1.0 750 10/23/02 10/29/02 400 100
302 00 0095 / 5777 221 N WELLS ST 2.0 1,500 10/23/02 10/29/02 1,000 100
302 00 0095 / 5777 135 S LA SALLE ST 4.0 3,000 06/02/99 06/04/99 3,605 100
302 00 0095 / 5777 18 S MICHIGAN AVE 26.0 19,500 02/28/03 03/12/03 23,681 100
300 06 0078 / 5241 122 S MICHIGAN AVE 17.0 12/23/02 12/31/02 15,700 12/23/02 12/31/02 15,694 100
300 06 0225 / 5340 220 S MICHIGAN AVE 4.0 12/18/02 12/20/02 7,750 12/18/02 12/20/02 7,740 100
300 06 0078 / 5241 211 S STATE ST 14.0 10/29/02 11/06/02 14,850 10/29/02 11/06/02 14,831 100
300 06 0225 / 5340 211 S STATE ST 8.0 10/30/02 10/31/02 6,341 10/30/02 10/31/02 6,340 100
302 00 0095 / 5777 30 S WABASH AVE 5.0 3,750 03/13/03 03/14/03 5,129 100
805 06 0697 / 6883 58 W ERIE ST 1.0 11/06/96 11/06/96 0 11/06/96 11/06/96 300 100
302 00 0092 / 5774 501 W HURON ST 1.0 0 01/17/02 01/17/02 236 100
302 00 0095 / 5777 50 W LAKE ST 4.0 3,000 07/21/97 08/08/97 2,986 100
302 00 0095 / 5777 40-42 W MARBLE PL 15.0 11,250 03/17/03 03/28/03 12,754 100
302 00 0095 / 5777 22 W MONROE ST 12.0 9,000 12/16/97 12/26/97 10,237 100
805 06 0607 / 6793 63 W ONTARIO ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
302 00 0095 / 5777 190 W RANDOLPH ST 4.0 3,000 07/21/97 08/08/97 2,986 100
302 00 0095 / 5777 205 W RANDOLPH ST 4.0 3,000 03/23/00 03/24/00 1,926 100
300 06 0166 / 5305 4-36 W TOOKER PL 5.0 04/01/00 04/21/00 1,679 04/01/00 04/21/00 1,678 100
302 00 0095 / 5777 41 W WACKER DR 3.0 2,250 10/23/02 10/29/02 1,200 100
805 06 1798 / 7984 60 W WALTON ST 1.0 04/10/97 04/10/97 0 04/10/97 04/10/97 300 100
302 00 0095 / 5777 69 W WASHINGTON ST 11.0 12/06/02 12/11/02 8,250 12/06/02 12/11/02 10,477 100

Totals per Alley Lighting/Lamps 597.0 195,820 207,421

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 121 N LA SALLE ST 3,803.0 06/01/07 12/31/07 111,960 07/01/07 01/01/08 108,575 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 121 N LA SALLE ST 2,165.0 0 11/01/02 12/31/02 65,690 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 435

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N PARK DR FROM E NORTH WATER ST TO E ILLINOIS ST 2.0 01/10/07 01/31/07 1,000 1,000 100
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W MADISON ST FROM WACKER DR TO CANAL ST 1.0 01/10/07 01/31/07 500 500 100
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W WASHINGTON ST FROM N WACKER DR TO N RIVERSIDE PLZ 2.0 01/10/07 01/31/07 1,000 100 100
302 00 0092 / 5774 12 W WASHINGTON ST 2.0 0 07/09/01 07/09/01 941 100
302 00 0092 / 5774 26 W WASHINGTON ST 2.0 0 07/09/01 07/09/01 941 100

Totals per Flood Light Install 9.0 2,500 3,482

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 436

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 06 0282 / 5390 345 E OHIO ST 1.0 01/14/05 01/16/05 8,000 01/14/05 01/16/05 6,662 100
281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0
300 06 0292 / 5399 300 N CANAL ST 1.0 09/01/05 48,415 12/28/06 48,836 100
300 06 0282 / 5390 747 N WABASH AVE 1.0 81,000 12/01/04 09/13/05 68,596 100
300 06 0292 / 5399 330 W GRAND AVE 1.0 45,000 08/01/05 10/14/05 38,546 100

Totals per Lighting Imprvmnts 4.0 182,415 162,640

Work Type: Lighting Imprvmnts Projects


300 06 0199 / 5324 ON N WABASH AVE FROM E CHESTNUT ST TO E DELAWARE PL 1.0 32,573 10/04/99 11/10/99 24,412 100
150 06 0068 / 2139 ON W WACKER DR FROM N STATE ST TO N WELLS ST 1.0 0 11/15/98 12/31/99 17,879 100
300 06 0292 / 5399 156 W SUPERIOR ST .0 03/01/05 12/31/05 0 06/17/05 06/09/06 0 100

Totals per Lighting Imprvmnts 2.0 32,573 42,291

Work Type: Loop Lighting Blocks


281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 437

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 11 / 32231 ON N DEARBORN ST FROM W DIVISION ST TO W BURTON PL 25.0 03/08/08 03/08/08 33,750 07/09/08 07/09/08 38,636 100
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 06 0122 / 5275 ON W NORTH AVE FROM N WELLS ST TO N CLARK ST 4.55 08/20/03 08/25/03 5,670 08/19/03 08/25/03 5,267 100
300 06 0122 / 5275 ON W NORTH BLVD FROM N CLARK ST TO N DEARBORN PKWY 6.50 08/20/03 08/25/03 8,100 08/19/03 08/22/03 15,048 100
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 333 W HUBBARD ST 7.0 04/18/06 11/18/06 9,450 9,450 100

Totals per Ornamental - Piggyback Lighting 43.05 56,970 68,401


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 438

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental Lighting Blocks
300 06 0188 / 5313 ON E CHESTNUT ST FROM N RUSH ST TO N WABASH AVE .50 06/01/02 12/01/02 69,500 05/28/02 12/27/02 49,622 100
300 06 0188 / 5313 ON E PEARSON ST FROM N RUSH ST TO N WABASH AVE .50 06/01/02 12/01/02 69,500 05/28/02 12/27/02 49,622 100
300 06 0132 / 5285 ON N FRANKLIN ST FROM W HURON ST TO W CHICAGO AVE 1.0 125,000 05/01/00 05/19/00 49,188 100
300 06 0073 / 5236 ON N RUSH ST FROM E CHESTNUT ST TO E CEDAR ST 3.0 08/03/98 09/28/01 1,700,000 08/03/98 05/20/02 1,173,525 100
300 06 0188 / 5313 ON N RUSH ST FROM E CHESTNUT ST TO E PEARSON ST .50 06/01/02 12/01/02 69,500 05/28/02 12/27/02 49,622 100
300 06 0188 / 5313 ON N WABASH AVE FROM E CHESTNUT ST TO E PEARSON ST .50 06/01/02 12/01/02 69,500 05/28/02 12/27/02 49,623 100
302 00 0043 / 5753 ON W WACKER DR FROM N STATE ST TO N FRANKLIN ST 3.50 0 0
300 11 / 32231 N DEARBORN PKWY AND W NORTH BLVD 1.0 03/08/08 07/09/08 36,000 03/08/08 07/09/08 38,636 100
300 11 / 32231 N DEARBORN ST AND W GOETHE ST 1.0 03/08/08 07/09/08 30,000 03/08/08 07/09/08 38,636 100
300 11 / 32231 W BURTON PL AND N DEARBORN ST 1.0 03/08/08 07/09/08 36,000 03/08/08 07/09/08 38,636 100
281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0

Totals per Ornamental Lighting 12.50 2,205,000 1,537,110

Work Type: POD Camera Pole Poles


281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 311 W SUPERIOR ST .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0298 / 5405 ON N DEARBORN ST FROM W CHICAGO AVE TO W OAK ST 2.0 11/01/05 12/15/05 0 10/10/05 11/18/05 144,313 100
300 06 0308 / 5414 ON N DEARBORN ST FROM W OAK ST TO W DIVISION ST 2.0 03/16/06 12/31/06 209,566 10/06/06 11/17/06 135,535 100

Totals per Residntl Staggered Lighting 4.0 209,566 279,848

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0166 / 5305 ON W CHESTNUT ST FROM N STATE ST TO N DEARBORN ST .50 04/01/00 04/21/00 1,679 04/01/00 04/21/00 1,678 100
300 06 0235 / 5349 ON W OAK ST FROM N LA SALLE ST TO N DEARBORN ST 2.0 09/15/03 10/30/03 85,094 08/18/03 10/17/03 146,995 100

Totals per Residntl Strt Lighting/Lamps 2.50 86,773 148,673

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 439

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 440

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0081 / 5244 ON E ADAMS ST FROM S STATE ST TO S MICHIGAN AVE 27.0 05/02/98 05/03/98 1,715 05/02/98 05/03/98 1,715 100
300 07 0042 / 5465 ON E BELLEVUE PL FROM N STATE ST TO N LAKE SHORE DR WEST 8.0 04/18/06 11/18/06 1,600 04/18/06 11/18/06 1,600 100
300 07 0042 / 5465 ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST 7.0 04/18/06 11/18/06 1,750 08/14/06 09/01/06 1,382 100
300 06 0081 / 5244 ON E MADISON ST FROM S STATE ST TO N MICHIGAN AVE 20.0 0 05/09/98 05/10/98 1,270 100
300 06 0081 / 5244 ON E MONROE ST FROM S STATE ST TO S MICHIGAN AVE 20.0 0 05/09/98 05/10/98 1,270 100
300 06 0081 / 5244 ON E WASHINGTON ST FROM N STATE ST TO N MICHIGAN AVE 20.0 0 05/16/98 05/17/98 1,270 100
300 07 0042 / 5465 ON N COLUMBUS DR FROM E WACKER DR TO E NORTH WATER ST 6.0 04/18/06 11/18/06 1,500 08/14/06 09/01/06 1,185 100
300 11 / 32231 ON N DEARBORN ST FROM W DIVISION ST TO W BURTON PL 25.0 03/08/08 07/09/08 7,500 03/08/08 07/09/08 5,000 100
300 07 0042 / 5465 ON N DEARBORN ST FROM W ERIE ST TO W ONTARIO ST 11.0 04/18/06 11/18/06 2,750 08/14/06 09/01/06 2,172 100
302 00 0076 / 5764 ON N DEARBORN ST FROM W MADISON ST TO W WACKER DR 48.0 09/01/00 12/31/00 0 816
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0043 / 5466 ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE 14.50 04/18/06 11/18/06 3,625 08/04/06 09/01/06 0 100
300 07 0042 / 5465 ON N LAKE SHORE DR WEST FROM E ERIE ST TO E ONTARIO ST 7.0 04/18/06 11/18/06 1,750 08/14/06 09/01/06 1,381 100
300 07 0042 / 5465 ON N MIES VAN DER ROHE WAY FROM E CHICAGO AVE TO E WALTON ST 3.0 04/18/06 01/31/07 600 08/14/06 09/01/06 592 100
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 06 0081 / 5244 ON N ORLEANS ST FROM W HUBBARD ST TO W CHICAGO AVE 70.0 0 05/12/98 05/17/98 4,505 100
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
302 00 0076 / 5764 ON N RUSH ST FROM E SUPERIOR ST TO E CHICAGO AVE 4.0 09/01/00 12/31/00 0 68
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 06 0081 / 5244 ON N STATE ST FROM E MADISON ST TO W WACKER DR 4.0 0 05/23/98 05/23/98 254 100
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 441

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 06 0081 / 5244 ON S CLARK ST FROM W MADISON ST TO W VAN BUREN ST 37.0 0 05/17/98 05/23/98 2,350 100
300 06 0081 / 5244 ON S LA SALLE ST FROM W MADISON ST TO W VAN BUREN ST 23.50 0 05/13/98 05/16/98 1,493 100
300 06 0081 / 5244 ON S STATE ST FROM E MADISON ST TO W CONGRESS PKWY 4.0 0 05/23/98 05/23/98 254 100
300 06 0081 / 5244 ON S WABASH AVE FROM E MADISON ST TO E BALBO AVE 55.90 0 05/08/98 05/17/98 3,598 100
300 06 0081 / 5244 ON S WABASH AVE FROM E MADISON ST TO E CONGRESS PKWY 4.80 0 05/23/98 05/23/98 305 100
300 06 0081 / 5244 ON W ADAMS ST FROM S STATE ST TO S JEFFERSON ST 50.0 0 04/25/98 05/03/98 3,175 100
300 06 0081 / 5244 ON W CHICAGO AVE FROM N DEARBORN ST TO N LA SALLE DR 12.0 0 05/23/98 05/23/98 762 100
300 03 0042 / 4913 ON W DELAWARE PL FROM N CLARK ST TO N LA SALLE DR 3.0 03/01/05 03/01/05 600 0
300 07 0042 / 5465 ON W ERIE ST FROM N DEARBORN ST TO N CLARK ST 4.0 04/18/06 11/18/06 1,000 08/14/06 09/01/06 791 100
300 06 0081 / 5244 ON W ERIE ST FROM N LA SALLE DR TO N ORLEANS ST 15.0 0 05/17/98 05/17/98 952 100
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST 6.50 04/18/06 11/18/06 1,625 08/14/06 09/01/06 1,283 100
300 06 0081 / 5244 ON W HUBBARD ST FROM N STATE ST TO N WELLS ST 23.0 0 05/16/98 05/17/98 1,461 100
300 06 0081 / 5244 ON W HURON ST FROM N LA SALLE DR TO N ORLEANS ST 13.0 0 05/17/98 05/17/98 825 100
300 06 0081 / 5244 ON W KINZIE ST FROM N STATE ST TO N WELLS ST 22.0 0 05/16/98 05/17/98 1,397 100
300 06 0081 / 5244 ON W MADISON ST FROM S STATE ST TO S DESPLAINES ST 44.50 0 05/04/98 05/10/98 2,826 100
300 07 0042 / 5465 ON W MADISON ST FROM WACKER DR TO CANAL ST 2.0 04/18/06 11/18/06 500 08/14/06 09/01/06 395 100
300 07 0042 / 5465 ON W MAPLE ST FROM N STATE ST TO N DEARBORN ST 2.0 04/18/06 11/18/06 400 08/14/06 09/01/06 395 100
300 07 0042 / 5465 ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR 6.0 04/18/06 11/18/06 1,500 08/14/06 09/01/06 1,185 100
300 06 0081 / 5244 ON W MONROE ST FROM S STATE ST TO S JEFFERSON ST 45.0 0 05/04/98 05/10/98 2,858 100
300 06 0108 / 5263 ON W NORTH AVE FROM N CLARK ST TO N DEARBORN ST 8.50 07/01/03 07/07/03 2,000 06/20/03 06/30/03 1,925 100
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 03/01/06 12/31/06 0 0
300 06 0081 / 5244 ON W SUPERIOR ST FROM N LA SALLE DR TO N ORLEANS ST 11.0 0 05/17/98 05/17/98 698 100
300 06 0081 / 5244 44 E ONTARIO ST 5.0 0 05/22/98 05/22/98 317 100
300 06 0081 / 5244 65 E ONTARIO ST 5.0 0 05/23/98 05/23/98 317 100
300 06 0081 / 5244 200 E ONTARIO ST 22.0 0 05/21/98 05/22/98 1,397 100
300 06 0081 / 5244 300 E ONTARIO ST 7.0 0 05/22/98 05/22/98 444 100
302 00 0076 / 5764 400-430 N LA SALLE ST 4.0 09/01/00 12/31/00 0 68
300 07 0042 / 5465 333 W HUBBARD ST 9.0 04/18/06 11/18/06 2,250 04/18/06 11/18/06 2,250 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 442

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 06 0081 / 5244 1-630 W WASHINGTON BLVD 90.0 0 05/02/98 05/17/98 5,715 100

Totals per Strt Light Pole Painting 831.20 33,315 64,309

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


281 00 / 33670 206-232 E SUPERIOR ST .0 01/01/08 12/31/08 0 0 0

Work Type: Strt Lighting Blocks


302 00 0071 / 5759 ON W LAKE ST FROM N WELLS ST TO N FRANKLIN ST 0 247,621
300 06 0117 / 5271 ON W WACKER DR FROM N STATE ST TO N ORLEANS ST 30,000 24,000
300 06 0291 / 5398 401 N WABASH AVE .0 12/01/04 02/28/05 67,142 01/03/05 03/22/05 60,640 100
303 00 0006 / 5783 540 W LAKE ST 08/01/97 12/01/97 60,000 08/01/97 04/30/98 76,547 100

Totals per Strt Lighting .0 157,142 408,808

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 121 N LA SALLE ST 945.0 03/01/04 12/01/04 4,914 10/27/06 11/27/06 10,291 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 443

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
302 00 0073 / 5761 ON E HUBBARD ST FROM N RUSH ST TO N WABASH AVE 22.0 06/01/00 10/31/01 76,562 07/19/01 15,742 100
302 00 0073 / 5761 ON N WABASH AVE FROM E WACKER DR TO E GRAND AVE 171.0 06/01/00 10/31/01 76,564 04/16/01 122,366 100
805 06 2255 / 8441 44 E ADAMS ST 4.0 12/31/93 12/31/93 0 12/31/93 12/31/93 3,000 100
805 06 2649 / 8835 134 E GRAND AVE 28.0 01/01/92 01/01/92 0 01/01/92 01/01/92 21,000 100
805 06 2627 / 8813 498 E GRAND AVE 32.0 01/01/93 01/01/93 0 01/01/93 01/01/93 24,000 100
805 06 2578 / 8764 134 E ILLINOIS ST 28.0 01/01/92 01/01/92 0 01/01/92 01/01/92 21,000 100
805 06 2402 / 8588 520 E ILLINOIS ST 32.0 01/01/92 01/01/92 0 01/01/92 01/01/92 24,000 100
300 06 0207 / 5330 150 N COLUMBUS DR 66.0 0 10/25/01 59,080 95
805 06 2927 / 9113 435 N DESPLAINES ST 14.0 12/01/93 12/01/93 0 12/01/93 12/01/93 10,500 100
302 00 0070 / 5758 320 N JEFFERSON ST 0 12/31/97 01/06/98 6,439 100
302 00 0070 / 5758 600 N KINGSBURY ST 0 06/24/97 07/02/97 10,451 100
805 06 2119 / 8305 600 N KINGSBURY ST 17.0 07/02/97 07/02/97 0 07/02/97 07/02/97 12,750 100
300 06 0217 / 5337 121 N LA SALLE ST 544.0 06/07/04 06/14/04 30,577 07/26/04 08/09/04 10,880 100
302 00 0072 / 5760 220 N MILWAUKEE AVE 1.0 0 10/28/99 12/29/99 23,017 100
805 06 2906 / 9092 220 N MILWAUKEE AVE 18.0 07/29/94 07/29/94 0 07/29/94 07/29/94 13,500 100
302 00 0070 / 5758 1 S STATE ST 0 441,811
805 06 2278 / 8464 201 W ADAMS ST 4.0 12/31/93 12/31/93 0 12/31/93 12/31/93 3,000 100
805 06 2903 / 9089 501 W FULTON ST 16.0 02/22/94 02/22/94 0 02/22/94 02/22/94 12,000 100
805 06 2902 / 9088 628 W HUBBARD ST 24.0 12/01/93 12/01/93 0 12/01/93 12/01/93 18,000 100
805 06 2275 / 8461 405 W KINZIE ST 12.0 12/31/94 12/31/94 0 12/31/94 12/31/94 9,000 100
805 06 2276 / 8462 405 W KINZIE ST 12.0 12/31/94 12/31/94 0 12/31/94 12/31/94 9,000 100
805 06 2904 / 9090 534 W KINZIE ST 23.0 11/17/93 11/17/93 0 11/17/93 11/17/93 17,250 100
805 06 2235 / 8421 501 W LAKE ST 42.0 04/17/96 04/17/96 0 04/17/96 04/17/96 31,500 100
805 06 2855 / 9041 505 W RANDOLPH ST 42.0 01/30/93 01/30/93 0 01/30/93 01/30/93 31,500 100
805 06 2246 / 8432 505 W WASHINGTON BLVD 98.0 05/19/96 05/19/96 0 05/19/96 05/19/96 73,500 100

Totals per Underpass Lighting 1,250.0 183,703 1,024,286


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 444

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Locations
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W FULTON ST FROM N CANAL ST TO N CLINTON ST 6.0 04/18/06 11/18/06 6,000 6,000 100
300 07 0042 / 5465 ON W KINZIE ST FROM N CANAL ST TO N CLINTON ST 7.0 04/18/06 11/18/06 7,000 7,000 100
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0

Totals per Underpass Lighting 13.0 13,000 13,000


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 445

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 E GRAND AVE AND N WABASH AVE 1.0 0 11/04/02 11/04/02 7,324 100
210 06 0175 / 4423 E ILLINOIS ST AND N STREETER DR 1.0 04/03/03 05/03/03 10,000 04/03/03 04/03/03 10,663 100
210 06 0130 / 4389 E MONROE ST AND S WABASH AVE 1.0 0 10/03/01 10/03/01 7,552 100
210 06 0130 / 4389 E ONTARIO ST AND N WABASH AVE 1.0 0 09/04/02 09/04/02 7,324 100
210 06 0130 / 4389 N CLARK ST AND W CHICAGO AVE 1.0 0 04/08/02 04/08/02 8,091 100
210 06 0130 / 4389 N CLARK ST AND W GRAND AVE 1.0 0 11/11/01 11/11/01 6,108 100
210 06 0130 / 4389 N CLARK ST AND W HUBBARD ST 1.0 0 11/11/01 11/11/01 3,677 100
210 06 0130 / 4389 N CLARK ST AND W HURON ST 1.0 0 11/08/01 11/08/01 7,324 100
210 06 0130 / 4389 N CLARK ST AND W ILLINOIS ST 1.0 0 11/11/01 11/11/01 6,108 100
210 06 0130 / 4389 N CLARK ST AND W KINZIE ST 1.0 0 11/12/01 11/12/01 7,324 100
210 06 0130 / 4389 N CLARK ST AND W LAKE ST 1.0 0 10/21/01 10/21/01 7,324 100
210 06 0130 / 4389 N CLARK ST AND W OHIO ST 1.0 0 11/11/01 11/11/01 7,552 100
210 06 0130 / 4389 N CLARK ST AND W ONTARIO ST 1.0 0 11/08/01 11/08/01 6,108 100
210 06 0130 / 4389 N CLARK ST AND W RANDOLPH ST 1.0 0 10/11/01 10/11/01 6,108 100
210 06 0130 / 4389 N CLARK ST AND W WASHINGTON ST 1.0 0 09/17/01 09/17/01 6,108 100
210 06 0130 / 4389 N CLINTON ST AND W LAKE ST 1.0 0 11/21/01 11/21/01 8,134 100
210 06 0175 / 4423 N COLUMBUS DR AND E NORTH WATER ST 1.0 01/01/04 01/01/04 16,000 12/30/03 12/31/03 13,613 100
210 06 0130 / 4389 N DEARBORN ST AND W ERIE ST 1.0 0 11/13/01 11/13/01 3,522 100
210 06 0130 / 4389 N DEARBORN ST AND W GRAND AVE 1.0 0 11/13/01 11/13/01 6,108 100
210 06 0130 / 4389 N DEARBORN ST AND W HURON ST 1.0 0 11/13/01 11/13/01 6,108 100
210 06 0130 / 4389 N DEARBORN ST AND W ILLINOIS ST 1.0 0 11/13/01 11/13/01 6,108 100
210 06 0130 / 4389 N DEARBORN ST AND W KINZIE ST 1.0 0 11/13/01 11/13/01 7,324 100
210 06 0130 / 4389 N DEARBORN ST AND W LAKE ST 1.0 0 10/21/01 10/21/01 9,367 100
210 06 0130 / 4389 N DEARBORN ST AND W OHIO ST 1.0 0 11/14/01 07/25/02 5,423 90
210 06 0130 / 4389 N DEARBORN ST AND W ONTARIO ST 1.0 0 11/14/01 11/14/01 5,651 100
210 06 0130 / 4389 N DEARBORN ST AND W RANDOLPH ST 1.0 0 10/11/01 10/11/01 6,285 100
210 06 0130 / 4389 N DEARBORN ST AND W SUPERIOR ST 1.0 0 11/14/01 11/14/01 3,065 100
210 06 0130 / 4389 N DEARBORN ST AND W WASHINGTON ST 1.0 0 09/18/01 09/18/01 6,513 100
210 06 0130 / 4389 N FAIRBANKS CT AND E GRAND AVE 1.0 0 10/31/01 10/31/01 4,384 90
210 06 0175 / 4423 N FAIRBANKS CT AND E OHIO ST 1.0 01/02/04 01/02/04 12,000 01/08/04 01/08/04 13,958 100
210 06 0175 / 4423 N FAIRBANKS CT AND E ONTARIO ST 1.0 01/03/04 01/03/04 10,000 01/07/04 01/07/04 13,392 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 446

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N FRANKLIN ST AND W GRAND AVE 1.0 0 05/23/02 05/23/02 10,160 100
210 06 0130 / 4389 N FRANKLIN ST AND W LAKE ST 1.0 0 10/16/01 10/16/01 5,880 100
210 06 0130 / 4389 N FRANKLIN ST AND W OHIO ST 1.0 0 05/28/02 05/28/02 3,117 100
210 06 0130 / 4389 N FRANKLIN ST AND W ONTARIO ST 1.0 0 05/29/02 05/29/02 6,638 100
210 06 0130 / 4389 N FRANKLIN ST AND W RANDOLPH ST 1.0 0 10/15/01 10/15/01 6,513 100
210 06 0130 / 4389 N FRANKLIN ST AND W WASHINGTON ST 1.0 0 09/16/01 09/16/01 6,108 100
210 06 0175 / 4423 N KINGSBURY ST AND W GRAND AVE 1.0 01/04/04 01/04/04 12,000 12/22/03 12/22/03 13,096 100
210 06 0130 / 4389 N LA SALLE ST AND W CHICAGO AVE 1.0 0 04/09/02 04/09/02 9,349 100
210 06 0130 / 4389 N LA SALLE ST AND W ERIE ST 1.0 0 11/07/01 11/07/01 8,539 100
210 06 0130 / 4389 N LA SALLE ST AND W GRAND AVE 1.0 0 11/06/01 11/06/01 8,496 100
210 06 0130 / 4389 N LA SALLE ST AND W HUBBARD ST 1.0 0 11/05/01 11/05/01 8,539 100
210 06 0130 / 4389 N LA SALLE ST AND W HURON ST 1.0 0 11/07/01 11/07/01 7,324 100
210 06 0130 / 4389 N LA SALLE ST AND W ILLINOIS ST 1.0 0 11/06/01 11/06/01 5,246 100
210 06 0130 / 4389 N LA SALLE ST AND W LAKE ST 1.0 0 10/18/01 10/18/01 8,539 100
210 06 0130 / 4389 N LA SALLE ST AND W OHIO ST 1.0 0 11/06/01 06/12/02 9,711 100
210 06 0130 / 4389 N LA SALLE ST AND W ONTARIO ST 1.0 0 06/13/02 06/13/02 6,190 100
210 06 0130 / 4389 N LA SALLE ST AND W RANDOLPH ST 1.0 0 10/11/01 10/11/01 7,729 100
210 06 0130 / 4389 N LA SALLE ST AND W SUPERIOR ST 1.0 0 11/07/01 11/07/01 7,729 100
210 06 0130 / 4389 N LA SALLE ST AND W WASHINGTON ST 1.0 0 09/17/01 09/17/01 7,729 100
210 06 0175 / 4423 N MCCLURG CT AND E OHIO ST 1.0 01/10/04 01/10/04 11,000 12/30/03 12/31/03 9,560 100
210 06 0175 / 4423 N MCCLURG CT AND E ONTARIO ST 1.0 01/02/04 01/02/04 10,000 12/30/03 12/31/03 9,921 100
210 06 0130 / 4389 N MICHIGAN AVE AND E CHICAGO AVE 1.0 0 04/01/02 04/01/02 13,397 100
210 06 0175 / 4423 N MICHIGAN AVE AND E ERIE ST 1.0 06/11/03 06/12/03 14,000 05/28/03 05/29/03 15,066 100
210 06 0175 / 4423 N MICHIGAN AVE AND E GRAND AVE 2.0 06/19/03 01/03/04 24,000 05/08/03 01/23/04 23,372 100
210 06 0175 / 4423 N MICHIGAN AVE AND E HURON ST 1.0 06/09/03 06/10/03 16,000 05/30/03 05/30/03 14,205 100
210 06 0175 / 4423 N MICHIGAN AVE AND E ILLINOIS ST 1.0 06/20/03 06/23/03 11,000 05/09/03 05/12/03 12,402 100
210 06 0130 / 4389 N MICHIGAN AVE AND E LAKE ST 1.0 0 10/23/01 10/23/01 12,522 100
210 06 0175 / 4423 N MICHIGAN AVE AND E OHIO ST 1.0 06/17/03 06/18/03 15,000 05/13/03 05/15/03 15,650 100
210 06 0175 / 4423 N MICHIGAN AVE AND E ONTARIO ST 1.0 06/13/03 06/16/03 16,000 05/16/03 05/19/03 16,126 100
210 06 0130 / 4389 N MICHIGAN AVE AND E RANDOLPH ST 1.0 0 10/16/01 10/16/01 15,069 100
210 06 0175 / 4423 N MICHIGAN AVE AND E SUPERIOR ST 1.0 06/05/03 06/06/03 15,000 06/02/03 06/05/03 16,936 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 447

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N MICHIGAN AVE AND E WASHINGTON ST 1.0 0 09/20/01 09/20/01 8,944 100
210 06 0130 / 4389 N ORLEANS ST AND W CHICAGO AVE .50 0 04/12/02 04/12/02 3,953 100
210 06 0130 / 4389 N ORLEANS ST AND W GRAND AVE 1.0 0 05/13/02 05/13/02 9,306 100
210 06 0130 / 4389 N ORLEANS ST AND W HURON ST 1.0 0 10/30/01 10/30/01 5,953 100
210 06 0130 / 4389 N ORLEANS ST AND W ILLINOIS ST 1.0 0 05/10/02 05/10/02 8,082 100
210 06 0130 / 4389 N ORLEANS ST AND W MERCHANDISE MART PLZ 1.0 0 04/12/02 04/12/02 6,513 100
210 06 0130 / 4389 N ORLEANS ST AND W OHIO ST 1.0 0 05/13/02 05/13/02 5,195 100
210 06 0130 / 4389 N ORLEANS ST AND W SUPERIOR ST 1.0 0 05/02/02 05/02/02 9,806 100
210 06 0175 / 4423 N PESHTIGO CT AND E GRAND AVE 1.0 01/05/04 01/05/04 14,000 01/14/04 01/14/04 10,966 100
210 06 0175 / 4423 N PESHTIGO CT AND E ILLINOIS ST 1.0 06/04/03 06/05/03 9,000 06/12/03 06/12/03 7,032 100
210 06 0175 / 4423 N RUSH ST AND E GRAND AVE 1.0 04/18/03 04/21/03 12,000 04/18/03 04/21/03 13,022 100
210 06 0175 / 4423 N RUSH ST AND E ILLINOIS ST 1.0 04/22/03 04/23/03 12,000 04/22/03 04/23/03 13,251 100
210 06 0175 / 4423 N RUSH ST AND E OHIO ST 1.0 04/24/03 04/25/03 10,000 04/24/03 04/25/03 10,977 100
210 06 0175 / 4423 N RUSH ST AND E ONTARIO ST 1.0 04/25/03 04/28/03 10,000 04/25/03 04/28/03 10,977 100
210 06 0175 / 4423 N ST CLAIR ST AND E GRAND AVE 1.0 04/29/03 04/29/03 10,000 04/29/03 04/29/03 11,135 100
210 06 0175 / 4423 N ST CLAIR ST AND E HURON ST 1.0 04/30/03 05/01/03 12,000 05/01/03 05/01/03 13,251 100
210 06 0175 / 4423 N ST CLAIR ST AND E OHIO ST 1.0 01/07/04 01/07/04 14,000 12/23/03 12/23/03 12,086 100
210 06 0175 / 4423 N ST CLAIR ST AND E ONTARIO ST 1.0 01/08/04 01/08/04 16,000 12/31/03 12/31/03 11,320 100
210 06 0130 / 4389 N STATE ST AND E BELLEVUE PL 1.0 0 05/02/02 05/02/02 8,539 100
210 06 0175 / 4423 N STREETER DR AND E ILLINOIS ST 1.0 04/11/03 04/14/03 11,000 04/11/03 04/14/03 12,353 100
210 06 0130 / 4389 N WABASH AVE AND E CHICAGO AVE 1.0 0 04/04/02 04/04/02 8,539 100
210 06 0130 / 4389 N WABASH AVE AND E LAKE ST 1.0 0 10/23/01 10/23/01 6,513 100
210 06 0130 / 4389 N WABASH AVE AND E NORTH WATER ST 1.0 0 11/04/02 11/04/02 7,625 100
210 06 0130 / 4389 N WABASH AVE AND E RANDOLPH ST 1.0 0 10/14/01 10/14/01 10,970 100
210 06 0130 / 4389 N WABASH AVE AND E WASHINGTON ST 1.0 0 09/19/01 09/19/01 6,918 100
210 06 0130 / 4389 N WELLS ST AND W CHICAGO AVE .50 0 04/10/02 04/10/02 4,270 100
210 06 0130 / 4389 N WELLS ST AND W GRAND AVE 1.0 0 11/01/01 11/01/01 7,324 100
210 06 0130 / 4389 N WELLS ST AND W HUBBARD ST 1.0 0 11/01/01 11/01/01 7,095 100
210 06 0130 / 4389 N WELLS ST AND W ILLINOIS ST 1.0 0 11/01/01 11/01/01 6,108 100
210 06 0130 / 4389 N WELLS ST AND W KINZIE ST 1.0 0 11/01/01 11/01/01 8,539 100
210 06 0130 / 4389 N WELLS ST AND W LAKE ST 1.0 0 10/17/01 10/17/01 7,677 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 448

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N WELLS ST AND W OHIO ST 1.0 0 05/30/02 05/30/02 3,751 100
210 06 0130 / 4389 N WELLS ST AND W ONTARIO ST 1.0 0 11/05/01 11/05/01 4,893 100
210 06 0130 / 4389 N WELLS ST AND W RANDOLPH ST 1.0 0 10/16/01 10/16/01 7,324 100
210 06 0130 / 4389 N WELLS ST AND W WASHINGTON ST 1.0 0 09/17/01 09/17/01 6,513 100
210 06 0130 / 4389 S CLARK ST AND W ADAMS ST 1.0 0 10/02/01 10/02/01 6,513 100
210 06 0130 / 4389 S CLARK ST AND W JACKSON BLVD .50 0 10/09/01 10/09/01 3,257 100
210 06 0130 / 4389 S COLUMBUS DR AND E BALBO AVE .50 0 02/06/02 02/06/02 6,231 100
210 06 0130 / 4389 S COLUMBUS DR AND E CONGRESS DR .50 0 03/06/02 03/06/02 4,728 100
210 06 0130 / 4389 S COLUMBUS DR AND E JACKSON BLVD .50 0 01/17/02 01/17/02 4,856 100
210 06 0130 / 4389 S COLUMBUS DR AND E MONROE ST 1.0 0 01/16/02 01/16/02 13,229 100
210 06 0130 / 4389 S DEARBORN ST AND W ADAMS ST 1.0 0 04/05/02 04/05/02 8,901 100
210 06 0130 / 4389 S DEARBORN ST AND W JACKSON BLVD .50 0 10/09/01 10/09/01 3,257 100
210 06 0130 / 4389 S DEARBORN ST AND W MONROE ST 1.0 0 09/26/01 09/26/01 6,918 100
210 06 0130 / 4389 S LA SALLE ST AND W ADAMS ST 1.0 0 10/02/01 10/02/01 7,324 100
210 06 0130 / 4389 S LA SALLE ST AND W MONROE ST 1.0 0 09/26/01 09/26/01 7,095 100
210 06 0130 / 4389 S MICHIGAN AVE AND E JACKSON BLVD .50 0 11/04/02 11/04/02 5,132 100
210 06 0130 / 4389 S MICHIGAN AVE AND E MONROE ST 1.0 0 09/27/01 09/27/01 11,478 100
210 06 0130 / 4389 S STATE ST AND W MADISON ST 1.0 0 09/21/01 09/21/01 7,324 100
210 06 0130 / 4389 S WABASH AVE AND E ADAMS ST 1.0 0 10/03/01 10/03/01 6,513 100
210 06 0130 / 4389 S WABASH AVE AND E JACKSON BLVD .50 0 10/09/01 10/09/01 2,395 100
210 06 0130 / 4389 S WELLS ST AND W ADAMS ST .50 0 10/04/01 10/04/01 3,459 100
210 06 0130 / 4389 S WELLS ST AND W JACKSON BLVD .50 0 10/10/01 10/10/01 2,940 100
210 06 0130 / 4389 S WELLS ST AND W MONROE ST .50 0 10/04/01 10/04/01 3,662 100
210 06 0130 / 4389 320 N CLARK ST 1.0 0 11/21/01 11/21/01 3,927 100

Totals per LED Signal Head Install 112.0 322,000 960,363

Totals per Traffic 3,487,726 5,843,683


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 449

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Left Turn Arrow Locations
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 N FAIRBANKS CT AND E GRAND AVE 1.0 04/18/06 11/18/06 5,000 5,000 100
210 06 0021 / 4296 W GRAND AVE AND N KINGSBURY ST 1.0 01/31/02 05/03/02 60,000 11/17/01 11/17/01 10,543 100

Totals per Left Turn Arrow 2.0 65,000 15,543

Work Type: New Signal Locations


210 06 0022 / 4297 N CLARK ST AND W SUPERIOR ST 1.0 06/01/02 12/31/02 15,000 11/20/02 01/08/03 14,868 100
210 06 0189 / 4434 1 N WACKER DR 1.0 44,000 0

Totals per New Signal 2.0 59,000 14,868


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 450

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Pedestrian Countdown Signal Install Locations
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
210 06 0207 / 4450 N COLUMBUS DR AND E ILLINOIS ST 1.0 08/15/05 11/15/05 8,800 10/06/05 10/19/05 5,792 100
300 07 0042 / 5465 N DEARBORN ST AND W OAK ST 1.0 04/18/06 11/18/06 24,000 24,000 100
210 06 0207 / 4450 N FAIRBANKS CT AND E GRAND AVE 1.0 08/15/05 11/15/05 8,800 10/06/05 10/19/05 5,792 100
210 06 0240 / 4477 N LA SALLE ST AND W LAKE ST 8.0 05/01/06 06/01/06 12,500 08/24/06 08/24/06 6,155 100
210 06 0240 / 4477 N LA SALLE ST AND W RANDOLPH ST 8.0 05/01/06 06/01/06 12,500 08/23/06 08/23/06 5,007 100
210 06 0240 / 4477 N LA SALLE ST AND W WASHINGTON ST 8.0 05/01/06 06/01/06 11,000 08/23/06 08/23/06 5,224 100
210 06 0207 / 4450 N LOWER MICHIGAN AVE AND E GRAND AVE 1.0 08/15/05 11/15/05 6,600 10/06/05 11/15/05 5,792 100
210 06 0207 / 4450 N MICHIGAN AVE AND E GRAND AVE 1.0 08/15/05 11/15/05 8,800 08/26/05 12/02/05 5,792 100
210 06 0207 / 4450 N MICHIGAN AVE AND E OAK ST 1.0 08/15/05 08/01/05 8,959 08/26/05 08/26/05 2,982 100
210 06 0207 / 4450 N MICHIGAN AVE AND E RANDOLPH ST 1.0 12/01/04 12/15/04 12,650 12/01/04 12/08/04 6,617 100
210 06 0207 / 4450 N MICHIGAN AVE AND E WASHINGTON ST 1.0 12/01/04 12/15/04 7,672 12/01/04 12/08/04 6,079 100
210 06 0207 / 4450 N PESHTIGO CT AND E GRAND AVE 1.0 08/15/05 11/15/05 4,400 04/26/05 11/18/05 5,792 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 451

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Pedestrian Countdown Signal Install Locations
210 06 0207 / 4450 N PESHTIGO CT AND E ILLINOIS ST 1.0 08/15/05 11/15/05 6,600 10/06/05 10/19/05 5,792 100
210 06 0207 / 4450 N ST CLAIR ST AND E GRAND AVE 1.0 08/15/05 11/15/05 8,800 10/06/05 10/19/05 5,792 100
210 06 0207 / 4450 N STREETER DR AND E ILLINOIS ST 1.0 08/15/05 11/15/05 6,600 10/06/05 10/19/05 5,792 100
210 06 0243 / 4480 N WABASH AVE AND E WASHINGTON ST .0 03/15/06 05/08/07 12,000 01/15/07 02/15/07 5,213 100
210 06 0207 / 4450 S MICHIGAN AVE AND E ADAMS ST 1.0 12/01/04 12/15/04 5,180 12/01/04 12/08/04 4,361 100
210 06 0207 / 4450 S MICHIGAN AVE AND E JACKSON BLVD .50 12/01/04 12/15/04 5,179 12/01/04 12/08/04 5,255 100
210 06 0207 / 4450 S MICHIGAN AVE AND E MONROE ST 1.0 12/01/04 12/15/04 10,358 12/01/04 12/08/04 18,193 100
210 06 0243 / 4480 W ILLINOIS ST AND N LA SALLE DR .0 04/01/06 04/01/07 11,356 07/18/07 07/18/07 4,190 100

Totals per Pedestrian Countdown Signal Install 38.50 192,754 139,612

Work Type: Pedestrian Countdown Signal Installation Installations


210 06 / 32276 E DELAWARE PL AND N MICHIGAN AVE .0 04/01/07 02/28/08 11,744 0 0
210 06 / 32276 N CANAL ST AND W MADISON ST .0 04/01/07 02/28/08 11,356 0 0
210 06 / 32276 N CLINTON ST AND W MADISON ST .0 04/01/07 02/28/08 11,356 0 0
210 06 / 32276 N FAIRBANKS CT AND E ONTARIO ST .0 04/01/07 02/28/08 11,356 0 0

Totals per Pedestrian Countdown Signal Installation .0 45,812 0

Work Type: Signal Removal Locations


300 06 0225 / 5340 N DESPLAINES ST AND W RANDOLPH ST .50 11/01/02 11/30/02 2,500 09/25/02 11/14/02 1,906 100

Work Type: Signals Intersections


300 06 0096 / 5258 121 N LA SALLE ST 161.0 03/01/05 03/01/05 0 08/31/06 10/30/06 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 452

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
300 09 / 33108 ON N WABASH AVE FROM E SUPERIOR ST TO E ONTARIO ST 1.0 6,600 04/01/08 12/01/08 0 0
210 06 0022 / 4297 N CLARK ST AND W ERIE ST 1.0 07/01/02 08/30/02 15,000 06/10/02 08/25/02 14,645 100
210 06 0023 / 4298 N CLARK ST AND W ERIE ST 1.0 01/15/03 03/15/03 139,000 11/20/02 12/24/02 133,112 100
210 06 0021 / 4296 N CLARK ST AND W MAPLE ST 1.0 02/01/01 05/31/01 133,500 11/15/00 03/06/01 153,138 100
210 06 0023 / 4298 N CLARK ST AND W SUPERIOR ST 1.0 02/01/03 04/01/03 133,000 11/20/02 01/08/03 103,819 100
210 06 0184 / 4430 N FAIRBANKS CT AND E HURON ST 1.0 09/15/04 03/01/05 180,000 09/15/04 02/25/05 170,452 100
210 06 0021 / 4296 N ORLEANS ST AND W SUPERIOR ST 1.0 11/06/00 12/31/01 133,000 11/03/00 10/30/01 166,266 100
210 06 0023 / 4298 N RUSH ST AND E WALTON ST 1.0 03/15/03 05/15/03 108,000 01/06/03 02/21/03 131,439 100
210 06 0022 / 4297 N STATE ST AND E BELLEVUE PL 1.0 03/15/02 05/17/02 143,500 01/17/02 05/07/02 175,165 100
210 06 0023 / 4298 N WELLS ST AND W HURON ST 1.0 07/01/03 09/01/03 139,000 03/31/03 05/12/03 134,983 100
300 11 / 32231 W CHESTNUT ST AND N DEARBORN ST 1.0 11/29/06 06/21/07 18,652 11/29/06 06/21/07 178,652 100
210 06 0135 / 4393 W LAKE ST AND N CLINTON ST 1.0 09/14/01 12/31/01 138,405 09/14/01 11/21/01 12,387 100
300 03 0042 / 4913 W ONTARIO ST AND N KINGSBURY ST 1.0 200,000 0
814 06 0301 / 16513 382 E BALBO DR 1.0 04/19/90 04/19/90 0 04/19/90 04/19/90 277,443 100
271 00 0045 / 4794 400 E OHIO ST 1.0 0 08/01/97 08/15/99 201,000
814 06 0332 / 16535 430 N CLARK ST 1.0 04/24/97 04/24/97 0 04/24/97 07/31/97 200,000 100
814 06 0343 / 16541 1600 N CLARK ST 1.0 01/01/96 01/01/96 0 01/01/96 01/06/98 146,217 100
814 06 0241 / 16453 500 N COLUMBUS DR 1.0 01/01/93 01/01/93 0 01/01/93 01/01/93 8,000 100
814 06 0330 / 16533 430 N DEARBORN ST 1.0 04/08/97 04/08/97 0 04/08/97 05/06/97 200,000 100
210 06 0060 / 4327 658 N DEARBORN ST 1.0 06/01/99 12/01/99 150,000 03/03/99 09/23/99 100,448 100
210 06 0061 / 4328 700 N DEARBORN ST 1.0 06/01/99 12/01/99 150,000 07/06/99 09/23/99 124,041 100
210 06 0062 / 4329 732 N DEARBORN ST 1.0 06/01/99 12/01/99 150,000 06/07/99 09/23/99 106,124 100
814 06 0246 / 16458 100 N JEFFERSON ST 1.0 02/06/92 02/06/92 0 02/06/92 02/06/92 88,990 100
814 06 0228 / 16440 148 N JEFFERSON ST 1.0 02/07/92 02/07/92 0 02/07/92 02/07/92 88,990 100
814 06 0209 / 16421 200 N JEFFERSON ST 1.0 02/04/92 02/04/92 0 02/04/92 02/04/92 88,990 100
814 06 0182 / 16394 300 N JEFFERSON ST 1.0 03/23/92 03/23/92 0 03/23/92 03/23/92 106,743 100
814 06 0272 / 16484 800 N MIES VAN DER ROHE WY 1.0 01/24/89 01/24/89 0 01/24/89 01/24/89 95,000 100
814 06 0305 / 16517 500 N ORLEANS ST 1.0 01/08/92 01/08/92 0 01/08/92 01/08/92 110,000 100
814 06 0306 / 16518 530 N ORLEANS ST 1.0 01/02/92 01/02/92 0 01/02/92 01/02/92 110,000 100
210 06 0072 / 4336 700 N ORLEANS ST 1.0 02/10/00 04/15/00 150,000 02/17/00 06/27/00 165,236 100
210 06 0019 / 4294 932 N STATE ST 1.0 125,000 10/16/98 10/29/98 90,174 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 453

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0019 / 4294 1000 N STATE ST 1.0 125,000 11/18/98 03/22/99 115,227 100
814 06 0267 / 16479 430 N WELLS ST 1.0 03/11/92 03/11/92 0 03/11/92 03/11/92 108,062 100
814 06 0263 / 16475 500 N WELLS ST 1.0 03/10/92 03/10/92 0 03/10/92 03/10/92 108,062 100
814 06 0131 / 16345 500 S LAKE SHORE DR 1.0 05/22/90 05/22/90 0 05/22/90 05/22/90 115,491 100
300 06 0078 / 5241 36 W ILLINOIS ST 1.0 06/15/00 07/01/00 5,000 07/14/00 07/18/00 11,701 100
210 06 0167 / 4418 540 W MADISON ST 2.0 09/01/03 12/31/03 417,924 09/06/01 10/27/03 306,019 100
814 06 0235 / 16447 600 W MADISON ST 1.0 02/05/92 02/05/92 0 02/05/92 02/05/92 88,990 100
814 06 0242 / 16454 421 W WASHINGTON ST 1.0 01/01/94 01/01/94 0 01/01/94 01/01/94 120,000 100

Totals per TSM Install 40.0 2,760,581 4,655,006


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 454

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Traffic Equipment Painting Locations
300 07 0042 / 5465 ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST .0 03/01/06 12/31/06 0 0 0
300 07 0043 / 5466 ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE 9.0 04/18/06 11/18/06 3,675 08/04/06 09/01/06 0 100
300 06 0251 / 5361 ON N MICHIGAN AVE FROM E MADISON ST TO E LAKE ST 214.0 07/15/05 08/30/05 20,404 07/10/05 08/01/05 49,605 100
300 07 0042 / 5465 ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W HURON ST TO W ERIE ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM CHESTNUT ST TO PEARSON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N STATE ST FROM ERIE ST TO HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E ERIE ST TO E HURON ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ERIE ST FROM N STATE ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST .0 03/01/06 12/31/06 0 0 0
300 07 0042 / 5465 121 N LA SALLE ST 21.0 04/18/06 11/18/06 7,500 08/14/06 09/01/06 4,146 100

Totals per Traffic Equipment Painting 244.0 31,579 53,751

Work Type: Traffic Equipment Reloc Locations


300 06 0225 / 5340 N JEFFERSON ST AND W LAKE ST 1.0 11/14/03 11/14/03 3,500 11/05/03 11/05/03 1,234 100

Work Type: Traffic Monitoring Cameras Locations


300 06 0225 / 5340 E MONROE ST AND S MICHIGAN AVE 1.0 11/01/02 11/30/02 5,000 10/28/02 10/28/02 1,400 100

Totals per Construction Phase 7,012,377 10,037,432

Totals for Ward 42 7,089,854 10,049,383


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 455

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N DAYTON ST FROM W BLACKHAWK ST TO W NORTH AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 1,391 100
300 06 / 32146 ON N MOHAWK ST FROM N CLYBOURN AVE TO W NORTH AVE 1.0 05/01/07 10/31/07 3,900 07/03/07 07/31/07 2,000 100
300 11 / 32232 N CLARK ST AND N LINCOLN AVE 1.0 06/01/07 12/31/07 0 2,317 100
300 11 / 32232 N CLARK ST AND W FULLERTON PKWY 1.0 06/01/07 12/31/07 0 290 100
300 11 / 32232 N CLARK ST AND W WEBSTER AVE 1.0 06/01/07 12/31/07 0 2,897 100
300 11 / 32232 N HALSTED ST AND W WEBSTER AVE 1.0 06/01/07 12/31/07 0 232 100
300 11 / 32232 N LINCOLN AVE AND W WEBSTER AVE .0 06/01/07 12/31/07 0 0 0
300 11 / 32232 W ARMITAGE AVE AND N CLARK ST 1.0 06/01/07 12/31/07 0 5,301 100
300 11 / 32232 W ARMITAGE AVE AND N HALSTED ST 1.0 06/01/07 12/31/07 0 290 100
300 11 / 32232 W BELDEN AVE AND N CLARK ST .0 06/01/07 12/31/07 0 3,186 0
210 06 0240 / 4477 W DIVERSEY PKWY AND N SHERIDAN RD .0 10/10/05 07/31/06 600 10/10/05 04/27/06 250 100
210 06 0240 / 4477 W NORTH AVE AND N SEDGWICK ST .0 10/10/05 07/31/06 600 10/10/05 08/08/06 125 100
210 06 0207 / 4450 2350 N LINCOLN AVE .0 07/01/04 12/30/04 1,500 08/02/06 08/08/06 470 100

Totals per Design/Engineering 7.0 6,600 18,749

Work Type: Feasibility Study Projects


302 00 0079 / 5767 ON W ARMITAGE AVE FROM N HALSTED ST TO N CLARK ST .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100
302 00 0079 / 5767 ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100

Totals per Feasibility Study .0 0 0

Totals per Lighting/Electrical 6,600 18,749


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 456

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 07 0032 / 5455 ON N CLYBOURN AVE FROM W WEBSTER AVE TO N MAGNOLIA AVE 1.0 04/18/06 11/18/06 400 09/22/06 10/10/06 202 100
300 06 0122 / 5275 ON N FREMONT ST FROM W NORTH AVE TO W BLACKHAWK ST 6.0 11/01/03 11/07/03 2,250 10/30/03 10/30/03 1,461 100
300 07 0032 / 5455 ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE 2.50 04/18/06 11/18/06 1,000 09/22/06 10/10/06 505 100
300 07 0032 / 5455 ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE 2.50 04/18/06 11/18/06 1,000 09/22/06 10/10/06 0 100
300 06 0069 / 5233 900 W MONTANA ST 5.0 02/16/03 02/16/03 1,015 02/13/03 02/13/03 2,089 100

Totals per 250 Watt Changeout 17.0 5,665 4,257

Work Type: 400 Watt Changeout Fixtures


300 09 / 33109 ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE 12.0 07/07/08 07/11/08 5,800 07/07/08 07/11/08 4,142 100
300 09 / 33109 ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE 9.0 02/01/08 12/31/08 3,600 08/07/08 08/11/08 3,048 100
300 09 / 33109 ON N RACINE AVE FROM W DICKENS AVE TO N MAUD AVE 9.0 06/23/08 06/27/08 3,600 04/01/08 12/01/08 0 0
300 07 0032 / 5455 ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE 4.0 04/18/06 11/18/06 1,600 09/07/06 10/10/06 808 100
300 06 0069 / 5233 ON W ARMITAGE AVE FROM N SHEFFIELD AVE TO N HALSTED ST 52.0 08/23/02 08/23/02 20,800 08/20/02 08/20/02 19,500 100
300 03 0043 / 4914 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 9.50 07/10/04 07/13/04 3,800 07/05/04 07/12/04 2,430 100
300 03 0044 / 4915 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 41.0 07/10/04 07/13/04 16,400 07/12/04 08/10/04 10,486 100
300 06 0069 / 5233 ON W FULLERTON AVE FROM N LINCOLN AVE TO N CLARK ST 24.0 12/15/03 12/21/03 9,000 01/13/04 01/18/04 3,702 100
300 07 0043 / 5466 ON W WEBSTER AVE FROM N CLEVELAND AVE TO N LINCOLN AVE 1.0 04/18/06 11/18/06 2,400 11/01/06 11/01/06 2,886 100

Totals per 400 Watt Changeout 161.50 67,000 47,001

Totals per Lighting/Electrical 1,632,999 1,563,366


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 457

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 2021 / 8207 2421 N CLARK ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1655 / 7841 2440 N CLARK ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1637 / 7823 2464 N CLARK ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1648 / 7834 2581 N CLARK ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1629 / 7815 2634 N CLARK ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1610 / 7796 2749 N CLARK ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1465 / 7651 1518 N CLEVELAND AVE 1.0 05/23/96 05/23/96 0 05/23/96 05/23/96 300 100
805 06 1511 / 7697 2325 N COMMONWEALTH AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1492 / 7678 2330 N COMMONWEALTH AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1473 / 7659 2331 N COMMONWEALTH AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1484 / 7670 2350 N COMMONWEALTH AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1773 / 7959 1704 N CRILLY CT 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1784 / 7970 1720 N CRILLY CT 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0850 / 7036 1651 N DAYTON ST 1.0 11/06/96 11/06/96 0 11/06/96 11/06/96 300 100
805 06 1142 / 7328 1651 N DAYTON ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1153 / 7339 2617 N DAYTON ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1134 / 7320 2730 N DAYTON ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1140 / 7326 1814 N HALSTED ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1129 / 7315 1914 N HALSTED ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1150 / 7336 1959 N HALSTED ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1131 / 7317 1973 N HALSTED ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1132 / 7318 2009 N HALSTED ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 1133 / 7319 2021 N HALSTED ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 1135 / 7321 2045 N HALSTED ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 1136 / 7322 2049 N HALSTED ST 1.0 12/09/96 12/09/96 0 12/09/96 12/09/96 300 100
805 06 1137 / 7323 2145 N HALSTED ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1138 / 7324 2213 N HALSTED ST 1.0 04/27/96 04/27/96 0 04/27/96 04/27/96 300 100
805 06 1105 / 7291 2237 N HALSTED ST 1.0 04/22/96 04/22/96 0 04/22/96 04/22/96 300 100
805 06 1151 / 7337 2417 N HALSTED ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1121 / 7307 2705 N HALSTED ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1066 / 7252 2730 N HALSTED ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 458

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1067 / 7253 2733 N HALSTED ST 1.0 12/24/96 12/24/96 0 12/24/96 12/24/96 300 100
805 06 1054 / 7240 2630 N HAMPDEN CT 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1461 / 7647 1518 N HUDSON AVE 1.0 12/03/97 12/03/97 0 12/03/97 12/03/97 300 100
805 06 1215 / 7401 1812 N HUDSON AVE 1.0 12/26/96 12/26/96 0 12/26/96 12/26/96 300 100
805 06 1186 / 7372 1834 N HUDSON AVE 1.0 12/26/96 12/26/96 0 12/26/96 12/26/96 300 100
805 06 1188 / 7374 2144 N HUDSON AVE 1.0 12/03/96 12/03/96 0 12/03/96 12/03/96 300 100
805 06 0304 / 6490 2265 N LINCOLN AVE 1.0 05/23/96 05/23/96 0 05/23/96 05/23/96 300 100
805 06 0350 / 6536 2358 N LINCOLN AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 2091 / 8277 1811 N LINCOLN PARK WEST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1933 / 8119 2622 N MILDRED AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1964 / 8150 2651 N MILDRED AVE 1.0 12/26/96 12/26/96 0 12/26/96 12/26/96 300 100
805 06 1923 / 8109 1617 N MOHAWK ST 1.0 06/05/96 06/05/96 0 06/05/96 06/05/96 300 100
805 06 1952 / 8138 1631 N MOHAWK ST 1.0 01/26/96 01/26/96 0 01/26/96 01/26/96 300 100
805 06 1980 / 8166 2011 N MOHAWK ST 1.0 01/26/96 01/26/96 0 01/26/96 01/26/96 300 100
805 06 1941 / 8127 2043 N MOHAWK ST 1.0 01/26/96 01/26/96 0 01/26/96 01/26/96 300 100
805 06 0604 / 6790 2219 N ORCHARD ST 1.0 11/21/96 11/21/96 0 11/21/96 11/21/96 300 100
805 06 0595 / 6781 2223 N ORCHARD ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0629 / 6815 2229 N ORCHARD ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0630 / 6816 1811 N ORLEANS ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0601 / 6787 1823 N ORLEANS ST 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0602 / 6788 1823 N ORLEANS ST 1.0 12/03/96 12/03/96 0 12/03/96 12/03/96 300 100
805 06 0603 / 6789 1824 N ORLEANS ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0586 / 6772 1840 N ORLEANS ST 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0529 / 6715 2700 N PINE GROVE AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1462 / 7648 1520 N SEDGWICK ST 1.0 12/03/97 12/03/97 0 12/03/97 12/03/97 300 100
805 06 0621 / 6807 1618 N SEDGWICK ST 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0673 / 6859 2113 N SHEFFIELD AVE 1.0 05/16/96 05/16/96 0 05/16/96 05/16/96 300 100
805 06 0641 / 6827 2131 N SHEFFIELD AVE 1.0 05/17/96 05/17/96 0 05/17/96 05/17/96 300 100
805 06 0718 / 6904 830 W ALTGELD ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0706 / 6892 907 W ALTGELD ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0732 / 6918 1018 W ALTGELD ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 459

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0733 / 6919 1113 W ALTGELD ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0737 / 6923 950 W ARMITAGE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0852 / 7038 549 W BELDEN AVE 1.0 12/05/96 12/05/96 0 12/05/96 12/05/96 300 100
805 06 0854 / 7040 619 W BELDEN AVE 1.0 12/04/96 12/04/96 0 12/04/96 12/04/96 300 100
805 06 1564 / 7750 315 W CONCORD PL 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0997 / 7183 613 W DIVERSEY PKWY 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0670 / 6856 237 W EUGENIE ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0761 / 6947 335 W EUGENIE ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 0632 / 6818 403 W EUGENIE ST 1.0 11/29/96 11/29/96 0 11/29/96 11/29/96 300 100
805 06 1116 / 7302 722 W FULLERTON AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1117 / 7303 903 W FULLERTON AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1118 / 7304 949 W FULLERTON AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1801 / 7987 428 W FULLERTON PKWY 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1113 / 7299 626 W FULLERTON PKWY 1.0 12/05/96 12/05/96 0 12/05/96 12/05/96 300 100
805 06 0336 / 6522 1103 W LILL AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 0337 / 6523 1113 W LILL AVE 1.0 12/26/96 12/26/96 0 12/26/96 12/26/96 300 100
805 06 1972 / 8158 1018 W MONTANA ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1962 / 8148 1032 W MONTANA ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1951 / 8137 1140 W MONTANA ST 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
805 06 1464 / 7650 435 W NORTH AVE 1.0 12/03/97 12/03/97 0 12/03/97 12/03/97 300 100
805 06 1466 / 7652 525 W NORTH AVE 1.0 12/03/97 12/03/97 0 12/03/97 12/03/97 300 100
805 06 0620 / 6806 637 W SCHUBERT AVE 1.0 12/05/96 12/05/96 0 12/05/96 12/05/96 300 100
805 06 0513 / 6699 636 W WEBSTER AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0511 / 6697 652 W WEBSTER AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0503 / 6689 658 W WEBSTER AVE 1.0 11/20/96 11/20/96 0 11/20/96 11/20/96 300 100
805 06 0463 / 6649 323 W WISCONSIN ST 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0470 / 6656 444 W WRIGHTWOOD AVE 1.0 12/04/96 12/04/96 0 12/04/96 12/04/96 300 100
300 06 0139 / 5289 735 W WRIGHTWOOD AVE 596.0 03/01/06 09/01/06 13,796 05/10/06 06/01/06 18,007 100
302 00 0092 / 5774 735 W WRIGHTWOOD AVE 25.0 0 01/04/01 01/17/02 5,891 100
805 06 0472 / 6658 931 W WRIGHTWOOD AVE 1.0 12/26/96 12/26/96 0 12/26/96 12/26/96 300 100
805 06 0473 / 6659 939 W WRIGHTWOOD AVE 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 460

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
Totals per Alley Lighting/Lamps 712.0 13,796 51,198

Work Type: Arterial Group Relamping Lamps


300 06 0215 / 5336 735 W WRIGHTWOOD AVE 1,796.0 06/01/07 12/31/07 52,874 07/10/07 08/16/07 52,874 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 735 W WRIGHTWOOD AVE 1,601.0 0 05/17/02 05/20/02 29,151 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 N ORCHARD ST AND W DEMING PL 2.0 0 11/30/99 11/30/99 702 100
302 00 0092 / 5774 602 W DICKENS AVE 1.0 0 08/22/01 08/22/01 404 100

Totals per Flood Light Install 3.0 0 1,106

Work Type: Lighting Imprvmnts Projects


300 06 0203 / 5326 ON W WISCONSIN ST FROM N SEDGWICK ST TO N CLEVELAND AVE 08/01/01 12/01/01 46,535 07/25/01 07/30/01 44,487 100
300 06 0203 / 5326 1900 N LINCOLN AVE 08/01/01 12/01/01 29,702 08/17/01 10/15/01 12,671 100
300 06 0203 / 5326 2000 N LINCOLN AVE 08/01/01 12/01/01 74,098 08/06/01 08/16/01 53,725 100
300 06 0203 / 5326 1900 N SEDGWICK ST 08/01/01 12/01/01 29,510 07/31/01 08/03/01 6,183 100
300 06 0118 / 5272 2400 N SHEFFIELD AVE 1.0 10/30/00 06/29/01 92,687 03/06/01 05/16/01 96,827 100

Totals per Lighting Imprvmnts 1.0 272,532 213,893

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33109 ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE 22.0 07/28/08 08/01/08 29,700 07/28/08 08/01/08 24,493 100
300 09 / 33109 ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE 9.0 08/25/08 09/12/08 12,150 08/25/08 09/12/08 10,324 100
300 07 0032 / 5455 ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE 4.0 04/18/06 11/18/06 5,400 09/22/06 10/10/06 3,425 100
300 06 0069 / 5233 ON W ARMITAGE AVE FROM N HALSTED ST TO N ORCHARD ST 9.0 12/10/02 12/11/02 10,800 12/10/02 12/11/02 12,245 100
300 06 0122 / 5275 ON W NORTH AVE FROM N WELLS ST TO N CLARK ST 8.45 08/20/03 08/25/03 10,530 08/19/03 08/25/03 9,781 100
300 06 0122 / 5275 ON W NORTH BLVD FROM N CLARK ST TO N DEARBORN PKWY 6.50 08/20/03 08/25/03 8,100 08/19/03 08/22/03 15,048 100
300 06 0069 / 5233 N CLARK ST AND W FULLERTON AVE 35.0 12/01/02 12/20/02 42,000 12/01/02 12/20/02 45,531 100
300 06 0122 / 5275 160 W WENDELL ST 1.0 06/01/04 07/01/04 1,450 05/25/04 05/25/04 1,200 100

Totals per Ornamental - Piggyback Lighting 94.95 120,130 122,047


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 461

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residential Regrouping Lamps
300 06 0270 / 5378 735 W WRIGHTWOOD AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0308 / 5414 ON N DAYTON ST FROM W BLACKHAWK ST TO W NORTH AVE 2.0 04/01/06 06/01/06 102,397 03/27/06 05/12/06 76,570 100
300 06 / 32146 ON N MOHAWK ST FROM N CLYBOURN AVE TO W NORTH AVE 4.0 12/05/07 06/24/08 245,174 12/12/07 0 50
300 06 0298 / 5405 ON W BLACKHAWK ST FROM N HALSTED ST TO N FREMONT ST 2.0 06/01/05 07/15/05 0 06/10/05 07/29/05 85,262 100

Totals per Residntl Staggered Lighting 8.0 347,571 161,832

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N BURLING ST FROM W FULLERTON AVE TO W SCHUBERT AVE 2.0 03/10/03 05/06/03 221,216 03/10/03 05/06/03 218,036 100
302 00 0092 / 5774 ON W GOETHE ST FROM N WELLS ST TO N SEDGWICK ST 08/13/01 41,000 08/13/01 09/07/01 40,581 100

Totals per Residntl Strt Lighting/Lamps 2.0 262,216 258,617

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 1401 N WIELAND ST 1.0 0 01/23/01 01/23/01 378 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 462

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 07 0043 / 5466 ON E BANKS ST FROM N STATE PKWY TO N LAKE SHORE DR WEST 8.0 04/18/06 11/18/06 1,600 08/04/06 09/01/06 1,554 100
300 07 0043 / 5466 ON E BURTON PL FROM N STATE PKWY TO N LAKE SHORE DR WEST 5.0 04/18/06 11/18/06 1,000 08/04/06 09/01/06 971 100
300 07 0043 / 5466 ON E GOETHE ST FROM N STATE PKWY TO N LAKE SHORE DR WEST 6.0 04/18/06 11/18/06 1,200 08/04/06 09/01/06 1,165 100
300 07 0043 / 5466 ON E SCHILLER ST FROM N STATE PKWY TO N LAKE SHORE DR WEST 8.0 04/18/06 11/18/06 1,600 08/04/06 09/01/06 1,554 100
300 07 0043 / 5466 ON E SCOTT ST FROM N STATE PKWY TO N LAKE SHORE DR WEST 6.0 04/18/06 11/18/06 1,200 08/04/06 09/01/06 1,165 100
300 07 0043 / 5466 ON N ASTOR ST FROM E DIVISION ST TO E NORTH AVE 27.0 04/18/06 11/18/06 5,400 08/04/06 09/01/06 5,244 100
300 05 0043 / 5158 ON N BISSELL ST FROM N DAYTON ST TO W BELDEN AVE 34.0 04/04/05 11/18/05 6,800 06/27/05 07/23/05 5,451 100
300 09 / 33109 ON N BISSELL ST FROM W ARMITAGE AVE TO W BELDEN AVE 14.0 05/19/08 06/20/08 2,800 04/01/08 12/01/08 1,680 100
300 07 0043 / 5466 ON N BURLING ST FROM W FULLERTON AVE TO W ARMITAGE AVE 8.0 04/18/06 11/18/06 1,600 08/04/06 09/01/06 1,554 100
300 06 0108 / 5263 ON N CLARK ST FROM W NORTH AVE TO W ARMITAGE AVE 61.0 06/20/03 07/01/03 22,200 07/07/03 07/17/03 22,190 100
300 09 / 33109 ON N CLEVELAND AVE FROM N CLYBOURN AVE TO W NORTH AVE 9.80 05/19/08 06/20/08 1,960 04/01/08 12/01/08 1,176 100
300 07 0043 / 5466 ON N CLEVELAND AVE FROM W ARMITAGE AVE TO W FULLERTON PKWY 17.0 04/18/06 11/18/06 3,400 08/04/06 09/01/06 3,301 100
300 05 0043 / 5158 ON N CLEVELAND AVE FROM W ARMITAGE AVE TO W NORTH AVE 16.0 04/04/05 11/18/05 3,200 06/27/05 07/23/05 2,565 100
300 09 / 33109 ON N CLIFTON AVE FROM W ARMITAGE AVE TO W DICKENS AVE 1.0 05/19/08 06/20/08 200 04/01/08 12/01/08 120 100
300 07 0043 / 5466 ON N COMMONWEALTH AVE FROM W BELDEN AVE TO W FULLERTON 4.0 04/18/06 11/18/06 800 08/04/06 09/01/06 777 100
PKWY
300 06 0108 / 5263 ON N CRILLY CT FROM W EUGENIE ST TO W ST PAUL AVE 3.0 06/20/03 07/01/03 560 07/07/03 07/17/03 587 100
300 06 0108 / 5263 ON N CRILLY CT FROM W WILLOW ST TO W MENOMONEE ST 3.0 06/20/03 07/01/03 560 07/07/03 07/17/03 587 100
300 05 0043 / 5158 ON N DAYTON ST FROM N BISSELL ST TO W BELDEN AVE 32.0 04/04/05 11/18/05 6,400 06/27/05 07/23/05 5,130 100
300 09 / 33109 ON N DAYTON ST FROM W ARMITAGE AVE TO W BELDEN AVE 12.0 05/19/08 06/20/08 2,400 04/01/08 12/01/08 14,400 100
300 09 / 33109 ON N DAYTON ST FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY 8.0 05/19/08 06/20/08 1,600 04/01/08 12/01/08 960 100
300 05 0043 / 5158 ON N FERN CT FROM W EUGENIE ST TO W WILLOW ST 4.0 04/04/05 11/18/05 800 06/27/05 07/23/05 641 100
300 05 0043 / 5158 ON N FREMONT ST FROM N BISSELL ST TO W BELDEN AVE 33.0 04/04/05 11/18/05 6,600 06/27/05 07/23/05 5,291 100
300 09 / 33109 ON N FREMONT ST FROM W ARMITAGE AVE TO W BELDEN AVE 18.0 05/19/08 06/20/08 3,600 04/01/08 12/01/08 2,160 100
300 09 / 33109 ON N GENEVA TER FROM W FULLERTON PKWY TO W DEMING PL 6.0 05/19/08 06/20/08 1,200 04/01/08 12/01/08 720 100
300 07 0043 / 5466 ON N GENEVA TER FROM W WEBSTER AVE TO W FULLERTON PKWY 9.0 04/18/06 11/18/06 2,250 08/04/06 09/01/06 1,748 100
302 00 0076 / 5764 ON N HALSTED ST FROM W NORTH AVE TO W FULLERTON AVE 07/08/98 07/08/98 0 07/08/98 07/08/98 0
300 09 / 33109 ON N HAMPDEN CT FROM W DEMING PL TO W DIVERSEY PKWY 11.0 05/19/08 06/20/08 2,200 04/01/08 12/01/08 1,320 100
300 07 0043 / 5466 ON N HOWE ST FROM W ARMITAGE AVE TO W DICKENS AVE 5.0 04/18/06 11/18/06 1,000 08/04/06 09/01/06 971 100
300 05 0043 / 5158 ON N HOWE ST FROM W WILLOW ST TO W ARMITAGE AVE 12.0 04/04/05 11/18/05 2,400 06/27/05 07/23/05 1,924 100
300 09 / 33109 ON N HUDSON AVE FROM W BLACKHAWK ST TO W NORTH AVE 4.0 05/19/08 06/20/08 800 04/01/08 12/01/08 480 100
300 07 0043 / 5466 ON N HUDSON AVE FROM W DICKENS AVE TO W WEBSTER AVE 5.0 04/18/06 11/18/06 1,000 08/04/06 09/01/06 971 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 463

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 05 0043 / 5158 ON N HUDSON AVE FROM W MENOMONEE ST TO W ARMITAGE AVE 8.0 04/04/05 11/18/05 1,600 06/27/05 07/23/05 1,283 100
300 05 0043 / 5158 ON N HUDSON AVE FROM W NORTH AVE TO W WILLOW ST 8.0 04/04/05 11/18/05 1,600 06/27/05 07/23/05 1,283 100
300 09 / 33109 ON N KENMORE AVE FROM W ARMITAGE AVE TO W DICKENS AVE 2.0 05/19/08 06/20/08 400 04/01/08 12/01/08 240 100
300 07 0043 / 5466 ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE 14.50 04/18/06 11/18/06 3,625 08/04/06 09/01/06 0 100
300 05 0043 / 5158 ON N LARRABEE ST FROM W NORTH AVE TO W ARMITAGE AVE 37.0 04/04/05 11/18/05 7,400 06/27/05 07/23/05 8,003 100
300 09 / 33109 ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE 22.0 06/30/08 07/07/08 5,500 06/30/08 07/07/08 4,400 100
300 05 0043 / 5158 ON N LINCOLN PARK WEST FROM W MENOMONEE ST TO W WISCONSIN 3.0 04/04/05 11/18/05 600 06/27/05 07/23/05 481 100
ST
300 09 / 33109 ON N MAGNOLIA AVE FROM W DICKENS AVE TO N CLYBOURN AVE 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
300 05 0043 / 5158 ON N MEYER AVE FROM N CLEVELAND AVE TO W EUGENIE ST 4.0 04/04/05 11/18/05 800 06/27/05 07/23/05 641 100
300 09 / 33109 ON N MILDRED AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY 6.0 05/19/08 06/20/08 1,200 04/01/08 12/01/08 720 100
300 05 0043 / 5158 ON N MOHAWK ST FROM W ARMITAGE AVE TO W NORTH AVE 16.0 04/04/05 11/18/05 3,200 06/27/05 07/23/05 2,565 100
300 09 / 33109 ON N ORCHARD ST FROM W FULLERTON AVE TO W WRIGHTWOOD AVE 7.0 05/19/08 06/20/08 1,400 04/01/08 12/01/08 840 100
300 05 0043 / 5158 ON N ORCHARD ST FROM W NORTH AVE TO W ARMITAGE AVE 20.0 04/04/05 11/18/05 4,000 06/27/05 07/23/05 3,206 100
300 07 0043 / 5466 ON N ORCHARD ST FROM W WEBSTER AVE TO W FULLERTON AVE 9.0 04/18/06 11/18/06 2,250 08/04/06 09/01/06 1,748 100
300 07 0043 / 5466 ON N ORLEANS ST FROM W ARMITAGE AVE TO W DICKENS AVE 5.0 04/18/06 11/18/06 1,000 08/04/06 09/01/06 971 100
300 06 0108 / 5263 ON N ORLEANS ST FROM W EUGENIE ST TO W WILLOW ST 3.0 08/20/03 09/01/03 560 08/19/03 08/22/03 587 100
300 06 0108 / 5263 ON N ORLEANS ST FROM W MENOMONEE ST TO W WISCONSIN ST 3.0 08/01/03 09/08/03 560 08/01/03 08/22/03 587 100
300 09 / 33109 ON N PINE GROVE AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY 4.0 05/19/08 06/20/08 800 04/01/08 12/01/08 480 100
PKWY
300 09 / 33109 ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE 9.0 06/16/08 06/20/08 2,700 06/16/08 06/20/08 1,800 100
300 07 0043 / 5466 ON N RITCHIE CT FROM E GOETHE ST TO E BANKS ST 4.0 04/18/06 11/18/06 800 08/04/06 09/01/06 777 100
300 06 0108 / 5263 ON N SEDGWICK ST FROM W NORTH AVE TO W ARMITAGE AVE 16.0 08/01/03 09/08/03 2,970 08/01/03 08/22/03 3,134 100
300 07 0043 / 5466 ON N SEDGWICK ST FROM W WEBSTER AVE TO N LINCOLN AVE 14.0 04/18/06 11/18/06 2,800 08/04/06 09/01/06 2,719 100
300 09 / 33109 ON N SEMINARY AVE FROM W ARMITAGE AVE TO W DICKENS AVE 2.0 05/19/08 06/20/08 400 04/01/08 12/01/08 240 100
300 09 / 33109 ON N SEMINARY AVE FROM W FULLERTON AVE TO W LILL AVE 4.0 05/19/08 06/20/08 800 04/01/08 12/01/08 480 100
300 09 / 33109 ON N SHEFFIELD AVE FROM W ARMITAGE AVE TO W WEBSTER AVE 6.75 05/19/08 06/20/08 1,350 04/01/08 12/01/08 1,350 100
300 05 0043 / 5158 ON N ST MICHAELS CT FROM W EUGENIE ST TO W WILLOW ST 5.0 04/04/05 11/18/05 1,000 06/27/05 07/23/05 802 100
300 07 0043 / 5466 ON N STONE ST FROM E DIVISION ST TO E GOETHE ST 8.0 04/18/06 11/18/06 1,600 08/04/06 09/01/06 1,554 100
300 05 0043 / 5158 ON N VINE ST FROM W NORTH AVE TO W WILLOW ST 7.0 04/04/05 11/18/05 1,400 06/27/05 07/23/05 1,122 100
300 09 / 33109 ON N WILTON AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY 6.0 05/19/08 06/20/08 1,200 04/01/08 12/01/08 720 100
300 09 / 33109 ON W ARLINGTON PL FROM N CLARK ST TO N ORCHARD ST 5.0 05/19/08 06/20/08 1,000 04/01/08 12/01/08 600 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 464

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 05 0043 / 5158 ON W ARLINGTON PL FROM N LAKEVIEW AVE TO N CLARK ST 3.0 04/04/05 11/18/05 600 06/27/05 07/23/05 481 100
300 09 / 33109 ON W ARLINGTON PL FROM N LAKEVIEW AVE TO N CLARK ST 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
302 00 0079 / 5767 ON W ARMITAGE AVE FROM N HALSTED ST TO N CLARK ST 30.0 08/01/02 08/03/02 4,000 07/23/02 08/06/02 12,880 100
300 07 0043 / 5466 ON W BELDEN AVE FROM N LINCOLN PARK WEST TO N HALSTED ST 22.0 04/18/06 11/18/06 5,500 08/04/06 09/01/06 4,272 100
300 09 / 33109 ON W BLACKHAWK ST FROM N CLEVELAND AVE TO N LARRABEE ST 4.0 05/19/08 06/20/08 800 04/01/08 12/01/08 480 100
300 06 0108 / 5263 ON W CONCORD PL FROM N NORTH PARK AVE TO N SEDGWICK ST 3.0 08/01/03 08/08/03 560 08/01/03 08/15/03 587 100
300 09 / 33109 ON W DEMING PL FROM N CLARK ST TO N ORCHARD ST 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
300 05 0043 / 5158 ON W DICKENS AVE FROM N HALSTED ST TO N SHEFFIELD AVE 8.0 04/04/05 11/18/05 1,600 06/27/05 07/23/05 1,283 100
300 07 0043 / 5466 ON W DICKENS AVE FROM N LINCOLN AVE TO N HALSTED ST 15.0 04/18/06 11/18/06 3,750 08/04/06 09/01/06 2,913 100
300 03 0043 / 4914 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 14.50 07/26/04 08/09/04 4,725 07/01/04 08/10/04 2,961 100
300 03 0044 / 4915 ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR 72.0 07/26/04 08/09/04 15,950 08/01/04 08/10/04 14,703 100
300 09 / 33109 ON W DRUMMOND PL FROM N CLARK ST TO N ORCHARD ST 2.0 05/19/08 06/20/08 400 04/01/08 12/01/08 240 100
300 06 0108 / 5263 ON W EUGENIE ST FROM N LA SALLE ST TO N SEDGWICK ST 12.0 08/05/03 08/12/03 2,220 08/01/03 08/15/03 2,350 100
300 05 0043 / 5158 ON W EUGENIE ST FROM N SEDGWICK ST TO N LARRABEE ST 9.0 04/04/05 11/18/05 1,800 06/27/05 07/23/05 1,443 100
300 09 / 33109 ON W EVERGREEN AVE FROM N WELLS ST TO N NORTH PARK AVE 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
300 06 0058 / 5229 ON W FULLERTON AVE FROM N CLARK ST TO N LINCOLN AVE 27.0 12/01/02 01/01/03 5,670 12/01/02 01/09/03 5,670 100
302 00 0079 / 5767 ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE 101.60 12/01/01 12/22/01 12,800 04/20/01 05/03/01 12,700 100
300 07 0043 / 5466 ON W GRANT PL FROM N SEDGWICK ST TO N GENEVA TER 9.0 04/18/06 11/18/06 1,800 08/04/06 09/01/06 1,748 100
300 07 0043 / 5466 ON W KEMPER PL FROM N GENEVA TER TO N ORCHARD ST 3.0 04/18/06 11/18/06 600 08/04/06 09/01/06 582 100
300 09 / 33109 ON W LILL AVE FROM N HALSTED ST TO N LINCOLN AVE 5.0 05/19/08 06/20/08 1,000 04/01/08 12/01/08 600 100
300 07 0032 / 5455 ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE 2.50 04/18/06 11/18/06 500 01/05/07 01/05/07 0 100
300 06 0108 / 5263 ON W MENOMONEE ST FROM N CLARK ST TO N SEDGWICK ST 20.0 08/05/03 08/12/03 3,715 08/01/03 08/20/03 3,917 100
300 05 0043 / 5158 ON W MENOMONEE ST FROM N SEDGWICK ST TO N LARRABEE ST 11.0 04/04/05 11/18/05 2,200 06/27/05 07/23/05 1,764 100
300 09 / 33109 ON W MONTANA ST FROM N LINCOLN AVE TO N RACINE AVE 9.0 05/19/08 06/20/08 1,800 04/01/08 12/01/08 1,080 100
300 06 0108 / 5263 ON W NORTH AVE FROM N CLARK ST TO N DEARBORN ST 8.50 07/01/03 07/07/03 2,000 06/20/03 06/30/03 1,925 100
300 05 0043 / 5158 ON W ROSLYN PL FROM N LAKEVIEW AVE TO N CLARK ST 3.0 04/04/05 11/18/05 600 06/27/05 07/23/05 481 100
300 09 / 33109 ON W ROSLYN PL FROM N LAKEVIEW AVE TO N CLARK ST 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
300 09 / 33109 ON W SCHILLER ST FROM N LA SALLE DR TO N WELLS ST 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
300 09 / 33109 ON W SCHUBERT AVE FROM N CLARK ST TO N HALSTED ST 14.0 05/19/08 06/20/08 2,800 04/01/08 12/01/08 1,680 100
300 09 / 33109 ON W SCHUBERT AVE FROM N DAYTON ST TO N SHEFFIELD AVE 3.0 05/19/08 06/20/08 600 04/01/08 12/01/08 360 100
300 06 0108 / 5263 ON W ST PAUL AVE FROM N NORTH PARK AVE TO N WELLS ST 3.0 08/01/03 08/07/03 560 08/01/03 08/20/03 587 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 465

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 05 0043 / 5158 ON W WEBSTER AVE FROM N HALSTED ST TO N SHEFFIELD AVE 23.0 04/04/05 11/18/05 4,600 06/27/05 07/23/05 3,687 100
300 07 0043 / 5466 ON W WEBSTER AVE FROM N LINCOLN PARK WEST TO N HALSTED ST 25.0 04/18/06 11/18/06 6,250 08/04/06 09/01/06 4,855 100
300 05 0043 / 5158 ON W WILLOW ST FROM N FERN CT TO N ST MICHAELS CT 7.0 04/04/05 11/18/05 1,400 06/27/05 07/23/05 1,122 100
300 05 0043 / 5158 ON W WILLOW ST FROM N HALSTED ST TO N SHEFFIELD AVE 2.50 04/04/05 11/18/05 500 06/27/05 07/23/05 401 100
300 05 0043 / 5158 ON W WILLOW ST FROM N LARRABEE ST TO N HALSTED ST 11.0 04/04/05 11/18/05 2,200 06/27/05 07/23/05 1,764 100
300 06 0108 / 5263 ON W WILLOW ST FROM N WELLS ST TO N SEDGWICK ST 12.0 08/02/03 08/09/03 2,220 08/01/03 08/21/03 2,350 100
300 06 0108 / 5263 ON W WISCONSIN ST FROM N CLARK ST TO N SEDGWICK ST 20.0 08/05/03 08/12/03 3,715 08/01/03 08/21/03 3,917 100
300 09 / 33109 ON W WRIGHTWOOD AVE FROM N CLARK ST TO N SHEFFIELD AVE 4.0 05/19/08 06/20/08 800 04/01/08 12/01/08 480 100
300 07 0043 / 5466 W BELDEN AVE AND N CAMBRIDGE AVE 3.0 04/18/06 11/18/06 600 08/04/06 09/01/06 582 100

Totals per Strt Light Pole Painting 1,187.65 247,280 230,695

Work Type: Strt Lighting Blocks


300 06 0076 / 5239 1600 N CLYBOURN AVE 06/01/00 09/15/00 58,500 07/05/00 07/25/00 66,504 100
300 06 0078 / 5241 1600 N CLYBOURN AVE 1.0 04/01/98 12/01/98 51,000 07/05/00 07/25/00 11,552 100
300 06 0076 / 5239 1536 N SEDGWICK ST 06/01/00 09/15/00 58,500 05/22/00 06/15/00 66,504 100
303 00 0006 / 5783 2000 N SHEFFIELD AVE 08/01/97 12/01/97 60,000 08/01/97 04/30/98 76,547 100

Totals per Strt Lighting 1.0 228,000 221,107

Work Type: Traffic Signal Regrouping Lamps


300 06 0238 / 5352 735 W WRIGHTWOOD AVE 2,012.0 06/01/06 12/31/06 12,000 10/27/06 11/03/06 10,462 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 466

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2742 / 8928 98 E LA SALLE DR 27.0 12/31/95 12/31/95 0 12/31/95 12/31/95 20,250 100
302 00 0070 / 5758 100 E LA SALLE DR 0 10/12/97 10/20/97 17,175 100
302 00 0072 / 5760 1620 N HALSTED ST 1.0 0 10/18/99 10/20/99 9,505 100
805 06 2686 / 8872 1622 N HALSTED ST 48.0 03/11/91 03/11/91 0 03/11/91 03/11/91 36,000 100
805 06 2135 / 8321 1650 S CLARK ST 8.0 12/20/97 12/20/97 0 12/20/97 12/20/97 6,000 100
805 06 2268 / 8454 2495 S HALSTED ST 18.0 01/01/91 01/01/91 0 01/01/91 01/01/91 13,500 100
805 06 2270 / 8456 2495 S HALSTED ST 8.0 01/01/91 01/01/91 0 01/01/91 01/01/91 6,000 100
805 06 2754 / 8940 2495 S HALSTED ST 18.0 02/26/91 02/26/91 0 02/26/91 02/26/91 13,500 100
805 06 2710 / 8896 999 W FULLERTON AVE 28.0 06/16/94 06/16/94 0 06/16/94 06/16/94 21,000 100
805 06 2738 / 8924 40 W FULLERTON DR 14.0 01/01/90 01/01/90 0 01/01/90 01/01/90 10,500 100
300 06 0217 / 5337 735 W WRIGHTWOOD AVE 70.0 06/15/04 06/22/04 3,935 06/15/04 06/16/04 5,318 100

Totals per Underpass Lighting 240.0 3,935 158,748


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 467

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
300 06 0225 / 5340 2000 N CLYBOURN AVE 4.0 09/02/02 10/31/02 17,250 08/14/02 10/14/02 14,369 100
210 06 0130 / 4389 2330 N LINCOLN AVE 1.0 0 10/10/01 10/10/01 3,979 100

Totals per LED Signal Head Install 5.0 17,250 18,348

Work Type: Left Turn Arrow Locations


210 06 0231 / 4470 W DIVISION ST AND N LA SALLE DR .0 03/01/08 12/01/08 15,516 0 0
300 06 0117 / 5271 2400 N CANNON DR 1.0 20,000 10/29/99 11/15/99 4,276 100

Totals per Left Turn Arrow 1.0 35,516 4,276

Work Type: Pedestrian Countdown Signal Install Locations


300 09 / 33109 N CLARK ST AND N LINCOLN AVE 1.0 15,000 04/01/08 12/01/08 0 7
300 11 / 32232 N CLARK ST AND N LINCOLN AVE 1.0 05/15/09 12/15/09 12,000 11,230 0
300 11 / 32232 N CLARK ST AND W FULLERTON PKWY 1.0 07/24/07 09/15/07 12,000 07/31/07 08/01/07 6,529 100
300 11 / 32232 N CLARK ST AND W WEBSTER AVE 1.0 08/01/07 08/02/07 12,000 07/26/07 07/26/07 0 100
300 11 / 32232 N HALSTED ST AND W WEBSTER AVE 1.0 06/25/07 07/26/07 12,000 06/25/07 07/26/07 5,194 100
300 11 / 32232 N LINCOLN AVE AND W WEBSTER AVE 1.0 12,000 0 0
300 11 / 32232 W ARMITAGE AVE AND N CLARK ST 1.0 06/15/07 07/30/07 12,000 07/10/07 07/11/07 3,414 100
300 11 / 32232 W ARMITAGE AVE AND N HALSTED ST 1.0 06/25/07 07/26/07 12,000 06/25/07 07/26/07 8,399 100
300 09 / 33109 W BELDEN AVE AND N CLARK ST 1.0 02/25/08 06/27/08 83,000 04/01/08 12/01/08 81,259 100
300 11 / 32232 W BELDEN AVE AND N CLARK ST 1.0 12,000 78,072 0
210 06 0240 / 4477 W DIVERSEY PKWY AND N SHERIDAN RD 6.0 11/06/06 09/20/07 8,700 11/08/06 11/22/06 4,911 100
210 06 0240 / 4477 W NORTH AVE AND N SEDGWICK ST 4.0 11/01/05 09/30/06 5,000 11/01/05 10/16/06 2,979 100
210 06 0207 / 4450 2350 N LINCOLN AVE 6.0 04/01/04 12/31/05 10,000 09/12/06 09/12/05 5,160 100

Totals per Pedestrian Countdown Signal Install 26.0 217,700 207,147

Totals per Traffic 780,331 797,987


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 468

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley
CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Pedestrian Countdown Signal Installation Installations
300 11 / 32600 N CLARK ST AND N LINCOLN AVE 1.0 09/08/07 01/04/08 11,520 07/23/07 07/25/07 0 100
300 11 / 32600 N CLARK ST AND W FULLERTON PKWY .0 09/08/07 01/04/08 11,520 07/31/07 08/01/07 0 100
300 11 / 32600 N CLARK ST AND W WEBSTER AVE 1.0 09/08/07 01/04/08 11,520 07/24/07 07/26/07 0 100
300 11 / 32600 N HALSTED ST AND W WEBSTER AVE 1.0 09/08/07 01/04/08 11,520 07/26/07 07/27/07 0 100
300 11 / 32600 N LINCOLN AVE AND W WEBSTER AVE 1.0 09/08/07 01/04/08 11,520 07/24/07 07/26/07 0 100
300 11 / 32600 W ARMITAGE AVE AND N CLARK ST 1.0 09/08/07 01/04/08 11,520 07/10/07 07/11/07 0 100
300 11 / 32600 W ARMITAGE AVE AND N HALSTED ST 1.0 09/08/07 01/04/08 11,520 07/25/07 07/26/07 0 100
300 11 / 32600 W BELDEN AVE AND N CLARK ST 1.0 09/08/07 01/04/08 11,520 02/25/08 06/05/08 6,529 100

Totals per Pedestrian Countdown Signal Installation 7.0 92,160 6,529

Work Type: Signals Intersections


300 06 0096 / 5258 735 W WRIGHTWOOD AVE 45.0 11/12/03 11/20/03 0 11/20/03 11/28/03 7,115 100

Work Type: TSM Install Locations


210 06 0013 / 4288 2100 N CLEVELAND AVE 1.0 02/17/99 09/01/99 259,000 12/15/98 02/15/99 221,697 100
210 06 0093 / 4355 2000 N CLYBOURN AVE 1.0 02/14/00 04/30/00 150,000 02/14/00 04/13/00 114,657 100
814 06 0254 / 16466 2331 N LINCOLN AVE 1.0 01/28/92 01/28/92 0 01/28/92 01/28/92 87,936 100
814 06 0389 / 16577 800 W ARMITAGE AVE 1.0 08/17/95 08/17/95 0 08/17/95 08/17/95 128,682 100

Totals per TSM Install 4.0 409,000 552,972

Work Type: Traffic Equipment Painting Locations


300 07 0043 / 5466 ON N ASTOR ST FROM E DIVISION ST TO E NORTH AVE 6.0 04/18/06 11/18/06 1,800 08/04/06 09/01/06 1,165 100
300 07 0043 / 5466 ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE 9.0 04/18/06 11/18/06 3,675 08/04/06 09/01/06 0 100
300 06 0108 / 5263 N HALSTED ST AND W DIVERSEY AVE 04/01/05 04/10/05 1,260 0
300 06 0108 / 5263 N WELLS ST AND W NORTH AVE 04/01/05 04/10/05 1,470 0
300 09 / 33109 W FULLERTON AVE AND N HALSTED ST 1.0 05/19/08 06/20/08 500 05/19/08 06/20/08 435 100

Totals per Traffic Equipment Painting 16.0 8,705 1,600

Totals per Construction Phase 2,413,330 2,361,353

Totals for Ward 43 2,419,930 2,380,102


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 469

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N BURLING ST FROM W DIVERSEY PKWY TO W OAKDALE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,916 100
300 06 / 32277 ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE .0 04/01/08 08/30/08 0 0 0
300 06 / 32146 ON N WAYNE AVE FROM W ADDISON ST TO W GRACE ST .0 05/01/07 10/31/07 4,000 2,000 100
300 06 / 32277 ON W OAKDALE AVE FROM N RACINE AVE TO N SHEFFIELD AVE .0 04/01/08 08/30/08 0 0 0
210 06 0240 / 4477 W DIVERSEY PKWY AND N SHERIDAN RD .0 10/10/05 07/31/06 600 10/10/05 04/27/06 250 100
300 06 / 32146 3600-3800 N LAKEWOOD AVE .0 05/01/07 10/31/07 0 0 100
300 06 0292 / 5399 3128 N SHEFFIELD AVE 1.0 2,000 02/08/05 2,839
300 06 0292 / 5399 3140 N SHEFFIELD AVE 1.0 3,000 08/02/05 11/16/05 0 100

Totals per Design/Engineering 2.0 9,600 8,005


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 470

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 03 0044 / 4915 ON N ELAINE PL FROM W ROSCOE ST TO W CORNELIA AVE 5.0 07/01/04 07/01/04 2,075 05/16/04 05/16/04 1,220 100
300 03 0044 / 4915 ON W WELLINGTON AVE FROM N RACINE AVE TO N SHEFFIELD AVE 7.0 08/10/04 08/10/04 2,825 05/25/04 05/25/04 1,448 100

Totals per 250 Watt Changeout 12.0 4,900 2,668

Work Type: 400 Watt Changeout Fixtures


300 05 0044 / 5159 ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST 45.0 04/04/05 11/18/05 4,434 09/01/05 09/25/05 0 100
300 06 0122 / 5275 ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST 27.50 11/01/03 11/21/03 11,200 10/05/03 10/06/03 7,718 100

Totals per 400 Watt Changeout 72.50 15,634 7,718

Work Type: Alley Lighting/Lamps Installations


805 06 2007 / 8193 3722 N LAKEWOOD AVE 1.0 01/27/97 01/27/97 0 01/27/97 01/27/97 300 100
805 06 0623 / 6809 3135 N SEMINARY AVE 1.0 10/01/96 10/01/96 0 10/01/96 10/01/96 300 100
805 06 0877 / 7063 547 W BELMONT AVE 1.0 09/04/96 09/04/96 0 09/04/96 09/04/96 300 100
805 06 1671 / 7857 549 W BELMONT AVE 1.0 07/18/97 07/18/97 0 07/18/97 07/18/97 300 100
805 06 0878 / 7064 854 W BELMONT AVE 1.0 11/06/96 11/06/96 0 11/06/96 11/06/96 300 100
805 06 0863 / 7049 924 W BELMONT AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 0880 / 7066 924 W BELMONT AVE 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
300 06 0139 / 5289 1057 W BELMONT AVE 741.0 03/01/06 09/01/06 19,365 05/24/06 06/01/06 22,389 100
302 00 0092 / 5774 1057 W BELMONT AVE 6.0 0 03/21/01 12/14/01 1,414 100
805 06 0825 / 7011 426 W BRIAR PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0810 / 6996 450 W BRIAR PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1198 / 7384 1000 W DAKIN ST 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 1682 / 7868 1000 W DAKIN ST 1.0 11/19/96 11/19/96 0 11/19/96 11/19/96 300 100
805 06 1120 / 7306 938 W GEORGE ST 1.0 05/02/96 05/02/96 0 05/02/96 05/02/96 300 100
805 06 1074 / 7260 1503 W HENDERSON ST 1.0 12/17/96 12/17/96 0 12/17/96 12/17/96 300 100
805 06 1106 / 7292 1519 W HENDERSON ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0693 / 6879 816 W ROSCOE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0694 / 6880 820 W ROSCOE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0695 / 6881 938 W ROSCOE ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1689 / 7875 1115 W ROSCOE ST 1.0 07/02/97 07/02/97 0 07/02/97 07/02/97 300 100

Totals per Alley Lighting/Lamps 765.0 19,365 29,203


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 471

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0215 / 5336 1057 W BELMONT AVE 1,325.0 06/01/07 12/31/07 39,008 08/01/07 08/10/07 39,008 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 1057 W BELMONT AVE 1,190.0 0 05/04/02 05/07/02 21,668 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 W ADDISON ST AND N SHEFFIELD AVE 1.0 0 05/18/99 05/18/99 351 100
300 06 0071 / 5234 3843 N CLARK ST 11/15/00 11/16/00 0 11/15/00 11/16/00 3,000 100
302 00 0092 / 5774 656 W BARRY AVE 2.0 0 09/06/01 09/06/01 807 100

Totals per Flood Light Install 3.0 0 4,158

Work Type: Lighting Imprvmnts Projects


300 06 0118 / 5272 3200 N SHEFFIELD AVE 1.0 10/30/00 06/29/01 98,049 03/26/01 05/21/01 80,036 100

Work Type: Ornamental - Piggyback Lighting Fixtures


300 06 0122 / 5275 ON N CLARK ST FROM W BELMONT AVE TO W ADDISON ST 55.0 09/15/03 09/20/03 66,000 09/26/03 10/02/03 88,094 100
300 06 0122 / 5275 ON N SHERIDAN RD FROM W BYRON ST TO W IRVING PARK RD 11/01/04 11/30/04 48,250 10/01/04 11/01/04 30,189 100
300 06 0122 / 5275 ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST 21.50 11/01/03 11/21/03 25,800 10/14/03 10/20/03 37,364 100

Totals per Ornamental - Piggyback Lighting 76.50 140,050 155,646

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 1057 W BELMONT AVE .0 03/01/08 12/01/08 0 0 0

Totals per Lighting/Electrical 5,617,077 3,355,956


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 472

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 06 0308 / 5414 ON N BURLING ST FROM W DIVERSEY PKWY TO W OAKDALE AVE 2.0 03/27/06 05/27/06 142,196 03/16/06 05/18/06 99,896 100
300 11 / 32233 ON N CAMBRIDGE AVE FROM W BRIAR PL TO W BELMONT AVE 1.0 05/29/07 07/13/07 28,334 05/29/07 08/03/07 19,195 100
300 09 / 33110 ON N CAMBRIDGE AVE FROM W DIVERSEY PKWY TO W SURF ST 1.0 50,000 04/01/08 12/01/08 0 0
300 11 / 32233 ON N CLIFTON AVE FROM W WELLINGTON AVE TO W BELMONT AVE 3.0 06/11/07 09/07/07 187,500 06/11/07 09/19/07 114,078 100
300 07 0044 / 5467 ON N ELAINE PL FROM W ROSCOE ST TO W CORNELIA AVE 1.0 07/19/06 09/08/06 60,000 08/07/06 09/18/06 64,282 100
300 09 / 33110 ON N FREMONT ST FROM W CORNELIA AVE TO W ADDISON ST 1.0 65,000 04/01/08 12/01/08 0 0
300 11 / 32233 ON N KENMORE AVE FROM W WELLINGTON AVE TO W BELMONT AVE 3.0 06/11/07 09/07/07 187,500 06/11/07 09/19/07 114,078 100
300 11 / 32233 ON N MAGNOLIA AVE FROM W ADDISON ST TO W GRACE ST 2.0 110,000 0 0
300 09 / 33110 ON N PINE GROVE AVE FROM W DIVERSEY PKWY TO W SURF ST 1.0 50,000 04/01/08 12/01/08 0 0
300 06 / 32277 ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE .0 05/04/08 12/31/08 0 0 0
300 09 / 33110 ON N RETA AVE FROM W CORNELIA AVE TO W ADDISON ST 1.0 65,000 04/01/08 12/01/08 0 0
300 11 / 32233 ON N SEMINARY AVE FROM W WELLINGTON AVE TO W BELMONT AVE 2.0 06/11/07 09/07/07 125,000 06/11/07 09/19/07 114,078 100
300 06 / 32146 ON N WAYNE AVE FROM W ADDISON ST TO W GRACE ST 2.0 10/05/07 05/29/08 394,424 0 0
300 11 / 32233 ON W ALDINE AVE FROM N HALSTED ST TO W SCHOOL ST .0 06/27/07 08/03/07 42,500 06/22/07 10/10/07 33,929 100
300 07 0044 / 5467 ON W BARRY AVE FROM N BROADWAY TO N SHERIDAN RD 2.0 05/01/07 07/01/07 150,000 09/25/06 107,668 95
300 09 / 33110 ON W BARRY AVE FROM N HALSTED ST TO N SHEFFIELD AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 07 0044 / 5467 ON W BRIAR PL FROM N BROADWAY TO N SHERIDAN RD 2.0 05/01/07 07/01/07 150,000 09/25/06 107,669 95
300 11 / 32233 ON W CORNELIA AVE FROM N BROADWAY TO N HALSTED ST .50 06/27/07 08/03/07 18,750 06/25/07 10/10/07 10,885 100
300 09 / 33110 ON W CORNELIA AVE FROM N HALSTED ST TO N WILTON AVE 1.0 65,000 04/01/08 12/01/08 0 0
300 06 0298 / 5405 ON W EDDY ST FROM N RACINE AVE TO N SOUTHPORT AVE 2.0 04/01/05 05/15/05 0 04/01/05 05/20/05 107,553 100
300 05 0044 / 5159 ON W HENDERSON ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE 1.0 04/04/05 11/18/05 80,000 10/10/05 03/10/06 61,601 100
300 05 0044 / 5159 ON W MELROSE ST FROM N RACINE AVE TO N SOUTHPORT AVE 2.0 04/04/05 11/18/05 150,000 09/19/05 03/10/06 115,718 100
300 09 / 33110 ON W NEWPORT AVE FROM N HALSTED ST TO N SHEFFIELD AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 05 0044 / 5159 ON W NEWPORT AVE FROM N RACINE AVE TO N SOUTHPORT AVE 2.0 04/04/05 11/18/05 150,000 10/20/05 03/10/06 115,718 100
300 07 0044 / 5467 ON W OAKDALE AVE FROM N BROADWAY TO N SHERIDAN RD 2.0 05/01/07 07/01/07 150,000 09/25/06 107,668 95
300 06 / 32277 ON W OAKDALE AVE FROM N RACINE AVE TO N SHEFFIELD AVE .0 05/04/08 12/31/08 0 0 0
300 05 0044 / 5159 ON W ROSCOE ST FROM N RACINE AVE TO N SOUTHPORT AVE 2.0 04/04/05 11/18/05 150,000 10/17/05 03/10/06 115,719 100
300 05 0044 / 5159 ON W SCHOOL ST FROM N RACINE AVE TO N SOUTHPORT AVE 2.0 04/04/05 11/18/05 150,000 09/22/05 03/10/06 115,719 100
300 11 / 32233 ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE .67 07/09/07 09/07/07 30,150 07/09/07 11/02/07 18,391 100
300 11 / 32235 ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE .50 07/09/07 09/07/07 22,500 07/09/07 11/02/07 13,725 100
300 09 / 33110 ON W SURF ST FROM N BROADWAY TO N SHERIDAN RD 2.0 80,000 04/01/08 12/01/08 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 473

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32233 ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST .50 07/09/07 09/07/07 22,500 07/09/07 11/02/07 13,725 100
300 11 / 32235 ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST .50 07/09/07 09/07/07 21,250 07/09/07 11/02/07 13,725 100
300 07 0044 / 5467 ON W WELLINGTON AVE FROM N BROADWAY TO N SHERIDAN RD 2.0 05/01/07 07/01/07 150,000 09/25/06 107,669 95
300 06 / 32146 3600-3800 N LAKEWOOD AVE 2.0 09/05/07 05/29/08 394,424 0 95

Totals per Residntl Staggered Lighting 50.67 3,702,028 1,692,687

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N JANSSEN AVE FROM W ROSCOE ST TO W ADDISON ST 2.0 04/08/03 06/08/03 166,978 04/08/03 06/02/03 152,353 100
300 03 0044 / 4915 ON N SHEFFIELD AVE FROM W DIVERSEY PKWY TO W BELMONT AVE 09/15/04 11/15/04 400,000 09/07/04 02/11/05 232,307 100
300 06 0267 / 5375 ON W CORNELIA AVE FROM N RACINE AVE TO N SOUTHPORT AVE 2.0 03/15/04 05/15/04 147,242 03/05/04 04/27/04 145,026 100
300 03 0044 / 4915 ON W FLETCHER ST FROM N CLARK ST TO N SHEFFIELD AVE 2.0 09/15/04 11/15/04 150,000 09/07/04 01/07/05 67,996 100
300 06 0069 / 5233 ON W FLETCHER ST FROM N CLARK ST TO N SHEFFIELD AVE 2.0 08/01/04 10/01/04 203,500 09/08/04 02/23/05 73,656 100
300 06 0069 / 5233 ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY 1.0 10/15/04 12/15/04 27,500 12/01/04 12/23/04 36,344 100
300 06 0276 / 5384 ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY 10/15/04 12/15/04 27,500 10/22/04 12/23/04 36,344 100

Totals per Residntl Strt Lighting/Lamps 9.0 1,122,720 744,025

Work Type: Strt Light Pole Painting Locations


300 06 0108 / 5263 ON N ASHLAND AVE FROM W ROSCOE ST TO W ADDISON ST 19.0 10/03/03 10/05/03 4,620 10/17/03 10/18/03 4,620 100
300 06 0108 / 5263 ON N CLARK ST FROM W BELMONT AVE TO W ADDISON ST 56.0 08/03/03 08/15/03 24,400 08/04/03 08/22/03 23,671 100
300 06 0108 / 5263 ON N LAKE SHORE DR WEST FROM W DIVERSEY PKWY TO W BELMONT 42.0 08/03/03 08/15/03 21,400 08/15/03 08/22/03 8,330 100
AVE
300 05 0044 / 5159 ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST 29.0 04/04/05 11/18/05 6,273 6,273 100
300 06 0108 / 5263 ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST 21.50 10/01/03 10/22/03 9,520 09/20/03 09/26/03 9,520 100
300 04 0216 / 5114 ON W BELMONT AVE FROM N LINCOLN AVE TO N SOUTHPORT AVE 17.0 05/01/06 11/01/06 3,677 05/17/06 06/25/06 3,677 100
302 00 0076 / 5764 3400-3500 N CLARK ST 32.0 04/01/00 12/31/00 0 544
302 00 0076 / 5764 300-400 W DIVERSEY AVE 10.0 09/01/00 12/31/00 0 170

Totals per Strt Light Pole Painting 226.50 69,890 56,805

Work Type: Strt Light Pole Replacmnt/Reloc Blocks


300 06 0122 / 5275 ON W BELMONT AVE FROM N HALSTED ST TO N SHEFFIELD AVE 7.0 11/01/03 12/31/03 394,607 09/15/03 06/15/04 501,452 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 474

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Traffic Signal Regrouping Lamps
300 06 0139 / 5289 1057 W BELMONT AVE 1,855.0 03/01/04 12/01/04 9,646 11/02/06 11/27/06 20,201 100

Work Type: Underpass Lighting Fixtures


300 06 0217 / 5337 1057 W BELMONT AVE 21.0 06/23/04 06/24/04 1,180 06/16/04 06/16/04 681 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 475

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: New Signal Locations
210 06 0171 / 4420 N HALSTED ST AND W WAVELAND AVE .50 08/01/06 04/01/07 108,000 04/25/07 05/24/07 53,026 100
210 06 0171 / 4420 N LINCOLN AVE AND W SCHOOL ST .50 08/02/07 09/20/07 57,120 04/19/07 91,967 85

Totals per New Signal 1.0 165,120 144,993

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0240 / 4477 W DIVERSEY PKWY AND N SHERIDAN RD 6.0 11/06/06 09/20/07 8,700 11/08/06 11/22/06 4,911 100

Work Type: Pedestrian Countdown Signal Installation Installations


210 06 / 32276 W DIVERSEY PKWY AND N SHEFFIELD AVE .0 04/01/07 02/28/08 5,760 0 0

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N ASHLAND AVE AND W SCHOOL ST 1.0 4,000 12/10/01 01/18/02 9,284 100

Work Type: Signals Intersections


300 06 0096 / 5258 1057 W BELMONT AVE 41.0 11/15/03 11/21/03 0 10/07/03 10/14/03 6,483 100

Work Type: TSM Install Locations


210 06 0020 / 4295 N BROADWAY AND W CORNELIA AVE 02/01/01 03/15/01 67,500 02/14/01 04/20/01 38,582 100
210 06 0020 / 4295 W BARRY AVE AND N SHERIDAN RD 01/25/00 03/15/00 153,466 01/26/00 02/29/00 100,439 100
814 06 0134 / 16348 3000 N HALSTED ST 1.0 04/08/93 04/08/93 0 04/08/93 04/08/93 112,423 100
271 00 0045 / 4794 3500 N HALSTED ST 1.0 0 08/01/97 08/15/99 201,000
210 06 0019 / 4294 3800 N SOUTHPORT AVE 1.0 290,000 07/20/99 02/06/00 239,714 100
814 06 0390 / 16578 800 W BELMONT AVE 1.0 07/06/95 07/06/95 0 07/06/95 07/06/95 149,081 100

Totals per TSM Install 4.0 510,966 841,239

Work Type: Traffic Equipment Painting Locations


300 05 0044 / 5159 ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST 24.0 04/04/05 11/18/05 10,238 10,238 100
300 06 0108 / 5263 N HALSTED ST AND W DIVERSEY AVE 04/01/05 04/10/05 1,260 0

Totals per Traffic Equipment Painting 24.0 11,498 10,238

Totals per Traffic 706,044 1,017,148

Totals per Construction Phase 6,323,121 4,373,103


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 476

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt
Totals for Ward 44 6,332,721 4,381,108
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 477

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0274 / 5382 ON N LUNA AVE FROM W LAWRENCE AVE TO W GIDDINGS ST .0 07/01/04 12/31/04 0 03/22/05 10/05/05 3,567 100
300 06 0308 / 5414 ON W SUNNYSIDE AVE FROM N LOCKWOOD AVE TO N LINDER AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 283 100
210 06 0127 / 4386 N AUSTIN AVE AND W FOSTER AVE 1.0 12/15/05 03/15/06 0 12/15/05 02/14/06 940 100
210 06 0127 / 4386 N CICERO AVE AND W LAWRENCE AVE .0 12/15/05 03/15/06 0 0 0

Totals per Design/Engineering 1.0 0 4,790


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 478

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
302 00 0092 / 5774 ON N LAVERGNE AVE FROM W IRVING PARK RD TO N DICKINSON AVE 7.0 03/02/02 03/02/02 1,470 02/28/02 02/28/02 1,421 100
302 00 0092 / 5774 4000 N LAPORTE AVE 4.0 03/03/02 03/03/02 840 02/28/02 02/28/02 812 100
302 00 0092 / 5774 4900 W BELLE PLAINE AVE 5.0 03/03/02 03/03/02 1,050 02/28/02 02/28/02 1,015 100

Totals per 250 Watt Changeout 16.0 3,360 3,248

Totals per Lighting/Electrical 2,073,493 1,836,301


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 479

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0846 / 7032 4816 N AVONDALE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0847 / 7033 4830 N AVONDALE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0848 / 7034 4846 N AVONDALE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0811 / 6997 5851 N CENTRAL AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0397 / 6583 4337 N CICERO AVE 1.0 05/21/96 05/21/96 0 05/21/96 05/21/96 300 100
805 06 1088 / 7274 4588 N ELSTON AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0651 / 6837 5901 N ELSTON AVE 1.0 01/25/96 01/25/96 0 01/25/96 01/25/96 300 100
805 06 1159 / 7345 4336 N KEDVALE AVE 1.0 04/03/96 04/03/96 0 04/03/96 04/03/96 300 100
805 06 1183 / 7369 4505 N KEOKUK AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2031 / 8217 4463 N KILDARE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0358 / 6544 4635 N LECLAIRE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1965 / 8151 4831 N LIPPS AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 2093 / 8279 4835 N LIPPS AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1854 / 8040 4607 N LOWELL AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1881 / 8067 5011 N MAJOR AVE 1.0 09/11/96 09/11/96 0 09/11/96 09/11/96 300 100
805 06 1824 / 8010 5553 N MC VICKER AVE 1.0 12/12/96 12/12/96 0 12/12/96 12/12/96 300 100
805 06 1842 / 8028 5723 N MC VICKER AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1822 / 8008 6036 N MENARD AVE 1.0 08/01/96 08/01/96 0 08/01/96 08/01/96 300 100
805 06 1924 / 8110 4307 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
805 06 1942 / 8128 4411 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
805 06 1963 / 8149 4441 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
805 06 1944 / 8130 4659 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
300 06 0139 / 5289 4849 N MILWAUKEE AVE 2,061.0 03/01/06 09/01/06 47,298 05/20/06 06/01/06 62,271 100
302 00 0092 / 5774 4849 N MILWAUKEE AVE 13.0 0 01/25/01 01/18/02 3,063 100
805 06 1945 / 8131 5119 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
805 06 1946 / 8132 5147 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
805 06 1947 / 8133 6349 N MILWAUKEE AVE 1.0 06/24/96 06/24/96 0 06/24/96 06/24/96 300 100
805 06 0884 / 7070 4907 W BERTEAU AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1070 / 7256 5351 W DEVON AVE 1.0 11/13/96 11/13/96 0 11/13/96 11/13/96 300 100
805 06 1704 / 7890 5921 W GIDDINGS ST 1.0 06/23/97 06/23/97 0 06/23/97 06/23/97 300 100
302 00 0092 / 5774 5931 W GIDDINGS ST 1.0 0 06/14/01 06/14/01 236 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 480

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1189 / 7375 4710 W HUTCHINSON ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0318 / 6504 5850 W LAWRENCE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0333 / 6519 4359 W LELAND AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0334 / 6520 5901 W LELAND AVE 1.0 09/25/96 09/25/96 0 09/25/96 09/25/96 300 100
805 06 0528 / 6714 5811 W PETERSON AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100

Totals per Alley Lighting/Lamps 2,108.0 47,298 75,470

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 5205 N MILWAUKEE AVE 2,320.0 06/01/07 12/31/07 68,300 09/01/07 09/21/07 68,300 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 4849 N MILWAUKEE AVE 2,135.0 0 04/20/02 04/23/02 38,874 100

Work Type: Ornamental Lighting Blocks


300 06 0157 / 5297 5100 N MILWAUKEE AVE 1.0 0 03/08/99 05/20/99 45,516

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5205 N MILWAUKEE AVE .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 09 / 33111 ON N LARAMIE AVE FROM W ARGYLE ST TO W CARMEN AVE 2.0 20,000 04/01/08 12/01/08 0 0
300 05 0045 / 5160 ON N LIEB AVE FROM W GETTYSBURG ST TO N LONG AVE 1.0 04/04/05 11/18/05 75,000 09/12/05 11/04/05 37,904 100
300 09 / 33111 ON N LINDER AVE FROM W BALMORAL AVE TO W CATALPA AVE 2.0 20,000 04/01/08 12/01/08 0 0
300 05 0045 / 5160 ON N LONG AVE FROM W GETTYSBURG ST TO N LIEB AVE 1.0 04/04/05 11/18/05 75,000 09/12/05 11/04/05 37,904 100
300 05 0045 / 5160 ON W AINSLIE ST FROM N MENARD AVE TO N MARMORA AVE 2.0 04/04/05 11/18/05 100,000 07/12/05 09/22/05 70,482 100
300 06 0298 / 5405 ON W ARDMORE AVE FROM N MELVINA AVE TO N AUSTIN AVE 2.0 0 07/27/05 10/03/05 94,527 100
300 05 0045 / 5160 ON W STRONG ST FROM N MENARD AVE TO N MARMORA AVE 2.0 04/04/05 11/18/05 100,000 07/12/05 09/22/05 70,482 100
300 05 0045 / 5160 ON W SUNNYSIDE AVE FROM N KOSTNER AVE TO N LOWELL AVE 2.0 04/04/05 11/18/05 100,000 09/01/05 10/19/05 69,763 100
300 07 0045 / 5468 ON W SUNNYSIDE AVE FROM N LINDER AVE TO N CENTRAL AVE 1.0 04/15/07 05/15/07 50,000 10/25/06 04/06/07 0 100
300 06 0308 / 5414 ON W SUNNYSIDE AVE FROM N LOCKWOOD AVE TO N LINDER AVE 2.0 03/16/06 12/31/06 221,872 10/25/06 12/29/06 119,086 100
300 07 0045 / 5468 ON W SUNNYSIDE AVE FROM N LOWELL AVE TO N KOSTNER AVE .0 03/01/06 12/31/06 0 0 0

Totals per Residntl Staggered Lighting 17.0 761,872 500,148


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 481

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0235 / 5349 ON N LAVERGNE AVE FROM W MONTROSE AVE TO W WILSON AVE 2.0 06/15/03 08/15/03 144,200 06/06/03 07/24/03 151,269 100
300 06 0267 / 5375 ON W WILSON AVE FROM N LAVERGNE AVE TO N LECLAIRE AVE 2.0 08/01/04 10/01/04 150,872 07/22/04 09/16/04 138,802 100

Totals per Residntl Strt Lighting/Lamps 4.0 295,072 290,071

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 5025 N LARAMIE AVE 1.0 0 03/14/01 03/14/01 378 100

Work Type: Strt Light Pole Painting Locations


302 00 0076 / 5764 ON W LAWRENCE AVE FROM N CENTRAL AVE TO N MENARD AVE 15.0 09/01/00 12/31/00 0 255
300 04 0216 / 5114 ON W LAWRENCE AVE FROM N CENTRAL AVE TO N MILWAUKEE AVE 34.0 05/01/06 11/01/06 7,354 05/17/06 07/24/06 7,354 100

Totals per Strt Light Pole Painting 49.0 7,354 7,609

Work Type: Strt Lighting Blocks


300 06 0246 / 5356 ON N LARNED AVE FROM N LIEB AVE TO N LYNCH AVE 1.0 08/01/04 12/01/04 157,142 10/27/04 03/24/06 83,659 100
300 06 0246 / 5356 ON N LAVERGNE AVE FROM W WINNEMAC AVE TO W ARGYLE ST .50 08/01/04 12/01/04 157,143 10/27/04 03/24/06 83,659 100
300 06 0246 / 5356 ON N LAVERGNE AVE FROM W WINONA ST TO W CARMEN AVE .50 05/01/04 12/31/04 157,143 10/27/04 03/24/06 83,659 100
300 06 0274 / 5382 ON N LUNA AVE FROM W LAWRENCE AVE TO W GIDDINGS ST 1.0 04/20/06 05/16/06 75,000 04/20/06 05/16/06 61,256 100
300 06 0246 / 5356 ON W ARDMORE AVE FROM N MILTIMORE AVE TO N MILWAUKEE AVE 2.0 08/01/04 12/01/04 157,143 10/27/04 03/24/06 83,659 100
300 06 0246 / 5356 ON W CATALPA AVE FROM N CENTRAL AVE TO N LOTUS AVE 1.50 08/01/04 12/01/04 157,143 10/27/04 03/24/06 83,659 100

Totals per Strt Lighting 6.50 860,714 479,551

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 4849 N MILWAUKEE AVE 2,532.0 03/01/04 12/01/04 13,166 11/15/06 11/27/06 27,573 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 482

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
805 06 2304 / 8490 5152 N CENTRAL AVE 22.0 07/05/96 07/05/96 0 07/05/96 07/05/96 16,500 100
302 00 0070 / 5758 4450 N CICERO AVE 0 06/12/97 06/19/97 16,511 100
302 00 0070 / 5758 4500 N CICERO AVE 0 06/12/97 06/19/97 4,554 100
805 06 2167 / 8353 4505 N CICERO AVE 14.0 06/19/97 06/19/97 0 06/19/97 06/19/97 10,500 100
805 06 2170 / 8356 4505 N CICERO AVE 13.0 06/19/97 06/19/97 0 06/19/97 06/19/97 9,750 100
805 06 2657 / 8843 4830 N CICERO AVE 18.0 07/09/93 07/09/93 0 07/09/93 07/09/93 13,500 100
805 06 2566 / 8752 5290 N ELSTON AVE 28.0 03/27/95 03/27/95 0 03/27/95 03/27/95 21,000 100
805 06 2441 / 8627 5688 N FOREST GLEN AVE 12.0 09/12/95 09/12/95 0 09/12/95 09/12/95 9,000 100
300 06 0217 / 5337 4849 N MILWAUKEE AVE 291.0 06/25/04 07/07/04 16,357 06/17/04 06/25/04 17,312 100
805 06 2567 / 8753 5000 N MILWAUKEE AVE 42.0 04/25/95 04/25/95 0 04/25/95 04/25/95 31,500 100
805 06 2326 / 8512 4905 W AINSLIE ST 10.0 05/07/96 05/07/96 0 05/07/96 05/07/96 7,500 100
805 06 2877 / 9063 5201 W AINSLIE ST 10.0 05/04/94 05/04/94 0 05/04/94 05/04/94 7,500 100
805 06 2330 / 8516 4901 W ARGYLE ST 9.0 04/28/96 04/28/96 0 04/28/96 04/28/96 6,750 100
805 06 2303 / 8489 5001 W CARMEN AVE 10.0 05/07/96 05/07/96 0 05/07/96 05/07/96 7,500 100
805 06 2435 / 8621 5099 W FOSTER AVE 14.0 05/22/92 05/22/92 0 05/22/92 05/22/92 10,500 100
302 00 0070 / 5758 5700 W FOSTER AVE 0 05/22/97 05/29/97 13,414 100
805 06 2162 / 8348 5751 W FOSTER AVE 22.0 05/29/97 05/29/97 0 05/29/97 05/29/97 16,500 100
805 06 2672 / 8858 4801 W LAWRENCE AVE 20.0 11/15/94 11/15/94 0 11/15/94 11/15/94 15,000 100
805 06 2241 / 8427 4901 W LAWRENCE AVE 14.0 09/16/96 09/16/96 0 09/16/96 09/16/96 10,500 100
805 06 2878 / 9064 5150 W LAWRENCE AVE 12.0 03/24/94 03/24/94 0 03/24/94 03/24/94 9,000 100
805 06 2909 / 9095 4701 W MONTROSE AVE 10.0 05/29/92 05/29/92 0 05/29/92 05/29/92 7,500 100
302 00 0071 / 5759 4740 W MONTROSE AVE 0 05/12/99 05/19/99 13,772 100
805 06 2371 / 8557 4810 W WILSON AVE 14.0 09/14/95 09/14/95 0 09/14/95 09/14/95 10,500 100
805 06 2372 / 8558 4810 W WILSON AVE 18.0 09/14/95 09/14/95 0 09/14/95 09/14/95 13,500 100

Totals per Underpass Lighting 603.0 16,357 299,563


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 483

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N AUSTIN AVE AND N ELSTON AVE 1.0 0 11/05/02 11/05/02 8,539 100

Work Type: Left Turn Arrow Locations


210 06 0127 / 4386 N AUSTIN AVE AND W FOSTER AVE 1.0 10/01/06 11/01/06 75,000 03/30/06 08/15/06 80,221 100
210 06 0127 / 4386 N CICERO AVE AND W LAWRENCE AVE .50 47,500 0 0
300 06 0199 / 5324 W MONTROSE AVE AND N LARAMIE AVE .50 11/01/01 11/28/01 3,078 11/07/01 11/08/01 4,980 100
210 06 0074 / 4338 4800 W LAWRENCE AVE 1.0 02/01/03 03/01/03 50,000 01/16/03 01/30/03 65,766 100

Totals per Left Turn Arrow 3.0 175,578 150,967

Work Type: New Signal Locations


210 06 0075 / 4339 W MONTROSE AVE AND N KNOX AVE 09/01/04 11/01/04 90,500 07/26/04 07/07/05 114,304 100

Work Type: Signals Intersections


300 06 0096 / 5258 4849 N MILWAUKEE AVE 64.0 11/15/03 11/25/03 0 10/01/03 10/08/03 10,120 100

Totals per Traffic 341,078 1,975,281


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 484

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: TSM Install Locations
210 06 0072 / 4336 W GRACE ST AND N LARAMIE AVE .50 02/12/01 04/12/01 75,000 02/01/01 04/02/01 72,768 100
814 06 0363 / 16555 5600 N CENTRAL AVE 1.0 08/06/97 09/02/97 0 08/06/97 09/02/97 115,183 100
814 06 0202 / 16414 3800 N CICERO AVE 1.0 08/21/90 08/21/90 0 08/21/90 08/21/90 95,000 100
814 06 0226 / 16438 4000 N CICERO AVE 1.0 08/21/90 08/21/90 0 08/21/90 08/21/90 37,173 100
814 06 0225 / 16437 4200 N CICERO AVE 1.0 09/07/90 09/07/90 0 09/07/90 09/07/90 37,173 100
814 06 0173 / 16385 4400 N CICERO AVE 1.0 09/11/90 09/11/90 0 09/11/90 09/11/90 95,000 100
814 06 0222 / 16434 5200 N CICERO AVE 1.0 02/07/92 02/07/92 0 02/07/92 02/07/92 40,173 100
814 06 0280 / 16492 5200 N ELSTON AVE 1.0 10/28/91 10/28/91 0 10/28/91 10/28/91 134,857 100
814 06 0163 / 16375 5770 N FOREST GLEN AVE 1.0 12/03/91 12/03/91 0 12/03/91 12/03/91 96,000 100
814 06 0109 / 16324 4400 N KILBOURN AVE 1.0 07/29/94 07/29/94 0 07/29/94 07/29/94 59,132 100
814 06 0339 / 16538 4400 N KOSTNER AVE 1.0 03/09/92 03/09/92 0 03/09/92 03/09/92 73,893 100
814 06 0157 / 16371 4400 N LARAMIE AVE 1.0 09/15/92 09/15/92 0 09/15/92 09/15/92 95,000 100
814 06 0171 / 16383 5199 N LARAMIE AVE 1.0 02/10/92 02/10/92 0 02/10/92 02/10/92 96,000 100
814 06 0172 / 16384 5199 N LECLAIRE AVE 1.0 02/19/92 02/19/92 0 02/19/92 02/19/92 96,000 100
814 06 0170 / 16382 5200 N LONG AVE 1.0 02/18/92 02/18/92 0 02/18/92 02/18/92 96,000 100
814 06 0167 / 16379 5750 W FOSTER AVE 1.0 02/14/92 02/14/92 0 02/14/92 02/14/92 96,000 100
814 06 0379 / 16569 6400 W HIGGINS AVE 1.0 03/01/97 03/01/97 0 03/01/97 04/01/97 136,000 100
814 06 0179 / 16391 4730 W WILSON AVE 1.0 11/04/92 11/04/92 0 11/04/92 11/04/92 105,000 100
814 06 0178 / 16390 4770 W WILSON AVE 1.0 10/22/93 10/22/93 0 10/22/93 10/22/93 115,000 100

Totals per TSM Install 18.50 75,000 1,691,352

Totals per Construction Phase 2,414,571 3,811,582

Totals for Ward 45 2,414,571 3,816,372


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 485

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N CLARENDON AVE FROM W IRVING PARK RD TO W MONTROSE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 3,010 100
300 06 / 32146 ON W SUNNYSIDE AVE FROM N SHERIDAN RD TO N CLARENDON AVE .0 05/01/07 10/31/07 3,900 07/13/07 08/20/07 3,500 100
300 06 / 32146 ON W WINDSOR AVE FROM N SHERIDAN RD TO N CLARENDON AVE .0 05/01/07 10/31/07 3,900 07/02/07 08/10/07 2,000 100
210 06 0023 / 4298 N BROADWAY AND W MONTROSE AVE 1.0 02/06/02 04/02/02 5,000 02/06/02 07/26/06 3,760 100
300 06 0292 / 5399 4258 N BROADWAY 1.0 1,000 03/02/05 08/24/05 747 100
300 06 0292 / 5399 4700 N MARINE DR 1.0 01/31/05 02/25/05 2,000 01/05/05 03/14/05 1,197 100

Totals per Design/Engineering 3.0 15,800 14,214


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 486

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 400 Watt Changeout Fixtures
300 06 0122 / 5275 ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE 8.82 12/15/03 12/21/03 3,528 12/09/03 12/14/03 2,563 100

Totals per Lighting/Electrical 5,495,724 5,111,611


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 487

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1296 / 7482 4819 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4839 N ASHLAND AVE 0 12/04/97 12/04/97 266 100
805 06 1300 / 7486 4839 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4857 N ASHLAND AVE 0 12/04/97 12/04/97 266 100
805 06 1305 / 7491 4857 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4879 N ASHLAND AVE 0 12/04/97 12/04/97 266 100
805 06 1281 / 7467 4879 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4913 N ASHLAND AVE 0 12/04/97 12/04/97 267 100
805 06 1284 / 7470 4913 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5013 N ASHLAND AVE 0 12/04/97 12/04/97 267 100
805 06 1286 / 7472 5013 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5043 N ASHLAND AVE 0 12/04/97 12/04/97 267 100
805 06 1287 / 7473 5043 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0819 / 7005 4449 N BROADWAY 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
300 06 0096 / 5258 4544 N BROADWAY 575.0 03/01/03 09/01/03 15,019 03/01/06 09/01/06 17,373 0
302 00 0092 / 5774 4544 N BROADWAY 11.0 0 01/16/01 01/16/02 2,592 100
302 00 0083 / 5768 4821 N CLARK ST 0 11/18/97 11/18/97 266 100
805 06 1285 / 7471 4921 N CLARK ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5044 N CLARK ST 0 11/18/97 11/18/97 266 100
805 06 1288 / 7474 5044 N CLARK ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 5050 N CLARK ST 0 11/18/97 11/18/97 266 100
805 06 1289 / 7475 5050 N CLARK ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4519 N DOVER ST 0 06/08/98 06/08/98 275 100
805 06 1337 / 7523 4519 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4529 N DOVER ST 0 06/08/98 06/08/98 275 100
805 06 1338 / 7524 4529 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4553 N DOVER ST 0 06/08/98 06/08/98 275 100
805 06 1343 / 7529 4553 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4601 N DOVER ST 0 06/08/98 06/08/98 275 100
805 06 1344 / 7530 4601 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4641 N DOVER ST 0 06/08/98 06/08/98 275 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 488

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1324 / 7510 4641 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4751 N DOVER ST 0 06/08/98 06/08/98 275 100
805 06 1315 / 7501 4751 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4755 N DOVER ST 0 06/08/98 06/08/98 275 100
805 06 1318 / 7504 4755 N DOVER ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4000 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1383 / 7569 4000 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4012 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1385 / 7571 4012 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4022 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1387 / 7573 4022 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4026 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1389 / 7575 4026 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4030 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1390 / 7576 4030 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4048 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1392 / 7578 4048 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4058 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1395 / 7581 4058 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4068 N KENMORE AVE 0 06/15/98 06/15/98 275 100
805 06 1366 / 7552 4068 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4124 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1369 / 7555 4124 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4126 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1370 / 7556 4126 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4130 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1371 / 7557 4130 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4132 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1372 / 7558 4132 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4146 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1373 / 7559 4146 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 489

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0084 / 5769 4148 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1375 / 7561 4148 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4218 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1376 / 7562 4218 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4228 N KENMORE AVE 0 06/22/98 06/22/98 275 100
805 06 1377 / 7563 4228 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4305 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1378 / 7564 4305 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4306 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1379 / 7565 4306 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4326 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1380 / 7566 4326 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4342 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1351 / 7537 4342 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4347 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1352 / 7538 4347 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4353 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1353 / 7539 4353 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4621 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1349 / 7535 4621 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4631 N KENMORE AVE 0 06/25/98 06/25/98 275 100
805 06 1321 / 7507 4631 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4721 N KENMORE AVE 0 06/29/98 06/29/98 275 100
805 06 1331 / 7517 4721 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4722 N KENMORE AVE 0 06/29/98 06/29/98 275 100
805 06 1334 / 7520 4722 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4730 N KENMORE AVE 0 06/29/98 06/29/98 275 100
805 06 1335 / 7521 4730 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4741 N KENMORE AVE 0 06/29/98 06/29/98 275 100
805 06 1311 / 7497 4741 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4758 N KENMORE AVE 0 06/29/98 06/29/98 275 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 490

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1292 / 7478 4758 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1148 / 7334 4801 N KENMORE AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
805 06 1176 / 7362 4801 N KENMORE AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
302 00 0084 / 5769 4817 N KENMORE AVE 0 06/29/98 06/29/98 275 100
805 06 1295 / 7481 4817 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4859 N KENMORE AVE 0 06/29/98 06/29/98 275 100
805 06 1276 / 7462 4859 N KENMORE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4419 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1359 / 7545 4419 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4453 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1363 / 7549 4453 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4541 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1340 / 7526 4541 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4639 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1323 / 7509 4639 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4715 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1329 / 7515 4715 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4719 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1330 / 7516 4719 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4749 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1313 / 7499 4749 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4755 N MAGNOLIA AVE 0 07/07/98 07/07/98 275 100
805 06 1319 / 7505 4755 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4816 N MAGNOLIA AVE 0 11/24/97 11/24/97 266 100
805 06 1294 / 7480 4816 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4834 N MAGNOLIA AVE 0 11/24/97 11/24/97 266 100
805 06 1299 / 7485 4834 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4850 N MAGNOLIA AVE 0 11/24/97 11/24/97 266 100
805 06 1303 / 7489 4850 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 4872 N MAGNOLIA AVE 0 11/24/97 11/24/97 267 100
805 06 1279 / 7465 4872 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 491

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0083 / 5768 4886 N MAGNOLIA AVE 0 11/24/97 11/24/97 267 100
805 06 1282 / 7468 4886 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4400 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1354 / 7540 4400 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4401 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1356 / 7542 4401 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4418 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1358 / 7544 4418 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4425 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1360 / 7546 4425 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4436 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1361 / 7547 4436 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4516 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1365 / 7551 4516 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4530 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1339 / 7525 4530 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4552 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1341 / 7527 4552 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4602 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1345 / 7531 4602 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4615 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1346 / 7532 4615 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4616 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1348 / 7534 4616 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4626 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1350 / 7536 4626 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4637 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1322 / 7508 4637 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4642 N MALDEN ST 0 07/13/98 07/13/98 275 100
805 06 1325 / 7511 4642 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4703 N MALDEN ST 0 07/16/98 07/16/98 275 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 492

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 1326 / 7512 4703 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4721 N MALDEN ST 0 07/16/98 07/16/98 275 100
805 06 1332 / 7518 4721 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4736 N MALDEN ST 0 07/16/98 07/16/98 275 100
805 06 1308 / 7494 4736 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4741 N MALDEN ST 0 07/16/98 07/16/98 275 100
805 06 1312 / 7498 4741 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4752 N MALDEN ST 0 07/16/98 07/16/98 275 100
805 06 1316 / 7502 4752 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4755 N MALDEN ST 0 07/16/98 07/16/98 275 100
805 06 1320 / 7506 4755 N MALDEN ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4401 N RACINE AVE 0 07/20/98 07/20/98 275 100
805 06 1357 / 7543 4401 N RACINE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4007 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1384 / 7570 4007 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4013 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1386 / 7572 4013 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4024 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1388 / 7574 4024 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4046 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1391 / 7577 4046 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4056 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1394 / 7580 4056 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4072 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1367 / 7553 4072 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4106 N SHERIDAN RD 0 07/27/98 07/27/98 276 100
805 06 1368 / 7554 4106 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4445 N SHERIDAN RD 0 07/27/98 07/27/98 275 100
805 06 1362 / 7548 4445 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4500 N SHERIDAN RD 0 07/27/98 07/27/98 275 100
805 06 1364 / 7550 4500 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 493

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0675 / 6861 4518 N SHERIDAN RD 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0084 / 5769 4552 N SHERIDAN RD 0 07/27/98 07/27/98 275 100
805 06 1342 / 7528 4552 N SHERIDAN RD 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0462 / 6648 4801 N WINTHROP AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
805 06 0479 / 6665 4801 N WINTHROP AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
302 00 0084 / 5769 4802 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
805 06 1293 / 7479 4802 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4824 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
805 06 1297 / 7483 4824 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4825 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
805 06 1298 / 7484 4825 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4828 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
302 00 0084 / 5769 4839 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
805 06 1301 / 7487 4839 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1304 / 7490 4852 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4853 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
302 00 0084 / 5769 4861 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
805 06 1278 / 7464 4861 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4875 N WINTHROP AVE 0 08/17/98 08/17/98 275 100
805 06 1280 / 7466 4875 N WINTHROP AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0781 / 6967 830 W AGATITE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0084 / 5769 935 W AGATITE AVE 0 08/25/98 08/25/98 276 100
805 06 1222 / 7408 935 W AGATITE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 945 W AGATITE AVE 0 08/25/98 08/25/98 276 100
805 06 1225 / 7411 945 W AGATITE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0861 / 7047 620 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0829 / 7015 622 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0874 / 7060 640 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0845 / 7031 660 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0820 / 7006 680 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0821 / 7007 720 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 494

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0822 / 7008 740 W BITTERSWEET PL 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0083 / 5768 1249 W CARMEN AVE 0 09/02/97 09/02/97 266 100
805 06 1442 / 7628 1249 W CARMEN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1309 W CARMEN AVE 0 09/02/97 09/02/97 266 100
805 06 1445 / 7631 1309 W CARMEN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1333 W CARMEN AVE 0 09/02/97 09/02/97 266 100
805 06 1451 / 7637 1333 W CARMEN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 1345 W CARMEN AVE 0 08/25/98 08/25/98 276 100
805 06 1453 / 7639 1345 W CARMEN AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 950 W CUYLER AVE 0 08/25/98 08/25/98 276 100
805 06 1226 / 7412 950 W CUYLER AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 960 W CUYLER AVE 0 08/25/98 08/25/98 276 100
805 06 1227 / 7413 960 W CUYLER AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 970 W CUYLER AVE 0 08/25/98 08/25/98 276 100
805 06 1230 / 7416 970 W CUYLER AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 911 W EASTWOOD AVE 0 09/09/98 09/09/98 276 100
805 06 1221 / 7407 911 W EASTWOOD AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 803 W LAKESIDE PL 0 09/09/98 09/09/98 276 100
805 06 1245 / 7431 803 W LAKESIDE PL 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 839 W LAKESIDE PL 0 09/09/98 09/09/98 276 100
805 06 1217 / 7403 839 W LAKESIDE PL 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 855 W LAKESIDE PL 0 09/09/98 09/09/98 276 100
805 06 1220 / 7406 855 W LAKESIDE PL 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 937 W LAKESIDE PL 0 09/09/98 09/09/98 276 100
805 06 1223 / 7409 937 W LAKESIDE PL 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 827 W LELAND AVE 0 09/14/98 09/14/98 276 100
805 06 1216 / 7402 827 W LELAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 845 W LELAND AVE 0 09/14/98 09/14/98 276 100
805 06 1219 / 7405 845 W LELAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 937 W LELAND AVE 0 09/14/98 09/14/98 276 100
805 06 1224 / 7410 937 W LELAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 495

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
302 00 0084 / 5769 960 W LELAND AVE 0 09/14/98 09/14/98 276 100
805 06 1228 / 7414 960 W LELAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0509 / 6695 732 W WAVELAND AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0083 / 5768 1238 W WINONA ST 0 09/02/97 09/02/97 267 100
805 06 1441 / 7627 1238 W WINONA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1258 W WINONA ST 0 09/02/97 09/02/97 267 100
805 06 1444 / 7630 1258 W WINONA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1312 W WINONA ST 0 09/02/97 09/02/97 267 100
805 06 1448 / 7634 1312 W WINONA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1332 W WINONA ST 0 09/02/97 09/02/97 267 100
805 06 1450 / 7636 1332 W WINONA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1340 W WINONA ST 0 09/02/97 09/02/97 267 100
805 06 1452 / 7638 1340 W WINONA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0083 / 5768 1346 W WINONA ST 0 09/02/97 09/02/97 266 100
805 06 1454 / 7640 1346 W WINONA ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100

Totals per Alley Lighting/Lamps 724.0 15,019 95,015

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 4544 N BROADWAY 1,228.0 06/01/07 12/31/07 36,152 08/01/07 08/17/07 36,152 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 4544 N BROADWAY 1,132.0 0 04/08/02 04/11/02 20,612 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 4700 N MAGNOLIA AVE 7.0 0 10/13/99 10/13/99 1,152 100
300 06 0167 / 5306 801 W SHERIDAN RD 1.0 0 08/16/99 08/16/99 351 100

Totals per Flood Light Install 8.0 0 1,503

Work Type: Lighting Imprvmnts Installations


300 06 0292 / 5399 4700 N MARINE DR .0 07/22/05 02/17/06 13,602 07/22/06 09/22/06 8,177 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 496

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Ornamental - Piggyback Lighting Fixtures
300 05 0046 / 5161 ON N CLARENDON AVE FROM W WILSON AVE TO W WINDSOR AVE 2.0 04/04/05 11/18/05 15,000 06/20/05 06/24/05 9,992 100
300 06 0122 / 5275 ON N SHERIDAN RD FROM W BYRON ST TO W IRVING PARK RD 11/01/04 11/30/04 48,250 10/01/04 11/01/04 30,189 100
300 07 0046 / 5469 ON W WAVELAND AVE FROM N LAKE SHORE DR WEST TO N BROADWAY 2.0 08/01/06 08/10/06 135,000 08/14/06 09/20/06 77,358 100

Totals per Ornamental - Piggyback Lighting 4.0 198,250 117,539

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 4544 N BROADWAY .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 06 0308 / 5414 ON N CLARENDON AVE FROM W IRVING PARK RD TO W MONTROSE AVE 2.0 06/12/06 08/25/06 119,285 07/21/06 09/28/06 72,126 100
300 07 0046 / 5469 ON N FREMONT ST FROM W SHERIDAN RD TO W IRVING PARK RD 1.0 07/24/06 09/29/06 85,000 03/26/07 07/13/07 47,349 100
300 07 0046 / 5469 ON N GLENWOOD AVE FROM W ARGYLE ST TO W FOSTER AVE 1.0 08/07/06 10/06/06 72,500 11/02/06 04/16/07 48,783 100
300 09 / 33112 ON N KENMORE AVE FROM W IRVING PARK RD TO W MONTROSE AVE 4.0 20,000 0 0
300 11 / 32235 ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 2.0 04/01/08 06/02/08 72,500 10/29/07 04/18/08 59,547 100
300 11 / 32237 ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 2.0 04/01/08 06/02/08 55,000 10/29/07 04/18/08 45,000 100
300 11 / 32235 ON N RACINE AVE FROM W WILSON AVE TO W LELAND AVE 1.0 12/07/07 03/14/08 45,000 12/07/07 04/25/08 34,455 100
300 05 0046 / 5161 ON W BRADLEY PL FROM N HALSTED ST TO N FREMONT ST 1.0 09/25/05 11/18/05 85,000 10/12/05 12/09/05 39,287 100
300 05 0046 / 5161 ON W BROMPTON AVE FROM N BROADWAY TO N HALSTED ST 1.0 10/15/05 11/18/05 85,000 10/12/05 12/09/05 39,287 100
300 11 / 32233 ON W CORNELIA AVE FROM N BROADWAY TO N HALSTED ST .50 06/27/07 08/03/07 18,750 06/25/07 10/10/07 10,885 100
300 07 0046 / 5469 ON W DAKIN ST FROM N BROADWAY TO N SHERIDAN RD 2.0 07/24/06 09/29/06 150,000 03/26/07 07/13/07 95,643 100
300 06 0298 / 5405 ON W GRACE ST FROM N HALSTED ST TO N LAKE SHORE DR WEST 2.0 06/01/05 07/01/05 0 06/20/05 08/05/05 80,715 100
300 07 0046 / 5469 ON W SHERIDAN RD FROM N FREMONT ST TO N LAKE SHORE DR WEST 3.0 07/24/06 09/26/06 165,000 03/26/07 07/13/07 95,436 100
300 11 / 32233 ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE .33 07/09/07 09/07/07 14,850 07/09/07 11/02/07 9,058 100
300 11 / 32235 ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE .50 07/09/07 09/07/07 22,500 07/09/07 11/02/07 13,725 100
300 06 / 32146 ON W SUNNYSIDE AVE FROM N SHERIDAN RD TO N CLARENDON AVE .0 10/05/07 03/31/08 328,000 0 99
300 11 / 32233 ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST .50 07/09/07 09/07/07 22,500 07/09/07 11/02/07 13,725 100
300 11 / 32235 ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST .50 07/09/07 09/07/07 21,250 07/09/07 11/02/07 13,725 100
300 06 / 32146 ON W WINDSOR AVE FROM N SHERIDAN RD TO N CLARENDON AVE 2.0 11/05/07 04/29/08 328,000 0 98
300 07 0046 / 5469 ON W WINNEMAC AVE FROM N CLARK ST TO N ASHLAND AVE 1.0 08/14/06 09/15/06 50,000 11/10/06 04/16/07 18,365 100
300 07 0046 / 5469 ON W WINONA ST FROM N BROADWAY TO N GLENWOOD AVE 2.0 08/07/06 10/06/06 140,000 11/10/06 04/16/07 97,625 100

Totals per Residntl Staggered Lighting 29.33 1,900,135 834,734


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 497

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 06 0267 / 5375 ON N HAZEL ST FROM W BUENA AVE TO W MONTROSE AVE 2.0 07/01/04 08/15/04 160,902 07/06/04 11/12/04 131,497 100
300 06 0069 / 5233 ON N JANSSEN AVE FROM W ARGYLE ST TO W AINSLIE ST 1.0 10/15/03 01/15/04 40,000 10/14/03 12/05/03 38,748 100
300 03 0046 / 4917 ON N PINE GROVE AVE FROM W CORNELIA AVE TO W IRVING PARK RD 4.0 12/15/04 03/01/05 251,000 12/06/04 05/27/05 193,741 100
300 06 0069 / 5233 ON W ARGYLE ST FROM N CLARK ST TO N MAGNOLIA AVE 2.96 10/15/03 01/15/04 162,800 10/14/03 12/05/03 120,013 100
300 06 0276 / 5384 ON W BELLE PLAINE AVE FROM N CLARENDON AVE TO N BROADWAY 11/15/04 12/15/04 60,000 12/06/04 03/15/05 53,453 100
302 00 0092 / 5774 ON W BITTERSWEET PL FROM N CLARENDON AVE TO N MARINE DR 2.0 01/10/03 03/10/03 129,000 01/17/03 03/13/03 125,221 100
300 03 0046 / 4917 ON W BUENA AVE FROM N CLARENDON AVE TO N HAZEL ST 1.0 07/06/04 09/06/04 80,000 07/06/04 11/05/04 68,072 100
302 00 0092 / 5774 ON W BUENA AVE FROM N CLARENDON AVE TO N MARINE DR 2.0 12/04/02 02/15/03 90,000 12/04/02 02/11/03 84,108 100
300 06 0069 / 5233 ON W BUENA AVE FROM N SHERIDAN RD TO N BROADWAY 1.0 11/01/03 12/01/03 50,000 10/21/03 01/20/04 28,162 100
300 03 0046 / 4917 ON W CORNELIA AVE FROM N BROADWAY TO N LAKE SHORE DR 1.0 10/15/04 12/15/04 110,000 10/22/04 12/23/04 85,812 100
300 06 0069 / 5233 ON W CULLOM AVE FROM N BROADWAY TO N HAZEL ST 1.0 11/15/03 12/15/03 63,000 10/21/03 01/20/04 77,152 100
300 03 0046 / 4917 ON W CUYLER AVE FROM N BROADWAY TO N SHERIDAN RD 1.0 11/01/04 12/15/04 100,000 12/15/04 03/01/05 85,372 100
302 00 0092 / 5774 ON W EASTWOOD AVE FROM N CLARENDON AVE TO N SHERIDAN RD 2.0 03/01/03 05/01/03 105,000 04/01/03 06/15/03 135,719 100
300 06 0235 / 5349 ON W GORDON TER FROM N MARINE DR TO N CLARENDON AVE 1.0 06/15/03 08/15/03 76,427 06/16/03 08/14/03 65,281 100
300 03 0046 / 4917 ON W HUTCHINSON AVE FROM N MARINE DR TO N HAZEL ST 2.0 07/06/04 09/06/04 150,000 07/06/04 11/05/04 114,363 100
300 03 0046 / 4917 ON W JUNIOR TER FROM N CLARENDON AVE TO N HAZEL ST 1.0 07/06/04 09/06/04 75,000 07/06/04 11/05/04 53,740 100
300 06 0235 / 5349 ON W JUNIOR TER FROM N MARINE DR TO N CLARENDON AVE 1.0 06/15/03 08/15/03 76,427 06/16/03 08/14/03 65,281 100
300 06 0069 / 5233 ON W LAKESIDE PL FROM N SHERIDAN RD TO N CLARENDON AVE 2.0 07/27/03 10/15/03 134,000 07/27/03 11/07/03 108,601 100
302 00 0092 / 5774 ON W LELAND AVE FROM N CLARENDON AVE TO N SHERIDAN RD 2.0 02/15/03 04/15/03 118,500 02/14/03 05/21/03 109,284 100
300 06 0069 / 5233 ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY 1.0 10/15/04 12/15/04 27,500 12/01/04 12/23/04 36,344 100
300 06 0276 / 5384 ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY 10/15/04 12/15/04 27,500 10/22/04 12/23/04 36,344 100

Totals per Residntl Strt Lighting/Lamps 30.96 2,087,056 1,816,307

Work Type: Residntl Strt Lighting/Lamps Locations


300 06 0122 / 5275 ON N PINE GROVE AVE FROM W CORNELIA AVE TO W IRVING PARK RD 12/01/04 01/31/05 124,000 12/06/04 05/20/05 124,000 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 498

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 1020 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1023 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1241 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1434 W LELAND AVE 1.0 0 01/23/01 01/23/01 378 100

Totals per Short Arm Installs - Residntl 4.0 0 1,512

Work Type: Strt Light Pole Painting Locations


302 00 0076 / 5764 ON N BROADWAY FROM W LAWRENCE AVE TO W GRANVILLE AVE 11.0 05/05/98 05/21/98 0 05/05/98 05/21/98 187 100
300 06 0058 / 5229 ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE 50.49 09/20/02 10/20/02 11,550 09/20/02 10/30/02 11,550 100
300 06 0108 / 5263 ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE 11.34 03/01/04 03/10/04 3,346 04/12/04 05/07/04 2,773 100

Totals per Strt Light Pole Painting 72.83 14,896 14,510


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 499

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Lighting Blocks
302 00 0091 / 5773 ON N BEACON ST FROM W LAWRENCE AVE TO W WILSON AVE 2.0 09/01/01 12/30/01 78,249 08/20/01 01/29/02 74,660 100
302 00 0088 / 5770 ON N HAZEL ST FROM W MONTROSE AVE TO W WILSON AVE 0 06/23/97 02/25/98 67,521 100
302 00 0089 / 5771 ON N KENMORE AVE FROM W IRVING PARK RD TO W MONTROSE AVE 0 09/11/98 09/28/99 250,573 100
302 00 0091 / 5773 ON N MAGNOLIA AVE FROM W LAWRENCE AVE TO W WILSON AVE 2.0 10/01/01 12/30/01 77,590 10/12/01 01/14/02 73,083 100
302 00 0091 / 5773 ON N MALDEN ST FROM W LAWRENCE AVE TO W WILSON AVE 2.0 10/01/01 12/30/01 76,368 08/27/01 01/29/02 71,495 100
302 00 0089 / 5771 ON N PINE GROVE AVE FROM W ADDISON ST TO W SHERIDAN RD 0 40,000 100
302 00 0088 / 5770 ON W AGATITE AVE FROM N CLARENDON AVE TO N SHERIDAN RD 0 67,521 100
302 00 0089 / 5771 ON W AINSLIE ST FROM N SHERIDAN RD TO N WINTHROP AVE 0 04/16/99 06/24/99 0 100
302 00 0088 / 5770 ON W ARGYLE ST FROM N GLENWOOD AVE TO N CLARK ST 0 06/03/98 06/18/98 67,521 100
302 00 0091 / 5773 ON W ARGYLE ST FROM N SHERIDAN RD TO N WINTHROP AVE .50 491 02/13/01 02/13/01 193 100
302 00 0091 / 5773 ON W CARMEN AVE FROM N BROADWAY TO N GLENWOOD AVE 3.0 11/02/00 03/15/01 72,300 11/08/00 02/27/01 97,891 100
302 00 0091 / 5773 ON W CARMEN AVE FROM N GLENWOOD AVE TO N CLARK ST 1.0 11/01/00 12/04/00 60,700 11/01/00 12/04/00 77,631 100
302 00 0088 / 5770 ON W LELAND AVE FROM N RACINE AVE TO N BEACON ST 0 12/30/97 09/30/98 67,521 100
302 00 0088 / 5770 ON W SUNNYSIDE AVE FROM N CLARENDON AVE TO N SHERIDAN RD 0 67,522 100
302 00 0088 / 5770 ON W WINDSOR AVE FROM N CLARENDON AVE TO N SHERIDAN RD 0 67,522 100
302 00 0088 / 5770 ON W WINNEMAC AVE FROM N BROADWAY TO N GLENWOOD AVE 0 01/07/98 06/08/98 33,761 100
302 00 0091 / 5773 ON W WINNEMAC AVE FROM N CLARK ST TO N GLENWOOD AVE 1.0 10/01/01 12/30/01 57,700 09/17/01 02/07/02 61,166 100
302 00 0088 / 5770 ON W WINONA ST FROM N GLENWOOD AVE TO N CLARK ST 0 04/07/98 06/03/98 33,761 100
302 00 0091 / 5773 4400-4500 N BEACON ST 2.0 100,000 06/28/01 12/10/01 119,477 100
302 00 0091 / 5773 4400 N CLIFTON AVE 1.0 45,000 05/22/01 08/14/01 69,934 100
302 00 0090 / 5772 4600 N CLIFTON AVE 11/01/99 02/15/00 78,895 11/15/99 02/15/00 60,000 100
302 00 0089 / 5771 3900-3931 N FREMONT ST 0 10/01/98 09/27/99 99,386 100
302 00 0091 / 5773 4800 N KENMORE AVE 1.0 80,000 07/23/01 02/07/02 82,981 100
302 00 0091 / 5773 4400-4500 N MAGNOLIA AVE 2.0 100,000 05/03/01 09/11/01 60,217 100
302 00 0091 / 5773 4400-4500 N MALDEN ST 2.0 100,000 05/10/01 01/29/02 59,819 100
302 00 0091 / 5773 4400 N RACINE AVE 1.0 04/03/01 12/03/01 50,000 04/03/01 08/14/01 45,801 100
302 00 0089 / 5771 4800-4899 N WINTHROP AVE 0 04/23/99 06/17/99 0 100
302 00 0091 / 5773 900 W BELLE PLAINE AVE 1.0 42,000 06/14/01 09/11/01 60,848 100
302 00 0091 / 5773 900 W GORDON TER 1.0 42,000 06/26/01 09/11/01 39,393 100
302 00 0091 / 5773 1200 W SUNNYSIDE AVE 1.0 11/01/01 12/30/01 25,000 05/22/01 08/14/01 2,599 100

Totals per Strt Lighting 23.50 1,086,293 1,919,797


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 500

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Traffic Signal Regrouping Lamps
300 06 0139 / 5289 4544 N BROADWAY 1,500.0 03/01/04 12/01/04 7,800 11/02/06 11/28/06 16,335 100

Work Type: Underpass Lighting Fixtures


300 06 0217 / 5337 4544 N BROADWAY 160.0 07/08/04 07/14/04 8,993 06/25/04 06/29/04 6,856 100
805 06 2297 / 8483 4698 N BROADWAY 20.0 10/02/96 10/02/96 0 10/02/96 10/02/96 15,000 100
805 06 2740 / 8926 555 W IRVING PARK DR 31.0 11/01/94 11/01/94 0 11/01/94 11/01/94 23,250 100
805 06 2674 / 8860 1195 W LELAND AVE 19.0 12/14/94 12/14/94 0 12/14/94 12/14/94 14,250 100
805 06 2687 / 8873 1199 W LELAND AVE 21.0 07/01/94 07/01/94 0 07/01/94 07/01/94 15,750 100
805 06 2395 / 8581 1039 W MONTROSE AVE 4.0 07/19/95 07/19/95 0 07/19/95 07/19/95 3,000 100
805 06 2737 / 8923 620 W MONTROSE DR 27.0 12/14/94 12/14/94 0 12/14/94 12/14/94 20,250 100
805 06 2182 / 8368 1129 W WILSON AVE 6.0 12/31/95 12/31/95 0 12/31/95 12/31/95 4,500 100

Totals per Underpass Lighting 288.0 8,993 102,856


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 501

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Left Turn Arrow Locations
210 06 0023 / 4298 N BROADWAY AND W MONTROSE AVE 1.0 07/01/06 09/30/06 55,000 0

Work Type: New Signal Locations


210 06 0171 / 4420 N HALSTED ST AND W WAVELAND AVE .50 08/01/06 04/01/07 108,000 04/25/07 05/24/07 53,026 100

Work Type: Pedestrian Countdown Signal Install Locations


300 11 / 32235 W GRACE ST AND N HALSTED ST 12.0 12/05/07 12/09/07 18,000 12/07/07 12/11/07 0 100

wo#10720180 Note Last Updated on 07-MAR-08


300 06 0166 / 5305 4900 N GLENWOOD AVE 1.0 07/11/00 07/11/00 8,000 07/11/00 07/11/00 7,224 100

Totals per Pedestrian Countdown Signal Install 13.0 26,000 7,224

Work Type: Signals Intersections


300 06 0096 / 5258 4544 N BROADWAY 38.0 11/20/03 11/25/03 0 09/20/06 09/26/06 6,009 100

Work Type: TSM Install Locations


210 06 0020 / 4295 N BROADWAY AND W CORNELIA AVE 02/01/01 03/15/01 67,500 02/14/01 04/20/01 38,582 100
210 06 0020 / 4295 W FOSTER AVE AND N GLENWOOD AVE 01/15/01 03/15/01 65,450 12/09/99 02/11/00 50,081 100
210 06 0019 / 4294 W MONTROSE AVE AND N HAZEL ST 1.0 05/16/00 06/30/00 150,000 07/09/98 04/06/00 92,244 100
814 06 0372 / 16562 4700 N BROADWAY 1.0 03/08/96 03/08/96 0 03/08/96 03/08/96 159,145 100
271 00 0045 / 4794 4400 N MARINE DR 1.0 0 08/01/97 08/15/99 201,000
814 06 0140 / 16354 4000 N SHERIDAN RD 1.0 07/06/93 07/06/93 0 07/06/93 07/06/93 111,966 100

Totals per TSM Install 4.0 282,950 653,018

Totals per Traffic 471,950 719,277

Totals per Construction Phase 5,967,674 5,830,887

Totals for Ward 46 5,983,474 5,845,101


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 502

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD .0 02/01/06 07/31/06 0 02/01/06 09/28/06 27 100
300 06 / 32275 ON N BELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE .0 03/01/07 10/31/07 3,900 03/06/07 04/03/07 2,365 100
300 05 0047 / 5162 ON N BELL AVE FROM W LAWRENCE AVE TO W ARGYLE ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N CAMPBELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 / 32277 ON N CLAREMONT AVE FROM W AINSLIE ST TO W ARGYLE ST .0 04/01/08 08/30/08 0 0 0
300 05 0047 / 5162 ON N GREENVIEW AVE FROM W MONTROSE AVE TO W SUNNYSIDE AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N HERMITAGE AVE FROM W GRACE ST TO W IRVING PARK RD .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N HERMITAGE AVE FROM W IRVING PARK RD TO W BERTEAU AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N HERMITAGE AVE FROM W MONTROSE AVE TO W SUNNYSIDE AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N HOYNE AVE FROM W GRACE ST TO W BYRON ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N HOYNE AVE FROM W LAWRENCE AVE TO W ARGYLE ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 0308 / 5414 ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD .0 02/01/06 07/31/06 0 02/01/06 07/31/06 27 100
300 06 / 32275 ON N LEAVITT ST FROM W IRVING PARK RD TO W BELLE PLAINE AVE .0 03/01/07 10/31/07 3,900 02/02/07 03/15/07 2,365 100
300 05 0047 / 5162 ON N LINCOLN AVE FROM W LELAND AVE TO W LAWRENCE AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N MAPLEWOOD AVE FROM W MONTROSE AVE TO W WILSON AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 / 32277 ON N OAKLEY AVE FROM W AINSLIE ST TO W ARGYLE ST .0 04/01/08 08/30/08 0 0 0
300 05 0047 / 5162 ON N OAKLEY AVE FROM W LAWRENCE AVE TO W AINSLIE ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N ROCKWELL ST FROM W LAWRENCE AVE TO W GUNNISON ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N SEELEY AVE FROM W CORNELIA AVE TO W ADDISON ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON N WOLCOTT AVE FROM W BERTEAU AVE TO W CULLOM AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 / 32277 ON W AINSLIE ST FROM N OAKLEY AVE TO N WESTERN AVE .0 04/01/08 08/30/08 0 0 0
300 05 0047 / 5162 ON W ARGYLE ST FROM N DAMEN AVE TO N LEAVITT ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W ARGYLE ST FROM N LINCOLN AVE TO N ROCKWELL ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 06 / 32277 ON W ARGYLE ST FROM N OAKLEY AVE TO N WESTERN AVE .0 04/01/08 08/30/08 0 0 0
300 05 0047 / 5162 ON W BELLE PLAINE AVE FROM N DAMEN AVE TO N LINCOLN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W BERTEAU AVE FROM N LINCOLN AVE TO N LEAVITT ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W BRADLEY PL FROM N WOLCOTT AVE TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W BYRON ST FROM N CLAREMONT AVE TO N WESTERN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W CARMEN AVE FROM N LEAVITT ST TO N OAKLEY AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W CORNELIA AVE FROM N DAMEN AVE TO N LEAVITT ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W CULLOM AVE FROM N DAMEN AVE TO N LINCOLN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 503

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 05 0047 / 5162 ON W CUYLER AVE FROM N WOLCOTT AVE TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W EASTWOOD AVE FROM N CAMPBELL AVE TO N ROCKWELL ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W EASTWOOD AVE FROM N ROCKWELL ST TO N VIRGINIA AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W EASTWOOD AVE FROM N SEELEY AVE TO N HAMILTON AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W GRACE ST FROM N RAVENSWOOD TO N LINCOLN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W LELAND AVE FROM N WESTERN AVE TO N WASHTENAW AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W PENSACOLA AVE FROM N DAMEN AVE TO N HOYNE AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WARNER AVE FROM N LINCOLN AVE TO N LEAVITT ST .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WARNER AVE FROM N WESTERN AVE TO N CAMPBELL AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WAVELAND AVE FROM N LINCOLN AVE TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WAVELAND AVE FROM N WOLCOTT AVE TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WILSON AVE FROM N WESTERN AVE TO N VIRGINIA AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WINNEMAC AVE FROM N RAVENSWOOD TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WINNEMAC AVE FROM N WESTERN AVE TO N LINCOLN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WINNEMAC AVE FROM N WINCHESTER AVE TO N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 ON W WINONA ST FROM N LEAVITT ST TO N OAKLEY AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
210 06 0243 / 4480 N DAMEN AVE AND W LAWRENCE AVE .0 12/26/06 01/26/07 500 12/26/06 01/26/07 1,275 100
300 05 0047 / 5162 N GREENVIEW AVE AND W LELAND AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
210 06 0205 / 4448 W ADDISON ST AND N WOLCOTT AVE .0 07/01/04 12/01/04 0 07/01/04 12/01/04 2,531 100
300 06 0292 / 5399 4700 N CLARK ST 1.0 4,000 04/12/05 05/12/05 0 100
300 05 0047 / 5162 4632 N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 4700 N DAMEN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
210 06 0106 / 4366 4800 N OAKLEY AVE .0 07/27/00 10/17/00 0 07/27/00 10/17/00 1,817 100
300 05 0047 / 5162 3800 N WESTERN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 4132 N WESTERN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 4700 N WESTERN AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0
300 05 0047 / 5162 4800 N WOLCOTT AVE .0 07/17/06 07/30/06 0 07/17/06 07/30/06 0 0

Totals per Design/Engineering 1.0 12,300 10,407


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 504

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0307 / 5413 ON N WOLCOTT AVE FROM W WINONA ST TO W BRYN MAWR AVE 8.50 02/21/06 05/31/06 3,400 01/16/05 02/10/06 2,113 100

Work Type: 400 Watt Changeout Fixtures


300 03 0047 / 4918 ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE 42.0 11/01/04 11/20/04 16,800 10/01/04 10/15/04 16,114 100
300 03 0047 / 4918 ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE 18.0 11/01/04 11/20/04 7,200 10/01/04 10/15/04 7,092 100
300 03 0047 / 4918 ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE 5.0 11/01/04 11/20/04 2,000 10/01/04 10/15/04 2,087 100
300 03 0040 / 4911 ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE 12.25 08/20/04 09/20/04 4,900 07/14/04 08/10/04 3,202 100
300 03 0047 / 4918 ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE 9.0 11/01/04 11/20/04 1,200 10/01/04 10/15/04 2,417 100
300 03 0040 / 4911 ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE 26.40 08/20/04 09/20/04 10,560 07/14/04 08/10/04 6,901 100
300 03 0047 / 4918 ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE 18.0 11/01/04 11/20/04 7,200 10/01/04 10/15/04 5,167 100
300 03 0040 / 4911 ON W LAWRENCE AVE FROM N CALIFORNIA AVE TO N ROCKWELL AVE 5.92 08/20/04 09/20/04 2,368 07/14/04 08/10/04 1,547 100
300 03 0047 / 4918 ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE 40.0 11/01/04 11/20/04 16,000 10/01/04 10/15/04 16,276 100
300 09 / 33113 4832-4900 N LINCOLN AVE 2.0 02/01/08 12/31/08 800 08/28/08 08/29/08 0 100

Totals per 400 Watt Changeout 178.57 69,028 60,803

Totals per Lighting/Electrical 1,308,235 1,335,264


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 505

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0739 / 6925 4520 N ARTESIAN AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
805 06 0740 / 6926 4532 N ARTESIAN AVE 1.0 11/27/96 11/27/96 0 11/27/96 11/27/96 300 100
805 06 0726 / 6912 4551 N ARTESIAN AVE 1.0 09/30/96 09/30/96 0 09/30/96 09/30/96 300 100
805 06 1799 / 7985 3949 N ASHLAND AVE 1.0 04/11/97 04/11/97 0 04/11/97 04/11/97 300 100
302 00 0083 / 5768 4814 N ASHLAND AVE 0 12/04/97 12/04/97 266 100
302 00 0083 / 5768 5054 N ASHLAND AVE 0 12/04/97 12/04/97 266 100
805 06 1290 / 7476 5054 N ASHLAND AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1591 / 7777 4617 N CLARK ST 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
300 06 0139 / 5289 4237 N LINCOLN AVE 1,208.0 03/01/06 09/01/06 31,905 05/20/06 06/01/06 36,498 100
302 00 0092 / 5774 4237 N LINCOLN AVE 14.0 0 01/16/01 12/12/01 3,299 100
805 06 0596 / 6782 5136 N OAKLEY AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0588 / 6774 5142 N OAKLEY AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0544 / 6730 3900 N PAULINA ST 1.0 01/17/96 01/17/96 0 01/17/96 01/17/96 300 100
805 06 0545 / 6731 4140 N PAULINA ST 1.0 08/16/96 08/16/96 0 08/16/96 08/16/96 300 100
805 06 0655 / 6841 3946 N SOUTHPORT AVE 1.0 12/05/96 12/05/96 0 12/05/96 12/05/96 300 100
805 06 0465 / 6651 4515 N WOLCOTT AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1731 / 7917 1923 W GRACE ST 1.0 05/30/97 05/30/97 0 05/30/97 05/30/97 300 100
805 06 1193 / 7379 2140 W IRVING PARK RD 1.0 01/30/97 01/30/97 0 01/30/97 01/30/97 300 100
805 06 0329 / 6515 2200 W LAWRENCE AVE 1.0 11/15/96 11/15/96 0 11/15/96 11/15/96 300 100
805 06 0330 / 6516 2204 W LAWRENCE AVE 1.0 11/06/96 11/06/96 0 11/06/96 11/06/96 300 100
805 06 0331 / 6517 1761 W LELAND AVE 1.0 11/27/96 11/27/96 0 11/27/96 11/27/96 300 100
805 06 1954 / 8140 2213 W MONTROSE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0456 / 6642 2219 W WILSON AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100

Totals per Alley Lighting/Lamps 1,241.0 31,905 46,029

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 4237 N LINCOLN AVE 1,496.0 06/01/07 12/31/07 44,042 07/31/07 08/17/07 44,042 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 4237 N LINCOLN AVE 1,401.0 0 04/16/02 04/19/02 25,510 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 506

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 09 / 33113 4500 N LINCOLN AVE 1.0 09/08/08 09/10/08 500 09/08/08 09/10/08 500 100
300 11 / 32236 4740 N WESTERN AVE 2.0 10/01/07 10/01/07 1,000 10/01/07 10/01/07 941 100
302 00 0092 / 5774 1332 W IRVING PARK RD 1.0 0 03/26/01 03/26/01 471 100
302 00 0092 / 5774 1822 W LARCHMONT AVE 1.0 0 06/29/01 06/29/01 471 100

Totals per Flood Light Install 5.0 1,500 2,383

Work Type: Ornamental - Piggyback Lighting Fixtures


300 03 0047 / 4918 ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE 33.0 11/01/04 11/20/04 44,550 11/01/04 11/20/04 35,004 100
300 03 0047 / 4918 ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE 14.0 11/01/04 11/20/04 18,900 11/01/04 11/20/04 14,673 100
300 11 / 32222 ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST 11.55 11/01/07 12/01/07 15,725 03/13/08 04/04/08 13,060 100
300 03 0047 / 4918 ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE 3.0 11/01/04 11/20/04 4,050 11/01/04 11/20/04 3,307 100
300 03 0047 / 4918 ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE 34.0 11/01/04 11/20/04 45,900 11/01/04 11/20/04 37,296 100
300 09 / 33113 4832-4900 N LINCOLN AVE 2.0 02/01/08 12/31/08 2,700 08/28/08 08/29/08 0 100

Totals per Ornamental - Piggyback Lighting 97.55 131,825 103,340

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 4237 N LINCOLN AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 507

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 05 0047 / 5162 ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD .0 08/01/06 09/15/06 25,000 08/01/06 09/15/06 0 100
300 06 0308 / 5414 ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD 1.0 03/16/06 09/28/06 90,005 07/31/06 09/28/06 59,380 100
300 06 / 32275 ON N BELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE 1.0 04/01/07 12/31/07 104,140 03/27/07 08/03/07 60,317 100
300 06 / 32277 ON N CLAREMONT AVE FROM W AINSLIE ST TO W ARGYLE ST .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON N CLAREMONT AVE FROM W WILSON AVE TO W SUNNYSIDE AVE 1.0 05/10/05 06/25/05 0 05/02/05 06/06/05 66,931 100
300 05 0047 / 5162 ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD .0 08/01/06 09/15/06 25,000 08/01/06 09/15/06 0 100
300 06 0308 / 5414 ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD 1.0 09/01/06 09/28/06 90,005 07/31/06 09/28/06 59,380 100
300 06 / 32275 ON N LEAVITT ST FROM W IRVING PARK RD TO W BELLE PLAINE AVE 1.0 04/01/07 12/31/07 104,140 03/28/07 08/03/07 60,317 100
300 06 / 32277 ON N OAKLEY AVE FROM W AINSLIE ST TO W ARGYLE ST .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON N OAKLEY AVE FROM W WILSON AVE TO W SUNNYSIDE AVE 1.0 05/10/05 06/20/05 0 05/02/05 06/06/05 66,931 100
300 06 / 32277 ON W AINSLIE ST FROM N OAKLEY AVE TO N WESTERN AVE .0 05/04/08 12/31/08 0 0 0
300 06 / 32277 ON W ARGYLE ST FROM N OAKLEY AVE TO N WESTERN AVE .0 05/04/08 12/31/08 0 0 0

Totals per Residntl Staggered Lighting 6.0 438,290 373,256

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0267 / 5375 ON N LEAVITT ST FROM W ARGYLE ST TO W FOSTER AVE 2.0 05/26/04 07/26/04 159,200 05/06/04 07/14/04 153,257 100
300 06 0235 / 5349 ON N WASHTENAW AVE FROM W LELAND AVE TO W GIDDINGS ST 1.0 05/10/03 07/10/03 67,031 05/08/03 07/03/03 62,697 100

Totals per Residntl Strt Lighting/Lamps 3.0 226,231 215,954

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 1510 W LELAND AVE 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1522 W LELAND AVE 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1532 W LELAND AVE 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1534 W LELAND AVE 1.0 0 01/23/01 01/23/01 378 100
302 00 0092 / 5774 1546 W LELAND AVE 1.0 0 01/23/01 01/23/01 378 100

Totals per Short Arm Installs - Residntl 5.0 0 1,890


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 508

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Painting Locations
300 03 0047 / 4918 ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE 46.0 11/01/04 11/20/04 13,550 10/01/04 10/20/04 10,630 100
300 03 0047 / 4918 ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE 20.0 11/01/04 11/20/04 5,750 10/01/04 10/20/04 5,335 100
300 03 0047 / 4918 ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE 5.50 11/01/04 11/20/04 1,750 10/01/04 10/20/04 1,298 100
300 03 0040 / 4911 ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE 11.34 05/10/04 09/10/04 3,112 05/10/04 08/01/04 3,062 100
300 03 0047 / 4918 ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE 3.0 11/01/04 11/20/04 600 10/01/04 10/20/04 649 100
300 11 / 32190 ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE 4.95 05/15/07 06/01/07 1,089 05/15/07 06/01/07 1,089 100
300 03 0040 / 4911 ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE 25.68 05/10/04 09/10/04 7,728 05/10/04 08/01/04 6,934 100
300 03 0047 / 4918 ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE 21.50 11/01/04 11/20/04 6,500 10/01/04 10/20/04 5,101 100
300 04 0216 / 5114 ON W IRVING PARK RD FROM N DAMEN AVE TO N BELL AVE 27.0 05/01/06 11/01/06 5,768 05/17/06 08/15/06 5,768 100
300 04 0216 / 5114 ON W IRVING PARK RD FROM N ROCKWELL ST TO N CALIFORNIA AVE 12.0 05/01/06 11/01/06 2,596 05/17/06 07/25/06 2,596 100
300 03 0040 / 4911 ON W LAWRENCE AVE FROM N ROCKWELL AVE TO N CALIFORNIA AVE 6.29 05/10/04 09/10/04 1,924 05/10/04 08/01/04 1,698 100
300 03 0047 / 4918 ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE 60.0 11/01/04 11/20/04 17,900 10/01/04 10/20/04 14,042 100

Totals per Strt Light Pole Painting 243.26 68,266 58,201

Work Type: Strt Lighting Blocks


300 06 0247 / 5357 ON N CLAREMONT AVE FROM W HUTCHINSON ST TO W CULLOM AVE .50 08/01/03 09/15/03 40,000 08/01/03 09/27/03 34,739 100
300 06 0247 / 5357 ON W BELLE PLAINE AVE FROM N CLARK ST TO N SOUTHPORT AVE 1.0 12/15/03 12/31/03 34,000 12/17/03 02/06/04 33,353 100
300 06 0247 / 5357 ON W HUTCHINSON ST FROM N CLAREMONT AVE TO N OAKLEY AVE 2.0 08/01/03 09/15/03 40,000 08/01/03 09/27/03 34,738 100
300 06 0076 / 5239 4643 N DAMEN AVE 06/01/00 09/15/00 58,500 02/24/99 12/30/99 66,504 100
300 06 0076 / 5239 4643 N ROCKWELL ST 06/01/00 09/15/00 58,500 02/24/99 12/30/99 66,504 100
300 06 0078 / 5241 4635 N SEELEY AVE 1.0 04/01/98 12/01/98 6,900 04/15/98 09/15/99 4,339 100
302 00 0091 / 5773 1400 W SUNNYSIDE AVE 1.0 35,000 06/25/01 10/05/01 45,581 100

Totals per Strt Lighting 5.50 272,900 285,758

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 4237 N LINCOLN AVE 3,058.0 03/01/04 12/01/04 15,902 11/13/06 11/29/06 33,302 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 509

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0217 / 5337 4237 N LINCOLN AVE 88.0 07/15/04 07/20/04 4,946 06/29/04 07/02/04 6,722 100
805 06 2202 / 8388 1790 W ADDISON ST 6.0 02/14/97 02/14/97 0 02/14/97 02/14/97 4,500 100
805 06 2881 / 9067 1799 W ADDISON ST 11.0 09/25/93 09/25/93 0 09/25/93 09/25/93 8,250 100
302 00 0070 / 5758 1820 W ADDISON ST 0 02/07/97 02/14/97 6,212 100
805 06 2887 / 9073 1785 W BERTEAU AVE 6.0 12/06/93 12/06/93 0 12/06/93 12/06/93 4,500 100
805 06 2883 / 9069 1795 W GRACE ST 6.0 12/03/93 12/03/93 0 12/03/93 12/03/93 4,500 100
805 06 2885 / 9071 1785 W IRVING PARK RD 10.0 12/09/93 12/09/93 0 12/09/93 12/09/93 7,500 100
805 06 2204 / 8390 1790 W IRVING PARK RD 8.0 12/31/95 12/31/95 0 12/31/95 12/31/95 6,000 100
805 06 2866 / 9052 1785 W LAWRENCE AVE 8.0 12/02/93 12/02/93 0 12/02/93 12/02/93 6,000 100
805 06 2865 / 9051 1785 W LELAND AVE 8.0 12/10/93 12/10/93 0 12/10/93 12/10/93 6,000 100
805 06 2888 / 9074 1805 W MONTROSE AVE 8.0 12/08/93 12/08/93 0 12/08/93 12/08/93 6,000 100
805 06 2863 / 9049 1785 W SUNNYSIDE AVE 8.0 12/07/93 12/07/93 0 12/07/93 12/07/93 6,000 100
805 06 2864 / 9050 1785 W WILSON AVE 8.0 12/01/93 12/01/93 0 12/01/93 12/01/93 6,000 100
805 06 2914 / 9100 1785 W WINNEMAC AVE 6.0 12/13/93 12/13/93 0 12/13/93 12/13/93 4,500 100

Totals per Underpass Lighting 181.0 4,946 82,684


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 510

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0219 / 4459 N WESTERN AVE AND W ADDISON ST 1.0 04/13/05 04/14/05 10,563 04/05/05 04/05/05 10,084 100
210 06 0130 / 4389 N WESTERN AVE AND W AINSLIE ST 1.0 0 05/14/02 05/14/02 1,850 100
210 06 0130 / 4389 N WESTERN AVE AND W BERTEAU AVE 1.0 0 05/14/02 05/14/02 1,850 100
210 06 0130 / 4389 N WESTERN AVE AND W FOSTER AVE .50 0 05/14/02 05/14/02 925 100
210 06 0219 / 4459 N WESTERN AVE AND W FOSTER AVE .50 04/22/05 04/23/05 5,282 04/13/05 04/13/05 4,985 100
210 06 0219 / 4459 N WESTERN AVE AND W GRACE ST 1.0 04/14/05 04/15/05 10,563 04/15/05 04/15/05 8,007 100
210 06 0219 / 4459 N WESTERN AVE AND W IRVING PARK RD 1.0 04/15/05 04/16/05 10,563 04/22/05 04/22/05 11,527 100
210 06 0130 / 4389 N WESTERN AVE AND W LAWRENCE AVE 1.0 0 05/14/02 05/14/02 1,850 100
210 06 0219 / 4459 N WESTERN AVE AND W LAWRENCE AVE 1.0 04/20/05 04/21/05 10,563 03/01/05 03/01/05 10,084 100
210 06 0130 / 4389 N WESTERN AVE AND W LELAND AVE 1.0 0 05/14/02 05/14/02 1,850 100
210 06 0219 / 4459 N WESTERN AVE AND W LELAND AVE 1.0 04/19/05 04/20/05 10,563 03/01/05 03/01/05 10,388 100
210 06 0219 / 4459 N WESTERN AVE AND W MONTROSE AVE 1.0 04/16/05 04/17/05 10,563 03/03/05 03/03/05 8,007 100
210 06 0130 / 4389 N WESTERN AVE AND W SUNNYSIDE AVE 1.0 0 05/14/02 05/14/02 1,850 100
210 06 0219 / 4459 N WESTERN AVE AND W WILSON AVE 1.0 04/18/05 04/19/05 10,563 03/16/05 03/16/05 8,007 100
210 06 0130 / 4389 N WESTERN AVE AND W WINNEMAC AVE .50 0 04/25/02 04/25/02 3,662 100
210 06 0130 / 4389 N WOLCOTT AVE AND W MONTROSE AVE 1.0 0 04/18/02 04/18/02 7,324 100

Totals per LED Signal Head Install 14.50 79,223 92,250

Work Type: Left Turn Arrow Locations


210 06 0128 / 4387 W FOSTER AVE AND N LEAVITT ST .50 12/31/01 01/31/02 7,500 0

Work Type: New Signal Locations


210 06 0205 / 4448 W ADDISON ST AND N WOLCOTT AVE 1.0 01/02/06 07/31/07 192,500 01/24/06 219,904 95
210 06 0073 / 4337 1900 W MONTROSE AVE 1.0 01/31/02 11/15/02 130,000 12/17/01 11/29/02 136,286 100

Totals per New Signal 2.0 322,500 356,190

Work Type: Pedestrian Countdown Signal Install Locations


210 06 0243 / 4480 N DAMEN AVE AND W LAWRENCE AVE .0 03/15/06 05/08/07 12,000 01/26/07 02/22/07 5,773 100
210 06 / 32280 W IRVING PARK RD AND N WESTERN AVE .0 12/29/08 01/31/09 10,500 0 0

Totals per Pedestrian Countdown Signal Install .0 22,500 5,773

Totals per Traffic 1,185,853 2,080,072


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 511

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Pedestrian Countdown Signal Installation Installations
210 06 / 32276 W ADDISON ST AND N PAULINA ST 4.0 11/21/07 11/26/07 5,760 12/10/07 12/14/07 3,425 100

Work Type: Signals Intersections


300 06 0096 / 5258 4237 N LINCOLN AVE 37.0 11/20/03 11/25/03 0 09/18/03 09/22/03 5,850 100

Work Type: TSM Install Locations


210 06 0183 / 4429 N WESTERN AVE AND W WAVELAND AVE 1.0 03/01/04 07/31/05 224,388 12/18/03 07/07/05 234,600 100
814 06 0135 / 16349 4800 N LEAVITT ST 1.0 07/12/93 07/12/93 0 07/12/93 07/12/93 81,947 100
814 06 0328 / 16532 3800 N LINCOLN AVE 1.0 09/01/96 09/01/96 0 09/01/96 01/06/97 60,000 100
300 06 0078 / 5241 4600 N LINCOLN AVE 1.0 04/01/98 12/01/98 31,165 11/05/99 02/01/00 31,165 100
300 06 0117 / 5271 4600 N LINCOLN AVE 1.0 12,335 11/05/99 02/01/00 0 100
814 06 0342 / 16540 5046 N LINCOLN AVE 1.0 02/10/97 02/10/97 0 02/10/97 07/22/97 200,000 100
210 06 0106 / 4366 4800 N OAKLEY AVE 1.0 11/20/00 04/15/01 146,619 11/14/00 03/07/01 158,458 100
210 06 0039 / 4309 3600 N RAVENSWOOD AVE 06/01/99 09/30/00 333,352 03/16/00 10/16/00 327,887 100
814 06 0299 / 16511 4000 N SOUTHPORT AVE 1.0 07/03/91 07/03/91 0 07/03/91 07/03/91 115,984 100
814 06 0300 / 16512 3800 N WESTERN AVE 1.0 10/25/90 10/25/90 0 10/25/90 10/25/90 86,982 100
814 06 0302 / 16514 4400 N WESTERN AVE 1.0 11/07/91 11/07/91 0 11/07/91 11/07/91 169,050 100
814 06 0197 / 16409 4800 N WOLCOTT AVE 1.0 08/14/96 08/14/96 0 08/14/96 08/14/96 150,000 100

Totals per TSM Install 11.0 747,859 1,616,073

Work Type: Traffic Equipment Painting Locations


300 11 / 32190 ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE 1.65 05/15/07 06/01/07 512 05/15/07 06/01/07 512 100

Totals per Construction Phase 2,494,088 3,415,336

Totals for Ward 47 2,506,388 3,425,743


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 512

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 0308 / 5414 ON N KENMORE AVE FROM W ARDMORE AVE TO W THORNDALE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 3,123 100
300 06 / 32277 ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 04/01/08 08/30/08 0 0 0
300 06 / 32146 ON N MAGNOLIA AVE FROM N RIDGE AVE TO W ROSEDALE AVE .0 05/01/07 10/31/07 3,900 06/19/07 07/19/07 4,811 100
300 06 / 32277 ON N WINTHROP AVE FROM W GRANVILLE AVE TO W SHERIDAN RD 4.0 04/01/08 08/30/08 260,000 05/14/08 0 50
300 06 / 32146 ON W EARLY AVE FROM N WAYNE AVE TO N BROADWAY .0 05/01/07 10/31/07 5,000 07/02/07 08/15/07 4,811 100
300 06 / 32146 ON W VICTORIA ST FROM N WAYNE AVE TO N BROADWAY .0 05/01/07 10/31/07 5,000 06/15/07 07/20/07 4,811 100
300 06 0285 / 5393 5556 N SHERIDAN RD 1.0 05/01/04 08/01/04 0 05/11/04 08/11/04 2,617 100
281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Totals per Design/Engineering 5.0 273,900 20,173

Work Type: Feasibility Study Projects


302 00 0079 / 5767 ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100
302 00 0079 / 5767 N LAKEWOOD AVE AND W BALMORAL AVE .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100
302 00 0079 / 5767 5701 N SHERIDAN RD .0 10/25/01 10/25/01 0 10/25/01 10/25/01 0 100

Totals per Feasibility Study .0 0 0

Totals per Lighting/Electrical 273,900 20,173


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 513

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0307 / 5413 ON N GREENVIEW AVE FROM W HOOD AVE TO W DEVON AVE 2.0 02/01/06 05/31/06 800 01/16/05 02/10/06 497 100
300 06 0307 / 5413 ON W HOOD AVE FROM N GREENVIEW AVE TO N CLARK ST 4.0 02/03/06 05/31/06 1,600 01/16/05 02/10/06 995 100
300 06 0307 / 5413 ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N BROADWAY 1.50 02/02/06 05/31/06 600 01/16/05 02/10/06 373 100

Totals per 250 Watt Changeout 7.50 3,000 1,865

Work Type: 400 Watt Changeout Fixtures


300 06 0069 / 5233 ON N SHERIDAN RD FROM W FOSTER AVE TO W DEVON AVE 95.16 12/02/02 12/02/02 38,064 11/30/02 11/30/02 23,398 100
300 06 0122 / 5275 ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE 52.29 12/15/03 12/21/03 20,916 12/09/03 12/14/03 15,193 100
300 06 0307 / 5413 ON W GRANVILLE AVE FROM N GLENWOOD AVE TO N GREENVIEW AVE .50 02/02/06 05/31/06 200 01/16/05 02/10/06 124 100
300 06 0069 / 5233 5700 N SHERIDAN RD 16.0 08/11/02 08/11/02 6,400 08/08/02 08/08/02 4,060 100

Totals per 400 Watt Changeout 163.95 65,580 42,775

Totals per Lighting/Electrical 2,762,085 1,695,952


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 514

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
300 06 0096 / 5258 5533 N BROADWAY 983.0 03/01/03 09/01/03 0 03/01/06 09/01/06 29,700 0
302 00 0092 / 5774 5533 N BROADWAY 6.0 0 01/26/01 01/29/02 1,414 100
302 00 0083 / 5768 5146 N CLARK ST 0 11/18/97 11/18/97 267 100
805 06 1261 / 7447 5146 N CLARK ST 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4735 N CLIFTON AVE 0 06/01/98 06/01/98 275 100
805 06 1307 / 7493 4735 N CLIFTON AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4751 N CLIFTON AVE 0 06/01/98 06/01/98 275 100
805 06 1314 / 7500 4751 N CLIFTON AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4755 N CLIFTON AVE 0 06/01/98 06/01/98 275 100
805 06 1317 / 7503 4755 N CLIFTON AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1168 / 7354 5320 N KENMORE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0083 / 5768 4861 N MAGNOLIA AVE 0 11/24/97 11/24/97 267 100
805 06 1277 / 7463 4861 N MAGNOLIA AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1888 / 8074 5100 N MARINE DR 1.0 12/23/96 12/23/96 0 12/23/96 12/23/96 300 100
302 00 0084 / 5769 4705 N RACINE AVE 0 07/20/98 07/20/98 275 100
805 06 1327 / 7513 4705 N RACINE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4721 N RACINE AVE 0 07/20/98 07/20/98 275 100
805 06 1333 / 7519 4721 N RACINE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 4731 N RACINE AVE 0 07/20/98 07/20/98 275 100
805 06 1306 / 7492 4731 N RACINE AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 0460 / 6646 6312 N WINTHROP AVE 1.0 11/18/96 11/18/96 0 11/18/96 11/18/96 300 100
805 06 1125 / 7311 1040 W GRANVILLE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
302 00 0084 / 5769 1255 W WINNEMAC AVE 0 09/30/98 09/30/98 276 100
805 06 0458 / 6644 1255 W WINNEMAC AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1443 / 7629 1255 W WINNEMAC AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 1311 W WINNEMAC AVE 0 09/30/98 09/30/98 276 100
805 06 1447 / 7633 1311 W WINNEMAC AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
302 00 0084 / 5769 1329 W WINNEMAC AVE 0 09/30/98 09/30/98 276 100
805 06 1449 / 7635 1329 W WINNEMAC AVE 1.0 12/05/97 12/05/97 0 12/05/97 12/05/97 300 100
805 06 1776 / 7962 900 W WINONA ST 1.0 04/16/97 04/16/97 0 04/16/97 04/16/97 300 100

Totals per Alley Lighting/Lamps 1,006.0 0 39,226


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 515

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Arterial Group Relamping Lamps
300 06 0238 / 5352 5533 N BROADWAY 968.0 06/01/07 12/31/07 28,497 08/01/07 08/17/07 28,497 100

Work Type: Arterial Strt Lighting/Lamps Blocks


300 11 / 32237 ON N BROADWAY FROM W LELAND AVE TO N RACINE AVE 1.0 17,000 0 0

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 5533 N BROADWAY 873.0 0 04/14/02 04/17/02 15,896 100

Work Type: Flood Light Install Fixtures


300 06 0167 / 5306 5917 N BROADWAY 2.0 0 12/10/99 12/10/99 702 100
302 00 0092 / 5774 6215 N KENMORE AVE 1.0 0 10/15/01 10/15/01 404 100
302 00 0092 / 5774 5005 N WINTHROP AVE 2.0 0 03/22/01 03/22/01 941 100

Totals per Flood Light Install 5.0 0 2,047

Work Type: Lighting Imprvmnts Blocks


281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Lighting Imprvmnts Installations


300 06 0285 / 5393 5556 N SHERIDAN RD 1.0 08/11/04 08/15/06 95,000 08/23/04 05/15/06 64,563 100

Project has been completed.(100%) Note Last Updated on 05-SEP-06


281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Totals per Lighting Imprvmnts 1.0 95,000 64,563

Work Type: Lighting Imprvmnts Projects


300 06 0201 / 5325 W GRANVILLE AVE AND N WINTHROP AVE 1.0 0 1,460 100

Work Type: Loop Lighting Blocks


281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Ornamental Lighting Blocks


300 06 0120 / 5274 934-1200 W BRYN MAWR AVE 2.50 10/18/99 02/04/00 600,000 10/18/99 02/04/00 202,287
281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Totals per Ornamental Lighting 2.50 600,000 202,287


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 516

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: POD Camera Pole Poles
281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 5533 N BROADWAY .0 03/01/08 12/01/08 0 0 0

Work Type: Residntl Staggered Lighting Blocks


300 07 0046 / 5469 ON N GLENWOOD AVE FROM W ARGYLE ST TO W FOSTER AVE 1.0 08/07/06 10/06/06 72,500 11/02/06 04/16/07 48,783 100
300 06 0308 / 5414 ON N KENMORE AVE FROM W ARDMORE AVE TO W THORNDALE AVE 2.0 06/26/06 08/25/06 189,505 06/26/06 09/15/06 126,957 100
300 06 / 32277 ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 05/04/08 12/31/08 0 0 0
300 11 / 32235 ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 2.0 04/01/08 06/02/08 72,500 10/29/07 04/18/08 59,547 100
300 11 / 32237 ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE 2.0 04/01/08 06/02/08 55,000 10/29/07 04/18/08 45,000 100
300 06 / 32146 ON N MAGNOLIA AVE FROM N RIDGE AVE TO W ROSEDALE AVE 2.0 12/03/07 05/30/08 317,516 12/06/07 0 50

Magnolia: Ridge to to Rosedale-Victoria: Wayne to Broadway--Early: Wayne to Broadway-all under same project Note Last Updated on 04-MAR-08
300 06 / 32277 ON N WINTHROP AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON N WINTHROP AVE FROM W THORNDALE AVE TO W GRANVILLE AVE 2.0 06/15/05 07/15/05 0 06/14/05 08/05/05 131,505 100
300 06 / 32146 ON W EARLY AVE FROM N WAYNE AVE TO N BROADWAY 1.0 12/05/07 06/18/08 317,516 0 50

Magnolia: Ridge to to Rosedale-Victoria: Wayne to Broadway--Early: Wayne to Broadway- all on a single project Note Last Updated on 04-MAR-08
300 06 / 32146 ON W VICTORIA ST FROM N WAYNE AVE TO N BROADWAY 1.0 10/05/07 04/29/08 317,516 0 50
300 07 0048 / 5471 W WINONA ST AND N WINTHROP AVE .20 04/18/06 11/18/06 4,000 0 0

Totals per Residntl Staggered Lighting 13.20 1,346,053 411,792

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N WINTHROP AVE FROM W AINSLIE ST TO W WINONA ST 2.0 05/01/03 07/01/03 201,214 04/28/03 06/27/03 179,171 100
300 06 0069 / 5233 ON W ARGYLE ST FROM N CLARK ST TO N MAGNOLIA AVE 1.04 10/15/03 01/15/04 57,200 10/14/03 12/05/03 42,167 100
300 06 0267 / 5375 ON W ELMDALE AVE FROM N GLENWOOD AVE TO N BROADWAY 2.0 08/31/04 12/15/04 149,400 08/31/04 12/03/04 153,247 100

Totals per Residntl Strt Lighting/Lamps 5.04 407,814 374,585

Work Type: Short Arm Installs - Arterial Locations


281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 517

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Short Arm Installs - Residntl Locations
302 00 0092 / 5774 1000 W ARDMORE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 1018 W ARDMORE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 1028 W ARDMORE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 1038 W ARDMORE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 1048 W ARDMORE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 1058 W ARDMORE AVE 1.0 0 02/13/01 02/13/01 378 100
302 00 0092 / 5774 1050 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1051 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1115 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1124 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1129 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1136 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1150 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1155 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1214 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
302 00 0092 / 5774 1230 W ARGYLE ST 1.0 0 03/15/01 03/15/01 378 100
281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0
302 00 0092 / 5774 1256 W VICTORIA ST 1.0 0 05/07/01 05/07/01 378 100
302 00 0092 / 5774 1268 W VICTORIA ST 1.0 0 05/07/01 05/07/01 378 100
302 00 0092 / 5774 1280 W VICTORIA ST 1.0 0 05/07/01 05/07/01 378 100

Totals per Short Arm Installs - Residntl 19.0 0 7,182

Work Type: Strt Light Pole Painting Locations


302 00 0076 / 5764 ON N BROADWAY FROM W LAWRENCE AVE TO W GRANVILLE AVE 209.0 05/05/98 05/21/98 0 05/05/98 05/21/98 3,553 100
302 00 0079 / 5767 ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST 52.0 12/01/01 12/31/01 18,000 10/22/01 11/09/01 14,929 100
300 06 0058 / 5229 ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE 50.49 09/20/02 10/20/02 11,550 09/20/02 10/30/02 11,550 100
300 06 0108 / 5263 ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE 67.23 03/01/04 03/10/04 19,837 04/12/04 05/07/04 16,442 100
302 00 0079 / 5767 N LAKEWOOD AVE AND W BALMORAL AVE 1.0 03/15/02 06/30/02 11,200 10/22/01 11/09/01 9,953 100
302 00 0079 / 5767 5701 N SHERIDAN RD 12.0 08/01/02 08/01/02 1,500 07/25/02 08/06/02 6,020 100
300 06 0058 / 5229 1100 W CATALPA AVE 4.0 09/27/02 09/27/02 560 10/28/02 10/29/02 560 100

Totals per Strt Light Pole Painting 395.72 62,647 63,007


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 518

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Light Pole Replacmnt/Reloc Blocks
300 06 0225 / 5340 4720 N BROADWAY 1.0 11/18/03 11/26/03 20,000 12/04/03 02/06/04 29,059 100
281 00 / 33670 1135-1141 W GLENLAKE AVE .0 01/01/08 12/31/08 0 0 0

Totals per Strt Light Pole Replacmnt/Reloc 1.0 20,000 29,059

Work Type: Strt Lighting Blocks


302 00 0092 / 5774 ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST 52.0 02/01/02 03/31/02 18,000 02/27/02 04/01/02 47,602 100
302 00 0089 / 5771 ON W AINSLIE ST FROM N SHERIDAN RD TO N WINTHROP AVE 0 04/16/99 06/24/99 0 100
302 00 0091 / 5773 ON W ARGYLE ST FROM N SHERIDAN RD TO N WINTHROP AVE .50 491 02/13/01 02/13/01 193 100
300 06 0076 / 5239 ON W THORNDALE AVE FROM N WINTHROP AVE TO N BROADWAY 06/01/00 09/15/00 58,500 02/24/99 12/30/99 66,503 100
302 00 0088 / 5770 ON W WINNEMAC AVE FROM N BROADWAY TO N GLENWOOD AVE 0 01/07/98 06/08/98 33,761 100
302 00 0088 / 5770 ON W WINONA ST FROM N GLENWOOD AVE TO N CLARK ST 0 04/07/98 06/03/98 33,761 100
302 00 0091 / 5773 5700 N WINTHROP AVE 1.0 9,500 04/06/00 04/06/00 2,915 100
302 00 0091 / 5773 5700-5799 N WINTHROP AVE 1.0 9,295 02/13/01 02/13/01 0 100

Totals per Strt Lighting 54.50 95,786 184,735

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 5533 N BROADWAY 1,280.0 03/01/04 12/01/04 6,656 11/03/06 12/05/06 13,939 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 519

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0217 / 5337 5533 N BROADWAY 250.0 07/21/04 07/28/04 14,052 07/02/04 07/12/04 13,782 100
805 06 2868 / 9054 1195 W AINSLIE ST 10.0 11/11/93 11/11/93 0 11/11/93 11/11/93 7,500 100
805 06 2873 / 9059 1199 W ARDMORE AVE 14.0 12/27/93 12/27/93 0 12/27/93 12/27/93 10,500 100
805 06 2719 / 8905 1195 W ARGYLE ST 22.0 03/20/94 03/20/94 0 03/20/94 03/20/94 16,500 100
805 06 2870 / 9056 1199 W BALMORAL AVE 14.0 12/09/93 12/09/93 0 12/09/93 12/09/93 10,500 100
805 06 2296 / 8482 1199 W BERWYN AVE 22.0 09/25/96 09/25/96 0 09/25/96 09/25/96 16,500 100
805 06 2194 / 8380 937 W BRYN MAWR AVE 18.0 12/31/95 12/31/95 0 12/31/95 12/31/95 13,500 100
805 06 2871 / 9057 1198 W BRYN MAWR AVE 40.0 02/11/94 02/11/94 0 02/11/94 02/11/94 30,000 100
302 00 0072 / 5760 1120 W CATALPA AVE 1.0 0 01/18/00 02/04/00 15,500 100
805 06 2151 / 8337 1195 W CATALPA AVE 11.0 12/31/94 12/31/94 0 12/31/94 12/31/94 8,250 100
805 06 2869 / 9055 1199 W FOSTER AVE 14.0 02/17/93 02/17/93 0 02/17/93 02/17/93 10,500 100
302 00 0071 / 5759 1120 W GLENLAKE AVE 0 04/04/99 04/13/99 14,256 100
805 06 2152 / 8338 1200 W GLENLAKE AVE 11.0 12/31/94 12/31/94 0 12/31/94 12/31/94 8,250 100
805 06 2872 / 9058 1199 W HOLLYWOOD AVE 14.0 01/21/94 01/21/94 0 01/21/94 01/21/94 10,500 100
805 06 2720 / 8906 1199 W THORNDALE AVE 22.0 03/30/94 03/30/94 0 03/30/94 03/30/94 16,500 100
805 06 2616 / 8802 1199 W WINONA ST 14.0 11/11/94 11/11/94 0 11/11/94 11/11/94 10,500 100

Totals per Underpass Lighting 477.0 14,052 213,038


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 520

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: Pedestrian Countdown Signal Install Locations
210 06 / 32280 N BROADWAY AND W FOSTER AVE .0 05/04/08 12/31/08 10,800 0 0

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N BROADWAY AND W ARDMORE AVE 2.0 8,000 12/05/01 12/07/01 4,737 100
300 06 0197 / 5322 N BROADWAY AND W BERWYN AVE 1.0 4,000 12/03/01 12/05/01 3,842 100

Totals per Removal Temp Wiring - Signals 3.0 12,000 8,579

Work Type: Signals Intersections


300 06 0096 / 5258 5533 N BROADWAY 33.0 11/19/03 11/23/03 0 09/21/06 09/26/06 5,218 100

Work Type: TSM Install Locations


210 06 0020 / 4295 W FOSTER AVE AND N GLENWOOD AVE 01/15/01 03/15/01 65,450 12/09/99 02/11/00 50,081 100
300 07 0048 / 5471 W FOSTER AVE AND N SHERIDAN RD 1.0 11/17/05 04/03/06 275,000 0
814 06 0077 / 16293 5929 N BROADWAY 1.0 12/06/94 12/06/94 0 12/06/94 12/06/94 129,903 100
814 06 0078 / 16294 6000 N BROADWAY 1.0 05/08/95 05/08/95 0 05/08/95 05/08/95 97,884 100
814 06 0154 / 16368 6200 N BROADWAY 1.0 10/24/94 10/24/94 0 10/24/94 10/24/94 101,516 100
814 06 0145 / 16359 5599 N KENMORE AVE 1.0 02/27/92 02/27/92 0 02/27/92 02/27/92 90,110 100
814 06 0147 / 16361 5700 N KENMORE AVE 1.0 02/20/92 02/20/92 0 02/20/92 02/20/92 99,051 100
814 06 0149 / 16363 5700 N RIDGE AVE 1.0 12/23/91 12/23/91 0 12/23/91 12/23/91 99,051 100
814 06 0240 / 16452 5748 N RIDGE AVE 1.0 01/01/91 01/01/91 0 01/01/91 01/01/91 100,000 100
814 06 0151 / 16365 5800 N RIDGE AVE 1.0 12/26/91 12/26/91 0 12/26/91 12/26/91 99,051 100
814 06 0143 / 16357 5600 N SHERIDAN RD 1.0 02/25/92 02/25/92 0 02/25/92 02/25/92 90,110 100
814 06 0074 / 16290 5700 N SHERIDAN RD 1.0 01/01/97 01/01/97 0 06/30/95 06/30/95 37,836 100
814 06 0148 / 16362 5700 N SHERIDAN RD 1.0 02/24/92 02/24/92 0 02/24/92 02/24/92 99,051 100
814 06 0144 / 16358 5599 N WINTHROP AVE 1.0 02/26/92 02/26/92 0 02/26/92 02/26/92 90,110 100
814 06 0152 / 16366 5700 N WINTHROP AVE 1.0 02/21/92 02/21/92 0 02/21/92 02/21/92 99,051 100

Totals per TSM Install 14.0 340,450 1,282,805

Totals per Traffic 363,250 1,296,602

Totals per Construction Phase 3,125,335 2,992,553

Totals for Ward 48 3,399,235 3,012,726


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 521

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32146 ON N BELL AVE FROM W TOUHY AVE TO W JARVIS AVE 1.0 05/01/07 10/31/07 3,900 06/28/07 07/19/07 2,374 100
300 06 / 32277 ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 04/01/08 08/30/08 0 0 0
300 06 0308 / 5414 ON W GREENLEAF AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD .0 02/01/06 07/31/06 0 02/01/06 07/31/06 3,608 100
210 06 0023 / 4298 N CLARK ST AND N ROGERS AVE .0 02/06/02 04/02/02 0 02/06/02 04/02/02 0 0

Totals per Design/Engineering 1.0 3,900 5,982


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 522

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 03 0049 / 4920 W ESTES AVE AND N GREENVIEW AVE 1.0 09/10/04 09/10/04 375 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W ESTES AVE AND N PAULINA ST 1.0 09/10/04 09/10/04 375 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W GREENLEAF AVE AND N GREENVIEW AVE 1.0 09/10/04 09/10/04 375 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W GREENLEAF AVE AND N PAULINA ST 1.0 09/10/04 09/10/04 375 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W LUNT AVE AND N GREENVIEW AVE 1.0 09/10/04 09/10/04 375 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W LUNT AVE AND N PAULINA ST 1.0 09/10/04 09/10/04 375 09/10/04 09/10/04 0 100

Totals per 250 Watt Changeout 6.0 2,250 0

Work Type: 400 Watt Changeout Fixtures


300 03 0040 / 4911 ON N BROADWAY FROM W DEVON AVE TO W ROSEMONT AVE 8.0 08/20/04 09/20/04 3,200 07/14/04 08/10/04 2,092 100
300 06 0069 / 5233 ON N SHERIDAN RD FROM W FOSTER AVE TO W DEVON AVE 26.84 12/02/02 12/02/02 10,736 11/30/02 11/30/02 6,599 100
300 03 0049 / 4920 W ESTES AVE AND N ASHLAND AVE 3.0 09/10/04 09/10/04 1,400 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W GREENLEAF AVE AND N ASHLAND AVE 3.0 09/10/04 09/10/04 1,400 09/10/04 09/10/04 0 100
300 03 0049 / 4920 W LUNT AVE AND N ASHLAND AVE 3.0 09/10/04 09/10/04 1,400 09/10/04 09/10/04 0 100

Totals per 400 Watt Changeout 43.84 18,136 8,691

Totals per Lighting/Electrical 4,693,042 3,001,506


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 523

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Alley Lighting/Lamps Installations
805 06 0721 / 6907 6949 N ASHLAND BLVD 1.0 08/16/96 08/16/96 0 08/16/96 08/16/96 300 100
805 06 1533 / 7719 7130 N CLARK ST 1.0 10/21/97 10/21/97 0 10/21/97 10/21/97 300 100
805 06 1128 / 7314 6964 N GREENVIEW AVE 1.0 02/14/96 02/14/96 0 02/14/96 02/14/96 300 100
300 06 0139 / 5289 7356 N GREENVIEW AVE 621.0 03/01/04 12/01/04 0 05/10/06 05/20/06 18,763 100
302 00 0092 / 5774 7356 N GREENVIEW AVE 3.0 0 03/16/01 12/12/01 707 100
805 06 0599 / 6785 7434 N OAKLEY AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0680 / 6866 6971 N RIDGE BLVD 1.0 08/01/96 08/01/96 0 08/01/96 08/01/96 300 100
805 06 0661 / 6847 7053 N RIDGE BLVD 1.0 08/01/96 08/01/96 0 08/01/96 08/01/96 300 100
805 06 0646 / 6832 6548 N SHERIDAN RD 1.0 03/14/97 03/14/97 0 03/14/97 03/14/97 300 100
805 06 0647 / 6833 7021 N SHERIDAN RD 1.0 03/14/97 03/14/97 0 03/14/97 03/14/97 300 100
805 06 0648 / 6834 7025 N SHERIDAN RD 1.0 03/12/97 03/12/97 0 03/12/97 03/12/97 300 100
805 06 0633 / 6819 7714 N SHERIDAN RD 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 0436 / 6622 7319 N WOLCOTT AVE 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 0857 / 7043 1565 W BIRCHWOOD AVE 1.0 08/01/96 08/01/96 0 08/01/96 08/01/96 300 100
805 06 0858 / 7044 1836 W BIRCHWOOD AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1957 / 8143 1811 W CHASE AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1529 / 7715 1718 W ESTES AVE 1.0 11/12/97 11/12/97 0 11/12/97 11/12/97 300 100
805 06 0860 / 7046 1425 W FARGO AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1100 / 7286 1638 W GREENLEAF AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1101 / 7287 1920 W GREENLEAF AVE 1.0 12/02/96 12/02/96 0 12/02/96 12/02/96 300 100
805 06 1130 / 7316 2030 W GREENLEAF AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
805 06 1831 / 8017 1319 W LUNT AVE 1.0 10/03/96 10/03/96 0 10/03/96 10/03/96 300 100
805 06 1889 / 8075 1509 W LUNT AVE 1.0 02/14/96 02/14/96 0 02/14/96 02/14/96 300 100
805 06 1918 / 8104 1530 W MORSE AVE 1.0 02/14/96 02/14/96 0 02/14/96 02/14/96 300 100

Totals per Alley Lighting/Lamps 646.0 0 26,070

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 7356 N GREENVIEW AVE 687.0 06/01/07 12/31/07 20,225 08/01/07 08/18/07 20,225 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 7356 N GREENVIEW AVE 592.0 0 04/18/02 04/21/02 10,779 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 524

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Flood Light Install Fixtures
300 06 0167 / 5306 7442 N ASHLAND AVE 1.0 0 01/11/99 01/11/99 351 100
300 06 0167 / 5306 7300-7400 N GREENVIEW AVE 3.0 0 11/09/99 11/09/99 1,053 100
300 06 0167 / 5306 7410 N GREENVIEW AVE 1.0 0 08/14/99 08/14/99 351 100

Totals per Flood Light Install 5.0 0 1,755

Work Type: Ornamental - Piggyback Lighting Fixtures


300 06 0069 / 5233 ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST 6.0 11/20/02 12/05/02 27,600 11/10/02 12/06/02 29,679 100

Work Type: Ornamental Lighting Blocks


300 07 0049 / 5472 7700 N ASHLAND AVE 1.0 04/18/06 11/18/06 2,000 0 0
300 11 / 32238 7700 N ASHLAND AVE 1.0 01/18/07 01/18/07 2,000 01/18/07 01/18/07 834 100
300 07 0049 / 5472 7500 N SEELEY AVE 1.0 04/18/06 11/18/06 2,000 0 0
300 11 / 32238 7500 N SEELEY AVE 1.0 01/18/07 01/18/07 2,000 01/18/07 01/18/07 834 100

Totals per Ornamental Lighting 4.0 8,000 1,668

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 7356 N GREENVIEW AVE .0 03/01/08 12/01/08 0 0 0
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 525

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 11 / 32238 ON N ASHLAND AVE FROM W JONQUIL TER TO W JUNEWAY TER 1.0 04/01/08 06/27/08 40,000 0 0
300 06 / 32146 ON N BELL AVE FROM W TOUHY AVE TO W JARVIS AVE 4.0 12/05/07 06/27/08 247,147 12/07/07 0 75

Hamilton from Touhy to Jarvis under the same project Note Last Updated on 04-MAR-08
300 07 0049 / 5472 ON N CLAREMONT AVE FROM W TOUHY AVE TO W HOWARD ST 4.0 04/18/06 11/18/06 280,000 09/27/06 04/27/07 261,872 100
300 09 / 33115 ON N DAMEN AVE FROM N ROGERS AVE TO W JARVIS AVE 2.0 130,000 04/01/08 12/01/08 0 0
300 05 0049 / 5164 ON N HONORE ST FROM W CHASE AVE TO N ROGERS AVE 1.0 04/04/05 11/18/05 50,000 11/01/05 03/22/06 45,748 100
300 09 / 33115 ON N HOYNE AVE FROM W JARVIS AVE TO W HOWARD ST 2.0 167,500 04/01/08 12/01/08 0 0
300 06 / 32277 ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 05/04/08 12/31/08 0 0 0
300 09 / 33115 ON N OAKLEY AVE FROM W TOUHY AVE TO W HOWARD ST 4.0 280,000 04/01/08 12/01/08 0 0
300 09 / 33115 ON N SEELEY AVE FROM W JARVIS AVE TO W FARGO AVE 1.0 32,500 04/01/08 12/01/08 0 0
300 05 0049 / 5164 ON N WOLCOTT AVE FROM W TOUHY AVE TO N ROGERS AVE 2.0 04/04/05 11/18/05 170,000 11/01/05 03/22/06 91,496 100
300 11 / 32238 ON W ALBION AVE FROM N LAKEWOOD AVE TO N SHERIDAN RD 1.0 04/01/08 06/27/08 71,500 0 0
300 05 0049 / 5164 ON W CHASE AVE FROM N DAMEN AVE TO N ROGERS AVE 1.0 04/04/05 11/18/05 50,000 11/01/05 03/22/06 45,748 100
300 11 / 32238 ON W COLUMBIA AVE FROM N LAKEWOOD AVE TO N SHERIDAN RD 1.0 04/01/08 06/27/08 71,500 0 0
300 11 / 32238 ON W ESTES AVE FROM N ASHLAND BLVD TO N CLARK ST 1.0 45,000 0 0
300 07 0049 / 5472 ON W ESTES AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD 2.0 04/18/06 11/18/06 170,000 08/10/06 10/06/06 179,415 100
300 07 0049 / 5472 ON W FARWELL AVE FROM N ASHLAND BLVD TO N GLENWOOD AVE 1.0 04/18/06 11/18/06 70,000 09/13/06 10/31/06 67,868 100
300 11 / 32238 ON W FARWELL AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD 2.0 04/01/08 06/27/08 150,000 0 0
300 11 / 32238 ON W GREENLEAF AVE FROM N ASHLAND BLVD TO N CLARK ST 2.0 130,000 0 0
300 06 0308 / 5414 ON W GREENLEAF AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD 2.0 05/08/06 07/14/06 219,094 05/08/06 07/14/06 151,913 100

Project has been completed as of 07/14/2006 Note Last Updated on 25-AUG-06


300 05 0049 / 5164 ON W JARVIS AVE FROM N ASHLAND BLVD TO N GREENVIEW AVE 1.0 04/04/05 11/18/05 85,000 10/28/05 03/22/06 116,148 100
300 05 0049 / 5164 ON W JARVIS AVE FROM N CLARK ST TO N ASHLAND BLVD 2.0 04/04/05 11/18/05 120,000 11/30/05 03/22/06 107,562 100
300 05 0049 / 5164 ON W JONQUIL TER FROM N SHERIDAN RD TO N ASHLAND AVE 2.0 04/04/05 11/18/05 110,000 10/21/05 03/22/06 122,595 100
300 07 0049 / 5472 ON W JUNEWAY TER FROM N ASHLAND AVE TO N HASKINS AVE 2.0 04/18/06 11/18/06 170,000 10/19/06 05/04/07 160,890 100
300 07 0049 / 5472 ON W LUNT AVE FROM N ASHLAND BLVD TO N GREENVIEW AVE 1.0 04/18/06 11/18/06 70,000 09/13/06 10/31/06 67,867 100
300 06 0298 / 5405 ON W LUNT AVE FROM N GREENVIEW AVE TO N SHERIDAN RD 2.0 0 06/10/05 08/22/05 94,038 100
300 11 / 32238 ON W LUNT AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD 3.0 04/01/08 06/27/08 150,000 0 0
300 11 / 32238 ON W MORSE AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD 3.0 04/01/08 06/27/08 150,000 0 0

Totals per Residntl Staggered Lighting 50.0 3,229,241 1,513,160


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 526

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Strt Lighting/Lamps Blocks
300 03 0049 / 4920 ON N BOSWORTH AVE FROM W HOWARD ST TO W JONQUIL TER 10/15/04 12/15/04 80,000 11/08/04 02/15/05 47,191 100
300 03 0049 / 4920 ON N GREENVIEW AVE FROM W FARWELL AVE TO W LUNT AVE 07/20/04 09/20/04 140,000 08/03/04 02/15/05 94,257 100
300 03 0049 / 4920 ON N MARSHFIELD AVE FROM W HOWARD ST TO W JUNEWAY TER 09/20/04 11/20/04 171,000 10/19/04 02/15/05 130,365 100
300 06 0122 / 5275 ON N PAULINA ST FROM W HOWARD ST TO W JUNEWAY TER 2.0 11/15/03 01/15/04 175,000 10/16/03 12/09/03 156,063 100
300 03 0049 / 4920 ON N SEELEY AVE FROM W HOWARD ST TO W FARGO AVE 10/01/04 12/01/04 160,000 10/22/04 05/02/05 127,835 100
300 03 0049 / 4920 ON N WAYNE AVE FROM W MORSE AVE TO W PRATT BLVD 10/15/04 12/15/04 130,000 11/08/04 02/15/05 72,808 100
300 06 0267 / 5375 ON N WOLCOTT AVE FROM W HOWARD ST TO W FARGO AVE 2.0 08/01/04 09/01/04 148,760 08/12/04 12/10/04 143,771 100
300 03 0049 / 4920 ON W FARGO AVE FROM N GREENVIEW AVE TO N ASHLAND BLVD 11/15/04 01/15/05 95,000 11/08/04 02/15/05 62,218 100
300 03 0049 / 4920 ON W FARWELL AVE FROM N CLARK ST TO N ASHLAND BLVD 10/15/04 12/15/04 90,000 11/10/04 02/14/05 56,953 100
300 06 0254 / 5364 1707 W MORSE AVE 2.0 08/01/03 08/29/03 105,245 08/11/03 09/02/03 96,198 100

Totals per Residntl Strt Lighting/Lamps 6.0 1,295,005 987,659

Work Type: Short Arm Installs - Residntl Locations


302 00 0092 / 5774 2000 W BIRCHWOOD AVE 1.0 0 03/26/01 03/26/01 378 100

Work Type: Strt Light Pole Painting Locations


300 03 0040 / 4911 ON N BROADWAY FROM W ROSEMONT AVE TO W DEVON AVE 8.0 05/10/04 09/10/04 2,200 05/10/04 08/01/04 2,160 100
300 04 0216 / 5114 ON N SHERIDAN RD FROM W DEVON AVE TO W ALBION AVE 14.0 05/01/06 11/01/06 3,028 05/17/06 08/05/06 3,028 100
300 06 0058 / 5229 ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE 50.49 09/20/02 10/20/02 11,550 09/20/02 10/30/02 11,550 100
300 06 0058 / 5229 ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST 15.0 09/27/02 10/15/02 7,910 10/07/02 10/30/02 7,910 100
300 06 0058 / 5229 ON W TOUHY AVE FROM N SHERIDAN RD TO N CLARK ST 31.0 09/27/02 10/19/02 8,610 10/07/02 11/20/02 8,610 100

Totals per Strt Light Pole Painting 118.49 33,298 33,258

Work Type: Strt Lighting Blocks


302 00 0092 / 5774 ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST 1.0 03/01/02 03/31/02 15,000 12/10/01 12/10/01 6,228 100
300 06 0078 / 5241 7500 S HERMITAGE AVE 1.0 04/01/98 12/01/98 10,620 07/21/00 08/30/00 18,634 100

Totals per Strt Lighting 2.0 25,620 24,862

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 7356 N GREENVIEW AVE 1,848.0 03/01/04 12/01/04 9,610 11/06/06 11/07/06 20,125 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 527

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Underpass Lighting Fixtures
300 06 0217 / 5337 7356 N GREENVIEW AVE 428.0 07/29/04 08/09/04 24,057 07/13/04 07/23/04 8,560 100
805 06 2651 / 8837 7398 N ROGERS AVE 10.0 12/14/94 12/14/94 0 12/14/94 12/14/94 7,500 100
805 06 2852 / 9038 7492 N ROGERS AVE 14.0 04/23/92 04/23/92 0 04/23/92 04/23/92 10,500 100
805 06 2726 / 8912 6501 N SHERIDAN RD 51.0 02/15/95 02/15/95 0 02/15/95 02/15/95 38,250 100
805 06 2875 / 9061 1899 W BIRCHWOOD AVE 10.0 06/01/93 06/01/93 0 06/01/93 06/01/93 7,500 100
805 06 2460 / 8646 1495 W CHASE AVE 18.0 09/22/95 09/22/95 0 09/22/95 09/22/95 13,500 100
302 00 0071 / 5759 1350 W COLUMBIA AVE 0 03/07/99 03/12/99 11,638 100
805 06 2727 / 8913 1404 W ESTES AVE 12.0 05/10/94 05/10/94 0 05/10/94 05/10/94 9,000 100
805 06 2721 / 8907 1780 W ESTES AVE 8.0 06/30/94 06/30/94 0 06/30/94 06/30/94 6,000 100
805 06 2851 / 9037 1605 W FARGO AVE 25.0 02/09/94 02/09/94 0 02/09/94 02/09/94 18,750 100
805 06 2254 / 8440 1406 W FARWELL AVE 14.0 08/16/96 08/16/96 0 08/16/96 08/16/96 10,500 100
805 06 2725 / 8911 1780 W FARWELL AVE 10.0 07/27/94 07/27/94 0 07/27/94 07/27/94 7,500 100
302 00 0071 / 5759 1120 W GRANVILLE AVE 0 03/20/99 03/30/99 21,337 100
302 00 0071 / 5759 1400 W GREENLEAF AVE 0 03/08/99 03/12/99 6,206 100
805 06 2850 / 9036 1408 W GREENLEAF AVE 14.0 12/28/93 12/28/93 0 12/28/93 12/28/93 10,500 100
805 06 2849 / 9035 1750 W GREENLEAF AVE 10.0 02/01/94 02/01/94 0 02/01/94 02/01/94 7,500 100
805 06 2729 / 8915 1599 W JARVIS AVE 16.0 08/05/94 08/05/94 0 08/05/94 08/05/94 12,000 100
302 00 0071 / 5759 1400 W LUNT AVE 0 03/25/99 04/05/99 20,125 100
805 06 2722 / 8908 1800 W LUNT AVE 10.0 06/28/94 06/28/94 0 06/28/94 06/28/94 7,500 100
805 06 2247 / 8433 1407 W MORSE AVE 21.0 10/15/96 10/15/96 0 10/15/96 10/15/96 15,750 100
805 06 2723 / 8909 1781 W MORSE AVE 10.0 07/12/94 07/12/94 0 07/12/94 07/12/94 7,500 100
805 06 2149 / 8335 1400 W PRATT BLVD 12.0 12/31/94 12/31/94 0 12/31/94 12/31/94 9,000 100
805 06 2675 / 8861 1770 W PRATT BLVD 10.0 11/03/94 11/03/94 0 11/03/94 11/03/94 7,500 100
302 00 0070 / 5758 1120 W ROSEMONT AVE 0 11/25/97 12/01/97 9,975 100
805 06 2124 / 8310 1120 W ROSEMONT AVE 13.0 12/01/97 12/01/97 0 12/01/97 12/01/97 9,750 100
302 00 0071 / 5759 1120 W SHERIDAN RD 0 05/18/99 05/27/99 15,856 100
805 06 2728 / 8914 1401 W TOUHY AVE 12.0 05/13/94 05/13/94 0 05/13/94 05/13/94 9,000 100
805 06 2792 / 8978 1760 W TOUHY AVE 6.0 04/13/94 04/13/94 0 04/13/94 04/13/94 4,500 100

Totals per Underpass Lighting 734.0 24,057 323,197


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 528

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 ON W HOWARD ST FROM N HERMITAGE AVE TO N PAULINA ST 1.0 0 12/18/01 12/18/01 1,850 100
210 06 0219 / 4459 N WESTERN AVE AND W HOWARD ST .50 05/03/05 05/04/05 5,282 04/21/05 04/21/05 5,042 100
210 06 0219 / 4459 N WESTERN AVE AND W TOUHY AVE .50 04/29/05 04/30/05 5,282 03/11/05 03/11/05 5,042 100

Totals per LED Signal Head Install 2.0 10,563 11,934

Work Type: Left Turn Arrow Locations


210 06 0023 / 4298 N CLARK ST AND N ROGERS AVE 04/15/03 05/01/03 6,000 01/08/03 01/15/03 4,801 100

Work Type: Signals Intersections


300 06 0096 / 5258 7356 N GREENVIEW AVE 44.0 11/25/03 12/01/03 0 09/22/06 09/30/06 6,957 100

Work Type: TSM Install Locations


814 06 0064 / 16280 6399 N BROADWAY 1.0 10/06/95 10/06/95 0 10/06/95 10/06/95 111,594 100
814 06 0304 / 16516 6551 N SHERIDAN RD 1.0 06/14/91 06/14/91 0 06/14/91 06/14/91 69,253 100
210 06 0104 / 4364 1900 W LUNT AVE 1.0 12/01/00 03/31/01 170,903 11/20/00 04/26/01 183,550 100

Totals per TSM Install 3.0 170,903 364,397

Totals per Traffic 187,466 388,089

Totals per Construction Phase 4,880,508 3,389,595

Totals for Ward 49 4,884,408 3,395,577


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 529

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Design
Work Category: Lighting/Electrical
Work Type: Design/Engineering Projects
300 06 / 32275 ON N FRANCISCO AVE FROM W PETERSON AVE TO W GRANVILLE AVE .0 03/01/07 10/31/07 3,900 03/06/07 04/03/07 2,655 0
300 06 / 32277 ON N SACRAMENTO AVE FROM W PRATT BLVD TO W DEVON AVE .0 04/01/08 08/30/08 0 0 0
300 06 0308 / 5414 ON N WASHTENAW AVE FROM W PETERSON AVE TO W GRANVILLE AVE .0 02/01/06 07/31/06 0 02/01/06 07/31/06 2,400 100
210 06 / 32040 W DEVON AVE AND N WESTERN AVE .0 11/01/06 12/31/07 5,000 1,274 0
210 06 0158 / 5058 W PETERSON AVE AND N KIMBALL AVE .0 08/15/05 12/31/05 0 08/15/05 12/31/05 235 100
300 06 0282 / 5390 W PETERSON AVE AND N RICHMOND ST .50 500 09/17/04 10/06/04 500 100

Totals per Design/Engineering .50 9,400 7,064


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 530

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: 250 Watt Changeout Fixtures
300 06 0307 / 5413 ON W GRANVILLE AVE FROM N RAVENSWOOD AVE TO N OAKLEY AVE 16.50 02/07/06 05/31/06 6,600 01/16/05 02/10/06 4,100 100
300 06 0307 / 5413 W GRANVILLE AVE AND N LEAVITT ST 2.0 02/07/06 05/31/06 800 01/16/05 02/10/06 497 100
300 06 0069 / 5233 7100 N WASHTENAW AVE 6.0 07/19/02 07/19/02 1,260 07/16/02 07/16/02 1,218 100
300 06 0069 / 5233 3000 W SHERWIN AVE 4.0 07/04/02 07/04/02 840 07/01/02 07/01/02 812 100

Totals per 250 Watt Changeout 28.50 9,500 6,627

Work Type: 400 Watt Changeout Fixtures


300 09 / 33116 ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD 27.0 05/05/08 05/23/08 8,750 04/25/08 05/02/08 8,750 100
300 09 / 33116 ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE 6.0 05/12/08 05/23/08 2,400 05/07/08 05/30/08 2,400 100
300 09 / 33116 ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE 18.0 05/13/08 05/30/08 7,200 05/13/08 05/23/08 7,200 100
300 03 0040 / 4911 ON W PETERSON AVE FROM N CLARK ST TO N LINCOLN AVE 30.02 08/20/04 09/20/04 12,008 08/01/04 08/20/04 7,847 100
300 03 0050 / 4921 ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE 46.08 10/01/04 10/20/04 18,432 08/27/04 09/06/04 12,834 100

Totals per 400 Watt Changeout 127.10 48,790 39,031

Work Type: Alley Lighting/Lamps Installations


805 06 0809 / 6995 6222 N CAMPBELL AVE 1.0 01/25/96 01/25/96 0 01/25/96 01/25/96 300 100
805 06 1072 / 7258 6423 N HAMILTON AVE 1.0 06/01/95 06/01/95 0 06/01/95 06/01/95 300 100
300 06 0139 / 5289 6199 N LINCOLN AVE 1,134.0 03/01/06 09/01/06 30,303 05/20/06 06/01/06 34,262 100
302 00 0092 / 5774 6199 N LINCOLN AVE 6.0 0 04/25/01 01/04/02 1,414 100
805 06 1619 / 7805 6500 N WESTERN AVE 1.0 09/24/97 09/24/97 0 09/24/97 09/24/97 300 100

Totals per Alley Lighting/Lamps 1,143.0 30,303 36,576

Work Type: Arterial Group Relamping Lamps


300 06 0238 / 5352 6199 N LINCOLN AVE 1,332.0 06/01/07 12/31/07 39,214 07/31/07 08/18/07 39,214 100

Work Type: Arterial Strt Lighting/Lamps Blocks


300 06 0166 / 5305 6100 N LINCOLN AVE 1.0 02/21/01 11/01/01 88,237 02/21/01 11/07/01 5,584 100

Work Type: Arterial Strt Lighting/Lamps Installations


300 06 0053 / 5228 6199 N LINCOLN AVE 1,227.0 0 04/07/02 04/10/02 22,341 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 531

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Lighting Imprvmnts Installations
300 09 / 33116 ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE 18.0 02/01/08 12/31/08 18,000 06/06/08 07/11/08 16,000 100

Work Type: Lighting Imprvmnts Projects


300 06 0282 / 5390 W PETERSON AVE AND N RICHMOND ST .0 10/06/04 10/31/04 0 0 0

Work Type: Ornamental - Piggyback Lighting Fixtures


300 09 / 33116 ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD 27.0 06/23/08 07/11/08 36,990 07/22/08 08/11/08 40,000 100
300 09 / 33116 ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE 6.0 05/12/08 06/27/08 8,220 07/18/08 08/11/08 9,000 100
300 09 / 33116 ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE 18.0 07/01/08 07/11/08 24,300 07/11/08 08/11/08 18,826 100

Totals per Ornamental - Piggyback Lighting 51.0 69,510 67,826

Work Type: Ornamental Lighting Blocks


300 09 / 33116 ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0

Totals per Ornamental Lighting .0 0 0

Work Type: Residential Regrouping Lamps


300 06 0270 / 5378 6199 N LINCOLN AVE .0 03/01/08 12/01/08 0 0 0

Totals per Lighting/Electrical 6,196,177 1,445,792


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 532

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 09 / 33116 ON N ALBANY AVE FROM W ALBION AVE TO W DEVON AVE 2.0 02/01/08 12/31/08 130,000 04/01/08 12/01/08 0 100
300 09 / 33116 ON N ALBANY AVE FROM W DEVON AVE TO W ALBION AVE 1.0 130,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON N ALBANY AVE FROM W DEVON AVE TO W PETERSON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N ALBANY AVE FROM W PETERSON AVE TO W DEVON AVE 1.0 184,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON N BELL AVE FROM W GRANVILLE AVE TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 11 / 32239 ON N CENTRAL PARK AVE FROM W GRANVILLE AVE TO W PETERSON 2.0 03/01/07 12/31/07 110,000 0 0
AVE
300 09 / 33116 ON N FRANCISCO AVE FROM W DEVON AVE TO W PETERSON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N FRANCISCO AVE FROM W DEVON AVE TO W PRATT BLVD 4.0 04/09/08 05/19/08 260,000 04/01/08 12/01/08 0 100
300 09 / 33116 ON N FRANCISCO AVE FROM W PETERSON AVE TO W DEVON AVE 1.0 285,000 04/01/08 12/01/08 0 0
300 06 / 32275 ON N FRANCISCO AVE FROM W PETERSON AVE TO W GRANVILLE AVE .0 04/01/07 12/31/07 151,760 04/06/07 08/03/07 90,228 100
300 09 / 33116 ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N LEAVITT ST FROM W GRANVILLE AVE TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N MOZART ST FROM W DEVON AVE TO W PETERSON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N MOZART ST FROM W DEVON AVE TO W PRATT BLVD 4.0 04/05/08 05/19/08 260,000 04/01/08 12/01/08 0 100
300 09 / 33116 ON N MOZART ST FROM W PETERSON AVE TO W DEVON AVE 1.0 285,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON N MOZART ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N RICHMOND ST FROM W DEVON AVE TO W PETERSON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N RICHMOND ST FROM W DEVON AVE TO W PRATT BLVD 4.0 04/10/08 05/19/08 260,000 04/01/08 12/01/08 0 100
300 09 / 33116 ON N RICHMOND ST FROM W PETERSON AVE TO W DEVON AVE 1.0 285,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N SACRAMENTO AVE FROM W ARTHUR AVE TO W PRATT BLVD 1.0 193,600 04/01/08 12/01/08 0 0
300 09 / 33116 ON N SACRAMENTO AVE FROM W DEVON AVE TO W ARTHUR AVE 1.0 66,400 04/01/08 12/01/08 0 0
300 09 / 33116 ON N SACRAMENTO AVE FROM W DEVON AVE TO W PETERSON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N SACRAMENTO AVE FROM W DEVON AVE TO W PRATT BLVD 1.0 02/01/08 12/31/08 296,573 04/01/08 12/01/08 0 100
300 09 / 33116 ON N SACRAMENTO AVE FROM W PETERSON AVE TO W DEVON AVE 1.0 285,000 04/01/08 12/01/08 0 0
300 06 / 32277 ON N SACRAMENTO AVE FROM W PRATT BLVD TO W DEVON AVE .0 05/04/08 12/31/08 0 0 0
300 06 0298 / 5405 ON N TALMAN AVE FROM W PETERSON AVE TO W GRANVILLE AVE 2.0 06/15/05 07/15/05 0 06/15/05 08/12/05 100,795 100
300 09 / 33116 ON N TROY ST FROM N LINCOLN AVE TO W DEVON AVE 1.0 184,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON N TROY ST FROM W ALBION AVE TO W DEVON AVE 2.0 02/01/08 12/31/08 130,000 04/01/08 12/01/08 0 100
300 06 0308 / 5414 ON N WASHTENAW AVE FROM W PETERSON AVE TO W GRANVILLE AVE 2.0 04/17/06 06/01/06 141,265 04/12/06 06/09/06 99,063 100
300 07 0040 / 5463 ON N WHIPPLE ST FROM N LINCOLN AVE TO W HOOD AVE .50 07/17/06 09/08/06 42,500 08/14/06 10/13/06 38,578 100
CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 533

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Residntl Staggered Lighting Blocks
300 09 / 33116 ON N WHIPPLE ST FROM W DEVON AVE TO W PETERSON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N WHIPPLE ST FROM W DEVON AVE TO W PRATT BLVD 4.0 04/15/08 05/06/08 260,000 04/01/08 12/01/08 0 100
300 09 / 33116 ON N WHIPPLE ST FROM W PETERSON AVE TO W DEVON AVE 1.0 184,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON N WHIPPLE ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON W DEVON AVE FROM N ALBANY AVE TO N TROY ST 1.0 130,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON W GRANVILLE AVE FROM N KEDZIE AVE TO N SACRAMENTO AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON W GRANVILLE AVE FROM N SACRAMENTO AVE TO N KEDZIE AVE 1.0 184,000 04/01/08 12/01/08 0 0
300 09 / 33116 ON W HOOD AVE FROM N KEDZIE AVE TO N SACRAMENTO AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON W HOOD AVE FROM N SACRAMENTO AVE TO N KEDZIE AVE 1.0 184,000 04/01/08 12/01/08 0 0

Totals per Residntl Staggered Lighting 40.50 4,622,098 328,664

Work Type: Residntl Strt Lighting/Lamps Blocks


300 06 0235 / 5349 ON N DAMEN AVE FROM W DEVON AVE TO W ALBION AVE 2.0 05/01/03 07/01/03 161,203 04/23/03 07/08/03 148,028 100

Work Type: Strt Light Pole Painting Locations


300 09 / 33116 ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD 27.0 05/05/08 05/23/08 10,260 05/01/08 05/16/08 5,400 100
300 09 / 33116 ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE 6.0 05/12/08 06/27/08 2,280 05/12/08 05/23/08 1,200 100
300 09 / 33116 ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE .0 02/01/08 12/31/08 0 04/01/08 12/01/08 0 0
300 09 / 33116 ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE 18.0 05/05/08 06/27/08 5,400 05/05/08 05/16/08 3,600 100
302 00 0076 / 5764 ON W PETERSON AVE FROM N KIMBALL AVE TO N PULASKI RD 23.50 04/11/98 04/17/98 0 04/11/98 04/17/98 400 100
300 03 0050 / 4921 ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE 49.44 10/01/04 10/20/04 13,992 07/10/04 08/27/04 13,809 100
300 03 0040 / 4911 ON W PETERSON AVE FROM N LINCOLN AVE TO N CLARK ST 37.05 05/10/04 09/10/04 9,101 05/10/04 08/01/04 10,004 100

Totals per Strt Light Pole Painting 160.99 41,033 34,412


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 534

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Lighting/Electrical
Work Type: Strt Lighting Blocks
300 06 0246 / 5356 ON N BELL AVE FROM W MORSE AVE TO W FARWELL AVE .50 09/01/04 12/01/04 54,000 05/19/05 10/03/05 66,733 100
300 06 0246 / 5356 ON N HAMILTON AVE FROM W MORSE AVE TO W PRATT BLVD 1.0 09/01/04 12/01/04 108,000 05/20/05 10/03/05 66,733 100
300 06 0246 / 5356 ON N OAKLEY AVE FROM W PRATT BLVD TO W MORSE AVE 1.0 09/01/04 12/31/04 108,000 06/14/05 10/13/05 66,733 100
300 06 0246 / 5356 ON N SEELEY AVE FROM W FARWELL AVE TO W PRATT BLVD .50 09/01/04 12/01/04 54,000 06/12/05 09/23/05 66,733 100
300 06 0246 / 5356 ON N WASHTENAW AVE FROM W SHERWIN AVE TO W TOUHY AVE 1.50 09/01/04 12/01/04 108,000 06/17/05 09/23/05 66,733 100
300 06 0246 / 5356 ON W COLUMBIA AVE FROM N DAMEN AVE TO N SEELEY AVE .50 08/01/04 12/01/04 108,000 06/17/05 10/13/05 66,733 100
300 03 0050 / 4921 ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE 01/15/05 06/15/05 520,000 01/17/05 06/17/05 251,730 100

Totals per Strt Lighting 5.0 1,060,000 652,128

Work Type: Traffic Signal Regrouping Lamps


300 06 0139 / 5289 6199 N LINCOLN AVE 1,140.0 03/01/04 12/01/04 5,928 11/07/06 11/08/06 12,414 100

Work Type: Underpass Lighting Fixtures


300 06 0217 / 5337 6199 N LINCOLN AVE 42.0 08/10/04 08/13/04 2,361 08/10/04 09/13/04 26,448 100
805 06 2704 / 8890 1780 W DEVON AVE 14.0 07/20/94 07/20/94 0 07/20/94 07/20/94 10,500 100

Totals per Underpass Lighting 56.0 2,361 36,948


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 535

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Work Type: LED Signal Head Install Locations
210 06 0130 / 4389 N CALIFORNIA AVE AND W TOUHY AVE 1.0 0 03/21/02 03/21/02 8,539 90
210 06 0130 / 4389 N WESTERN AVE AND W ALBION AVE 1.0 0 05/14/02 05/14/02 1,850 100
210 06 0219 / 4459 N WESTERN AVE AND W ALBION AVE 1.0 04/29/05 04/29/05 10,563 04/23/05 04/23/05 8,007 100
210 06 0219 / 4459 N WESTERN AVE AND W DEVON AVE 1.0 04/26/05 04/27/05 10,563 04/09/05 04/09/05 8,007 100
210 06 0219 / 4459 N WESTERN AVE AND W GRANVILLE AVE 1.0 04/10/05 04/10/05 10,563 04/05/05 04/05/05 8,008 100
210 06 0219 / 4459 N WESTERN AVE AND W HOWARD ST .50 05/03/05 05/04/05 5,282 04/21/05 04/21/05 5,042 100
210 06 0219 / 4459 N WESTERN AVE AND W LUNT AVE 1.0 04/28/05 04/29/05 10,563 03/02/05 03/02/05 8,008 100
210 06 0130 / 4389 N WESTERN AVE AND W PRATT AVE 1.0 0 04/24/02 04/24/02 10,074 100
210 06 0219 / 4459 N WESTERN AVE AND W TOUHY AVE .50 04/29/05 04/30/05 5,282 03/11/05 03/11/05 5,042 100

Totals per LED Signal Head Install 8.0 52,815 62,577

Work Type: Left Turn Arrow Locations


210 06 0231 / 4470 N CALIFORNIA AVE AND W PETERSON AVE .0 03/01/08 12/01/08 98,116 0 0
210 06 / 32040 W DEVON AVE AND N WESTERN AVE 1.0 11/01/06 12/31/07 85,000 09/17/07 12/15/07 36,089 70
210 06 0158 / 5058 W PETERSON AVE AND N KIMBALL AVE .50 06/02/06 02/19/07 30,000 06/22/06 03/02/07 33,249 100

Totals per Left Turn Arrow 1.50 213,116 69,338

Work Type: Removal Temp Wiring - Signals Crossings


300 06 0197 / 5322 N LEAVITT ST AND W DEVON AVE 1.0 4,000 04/08/02 04/08/02 0 100

Work Type: Signals Intersections


300 06 0096 / 5258 6199 N LINCOLN AVE 29.0 11/25/03 12/01/03 0 09/16/03 09/22/03 4,585 100

Work Type: TSM Install Locations


814 06 0141 / 16355 6400 N CALIFORNIA AVE 1.0 07/22/93 07/22/93 0 07/22/93 07/22/93 109,947 100
814 06 0354 / 16551 7199 N KEDZIE AVE 1.0 01/01/96 01/01/96 0 01/01/96 12/31/97 175,000 100
814 06 0195 / 16407 7599 N KEDZIE AVE 1.0 04/09/96 04/09/96 0 04/09/96 04/09/96 150,000 100
814 06 0271 / 16483 6600 N WESTERN AVE 1.0 04/25/89 04/25/89 0 04/25/89 04/25/89 90,000 100
814 06 0357 / 16552 7000 N WESTERN AVE 1.0 10/11/90 10/11/90 0 10/11/90 10/11/90 86,982 100
814 06 0111 / 16326 7400 N WESTERN AVE 1.0 09/18/90 09/18/90 0 09/18/90 09/18/90 86,982 100

Totals per TSM Install 6.0 0 698,911


CPMR055
05-08-09 03:47 PM
C apital P rogram M anagement Projects By Ward, Phase, Work Category, Work Type Page 536

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone


CIP/CPM No of WIP Estimate WIP Actual (to Date) %
Number Street Address Units Start End Cost Start End Cost Cmplt

Phase: Construction
Work Category: Traffic
Totals per Traffic 269,931 835,411

Totals per Construction Phase 6,466,108 2,281,203

Totals for Ward 50 6,475,508 2,288,267

Totals for Report 175,941,558 169,885,440


C apital P rogram M anagement
CPMR055

End of Report