A Breakdown of Activities for the Project Tentative Master Programme of A & A Works for Nuclear Medicine and PET

CT Centre at ALG2 of HKBH (Ref: AEFD/SI010(P12-20)/2013) Builders works - Ceiling - Wall - Floor - Door - Floors - Fixtures Building Services - Air-conditioning Equipment Installation Primary air handling unit (PAU) Exhaust fans Air side/water side control LMCP at exhaust air fans (Uptake room 1) Pressure monitoring device Variable air volume flow rate control box Air-side Air diffusers Fresh and exhaust air louvres Supply and exhaust air ducts Non-return air damper Exhaust and return air grilles Fan coil units Duct insulation Water-side Chilled water flow and return (from chiller to PAU and FCUs) Pipe Insulation Flow balancing and associated equipment Valves Dampers

Electrical services Small Power Socket outlets with on/off switch and indication lamp Trunking, RCD, cables, GI conduit and fixing accessories Fuse Spur Unit Socket outlet for data, telephone and computer (Trunking.) Socket outlet for master clock (Trunking) Socket outlet for TV Projector system Intercom system (Trunking) CCTV MCB board MCCB board XLPE cables Fuse switch Changeover switch Emergency stop switch Red operation indication light to power distribution box Metal Trunking for IT cables UPS power supply Lighting Downlights (dimmable, N & E, Trunking..) LED spot lights T5 luminaires (N & E) T5 dimmable luminaries Direction, exit signs T5 tubes for light troughs

Fire services Smoke detectors including cables. Hose Reels FS Visual lights Plumbing and drainage

Вам также может понравиться