Вы находитесь на странице: 1из 1

Sheet1

COPYRIGHT 1992 MITCHELL ENGINEERING PO BOX 1492 GOLDEN CO USA 303 273 3744

LEAD OF TARGET PATH

0.017453

R
20
2178
3216
524

Right Turn Lead or Left Turn Lead; (R or L)

3884.11
1.2217
5678.19

Length of Chord; ft
70
Radius of Arc, R; ft

1.01
3964.13
5335.76
1942.06
1418.06
0.2524
162.52
0.9755
0.6264
-3328.94
4600.00
0.5607
0.8280
1089.00
1608.00
0.8280
-0.5607
293.83
433.87
428.39
342.74
0.6617
-0.7498
5864.00
1464.46
1526.38
1311.79
0.7498
0.6617

41.4307
428.39
342.74

Lead Angle; degree


North Target Coordinate; ft
East Target Coordinate; ft
Distance Along Section to the Target, a; ft
Epsilon; rad, deg

Turn Gradient of Arc; deg/100ft


Length of Arc; ft
e
d
c
14.4620
b
55.89261841
35.89261841
N5
E5
cosa1-2
cosb1-2
N6
E6
cosa5-6
cosb5-6
N4
E4
N3
E3
cosa3-5
cosb3-5
Length 5-7
Length 3-7
N7
E7
cosa3-7
cosb3-7

Lambda; rad, deg


Theta; rad, deg
Sigma; rad, deg

1
sum

1
sum

1
sum

1
sum

Azimuth of Tangent at Point 3; rad, deg


North Coordinate of Point 3; ft
East Coordinate of Point 3; ft

Page 1

Вам также может понравиться