Вы находитесь на странице: 1из 91

DATOS EMPRESA CONSTRUCTORA FECHA: OBRA: ENRIQUE FRANCISCO SOTOMAYOR CANO 1-Jun-12 CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS

EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA., CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. IO-821156985-N48-2012 1412100.-A/005

LOCALIDAD: UBICACION:

No. DE CONTRATO: No. DE OFICIO DE ASIGNACION FEDERAL: No. DE OFICIO DE SUFICIENCIA PRESUPUESTAL: NO. OBRA R33: NO. OBRA R20: FONDO (S): EJERCICIO FISCAL : PROGRAMA: IMPORTE DE CONTRATO: PAGO DE ANTICIPO DEL 30 % PAGO DE ESTIMACION No. 1 (UNO) PAGO DE ESTIMACION No. 2 (DOS) PAGO DE ESTIMACION No. 1 (UNO) PERIODO DE EJECUCIN: PERIODO DE ESTIMACION REPRESENTANTE LEGAL DE LA EMPRESA SUPERINTENDENTE DE OBRA DIRECTOR DE OBRAS JEFE DE PROGRAMA HABITAT RESIDENCIA DE OBRA ESTIMACION No. INICIO CONTRACTUAL FECHA DE TERMINO CONTRACTUAL

FEDERAL (HOJA 1 CONTRATO 142100.-ETC


TM/FORTAMUN2012/12011/2012

ESTATAL (HOJA 2 CONTRATO TM/FORTAMUN ETC


12011 211561ME020 FORTAMUN 2012 Y HABITAT FEDERAL 2012 2012 RAMO 33 Y RAMO 20 $ 542,697.56 162,809.27 FINIQUITO 467,842.72 140,352.82 74,854.84 22,456.45

ARRIBA CONTRATO

04 DE JUNIO DE 2012 04 DE JUNIO DE 2012 ENRIQUE FRANCISCO SOTOMAYOR CANO ARQ. FRANCISCO SOTOMAYOR ALVAREZ C. JESUS ARRIAGA ARRIAGA ARQ. JAIME ARNULFO VERA CASILLAS ARQ. MANUEL SANTIAGO COLOTLA 01 (UNO) FINIQUITO 04 DE JUNIO DE 2012 13 DE JULIO DE 20112

13 DE JULIO DE 20112 13 DE JULIO DE 20112

TO 142100.-ETC

TO TM/FORTAMUN ETC

CARTULA DE INTEGRACIN DE DOCUMENTOS H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUEBLA. 2011 - 2014 DOCUMENTOS QUE INTEGRAN LA ESTIMACION
X
RECIBO

ESTIMACION:

01 (UNO) FINIQUITO

OBRA:

CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

X X
X

REPORTES DE CALIDAD LABORATORIO

NO. OBRA R33:

12011

X x X

FACTURA AVANCE FISICO FINANCIERO CONTROL DE ESTIMACIONES ESTIMACION DE OBRA GENERADORES DE OBRA

REPORTE FOTOGRAFICO NOTAS DE BITACORA FIANZA DE ANTICIPO

211561ME020 NO. OBRA R20: No. CONTRATO : IO-821156985-N48-2012

N/A
X X X X

CONTRATISTA: FONDO(S):

ENRIQUE FRANCISCO SOTOMAYOR CANO

X X X X

N/A FIANZA DE CUMPLIMIENTO


FIANZA DE VICIOS OCULTOS (P/FINIQUITO) OFICIO DE TERMINACION DE OBRA ACTA DE ENTREGA RECEPCIN CONTRATISTA. (PARA FINIQUITO) PRESUPUESTO FINAL EJECUTADO. (PARA FINIQITO)

FORTAMUN 2012 Y HABITAT FEDERAL 2012

N/A OFICIO DE INICIO DE OBRA PROGRAMAS: EJERCICIO FISCAL: 1


RAMO 33 Y RAMO 20 2012 CROQUIS GENERADOR ANEXOS

COORDINACION DE RESIDENCIA H. AYUNTAMIENTO RECIBE DE EMPRESA FECHA ENTRADA: REVISION TIEMPO NECESARIO: FECHA AUTORIZACION:

TESORERIA MUNICIPAL FECHA ENTRADA: REVISION TIEMPO NECESARIO: FECHA AUTORIZACION:

DEPARTAMENTO DE CONTABILIDAD RECIBE DE COORDINACIN DE CONTROL FECHA ENTRADA: PARA COMPROBACION:

REVISIONES: FECHAS: 1RA. REV. 2DA. REV. 3RA. REV. 4TA. REV.

ABREVIATURAS: ('R) Residencia ('C) Contabilidad

MUNICIPIO DE TEHUACAN, PUEBLA RAYON No. 7 COL. CENTRO TEHUACAN, PUEBLA MTP9302157Z3 C.P 75700 MNB-850101 3TA 24-Jun-11

PAGO CORRESPONDIENTE LA ESTIMACIN 1 (UNO), REFERENTE AL CONTRATO DE OBRA PBLICA No: AO-821156985N17-2011, CONVENIDO A BASE DE PRECIOS UNITARIOS Y TIEMPO DETERMINADO DE LA OBRA DENOMINADA: CONSTRUCCIN DE PAVIMENTO ASFLTICO EN LA CALLE ANTONIO NAVA CASTILLO ENTRE CALLE GUSTAVO DAZ ORDAZ Y CALLE 23 PONIENTE DE LA COLONIA AMRICA HBITAT DE ESTE MUNICIPIO DE TEHUACAN, PUEBLA.
PROGRAMA NO. OBRA R33: No. DE OFICIO DE SUFICIENCIA PRESUPUESTAL: NO. OBRA R20: No. DE OFICIO DE ASIGNACION R20 EJERCICIO FISCAL:

RAMO 33 Y RAMO 20 12011 TM/FORTAMUN2012/12011/2012 IMPORTE 211561ME020 1412100.-A/005 2012


% 50.000000000% 50.000000000% TOTAL

AMORTIZACION 30% ANTICIPO SUBTOTAL 16 % IVA TOTAL ESTIMACION CONTRATO #REF! #REF! #REF! ESTIMACIN RETENCION 5 AL MILLAR #REF! NETO A PAGAR #REF! #REF!

ESTRUCTURA FINANCIERA

FORTAMUN 2011 HABITAT FEDERAL 2011

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

100%

PRESIDENTE MUNICIPAL DE TEHUACAN

TESORERO MUNICIPAL DE TEHUACAN

C. ELISEO LEZAMA PRIETO

C.P. JOSE PAUL NORBERTO SANCHEZ ROMERO

CONTRATISTA

DIRECTOR DE OBRAS PUBLICAS

ENRIQUE FRANCISCO SOTOMAYOR CANO


REPRESENTANTE LEGAL

C. JESUS ARRIAGA ARRIAGA

#REF!

MUNICIPIO DE TEHUACN PUEBLA RAYN N 7, COL. CENTRO TEHUACN, PUEBLA MTP 9302157Z3 10 DE SEP-2012 C.P. 75700

PAGO CORRESPONDIENTE A LA ESTIMACION 01 (UNO),FINIQUITO REFERENTE AL CONTRATO DE

OBRA PBLICA No: IO-821156985-N48-2011, CONVENIDO A BASE DE PRECIOS UNITARIOS Y TIEMPO DETERMINADO DE LA OBRA DENOMINADA: CONSTRUCCION DE PAVIMENTO ASFLTICO Y OBRAS
COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD, HBITAT. de este Municipio de

Tehuacn, P UEBLA.
PROGRAMA: RAMO 33 Y RAMO 20 12011 TM/FORTAMUN2012/12011/2012 211561ME020 1412100.-A/005 2012 % 50.000000000000% $ 50.000000000000% $ $
IMPORTE AMORTIZACION 30% ANTICIPO SUBTOTAL 16 % IVA TOTAL ESTIMACION RETENCION 5 AL MILLAR NETO A PAGAR

No. DE OBRA RAMO 33: No. DE OFICIO DE SUFICIENCIA PRESUPUESTAL: No. DE OBRA RAMO 20: No. DE OFICIO DE ASIGNACION:
EJERCICIO FISCAL: ESTRUCTURA FINANCIERA FORTAMUN 2011 HABITAT FEDERAL 2011

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

CONTRATO ESTIMACION 01 FINIQUITO 271,348.78 #REF! 271,348.78 #REF! 542,697.56 #REF!

PRESIDENTE MUNICIPAL DE TEHUACAN

TESORERO MUNICIPAL DE TEHUACN

C. ELISEO LEZAMA PRIETO

C.P. JOS PAUL NORBERTO SNCHEZ ROMERO

CONTRATISTA

DIRECTOR DE OBRAS PUBLICAS

ENRIQUE FRANCISCO SOTOMAYOR CANO PERSONA FISICA

C. JESUS ARRIAGA ARRIAGA

(CUATROCIENTOS OCHENTA MIL OCHENTA Y UN PESOS 41/100 M.N.)

#REF!

RECIBO DE PAGO

RECIBI DE LA TESORERIA MUNICIPAL DEL H. AYUNTAMIENTO DE TEHUACAN, PUEBLA; LA CANTIDAD DE $ 480,081.41 (CUATROCIENTOS OCHENTA MIL OCHENTA Y UN PESOS 41/100 M.N..) POR EL CONCEPTO DE PAGO DE ESTIMACION No. 1 (UNO) DE LA OBRA DENOMINADA: CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.
LOCALIDAD: TEHUACAN, PUEBLA., No. DE FACTURA: 233 PROGRAMA: RAMO 33 Y RAMO 20 No. DE CONTRATO: IO-821156985-N48-2012 NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020 EJERCICIO FISCAL: 2012 FONDO: FORTAMUN 2012 Y HABITAT FEDERAL 2012 MONTO CONTRATADO: $542,697.56 No. DE OFICIO DE ASIGNACION FEDERAL: 1412100.-A/005 No. DE OFICIO DE SUFICIENCIA PRESUPUESTAL: TM/FORTAMUN2012/12011/2012

Tehuacn, Pue., a

13 de Diciembre de 2011

ATENTAMENTE :

______________________________________ ENRIQUE FRANCISCO SOTOMAYOR CANO REPRESENTANTE LEGAL

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014

ESTIMACION 01 (UNO) FINIQUITO CONTROL DE ESTIMACIN DE OBRAS


NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020 SEGUN CONTRATO CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. IO-821156985-N48-2012 ENRIQUE FRANCISCO SOTOMAYOR CANO DIRECTO 2012
EJERCICIO FISCAL:

OBRA:

MONTO CONTRATADO SIN

IVA

467,842.72

UBICACIN: CONTRATO: CONTRATISTA: PROGRAMA:

IVA MONTO CONTRATADO CON IVA RETENCION 5 AL MILLAR

$ $ $ $

74,854.84 542,697.56 2,339.21 540,358.35

RAMO 33 FONDOS: 04 DE JUNIO DE 2012 AL

RAMO 20

MONTO A FACTURAR

FORTAMUN 2012 Y HABITAT FEDERAL 2012


ANTICIPO SIN IVA

$ $ $

140,352.82 22,456.45 162,809.27


OBSERVACIONES

PERIODO:

13 DE JULIO DE 2012

IVA ANTICIPO CON IVA

ESTIMACION

IMPORTE

AMORTIZACION DEL ANTICIPO

SUB TOTAL

IVA

TOTAL

RETENCION 5 TOTAL FACTURADO AL MILL.

ANTICIPO 30 %

140,352.82

22,456.45

162,809.27

162,809.27

ESTIMACION 01 (UNO)FINIQUITO

SUMAS TOTALES DIFERENCIAS


SUPERINTENDENTE DE CONSTRUCCION

$ $

467,842.72

$ $

140,352.82

$ $

140,352.82 327,489.90

$ $

22,456.45 52,398.39

$ $

162,809.27 379,888.29

$ $

162,809.27 377,549.08 $

MONTO CONTRATADO (TOTAL FACTURADO + RETENCIONES)

$ 2,339.21

162,809.27

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

DIRECTOR DE OBRAS PUBLICAS

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

C. JESUS ARRIAGA ARRIAGA

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014

ESTIMACION 01 (UNO) CONTROL DE ESTIMACIN DE OBRAS


NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020 SEGUN CONTRATO CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. IO-821156985-N48-2012 ENRIQUE FRANCISCO SOTOMAYOR CANO DIRECTO 2012 RAMO 33 FONDOS: 04 DE JUNIO DE 2012 AL X RAMO 20 X

OBRA: UBICACIN: CONTRATO: CONTRATISTA: PROGRAMA:


EJERCICIO FISCAL:

MONTO CONTRATADO SIN

IVA

$ $ $ $ $ $ $ $
TOTAL FACTURADO $ $ $ 162,809.27 81,404.64 81,404.63

467,842.72 74,854.84 542,697.56 2,339.21 540,358.35 140,352.82 22,456.45 162,809.27

IVA MONTO CONTRATADO CON IVA RETENCION 5 AL MILLAR MONTO A FACTURAR ANTICIPO SIN IVA IVA ANTICIPO CON IVA

FORTAMUN 2012 Y HABITAT FEDERAL 2012

PERIODO:

27 DE OCTUBRE DE 2011

ESTIMACION ANTICIPO 30 % FORTAMUN 2012 HABITAT FEDERAL 2012

IMPORTE

AMORTIZACION DEL ANTICIPO $ $ $

SUB TOTAL 140,352.82 70,176.41 70,176.41 $ $ $

IVA 22,456.45 11,228.23 11,228.22 $ $ $

TOTAL 162,809.27 81,404.64 81,404.63

RETENCION 5 AL MILL.

OBSERVACIONES

ESTIMACION 01 (UNO) FORTAMUN 2012 HABITAT FEDERAL 2012

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF!

SUMAS TOTALES DIFERENCIAS SUPERINTENDENTE DE CONSTRUCCION

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

#REF! #REF!

MONTO CONTRATADO (TOTAL FACTURADO + RETENCIONES)

#REF!

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

DIRECTOR DE OBRAS PUBLICAS

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

C. JESUS ARRIAGA ARRIAGA

MIENTO CONSTITUCIONAL EHUACAN, PUE. 2011 - 2014

E ESTIMACIN DE OBRAS

OBSERVACIONES

MONTO CONTRATADO (TOTAL FACTURADO + RETENCIONES)

#REF!

DIRECTOR DE OBRAS PUBLICAS

C. JESUS ARRIAGA ARRIAGA

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014


I.- DATOS DEL CONTRATO: OBRA: CONSTRUCCIN II.- FECHA DE INICIO Y TERMINACIN:

DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

INICIO CONTRACTUAL:

04 DE JUNIO DE 2012 13 DE JULIO DE 2012 04 DE JUNIO DE 2012

TERMINACIN: INICIO REAL: TERMINO REAL:

CONTRATO No: CONTRATISTA: NO. OBRA R33: NO. OBRA R20: III.-AVANCE A LA FECHA: FSICO PROGRAMADO FSICO REAL FINANCIERO PROGRAMADO FINANCIERO REAL

IO-821156985-N48-2012
ENRIQUE FRANCISCO SOTOMAYOR CANO

RETRASO A LA FECHA:_____________________

DURACIN PROGRAMA DE OBRA: 40 DIAS NATURALES IV.- AMPLIACION DE PLAZO:

12011 211561ME020
#REF! #REF! #REF! 53.96% V.- COSTO DE LA OBRA:

CONCEPTO
CONTRATO ORIGINAL CONV. MODIFICATORIO CONVENIO ADICIONAL TOTAL

IMPORTE INICIAL $ $ $ $ 542,697.56 542,697.56 $ $ $ $

ESTIMADO ANTERIOR -

ESTA ESTIM. #REF! $ $ #REF! -

ACUMULADO

% #REF!

SALDO POR EJECUTAR #REF! $ $ #REF!

% #REF! 0.00% 0.00% #REF!

#REF! $ $ #REF! -

#REF!

VI.-ANTICIPO OTORGADO $ 162,809.27

FECHA DE ANTICIPO:
AMORTIZADO: $ -

3 de octubre de 2011
ESTA ESTIMACIN: $ ACUMULADO: $ POR AMORTIZAR: $ 162,809.27

VII.-DEDUCCIONES DEDUCIDOS ESTA DEDUCCIN ACUMULADO $ #REF! #REF! -

CONTRATISTA

ENRIQUE FRANCISCO SOTOMAYOR CANO REPRESENTANTE LEGAL

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

DIRECTOR DE OBRAS PUBLICAS

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

C. JESUS ARRIAGA ARRIAGA

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014


ESTIMACION No 01( UNO ) FINIQUITO
FONDOS: EJERCICIO FISCAL: Nombre de la Empresa: Programa: No. de Contrato: Importe del Contrato Importe del Anticipo IMPORTE ESTIMADO C/IVA: IMPORTE ACUMULADO C/IVA: IMPORTE POR ESTIMAR C/IVA:
ENRIQUE FRANCISCO SOTOMAYOR CANO

FORTAMUN 2012 Y HABITAT FEDERAL 2012 2012 DEL 04 DE JUNIO DE 2012 AL 13 DE JULIO DE 2012

FECHA:

28-Oct-11 AL

PERIODO DE ESTIMACION: NOMBRE DE LA OBRA: 542,697.56 162,809.27 #REF! #REF! #REF! UBICACIN:

PERIODO DE EJECUCION DE LA OBRA:

04/06/2012

13/07/2012

RAMO 33 Y RAMO 20 IO-821156985-N48-2012 $ $

CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.
NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020

No. DE ESTIMACION:

1 (UNO) FINIQUITO #REF! #REF! #REF!

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

IMPORTE ESTIMADO SIN/IVA: IMPORTE ACUMULADO SIN/IVA:

IMPORTE POR ESTIMAR SIN/IVA:

HOJA
CANTIDAD DE PRESUPUESTO CLAVE PARTIDA Y CONCEPTO UNIDAD CANT P.U. SIN I.V.A CANTIDAD IMPORTE CANTIDAD REAL EJECUTADA ACUM. HASTA ESTA ESTIMACION CANTIDAD POR EJERCER CANTIDAD IMPORTE EN ESTIMACIN IMPORTE EN ESTIMACIN (CON IVA) FONDOS FORTAMUN FORTAMUN C/IVA 50.000000000% 50.000000000% HABITAT FED. HABITA FED. C/IVA

DE
ACUM. ANT. (%)

6
ACUMULADO (%)

AVANCE FINANCIERO POR CONCEPTO ESTA EST. (%)

1.000 TAL001

PRELIMINARES TALA DE ARBOL DE 0.25 A 0.75 M. DE PERIMETRO ( CORTADO A 1.00 M DEL NIVEL DEL TERRENO ) EXTRACCION DE TOCONES DE 0.25 A 0.75 M DE PERIMETRO INCLUYE DESENRAICE DEMOLICIN A MANO DE CONCRETO SIMPLE EN GUARNICIONES RUPTURA Y DEMOLICIN A MANO DE CONCRETO SIMPLE EN BANQUETAS ACARREO EN CAMIN DE MATERIAL MIXTO, PRIMER KILMEETRO, CARGA MECNICA ACARREO EN CAMIN DE MATERIAL MIXTO, KILMETRO SUBSECUENTE, ZONA SUB-URBANA GUARNICIONES TRAZO Y NIVELACIN DE PLAZAS, ANDADORES, BANQUETAS Y PAVIMENTOS, PRIMEROS 10,000 M2 EXCAVACIN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO, MATERIAL COMN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A 2.00 M RELLENO Y COMPACTACIN EN CIMENTACIN EN CAPAS DE 20 CM, CON PISON DE MANO UTIIZANDO EL MATERIAL PRODUCTO DE EXCAVACIN INCLUYE: TRASPALEOS AGUA PARA HOMOGENEIZAR EL MATERIAL HERRAMIENTA, MANO DE OBRA Y ACARREOS, MATERIAL MEDIDO EN SITIO PZA 1.00

$372.61

3.00

1,117.83

1,120.83

0.00

1,117.83

1,296.68

558.92

648.34

558.92

648.34

299.998%

######## ##########

EXT001 DEM006 1000 03 ACA090 ACA092 2.000 TRA004

PZA M3 M2 M3 M3/KM

1.00 2.10 82.20


16.48

$806.03 $261.89 $16.19 $21.38 $4.21

3.00 7.45 115.60 44.83 269.98

2,418.09

2,421.09 1,958.53 1,987.16 1,003.30 #VALUE!

0.00 0.00 0.00 0.00 0.00

2,418.09 1,951.08 1,871.56 958.47 1,136.62

2,804.98 2,263.25 2,171.01 1,111.83 1,318.48

1,209.05 975.54 935.78 479.24 568.30

1,402.49 1,131.63 1,085.51 555.92 659.23

1,209.05 975.54 935.77 479.23 568.31

1,402.49 1,131.62 1,085.50 555.92 659.25

300.001% 354.758% 140.632% 272.034% 273.045%

######## ########## ######## ########## ######## 2417.469% ######## 6087.993% #VALUE! #VALUE!

$ $ $

1,951.08 1,871.56 958.47

98.88

1,,136.62

M2

46.66

$2.88

57.10

164.45

0.00

0.00

164.45

190.76

82.23

95.39

82.22

95.37

122.376%

352.443%

474.819%

EXCA001

M3

14.00

$79.90

17.13

1,368-69

0.00

0.00

1,368.69

1,587.68

684.34

793.83

684.35

793.84

122.357%

#VALUE!

#VALUE!

RELL005

M3

6.00

$70.70

7.34

518.94

526.28

0.00

518.94

601.97

259.46

300.98

259.47

301.00

122.334%

######## 8771.334%

IMPORTE ESTA HOJA 1 : ARQ. FRANCISCO SOTOMAYOR ALVAREZ

11,505.73 ARQ. MANUEL SANTIAGO COLOTLA

11,505.73

13,346.64

5,752.86 ARQ. JAIME ARNULFO VERA CASILLAS

6,673.32

5,752.86

6,673.33 C. JESUS ARRIAGA ARRIAGA

SUPERINTENDENTE DE CONSTRUCCION PRESENTO

RESIDENTE DE OBRA (Municipio) REVISO

JEFE DE PROGRAMA HABITAT VERIFICO

DIRECTOR DE OBRAS PUBLICAS

AUTORIZO

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014


ESTIMACION No 01( UNO ) FINIQUITO
FONDOS: EJERCICIO FISCAL: Nombre de la Empresa: Programa: No. de Contrato: Importe del Contrato Importe del Anticipo IMPORTE ESTIMADO C/IVA: IMPORTE ACUMULADO C/IVA: IMPORTE POR ESTIMAR C/IVA:
ENRIQUE FRANCISCO SOTOMAYOR CANO

FORTAMUN 2012 Y HABITAT FEDERAL 2012 2012 DEL 04 DE JUNIO DE 2012 AL 13 DE JULIO DE 2012

FECHA:

28-Oct-11 AL

PERIODO DE ESTIMACION: NOMBRE DE LA OBRA: 542,697.56 162,809.27 #REF! #REF! #REF! UBICACIN:

PERIODO DE EJECUCION DE LA OBRA:

04/06/2012

13/07/2012

RAMO 33 Y RAMO 20 IO-821156985-N48-2012 $ $

CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.
NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020

No. DE ESTIMACION:

1 (UNO) FINIQUITO #REF! #REF! #REF!

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

IMPORTE ESTIMADO SIN/IVA: IMPORTE ACUMULADO SIN/IVA:

IMPORTE POR ESTIMAR SIN/IVA:

HOJA
CANTIDAD DE PRESUPUESTO CLAVE PARTIDA Y CONCEPTO UNIDAD CANT P.U. SIN I.V.A CANTIDAD IMPORTE CANTIDAD REAL EJECUTADA ACUM. HASTA ESTA ESTIMACION CANTIDAD POR EJERCER CANTIDAD IMPORTE EN ESTIMACIN IMPORTE EN ESTIMACIN (CON IVA) FONDOS FORTAMUN FORTAMUN C/IVA 50.000000000% 50.000000000% HABITAT FED. HABITA FED. C/IVA

DE
ACUM. ANT. (%)

6
ACUMULADO (%)

AVANCE FINANCIERO POR CONCEPTO ESTA EST. (%)

CIMB039

CIMBRADO Y DESCIMBRADO CON CHAROLAS METLICAS A DOS CARAS CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES FC= 150 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACIN, INCLUYE: ELABORACIN ,VACIADO, VIBRADO Y CURADO ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO LIMPIEZA GENERAL DURANTE LA ACARREOS DE ESCOMBROS, ETC. BANQUETAS TRAZO Y NIVELACIN DE PLAZAS, ANDADORES, BANQUETAS Y PAVIMENTOS, PRIMEROS 10,000 M2 RELLENO COMPACTADO DE TIERRA LIMPIA TRADA DE FUERA DE LA OBRA CIMBRADO Y DESCIMBRADO CON MADERA MADERA DE 3a. ACABADO COMN, EN FRONTERA DE COLADO OBRA INCLUYE

M2

74.98

58.36

91.77

5355.70

185.13

0.00

5,355.70

6,212.61

2,677.85

3,106.31

2,677.85

3,106.30

122.393%

0.00%

100.00%

CON003

M3

11.66

1,429.74

14.27

20,402.39

20,416.66

0.00

20,402.39

23,666.77

10,201.20

11,833.39

10,201.20

11,833.39

122.384%

######## ##########

PICAC006

166.63

6.59

203.94

1,343.96

428.00

0.00

1,343.96

1,558.99

671.98

779.50

671.98

779.49

122.391%

0.000%

100.000%

LIM005 3.000

M2

46.66

5.02

57.10

286.64

343.74

0.00

286.64

332.50

143.32

166.25

143.32

166.25

122.373%

614.316%

736.689%

TRA004

M2

172.19

2.88

248.32

715.16

963.48

0.00

715.16

829.59

357.58

414.81

357.57

414.79

144.211%

415.332%

559.543%

RELL005

M3

17.27

128.06

24.89

3,187.41

3,212.30

0.00

3,187.41

3,697.40

1,593.71

1,848.71

1,593.70

1,848.69

144.123%

######## ##########

CIMB040

M2

9.18

136.45

11.73

1,600.56

1,612.29

0.00

1,600.56

1,856.65

800.28

928.33

800.28

928.33

127.778%

######## ##########

CON003

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES FC= 150 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACIN, INCLUYE: ELABORACIN ,VACIADO, VIBRADO Y CURADO

M3

17.27

1,429.74

24.58

35,143.01

35,167.59

0.00

35,143.01

40,765.89

17,571.51

20,382.96

17,571.50

20,382.94

142.328%

######## ##########

PICAC005

ACABADO ESCOBILLADO SOBRE CONCRETO EN PISOS Y BANQUETAS

M2

172.69

15.16

223.00

3,380.68

3,603.68

0.00

3,380.68 71,415.51

3,921.59 82,841.99

1,690.33 35,707.76 ARQ. JAIME ARNULFO VERA CASILLAS

1,960.79 41,421.05

1,690.34 35,707.74

1,960.80 41,420.98

129.133%

######## 2086.791%

IMPORTE ESTA HOJA 2 : ARQ. FRANCISCO SOTOMAYOR ALVAREZ ARQ. MANUEL SANTIAGO COLOTLA

C. JESUS ARRIAGA ARRIAGA

SUPERINTENDENTE DE CONSTRUCCION PRESENTO

RESIDENTE DE OBRA (Municipio) REVISO

JEFE DE PROGRAMA HABITAT VERIFICO

DIRECTOR DE OBRAS PUBLICAS

AUTORIZO

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014


ESTIMACION No 01( UNO ) FINIQUITO
FONDOS: EJERCICIO FISCAL: Nombre de la Empresa: Programa: No. de Contrato: Importe del Contrato Importe del Anticipo IMPORTE ESTIMADO C/IVA: IMPORTE ACUMULADO C/IVA: IMPORTE POR ESTIMAR C/IVA:
ENRIQUE FRANCISCO SOTOMAYOR CANO

FORTAMUN 2012 Y HABITAT FEDERAL 2012 2012 DEL 04 DE JUNIO DE 2012 AL 13 DE JULIO DE 2012

FECHA:

28-Oct-11 AL

PERIODO DE ESTIMACION: NOMBRE DE LA OBRA: 542,697.56 162,809.27 #REF! #REF! #REF! UBICACIN:

PERIODO DE EJECUCION DE LA OBRA:

04/06/2012

13/07/2012

RAMO 33 Y RAMO 20 IO-821156985-N48-2012 $ $

CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.
NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020

No. DE ESTIMACION:

1 (UNO) FINIQUITO #REF! #REF! #REF!

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

IMPORTE ESTIMADO SIN/IVA: IMPORTE ACUMULADO SIN/IVA:

IMPORTE POR ESTIMAR SIN/IVA:

HOJA
CANTIDAD DE PRESUPUESTO CLAVE PARTIDA Y CONCEPTO UNIDAD CANT P.U. SIN I.V.A CANTIDAD IMPORTE CANTIDAD REAL EJECUTADA ACUM. HASTA ESTA ESTIMACION CANTIDAD POR EJERCER CANTIDAD IMPORTE EN ESTIMACIN IMPORTE EN ESTIMACIN (CON IVA) FONDOS FORTAMUN FORTAMUN C/IVA 50.000000000% 50.000000000% HABITAT FED. HABITA FED. C/IVA

DE
ACUM. ANT. (%)

6
ACUMULADO (%)

AVANCE FINANCIERO POR CONCEPTO ESTA EST. (%)

PICAC006

ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO LIMPIEZA GENERAL DURANTE LA OBRA INCLUYE ACARREOS DE ESCOMBROS, ETC. TERRACERIAS LIMPIA, TRAZO Y NIVELACIN PARA REAS DE A URBANIZAR, INCLUYE LOCALIZACIN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTAS Y MANO DE OBRA EXCAVACIN EN CAJA POR MEDIOS MECNICOS EN TERRENO TIPO I Y II CUALQUIER ZONA, ( CON MOTONIVELADORA ) ACARREO EN CAMIN DE MATERIAL MIXTO. PRIMER KILMETRO, CARGA MECNICA ACARREO EN CAMIN DE MATERIAL MIXTO. KILMETRO SUBSECUENTE, ZONA SUB-URBANA ESCARIFICADO O MOTONIVELADORA RASTREO DE TERRENO CON

345.76

6.59

458.36

3,020.59

1076.83

0.00

3,020.59

3,503.88

1,510.30

1,751.94

1,510.30

1,751.93

100.00%

0.000%

100.000%

LIM005 4.000

M2

172.69

5.02

248.32

1,246.57

1,494.89

0.00

1,246.57

1,446.02

623.29

723.01

623.29

723.00

100.000%

721.854%

821.854%

LIM002

M2

1,266.72

6.67

1,308.43

8,727.23

10,035.66

0.00

8,727.23

10,123.59

4,363.62

5,061.80

4,363.62

5,061.80

99.857%

688.963%

788.820%

EXCA023-2

M3

443.35

10.80

441.65

4,769.82

5,211.47

0.00

4,769.82

5,532.99

2,384.91

2,766.50

2,384.90

2,766.49

100.000%

######## 1175.859%

ACA090 ACA091

M3 M3/KM

576.36 3,458.16

21.38 4.21

574.65 3,447.90

12,286.02 14,515.66

12,860.67 17,963.56

0.00 0.00

12,286.02 14,515.66

14,251.78 16,838.17

6,143.01 7,257.83

7,125.89 8,419.09

6,143.01 7,257.83

7,125.89 8,419.08

100.000% 100.000%

######## 2231.657% 419.751% 519.751%

PAAS020

M3

253.34

2.59

259.62

672.42

932.04

0.00

672.42

780.01

336.20

390.00

336.21

390.02

99.764%

265.422%

365.186%

PAAS011

COMPACTACIN DE TERRENO NATURAL EN CAPAS DE 20 CM DE ESPESOR POR MEDIOS MECNICOS BASE HIDRAULICA CON MATERIAL QUE CUMPLA CON LAS NORMAS VIGENTES DE LA S.C.T. COMPACTADO AL 95% DE SU P.V.S.M. ( P.V.S.M. COMPRENDIDO ENTRE 1,850 A 1,950 KG/CM3 ). INCLUYE AGUA, INCORPORACIN, SUMINISTRO DE MATERIALES, MANO DE OBRA, MAQUINARIA, HERRAMIENTA ( 3.01. 0.3. 073. 03. 074 )

M2

1,266.72

7.74

1,298.42

10,049.77

11,348.19

0.00

10,049.77

11,657.73

5,024.89

5,828.87

5,024.89

5,828.87

99.764%

793.369%

893.133%

PAV002

M3

253.34

210.75

259.68

54,727.56

54,987.24

0.00

54,727.56

63,483.97

27,363.78

31,741.99

27,363.78

31,741.99

99.764%

######## ##########

PAAS022

BARRIDO A MANO DE LA SUPERFICIE A TRATAR

M2

1,266.72

0.28

1,298.42

363.56

1,661.98

0.00

363.56 110,379.20

421.73 128,039.87

181.78 55,189.61 ARQ. JAIME ARNULFO VERA CASILLAS

210.86 64,019.95

181.78 55,189.61

210.88 64,019.95

99.857%

28.701%

128.558%

IMPORTE ESTA HOJA 3 : ARQ. FRANCISCO SOTOMAYOR ALVAREZ ARQ. MANUEL SANTIAGO COLOTLA

C. JESUS ARRIAGA ARRIAGA

SUPERINTENDENTE DE CONSTRUCCION PRESENTO

RESIDENTE DE OBRA (Municipio) REVISO

JEFE DE PROGRAMA HABITAT VERIFICO

DIRECTOR DE OBRAS PUBLICAS

AUTORIZO

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014


ESTIMACION No 01( UNO ) FINIQUITO
FONDOS: EJERCICIO FISCAL: Nombre de la Empresa: Programa: No. de Contrato: Importe del Contrato Importe del Anticipo IMPORTE ESTIMADO C/IVA: IMPORTE ACUMULADO C/IVA: IMPORTE POR ESTIMAR C/IVA:
ENRIQUE FRANCISCO SOTOMAYOR CANO

FORTAMUN 2012 Y HABITAT FEDERAL 2012 2012 DEL 04 DE JUNIO DE 2012 AL 13 DE JULIO DE 2012

FECHA:

28-Oct-11 AL

PERIODO DE ESTIMACION: NOMBRE DE LA OBRA: 542,697.56 162,809.27 #REF! #REF! #REF! UBICACIN:

PERIODO DE EJECUCION DE LA OBRA:

04/06/2012

13/07/2012

RAMO 33 Y RAMO 20 IO-821156985-N48-2012 $ $

CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.
NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020

No. DE ESTIMACION:

1 (UNO) FINIQUITO #REF! #REF! #REF!

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

IMPORTE ESTIMADO SIN/IVA: IMPORTE ACUMULADO SIN/IVA:

IMPORTE POR ESTIMAR SIN/IVA:

HOJA
CANTIDAD DE PRESUPUESTO CLAVE PARTIDA Y CONCEPTO UNIDAD CANT P.U. SIN I.V.A CANTIDAD IMPORTE CANTIDAD REAL EJECUTADA ACUM. HASTA ESTA ESTIMACION CANTIDAD POR EJERCER CANTIDAD IMPORTE EN ESTIMACIN IMPORTE EN ESTIMACIN (CON IVA) FONDOS FORTAMUN FORTAMUN C/IVA 50.000000000% 50.000000000% HABITAT FED. HABITA FED. C/IVA

DE
ACUM. ANT. (%)

6
ACUMULADO (%)

AVANCE FINANCIERO POR CONCEPTO ESTA EST. (%)

ADMA004

ADQUISICIN DE MATERIALES ASFLTITICOS C) EMULSIONES ASFLTICAS. 1) EMULSIN ASFLTICA ECR65 RIEGO A) RIEGO DE IMPREGNACIN 1) EMULSIN ASFLTICA PARA IMPREGNACIN ACARREOS DE LOS MATERIALES ASFLTICOS ( INCISO 0.85-H.03 ). DEL ALMACENAMIENTO AL LUGAR DE LA UTILIZACIN, MEDIDOS EN LOS VEHCULOS DE TRANSPORTE O EN LOS ENVASES: B) KILMETROS SUSECUENTES POREO CON ARENA PARA PROTECCIN DE EMULSIN

L L

1,900.08 1,900.08

8.89 0.45

1,947.63 1,947.63

17,314.43 876.43

0 0

RIEGOIMPREG 001 ACA003

M3/KM

218.51

5.07

223.98

1135.58

8113.37

0.00

1,135.58

1,317.27

567.78

658.62

567.79

658.65

99.857%

0.000%

99.857%

PIADC007

M2

1,266.72

2.70

1,298.43

3,505.76

4,804.19

0.00

3,505.76

4,066.69

1,752.88

2,033.33

1,752.88

2,033.36

99.856%

276.759%

376.615%

4.020

CARPETA ASFLTICA

PAAS022

BARRIDO A MANO DE LA SUPERFICIE A TRATAR

M2

1,266.72

0.28

1,298.43

363.56

1,661.99

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

28.701%

28.701%

ADMA003

ADQUISICIN DE MATERIALES ASFLTITICOS C) EMULSIONES ASFLTICAS. 1) EMULSIN ASFLTICA ECR65

1,266.72

9.48

1,298.43

12,309.12

0.00

0.00

12,309.12

14,278.58

0.00

0.00

0.00

0.00

0.000%

971.732%

971.732%

RIEGOLIGA001

RIIEGO O APLICACIN DE LAS EMULSIONES ASFLTICAS B) RIEGO DE LIGA 1) EMULSIN ASFLTICA ACARREOS DE LOS MATERIALES ASFLTICOS ( INCISO 0.85-H.03 ). DEL ALMACENAMIENTO AL LUGAR DE LA UTILIZACIN, MEDIDOS EN LOS VEHCULOS DE TRANSPORTE O EN LOS ENVASES: B) KILMETROS SUSECUENTES CARPETA DE CONCRETO ASFLTICO ELABORADA A BASE DE MATERIAL PTREO ( 3/4" A FINOS ) Y AC-20 DE 6.00 CM DE ESPESOR COMPACTO ( SIN RIEGOS ) ACARREO EN CAMIN DE MATERIAL MIXTO, PRIMER KILOMETRO , CARGA MECANICA ACARREO EN CAMIN SUBSECUENTE CARRETERA MIXTO, KILMETRO

1,266.72

0.45

1,298.43

584.29

1,882.72

0.00

584.29

677.78

0.00

0.00

0.00

0.00

0.000%

46.126%

46.126%

ACA003

M3/KM

145.67

5.07

149.32

757.05

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

519.702%

519.702%

CARP006

M2

1,266.72

160.10

1,303.05

208,618.31

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

######## ##########

ACA090 ACA093

M3 M3/KM

95.00 10,925.00

21.38 1.75

97.73 11,238.95

2,089.47 19,668.16

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

######## 2199.442% 180.029%

3060 18

INCREMENTO O RENIVELACIN DE POZO DE VISITA TIPO COMN O ESPECIAL POR CADA 25 CM NO INCLUYE SUMINISTRO Y COLOCACIN DE BROCAL Y TAPA SUMINISTRO Y COLOCACIN DE BROCAL Y TAPA DE POLIETILENO MEDIA DENSIDAD, CON MORTERO DE CEMENTO-ARENA DE 1:4 CONSTRUCCIN DE DENTELLN TRANSVERSAL PARA CONFINAMIENTO DE ADOQUN O CONCRETO A BASE DE CONCRETO SIMPLE FC= 150 KG/CM2 CON UNA SECCIN DE 15X40 CM A CADA 8.00 M INCLUYE: EXCAVACIN, CIMBRA, ACARREO DEL MATERIAL, SOBRANTE HASTA 20 M

INC

2.00

709.14

5.00

3,545.70

0.00

########

BROCA002

PZA

2.00

1,565.44

5.00

7,827.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

######## ##########

DENT001

71.69

181.75

34.67

6,301.27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

######## 8789.608%

IMPORTE ESTA HOJA 4 : ARQ. FRANCISCO SOTOMAYOR ALVAREZ

0.00 0.00 ARQ. MANUEL SANTIAGO COLOTLA

17,534.75

20,340.32

2,320.66 ARQ. JAIME ARNULFO VERA CASILLAS

2,691.95

2,320.67

2,692.01 C. JESUS ARRIAGA ARRIAGA

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (Municipio)

JEFE DE PROGRAMA HABITAT

DIRECTOR DE OBRAS PUBLICAS

PRESENTO

REVISO

VERIFICO

AUTORIZO

H. AYUNTAMIENTO CONSTITUCIONAL TEHUACAN, PUE. 2011 - 2014


ESTIMACION No 01( UNO ) FINIQUITO
FONDOS: EJERCICIO FISCAL: Nombre de la Empresa: Programa: No. de Contrato: Importe del Contrato Importe del Anticipo IMPORTE ESTIMADO C/IVA: IMPORTE ACUMULADO C/IVA: IMPORTE POR ESTIMAR C/IVA:
ENRIQUE FRANCISCO SOTOMAYOR CANO

FORTAMUN 2012 Y HABITAT FEDERAL 2012 2012 DEL 04 DE JUNIO DE 2012 AL 13 DE JULIO DE 2012

FECHA:

28-Oct-11 AL

PERIODO DE ESTIMACION: NOMBRE DE LA OBRA: 542,697.56 162,809.27 #REF! #REF! #REF! UBICACIN:

PERIODO DE EJECUCION DE LA OBRA:

04/06/2012

13/07/2012

RAMO 33 Y RAMO 20 IO-821156985-N48-2012 $ $

CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.
NO. OBRA R33: 12011 NO. OBRA R20: 211561ME020

No. DE ESTIMACION:

1 (UNO) FINIQUITO #REF! #REF! #REF!

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

IMPORTE ESTIMADO SIN/IVA: IMPORTE ACUMULADO SIN/IVA:

IMPORTE POR ESTIMAR SIN/IVA:

HOJA
CANTIDAD DE PRESUPUESTO CLAVE PARTIDA Y CONCEPTO UNIDAD CANT P.U. SIN I.V.A CANTIDAD IMPORTE CANTIDAD REAL EJECUTADA ACUM. HASTA ESTA ESTIMACION CANTIDAD POR EJERCER CANTIDAD IMPORTE EN ESTIMACIN IMPORTE EN ESTIMACIN (CON IVA) FONDOS FORTAMUN FORTAMUN C/IVA 50.000000000% 50.000000000% HABITAT FED. HABITA FED. C/IVA

DE
ACUM. ANT. (%)

6
ACUMULADO (%)

AVANCE FINANCIERO POR CONCEPTO ESTA EST. (%)

6.000

SEALIZACIN SUMINISTRO Y APLICACIN DE PINTURA TIPO TRAFICO MCA. COMEX COLOR AMARILLO EN GUARNICIONES DE 30 CM. DE DESARROLLO. INCLUYE: LIMPIEZA Y DESPERDICIOS, MATERIALES, MANO DE OBRA Y HERRAMIENTA.: RAYA PARA CRUCE PEATONAL DE 60 CM DE ANCHO CON PINTURA TIPO TRANSITO MCA. COMEX COLOR AMARILLO.

PINT068

313.09

22.31

329.99

7362.08

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

0.000%

0.000%

PAAS023

128.40

128.40

128.04

16440.34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

0.000%

0.000%

PINDISC12

PINTURA DE RAYA DISCONTINUA DE 12 CM

93.31

7.36

104.22

767.06

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

0.000%

0.000%

090-E.01A

SEAL RESTRICTIVA SR-6

PZA

4.00

1,216.16

4.00

4864.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

0.000%

0.000%

090-D.01C

SEAL PREVENTIVA DE LA SP-26 A LA SP-40 DE 0.71X0.71

PZA

4.00

1,216.16

4.00

4864.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.000%

######## ##########

IMPORTE ESTA HOJA 6:

0.00

0.00

0.00

0.00

0.00

0.00

RESIDENTE DE OBRA (Municipio) REVISO SUPERINTENDENTE DE CONSTRUCCION PRESENTO SUMAS HOJAS : 1 - 2 - 3-4-5 AMORTIZACION ANTICIPO 30% SUBTOTAL 16 % I.V.A. TOTAL ESTIMACION: RETENCION 5 AL MILLAR TOTAL A FACTURAR EN ESTIMACION No. 1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

JEFE DE PROGRAMA HABITAT VERIFICO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

DIRECTOR DE OBRAS PUBLICAS

AUTORIZO
#REF! #REF! #REF! #REF! #REF! #REF!

ARQ. LUIS CASILLAS CASTELLANOS

RQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME VERA CASILLAS

C. JESUS ARRIAGA ARRIAGA

SUPERINTENDENTE DE CONSTRUCCION PRESENTO

RESIDENTE DE OBRA (Municipio) REVISO

JEFE DE PROGRAMA HABITAT VERIFICO

DIRECTOR DE OBRAS PUBLICAS

AUTORIZO

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 12011 RAMO 11092 IO-821156985-N48-2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20:

RAMO 20: 211561ME034 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01 ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LONG. ACARREO
FACTOR PIEZAS

SUBTOTAL

TOTAL

CROQUIS/OBS.

1.000
TAL002

PRELIMINARES
TALA DE ARBOL DE 0.76 A 1.50 M. DE PERIMETRO ( CORTADO A 1.00 M DEL NIVEL DEL TERRENO ) PZA 3.00 3.00 TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

3.00 1.00 3.00 0.00

EXT002

EXTRACCIN DE TOCONES DE 0.76 A 1.50 M DE PERIMETRO INCLUYE DESENRAICE

PZA

3.00

3.00 TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

3.00 1.00 3.00 0.00

DEM006 DEMOLICIN A MANO DE CONCRETO SIMPLE EN GUARNICIONES

M3

LADO NORTE ENTRE ALVARO OBREGON Y LAZARO C.ALLE LAZARO C.

2.72 1.86 48.09

LADO NORTE ENTRE LAZARO C. Y 5 NORTE

1.19 26.43 2.56 1.58

LADO SUR ENTRE ALVARO O. Y 5 NORTE LADO NORTE ENTRE 5 NORTE Y MIGUEL HIDALGO LADO SUR ENTRE 5 NORTE Y MIGUEL HIDALGO

12.00

10.00

106.43

0.07

7.45

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR SUPERINTENDENTE DE CONSTRUCCION RESIDENTE DE OBRA (MUNICIPIO)

7.45 2.10 7.45 0.00


JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 12011 RAMO 11092 IO-821156985-N48-2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20:

RAMO 20: 211561ME034 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01 ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LONG. ACARREO
FACTOR PIEZAS

SUBTOTAL

TOTAL

CROQUIS/OBS.

1000 03 RUPTURA Y DEMOLICIN A MANO DE CONCRETO SIMPLE EN BANQUETAS

M2 LADO NORTE
ENTRE ALVARO OBREGON Y 5 NORTE

LARGO

ANCHO 2.66 4.30 1.77 A= AXB/2 1.90X1.86/2=1.77 2.31+1.36=3.67/2=1.84

3.1416 X ( 1.84 )2 / 4 = 2.31 1.86

1.12

38.09

42.66 0.93 8.80


1.06+1.12=2.18/2=1.09

3.1416 X ( 1.09 )2 / 4 = 8.00 1.10

LADO SUR
ENTRE ALVARO OBREGON Y 5 NORTE

3.1416 X ( 1.55)2 / 4 =

1.89

1.30+1.79=3.09/2=1.55

5.84 4.38 2.66 1.97

1.30 1.36 0.96 0.61 1.64

7.59 5.96 2.55 1.20 19.68 1.62+1.65=3.27/2=1.64

LADO NORTE
ENTRE 5 NORTE Y MIGUEL HIDALGO

12.00

LADO SUR
ENTRE 5 NORTE Y MIGUEL HIDALGO

10.00

1.65

16.50 116.49 -0.33 -0.23 -0.19 0.071 2.00 -0.14

1.70+1.59=3.29/2=1.65

MENOS REGISTROS

0.48 0.34 0.55 PI X r2 =

0.68 0.69 0.35

MENOS OSTES C.F.E.

3.1416 x ( 0.15 )2 =

115.60
TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

115.60 55.18 115.60 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 12011 RAMO 11092 IO-821156985-N48-2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20:

RAMO 20: 211561ME034 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01 ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LONG. ACARREO
FACTOR PIEZAS

SUBTOTAL

TOTAL

CROQUIS/OBS.

ACA090

ACARREO EN CAMIN DE MATERIAL MIXTO PRIMER KILOMETRO CARGA MECANICA

M3

DIAMETRO 0.46

PI 3.1416

RADIO 0.23

AREA 0.17

ALTURA 1.50 1.30 1.30

PZAS 3.00 3.00

SUBTOTAL 0.77 19.34 9.69 15.03 TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR FOLLAJE-MENOS 50% DE ABUNDAMIENTO TOCN

FOLLAJE+TOCON=17.92 M3 GUARNICION BANQUETAS

4.96 7.45 115.60 0.10

1.30

44.83 44.83 16.35 44.83 0.00

ACA091 ACARREO EN CAMIN DE MATERIAL KILOMETRO SUBSECUENTE ZONA URBANA MIXTO

M3/KM

44.83

6.00

268.98

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

268.98 98.10 268.98 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 12011 RAMO 11092 IO-821156985-N48-2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20:

RAMO 20: 211561ME034 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01 ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LONG. ACARREO
FACTOR PIEZAS

SUBTOTAL

TOTAL

CROQUIS/OBS.

2.000
TRA004

GUARNICIONES
M2 TRAZO Y NIVELACIN DE PLAZAS, ANDADORES, BANQUETAS Y PAVIMENTOS, PRIMEROS 10,000 M2 2.72 1.86 30.00 8.09 1.19 26.43 2.56 1.58 30.00 30.00 12.07 1.68 14.04 0.64 3.85 3.06 15.97 2.80 15.40 203.94 0.28 57.10

LADO NORTE ENTRE ALVARO OBREGON Y 5 NORTE LADO SUR

LADO ORIENTE ENTRE 5 NORTE Y MIGUEL HIDALGO

LADO SUR

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

57.10 46.66 57.10 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 12011 RAMO 11092 IO-821156985-N48-2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20:

RAMO 20: 211561ME034 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01 ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE EXCA001 CONCEPTO UNIDAD M3 CADENAMIENTO 203.94 LARGO 0.28 ANCHO ALTO 0.30 LONG. ACARREO
FACTOR PIEZAS

SUBTOTAL 17.13

TOTAL

CROQUIS/OBS.

EXCAVACIN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO. MATERIAL COMN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A 2.00 M

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

17.13 14.00 17.13 0.00

RELL004

RELLENO Y COMPACTACIN EEN CIMENTACIN EN CAPAS DE 20 CM. CON PISON DE MANO UTILIZANDO EL MATERIAL PRODUCTO DE EXCAVACIN , INCLUYE: TRASPALEOS AGUA PARA HOGENEIZAR EL MATERIAL , HERRAMIENTA, MANO DE OBRA Y ACARREOS, MATERIAL MEDIDO EN SITIO.

M3

203.94

0.12

0.30

7.34

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

7.34 6.00 7.34 0.00

CIMB039

CIMBRADO Y DESCIMBRADO CON CHAROLAS MTALICAS, A DOS CARAS

M2

203.94

0.45

91.77

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

91.77 74.98 91.77 0.00

CON003

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES FC= 150 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACIN, INCLUYE: ELABORACIN , VACIADO, VIBRADO Y CURADO.

M3

203.94

0.07

14.27

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

14.27 11.66 14.27 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 12011 RAMO 11092 IO-821156985-N48-2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20:

RAMO 20: 211561ME034 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01 ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE PICAC006 CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LONG. ACARREO
FACTOR PIEZAS

SUBTOTAL

TOTAL

CROQUIS/OBS.

ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO

203.94

203.94

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

203.94 166.63 203.94 0.00

LIM005

LIMPIEZA GENERAL DURANTE LA OBRA INCLUYE ACARREOS DE ESCOMBROS, ETC.

M2

203.94

0.28

57.10

TOTAL PROYECTO EST 1 FINIQUITO POR COBRAR

57.10 46.66 57.10 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LADO NORTE M2 ENTRE ALVARO O. Y 5 NORTE LARGO PI X r2 / 4 = BXA/2= 2.31 30.00 8.09 PI X r2 / 4 = PI X r2 / 4 = 26.43 PI X r2 / 4 = LADO NORTE ENTRE ALVARO O. Y 5 NORTE PI X r2 / 4 = 30.00 30.00 12.07 PI X r2 / 4 = 14.04 LADO NORTE ENTRE 5 NORTE Y MIGUEL HIDALGO 0.64 13.85 PI X r2 / 4 = 15.97 LADO SUR ENTRE 5 NORTE Y MIGUEL HIDALGO PI X r2 / 4 = 15.40 1.66 1.63 0.87 0.58 1.00 3.1416( 1.63)/4= 1.65 3.1416( 1.62)/4= 1.58 1.62 1.64 1.09 1.86 1.12 1.12 3.1416( 1.09)2/4= 3.1416( 1.09)2/4= 1.06 3.1416( 1.21)2/4= 3.1416( 1.55)2/4= 1.30 1.07 1.07 1.02 3.1416( 0.95)2/4= 0.89 1.05 0.88 1.07 1.19 1.08 A-1 A-2 3.1416( 1.84 )2/4= 1.90X1.86/2= 1.86 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL 2.66 1.86 4.30 33.60 9.06 0.93 0.93 28.54 1.50 1.89 35.70 32.10 12.67 0.71 12.36 0.37 13.85 2.09 26.19 2.06 24.95 248.32 1.66+1.57=3.23/2=1.62 1.62+1.63=3.25/2=1.63 1.02+0.87=1.89/2=0.95 1.06+1.36=2.42/2=1.21 1.30+1.79=3.09/2=1.55 1.12+1.06=2.18/2=1.09 1.09+1.09=2.18/2=1.09 TOTAL CROQUIS/OBS. 1.36+2.31=3.67/2=1.84

3.000
TRA004

BANQUETAS
TRAZO Y NIVELACION DE PLAZZAS, ANDADORES, BANQUETAS Y PAVIMENTOS, PRIMEROS 10,000 M2

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

248.32 172.69 248.32 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE RELL005 CONCEPTO RELLENO COMPACTADO DE TIERRA IMPIA TRAIDA DE FUERA DE LA OBRA UNIDAD M3 LADO NORTE ENTRE ALVARO O. Y 5 NORTE PI X r2 / 4 = BXA/2= 2.31 30.00 8.09 PI X r2 / 4 = PI X r2 / 4 = 26.43 PI X r2 / 4 = LADO NORTE ENTRE ALVARO O. Y 5 NORTE PI X r2 / 4 = 30.00 30.00 12.07 PI X r2 / 4 = 14.04 0.64 13.85 PI X r2 / 4 = 15.97 1.86 1.12 1.12 3.1416( 1.09)2/4= 0.93 3.1416( 1.09)2/4= 0.93 1.09 1.06 3.1416( 1.21)2/4= 1.15 3.1416( 1.55)2/4= 1.89 1.30 1.07 1.07 1.07 1.02 3.1416( 0.95)2/4= 0.71 0.87 0.58 1.00 3.1416( 1.63)/4= 2.09 1.63 1.65 1.64 0.89 1.19 1.05 0.88 1.08 3.1416( 1.84 )2/4= 2.66 1.90X1.86/2= 1.86 4.30 33.6 9.06 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.27 0.19 0.43 3.36 0.91 0.09 0.09 2.85 0.12 0.19 3.57 3.21 1.27 0.07 1.24 0.37 1.39 0.21 2.61 CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

LADO NORTE M3 ENTRE 5 NORTE Y MIGUEL HIDALGO

LADO SUR ENTRE 5 NORTE Y MIGUEL HIDALGO MENOS REGISTROS

PI X r2 / 4 = 15.40 0.48 0.34 0.55 0.49 0.47 0.55 0.20

3.1416( 1.62)/4= 2.06 1.66 0.68 0.69 0.35 0.35 0.45 0.35 0.30 1.58 1.62

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

0.21 2.49

25.14
-0.03 -0.02 -0.02 -0.02 -0.02 -0.02 -0.006

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

MENOS JARDINERAS

0.72 0.58

0.61 0.55 0.071 2.00

0.10 0.10 0.10 0.10

-0.04 -0.03 -0.03 -0.01 TOTAL

MENOS POSTES DE C.F.E

PI X r2 =

0.53 0.61 3.1416 x ( 0.15 )2 =

24.89 24.89 17.27 24.89 0.00

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

CIMB040 CIMBRADO Y DESCIMBRADO CON MADERA DE 3a. ACABADO COMN, EN FRONTERA DE COLADO

M2

LADO NORTE

LONGITUD 2.31 30.00 8.09 26.43 30.00 30.00 12.07 14.04 0.64 13.85 15.97 15.40 198.8/2=99.40 99.40

A-1 1.86 1.12 1.12 1.09 1.30 1.07 1.07 0.87 0.58 1.00 1.63 1.66

A-2

ANCHO PROM. 1.86 1.12

1.06 1.07 1.02 0.89

1.65 1.58

1.12 1.08 1.19 1.07 1.05 0.88 0.58 1.00 1.64 1.62 14.21/12=1.18 1.18 0.10 11.73 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

11.73 9.18 11.73 0.00


JEFE DE PROGRAMA HABITAT

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

CON003

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES FC= 150 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACIN, INCLUYE: ELABORACIN , VACIADO, VIBRADO Y CURADO.

M3

LADO NORTE

PI X r2 / 4 =

3.1416( 1.84 )2/4=

2.66

ENTRE ALVARO O. Y 5 NORTE

BXA/2= 2.31 30.00 8.09 PI X r2 / 4 = PI X r2 / 4 = 26.43 PI X r2 / 4 = 1.09 1.86 1.12 1.12

1.90X1.86/2= 1.86

1.86 4.30 33.60 9.06

3.1416( 1.09)2/4= 3.1416( 1.09)2/4= 1.06 3.1416( 1.21)2/4= 3.1416( 1.55)2/4= 1.30 1.07 1.07 0.87 0.58 1.00 3.1416( 1.63)/4= 1.63 1.65 3.1416( 1.62)/4= 1.66 1.58 1.62 1.64 1.07 1.02 3.1416( 0.95)2/4= 0.89 1.19 1.05 0.88 1.08

0.93 0.93 28.54 1.50 1.89 35.70 32.10 12.67 0.71 12.36 0.37 13.85 2.09 26.19 2.06 24.95 248.32

LADO NORTE ENTRE ALVARO O. Y 5 NORTE

PI X r2 / 4 = 30.00 30.00 12.07 PI X r2 / 4 = 14.04 0.64 13.85 PI X r2 / 4 = 15.97 PI X r2 / 4 = 15.40

LADO NORTE ENTRE 5 NORTE Y MIGUEL HIDALGO

LADO SUR ENTRE 5 NORTE Y MIGUEL HIDALGO

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

248.32 MENOS REGISTROS 0.48 0.34 0.55 0.49 0.47 0.55 0.20 MENOS JARDINERAS 0.72 0.58 0.53 MENOS POSTES DE C.F.E PI X r2 = 0.68 0.69 0.35 0.35 0.45 0.35 0.30 0.61 0.55 0.61 0.071 2.00

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

24.83 -0.03 -0.02 -0.02 -0.02 -0.02 -0.02 -0.006 -0.04 -0.03 -0.03 -0.01 TOTAL

3.1416 x ( 0.15 )2 =

24.58

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

24.58 17.27 24.58 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE PICAC005 CONCEPTO UNIDAD M2 CADENAMIENTO LADO NORTE LARGO A-1 A-2
AREA/ PIEDRA

ANCHO PROMEDIO

FACTOR PIEZAS

SUBTOTAL

TOTAL

CROQUIS/OBS.

ACABADO ESCOBILLADO SOBRE CONCRETO EN PISOS Y BANQUETAS

LONGITUD A. PROM.

VUELTA 3.1416( 1.79)2/4= 2.52 BXA/2= 2.31 30.00 6.00 2.09 1.85X1.81/2= 1.67 1.86 1.12 1.12 1.12 2.26X1.76=3.98 1.07X1.90= 2.03 1.07X1.90= 2.03 1.07X1.99=2.13

1.00 1.00 1.00 15.00 3.00 1.00 1.00 1.00 12.00 1.00 1.00 1.00 15.00 15.00 5.00 1.00 1.00 6.00 1.00 1.00 6.00 1.00 1.00

2.52 1.67 3.98 30.45 6.09 2.13 0.85 0.93 23.52 2.40 1.06 1.77 32.55 29.10 9.50 1.97 0.28 9.48 1.61 0.31 10.86 1.66 1.96 21.14 2.97 1.94 20.86 2.04 TOTAL

2.26+1.31=3.91/2=1.79

PI X r2 / 4 = 3.1416( 1.04)2/4= 0.85 PI X r2 / 4 = 3.1416( 1.09)2/4= 0.93 24.00 2.43 1.08 1.08 1.03X1.90=1.96 1.03X2.33= 2.40

1.01+1.07=2.08/2=1.04 1.04+1.14=2.18/2=1.09 1.31+1.01=2.32/2=1.16 1.25+1.74=2.99/2=1.50

PI X r2 / 4 = 3.1416( 1.16)2/4= 1.06 PI X r2 / 4 = 3.1416( 1.50)2/4= 1.77 30.00 30.00 10.00 2.07 12.00 2.04 0.64 12.00 1.85 1.62 1.19 1.07 1.05 1.05 0.88 0.88 0.58 1.00 1.00 1.14X1.90=2.17 1.02X1.90=1.94 1.00X1.90=1.90 1.00X1.97=1.97 0.83X1.9001.58 0.83X1.94=1.61 0.59X0.53=0.31 0.95X1.90=1.81 0.95X1.75= 1.66 1.59X1.90=3.02 1.59X1.87=2.97 1.57X1.90=2.98 1.57X1.30=2.04

PI X r2 / 4 = 3.1416( 0.90)2/4=0.28

0.82+0.97=1.79/2=0.90

PI X r2 / 4 = 3.1416( 1.58)/4= 1.96 15.40 14.00 1.97 14.00 1.40 1.64 1.64 1.62 1.62

1.57+1.58=3.15/2=1.58

7.00 1.00 1.00 7.00 1.00

PI X r2 / 4 = 3.1416( 1.57)/4= 1.94

1.61+1.5203.13/2=1.57

225.60

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

MENOS REGISTROS

0.48 0.34 0.55 0.49 0.47 0.55 0.20

0.68 0.69 0.35 0.35 0.45 0.35 0.30 0.61 0.55 0.61 0.071 2.00

-0.33 -0.23 -0.19 -0.17 -0.21 -0.19 -0.060 -0.44 -0.32 -0.32 -0.14 TOTAL

MENOS JARDINERAS

0.72 0.58 0.53

MENOS POSTES DE C.F.E

PI X r2 =

3.1416 x ( 0.15 )2 =

223.00

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

223.00 172.69 223.00 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE PICAC006 CONCEPTO UNIDAD M LADO NORTE CADENAMIENTO LARGO LONGITUD VUELTA 2.31 30.00 6.00 2.09 VUELTA VUELTA 24.00 2.43 VUELTA VUELTA 30.00 30.00 10.00 2.07 VUELTA 12.00 2.04 0.64 12.00 1.85 VUELTA 14.00 1.97 VUELTA 14.00 1.40 1.62 1.62 1.64 1.64 0.88 0.88 0.58 1.00 1.00 1.19 1.07 1.05 1.05 1.08 1.08 1.86 1.12 1.12 1.12 A-1 A. PROM. A-2 LONG. PIEDRA 6.29 4.14 4.14 4.14 4.18 2.08 3.27 4.06 4.49 4.88 4.57 4.28 4.04 4.00 4.15 3.47 3.76 3.80 1.70 3.90 3.75 5.93 5.18 5.15 5.93 5.14 4.54 1.00 1.00 15.00 3.00 1.00 1.00 1.00 12.00 1.00 1.00 1.00 15.00 15.00 5.00 1.00 1.00 6.00 1.00 1.00 6.00 1.00 1.00 7.00 1.00 1.00 7.00 1.00 6.29 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS. DESARROLLO DE LONGITUD DE PIEDRA 3 LADOS 2.26+1.31+2.72=6.29 1.07+1.07+2.00=4.14 1.07+1.07+2.00=4.14 1+07+1.07+2=4.14 1.07+1.07+2.04=4.18 1.01+1.07=2.08 1.04+1.04+1.19=3.27 1.03+1.03+2.00=4.06 1.03+1.03+2.43=4.49 1.31+1.01+2.56=4.88 1.25+1.74+1.58=4.57 1.14+1.14+2.00=4.28 1.02+1.02+2.00=4.04 1.00+1.00+2=4.00 1.04+1.04+2.07=4.15 0.97+0.82+1.68=3.47 0.88+0.88+2=3.76 0.88+0.88+2.04=3.80 0.53+0.53+0.64=1.70 0.95+0.95+2.00=3.90 0.95+0.95+1.85=3.75 1.61+1.52+2.80=5.93 1.59+1.59+2.00=5.18 1.59+1.59+1.97=5.15 1.61+1.52+2.80=5.93 1.57+1.57+2.00=5.14 1.57+1.57+1.40=4.54

ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO.

4.14 62.10 12.42 4.18 2.08 3.27 48.72 4.49 4.88 4.57 64.20 60.60 20.00 4.15 3.47 22.56 3.80 1.70 23.40 3.75 5.93 36.26 5.15 5.93 35.98 4.54 TOTAL HOJA 1

458.56

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

RAMO 20: RAMO 20:

211561ME006 211561ME037

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

DE

NUMEROS GENERADORES
CLAVE PICAC006 CONCEPTO UNIDAD M TOTAL HOJA 1 CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO.

458.56

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

458.56 345.76 458.56 0.00

LIM005

LIMPIEZA GENERAL DURANTE LA OBRA INCLUYE ACARREOS DE ESCOMBROS, ETC.

M2

IDEM A TRA004

248.32

248.32

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

248.32 172.69 248.32 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO 0+000 A 0+020 M2 0+020 A 0+040 0+040 A 0+060 0+060 A0+74.86 0+000 A 0+023.13 0+000 A 0+020 0+020 A 0+040 0+040 A 0+55.60 0+55.60 A 0+62.40 LARGO 20.00 20.00 20.00 14.86 1.52 23.13 20.00 20.00 15.60 6.80 A-1 7.94 7.93 7.96 7.93 8.00 8.29 8.35 8.36 A-2 7.93 7.96 7.93 7.91 7.90 8.35 8.36 8.37 ANCHO PROMEDIO 7.94 7.95 7.95 7.92 5.90 7.95 8.32 8.36 8.37 8.37 FACTOR PIEZAS SUBTOTAL 158.80 159.00 159.00 117.69 8.97 183.88 166.40 167.20 130.57 56.92 1308.43 1308.43 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR EXCA023-2 M3 0+000 A 0+020 0+020 A 0+040 0+040 A 0+060 0+060 A0+74.86 0+000 A 0+023.13 0+000 A 0+020 0+020 A 0+040 0+040 A 0+55.60 0+55.60 A 0+62.40 20.00 20.00 20.00 14.86 1.52 23.13 20.00 20.00 15.60 6.80 TOTAL CROQUIS/OBS.

4.000
LIM002

PRELIMINARES
LIMPIA, TRAZO Y NIVELACIN PARA REAS DE A URBANIZAR, INCLUYE: LOCALIZACIN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.

1,308.43 1,266.72 1,308.43 0.00

EXCAVACIN EN CAJA POR MEDIOS MECNICOS EN TERRENO TIPO I Y II CUALQUIER ZONA, ( CON MOTONIVELADORA )

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

441.65 443.35 441.65 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE ACA090 CONCEPTO UNIDAD M3 441.65 1.30 574.15 CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

ACARREO EN CAMIN DE MATERIAL MIXTO, PRIMER KILMETRO, CARGA MECNICA

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR ACA091 ACARREO EN CAMIN DE MATERIAL MIXTO KILMETRO SUBSECUENTE, ZONA URBANA M3/KM IDEM A ACA090 574.65 6.00 3447.90 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR PAAS020 ESCARIFICADO O RASTREO DE TERRENO CON MOTONIVELADORA M3 IDEM A LIM002 1308.43 0.20 261.69

574.65 576.36 574.65 0.00

3,447.90 3,458.16 3,447.90 0.00

MENOS POZO DE VISITA MAXCOM MENOS POZO DE VISITA MENOS REGISTRO MAXCOM MENOS REGISTRO AGUA

3.1416 ( 0.38 )2= 0.45 3.1416 ( 0.38 )2= 0.45 2.07 1.27 2.50 1.32

0.20 0.20 0.20 0.20

2.00 5.00 1.00 1.00

-0.18 -0.45 -1.04 -0.34

259.68

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

259.68 253.34 259.68 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE PAAS011 CONCEPTO UNIDAD M2 IDEM A LIM002 1308.43 1308.43 CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

COMPACTACIN DE TERRENO NATURAL EN CAPAS DE 20 CM DE ESPESOR POR MEDIOS MECANICOS

MENOS POZO DE VISITA MAXCOM MENOS POZO DE VISITA MENOS REGISTRO MAXCOM MENOS REGISTRO AGUA

3.1416 ( 0.38 )2= 0.45 3.1416 ( 0.38 )2= 0.45 2.07 1.27 2.50 1.32

2.00 5.00 1.00 1.00

-0.90 -2.25 -5.18 -1.68 1298.42

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,298.42 1,266.72 1,298.42 0.00

BASE-001

BASE HIDRAULICA CON MATERIAL QUE CUMPLA CON LAS NORMAS VIGENTES DE LA S.C.T. COMPACTADO AL 95% DE SU P.V.S.M. ( P.V.S.M. COMPRENDIDO ENTRE 1,850 A 1,950 KG/CM3 ). INCLUYE AGUA, INCORPORACIN, SUMINISTRO DE MATERIALES, MANO DE OBRA, MAQUINARIA, HERRAMIENTA ( 3.01. 0.3. 073. 03. 074 )

M3

IDEM A PAAS011

1,308.43

0.20

261.69

MENOS POZO DE VISITA MAXCOM MENOS POZO DE VISITA MENOS REGISTRO MAXCOM MENOS REGISTRO AGUA

3.1416 ( 0.38 )2= 0.45 3.1416 ( 0.38 )2= 0.45 2.07 1.27 2.50 1.32

0.20 0.20 0.20 0.20

2.00 5.00 1.00 1.00

-0.18 -0.45 -1.04 -0.34

259.68
TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

259.68 253.34 259.68 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE PAAS022 CONCEPTO UNIDAD M2 CADENAMIENTO IDEM A PAAS022 LARGO 1298.42 A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL 1,298.42 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR TOTAL CROQUIS/OBS.

BARRIDO A MANO DE LA SUPERFICIE POR TRATAR POR MEDIOS MANUALES

1,298.42 1,266.72 1,298.42 0.00

ADMA004

AQDQUISICIN DE MATERIALES ASFLTICOS C) EMULSIONES ASFLTICAS. 1) EMULSIN ASFLTICA ECI-60

IDEM A PAAS022

1,298.42

1.50

1,947.63

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,947.63 1,900.08 1,947.63 0.00

RIEGOIMPREG001

RIEGO A) RIEGO DE IMPREGNACIN 1) EMULSIN ASFLTICA PARA IMPREGNACIN

IDEM A ADMA004

1,947.63

1947.63

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,947.63 1,900.08 1,947.63 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE ACA003 CONCEPTO ACARREOS DE LOS MATERIALES ASFLTICOS (INCISO 085H.03). C) DEL ALMACENAMIENTO AL LUGAR DE LA UTILIZACIN, MEDIDOS EN LOS VEHCULOS DE TRANSPORTE O EN LOS ENVASES: B) KILMETROS SUBSECUENTES UNIDAD M3/KM CADENAMIENTO IDEM A PAAS022 LARGO 1947.63 A-1 A-2 ANCHO PROMEDIO 115.00 FACTOR PIEZAS 0.001 SUBTOTAL 223.98 TOTAL CROQUIS/OBS.

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

223.98 218.51 223.98 0.00

PIADC007 POREO CON ARENA PARA PROTECCIN DE EMULSIN

M2

IDEM A PAAS022

1,298.43

1,298.43

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,298.43 1,266.72 1,298.43 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

5.000
PAAS022

CARPETA ASFALTICA
M2 BARRIDO A MANO DE LA SUPERFICIE POR TRATAR TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR 1,298.43 1,298.43

1,298.43 1,266.72 1,298.43 0.00

ADMA003

ADQUISICIN DE MATERIALES ASFLTICOS C) EMULSIONES ASFLTICOS. 1) EMULSIN ASFLTICA ECR-65

IDEM A PAAS022

1,298.43

1,298.43

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,298.43 1,266.72 1,298.43 0.00

RIEGOLIGA001

RIEGO O APLICACIN ASFLTICAS DE LAS EMULSIONES B) RIEGO DE LIGA 1) EMULSIN ASFLTICA

IDEM A ADMA003

1,298.43

1,298.43

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,298.43 1,266.72 1,298.43 0.00

ACA003

ACARREOS DE LOS MATERIALES ASFLTICOS ( INCISO 085 H 03 ) C) DEL ALMACENAMIENTO AL LUGAR E LA UTILIZACIN, M3/KM MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES B) KILOMETROS SUBSECUENTES

RIEGOLIGA001

1,298.43 115.00 0.001

149.32

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

149.32 145.67 149.32 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO RAMO33: 33:11172 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

16

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO A-1 A-2 ANCHO PROMEDIO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

22

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

CARP006

CARPETA DE CONCRETO ASFALTICO, ELABORADA A BASE DE MATERIAL PTREO ( 3/4"A FINOS ) Y AC-20, DE 6.00 CM DE ESPESOR COMPACTO ( SIN RIEGOS ) MENOS POZO DE VISITA MAXCOM MENOS POZO DE VISITA MAXCOM MENOS POZO DE VISITA MENOS REGISTRO AGUA

M2

IDEM A LIM002

1,308.43

1,308.43

3.1416 ( 0.42 )2= 0.55 3.1416 ( 0.38 )2= 0.45 3.1416 ( 0.38 )2= 0.45 1.27 1.32

1.00 2.00 5.00 1.00

-0.55 -0.90 -2.25 -1.68 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

1,303.05 1,303.05 1,266.72 1,303.05 0.00

ACA090

ACARREO EN CAMIN DE MATERIAL MIXTO PRIMER KILMETRO, CARGA MECANICA

M3

IDEM A CARP006

1,303.05

0.06

1.25

97.73

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

97.73 95.00 97.73 0.00

ACA093

ACARREO EN CAMIN DE MATERIAL MIXTO KILMETRO SUBSECUENTE . CARRETERA

M3/KM

IDEM A ACA090

97.73

115.00

11238.95

TOTAL PROYECTO

EST. 1 FINIQUITO
POR COBRAR

11,238.95 10,925.00 11,238.95 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

22

DE

NUMEROS GENERADORES
CLAVE 3060 18 CONCEPTO UNIDAD INC CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS 5.00 SUBTOTAL 5.00 TOTAL CROQUIS/OBS.

INCREMENTO O RENIVELACIN DE POZO DE VISITA TIPO COMN O ESPECIAL POR CADA 25 CM. NO INCLUYE SUMINISTRO Y COLOCACIN DE BROCAL Y TAPA

TOTAL PROYECTO

5.00 2.00 5.00 0.00

EST. 1 FINIQUITO
POR COBRAR

BROCA002

SUMINISTRO Y COLOCACIN DE BROCAL Y TAPA DE POLIETILENO MEDIA DENSIDAD CON MORTERO DE CEMENTO-ARENA DE 1:4

PZA

5.00

5.00 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

5.00 2.00 5.00 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

22

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

DENT001

CONSTRUCCIN DE DENTELLON TRANSVERSAL PARA CONFINAMIENTOS DE ADOQUIN O CONCRETO A BASE DE CONCRETO SIMPLE FC= 150 KG/CM2 CON UNA SECCIN DE 15X40 CM A CADA 8.00 M INCLUYE EXCAVACIN CIMBRA, ACARREO DEL MATERIAL SOBRANTE HASTA 20 M

CRUCERO CALLE LAZARO CARDENAS

4.34

CALLE 5 NORTE

LADO NORTE LADO SUR LADO NORTE LADO SUR

6.68 11.50 5.35 6.80 34.67

CRUCERO ENTRE CALLE LIBERTAD Y CALLE MIGEL HIDALGO

34.67 TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

34.67 71.69 34.67 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

22

DE

NUMEROS GENERADORES
CLAVE 6.000 SEALIZACIN SUMINISTRO Y APLICACIN DE PINTURA TIPO TRAFICO MARCA COMEX COLOR AMARILLO EN GUARNICIONES HASTA 35 CM DE DESARROLLO INCLUYE: LIMPIEZA Y DESPERDICIOS, MATERIALES, MANO DE OBRA Y HERRAMIENTA CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

PINT068

ENTRE CALLE ALVARO OBREGON Y CALLE LAZARO CARDENAS

26.40

LADO NORTE ENTRE CALLE LAZARO CARDENAS Y CALLE 5 NORTE LADO NORTE ENTRE CALLE ALVARO OBREGON Y CALLE 5 NORTE LADO SUR

30.70

7.60 30.70

30.70 30.70 30.70 6.16

ENTRE CALLE 5 NORTE Y CALLE MIGUEL HIDALGO LADO NORTE

12.40 30.70 30.70

LADO SUR LADO ORIENTE LADO ORIENTE

30.70 15.93 15.90

329.99

329.99

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

329.99 313.09 329.99 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

22

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

PAAS023

RAYA PARA CRUCE PEATONAL DE 60 CM DE ANCHO CON PINTURA TIPO TRANSITO MARCA COMEX COLOR AMARILLO

ESQ. ALVARO OBREGON LINEA DE ALTO

3.50 3.92

8.00 1.00

28.00 3.92

ESQ 5 NORTE LINEA DE ALTO LADO PTE ESQ. 5 NORTE LINEA DE ALTO LADO OTE

3.50 4.00

8.00 1.00

28.00 4.00

3.50 4.00

8.00 1.00

28.00 4.00

ESQ. MIGUEL HIDALGO LINEA DE ALTO

3.50 4.12

8.00 1.00

28.00 4.12

128.04

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

128.04 128.40 128.04 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: UBICACIN: LOCALIDAD: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

22

DE

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

PINDISC12 PINTURA DE RAYA DISCONTINUA DE 12 CM

ENTRE ALVARO OBREGON Y 5 NORTE

30.70 30.70 4.26

ENTRE 5 NORTE Y MIGUEL HIDALGO

30.70 7.86

104.22

104.22

104.22

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR 1.00

104.22 93.31 104.22 0.00

090-E.01A

SEAL RESTRICTIVA SR-6

PZA

ESQ.ALVARO OBREGON LADO NORTE

1.00

ESQ. 5 NORTE LADO SUR 1.00 1.00

ESQ. 5 NORTE LADO NORTE 1.000 1.00

ESQ. MIGUEL HIDALGO LADO SUR 1.00 1.00

4.00
TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

4.00 4.00 4.00 0.00


JEFE DE PROGRAMA HABITAT

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

28

DE

28

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS 1.00 SUBTOTAL TOTAL CROQUIS/OBS.

090-D.01C

SEAL PREVENTIVA DE LA SP-26 A LA SP-40

PZA

ESQ.ALVARO OBREGON LADO NORTE ESQ. 5 NORTE LADO SUR ESQ. 5 NORTE LADO NORTE ESQ. MIGUEL HIDALGO LADO SUR

1.00

1.00

1.00 4.00

TOTAL PROYECTO EST. 1 FINIQUITO POR COBRAR

4.00 4.00 4.00 0.00

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

28

DE

28

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

28

DE

28

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

28

DE

28

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

28

DE

28

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA No. DE CONTRATO: OBRA: RAMO 33:33: 11172 RAMO 11092 IO-821156985-N51-2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

RAMO 20: RAMO 20:

211561ME037

211561ME006

ESTIMACION: FECHA: PERIODO: HOJA

01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012


DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

UBICACIN: LOCALIDAD:

28

DE

28

NUMEROS GENERADORES
CLAVE CONCEPTO UNIDAD CADENAMIENTO LARGO ANCHO ALTO LOG. ACARREO FACTOR PIEZAS SUBTOTAL TOTAL CROQUIS/OBS.

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 1 DEMOLICION DE GUARNICIONES, BANQUETAS Y TALA DE ARBOL


E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 2 GUARNICIONES
E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 2 GUARNICIONES
ARQ. FRANCISCO SOTOMAYOR ALVAREZ
N
S E

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 3 GUARNICIONES
E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 3 GUARNICIONES
ARQ. FRANCISCO SOTOMAYOR ALVAREZ
N
S E

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 4 BANQUETAS
E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: 01| ( UNO ) FINIQUITO 13 DE JULIO DE 2012
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

PERIODO: DEL 04 DE JUNIO AL 13 DE JULIO DE 2012

CROQUIS 4 BANQUETAS
ARQ. FRANCISCO SOTOMAYOR ALVAREZ
N
S E

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 5 BANQUETAS
E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 5 BANQUETAS
ARQ. FRANCISCO SOTOMAYOR ALVAREZ
N
S E

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 6 TERRACERIAS
E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 6 TERRACERIAS
ARQ. FRANCISCO SOTOMAYOR ALVAREZ
N
S E

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 7 TERRACERIAS
E

POZO DE VISITA REGISTRO 1.30X1.85

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 7 TERRACERIAS
ARQ. FRANCISCO SOTOMAYOR ALVAREZ ARQ. MANUEL SANTIAGO COLOTLA ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA : No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 8 TERRACERIAS
E

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

ANEXO 17

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

ANEXO 17

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

ANEXO 17

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

ANEXO 2

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO:
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

ANEXO 2

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

ANEXO 1

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


RAMO 33: 11172 RAMO 20: 211561ME006 No. DE OBRA: No. DE CONTRATO: IO-821156985-N51-2011 CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE OBRA:
ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla.

ESTIMACION: FECHA: PERIODO:

01 (UNO)

UBICACIN: LOCALIDAD:

CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

CROQUIS

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO) 28 DE OCTUBRE DE 2011
DEL 20 DE SEPTIEMBRE AL 27 DE OCTUBRE DE 2011
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 9 ACARREOS
VIA PUEBLA ( CORREDOR INDUSTRIAL) ZONA DE DESAROLLO INDUSTRIAL
N

S
TELE SECUNDARIA
BE C . LI RTAD

LIENZO CHARRO

A V. D E LOS DE PORTES

C AM IN O DE L CA RNERO

CENTRO DE INTEGRACION SOCIAL


C AR RE

TE

RA

FED

ER

AL

M EX

IC O

-VERACRUZ

FEB RERO

C AN

AL

DE

VA

LS

EQUILLO

C . 5 DE

C . ALDAMA

ILIO C AR

RANZA

C . EM

C . JOSE

M AR IA

M ORELOS

C.

24

DE

FE

BR

ERO BR ERO

C.

17

DE

FE

. RA

MON CA BA

LLERO

. 16

SE

PTIEMBRE

REZ BE NI TO JUA

C.

V.

AM ON C AB ALLERO

C.

16 P

N IE O

NTE

C . 30 NORTE

C . 32 NORTE

C . 28 NORTE

C . 26 NORTE

C . 24 NORTE

C . 22 NORTE
C . 6 PONI EN T E

C . 20 NORTE

C . 18 NORTE

C . 20 D E NOVI EMBRE

C . 4 PONI EN T E

A V.

FRA

C . 16 NORTE

NC

C. 4 O R IE NT E

IS CO

I . MADERO

PARQUE ECOLO GICO

C . 1 NORTE

C. 2 O R IE NT E

A V. I ND EP EN DE NC IA P O NIENT E
A V. I ND EP EN DE NC IA O RIENT E

A V. R EFOR MA N ORTE

C . 1 D E AGUS TI N A. C ACHO

C . RA YON

C . 3 SUR

A V. R EFOR MA SUR

PARQUE "JUAREZ"
C . 1 SUR

C . 5 SUR

C. 1 O R IE NT E

C . 1 D E GR AL. JOSE M AR IA M OR ELOS Y PAVON C . 2 D E GR AL. JOSE M AR IA M OR ELOS Y PAVON

C. G A BI NO B ARREDA

MERCADO 16 DE MARZO

C. 3 O R IE NT E

C. 5 O R IE NT E

IMAGEN URBANA

CIRCUITO INTERIOR
A EL AYALA N IE NTE O RA F C . 15 P O

ALIN AS D E GORTARI

S AN TA M ONICA

C . 20 S UR O

C . CA RLOS S

C . EL R OS ARIO

C . 22 S UR O A GU STIN D E ITUR BIDE

C . 17 P ON I E N TE

OANT O NIONARRO

C . SA NTA ELVIRA

C . 19 P O N IE NT E

CIRCUITO MEDIO

CORREDOR UNIVERSITARIO

DISTANCIA DE TIRO 7 KM
SUPERINTENDENTE DE CONSTRUCCION RESIDENTE DE OBRA (MUNICIPIO) JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


No. DE OBRA: No. DE CONTRATO: OBRA: RAMO 33: 11172 IO-821156985-N51-2011 RAMO 20: 211561ME006 ESTIMACION: FECHA: PERIODO: 01 (UNO)
CONSTRUCCIN DE PAVIMENTO ASFLTICO Y OBRAS COMPLEMENTARIAS EN LA CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. CALLE LIBERTAD ENTRE CALLE ALVARO OBREGN Y CALLE MIGUEL HIDALGO DE LA COLONIA LOMAS DE LA SOLEDAD , HBITAT,de este Municipio de Tehuacn, Puebla. TEHUACAN, PUEBLA.

UBICACIN: LOCALIDAD:

CROQUIS 10
ACARREO DE MATERIALES ASFALTICOS
METLALTOYUCA A ALAMO

VENUSTIANO CARRANZA

A POZA RICA

MEX 130

XICOTEPEC DE JUAREZ

H I DALGO

A TULANCINGO DE BRAVO

HUAUCHINANGO

AYOTOXCO DE GUERRERO TEPANGO DE RODRIGUEZ CUETZALAN

MEX 119

A TLAPACOYAN ZACATLAN ZACAPOAXTLA TLATLAUQUITEPEC CHIGNAHUAPAN HUEYTAMALCO

MEX 119

ZARAGOZA

TEZIUTLAN

A JALACINGO

MEX 129

A TLAXCO

V ER A

TLAXCALA
LIBRES A CALPULALPAN A XICOTENCATL A MEXICO A TLAXCALA A HUAMANTLA SAN MARTIN TEXMELUCAN DE LABASTIDA Y SANTA MARIA MOYOTZINGO A ZACATELCO
MEX 129

A PEROTE

C RU

ORIENTAL GPE. VICTORIA

QUIMIXTLAN
MEX 140

HUEJOTZINGO TLACHICHUCA CHOLULA DE RIVADABIA Y SAN ANDRES CHOLULA AMOZOC

Banco de Carpeta DE MOTA


*

CHIPILO Banco de Emulsin


ATLIXCO

H. PUEBLA DE ZARAGOZA
CIUDAD SERDAN

5 KMS.

TEPEACA ACATZINGO DE HIDALGO TECALI DE HERRERA


MEX 150

TECAMACHALCO A ORIZABA

MEX 190

115 KMS.
MOLCAXAC TLAPANALA A CUAUTLA
MEX

M ORELOS
A AXOCHIAPAN

160

MEX

IZUCAR DE MATAMOROS

150

COATZINGO

TEPEXI DE RODRIGUEZ

TEHUACAN SAN JUAN IXCAQUIXTLA


MEX 190

TLACOTEPEC DE DIAZ AJALPAN

TEHUITZINGO JOLALPAN CHIAUTLA DE TAPIA

MEX MEX 125 135

TR

FO TO GR AM

COXCATLAN

AZ O NO
O RIC ET

ACATLAN A ATENANGO DEL RIO DE OSORIO A HUAJUAPAN DE LEON

A OAXACA A OAXACA

TULCINGO DE VALLE

A HUAMUXTITLAN A HUAJUAPAN DE LEON

OAXACA

GU ERRERO

SUPERINTENDENTE DE CONSTRUCCION

RESIDENTE DE OBRA (MUNICIPIO)

JEFE DE PROGRAMA HABITAT

ARQ. FRANCISCO SOTOMAYOR ALVAREZ

ARQ. MANUEL SANTIAGO COLOTLA

ARQ. JAIME ARNULFO VERA CASILLAS

MUNICIPIO DE TEHUACN, PUEBLA. 2011-2014


01 (UNO)

CROQUIS 10

EO DE MATERIALES ASFALTICOS

JEFE DE PROGRAMA HABITAT

ARQ. JAIME ARNULFO VERA CASILLAS

CLAVE
TAL002

CONCEPTO
TALA DE ARBOL DE 0.76 A 1.50 M. DE PERIMETRO ( CORTADO A 1.00 M DEL NIVEL DEL TERRENO )

UNIDAD PZA

CANTIDAD 3.00

P.U 372.61

EXT002

EXTRACCIN DE TOCONES DE 0.76 A 1.50 M DE PERIMETRO INCLUYE DESENRAICE

PZA

3.00

806.03

DEM006

DEMOLICIN A MANO DE CONCRETO SIMPLE EN GUARNICIONES

M3 M2

7.45 115.60

261.89 16.19

1000 03 RUPTURA Y DEMOLICIN A MANO DE CONCRETO SIMPLE EN BANQUETAS

ACA090

ACARREO EN CAMIN DE MATERIAL MIXTO PRIMER KILOMETRO CARGA MECANICA

M3 M3/KM

44.83 268.98

21.38 4.21

ACA091

ACARREO EN CAMIN DE MATERIAL MIXTO KILOMETRO SUBSECUENTE ZONA URBANA

TRA004

TRAZO Y NIVELACIN DE PLAZAS, ANDADORES, BANQUETAS Y PAVIMENTOS, PRIMEROS 10,000 M2

M2

57.10

2.88

EXCA001

EXCAVACIN A MANO EN ZANJA, INCLUYE AFINE DE TALUDES Y FONDO. MATERIAL COMN SECO, CUALQUIER ZONA, PROFUNDIDAD DE 0.00 A 2.00

M3

17.13

79.90

RELL004

RELLENO Y COMPACTACIN EEN CIMENTACIN EN CAPAS DE 20 CM. CON PISON DE MANO UTILIZANDO EL MATERIAL PRODUCTO DE EXCAVACIN , INCLUYE: TRASPALEOS AGUA PARA HOGENEIZAR EL MATERIAL , HERRAMIENTA, MANO DE OBRA Y ACARREOS, MATERIAL MEDIDO EN SITIO.

M3

7.34

70.70

CIMB039

CIMBRADO Y DESCIMBRADO CON CHAROLAS MTALICAS, A DOS CARAS

M2

91.77

58.36

CON003

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES FC= 150 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACIN, INCLUYE: ELABORACIN , VACIADO, VIBRADO Y CURADO.

M3

14.27

1,429.74

PICAC006

ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO

203.94

6.59

LIM005

LIMPIEZA GENERAL DURANTE LA OBRA INCLUYE ACARREOS DE ESCOMBROS, ETC.

M2

57.10

5.02

TRA004

TRAZO Y NIVELACION DE PLAZZAS, ANDADORES, BANQUETAS Y PAVIMENTOS, PRIMEROS 10,000 M2

M2

248.32

2.88

RELL005

RELLENO COMPACTADO DE TIERRA IMPIA TRAIDA DE FUERA DE LA OBRA

M3

24.89

128.06

CIMB040

CIMBRADO Y DESCIMBRADO CON MADERA DE 3a. ACABADO COMN, EN FRONTERA DE COLADO

M2

11.73

136.45

CON003

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL VACIADO CON CARRETILLA Y BOTES FC= 150 KG/CM2 REVENIMIENTO DE 10 CM AGREGADO MAXIMO 3/4" EN CIMENTACIN, INCLUYE: ELABORACIN , VACIADO, VIBRADO Y CURADO.

M3
PICAC005 ACABADO ESCOBILLADO SOBRE CONCRETO EN PISOS Y BANQUETAS

24.58

1,429.74

M2

223

15.16

PICAC006

ACABADO CON VOLTEADOR METLICO EN ARISTAS O JUNTAS DE GUARNICIONES, FIRMES, O PISOS DE CONCRETO. LIMPIEZA GENERAL DURANTE LA OBRA INCLUYE ACARREOS DE ESCOMBROS, ETC. LIMPIA, TRAZO Y NIVELACIN PARA REAS DE A URBANIZAR, INCLUYE: LOCALIZACIN DE EJES, COTAS, NIVELES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.

458.56

6.59

LIM005

M2

248.32

5.02

LIM002

M2

1,308.43

6.67

EXCA023-2

EXCAVACIN EN CAJA POR MEDIOS MECNICOS EN TERRENO TIPO I Y II CUALQUIER ZONA, ( CON MOTONIVELADORA ) ACARREO EN CAMIN DE MATERIAL MIXTO, PRIMER KILMETRO, CARGA MECNICA

M3

441.65

10.80

ACA090

M3

574.65

21.38

ACA091

ACARREO EN CAMIN DE MATERIAL MIXTO KILMETRO SUBSECUENTE, ZONA URBANA

M3/KM

3,447.00

4.21

PAAS020

ESCARIFICADO O RASTREO DE TERRENO CON MOTONIVELADORA

M3

259.68

2.59

PAAS011

COMPACTACIN DE TERRENO NATURAL EN CAPAS DE 20 CM DE ESPESOR POR MEDIOS MECANICOS

M2

1,298.42

7.74

BASE-001

BASE HIDRAULICA CON MATERIAL QUE CUMPLA CON LAS NORMAS VIGENTES DE LA S.C.T. COMPACTADO AL 95% DE SU P.V.S.M. ( P.V.S.M. COMPRENDIDO ENTRE 1,850 A 1,950 KG/CM3 ). INCLUYE AGUA, INCORPORACIN, SUMINISTRO DE MATERIALES, MANO DE OBRA, MAQUINARIA, HERRAMIENTA ( 3.01. 0.3. 073. 03. 074 )

M3
PAAS022 BARRIDO A MANO DE LA SUPERFICIE POR TRATAR POR MEDIOS MANUALES

259.68

210.75

M2

1,298.42

0.28

ADMA004

AQDQUISICIN DE MATERIALES ASFLTICOS C) EMULSIONES ASFLTICAS. 1) EMULSIN ASFLTICA ECI-60

1,947.63

8.89

RIEGO A) RIEGO DE IMPREGNACIN 1) RIEGOIMPREG001 EMULSIN ASFLTICA PARA IMPREGNACIN

1,947.63

0.45

ACA003

ACARREOS DE LOS MATERIALES ASFLTICOS (INCISO 085-H.03). C) DEL ALMACENAMIENTO AL LUGAR DE LA UTILIZACIN, MEDIDOS EN LOS VEHCULOS DE TRANSPORTE O EN LOS ENVASES: B) KILMETROS SUBSECUENTES

3/KM

223.98

5.07

PIADC007

POREO CON ARENA PARA PROTECCIN DE EMULSIN

M2

1,298.43

2.70

PAAS022

BARRIDO A MANO DE LA SUPERFICIE POR TRATAR

M2

1,298.43

0.28

ADMA003

ADQUISICIN DE MATERIALES ASFLTICOS C) EMULSIONES ASFLTICOS. 1) EMULSIN ASFLTICA ECR-65

1,298.43

9.48

RIEGOLIGA001

RIEGO O APLICACIN ASFLTICAS DE LAS EMULSIONES B) RIEGO DE LIGA 1) EMULSIN ASFLTICA

1,298.43

0.45

ACA003

ACARREOS DE LOS MATERIALES ASFLTICOS ( INCISO 085 H 03 ) C) DEL ALMACENAMIENTO AL LUGAR E LA UTILIZACIN, MEDIDOS EN LOS VEHICULOS DE TRANSPORTE O EN LOS ENVASES B) KILOMETROS SUBSECUENTES

M3/K M

149.32

5.07

CARP006

CARPETA DE CONCRETO ASFALTICO, ELABORADA A BASE DE MATERIAL PTREO ( 3/4"A FINOS ) Y AC-20, DE 6.00 CM DE ESPESOR COMPACTO ( SIN RIEGOS )

M2

1,303.05

160.1

ACA090

ACARREO EN CAMIN DE MATERIAL MIXTO PRIMER KILMETRO, CARGA MECANICA

M3

97.73

21.38

ACA093

ACARREO EN CAMIN DE MATERIAL MIXTO KILMETRO SUBSECUENTE . CARRETERA

M3/KM

11,238.95

1.75

3060 18

INCREMENTO O RENIVELACIN DE POZO DE VISITA TIPO COMN O ESPECIAL POR CADA 25 CM. NO INCLUYE SUMINISTRO Y COLOCACIN DE BROCAL Y TAPA SUMINISTRO Y COLOCACIN DE BROCAL Y TAPA DE POLIETILENO MEDIA DENSIDAD CON MORTERO DE CEMENTO-ARENA DE 1:4 CONSTRUCCIN DE DENTELLON TRANSVERSAL PARA CONFINAMIENTOS DE ADOQUIN O CONCRETO A BASE DE CONCRETO SIMPLE FC= 150 KG/CM2 CON UNA SECCIN DE 15X40 CM A CADA 8.00 M INCLUYE EXCAVACIN CIMBRA, ACARREO DEL MATERIAL SOBRANTE HASTA 20 M

PZA

5.00

709.14

BROCA002

PZA

5.00

1,565.44

DENT001

34.67

181.75

PINT068

SUMINISTRO Y APLICACIN DE PINTURA TIPO TRAFICO MARCA COMEX COLOR AMARILLO EN GUARNICIONES HASTA 35 CM DE DESARROLLO INCLUYE: LIMPIEZA Y DESPERDICIOS, MATERIALES, MANO DE OBRA Y HERRAMIENTA

329.99

22.31

PAAS023

RAYA PARA CRUCE PEATONAL DE 60 CM DE ANCHO CON PINTURA TIPO TRANSITO MARCA COMEX COLOR AMARILLO

128.04

52.82

PINDISC12 PINTURA DE RAYA DISCONTINUA DE 12 CM

104.22

7.36

090-E.01A

SEAL RESTRICTIVA SR-6

PZA
090-D.01C SEAL PREVENTIVA DE LA SP-26 A LA SP-40

4.00

1,216.16

PZA

4.00

1,216.16

HBITAT FEDERAL 2012 FORTAMUN 2012 TOTAL

$ 287,444.00 $ 287,444.00 $ 574,888.00

DIFERENCIA

IMPORTE $ 1,117.83

2,418.09

$ $

1,951.08 1,871.56

$ $

958.47 1,132.41

164.45

1,368.69

518.94

5,355.70

20,402.39

1,343.96

286.64

715.16

3,187.41

1,600.56

35,143.01

3,380.68

3,021.91

1,246.57

8,727.23

4,769.82

12,286.02

14,511.87

672.57

10,049.77

54,727.56

363.56

17,314.43

876.43

1,135.58

3,505.76

363.56

12,309.12

584.29

757.05

208,618.31

2,089.47

19,668.16

3,545.70

7,827.20

6,301.27

7,329.08

6,763.07

767.06

4,864.64

4,864.64 CONTRATO $ 467,842.72 $ 74,854.84 $ 542,697.56 $ 40,530.36

$ $ $ $ $