Вы находитесь на странице: 1из 3

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

DATA SHEET PREPARED BY GKC FOR EACH PIPELINE CROSSING FOR KBC DIVISION No. 1/1,RADHANPUR Name of the Sub Branch Canal/ Distributary/Minor Off taking from which Canal Off taking Chainage from Parent Canal Exact Chainage of Canal at point of Crossing in KM Chainage of Pipeline at point of Crossing ( May be available from Pipe Line company upon request ) Whether Canal is in Full Banking, Partial Banking and Partial Cutting or in Cutting Please mention. Design Discharge in Cumecs Angle of Crossing of Canal and Pipeline in Degrees Bed Gradient ( Slope ) Velocity in m/sec Canal Bed Width in m Canal Bed Level in m Full Supply Level in m Full Supply Depth in m Total Free Board in m Top of Bank Level in m Width of Service Road in m Width of Inspection Path in m Inner Slope of Canal ( H:V) Outer Slope of Canal (H:V) Thickness of Lining in cm Concrete Grade of Lining Allowable Head Loss in m Land Width in m from Centre of the Canal on both Service Road (SR ) Side Land Width in m from Centre of the Canal on both Inspection Path (IP) Side Total Land Width in m Actual Depth of Pipe Line from Ground Level in m Type of Soil Soft Soil / Hard Soil / Soft Rock Is Strata Sandy? Write Yes or No. Position of Water Table from Ground Level in m

Data by GKC

Data by Pipeline Company/Secon

Вам также может понравиться