CRONOGRAMA DE OBRA EN DIAGRAMA DE BARRAS GANTT

OBRA
:MEJORAMIENTO VIAL DE LOS PJES.: TUMI, PEREZ Y CARRION DEL DISTRITO DE CHILCA - HUANCAYO JUNIN
DISTRITO
: CHILCA
PROVINCIA
: HUANCAYO
DPTO.
: JUNIN
Tiempo de ejecucin del proyecto = 90 das.
Item

Descripcin Partida

UND

METRAD
O

P. UNIT.

TOTAL

DIAS
15

30

45

60

75

90

PAVIMENTO FLEXIBLE
01.00

OBRAS PROVISIONALES

02.00

GLB

1.00

10,752.96

10,752.96

GLB

1.00

6,400.53

6,400.53

03.00

MOVIMIENTO DE TIERRA

GLB

1.00

6,081.04

6,081.04

04.00

ELIMINACION DE MATERIAL EXCEDENTE

GLB

1.00

14,527.32

14,527.32

100.00%
3,200.27

3,200.27

50.00%

50.00%
6,081.04
100.00%
14,527.32
100.00%

RED DE DESAGUE

05.00
05.01

MOVIMIENTO DE TIERRA

GLB

1.00

9,922.09

9,922.09

05.02

CONSTRUCCION DE BUZONES

GLB

1.00

1,457.48

1,457.48

05.03

TENDIDO DE TUBERIAS

GLB

1.00

10,667.61

10,667.61

05.04

CONEXIONES DOMICILIARIAS

GLB

1.00

8,922.92

8,922.92

9,922.09
100.00%
1,457.48
100.00%
5,333.81
50.00%

5,333.81
50.00%
8,922.92
100.00%

RED DE AGUA POTABLE

06.00
06.01

LINEA DE DISTRIBUCION

GLB

1.00

14,764.52

14,764.52

06.02

CONEXIONES DOMICILIARIAS DE AGUA POTABLE

GLB

1.00

8,956.97

8,956.97

1.00

4,574.51

4,574.51

7,382.26

7,382.26

50.00%

50.00%
8,956.97
100.00%

EXPLANACIONES

07.00
07.01

10,752.96

ESCARIFICADO PERFILADO Y COMPACTADO

GLB

4,574.51
100.00%

PAVIMENTO

08.00
08.01

MEJORAMIENTO DE SUB RASANTE

GLB

1.00

15,523.75

15,523.75

08.02

SUB BASE GRANULAR E=0.15 mts

GLB

1.00

15,560.21

15,560.21

08.03

BASE GRANULAR E=0.15 mts

GLB

1.00

15,560.24

15,560.24

08.04

CARPETA ASFALTICA

GLB

1.00

73,788.46

73,788.46

7,761.88

7,761.88

50.00%

50.00%
7,780.11
50.00%

7,780.11
50.00%
7,780.12
50.00%

7,780.12
50.00%
73,788.46
100.00%

CRONOGRAMA DE OBRA EN DIAGRAMA DE BARRAS GANTT


OBRA
:MEJORAMIENTO VIAL DE LOS PJES.: TUMI, PEREZ Y CARRION DEL DISTRITO DE CHILCA - HUANCAYO JUNIN
DISTRITO
: CHILCA
PROVINCIA
: HUANCAYO
DPTO.
: JUNIN
Tiempo de ejecucin del proyecto = 90 das.
Item

Descripcin Partida

UND

METRAD
O

P. UNIT.

TOTAL

30

45

60

7,168.22

7,168.22

50.00%

50.00%
6,621.05

75

90

PAVIMENTO
FLEXIBLE
DRENAJE

09.00
09.01

CUNETA

GLB

1.00

14,336.43

14,336.43

09.02

BADEN

GLB

1.00

6,621.05

6,621.05

100.00%

ACERA PEATONAL

10.00
10.01

SARDINEL

GLB

1.00

24,596.47

24,596.47

10.02

VEREDAS

GLB

1.00

28,540.29

28,540.29

10.03

RAMPAS

GLB

1.00

294.58

294.58

11.00

SEALIZACION

GLB

1.00

5,242.96

5,242.96

12.00

JARDINERIA

GLB

1.00

986.73

986.73

13.00

MEDIO AMBIENTE

GLB

1.00

639.10

639.10

14.00

VARIOS

GLB

1.00

15,730.31

15,730.31

A
B
C
F
D

DIAS
15

TOTAL COSTO DIRECTO


GASTOS GENERALES (10.0% de A)
SUPERVISION DE OBRA (4.00% de A)
TOTAL GENERAL A+B+C
PORCENTAJE

314,448.53
31,444.85
12,577.94
358,471.32
100.00%

12,298.24

12,298.24

50.00%

50.00%
14,270.15
50.00%

14,270.15
50.00%
294.58
100.00%
5,242.96
100.00%

2,621.72
16.67%
33,879.30
3,387.93
1,355.17
38,622.40
10.77%

493.37

493.37

159.78

50.00%
159.78

50.00%
159.78

159.78

25.00%
2,621.72
16.67%
41,410.51
4,141.05
1,656.42
47,207.98
13.17%

25.00%
2,621.72
16.67%
63,604.57
6,360.46
2,544.18
72,509.21
20.23%

25.00%
2,621.72
16.67%
67,779.19
6,777.92
2,711.17
77,268.28
21.55%

25.00%
2,621.72
16.67%
18,341.72
1,834.17
733.67
20,909.56
5.83%

2,621.72
16.67%
89,433.25
8,943.31
3,577.33
101,953.89
28.44%