CV Ivor Goodone
Address Line 1
Address Line 2
Tyne and Wear
Post Code

Telephone: 0191 123456. Mobile: 07712 123456. Email: ivorgoodone@email.com


                                                                             
MECHANICAL COMMISSIONING ENGINEER
 Fabrication – Commissioning – Operational Management – Supervision 

Time-served with considerable Mechanical Construction experience: ship repairs / refits from fabrication
through to completion, including factory maintenance, oil rig FPSO refits and installations of hydraulics
pneumatics, tail ends, thrusters, steering gear, pipe work, compressors, valves, main engines (Sulzer,
Merlies and Doxford) and Gas Turbines. Experience covers HVAC, commissioning, power station
shutdowns (Nationwide). Fabrication, installation and work on Oil Rigs as well as petro-chemical plant
shutdowns in time critical situations.
__________________________________________________________________________________________________________

AREAS OF E XP ERTISE
• Ship repairs / refits • Commissions / handover • Operational management
• Fabrication • Factory maintenance • Resource management
• Hydraulics / pneumatics • Supervision / team leadership • Health and Safety
• Oil Rig FPSO / HVAC • Problem solving • Shutdowns

PROFESSIONAL DEVELOPMENT
European Safety Passport 2004
OPITO Offshore Safety Induction & Emergency Training Valid - Nov 07
AMEC Courses Permit to Work, Risk Assessments, Gas Detection / Monitoring. 2000 - 01
Medical Current to 2006
SCATS Card Number 154835

PROFESSIONAL EXPERIENCE AND ACHIEVEMENTS


EMAC AGL (BP Clair)
MECHANICAL COMMISSIONING ENGINEER Aug 04 – Dec 04
MECHANICAL FOREMAN Mar 04 – Aug 04
Hands-on responsibility for overseeing a mechanical workforce of up to 30 personnel. Daily workpacks
and job cards. Mechanical Construction through to completion.
• Installed and commissioned mechanical packages.
• Organised “permits to work”.
• Dealt with vendors, liaison with BP and Commissioning group.

EMAC Upstream Oil and Gas, Liverpool (Bonga Project)


MECHANICAL FIELD ENGINEER Mar 04 – Aug 04
• Responsible for mechanical activities for the following Topside Modules on the FPSO: Main Pipe Racks (7
off approximately 150 metres long), Water Injection (2 Solar Gas Turbine Driven Sulzer Pumps), Oil
Offloading and Metering, Sub Sea (2 modules), Process (2 modules), Export Gas Metering, Gas
Compression for Export (3 Modules, Solar Gas Turbine Driven Demag Compressors), Gas Compression
Control Building, Flare Scrubber.
• Worked closely with AMEC Commissioning Group.
• Liaised with on Site Designers for all disciplines, the SNEPCO Client Site Team, HSE Department and the
Permit to Work Office.
• Implemented HSE Policy, ensuring safe and environmentally sound methods of working.
• Installed Loss Control Equipment on the FPSO.
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________

PROFESSIONAL EXPERIENCE & ACHIEVEMENTS (CONTINUED)


EMAC Upstream Oil and Gas, Liverpool (Bonga Project)

• Operational Management: organised availability of resources (labour, plant, equipment, tools and
materials), from design to hand-over: installed equipment through to Mechanical Completion (in the
form of Field Test Records) .
• Daily resolutions of all construction related problems.
• Interfaced with representatives from other construction sites (especially regarding “Carrying over
Work”) and major equipment vendors’ representatives. Liaised with all other disciplines involved with
the construction on site.
• Wrote permits to work on petro-technics (ISSOW) system, method statements, risk assessments, and
field test reports (FTR).
• Preserved and Maintained all stored and installed equipment.
• Daily discussions with Supervision to ensure all work was being efficiently progressed.
• Identified and requisitioned materials.
• Ensure all work was mechanically completed in accordance with drawings, specifications and
procedures as part of the Completions Procedures.

EARLY CAREER SUMMARY

Tank Machinery Installer Brackett and Green, Howdon Sewage Works Nov 02 – Dec 02
Weir Pumps Wylfa Head Nuclear Power, Angelsey Aug 02 – Nov 02
Weir Services Cottam Power Station Jun 02 – Aug 02
Robot Installation Beck & Politzer (Toyota, Derby) Jan 02 - Jun 02
SABWABCO Carlisle Site, Rolling Stock Commissioning Oct 01 – Dec 01
FPSO Commissioning Swan Hunter Shipbuilders, Aug – Oct 01
Engineer
Turbine Engineer Innogy (TSG Ferrybridge), Didcot Power May-Jul 01
Station, Gas
Robotic installation Nissan MMUK, Sunderland, New Primera Mar-Apr 01
Mechanical Engineer A&P Appledore Tyne Ltd, Wallsend Feb-Mar 01
AMEC Process and Energy Ltd ICI Wilton 1999 - 00
Chemical Work shutdowns
CATS Terminal Seal Sands, shutdown 1999 - 00
Union Carbide, Teesside 1999 - 00
AMEC Process and Energy Limited, Wallsend, 1998 - 99
Offshore Modules
A&P Appledore Tyne Ltd, Wallsend 1995 - 98
Centre Manager Robson Plant Hire, North Shields 1991
Mechanical Engineer AMEC Offshore, Offshore Modules 1990 – 91
Swan Hunter Shipbuilders, Wallsend 1988 - 90
Wm. Press Production Systems Ltd, Wallsend 1982 - 88

* * *
PERSONAL:
Driving: Full clean licence.
Status: Single.
Born: 1969
_______________________________________________________________________________

CV Writing | CV Templates | Work at Home | Work Abroad

> Download CV Templates Templates at www.cvxl.org <

________________________________________________________________________________
CV Template by First Impressions

Вам также может понравиться